Article 1 (Purpose) The purpose of this Ruleis to prescribe matters delegated by the Electric Safety Management Act and the Enforcement Decree of the same Act , and matters necessary for the implementation thereof.
Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Dec. 20, 2023>
1. “Electric receiving facilities” refers to power receiving facilities and internal power distribution facilities.
2. “Receiving facility” refers to an electrical facility for receiving electricity from another person’s electrical facility or on-site power generation facility and supplying electricity to an on-site distribution facility, and refers to the facility from the receiving point to the distribution panel (referring to an electrical facility that distributes electricity to an on-site distribution facility).
3. “In-house power distribution facilities” refers to power lines, switches, circuit breakers, distribution boxes, outlets, control panels, switches, and other auxiliary facilities extending from the distribution panel of the power receiving facility to the electrical equipment.
4. “Low voltage” means low voltage as defined in subparagraph 8 of Article 2 of the Enforcement Rules of the Electric Power Business Act .
5. “High voltage” means high voltage as defined in subparagraph 9 of Article 2 of the Enforcement Rules of the Electric Power Business Act .
6. “Extra-high voltage” means extra-high voltage as defined in subparagraph 10 of Article 2 of the Enforcement Rules of the Electric Power Business Act .
7. “Lightning protection equipment” refers to equipment intended to protect a specific space, facility, or electrical equipment from the effects of lightning.
Article 3 (Construction Plans Requiring Approval and Notification) ① The subjects subject to approval and notification for installation or modification construction plans for private electrical facilities pursuant to the first part of Article 8 , Paragraph 1 and the first part of Paragraph 2 of the Electric Safety Management Act (hereinafterreferred to as the “Act”) are as set forth in Table 1 .
② In Article 8, Paragraph 3 of the Act , the term “private electrical facilities corresponding to low voltage as prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” refers to private electrical facilities corresponding to low voltage (excluding energy storage devices and uninterruptible power supply systems). <Amended Dec. 6, 2023; Oct. 1, 2025>
Article 4 (Application for Approval, etc. of Construction Plan) ① Any person who intends to apply for approval or modification approval of a construction plan pursuant to Article 8, Paragraph 1 of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval (modification approval)of a construction plan in the form of Annex No. 1, attaching documents prepared in accordance with the method of applying for approval (modification approval) of a construction plan pursuant to Annex 2. <Amended Oct. 1, 2025>
② Any person who intends to report a construction plan or a change report pursuant to Article 8, Paragraph 2 of the Act shall submit the construction plan report (change report) in Form No. 2 of the Attached Form, along with documents prepared in accordance with the method of reporting a construction plan (change report) pursuant to Table 2 of the Attached Table , to the Korea Electrical Safety Corporation (hereinafter referred to as the “Safety Corporation”) pursuant to Article 30 of the Act .
Article 5 (Standards and Procedures for Unavoidable Construction, etc.) ①Any person who has commenced unavoidable construction pursuant to Article 8, Paragraph 4 of the Act shall submit a report on unavoidable construction in the form of Annex 3 to the Mayor of a Special City, Metropolitan City, Special Self-Governing City, Governor of a Province, or Governor of a Special Self-Governing Province (hereinafter referred to as “Mayor/Governor of a City/Province”) or the Director of the Free Trade Zone Management Agency (limited to cases of private electrical facilities within a free trade zone pursuant to Article 2, Paragraph 1 of the Act on the Designation and Operation of Free Trade Zones) within 10 days from the start date of construction.
② The following documents must be attached to the report under Paragraph 1.
1. Document outlining the overview and necessity of the project
2. If construction is required pursuant to Article 8 , Paragraph 1 or 2 of the Act after the relevant construction, the construction plan
③ In cases where construction is carried out due to unavoidable circumstances pursuant to Article 8, Paragraph 4 of the Act , the following matters must be observed.
1. Obtain confirmation of the construction plan from the Electrical Safety Manager pursuant to Article 22 of the Act (hereinafter referred to as the “Electrical Safety Manager”), and ensure that the construction is carried out under the supervision of the Electrical Safety Manager.
2. Ensure that construction does not cause harm to people or impede the safety of surrounding buildings or other facilities.
Article 6 (Subjects, Standards, and Procedures, etc., of Pre-use Inspection) ①Electrical facilities subject to a pre-use inspection pursuant to Article 9 of the Act (hereinafter referred to as “pre-use inspection”) shall be electrical facilities for which installation or modification work is performed after obtaining approval for a construction plan or filing a report pursuant to Article 8 of the Act. However, a pre-use inspection may be waived in any of the following cases: <Amended Oct. 1, 2025>
1. When using temporarily to test electrical equipment
2. When a part of an electrical installation is completed and it is necessary to temporarily use that completed part to test other electrical installations
3. Cases where the Minister of Climate, Energy and Environment recognizes and announces that there is no impediment to safety, considering the details of the electrical installation work and the conditions of the installation site.
② Pre-use inspection of welded parts among electrical facilities under Paragraph 1 shall be performed for boilers, turbines, pressure vessels, liquefied gas storage tanks, liquefied gas vaporizers, gas holders, towers of wind power plants, and refrigeration facilities of power plants, as well as for pipes with an outer diameter of 150 millimeters or more that are designed to withstand a pressure equal to or greater than any of the pressures specified in the following subparagraphs. However, valves, nozzles, and reinforcing materials with a diameter of 61 millimeters or less, where welding is performed to join them discontinuously, shall be excluded from the scope of pre-use inspection. <Amended Apr. 22, 2022>
1. For containers or pipes using water with a maximum operating temperature of less than 100 degrees Celsius, the maximum operating pressure is 20 kilograms per square centimeter
2. In the case of containers or pipes for liquefied gas, the maximum operating pressure is 0 kilograms per square centimeter
3. In the case of containers other than those specified in Subparagraphs 1 and 2, the maximum operating pressure is 1 kilogram per square centimeter
4. In the case of pipes other than those specified in Subparagraphs 1 and 2, the maximum operating pressure is 10 kilograms per square centimeter (5 kilograms per square centimeter in the case of longitudinal joints).
③ The standards for pre-use inspection are as follows: <Amended Oct. 1, 2025>
1. The details of the installation and modification work of electrical facilities shall conform to the construction plan authorized or reported pursuant to Article 8, Paragraph 1 or 2 of the Act .
2. It shall comply with the technical standards pursuant to Article 67 of the Electric Power Business Act (hereinafter referred to as the “Technical Standards”).
3. It shall comply with the methods, procedures, etc. for inspection and verification notified by the Minister of Climate, Energy and Environment pursuant to Article 18 of the Act .
④ The timing of the pre-use inspection is as set forth in Attached Table 3 .
⑤ Any person intending to undergo a pre-use inspection shall submit an application for pre-use inspection in the form of Annex 4 , attached with the documents specified in each of the following subparagraphs, to the Safety Corporation no later than 7 days prior to the date of the inspection. However, the document specified in subparagraph 5 may be submitted by the date of the pre-use inspection. <Amended Apr. 22, 2022; Oct. 1, 2025>
1. Copy of construction plan approval or notification acceptance (excluding cases of low-voltage private electrical facilities)
2. Design documents pursuant to Article 2, Subparagraph 3 of the Electric Power Technology Management Act and a confirmation of supervision placement pursuant to Article 12-2, Paragraph 4 of the same Act (referring only to installation works for low-voltage private electrical facilities, excluding expansion and modification works for low-voltage private electrical facilities)
3. Documents verifying self-supervision (applicable only when the electrical safety manager conducts self-supervision)
4. Copy of Certificate of Reporting the Appointment of Electrical Safety Manager
5. Other documents necessary for conducting pre-use inspections as prescribed and notified by the Minister of Climate, Energy and Environment
Article 7 (Standards for Permitting Temporary Use of Private Electricity Facilities, etc.) ① The cases in which temporary use of private electricity facilities may be permitted pursuant to Article 10, Paragraph 2 of the Act are as follows:
1. Cases where the generator's output is lower than the authorized or reported output but is recognized as not impeding safety during use
2. Cases where protective fences, etc., not directly related to power transmission or reception have not been constructed, but safety measures have been taken to prevent human access.
3. In cases where alternating or backup facilities or emergency backup generators among electrical facilities for which a construction plan has been approved or reported are not yet completed, but the main facilities are recognized as not impeding the use or safety of electricity
4. Cases where temporary use of electrical facilities is deemed to pose no safety risk and urgent use is unavoidable
② The temporary use period for private electrical facilities pursuant to Article 10, Paragraph 2 of the Act shall be within three months. However, if it is recognized that there are special reasons for which the cause for temporary use cannot be resolved during the temporary use period, the temporary use period may be extended within the scope of not exceeding one year in total.
③ When the Safety Corporation permits the temporary use of electrical facilities in accordance with the first part of Article 10, Paragraph 1 of the Act , it shall notify the applicant for the pre-use inspection by writing the reason for permission, the period of use, the scope and method of use, etc., in the inspection confirmation certificate in Form No. 5 attached hereto .
Article 8 (Subjects, Standards, and Procedures, etc., of Periodic Inspection) ①Electrical facilities subject to periodic inspection pursuant to Article 11, Paragraph 1 of the Act (hereinafter referred to as “periodic inspection”) and the timing of such inspection are as set forth in Attached Table 4. However, in any of the cases falling under any of the following subparagraphs, the Minister of Climate, Energy and Environment or the Mayor or Provincial Governor may separately determine the timing of the periodic inspection. <Amended Oct. 1, 2025>
1. Cases where it is deemed difficult to conduct periodic inspections of commercial electrical facilities due to a shortage of power supply, disaster, or emergency.
2. In other cases where it is deemed urgent to conduct a periodic inspection to prevent electrical accidents, due to the occurrence of an electrical accident or a significant risk of its occurrence.
② An electric business operator or the owner or occupant of private electric facilities may undergo a periodic inspection before the inspection time under Paragraph 1 if deemed necessary. In this case, the next inspection time for the electric facilities that have undergone inspection shall be in accordance with Table 4 based on the date of the inspection .
③ The standards for periodic inspections are as follows: <Amended Oct. 1, 2025>
1. Must comply with technical standards
2. It shall comply with the methods, procedures, etc. for inspection and verification notified by the Minister of Climate, Energy and Environment pursuant to Article 18 of the Act .
④ If an electric business operator or the owner or occupant of a private electric facility fails a periodic inspection, they must undergo a re-inspection of the non-compliant parts within three months from the date of completion of the inspection. However, in cases where the site and structure of a photovoltaic power plant pursuant to Subparagraph 1(5)(b) of Annex 4 fail the periodic inspection, and the Korea Electric Power Corporation recognizes that the electric business operator or the owner or occupant of the private electric facility cannot undergo a re-inspection within three months due to the inability to carry out repairs, etc., caused by seasonal or environmental factors, the Korea Electric Power Corporation may extend the re-inspection period for a period not exceeding six months from the date of completion of the inspection. <Amended Apr. 23, 2025>
⑤ Any person intending to undergo a periodic inspection shall submit an application for periodic inspection in the form of Annex 6 , attached with the documents specified in each of the following subparagraphs, to the Safety Corporation no later than 7 days prior to the date of the inspection. However, the document specified in subparagraph 2 may be submitted by the date of the periodic inspection. <Amended Apr. 22, 2022; Oct. 1, 2025>
1. Copy of Certificate of Reporting the Appointment of Electrical Safety Manager
2. Other documents necessary for conducting periodic inspections as prescribed and notified by the Minister of Climate, Energy and Environment
Article 9 (Notification of Inspection Results, etc.) ① When the Safety Corporation conducts a pre-use inspection or a periodic inspection , it shall issue an inspection confirmation certificate in the form of Annex 5 to the applicant within 5 days from the date of completion of the inspection. However, if the inspection result is unsatisfactory, it shall notify the details, reasons, and the deadline for re-inspection.
