Rules concerning the construction and operation, etc. of trams

270631 · 2025-04-11

Chapter 1 General Provisions Article 1 (Purpose) The purpose of this Rule is to prescribe matters concerning the construction and operation, etc. of trams pursuant to Article 18-2 of the Urban Railway Act. Article 2 (Relationship with Other Laws) Matters concerning the construction and operation, etc. of trams not prescribed in this Rule shall be governed by the "Rules on Urban Railway Construction" and the "Rules on Urban Railway Operation." Article 3 (General Standards for Construction, etc. of Trams) ① The tram constructor shall construct the tram facility to minimize electrical influences received from the outside and to withstand the maximum possible mechanical, electrical, and thermal loads. ② The tram constructor shall ensure that the transportation vulnerable, such as persons with disabilities and the elderly, can easily access and use tram facilities, and shall install and operate such facilities if separate facilities are required for the transportation vulnerable. Chapter 2 Construction of the Tramway Section 1 Track Article 4 (Mixed-use Tram Lanes) In Article 18-2, Paragraph 2 of the Act, the term "reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport" refers to any of the cases falling under any of the following subparagraphs. <Amended Apr. 11, 2025> 1. In cases where the design service level of the relevant road (referring to the level pursuant to Article 7 of the "Rules on Standards for Road Structure and Facilities") falls below the grade determined by the Minister of Land, Infrastructure and Transport due to the installation of a tram-only road or dedicated lane 2. Where the road is so narrow that the driving path of vehicles, etc., cannot be installed separately from a tram-only road or dedicated lane Article 5 (Tram-only Roads and Lanes) ① To prevent vehicles, etc. from entering tram-only roads, dividers, curbs, or other similar facilities must be installed at the boundary with roads or lanes, or the road surface height must be varied. ② Road markings or signs indicating that a tram-only lane is a tram-only lane must be installed on tram-only lanes to inform drivers of vehicles, etc. ③ Where the direction of travel of a tram differs from the direction of travel of vehicles, etc. on an adjacent road, collision prevention facilities must be installed at the boundary of the tram-only road or dedicated lane. Article 6 (Intersections) ① At places where a tram track intersects another road or another tram track (hereinafter referred to as "intersection"), the tram track may be installed to intersect the other road or another tram track at a level. ② The installation of physical barriers at intersections shall be minimized. Article 7 (Standards for Installation of Tram Tracks) ① Tram tracks shall be double-tracked. However, sections specified in the Basic Urban Railway Plan by Route pursuant to Article 6 of the Urban Railway Act or the Basic Plan for Private Investment Facility Projects pursuant to Article 10 of the Private Investment in Social Infrastructure Act may be single-tracked. ② Tram tracks may be installed by mixing road-linked tracks (referring to tracks where tracks are installed on a road and trams operate; hereinafter the same) and track-independent tracks (referring to tracks where tracks are installed in a space other than an existing road and trams operate; hereinafter the same) within a single operating route. ③ The section of a mixed-use track (referring to a track installed on a mixed-use lane pursuant to Article 18-2, Paragraph 2 of the Urban Railway Act; hereinafter the same) shall not exceed one-fifth of the total tram track. Article 8 (Public Facilities) ① When installing manholes on roads surrounding tram tracks, they must be installed outside the building clearance (referring to the space necessary for the safe operation of vehicles, taking into account factors such as tram swaying or track twisting; hereinafter the same) so that access to the manholes is possible even while trams are in operation. However, in unavoidable cases, a minimum number of manholes may be installed within the building clearance. ② When installing facilities such as conduits or cables within tram tracks, measures shall be taken to facilitate the maintenance of such facilities and to minimize the impact on tram operations. Article 9 (Standards for Track Installation) ① The track of a tram line (referring to a facility composed of rails, sleepers, ballast, and accessories thereof; hereinafter the same) shall be capable of absorbing static and dynamic loads corresponding to the maximum allowable speed. ② The track shall be designed so that the tram does not derail. ③ The tracks of intersections and mixed-use tracks shall satisfy all of the requirements of the following subparagraphs. 1. The track must be able to withstand the load of trams, automobiles, etc. 2. Vehicles, etc. shall not slip due to the tracks. Article 10 (Distance from the Center of the Track) The Mayor of a Special City, Metropolitan City, Special Self-Governing City, or Governor of a Province or Special Self-Governing Province (hereinafter referred to as "City/Provincial Governor") may separately determine the distances specified in each of the following subparagraphs, taking into consideration the characteristics of the tram and tram facilities and operating conditions. 