Rules on Standards for Structures and Facilities of Rivers

279025 · 2025-10-01

Article 1 (Purpose) The purpose of this Rule is to prescribe standards for the structure and facilities of rivers in accordance with Article 13 of the River Act. Article 2 (Planar Structure of Rivers) ① The planar structure of a river shall be planned, taking into consideration the river environment and the existing river shape, so that the planned flood discharge pursuant to Article 24, Paragraph 2, Subparagraph 6, Item B of the Enforcement Decree of the River Act (hereinafter referred to as "planned flood discharge") flows safely. ② The alignment of the river shall be planned based on the existing river alignment to ensure smooth water flow. ③ The planned channel width shall be planned in consideration of the existing river boundaries, the current river site, and the river use plan. ④ The low-water channel (referring to the part where water flows under normal conditions; hereinafter the same) shall be determined based on the existing low-water channel of the river, but shall be planned in consideration of river usage conditions and changes in the riverbed. Article 3 (Longitudinal Structure of Rivers) ① The longitudinal structure of a river shall be planned to ensure stability with respect to flowing water, and shall be planned by comprehensively assessing sections requiring riverbed maintenance, water utilization and flood control, the river environment, and economic feasibility. ② The slope and height of the planned riverbed shall be determined in consideration of the existing riverbed; however, the riverbed height of tributaries, groundwater level, bottom height of structures, water intake facilities, and flow velocity must be reviewed to ensure that a stable riverbed is maintained. ③ Where necessary for the stability of the riverbed, the installation of riverbed maintenance facilities pursuant to Article 8 and riffles or pools pursuant to Article 16 shall be planned to create a dynamic and natural river shape. Article 4 (Transverse Structure of Rivers) ① The transverse structure of a river shall be planned to preserve the river's original natural shape. ② The transverse structure of a river shall be planned in consideration of the following matters. 1. Topography and Geology 2. Design Flood Discharge 3. Longitudinal Structure of Rivers 4. River environment including habitats of organisms, etc. 5. Current Status of Surrounding Land Use 6. Riverbank Site Use Plan Article 5 (Embankments) ① Embankments shall be planned in consideration of the following matters. 1. Prevention of flooding in the event of a flood discharge less than or equal to the flood volume according to the flood control planning scale pursuant to Attached Table 1 (referring to the target design frequency for the flood control capacity of the river) 2. Ensuring stability against scour, seepage, sliding, and settlement ② Embankments shall be constructed of earth. However, if construction with earth is inappropriate due to land use conditions, obstacles, etc., all or part thereof may be constructed using concrete, steel, or a wall structure equivalent thereto. ③ The embankment height (referring to the height of the upper part of the embankment from the mean sea level) shall be equal to or greater than the value obtained by adding the safety margin specified in Annex 2 to the planned flood level pursuant to Article 10, Paragraph 1, Subparagraph 4 of the River Act (hereinafter referred to as the "planned flood level"). ④ The crest width (referring to the width of the upper part of the embankment) shall be equal to or greater than the value specified in Attached Table 3. ⑤ The slope of the embankment shall be 1:3 or less. However, it may be steeper than 1:3 if there are reasons such as topographical conditions, maintenance of the cross-section for water flow, or obstacles; in such cases, the plan must be designed to ensure stability by considering the planned flood level, etc. 6. If necessary for the maintenance, management, disaster prevention, and patrolling of the river, a management road may be installed on the upper part or slope of the embankment. In this case, the management road shall be connected to a road outside the embankment at appropriate intervals for the convenience of passage. Article 6 (Revetment) ① Revetments [Revetment: Refers to structures installed on slopes to protect embankments and riverbanks. The same applies hereinafter] shall be planned to ensure stability against water flow at or below the planned flood level. ② The form and type of revetments shall be planned in consideration of hydraulic stability, ease of securing materials, economic feasibility, constructability, roughness, durability, and environmental friendliness. Article 7 (Handmade) ① Weirs (Water control: refers to structures installed on the front of a revetment or riverbank to control the direction and velocity of water flow; hereinafter the same applies) may be installed for the purposes of each of the following subparagraphs. 