② The Safety Corporation shall report to the Minister of Climate, Energy and Environment or the Mayor/Do Governor any person who uses electrical facilities without undergoing inspection after the inspection period under Article 6 , Paragraph 4 or Article 8 , Paragraph 1 , or the re-inspection period under Article 8 , Paragraph 4 has passed. <Amended Apr. 22, 2022; Oct. 1, 2025>
③ If the results of the re-inspection pursuant to Article 8, Paragraph 4 are found to be non-conforming to the technical standards, the Safety Corporation shall report the details to the Minister of Climate, Energy and Environment or the Mayor/Do Governor. <Amended Oct. 1, 2025>
Article 10 (Qualifications of Electrical Equipment Inspectors) Pre-use inspections and periodic inspections shall be performed by persons falling under any of the following subparagraphs among those holding technical qualifications in the fields of electricity, safety management (electrical safety), civil engineering, or mechanical engineering pursuant to the National Technical Qualifications Act. However, persons who have acquired the qualifications of Master Craftsman, Engineer, or Industrial Engineer but fail to meet the practical experience period requirements under subparagraphs 2 and 3 shall perform only auxiliary duties for inspections performed by the electrical equipment inspectors referred to in subparagraphs 1 through 3. <Amended Dec. 20, 2023>
1. Person who has obtained the Professional Engineer qualification in the relevant field
2. A person who has obtained a Master Craftsman or Engineer qualification in the relevant field and has at least 4 years of practical experience in the relevant field after obtaining the qualification.
3. A person who has obtained an Industrial Engineer qualification in the relevant field and has at least 6 years of practical experience in the relevant field after obtaining the qualification.
Article 11 (Timing and Procedure for Pre-use Inspection of General Electrical Facilities, etc.) ① The pre-use inspection of general electrical facilities pursuant to Article 12, Paragraph 1 of the Act (hereinafter referred to as “pre-use inspection”) must be carried out after the installation or modification work of the electrical facilities is completed and before electricity is supplied.
② Any person who intends to undergo a pre-use inspection shall submit a pre-use inspection application form (Form No. 7) for each electricity usage contract , attached with the documents specified in each of the following subparagraphs, to the Korea Electric Power Corporation at least three days prior to the date of the inspection. <Amended Jan. 21, 2022; Apr. 19, 2023; Aug. 27, 2026>
1. Single-line diagram of electrical equipment [referring to a diagram that briefly represents electrical connections with a single line; in the case of power generation facilities utilizing solar energy pursuant to Article 2, Subparagraph 2, Item ( a) of the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy (hereinafter referred to as “photovoltaic power generation facilities”), it includes design documents pursuant to Article 2, Subparagraph 3 of the Electric Power Technology Management Act . The same applies hereinafter.]
2. A copy of the electricity usage application or documents proving the electricity usage contract
③ If the results of the pre-use inspection are satisfactory, the Safety Corporation shall issue a Certificate of Confirmation of Pre-use Inspection in the form of Annex 8 to the applicant for inspection without delay. <Amended Apr. 19, 2023>
Article 12 (Timing and Procedures, etc. for Periodic Inspection of General Electrical Facilities) ① The Korea Electrical Safety Corporation shall conduct periodic inspections of general electrical facilities pursuant to Article 12, Paragraph 1 of the Act (hereinafter referred to as “periodic inspection”) within two months before or after the month in which any of the following subparagraphs falls after the pre-use inspection or periodic inspection. However, the first periodic inspection following the pre-use inspection may be conducted at the same time as the periodic inspections of other general electrical facilities installed in the Eup, Myeon, or Dong where the relevant electrical facility is installed. <Amended June 25, 2024; October 1, 2025>
1. Electrical equipment installed in the facilities of each of the following items on the day marking one year
a. Facilities pursuant to Article 3, Paragraph 2 , Subparagraph 2 or 3 of the Enforcement Rules of the Electric Power Business Act . However, this applies only to facilities where electrical equipment with a capacity of less than 20 kilowatts is installed.
B. Facilities for lodging businesses under Article 2, Subparagraph 2 of the Public Health Management Act or bathhouse businesses under Article 2 , Subparagraph 3 of the same Act
C. Facilities for video viewing services pursuant to Article 2, Subparagraph 16 of the Act on the Promotion of Film and Video , facilities for game services pursuant to Article 2, Subparagraph 6 of the Act on the Promotion of the Game Industry or facilities for internet computer game services pursuant to Subparagraph 7 of the same article , and facilities for karaoke services pursuant to Article 2, Subparagraph 13 of the Act on the Promotion of the Music Industry
D. Youth training facilities pursuant to Article 10 , Subparagraph 1 of the Youth Activities Promotion Act and camping business facilities pursuant to Article 3, Paragraph 1 , Subparagraph C of the Tourism Promotion Act
E. Social welfare facilities pursuant to Article 2, subparagraph 4 of the Social Welfare Services Act . However, visiting care service facilities pursuant to Article 38, Paragraph 1, subparagraph 1 of the Elderly Welfare Act and visiting bathing service facilities pursuant to subparagraph 4 of the same paragraph are excluded.
f. Kindergarten pursuant to Article 2, Subparagraph 2 of the Early Childhood Education Act
G. Cultural heritage facilities pursuant to Article 2 of the Cultural Heritage Protection Act
Ah. Streetlight facilities among road fixtures pursuant to Article 2 , subparagraph 2 of the Road Act . However, streetlight facilities on motorway-only roads pursuant to Article 48 of the Road Act are excluded.
J. Traffic light facilities pursuant to Article 7 of the Enforcement Rules of the Road Traffic Act
D. Facilities for engaging in mining, manufacturing, electricity, gas and water supply, and sewage and waste treatment and cleaning-related service industries, according to the standard classification of industries notified by the Minister of National Data pursuant to Article 22 of the Statistics Act .
K. Postpartum care center facilities pursuant to Article 2, Item 10 of the Maternal and Child Health Act
T. Facilities for resturant business pursuant to Subparagraph (a) of Article 21, Item 8 of the Enforcement Decree of the Food Sanitation Act or facilities for general restaurant business pursuant to Subparagraph (b) of the same item
P. Facilities conducting the business under Article 7, Paragraph 4, Subparagraph 8 of the Enforcement Decree of the Electric Safety Management Act (hereinafter referred to as the “Decree”)
H. Rural guesthouse business facilities pursuant to Article 2, Subparagraph 16, Item ( d) of the Rural Development Act
g. Traditional market pursuant to Article 2, Subparagraph 1 of the "Special Act on the Promotion of Traditional Markets and Shopping Districts"
2. Electrical facilities installed in schools pursuant to Article 2 of the Elementary and Secondary Education Act on the day marking two years
3. For electrical facilities installed in facilities other than those specified in Subparagraphs 1 and 2, on the day marking three years
② The Safety Corporation must conduct a re-inspection of facilities found to be non-compliant as a result of a regular inspection within two months from the date of notification.
③ Notwithstanding Paragraphs 1 and 2, if the Minister of Climate, Energy and Environment deems it difficult to conduct regular inspections due to a disaster or other emergency, the Minister may determine the timing of regular inspections separately. <Amended Oct. 1, 2025>
Article 13 (Qualifications of Inspectors of General Electrical Facilities) Inspections of general electrical facilities pursuant to Article 12, Paragraph 1 of the Act shall be performed by any of the following persons:
1. Persons holding a Craftsman or higher qualification in the electrical field under the National Technical Qualifications Act
2. A person who has graduated from a department related to electrical engineering at a high school pursuant to Article 2, Subparagraph 3 of the Elementary and Secondary Education Act, or a person with an educational attainment of an equivalent or higher level.
Article 13-2 (Adjustment of Periodic Inspection Timing for General Electrical Facilities Due to Remote Inspection) ① When the Safety Corporation conducts a remote inspection (hereinafter referred to as “remote inspection”) pursuant to Article 12, Paragraph 2 of the Act on general electrical facilities installed in residential facilities , it shall be deemed that a periodic inspection is being conducted in accordance with the proviso to the same paragraph.
② When the Safety Corporation conducts remote inspections on general electrical facilities installed in facilities other than residential facilities, the timing of the regular inspection may be adjusted within two months before or after the month in which the fifth year after the installation of the device with remote inspection capabilities falls, in accordance with the proviso to Article 12 , Paragraph 2 of the Act.
③ Notwithstanding Paragraphs 1 and 2, if the Minister of Climate, Energy and Environment deems it difficult to conduct remote inspections due to a disaster or other emergency, the Minister may determine the timing of regular inspections separately. <Amended Oct. 1, 2025>
[This Article Newly Inserted June 22, 2022]
Article 14 (Recording of Inspection Results, etc.) Pursuant to Article 12, Paragraph 7 of the Act , when the Safety Corporation inspects general-purpose electrical facilities or notifies the results of such inspection, it shall preserve documents or data containing the matters of each of the following subparagraphs for three years. <Amended June 22, 2022; April 19, 2023>
1. Name of the owner, etc. of the general electrical facility (in the case of a corporation, its name and the name of its representative) and address
2. Inspection Date
3. Results of the inspection
4. Date of notification
5. Notices
6. Name of the inspector
7. In the case of pre-use inspection, the name of the contractor (in the case of a corporation, its name and the name of its representative)
Article 15 (Measures, etc. Based on Results of Periodic Inspections) ① Pursuant to the latter part of Article 12, Paragraph 8 of the Act , the cases in which the Safety Corporation must directly issue an order regarding the repair, modification, or relocation of electrical facilities (hereinafter referred to as “improvement order”) to the owner or occupant of unsuitable general-purpose electrical facilities shall be cases where, as a result of inspecting the electrical facilities, three or more items among insulation resistance, service entrance wiring and indoor/outdoor/building-side wiring, earth leakage circuit breakers, switches (including circuit breakers), and grounding are found to be unsuitable. <Amended Jan. 21, 2022; Jun. 22, 2022>
② The Governor of a Special Self-Governing Province, the Mayor of a Special Self-Governing City, a Mayor, a County Head, or a District Head (referring to the head of an autonomous district; hereinafter referred to as “Mayor, County Head, or District Head”) shall notify the Safety Corporation of the fact that an improvement order has been issued. In this case, the Safety Corporation shall verify whether the improvement order has been complied with.
