원자력안전법 시행규칙
289525 · 2026-09-08
Nuclear Safety and Security Commission ( Safety Policy Division ), 02-397-7264
Nuclear Safety and Security Commission ( Safety Standards Division ), 02-397-7315
Nuclear Safety and Security Commission ( Radiation Safety Division ), 02-397-7273
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of this Ruleis to prescribe matters delegated by the Atomic Energy Safety Act and the Enforcement Decree of the same Act , and matters necessary for the implementation thereof.
Article 2 (Definitions) The meanings of terms used in this Rule are as follows:
1. “Surface radiation dose rate” refers to the radiation dose rate measured at a distance of 10 centimeters from the surface of an object emitting radiation, such as a radioactive material, a container or device containing a radioactive material, a radiation generating device, and a radiation shield.
2. “Fissile material” means uranium 233, uranium 235, plutonium 239, plutonium 241, or mixtures thereof. However, unirradiated natural uranium and depleted uranium, and natural uranium and depleted uranium irradiated in a thermal neutron reactor are excluded.
3. “Personal dosimeter” means a device capable of measuring the amount of radiation exposure to the outside of a person’s body, as determined and notified by the Nuclear Safety and Security Commission (hereinafter referred to as the “Commission”) pursuant to Article 3 of the Act on the Establishment and Operation of the Nuclear Safety and Security Commission .
4. “Cargo” refers to a container containing radioactive material, etc. prepared for transport.
5. “A value” refers to the radioactivity value determined and announced by the Committee for each radioactive isotope for the transport of radioactive materials, etc.
6. “Type B(U) transport” refers to a transport that carries radioactive materials, etc. exceeding the A value, and requires approval from the design country of origin in accordance with the International Atomic Energy Agency’s regulations on the safe transport of radioactive materials (hereinafter referred to as the “International Transport Regulations”).
7. “Type B(M) transport” refers to a transport that carries radioactive materials, etc. exceeding the A value, and which requires approval from the country through which the radioactive material transport from the country of design origin passes or arrives in accordance with international transport regulations.
8. “Type C cargo” refers to a cargo prepared for air transport that exceeds the amount of radioactivity determined and notified by the Committee .
9. “Fissile material carrier” means a carrier that carries fissile material exceeding the exemption criteria determined and notified by the Committee .
Article 3 (Internationally Regulated Materials) ① The term “materials prescribed by the Decree of the Prime Minister” in Article 2, subparagraph 17 of the Act refers to any of the following: <Amended Oct. 23, 2025>
1. Nuclear materials subject to safeguards and physical protection under the International Atomic Energy Agency
2. Reactor and its auxiliary equipment
3. Non-nuclear materials used in nuclear reactors
4. Reprocessing plant for irradiation fuel and equipment designed or manufactured for this purpose
5. Nuclear fuel conversion and processing facilities
6. Uranium enrichment facilities and equipment designed or manufactured for this purpose
7. Facilities for the production of heavy water, deuterium, or deuterium compounds and equipment designed or manufactured for this purpose
8. Other nuclear-related materials or facilities managed in accordance with nuclear-related treaties and other international agreements
② The Committee shall determine and announce the details of the substances, equipment, facilities, etc., listed in each subparagraph of Paragraph 1 .
Chapter 2 Construction and Operation of Nuclear Reactors and Related Facilities
Section 1. Power Generation Nuclear Reactors and Related Facilities
Article 4 (Application for Construction Permit) ①The application for a construction permit pursuant to Article 17 of the Enforcement Decree of the Atomic Energy Safety Act (hereinafter referred to as the “Decree”) shall be in the form of Annex No. 1 .