1. Prevention of riverbank erosion or revetment damage 2. Guidance of low-water channels or flow paths 3. Ecosystem Conservation 4. Landscape Improvement 5. Securing Flow Rate ② The scale, form, and layout of weirs shall be planned to be hydraulically stable and allow for sufficient water flow, and shall be installed in an environmentally friendly manner. ③ When installing groins, the effects such as scour, sedimentation, water flow, and water level changes must be reviewed through verified methods, including numerical analysis and hydraulic model experiments. Article 8 (Riverbed Maintenance Facilities) ① Riverbed maintenance facilities (referring to structures installed on the riverbed to maintain the stability of the riverbed and the longitudinal and transverse shapes of the river; hereinafter the same) shall be planned to minimize the impact on the riverbanks and river facilities surrounding the facilities. ② When installing riverbed maintenance facilities, protective works must be installed to prevent river scouring upstream and downstream of the facilities. ③ The structure and shape of riverbed maintenance facilities shall be determined in consideration of riverbed changes, water quality improvement, and ecological conservation, and shall be designed to harmonize with the surrounding landscape. Article 9 (Supplement) ① Weirs [Weir: Refers to facilities installed across a river to regulate water level or flow rate for the intake of various waters, navigation, and water-friendly activities, or to prevent backflow of seawater, among which facilities allow the overflow of flowing water. The same applies hereinafter] shall be planned to ensure stability against overturning, sliding, bearing capacity, settlement, and piping. ② When installing a weir, the impact of upstream and downstream water level changes on levee stability, groundwater level changes, intake and drainage structures, and river facilities shall be reviewed, and a plan shall be devised to ensure that no technical or structural problems arise. ③ The planar shape and installation direction of the weir shall be determined in consideration of the direction of water flow in the event of a flood, and when the management water level upstream of the weir is higher than that of the land within the weir, measures to prevent leakage and wetting of the embankment must be established. ④ The paper is classified into the following items. 1. Movable Weir: A weir that can be operated 2. Fixed Weir: A beam that cannot be manipulated ⑤ The spacing of movable weir columns shall be determined by considering the drainage level when the planned flood discharge occurs, river conditions, topographical conditions, economic feasibility, and constructability. ⑥ In cases where the movable part of a movable weir is of the lifting type, the bottom of the movable part at maximum lifting must be higher than the planned flood level plus the safety margin height according to Attached Table 2. 7. When installing a weir, protective works must be installed to prevent river scouring upstream and downstream of the main body. Article 10 (Sluices, Clearances and Passages) ① The structures set forth in each of the following subparagraphs installed for the purpose of water intake, drainage, and prevention of backflow shall be installed to be safe against water flow at water levels below the planned flood level. 1. Sluice Gate: A structure having a gate that opens and closes, installed to separate an embankment by crossing the main stream or a tributary flowing into the main stream 2. Pipeline: A structure installed by penetrating an embankment with a circular cross-section and equipped with an opening and closing gate at its end 3. Tunnel: A structure with a rectangular cross-section installed penetrating an embankment, with an opening and closing gate installed at its end or in the middle ② Sluice gates shall be installed in locations where the riverbed is stable and does not hinder river management, and they shall be avoided in bends, impact zones, and around structures such as bridges. <Revised Aug. 27, 2021> ③ The opening and closing doors of sluice gates and tunnels shall be constructed with watertightness (referring to the property of preventing the infiltration, absorption, and permeation of water), and if necessary, an operation room may be installed for the operation and protection of the opening and closing doors. 4. Clearances and gates shall be planned to prevent damage caused by seepage occurring along the contact surface with the embankment. Article 11 (Inland Water Drainage Facilities) ① Pumps of internal drainage facilities (referring to facilities for forcibly draining water from within the embankment into a river; hereinafter the same) shall be installed at a distance from the embankment or vibration countermeasures shall be provided to prevent damage to the embankment caused by vibration. ② Electrical facilities for the operation of internal drainage facilities shall be installed in such a way that they are not submerged by floods. Article 12 (Waterway) ① Discharge channels (referring to structures installed to discharge part or all of a flood volume to another location in order to regulate river flow; hereinafter the same) must ensure hydraulic and structural stability so that the allocated flow can flow safely. ② The discharge point of the spillway shall be a location that minimizes the impact of the discharged water on existing facilities and the surrounding environment. ③ The inlet, outlet, and downstream of the outlet of the spillway shall be planned to be safe from scour by reviewing hydraulic stability. Article 13 (Reservoirs and Flood Control Reservoirs) ① The following facilities may be installed to lower flood volume and flood level. 1. Retention basin: A facility installed along a riverbank that has the function of temporarily storing river flood volume. 