③ Where a Mayor, County Governor, or District Head requests the suspension of electricity supply from an electricity sales business operator pursuant to the first part of Article 12, Paragraph 9 of the Act , such request must be made in writing. <Amended June 22, 2022>
④ An electricity sales business operator who has received a request for suspension of electricity supply pursuant to the first part of Article 12, Paragraph 9 of the Act shall notify the Mayor, County Governor, or District Head of the results of the measure. <Amended June 22, 2022>
⑤ Where the Safety Corporation conducts a periodic inspection or re-inspection pursuant to Article 12 , Paragraphs 1 and 2 , or Article 13-2, Paragraph 2, if there is any person who refuses, obstructs, or evades the said inspection, the Corporation shall notify the Mayor, County Governor, or District Head of such fact without delay. <Amended June 22, 2022>
Article 16 (Request for Data Necessary for Inspection) ① Pursuant to the first part of Article 12, Paragraph 10 of the Act , the data that the Korea Electric Safety Corporation may request from electricity sales business operators for the inspection of general-use electrical facilities are as follows: <Amended June 22, 2022>
1. Data regarding the electricity recipient, such as the installation location, supply voltage, and contracted power of general-purpose electrical facilities
2. Data on changes in electricity supply details, such as suspension, closure, resumption of electricity supply, and increase or decrease in contracted power for general-purpose electrical facilities
② An electric sales business operator who receives a request for the provision of data pursuant to Paragraph 1 shall provide the relevant data to the Safety Corporation within 30 days from the date of receiving the request.
Article 17 (Inspection Standards and Methods) The inspection standards and methods for general-purpose electrical facilities pursuant to Article 12, Paragraph 12 of the Act are as set forth in Attached Table 5. <Amended June 22, 2022>
Article 18 (Standards for Electrical Safety Inspections, etc. for Facilities Used by Multiple People) ① The standards for electrical safety inspections (hereinafter referred to as “electrical safety inspections”) for facilities used by multiple people, designated cultural properties, and facilities within their protection zones pursuant to Article 13 , Paragraphs 1 and 2 of the Act (hereinafter referred to as “facilities used by multiple people, etc.”) are as follows: <Amended Oct. 1, 2025>
1. For general-purpose electrical facilities, the standards pursuant to Article 17 and the inspection standards notified by the Minister of Climate, Energy and Environment
2. For private electrical facilities, technical standards and inspection standards notified by the Minister of Climate, Energy and Environment
② A person who intends to receive an electrical safety inspection pursuant to Article 13 , Paragraphs 1 and 2 of the Act (referring to a person who newly installs or changes electrical facilities) must submit an application for electrical safety inspection in Form No. 9 of the attached document to the Safety Corporation by three days prior to the date of the inspection, with a single-line diagram of the electrical facilities attached.
③ If the electrical safety inspection results are satisfactory, the Safety Corporation shall issue an electrical safety inspection confirmation certificate in the form of Annex 10 to the applicant for the electrical safety inspection without delay. However, if the electrical safety inspection results are unsatisfactory, the Safety Corporation shall notify the applicant for the electrical safety inspection of the details and reasons without delay.
Article 19 (Recording of Electrical Safety Inspection Results, etc.) In cases where the Safety Corporation has conducted an electrical safety inspection pursuant to Article 13, Paragraph 3 of the Act , it shall preserve documents or data containing the following items for three years.
1. Name of the owner, etc. of the multi-use facility, etc. (in the case of a corporation, its name and the name of its representative) and address
2. Date of electrical safety inspection
3. Results of Electrical Safety Inspection
4. Name of the electrical safety inspector
5. Name of the contractor (in the case of a corporation, its name and the name of its representative)
Article 20 (Timing and Procedures, etc. for Safety Inspections of Multi-unit Housing, etc.) ① The Safety Corporation shall conduct safety inspections of private electrical facilities installed in facilities specified in each subparagraph of Article 14, Paragraph 1 of the Act within two months before or after the month in which the date specified in each of the following subparagraphs falls. <Amended June 25, 2024>
1. Households of multi-unit dwellings pursuant to Article 14, Paragraph 1, Subparagraph 1 of the Act (limited to multi-unit dwellings equipped with electrical receiving facilities with a capacity of less than 1,000 kilowatts): After conducting a safety inspection within 3 years from the date marking 25 years since the pre-use inspection, on the day marking every 3 years from the date of the safety inspection.
2. Traditional market stalls pursuant to Article 14, Paragraph 1, Subparagraph 2 of the Act : After conducting a safety inspection within one year from the date the certificate of recognition was issued pursuant to Article 2, Paragraph 4 of the Enforcement Decree of the Special Act on the Promotion of Traditional Markets and Shopping Districts , on the day that marks every one year from the date of the safety inspection.
② Articles 12 Paragraphs 2 and 3, 13 , 13-2 , 14 , 15 , and 17 shall apply mutatis mutandis to the safety inspection under Paragraph 1. <Amended June 22, 2022>
Article 20 (Timing and Procedures, etc. for Safety Inspections of Multi-unit Housing, etc.) ① The Safety Corporation shall conduct safety inspections of private electrical facilities installed in facilities specified in each subparagraph of Article 14, Paragraph 1 of the Act within two months before or after the month in which the date specified in each of the following subparagraphs falls. <Amended June 25, 2024; October 20, 2026>
1. Household of a multi-unit dwelling pursuant to Article 14, Paragraph 1, Subparagraph 1 of the Act: Date according to the classification in each of the following items
a. Households of multi-unit dwellings (limited to multi-unit dwellings equipped with electrical receiving facilities with a capacity of less than 1,000 kilowatts) where sprinkler systems pursuant to Item 1, Subparagraph (d) 1) of Annex 1 of the Enforcement Decree of the Act on Installation and Management of Firefighting Facilities or simplified sprinkler systems pursuant to Item 2) of the same subparagraph (hereinafter referred to as “sprinkler systems, etc.” in this paragraph) are installed: after conducting the initial safety inspection within 3 years from the date marking 25 years after the pre-use inspection, on every 3-year date from the date of the initial safety inspection.
B. Households in multi-unit dwellings not equipped with sprinkler systems, etc.: After conducting the initial safety inspection within 3 years following the pre-use inspection, on every 3-year date from the date of the initial safety inspection.
2. Traditional market stores pursuant to Article 14, Paragraph 1, Subparagraph 2 of the Act: After conducting a safety inspection within one year from the date the certificate of recognition was issued pursuant to Article 2, Paragraph 4 of the Enforcement Decree of the Special Act on the Promotion of Traditional Markets and Shopping Districts, on the day that marks every one year from the date of the safety inspection.
② Articles 12(2) and 12(3), 13, 13-2, 14, 15, and 17 shall apply mutatis mutandis to the safety inspection under Paragraph 1. <Amended June 22, 2022>
[Effective Date: Jan. 1, 2027] Article 20
Article 21 (Request for Data Necessary for Safety Inspection of Multi-unit Housing, etc.) ① The Safety Corporation may request data from electricity sales business operators regarding the installation location, supply voltage, contracted power, etc., of multi-unit housing and traditional markets for the safety inspection of households in multi-unit housing pursuant toArticle 2 , subparagraph 3 of the Housing Act and shops in traditional markets pursuant to Article 2, subparagraph 1 of the Special Act on the Promotion of Traditional Markets and Shopping Districts, in accordance with Article 14, Paragraph 1 of the Act.
② An electric sales business operator who receives a request for the provision of data pursuant to Paragraph 1 shall provide the relevant data to the Safety Corporation within 30 days from the date of receiving the request, unless there is a special reason.
Article 22 (Procedures for Emergency Inspection, etc.) ① When the Minister of Climate, Energy and Environment or the Korea Electric Power Corporation conducts an emergency inspection pursuant to Article 16, Paragraph 1 of the Act , they shall notify the electric business operator or the owner or occupant of private or general-use electric facilities in writing of the subject, period, and reasons, etc. of the emergency inspection. However, such notification may be omitted if the purpose of the emergency inspection cannot be achieved if the implementation of the emergency inspection is notified in advance. <Amended Oct. 1, 2025>
② When the Minister of Climate, Energy and Environment or the Safety Corporation conducts an emergency inspection pursuant to Paragraph 1, they shall record and preserve the results of the emergency inspection and details of safety measures, etc. <Amended Oct. 1, 2025>
Article 23 (Order for Safety Measures and Notification of Results of Implementation) ① When the Minister of Climate, Energy and Environment orders the repair, removal, relocation, suspension of construction, suspension of use, restriction of operation, or other necessary measures regarding electrical facilities pursuant to Article 16 , Paragraph 3 of the Act , the Minister shall issue a Safety Measures Order in the form of Annex 11 to an electric business operator or the owner or occupant of private or general-use electrical facilities. <Amended Oct. 1, 2025>
② An electric business operator or the owner or occupant of private or general-use electric facilities who has received an order for safety measures pursuant to Paragraph 1 shall, upon having implemented the said safety measures, notify the Minister of Climate, Energy and Environment by attaching documents proving the results of the safety measures to the Notification of Results of Implementation of Safety Measures in the Form No. 12 of the Appendix. <Amended Oct. 1, 2025>
Article 24 (Subjects, Criteria, and Procedures for Safety Grade Designation) ① The subjects for the designation of safety grades for electrical facilities pursuant to Article 17, Paragraph 1 of the Act shall be electrical facilities installed in the facilities listed in each of the following subparagraphs [in the case of Subparagraph 1, limited to general-purpose electrical facilities; in the case of Subparagraph 4, limited to electrical receiving facilities of high voltage or higher pursuant to Subparagraph 2, Item (b)(3) of Annex 4 , emergency backup power generation facilities, and electric vehicle charging facilities (including cases where they are installed independently)]. <Amended June 25, 2024>
1. Facilities pursuant to each item of Article 12, Paragraph 1, Subparagraph 1
2. Facilities of a district electricity business operator pursuant to Article 2, Subparagraph 12 of the Electric Power Business Act
3. A traditional market pursuant to Article 2, Subparagraph 1 of the Special Act on the Promotion of Traditional Markets and Shopping Districts
4. Apartments pursuant to Item 2, Subparagraph (a) of Annex 1 of the Enforcement Decree of the Building Act
② The safety grade standards for electrical facilities pursuant to Article 17 , Paragraph 1 of the Act are as set forth in Table 6 .
③ When the Minister of Climate, Energy and Environment or the Mayor or Provincial Governor has completed inspections and checks pursuant to Articles 11 , 12 , and 14 of the Act , they shall designate the safety grade of electrical facilities and notify the owner or occupant of the relevant electrical facilities. <Amended Oct. 1, 2025>
④ If the owner or occupant of an electrical facility notified pursuant to Paragraph 3 intends to change the safety grade of the electrical facility due to a reason falling under any of the subparagraphs of Article 17, Paragraph 2 of the Act , they shall submit an Application for Change of Safety Grade of Electrical Facility (Form No. 13) to the Minister of Climate, Energy and Environment or the Mayor/Do Governor, attaching documents proving the reason for the change. <Amended Oct. 1, 2025>
⑤ In cases where the Minister of Climate, Energy and Environment or the Mayor or Provincial Governor changes the safety grade of electrical facilities pursuant to Article 17, Paragraph 2 of the Act , they shall notify the owner or occupant of the relevant electrical facilities of the fact of the change within 15 days from the date of the change. <Amended Oct. 1, 2025>
⑥ The standards for adjusting the timing of inspections and checks pursuant to Article 17, Paragraph 3 of the Act are as set forth in Attached Table 7 .