1. Distance between the center of an orbit and the center of an adjacent orbit 2. Distance from the center of the track to the power supply pole or track separation facility located between the track and an adjacent track 3. Distance from the boundary facility or boundary line between the track and the lane of operation (such as for vehicles) to the center of the track 4. Distance from the center of the track to the sidewalk 5. Other distances between facilities that the Mayor/Do Governor deems necessary for the safe operation of trams Article 11 (Installation of Tracks for Road-Connected Railways) ① The tracks of road-linked railways shall be installed in accordance with the standards of each of the following subparagraphs. 1. A flange way (referring to a space created to allow a flange, which serves to prevent lateral derailment of a vehicle from the wheels, to pass) shall be constructed in such a way as not to obstruct the passage of other road users. 2. The height of the top surface of the track shall be equal to the height of the road surface. ② Mixed tracks, intersections, and other sections used by pedestrians or vehicles shall be installed as embedded tracks. Article 12 (Turnoffs) Turnoffs (referring to track structures intended to change the direction of a track on which a tram operates to the direction of another track; hereinafter the same) shall not be installed in places where the movement of the track may cause danger to other road users or where damage may be caused by vehicles, etc. Article 13 (Track Switches) ① A track switch (referring to a device that changes the direction of a turnout pursuant to Article 12; hereinafter the same) shall be installed to operate when a tram has sufficiently approached the track switch in order to minimize the risk of accidents caused by the change in track direction, provided that it operates when the tram driver is within a distance where the driver can confirm the direction of travel and stop. ② Track switches shall be locked (referring to a locking device that prevents electrical or mechanical operation; hereinafter the same) so that the direction of the track is not changed while a tram is passing. <Amended Apr. 11, 2025> ③ Automatic track switches shall be capable of remote control, but shall also be operable manually. ④ Track switches shall be installed so as not to be affected by the current generated by the tram's drive system. Article 14 (Evacuation Facilities) In the case of road-connected railway lines, the railway line may be used as an evacuation route without installing separate evacuation facilities. Article 15 (Track Drainage) Tracks shall be equipped with appropriate drainage functions, and track drainage facilities within roads shall be connected to the road drainage facilities. Article 16 (Vehicle Detection) Detection devices for trams (devices capable of identifying the current location, status, etc. of a vehicle and taking necessary measures) shall be installed in consideration of the tram's operating speed, the safety of intersections and pedestrian crossing facilities, etc. Section 2 Signaling Equipment Article 17 (Standards for Installation of Signals, etc.) ① The driver of a tram must be able to clearly distinguish and recognize tram signals and signal signs, and in visual operation sections, the driver of a tram must be able to recognize tram signals and signal signs even at night. ② When the visibility to the tram stop signal is shorter than the braking distance, a relay signal (referring to a signal subordinate to the main signal that relays its signal status) must be installed. Article 18 (Tram Signals) ① General traffic signals in accordance with Item 1 of Annex 1 shall be installed in the following places. 1. Places where tram drivers and drivers of vehicles, etc., must follow different signals 2. Sections of single-track tram lines where it is necessary to ensure safety in areas where trams travel in both directions ② At places where tram operating tracks diverge (hereinafter referred to as "junctions"), junction signals in accordance with Subparagraph 2 of Annex 1 shall be installed. ③ Tram signals shall be installed to the right of the tram's direction of travel; however, if unavoidable due to obstacles or other factors, their location may be changed. ④ Tram signals shall be clearly distinguishable from signals for pedestrians, vehicles, etc. Article 19 (Speed ​​Limit and Slow-Down Signal Signs) ① Speed ​​limit signal signs in accordance with Item 1 of Annex 2 shall be installed at the following places. 1. Locations within the branching section where passing speed needs to be limited 2. Other places where the maximum speed of trams must be partially restricted ② In places where temporary speed limits are required, slow-speed signal signs pursuant to Subparagraph 2 of Annex 2 shall be installed according to the classifications in each of the following subparagraphs. In this case, the speed limit shall be indicated on the signal signs under Subparagraphs 1 and 2. 