2. Flood Control Reservoir: A facility installed to reduce flood volume or slow down the flow of a river in a downstream area, comprising a structure crossing the main channel [including sluice gates that regulate the discharge volume of the main channel] and a control reservoir, which is a storage space surrounding the main channel (including an inlet for introducing water during a flood and an outlet gate that regulates the water level within the control reservoir through sluice gate operation). ② The scale and type of retention basins and flood control reservoirs shall be determined according to the flood share ratio, flood volume, and flood control method between the main stream and the relevant facility. ③ The inflow facilities of retention basins and flood control basins must be structured to safely pass inflow and safely protect surrounding facilities. Article 14 (Navigation Facilities) ① Navigation facilities (referring to all navigation channels and lock facilities installed in rivers to allow vessels to travel or anchor) shall ensure an appropriate width and depth for the smooth operation and anchoring of vessels, and shall ensure sufficient visibility during vessel operation. ② Navigation channels shall be installed safely against waves and floods. ③ The height of a bridge crossing a navigable waterway (referring to the distance between the bottom of the bridge superstructure and the water surface) shall be determined by considering the shape of the vessel and the cargo, etc. ③ The location and scale of lock facilities shall be determined in consideration of river conditions and the types, specifications, and frequency of passage of vessels. Article 15 (Estuary Facilities) ① Estuary facilities (referring to facilities installed at the estuary of a river meeting the sea for the purpose of securing water resources, preventing seawater inflow, reducing flood damage, and developing tidal flats; hereinafter the same) shall be planned to maintain natural equilibrium between the estuary and the coast, taking into account the hydraulic characteristics of the estuary, such as fluctuations in water levels between the river and the sea, scouring, and sedimentation. ② Estuary facilities shall be installed to ensure safety from waves, tides, tsunamis, and floods. ③ In cases where new estuary facilities are to be constructed, existing facilities improved, or their operation methods changed, the impacts on water utilization, flood control, the environment, water quality, groundwater, and salinity within the affected area must be comprehensively reviewed. Article 16 (Rapids and Pools) ① The following facilities may be installed for the improvement of water quality, the creation of an ecological environment, and the stabilization of the riverbed. 1. Riffle: A facility that increases dissolved oxygen levels through aeration, accelerates water flow to provide food for specific aquatic plants such as attached algae, and contributes to riverbed stability. 2. Pond: A facility that slows down the water flow to induce sedimentation, adsorption, and oxidative decomposition of suspended solids and pollutants, and provides a habitat for aquatic organisms such as fish ② The location and form of riffles and pools shall be planned as structures that are safe for water flow and environmentally friendly, taking into consideration the characteristics of the river. Article 17 (Waterfront Facilities, etc.) ① Waterfront facilities (referring to various facilities installed along rivers for the healthy activities of people, such as water leisure facilities, sports facilities, rest facilities, ecological and learning facilities, bicycle paths, and walking trails; hereinafter the same) shall be installed only in necessary areas, taking into consideration the surrounding population, demand for waterfront activities, accessibility, and the ecological environment. ② Waterfront facilities shall be planned in consideration of the following matters. 1. Be safe for water flow 2. Be easy to maintain 3. Be environmentally friendly 4. Ensure that obstruction to water flow is minimized ③ To ensure the safety of users of waterfront facilities, safety facilities such as warning systems and evacuation routes must be installed in areas where there is a risk of a rapid rise in water levels in the event of a flood. Article 18 (Detailed Standards) Except for matters prescribed in this Rule, detailed matters concerning the structural and facility standards of rivers shall be determined and announced by the Minister of Climate, Energy and Environment. <Amended Dec. 28, 2021; Oct. 1, 2025> Revision ⊙Ministry of Climate, Energy and Environment Decree No. 1 (Oct. 1, 2025) Enforcement Rules for the Organizational Structure of the Ministry of Climate, Energy and Environment and its Affiliated Agencies [Body omitted] Supplementary Provisions Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, among the Ministerial Ordinances amended pursuant to Article 6 of the Addenda, the parts amending Ministerial Ordinances that were promulgated prior to the enforcement of this Rule but whose effective date has not yet arrived shall enter into force on the respective effective dates of those Ministerial Ordinances. Articles 2 through 5 omitted Article 6 (Amendment of Other Laws) ① through <79> Omitted <80> The Rules on Standards for Structures and Facilities of Rivers are partially amended as follows. In Article 18, "Minister of Environment" shall be changed to "Minister of Climate, Energy and Environment". <81> through <98> omitted Reason for Enactment/Amendment [Enacted] ◇ Reasons for Amendment and Key Contents In relation to the amendment of the Government Organization Act (Act No. 21065, promulgated and effective October 1, 2025) to reorganize the Ministry of Environment into the Ministry of Climate, Energy and Environment in order to oversee affairs regarding the environment, response to climate change, and energy (excluding affairs related to the export of nuclear power and resources such as oil, coal, gas, and minerals), and the enactment of the "Organizational Structure of the Ministry of Climate, Energy and Environment and Its Affiliated Agencies" (Presidential Decree No. 35804, promulgated and effective October 1, 2025) which defines the organizations, scope of duties, and staffing levels of the Ministry of Climate, Energy and Environment and its affiliated agencies, this is intended to specifically determine matters concerning the division of duties and staffing levels by rank for subordinate organizations within the Ministry of Climate, Energy and Environment and its affiliated agencies. <Provided by the Ministry of Climate, Energy and Environment>