⑦ In addition to the matters prescribed in Paragraphs 1 through 6, detailed matters concerning the designation of safety grades shall be determined and announced by the Minister of Climate, Energy and Environment . <Newly added Jun. 25, 2024; Oct. 1, 2025>
Article 24-2 (Notification of Installation of Electric Vehicle Charging Facilities, etc.) ① Any person who intends to report the installation or change of charging facilities for an electric vehicle ( referring to an electric vehicle as defined in subparagraph 3 of Article 2 of the Act on Promotion of Development and Dissemination of Environmentally Friendly Vehicles ; hereinafter the same applies) pursuant to Article 21-2, Paragraph 1 of the Act shall submit the report on the installation (change) of electric vehicle charging facilities in the form of Annex 13-2 to the competent mayor or provincial governor.
② The cases requiring a change report pursuant to the latter part of Article 21-2, Paragraph 1 of the Act are as follows:
1. When changing the location of electric vehicle charging facilities
2. When changing the number of electric vehicle charging facilities installed
3. When changing the specifications of electric vehicle charging facilities (including the electrical capacity of the charging facilities)
4. In the case of changing the company name or trade name of the electric vehicle charging facility operator
[This Article Newly Inserted Nov. 26, 2025]
Article 25 (Appointment of Electrical Safety Manager, etc.) ① Electrical facilities for which an electrical safety manager must be appointed pursuant to Article 22, Paragraph 1 of the Act refer to electrical facilities other than those listed in each of the following subparagraphs.
1. Electric receiving facilities classified as low voltage ( excluding electric facilities pursuant to each subparagraph of Article 3 , Paragraph 2 of the Enforcement Rule of the Electric Power Business Act ) installed in manufacturing and manufacturing-related service industries pursuant to Article 2 of the Enforcement Decree of the Special Measures Act on Deregulation of Business Activities
2. Electrical receiving facilities corresponding to low voltage that utilize off-peak electricity
3. The following electrical facilities that are currently suspended
a. Electrical facilities for which the owner or occupant has notified the electric power business operator of the suspension of use.
b. Nighttime electricity facilities (only applicable if use has been suspended in accordance with the electricity supply contract)
C. Agricultural electrical facilities (applicable only in cases where all electrical facilities from the point of electricity supply to the usage facility are not in use)
4. Power generation facilities with an installed capacity of 20 kilowatts or less
② Persons required to appoint an electrical safety manager pursuant to Article 22 of the Act shall appoint an electrical safety manager and safety management assistants for each electrical facility or workplace in accordance with Table 8 before applying for a pre-use inspection of the electrical facility or before commencing business.
③ An electrical safety manager appointed pursuant to Article 22 , Paragraphs 1 , 2, and 4 of the Act shall be a technical personnel affiliated with the owner or occupant of the electrical facility or a person entrusted with electrical safety management duties by the owner or occupant of the electrical facility (including a person entrusted with electrical safety management duties by an electric business operator pursuant to Article 2, Subparagraph 2 of the Act on Promotion of Electricity Supply Business for Rural Areas ), and shall be employed on a full-time basis at the workplace where the electrical facility is installed; such manager may not be appointed as an electrical safety manager for electrical facilities at another workplace. However, one electrical safety manager appointed pursuant to Article 22 , Paragraph 1 or 4 of the Act may perform electrical safety management duties limited to electrical facilities falling under any of the following subparagraphs. <Amended Apr. 22, 2022; Dec. 20, 2023; Oct. 1, 2025>
1. Electrical facilities for drainage pumps at two retention basins located within 1,000 meters
2. Electrical facilities for water pumping and drainage pumps installed in four or fewer locations within the same water system for agricultural purposes
3. Electrical facilities for tunnels at two locations installed on expressways or national roads of the same route [four locations for expressways equipped with traffic control facilities that include remote monitoring and control functions (hereinafter referred to as “remote monitoring and control functions”) satisfying the standards prescribed and notified by the Minister of Climate, Energy and Environment]
4. Electrical equipment meeting all the requirements of each of the following items
a. Facilities of the same business operator operating two or more business sites within the same industrial complex ( referring to an industrial complex pursuant to Article 2 , Item 8 of the Industrial Location and Development Act ; hereinafter referred to as “industrial complex” in this Article).
B. The total installed capacity (referring only to the installed capacity of electrical facilities installed at workplaces within the same industrial complex) shall be less than 2,500 kilowatts.
5. In the case of an electric vehicle charging business operator pursuant to Article 2 , Subparagraph 12-5 of the Electric Power Business Act (referring to cases corresponding to the owner or occupant of private electrical facilities), electrical facilities of 60 or fewer electric vehicle charging stations operated by the same business operator (referring to 120 or fewer if equipped with remote monitoring and control functions).
6. Four or fewer electrical facilities in the same island area managed by an electricity business operator pursuant to Article 2, Subparagraph 2 of the Act on the Promotion of Electricity Supply Business in Rural Areas (in areas supplying electricity via self-generation facilities, this refers to the Mayor or County Governor).
Article 26 (Scale of Delegation of Electrical Safety Management Duties) Pursuant to Article 22, Paragraph 3 of the Act , the scale of electrical facilities for which the Korea Safety Corporation, an electrical safety management agency pursuant to Subparagraph 2 of the same Paragraph (hereinafter referred to as the “Agency”), and a person pursuant to Subparagraph 3 of the same Paragraph (hereinafter referred to as the “Individual Agent”) may delegate electrical safety management duties shall be as classified in each of the following subparagraphs. <Amended Apr. 22, 2022; Jun. 25, 2024; Aug. 31, 2026>
1. Safety Corporation and authorized contractors: Electrical facilities falling under any of the following subparagraphs (limited to cases where the sum of the capacities of two or more electrical facilities is less than 4,500 kilowatts)
a. Electrical receiving facilities: Those with a capacity of less than 1,000 kilowatts
B. Among power generation facilities that produce electricity using renewable energy pursuant to Article 2, Subparagraph 2 of the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy, energy utilized in fuel cells, etc. pursuant to Article 2, Subparagraphs 6 and 11 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management (hereinafter referred to as “new and renewable energy power generation facilities”), photovoltaic power generation facilities: those with a capacity of less than 1,000 kilowatts (or 3,000 kilowatts if equipped with remote monitoring and control functions).
c. Fuel cell power generation facilities among new and renewable energy power generation facilities for electricity business (limited to those equipped with remote monitoring and control functions): those with a capacity of less than 500 kilowatts
D. Other power generation facilities (limited to those equipped with remote monitoring and control functions in the case of new and renewable energy power generation facilities for electricity business): Those with a capacity of less than 300 kilowatts (500 kilowatts in the case of emergency backup power generation facilities).
2. Individual Agent: Electrical facilities falling under any of the following subparagraphs (limited to electrical facilities with a combined capacity of two or more units of less than 1,550 kilowatts)
a. Electrical receiving facilities: Those with a capacity of less than 500 kilowatts
B. Photovoltaic power generation facilities among new and renewable energy generation facilities: those with a capacity of less than 250 kilowatts (750 kilowatts if equipped with remote monitoring and control functions).
c. Fuel cell power generation facilities among new and renewable energy power generation facilities for electricity business (limited to those equipped with remote monitoring and control functions): those with a capacity of less than 250 kilowatts
D. Other power generation facilities (limited to those equipped with remote monitoring and control functions in the case of new and renewable energy power generation facilities for electricity business): Those with a capacity of less than 150 kilowatts (or 300 kilowatts in the case of emergency backup power generation facilities).
Article 27 (Areas for the Delegation of Electrical Safety Management Duties by the Korea Safety Corporation) In the proviso to the part other than the subparagraphs of Article 22 , Paragraph 3 of the Act , the term “areas prescribed by the Ordinance of the Ministry of Climate, Energy and Environment, such as remote and isolated areas” refers to the areas set forth in each of the following subparagraphs. <Amended Apr. 23, 2025; Oct. 1, 2025>
1. Rural areas pursuant to Article 3, Subparagraph 5 of the Framework Act on Agriculture, Rural Areas and Food Industry
2. Fishing village area pursuant to Article 3, Subparagraph 6 of the Framework Act on Fisheries and Fishing Village Development
3. Island areas pursuant to Article 2, Paragraph 1 of the Island Development Promotion Act
4. The Kaesong Industrial Complex pursuant to Article 2, Subparagraph 1 of the Act on Support for the Kaesong Industrial Complex
5. Military base and military facility protection zone pursuant to Article 2, Subparagraph 6 of the Military Base and Military Facilities Protection Act
6. Zones of critical national facilities pursuant to Article 2, Subparagraph 13 of the Integrated Defense Act
7. Areas of national security facilities pursuant to Article 32 of the “Regulations on Security Affairs”
8. Other areas where the Minister of Climate, Energy and Environment recognizes that it is difficult for business operators and individual agents to perform electrical safety management duties.
[Effective Date: April 1, 2028] Article 27
Article 28 (Relaxation of Qualifications for Electrical Safety Managers) Pursuant to Article 22, Paragraph 4 of the Act , the scope of regions or electrical facilities where it is deemed difficult or unsuitable to appoint an electrical safety manager under Paragraphs 1 through 3 of the same Article, and the qualification standards for persons who may be appointed as electrical safety managers, are as follows: <Amended Aug. 31, 2026>
1. Electrical facilities falling under any of the following subparagraphs: A person holding a Craftsman qualification or higher in the electrical, civil engineering, or mechanical fields under the National Technical Qualifications Act, or a person who has graduated from a high school with a major related to electrical, civil engineering, or mechanical engineering pursuant to Article 2, Subparagraph 3 of the Elementary and Secondary Education Act and has at least 3 years of practical experience in the relevant field.
a. Electrical facilities with a capacity of 500 kilowatts or less installed in military facility protection zones subject to restrictions on passage or use
B. Electrical and power generation facilities with an installed capacity of 1,000 kilowatts or less installed on islands or remote areas
C. Power generation facilities with an installed capacity of 1,000 kilowatts or less that produce electricity using renewable energy pursuant to Article 2 , Subparagraph 2 of the "Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy," energy utilized in fuel cells, etc. pursuant to Article 2 , Subparagraphs 6 and 11 of the "Act on Promotion of Hydrogen Economy and Hydrogen Safety Management," and hydrogen energy.
2. Electrical facilities belonging to military facilities: Holders of a Craftsman qualification or higher in the electrical field under the National Technical Qualifications Act , or persons who have completed prescribed training at a military educational institution.
Article 29 (Requirements for Designation of Acting Manager of Electrical Safety) ① An acting manager of electrical safety designated pursuant to Article 22, Paragraph 5 of the Act shall be a person falling under any one of the following subparagraphs.
1. Holders of a Craftsman or higher qualification in the electrical, civil engineering, or mechanical fields pursuant to the National Technical Qualifications Act
2. A person who has graduated from a high school with a degree or higher in an electrical, civil, or mechanical-related field pursuant to Article 2, Subparagraph 3 of the Elementary and Secondary Education Act and has at least one year of practical experience in the relevant field.
3. A person capable of operating or manipulating the relevant electrical equipment for routine operation, or supervising related duties.
② A person designated as an acting officer of the electrical safety manager pursuant to Article 22, Paragraph 5 of the Act shall perform duties of verification for the safety management of electrical facilities and operation, manipulation, or supervision thereof for the daily operation of electrical facilities.