② The Radiation Environmental Impact Assessment Report pursuant to Article 10, Paragraph 2 of the Act shall state the matters in each of the following subparagraphs in accordance with the guidelines prescribed and notified by the Committee . <Amended July 21, 2015>
1. Current environmental status of the facility and the surrounding area
2. Prediction of radiation impact on the surrounding environment due to the construction and operation of the facility
3. Radiation environmental monitoring plan to be implemented during the construction and operation of the facility
4. Radiation effects on the environment caused by accidents while driving
5. Opinion notified pursuant to Article 144, Paragraph 2 of the Enforcement Decree
6. Results of hearing opinions pursuant to the latter part of Article 145, Paragraph 5 of the Enforcement Decree or results of holding a public hearing pursuant to Article 145, Paragraph 6 of the Enforcement Decree
③ The preliminary safety analysis report pursuant to Article 10, Paragraph 2 of the Act shall contain the matters set forth in each of the following subparagraphs. However, matters that are unsuitable for application due to differences in the intended use or principles of the relevant reactor, matters that overlap with the contents of other documents submitted pursuant to Article 10, Paragraph 2 of the Act , or matters that overlap with the contents of documents submitted when applying for prior approval pursuant to Paragraph 5 of the same Article may be omitted. <Amended Nov. 24, 2014; Jun. 30, 2016; Oct. 20, 2021>
1. General matters of each of the following items
A. Overview of the Permit Application
B. Major characteristics of the power generation reactor and related facilities (hereinafter referred to as “reactor facilities”) and the site
C. Comparison with other similar reactor facilities
D. Contracting Parties and Scope of Liability Regarding the Construction of the Reactor Facility
E. Technical data to be additionally submitted
2. Matters concerning the site of the nuclear reactor facility, each of the following items
A. Geographical Characteristics and Population Status
B. Surrounding industrial, transportation, and military facilities
C. Weather Characteristics
D. Characteristics of the ocean
E. Hydrological characteristics
B. Geological, seismic, and geotechnical characteristics
3. Matters concerning the installation of structures, parts, equipment, and systems of nuclear reactor facilities, each of the following items
a. Whether it conforms to design standards
B. Classification of Structures, Parts, Equipment, and Systems
C. Protective measures against natural disasters such as typhoons, floods, and tsunamis, as well as flying debris, falling objects, or hypothetical ruptures of pipes, etc.
D. Seismic design
E. Design of structures for containment facilities and other facilities related to the safety of the reactor
f. Design of mechanical structures, equipment, and their parts
G. Seismic and environmental verification design for safety-related equipment
4. Matters concerning nuclear reactors, each of the following items
A. Design of nuclear fuel systems
B. Core Design
C. Thermohydraulic Design
D. Materials of the nuclear reactor
E. Design of Responsiveness Control Systems
5. Matters concerning the reactor cooling system, each of the following items
A. Overview of the Reactor Cooling System and Its Components
B. Pressure boundaries of the reactor cooling system
C. Reactor Vessel
D. Component Design
E. Design of auxiliary systems
6. Matters concerning engineering safety equipment, etc. of the systems, etc., of each of the following items
a. Engineered Safety Systems
B. Containment System
C. Emergency Core Cooling System
D. Control Room Safety Assurance System
E. Removal and control system for fission products
f. Leakage control system for isolation valves in the main steam system
G. In-service inspection regarding items A through F
7. The following matters concerning instrumentation and control systems
A. Overview
B. Reactor Shutdown System
C. Engineered Safety Equipment Operating System
D. Information systems critical to safety
E. Interlocking systems critical to safety
b. Safety Stop System
d. Control System
A. Measurement and control systems of diversity
Okay. Data communication system
8. Matters concerning the power system, each of the following items
A. Overview
B. Power system excluding power plants
C. AC power system within the power plant
D. DC power system within the power plant
9. Matters concerning the auxiliary system, each of the following items
A. Nuclear Fuel Storage and Handling System
B. Water System
C. Process Auxiliary Systems
D. Heating, Cooling, and Ventilation Systems
E. Fire protection system (including fire risk analysis)
10. Matters concerning steam and power conversion systems, each of the following items
A. Overview
B. Turbine (referring to a machine that obtains rotational force by striking high-pressure liquid or gas against the blades of a rotor) Generator
C. Main Steam Supply System
11. Matters concerning the management of radioactive waste, each of the following items
A. Sources of radioactive waste
B. Solid Waste Management System
C. Liquid Waste Management System
D. Gaseous Waste Management System
E. Monitoring and Sampling System
12. The following matters concerning radiation protection
A. Protection plan for radiation workers
B. Radiation Source
C. Radiation Protection Design
D. Method for evaluating radiation dose
E. Health Physics Planning
13. The following matters concerning the organization
A. Management System
B. Job Education and Training
C. Management Procedures
14. Matters concerning the initial test, each of the following items
A. Scope of the Test Plan
B. Matters concerning the examination organization
C. Overview of the test plan for the inherent characteristics or special design characteristics of the power plant
D. Regulations regarding the establishment and implementation of test plans and plans for the use of industrial technology standards
E. Plan for utilizing operation and testing experience from other similar power plants
F. Schedule of the Examination Plan
G. Overview of the pilot application of the Power Plant Operation Procedures and the Accident Management Plan pursuant to Article 20, Paragraph 2 of the Act (hereinafter referred to as the “Accident Management Plan”)
Ah. Member reinforcement plan during test plan execution
15. Matters concerning accident analysis
16. Matters concerning technical guidelines
17. Matters concerning quality assurance
18. The following matters concerning ergonomics
A. Application Methods and Analysis Framework of Ergonomic Design
B. Subject Room
C. Remote Control Room
④ The quality assurance plan pursuant to Article 10 , Paragraph 2 of the Act shall include the following items:
1. Organization of the Quality Assurance System
2. Quality Assurance Plan
3. Design Management
4. Purchase Document Management
5. Instructions, Procedures, and Drawings
6. Document Management
7. Management of Purchased Items and Services
8. Identification and Management of Items
9. Management of Special Operations
10. Examination
11. Exam Management
12. Management of Measurement and Test Equipment
13. Handling, Storage, and Transportation
14. Inspection, Testing, and Operation Status
15. Management of Non-conforming Items
16. Corrective Measures
17. Quality Assurance Records
18. Gratitude
⑤ The decommissioning plan for a nuclear reactor facility pursuant to Article 10, Paragraph 2 of the Act shall state the matters of each of the following subparagraphs as prescribed and notified by the Committee . <Newly added July 21, 2015>