1. Slow-down Warning Sign: Considering the speed of the tram, ahead of the slow-down section 2. Slow Speed ​​Signal Sign: Start point of slow speed section 3. Slow-down Release Signal Sign: A place where the tram's operating speed may be restored to normal speed (referring to the point where the rear end of the tram has completely passed through the slow-down section) Article 20 (Special Signal Signs) Special signal signs in accordance with Annex 3 shall be installed at points where the route switches from a visual operation section to a system operation section (referring to a situation where the driver operates the tram relying on vehicle operation control equipment; hereinafter the same applies) or from a system operation section to a visual operation section. Article 21 (Signals at Intersections) ① At intersections, traffic signals for vehicles and trams must be controlled together through a road traffic signal controller. ② Where a tram priority signal is installed at an intersection, the road traffic signal controller must be operated to allow trams to pass through the intersection in priority over other means of transportation. ③ The length of the tram priority signal installed at an intersection shall be sufficient to allow a single tram train to pass. Article 22 (Pedestrian Crossing Facilities and Signals) ① Pedestrian crossing facilities shall be installed on tram tracks in consideration of the safety and mobility convenience of the road-vulnerable. ② Visual or auditory signals announcing the approach of a tram shall be installed at pedestrian crossing facilities. ③ If it is difficult for the tram driver to visually confirm pedestrian crossing facilities, a separate signal sign must be installed to inform the tram driver of the presence of pedestrian crossing facilities. Section 3 Electrical Installations Article 23 (Method of Electricity Supply) ① Power to a tram shall be supplied by means of an overhead catenary (referring to a wire for supplying power to a tram; hereinafter the same), an onboard power supply method such as a battery, or a third rail (referring to a rail laid parallel to the track to contact the current collector under the tram, which is a type of catenary for supplying power to a tram; hereinafter the same). ② When a tram receives power from an overhead catenary, it shall be supplied via a 750-volt DC system; however, the voltage and current systems may be varied depending on the type of tram. ③ In cases where power is supplied to a tram using a third rail on a road-linked track, a device must be provided to prevent accidents caused by contact between the third rail and pedestrians or vehicles. Article 24 (Power Safety) ① Power supply facilities necessary for the operation of trams (hereinafter referred to as "power supply facilities") shall be equipped with a capacity capable of maintaining normal voltage. ② Trams shall be designed to protect people and equipment from internal and external abnormal voltages of power supply facilities. ③ When a rail is used as a return current conductor (referring to an object that transmits current returning from an operating tram to a substation), the connection between the substation and the rail shall be made two-circuit to minimize the risk caused by leakage current. ④ Structures supporting power supply facilities shall be installed so as not to obstruct the passage of other road users and to prevent damage caused by the operation of vehicles, etc. ⑤ All utility poles installed in public places for the operation of trams must be installed in such a way that no one other than authorized and equipped personnel can climb them. Article 25 (Overhead Catenary) ① The height of the overhead catenary shall be between 5,000 millimeters and 5,400 millimeters from the upper surface of the track. However, the Mayor or Provincial Governor may determine a different height for the overhead catenary if necessary. ② The feeder lines of the overhead catenary (referring to the wires that supply electricity for trams from a substation to the overhead catenary) shall be installed separately by upstream and downstream lines or by route. ③ Structures supporting overhead catenary lines shall be double-insulated from the overhead catenary lines. Section 4 Control Room and Communication Facilities Article 26 (Methods of Control Operation, etc.) ① The tram operator shall install and operate a control room (referring to a place that monitors the driving and operation of trams, tram facilities, and traffic signals or safety signs pursuant to Article 3 of the Road Traffic Act, and oversees measures and recovery in the event of accidents or malfunctions; hereinafter the same applies), and monitor trams and facilities, etc., controlled automatically or remotely, in real time. ② The tram operator shall establish and comply with methods and procedures for the operation of the control room that include the matters of each of the following subparagraphs. 1. Selection Criteria and Training for Control Personnel 2. Duties and Authority of Control Personnel 3. Procedures for Action in Case of Operational Failure, Accident, etc. 4. Other matters related to the operation and management of the control system Article 27 (Integration of Control Rooms) ① The tram operation control room and the power supply control room shall be installed in a single space and integrated for operation. ② Notwithstanding Paragraph 1, if the Operation Control Room and the Power Supply Control Room are operated separately due to unavoidable circumstances, dedicated communication facilities between the Operation Control Room and the Power Supply Control Room must be provided. Article 28 (Communication Facilities in the Control Room) ① Wireless communication facilities shall be installed in the control room to enable two-way communication between each operational personnel, and between the control room and external disaster-related agencies such as police stations, fire departments, and medical institutions. ② Dedicated communication facilities shall be established between the control room and the agency that installs and manages traffic signals, etc. pursuant to Article 3 of the Road Traffic Act. <Amended Apr. 11, 2025> Article 29 (Emergency Power Supply Facilities in Control Rooms) Control rooms shall be equipped