③ A person who has designated an acting officer for the duties of an electrical safety manager pursuant to Article 22, Paragraph 5 of the Act shall prepare and keep on file the designation certificate for the acting officer for the duties of an electrical safety manager in the form of Annex 14 .
④ The period of performance of duties by a substitute for an electrical safety manager designated pursuant to Article 22, Paragraph 5 of the Act shall not exceed 30 days.
Article 30 (Qualifications and Duties of Electrical Safety Managers) ①The detailed technical qualifications of electrical safety managers pursuant to Article 22, Paragraph 6 of the Act are as set forth in Table 8 .
② The scope of duties of an electrical safety manager appointed pursuant to Article 22 of the Act shall be as follows: <Amended Apr. 22, 2022; Aug. 31, 2026>
1. Work related to the construction, maintenance, and operation of electrical facilities and safety training for personnel engaged in such work
2. Verification and inspection for the safety management of electrical facilities and supervision of related work
3. Operation or manipulation of electrical facilities or supervision of duties related thereto
4. Preparation and preservation of records regarding electrical safety management pursuant to Article 24 , Paragraph 3 of the Act
5. Review of documents required for application for approval or notification of construction plan
6. Supervision duties for construction work falling under any of the following items
a. Installation or modification work for emergency backup power generation facilities with a total construction cost of less than 100 million won
B. Expansion or modification work of electrical receiving facilities with a total construction cost of less than 50 million won
C. Expansion or modification work on renewable energy facilities pursuant to Article 2, Subparagraph 3 of the "Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy," and fuel cells, etc. and hydrogen energy facilities pursuant to Article 2, Subparagraphs 6 and 12 of the "Act on Promotion of Hydrogen Economy and Hydrogen Safety Management," for which the total construction cost is less than 50 million won.
7. Preparation of safety management regulations regarding the procedures, methods, and standards for daily, periodic, and detailed inspections of electrical facilities
8. Emergency measures necessary to prevent the occurrence of electrical hazards or to reduce damage thereof
③ Detailed matters concerning the duties of electrical safety managers pursuant to each subparagraph of Paragraph 2 shall be determined and announced by the Minister of Climate, Energy and Environment . <Amended Oct. 1, 2025>
Article 31 (Scope of Delegation of Electrical Safety Management Duties, etc.) ① The scope of delegation that business operators and individual agents may perform shall be the jurisdictional area of the City or Provincial Governor where they are registered.
② The number of electrical safety management agency locations and electrical facility inspections that can be performed by one Safety Corporation, agency business operator, or individual agent is as shown in Attached Table 9 .
Article 32 (Remuneration for Agency of Electrical Safety Management Duties) The remuneration for agency of safety management duties pursuant to Article 22, Paragraph 7 of the Act shall be calculated according to the fixed-price-plus-actual-cost method among the remuneration standards for engineering projects pursuant to Article 31 of the Engineering Industry Promotion Act .
Article 33 (Electrical Safety Management Equipment) The equipment necessary for electrical safety management that a person who has appointed an electrical safety manager pursuant to Article 22, Paragraph 8 of the Act must possess is as set forth in Table 10 .
Article 34 (Reporting of Appointment and Dismissal of Electrical Safety Manager) ①Any person who intends to report the appointment or dismissal of an electrical safety manager pursuantto Article 22 , Paragraphs 1 , 2, or 4 of the Act pursuant to Article 23, Paragraph 1 of the Act shall submit the Report on Appointment (Dismissal) of Electrical Safety Manager in the form of Annex No. 15, attached with the documents classified according to each of the following subparagraphs, to an organization designated andamong the organizations of electrical engineers established pursuant to Article 18 of the Electric Power Technology Management Act (hereinafter referred to as the “Electric Power Engineers’ Organization”) within 30 days from the date of appointment or dismissal. <Amended Oct. 1, 2025>
1. In the case of appointment, the documents of each of the following items
a. Copy of the National Technical Qualification Certificate of the Appointed Electrical Safety Manager
B. Certificate of employment and certificate of practical experience (to be submitted only by applicable persons) or supporting documents thereof for the appointed Electrical Safety Manager
c. Graduation certificate or certificate of completion of training of the appointed electrical safety manager ( submitted only by persons falling under Article 28 )
D. Copy of the Electrical Safety Management Consignment Contract ( to be submitted only by the person entrusted with electrical safety management duties pursuant to Article 22, Paragraph 2 of the Act )
2. In the event of dismissal, a copy of the designation certificate for the acting electrical safety manager (to be submitted only if dismissal occurs without the appointment of a successor)
② Any person who intends to report the appointment or dismissal of an electrical safety manager pursuant to Article 22, Paragraph 3 of the Act pursuant to Article 23, Paragraph 1 of the Act shall submit the report on the appointment (dismissal) of an electrical safety manager in the form of Annex 16, along with a copy of the electrical safety management agency contract (applicable only in the case of an appointment report), to the electric power engineering association within 30 days from the date of appointment or dismissal.
③ If the electrical facilities managed by the technical personnel affiliated with the Safety Corporation and the agency are changed, they must notify the electrical engineering association of the status of electrical facilities managed by technical personnel in accordance with Form No. 17 within 30 days from the date of the change.
④ If a person who has filed a report pursuant to Paragraph 1 or 2 requests the issuance of a certificate of report on the appointment (dismissal) of an electrical safety manager, the electrical engineering association shall issue a certificate of report on the appointment (dismissal) of an electrical safety manager in the form of Annex 18 or Annex 19 without delay.
Article 35 (Reporting of Changes to Matters Reported for Appointment of Electrical Safety Manager, etc.) ① The phrase “matters prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” in the latter part of Article 23, Paragraph 1 of the Act refers to the matters set forth in each of the following subparagraphs concerning an electric business operator or the owner or occupant of a private electric facility. <Amended Oct. 1, 2025>
1. Company name or trade name
2. Representative's Name
3. Address of the electrical installation location
4. Capacity or voltage of electrical equipment
② Any person who intends to report a change in the appointment of an electrical safety manager pursuant to the latter part of Article 23, Paragraph 1 of the Act shall submit the report on the change in the appointment of an electrical safety manager in Form No. 20 of the Attached Form, along with documents proving the change, to the electrical engineering association within 30 days from the date the cause for the change occurred.
③ If a person who has filed a change report pursuant to Paragraph 2 requests the issuance of a change report certificate, the electric power engineering association shall issue a change report certificate in the form of Annex 18 or Annex 19 without delay.
Article 36 (Preparation and Preservation of Records Concerning Safety Management of Electrical Facilities, etc.) ① Pursuant to Article 24, Paragraph 3 of the Act , an electrical safety manager shall prepare records of matters falling under each of the following subparagraphs concerning the safety management of electrical facilities and preserve them for four years.
1. Matters concerning the implementation of safety education pursuant to Article 30 , Paragraph 2 , Subparagraph 1
2. Matters concerning the contents and results of verification and inspection for the safety management of electrical facilities pursuant to Article 30 , Paragraph 2, Subparagraph 2
3. Matters concerning safety management regulations regarding the procedures, methods, and standards for daily inspections, periodic inspections, and precision inspections of electrical facilities pursuant to Article 30, Paragraph 2, Subparagraph 7
4. Matters concerning safety measures, such as repair, modification, and maintenance of electrical facilities, as emergency measures for the prevention of electrical disasters and damage prevention pursuant to Article 30, Paragraph 2, Subparagraph 8
② Pursuant to Article 24, Paragraph 3 of the Act , an electrical safety manager shall submit records regarding the safety management of electrical facilities under Paragraph 1 to the Safety Corporation when undergoing a periodic inspection. However, if the results of verification and inspection for safety management, etc., have been entered into the Electrical Safety Comprehensive Information System under Article 38 , Paragraph 1 of the Act at least once a month, such submission may be omitted.
Article 37 (Education for Electrical Safety Managers, etc.) ① Any person who wishes to receive electrical safety education pursuant to Article 25, Paragraph 1 of the Act shall receive electrical safety education as classified in each of the following subparagraphs. <Amended Apr. 22, 2022>
1. Electrical safety managers appointed pursuant to the provisions of Article 22, Paragraphs 1 through 4 of the Act (in the case of the Safety Corporation and agency business operators pursuant to Article 22, Paragraph 3, this refers to their affiliated technical personnel): Electrical safety training pursuant to Annex 11
2. Construction manager pursuant to Article 17 of the Electric Construction Business Act : Electrical safety training pursuant to Annex 12
② If a person has completed an educational course listed in each of the following subparagraphs that is recognized by the Minister of Climate, Energy and Environment, they shall be deemed to have received electrical safety education within the scope specified in each subparagraph of Paragraph 1. <Newly added Apr. 22, 2022; Oct. 1, 2025>
1. Education conducted by an electricity-related institution that includes the educational content of each subparagraph of Paragraph 1
2. Education certified by international organizations related to new and renewable energy
③ If an electrical safety manager who has completed the education under Paragraph 2, Subparagraph 2 wishes to be recognized as having received all or part of the electrical safety education, he/she must submit documents proving completion of the relevant education to the head of the power engineering association or contractor association entrusted with electrical safety education duties pursuant to Article 17 , Paragraphs 4 and 5 of the Enforcement Decree (hereinafter referred to as the “education entrusted organization” in this Article) or to the head of an electrical-related institution. <Newly added Apr. 22, 2022>
④ The head of the organization entrusted with educational duties and the head of the electrical-related institution shall issue an Electrical Safety Education Completion Certificate in the form of Annex 21 without delay upon request for issuance by an Electrical Safety Manager or Construction Management Supervisor who has completed the Electrical Safety Education pursuant to Paragraph 1. <Amended Apr. 22, 2022>
⑤ The head of an organization entrusted with educational duties or the head of an electricity-related institution shall report the data specified in each of the following subparagraphs to the Minister of Climate, Energy and Environment by January 31 of the following year, in accordance with the classifications in each of the following subparagraphs. <Amended Apr. 22, 2022; Oct. 1, 2025>
1. Head of the organization entrusted with educational duties: The performance records and list of completers of electrical safety education pursuant to Paragraph 1, and the list of persons recognized as having received all or part of the electrical safety education pursuant to Paragraph 3.
2. Head of an electrical-related institution: The list of electrical safety education performance records and completers pursuant to Paragraph 2, Subparagraph 1, and the list of persons recognized as having received all or part of the electrical safety education pursuant to Paragraph 3.
Article 38 (Registration, etc. of Persons Specializing in Electrical Safety Management Duties) ①Pursuant to Article 26, Paragraph 1 , Subparagraph 1 or 2 of the Act , any person specializing in electrical safety management under Article 22, Paragraph 2, Subparagraph 1 of the Act , or a person specializing in facility management under Article 22, Paragraph 2, Subparagraph 2 of the Act who intends to be entrusted with electrical safety management duties,shall register with the Minister of Climate, Energy and Environment by attaching the documents set forth in each of the following subparagraphs to the application for registration in the form of Annex 22. <Amended Oct. 1, 2025>
1. Documents proving capital
2. Documents verifying the practical experience of affiliated technical personnel or a certificate of experience for electric power engineers pursuant to Article 8, Paragraph 3 of the Enforcement Rules of the Electric Power Technology Management Act
3. Equipment Specifications
② Upon receiving an application under Paragraph 1, the Minister of Climate, Energy and Environment shall verify the documents set forth in each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . However, if the applicant does not consent to the verification of the business registration certificate under Subparagraph 1, the applicant shall personally attach a copy of the business registration certificate. <Amended Oct. 1, 2025>
1. Business Registration Certificate
2. Certificate of Corporate Registration (applicable only to corporations)
③ A person who intends to perform safety management duties as an agent pursuant to Article 26, Paragraph 1, Subparagraph 3 of the Act shall register with the Mayor or Provincial Governor by attaching the documents specified in each subparagraph of Paragraph 1 to the registration application form in Annex 22 .
④ A person who intends to perform safety management duties as an individual agent pursuant to Article 26, Paragraph 1, Subparagraph 4 of the Act shall register with the Mayor/Do Governor by attaching the documents listed in each of the following subparagraphs to the registration application form in Annex 22. In this case, the Mayor/Do Governor who receives the registration application shall verify the applicant's business registration certificate through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act , and if the applicant does not consent to the verification, the applicant shall be required to attach a copy of the business registration certificate.
1. Documents verifying practical work experience or a certificate of experience as an electric power engineer pursuant to Article 8, Paragraph 3 of the Enforcement Rules of the Electric Power Technology Management Act
2. Equipment Specifications
⑤ The registration certificate pursuant to Article 26, Paragraph 3 of the Act shall be in accordance with Form No. 23 of the Attached Form .
Article 39 (Change Registration, etc.) In the event that any of the matters falling under any of the following subparagraphs are changed, a person who has registered pursuant to Article 38 shall submit an application for change registration in the form of Annex 22, accompanied by documents proving such changes,to the Minister of Climate, Energy and Environment, the Governor of a City or Province, or the electric power engineering association entrusted with the duties pursuant to Article 17 , Paragraph 4, Subparagraph 2 of the Enforcement Decree . <Amended Oct. 1, 2025>
1. Company name or trade name
2. Location of the principal office, business office, or branch office
3. Representative
4. Personnel specializing in electrical safety management, persons specializing in facility management, and technical personnel affiliated with the agency
Article 40 (Standards for Cancellation of Registration and Suspension of Business, etc.) The standards for cancellation of registration and suspension of business for persons specializing in electrical safety management, persons specializing in facility management, agency business operators, or individual agents pursuant to Article 27 , Paragraph 2 of the Act are as set forth in Table 13 .
Article 41 (Determination of Disaster Prevention Inspection Costs) ① The Safety Corporation shall apply to a central administrative agency or a local government for the costs necessary for safety inspections for disaster prevention, emergency measures in the event of a disaster, and damage recovery carried out by the Safety Corporation in accordance withthe Framework Act on Disaster and Safety Management, by attaching the following materials to the Application for Payment of Disaster Prevention Inspection Costs in Form No. 24 .
1. Document stating the purpose and details of the project
2. Explanation of costs required for project execution and the basis for their calculation
② When the Safety Corporation calculates the disaster prevention inspection costs under Paragraph 1, the costs incurred for inspections conducted at the request of the Head of the Fire Department or the Head of the Fire Station, who judges that the risk of disaster occurrence, such as fire, is particularly high, may not be included in the calculation of disaster prevention inspection costs.
Article 42 (Reporting) ①The matters and deadlines to be reported to the Minister of Climate, Energy and Environment by the Governors of Cities and Provinces, Mayors, County Heads, and District Heads, the Korea Electric Power Corporation, and electricity retailers pursuant to Article 39, Paragraph 1 of the Act are as set forth in Annex 14. <Amended Oct. 1, 2025>
② The matters and deadlines for electric power engineering organizations to report to the mayor or provincial governor pursuant to Article 39 , Paragraph 2 of the Act are as set forth in Attached Table 15 .
Article 43 (Notification and Investigation of Serious Accidents) ① In Article 40 , Paragraph 1 and Paragraph 2 of the Act , the term “serious accident prescribed by the Ordinance of the Ministry of Climate, Energy and Environment”refers to an accident set forth in Item 1 of Annex 16. <Amended Oct. 1, 2025>
② Pursuant to Article 40, Paragraphs 1 and 2 of the Act , electric business operators, owners or occupants of private electric facilities, and the Korea Power Exchange shall notify the Minister of Climate, Energy and Environment of the occurrence of a serious accident in accordance with the notification method prescribed in Subparagraph 2 of Annex 16. <Amended Oct. 1, 2025>
③ Pursuant to Article 40, Paragraph 3, Subparagraph 2 of the Act , persons whom the Minister of Climate, Energy and Environment may designate to conduct accident investigations shall be non-profit corporations or electricity-related institutions or organizations that meet the designation requirements set forth in Annex 17. <Amended Oct. 1, 2025>
Article 44 (Fees, etc.) Fees pursuant to Article 42 , Paragraph 1 of the Act and education expenses pursuant to Paragraph 2 of the same Article shall be calculated according to the standards set forth in Annex 18 .
Article 45 (Designation of Trustee Organizations for Private Entrustment) In Paragraphs 4 and 5 of Article 17 of the Enforcement Decree, the term “requirements prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” refers to the requirements classified according to each of the following subparagraphs. <Amended Oct. 1, 2025>
1. Requirements for an entrusted organization for electrical safety education duties pursuant to Article 25, Paragraph 1 , Subparagraphs 1 and 2 of the Act
a. Must have the organization and personnel necessary to conduct the training.
B. Be equipped with the facilities and equipment necessary for practical training.
c. Must offer educational courses in accordance with Annex 11 and Annex 12
2. Requirements for entrusted organizations for the change registration of persons specializing in electrical safety management, persons specializing in facility management, and agency business operators pursuant to Article 26, Paragraph 2 of the Act (applicable only if the change concerns technical personnel).
a. Must have the organization and personnel necessary for change registration tasks.
B. Must be equipped with facilities and equipment, such as computer systems, necessary for change registration tasks.
c. Must have operational regulations necessary for change registration tasks.
Article 46 (Criteria for Disposition by Violation and Criteria for Imposing Surcharges) Pursuant to Article 44, Paragraph 4 of the Act , the criteria for disposition by violation and the criteria for imposing surcharges on power engineering associations and construction contractor associations are as set forth in Attached Table 19 .
Article 47 (Review of Regulations) ① The Minister of Climate, Energy and Environment shall review the validity of the qualifications and scope of duties of electrical safety managers pursuant to Article 30 every three years, starting from January 1, 2020 (meaning the period prior to the same date as the reference date of every third year), and take measures such as improvements. <Amended Oct. 1, 2025>
② The Minister of Climate, Energy and Environment shall review the validity of the matters set forth in each of the following subparagraphs every two years based on the reference dates specified in each of the following subparagraphs (meaning until the day before the same date as the reference date of the year marking every second year) and take measures such as improvements. <Amended Oct. 1, 2025>
1. Documents to be submitted and compliance requirements for reporting unavoidable construction work pursuant to Article 5 : January 1, 2021
2. Criteria and period for allowing temporary use of private electrical facilities pursuant to Article 7 , Paragraphs 1 and 2 : January 1, 2021
3. Documents to be submitted and deadline for reporting the appointment and dismissal of an electrical safety manager pursuant to Article 34, Paragraphs 1 and 2 : January 1, 2021
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 415, Apr. 1, 2021>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, Article 27 shall enter into force on April 1, 2028, and Article 33 and Annex 10 shall enter into force on April 1, 2022.
Article 2 (Applicability to the Scale of Outsourcing of Electrical Safety Management Duties) Article 26 shall apply from the time a new outsourcing contract for electrical safety management duties is concluded after the enforcement of this Rule.
Article 3 (Applicability to Reporting of Construction Plan for Private Electricity Facilities) The reporting of a construction plan for the installation of on-premises distribution facilities for electric receiving facilities with a facility capacity of less than 1,000 kilowatts, as per Item 2, Subparagraph (a) of Annex 1, shall apply to construction projects starting on or after July 1, 2021.
Article 4 (Applicability to Pre-use Inspection of Fuel Cell Power Generation Facilities) The pre-use inspection for the installation or modification of fuel cell power generation facilities exceeding 100 kilowatts, as construction work for a fuel cell power plant pursuant to Item 10, Subparagraph (a) of Annex 3, shall apply to construction work starting on or after April 1, 2022.
Article 5 (Special Provisions Concerning Periodic Inspections, etc. of General-Use Electrical Facilities Installed in Rural Guesthouse Business Facilities) Electrical facilities of rural guesthouse business facilities pursuant to Article 2, Subparagraph 16, Item (d) of the Rural Development Act, for which a pre-use inspection or periodic inspection was conducted prior to the enforcement of this Rule, shall undergo periodic inspection pursuant to Article 12, Paragraph 1, Item 1, in accordance with the classifications in each of the following subparagraphs.
1. In cases where one year has not passed since the pre-use inspection or periodic inspection at the time of enforcement of this rule: Within two months before or after the month in which the one-year anniversary falls.
2. In cases where one year has passed since the pre-use inspection or periodic inspection was conducted at the time of the enforcement of this rule: Within two months from the date of enforcement of this rule.
Article 6 (General Transitional Measures) Decisions, dispositions, procedures, and other acts under the former Enforcement Rules of the Electric Power Business Act at the time of the enforcement of this Rule shall be deemed to have been performed in accordance with this Rule.
Article 7 (Amendment of Other Laws) ① The Enforcement Rules of the Mining Safety Act are partially amended as follows.
In Note 8 of Annex 3, Subparagraph (a) of “Article 73, Paragraph 3, Subparagraph 3 of the Electric Power Business Act” shall be changed to “Article 22, Paragraph 3, Subparagraph 3 of the Electric Safety Management Act”, and in Subparagraph (b) of the same subparagraph, “Article 73, Paragraph 3, Subparagraphs 1 and 2 of the Electric Power Business Act” shall be changed to “Article 22, Paragraph 3, Subparagraphs 1 and 2 of the Electric Safety Management Act”.
② The Enforcement Rules of the Energy Act are partially amended as follows.
In the section for reasons for exception payment of Form No. 4, “Article 42-3, Paragraph 4, Subparagraph 8, Item (a) of the Enforcement Decree of the Electric Power Business Act” shall be changed to “Article 7, Paragraph 4, Subparagraph 8, Item (a) of the Enforcement Decree of the Electric Safety Management Act”.
③ The Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas are partially amended as follows.
In Appendix 4, Item 1, Subparagraph (a) 10)f)(1), “Article 63 of the Electric Power Business Act” shall be changed to “Article 9 of the Electric Safety Management Act”.
④ Part of the Enforcement Rules of the Electric Power Technology Management Act is amended as follows.
In Article 33, Paragraph 2, “Article 73, Paragraph 3, Subparagraph 2 of the Electric Power Business Act” shall be changed to “Article 22, Paragraph 3, Subparagraph 2 of the Electric Safety Management Act”.