with emergency power supply facilities so that control facilities can operate normally even in the event of a power supply failure. Article 30 (Closed-circuit television, etc.) ① Closed-circuit television (CCTV) systems shall be installed at major intersections and stations to enable real-time video viewing from the control room. ② The control room shall be equipped with a device capable of checking the operating status of trams, the route direction of track switches, and the status of power supply facilities in real time. Article 31 (Emergency Communication Devices) Where emergency communication devices enabling passengers to communicate with the control room are installed on a platform, they shall be installed in a distributed manner at two or more locations at a height of 1.5 meters from the platform floor. Section 5 Lighting Installations Article 32 (Lighting Facilities) ① When installing lighting facilities, care must be taken to ensure that the lighting does not interfere with the tram driver's recognition of signals. ② When installing lighting facilities on a road-linked railway line, consultation with the road management authority pursuant to Article 23 of the Road Act (hereinafter referred to as the "Road Management Authority") is required. Article 33 (Station Lighting) ① Lighting facilities shall be installed at stations and entrances/exits used by passengers. In this case, the edges of the platform must be clearly recognizable. ② Notwithstanding Paragraph 1, separate lighting may not be installed at stations and station entrances/exits on road-linked tracks if lighting installed on the road can be utilized. Section 6 Station Article 34 (Tram stops on roads) ① When a tram operator installs a station on a road, the operator shall determine the location of the station after consultation with the relevant road management authority. ② When installing a station on a road, the principles of the following subparagraphs shall be followed, provided that passenger accessibility, transfer convenience, and surrounding traffic are taken into consideration. 1. It shall be located at a sufficient distance from intersections in consideration of the safety of tram passengers, drivers of vehicles, and pedestrians, and shall be conveniently accessible to all people, including those with disabilities. 2. Persons using the station shall be able to easily recognize the approach of trams, vehicles, etc. 3. The driver of a tram shall ensure that the location of the station and people approaching the station are easily recognizable. 4. Drivers of vehicles, etc., shall be able to easily identify persons using the station. ③ Facilities such as waiting rooms and restrooms may not be installed at the station pursuant to Paragraph 1. Article 35 (Length and Width of Platforms) ① The length of the platform must be at least sufficient to accommodate the longest tram train. ② The width of the platform shall take into account the scale and safety of everyday passengers. Article 36 (Platform Height) The difference between the floor of the doors of a tram used by persons with disabilities and the platform shall be within 15 millimeters. Article 37 (Safety Standards for Platforms) ① No structures that may impair the safety and convenience of passengers shall be installed on platforms. However, this shall not apply to structures supporting power supply facilities, etc., that exceed 2 meters from the ground. ② The boundary of the platform shall be clearly defined at the track-side edge using a color and surface finish different from other parts of the platform, and separate safety facilities, such as fall prevention devices, shall be installed at the boundary between the platform and the lane where vehicles operate. ③ If there are separate boarding and alighting locations for doors or platforms of a tram accessible to persons with disabilities, signs indicating that the tram is accessible to persons with disabilities must be placed on the vehicle doors and platforms. Chapter 3 Operation of Trams, etc. Section 1 Operation Article 38 (Operating Principles) ① A tram driver shall operate the tram while maintaining a fixed operating interval and shall maintain a safe distance so as to be able to stop safely even if a preceding tram stops abnormally. ② If a tram signal is malfunctioning or it is difficult to clearly recognize the signal, the tram driver shall stop assuming there is a stop signal. ③ Tram drivers shall operate by visual control on road-linked tracks and by system control on track-independent tracks. However, if a single line contains both road-linked and track-independent tracks, system control may be omitted. Article 39 (Direction of Operation) ① Trams operating on double tracks shall travel on the right. <Revised 2023.3.31> ② Notwithstanding Paragraph 1, in any of the following cases, the direction of operation may be changed after taking measures to ensure the safety of pedestrians or vehicles, etc. <Amended Mar. 31, 2023> 1. In case of a breakdown of the track or tram 2. When operating a rescue train (referring to a train operated for recovery from accidents, etc.) or a construction train (referring to a train operated for construction purposes) 3. When assembling or disassembling a vehicle, or changing lanes 4. In the case of driving within the premises 5. In case of test run 6. In the event of temporary single-line operation due to driving accidents, etc. 7. Other cases where the Minister of Land, Infrastructure and Transport recognizes that there are special grounds Article 40 (Speed ​​Limit) ① Trams operating on road-linked tracks shall not operate at a speed exceeding the maximum speed of the relevant road or 70 kilometers per hour. ② In any of the following cases, the vehicle must be operated at a speed of 15 kilometers per hour or less. <Amended 2025.4.11> 1. When operating where the switch is not locked 2. When driving in reverse (referring to driving in the opposite direction to the initial direction of travel) 3. When the distance to a preceding tram or vehicle, etc. within the same lane is 100 meters or less ③ The tram operator shall establish speed limit standards necessary for safe operation. In this case, the following matters shall be considered. 