Article 8 (Relationship with Other Laws and Regulations) Where, at the time of the enforcement of this Rule, other laws and regulations cite the provisions of the former Enforcement Rules of the Electric Power Business Act, and there are corresponding provisions in this Rule, the relevant provisions of this Rule shall be deemed to have been cited in place of the provisions of the former Enforcement Rules of the Electric Power Business Act.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 448, Jan. 21, 2022> (Partial Amendment to 36 Ministry of Trade, Industry and Energy Decrees, including the Enforcement Rule of the High-Pressure Gas Safety Management Act)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 464, Apr. 22, 2022>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the matters set forth in each of the following subparagraphs shall enter into force on the date specified in each subparagraph.
1. Amended provisions of the main text of Article 6, Paragraph 2 (excluding the subparagraphs), Article 25, Paragraph 3, Subparagraph 3, Article 26, Subparagraph 1 (b) and (c), Article 26, Subparagraph 2 (b) and (c), Subparagraphs 6 and 7 of Annex 3, and Note 4 (a) of Annex 8: One year after the date of promulgation
2. Amended provisions of Item 1 (5) and Item 2 (b) of Annex 4: January 1, 2023
Article 2 (Applicability to Pre-use Inspection) ① The amended provisions of the main text of the part other than each subparagraph of Article 6, Paragraph 2, and Subparagraph 6(b) and Subparagraph 7 of Annex 3 shall apply from the time of application for approval or notification of a plan for construction of private electrical facilities after the effective date pursuant to Subparagraph 1 of Article 1 of the Addenda.
② The amended provisions of the proviso to Article 6, Paragraph 5, Subparagraph 5 of the same paragraph, and Form No. 4 of the attached document shall apply from the time an application for approval or report is made for a plan for construction of private electrical facilities after the enforcement of this rule.
Article 3 (Applicability to Documents, etc. Required for Periodic Inspection) The amended provisions of the proviso to Article 8, Paragraph 5, Subparagraphs 1 and 2 of the same Paragraph, and Form No. 6 shall apply from the time an application for a periodic inspection is made after the enforcement of this Rule.
Article 4 (Applicability to the Scope of Agency for Electrical Safety Management Duties) ① The amended provisions of Article 26, subparagraph 1, item (b) and subparagraph 2, item (b) shall apply from the time an agency contract for electrical safety management duties is concluded, renewed, or extended after the effective date pursuant to Article 1, subparagraph 1 of the Addenda.
② The amended provisions of Item 1, Subparagraph (c) of Annex 9 shall apply from the time an agency contract for electrical safety management is concluded, renewed, or extended after the enforcement of this rule.
Article 5 (Applicability to Ordering of Construction Supervision) The amended provisions of Article 30, Paragraph 2, Subparagraph 6, Item (c) shall apply from the time an application for approval of an electrical facility construction plan is made or a report is filed pursuant to Article 8 of the Act and Article 61 of the Electric Power Business Act after the enforcement of this Rule.
Article 6 (Applicability to Deemed Completion of Electrical Safety Education) The amended provisions of Article 37, Paragraph 2, Subparagraph 2 shall apply from the time an educational course certified by an international organization related to electrical safety is completed after the enforcement of this Rule.
Article 7 (Applicability to Approval and Notification of Plans for Construction of Private Electrical Facilities) The amended provisions of Item 1, Subparagraphs (a) and (b) of Annex 1 shall apply from the time an application for approval or notification of a plan for construction of private electrical facilities is made after the enforcement of this rule.
Article 8 (Special provisions regarding periodic inspection of power generation facilities) ① Owners or occupants of commercial wind power generation facilities who have received a pre-use inspection or periodic inspection in accordance with the previous regulations at the time of enforcement of this rule shall undergo a periodic inspection in accordance with the following classifications, notwithstanding the amended provisions of Item 1 (4) of Table 4.
1. In cases where three years have elapsed since the pre-use inspection or periodic inspection was received at the time of the enforcement of this rule: Within six months from the date of enforcement of this rule.
2. In cases where three years have not elapsed since the pre-use inspection or periodic inspection was received at the time of enforcement of this rule: Within six months from the date marking the third year.
② Owners or occupants of commercial photovoltaic power generation facilities who have received a pre-use inspection or periodic inspection in accordance with the previous regulations at the time of enforcement of this rule shall receive a periodic inspection in accordance with the following classifications, notwithstanding the amended provisions of Item 1 (5)(b) of Table 4.
1. In cases where two years have elapsed since the pre-use inspection or periodic inspection was received at the time of the enforcement of this rule: Within six months from the date of enforcement of this rule.
2. In cases where two years have not elapsed since the pre-use inspection or periodic inspection was received at the time of enforcement of this rule: Within six months from the date marking the two-year mark.
③ New and renewable energy power generation business operators who have installed and are operating transmission lines and substations at the time of the enforcement of this rule shall undergo periodic inspections in accordance with the classifications in each of the following subparagraphs.
1. If four years have elapsed since the commencement date of the business at the time of the enforcement of this rule: Within six months from the enforcement date of this rule
2. If four years have not elapsed since the commencement date of the business at the time of the enforcement of this rule: Within six months from the date marking the fourth year.
④ Owners or occupants of private electrical facilities that have installed and are operating emergency backup power generation facilities of less than 75 kilowatts at the time of enforcement of this rule shall undergo periodic inspections in accordance with the classifications in each of the following subparagraphs.
1. In cases where it is installed in the same location as a receiving facility subject to periodic inspection: When inspecting the receiving facility
2. In cases where it is not installed in the same location as the receiving facility subject to periodic inspection: Within one year from the effective date of this rule.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 471, June 22, 2022>
This rule shall take effect on June 22, 2022.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 494, Dec. 21, 2022>
This rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 4, Item 1 (5)(b) of the Partial Amendment to the Enforcement Rule of the Electric Safety Management Act, Decree No. 464 of the Ministry of Trade, Industry and Energy shall enter into force on January 1, 2023.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 507, Apr. 19, 2023>
This rule will take effect on April 19, 2023.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 531, Dec. 6, 2023>
Article 1 (Enforcement Date) This rule shall enter into force on July 1, 2024.
Article 2 (Applicability to Approval or Notification, etc. of Uninterruptible Power Supply Construction Plans) The amended provisions of Annexes 1 through 3 shall apply from the time an application for approval or notification of a construction plan for an uninterruptible power supply is made after the enforcement of this rule.
Article 3 (Special Provisions Concerning Periodic Inspection of Uninterruptible Power Supply Systems) Notwithstanding the amended provisions of Annex 4, uninterruptible power supply systems that are already installed or under construction at the time of enforcement of this Rule shall undergo periodic inspection in accordance with the classifications in each of the following subparagraphs.
1. In the case of uninterruptible power supply systems already installed at the time of the enforcement of this rule: Within one year from the date of enforcement of this rule.
2. In the case of uninterruptible power supply systems under installation at the time of enforcement of this rule: Within one year from the date of completion.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 539, Dec. 20, 2023>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Periodic Inspections) The amended provisions of Annex 4 shall apply to electrical facilities for which a periodic inspection is requested after the enforcement of this rule.
Article 3 (Applicability of the method for calculating weights to determine the scope of electrical safety management agency work) The amended provisions of Note 2 of Annex 9 shall apply from the time an agency contract for electrical safety management work is concluded, renewed, or extended after the enforcement of this rule.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 562, June 25, 2024>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 24, Paragraph 1 shall enter into force six months after the date of promulgation.
Article 2 (Applicability to Subjects of Safety Grade Designation) The amended provisions of Article 24, Paragraph 1 shall apply to electrical facilities subject to periodic inspections starting from the enforcement of this Rule.
Article 3 (Applicability to the Scope of Agency for Electrical Safety Management Duties) The amended provisions of Article 26, subparagraphs 1 and 2 shall apply from the time an agency contract for electrical safety management duties is concluded, renewed, or extended after the enforcement of this Rule.
Article 4 (Transitional Measures Concerning Safety Inspections of Private Electrical Facilities Installed in Households of Multi-Unit Housing) For private electrical facilities installed in households of multi-unit housing where the period for safety inspection pursuant to the former Article 20, Paragraph 1 had elapsed prior to the enforcement of this Rule, and for which such period had not expired at the time of the enforcement of this Rule, safety inspections shall be conducted in accordance with the former regulations notwithstanding the amended provisions of Article 20, Paragraph 1, Subparagraph 1.
Article 5 (Transitional Measures Concerning Periodic Inspections) Notwithstanding the amended provisions of Annex 4, the timing of the inspection for the first periodic inspection conducted after the enforcement of this Rule on the site and structure of a solar power plant installed before the enforcement of this Rule shall be in accordance with the previous provisions.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 605, Apr. 23, 2025>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 27 of the Enforcement Rule of the Electric Safety Management Act, Decree No. 415 of the Ministry of Trade, Industry and Energy, shall enter into force on April 1, 2028.
Article 2 (Applicability to Re-inspection of Solar Power Plant Sites and Structures) The amended provisions of the proviso to Article 8, Paragraph 4 shall apply to the sites and structures of solar power plants subject to periodic inspections starting from the enforcement of this Rule.
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 1, Oct. 1, 2025> (Enforcement Rule on the Organization of the Ministry of Climate, Energy and Environment and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, among the Ministerial Ordinances amended pursuant to Article 6 of the Addenda, the parts amending Ministerial Ordinances that were promulgated prior to the enforcement of this Rule but whose effective date has not yet arrived shall enter into force on the respective effective dates of those Ordinances.
Articles 2 through 5 omitted
Article 6 (Amendment of Other Laws) ① through <62> Omitted
<63> The Enforcement Rules of the Electrical Safety Management Act are partially amended as follows.
In Article 3, Paragraph 2, the part other than the subparagraphs of Article 35, Paragraph 1, Article 43, Paragraph 1, and the part other than the subparagraphs of Article 45, “Ordinance of the Ministry of Trade, Industry and Energy” shall be changed to “Ordinance of the Ministry of Climate, Energy and Environment”.
Article 4, Paragraph 1; Article 6, Paragraph 1, Subparagraph 3; Article 6, Paragraph 3, Subparagraph 3; Article 6, Paragraph 5, Subparagraph 5; Article 8, Paragraph 1, proviso excluding the subparagraphs; Article 8, Paragraph 3, Subparagraph 2; Article 8, Paragraph 5, Subparagraph 2; Article 9, Paragraphs 2 and 3; Article 12, Paragraph 3; Article 13-2, Paragraph 3; Article 18, Paragraph 1, Subparagraphs 1 and 2; Article 22, Paragraph 1, main text; Article 22, Paragraph 2; Article 23, Paragraphs 1 and 2; Article 24, Paragraphs 3 through 5; Article 24, Paragraph 7; Article 25, Paragraph 3, Subparagraph 3; Article 30, Paragraph 3; Article 34, Paragraph 1, excluding the subparagraphs; Article 37, Paragraph 2, excluding the subparagraphs; Article 37, Paragraph 5, excluding the subparagraphs; Article 38, Paragraph 1, excluding the subparagraphs; Article 38, Paragraph 2, main text excluding the subparagraphs; Article 39, excluding the subparagraphs In the part, Article 42 Paragraph 1, Article 43 Paragraphs 2 and 3, Article 47 Paragraph 1 and the part other than the subparagraphs of Paragraph 2 of the same article, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment”.
In Article 12, Paragraph 1, Subparagraph 1, Item (c), “Commissioner of Statistics Korea” shall be changed to “Director of the National Data Office”.
In Annex 2, Item 1, the section for institutions subject to submission under the first part of Article 8, Paragraph 1 of the Act regarding application for authorization or notification; Item (f) of the section for attached documents under the first part of Article 8, Paragraph 1 and the first part of Article 8, Paragraph 2 of the Act regarding application for authorization or notification under the same item; the section for institutions subject to submission under the latter part of Article 8, Paragraph 1 of the Act regarding application for authorization or notification of change under the same item; Item (f) of the section for attached documents under the latter part of Article 8, Paragraph 1 and the latter part of Article 8, Paragraph 2 of the Act regarding application for authorization or notification of change under the same item; the section for inspection standards and methods for other items in Annex 5; the part other than the table in Annex 7, Item 1; Item 3 (a) of Annex 11; Item 3 (a) of Annex 12; and the title of Annex 14, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment” in each case.
In Form No. 1, Form No. 2, Form No. 3, Item 5 in the front attachment section of Form No. 4, Item 2 in the attachment section of Form No. 6, Form No. 11, Form No. 12, Form No. 13, the fee section of Form No. 18, Form No. 22, Form No. 23, Form No. 25, Form No. 26, Form No. 27, Form No. 28, Form No. 29, and Form No. 31, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment”.
In the processing procedure section of Form No. 1, the processing procedure section of Form No. 2, the consent form for the collection, use, and provision/utilization of personal information on the back of Form No. 15, and the consent form for the collection, use, and provision/utilization of personal information on the back of Form No. 16, “Ministry of Trade, Industry and Energy” shall be changed to “Ministry of Climate, Energy and Environment”.
In the fee section on the front of Form No. 4, the fee section on the front of Form No. 9, the fee section of Form No. 19, and the fee section of Form No. 22, “Ordinance of the Ministry of Trade, Industry and Energy” shall be changed to “Ordinance of the Ministry of Climate, Energy and Environment”.
In the part other than the subparagraphs of Article 27 of the Partial Amendment to the Enforcement Rules of the Electric Safety Management Act (Ministry of Trade, Industry and Energy Decree No. 415), “Ministry of Trade, Industry and Energy Decree” shall be changed to “Ministry of Climate, Energy and Environment Decree,” and in subparagraph 8 of the same article, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment.”
<64> through <98> omitted
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 6, Nov. 26, 2025>
This rule will take effect on November 28, 2025.
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 46, June 29, 2026>
Article 1 (Enforcement Date) This rule shall enter into force on July 1, 2026.
Article 2 (Special provisions regarding periodic inspection) For owners or occupants of solar power plants who have not received such periodic inspection at the time of enforcement of this rule, where the time for periodic inspection of the site and structure of a solar power plant has passed in accordance with the previous regulations prior to enforcement of this rule, notwithstanding the amended provisions of the time column in Item 1 (5)(b) of Annex 4, they must receive a periodic inspection within 3 months from the date of enforcement of this rule.
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 54, Aug. 27, 2026> (Enforcement Rule of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy)
Article 1 (Enforcement Date) This rule shall enter into force on September 18, 2026.
Articles 2 and 3 omitted
Article 4 (Amendment of Other Laws) ① through ⑥ Omitted
⑦ Part of the Enforcement Rules of the Electric Safety Management Act is amended as follows.
In Article 11, Paragraph 2, Subparagraph 1, “the Act on Promotion of Development, Utilization, and Dissemination of New and Renewable Energy” shall be changed to “the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy”.
In Item 1 of the attached documents section on the front of Form No. 7, “the Act on Promotion of Development, Utilization, and Dissemination of New and Renewable Energy” shall be changed to “the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy”.
Article 5 omitted
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 56, Aug. 31, 2026> (Enforcement Rule of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management)
Article 1 (Enforcement Date) This rule shall enter into force on September 18, 2026.
Article 2 (Amendment of Other Laws) ① through ⑧ Omitted
⑨ Part of the Enforcement Rules of the Electric Safety Management Act is amended as follows.
In Article 26, subparagraph 1, item (b), “new energy and renewable energy pursuant to subparagraphs 1 and 2 of Article 2 of the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be replaced with “renewable energy pursuant to subparagraph 2 of Article 2 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy and energy utilized in fuel cells, etc. and hydrogen energy pursuant to subparagraphs 6 and 11 of Article 2 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management.”
In Article 28, subparagraph 1, item (c), “new energy or renewable energy pursuant to Article 2, subparagraph 1 or 2 of the Act on Promotion of Development, Use, and Dissemination of New and Renewable Energy” shall be replaced with “renewable energy pursuant to Article 2, subparagraph 2 of the Act on Promotion of Development, Use, and Dissemination of Renewable Energy, and energy utilized in fuel cells, etc., pursuant to Article 2, subparagraphs 6 and 11 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management”.
In Article 30, Paragraph 2, Subparagraph 6, Item (c), “new energy and renewable energy facilities pursuant to the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be replaced with “renewable energy facilities pursuant to Article 2, Subparagraph 3 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy, and fuel cells, etc. and hydrogen energy facilities pursuant to Article 2, Subparagraphs 6 and 12 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management.”
Item 2(a) of Annex 11 shall be as follows.
H. Safety management guidelines for each type of renewable energy pursuant to Article 2, subparagraph 2 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy; safety management guidelines for energy utilized in fuel cells, etc. pursuant to Article 2, subparagraph 6 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management; and safety management guidelines for hydrogen energy pursuant to subparagraph 11 of the same article.
In Annex 16, Item 1, Subparagraph (a) 3)h), “new and renewable energy facilities pursuant to the Act on Promotion of Development, Use and Dissemination of New and Renewable Energy” shall be replaced with “renewable energy facilities pursuant to Article 2, Subparagraph 3 of the Act on Promotion of Development, Use and Dissemination of Renewable Energy, and fuel cells, etc. and hydrogen energy facilities pursuant to Article 2, Subparagraphs 6 and 12 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management”.
Omit ⑩ through ⑬
Article 3 Omitted
[Attached Table 1] Subjects of Approval and Notification for Private Electrical Facility Construction Plans (Related to Article 3, Paragraph 1)
[Appendix 2] Method of Applying for Approval and Reporting Private Electrical Facility Construction Plans (Related to Article 4)
[Appendix 3] Timing of Pre-use Inspection (Related to Article 6, Paragraph 4)
[Appendix 4] Electrical Facilities Subject to Periodic Inspection and Timing (Related to Article 8, Paragraphs 1 and 2)
[Appendix 5] Inspection Standards and Methods for General Electrical Facilities (Related to Article 17)
[Appendix 6] Safety Grade Standards for Electrical Installations (Related to Article 24, Paragraph 2)
[Appendix 7] Standards for Adjusting the Timing of Inspections and Checks According to Safety Grades of Electrical Facilities (Related to Article 24, Paragraph 6)
[Appendix 8] Criteria for Appointment of Electrical Safety Managers and Detailed Technical Qualifications (Related to Article 25, Paragraph 2 and Article 30)
[Appendix 9] Scope of Delegation for Electrical Safety Management Duties (Related to Article 31, Paragraph 2)
[Appendix 10] Equipment to be possessed by the person who has appointed an electrical safety manager (related to Article 33)
[Appendix 11] Electrical Safety Education for Electrical Safety Managers (Related to Article 37, Paragraph 1, Subparagraph 1)
[Appendix 12] Electrical Safety Training for Construction Management Officers (Related to Article 37, Paragraph 1, Subparagraph 2)
[Appendix 13] Criteria for Cancellation of Registration and Suspension of Business for Persons Specializing in Safety Management Duties, etc. (Related to Article 40)
[Appendix 14] Matters to be reported to the Minister of Climate, Energy and Environment and deadlines (related to Article 42, Paragraph 1)
[Attached Table 15] Matters to be reported to the Mayor/Provincial Governor and deadlines (related to Article 42, Paragraph 2)
[Appendix 16] Types of Serious Accidents and Methods of Notification (Related to Article 43, Paragraphs 1 and 2)
[Appendix 17] Requirements for Designation of Accident Investigators (Related to Article 43, Paragraph 3)
[Appendix 18] Standards for Calculating Fees and Education Expenses (Related to Article 44)
[Appendix 19] Criteria for Dispositions and Imposition of Surcharges by Violation (Related to Article 46)
[Attachment Form No. 1] Application for Construction Plan (Approval, Modification Approval)
[Attachment Form No. 2] Construction Plan (Notification, Change Notification)
[Attachment Form No. 3] Notification of Unavoidable Construction
[Attachment Form No. 4] Application for Pre-use Inspection
[Attachment Form No. 5] Inspection Confirmation Certificate
[Attachment Form No. 6] Application for Periodic Inspection
[Attachment Form No. 7] Application for Pre-use Inspection
[Attachment Form No. 8] Pre-use Inspection Certificate
[Attachment Form No. 9] Application for Electrical Safety Inspection
[Attachment Form No. 10] Electrical Safety Inspection Confirmation
[Attachment Form No. 11] Safety Measure Order
[Attachment Form No. 12] Notification of Safety Measure Implementation Results
[Form No. 13] Application for Change of Safety Grade of Electrical Equipment
[Form No. 13-2] Notification of Electric Vehicle Charging Facility (Installation, Change)
[Attachment Form No. 14] Designation of Acting Electrical Safety Manager
[Attachment Form No. 15] Report on Electrical Safety Manager (Appointment, Dismissal)
[Attachment Form No. 16] Report on Electrical Safety Manager (Appointment, Dismissal) (Korea Safety Corporation, Contractor, Individual Agent)
[Attachment Form No. 17] Status of Electrical Equipment Managers by Technical Personnel
[Attachment Form No. 18] Certificate of Electrical Safety Manager (Appointment, Dismissal, Change) [On-site, Contractor (Electrical Safety Management Specialist, Facility Management Specialist)]
[Attachment Form No. 19] Certificate of Electrical Safety Manager (Appointment, Dismissal, Change) (Korea Safety Corporation, Agency, Individual Agent)
[Attachment Form No. 20] Report on Change of Electrical Safety Manager Appointment Details
[Attachment Form No. 21] Certificate of Completion for Electrical Safety Training
[Attachment Form No. 22] [Person Specializing in Electrical Safety Management, Person Specializing in Facility Management, Electrical Safety Management Agency, Individual Electrical Safety Management Agent (Application for Registration, Application for Change of Registration)]
[Attachment Form No. 23] Registration Certificate (Person Specializing in Electrical Safety Management, Person Specializing in Facility Management, Electrical Safety Management Agency, Individual Electrical Safety Management Agent)
[Attachment Form No. 24] Application for Payment of Disaster Prevention Inspection Costs
[Form No. 25] Report on Matters Concerning Electrical Safety
[Attachment Form No. 26] Report on Results of Inspection Work
[Form No. 27] Report on Inspection Results for General Electrical Facilities and Multi-unit Housing, etc.
[Attachment Form No. 28] Report on Electrical Safety Inspection Results for Facilities Used by Multiple People
[Attachment Form No. 29] Status of Electricity Supply Suspension
[Attachment Form No. 30] Matters Concerning the Appointment, etc. of Electrical Safety Managers
[Form No. 31] Notification of Serious Electrical Accident (Detailed Report)