1. Curved Sections: Tram Performance and Passenger Comfort 2. Downhill Section: Braking Distance and Braking Performance Article 41 (Passenger Safety and Information) ① The tram driver shall depart after confirming that passengers have boarded and alighted at the station and that all doors of the tram are closed. ② The tram driver shall ensure that the tram doors open only in the direction of the platform when stopping during normal operation. ③ The tram driver shall provide passengers with the name of the arriving station, the direction in which the doors will open, and transfer information. ④ If passenger inconvenience is anticipated due to an operational disruption, the tram operator shall provide information regarding the disruption and alternative means of transportation to passengers at stations and on the tram. Article 42 (Priority Passage of Emergency Vehicles, etc.) ① A tram driver shall maintain a distance greater than or equal to the braking distance from an emergency vehicle when the emergency vehicle is traveling on a tram-only road or tram-only lane. ② Tram drivers shall yield to emergency vehicles at intersections so that they may pass first. Section 2 Safety Management, etc. Article 43 (Safety Management of Devices or Facilities) ① Tram operators shall install safety facilities or take security measures to prevent unauthorized persons from approaching or arbitrarily operating dangerous devices or equipment, such as overhead lines and track switches. ② The tram operator shall establish and implement a safety management plan for foreseeable emergency situations, such as gas leaks, water pipe ruptures, and traffic accidents. Article 44 (Storage of Trams) When a tram is stopped on the tracks after completing operation, the tram operator shall take measures to prevent the tram from moving and shall provide measures to prevent intrusion or damage by outsiders. Article 45 (Broken Tram) ① Trams with problems regarding safe operation shall not be operated. ② In the event that a tram in operation breaks down, it may proceed to the nearest station after taking appropriate safety measures. ③ In cases where driving is impossible from the lead cab of a tram (referring to the cab located at the very front in the direction of travel), an operator may board the lead cab and perform driving maneuvers from a location other than the lead cab, provided that the safety of the direction of travel is secured by means of wireless communication or the like. Article 46 (Work Around Tram Tracks) The tram operator shall prepare and implement a management plan for work around tram tracks that includes the following matters. 1. Task Management Target 2. Work Implementation Details and Schedule 3. Measures to ensure safety during work, etc. Article 47 (Maintenance, etc. of Tram Facilities and Trams) ① Tram operators shall comply with the minimum inspection and examination cycles for tram facilities and trams pursuant to the “Special Act on Safety and Maintenance of Facilities” and the “Rules on Urban Railway Operation,” provided that they determine the methods and scope of maintenance and inspection according to the construction methods and usage levels of the tram facilities and trams. <Amended Mar. 31, 2023> ② Tram operators shall record and manage details related to the formation and operation of trams. <Amended Mar. 31, 2023> Revision ⊙Ministry of Land, Infrastructure and Transport Decree No. 1478 The Partial Amendment to the Rules on the Construction and Operation, etc. of Trams is hereby promulgated as follows. April 11, 2025 Minister of Land, Infrastructure and Transport (Seal) Partial Amendment to the Rules on the Construction and Operation, etc. of Trams Part of the Rules on the Construction and Operation, etc. of Trams is amended as follows. In Article 4, subparagraph 1, "level according to" shall be changed to "level according to". In Article 13, Paragraph 2, "locking so as not to lock (locking, electrical)" shall be changed to "locking so as not to lock (electrical)", and "locking device so as not to lock" shall be changed to "locking device so as not to lock". In Article 28, Paragraph 2, "Article 3 of the Road Traffic Act" shall be changed to "Article 3 of the Road Traffic Act," and "shall be established" shall be changed to "must be established." In the part other than the subparagraphs of Article 40, Paragraph 2, "shall operate" shall be changed to "must operate," and in Subparagraph 1 of the same paragraph, "not locked" shall be changed to "not locked." Supplementary Provisions This rule shall take effect from the date of its promulgation. Reason for Enactment/Amendment [Partial revision] ◇ Reasons for Amendment and Key Contents The purpose is to replace the difficult Sino-Korean term "swaejeong (鎖錠)" with "jamgeum" to revise the language into Korean that is easy for the public to understand. <Provided by the Ministry of Land, Infrastructure and Transport>