1. Organization, personnel, costs, and funding for the decommissioning of nuclear reactor facilities
2. Decommissioning Strategy and Schedule for Reactor Facilities
3. Matters reflected in the design and measures to be taken during construction and operation to facilitate dismantling
4. Measures to prevent accidents from radiation
5. Methods for removing contamination caused by radioactive materials, etc.
6. Methods for the Treatment, Storage, and Disposal of Radioactive Waste
7. Assessment of and countermeasures for the impact of radioactive materials, etc. on the environment
8. Other matters determined by the Committee to prevent disasters resulting from the decommissioning of nuclear reactor facilities
⑥ In Article 10, Paragraph 2 of the Act , “other documents prescribed by Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs. <Amended July 21, 2015; June 30, 2016>
1. Description of the intended use of the reactor
2. Description of technical capability regarding the installation of the reactor facility prepared in accordance with the guidelines determined and notified by the Committee
3. Plan for preparing an accident management plan prepared in accordance with the guidelines established and notified by the Committee
4. Articles of Incorporation (applicable only to corporations)
⑦ Where a radiation impact assessment report has been submitted when applying for prior site approval pursuant to Article 7 , it may not be submitted when applying for a construction permit pursuant to Article 10, Paragraph 2 of the Act . <Amended July 21, 2015>
⑧ The Committee that receives an application for permission pursuant to Article 10, Paragraph 2 of the Act shall verify the applicant’s Certificate of Corporate Registration (applicable only in the case of a corporation) through the joint use of administrative information pursuant to Article 36 , Paragraph 1 of the Electronic Government Act. <Amended July 21, 2015>
⑨ When the Committee has granted a construction permit for a nuclear reactor facility pursuant to Article 10, Paragraph 1 of the Act , it shall issue a permit certificate in the form of Annex 2 to the applicant. <Amended July 21, 2015>
Article 5 (Application for Permission for Change) ①The application for permission for change pursuant to Article 21 of the Enforcement Decree shall be in the form of Annex 3 .
② The application form under Paragraph 1 must be accompanied by the following documents:
1. Comparison table of the attached documents to the permit application before and after change
2. Permit
Article 6 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by Decree of the Prime Minister” in the proviso to Article 10, Paragraph 1 of the Act refers to any of the matters falling under any of the following subparagraphs. <Amended Nov. 24, 2014>
1. Name and address of the person who received permission (in the case of a corporation, its name and address and the name of the representative)
2. Name of the business site (including factories; hereinafter the same) where the nuclear reactor facility is installed
3. Construction Schedule of Reactor Facilities
4. Annual planned usage of nuclear fuel materials used as fuel for nuclear reactors and acquisition plan thereof
5. Matters concerning changes to equipment or facilities within the contents of the preliminary safety analysis report that do not entail changes to safety-related equipment pursuant to Article 2, Subparagraph 22 of the Act
6. Matters concerning changes to the general organization, excluding the quality assurance system organization, within the contents of the Preliminary Safety Analysis Report and the Quality Assurance Plan
7. Typographical errors, omissions, or other similar reasons where the cause of change is clear
② Any person who intends to report a change pursuant to the proviso to Article 10, Paragraph 1 of the Act shall submit to the Committee the report form in Annex 4 , attaching the documents of each of the following subparagraphs.
1. Documents proving the changes
2. Permit
③ The report under Paragraph 2 shall be submitted within the period specified in each of the following subparagraphs. <Amended Nov. 24, 2014>
1. Matters concerning the changes to Paragraph 1, Subparagraphs 1 through 4: Within 20 days of the change
2. Matters concerning the changes to Paragraph 1, Subparagraphs 5 through 7: Within 6 months after the change
Article 7 (Prior Approval of Site and Scope of Work) ① The term “scope prescribed by the Decree of the Prime Minister” in Article 10, Paragraph 4 of the Act refers to the excavation of the site to be installed for the nuclear reactor facility and concrete work for the protection and reinforcement of the bedrock at said site. However, the Committee may adjust the scope if it deems it necessary to enhance the safety of the nuclear reactor facility.
② The application for approval pursuant to Article 10, Paragraph 5 of the Act is as in Form No. 5 of the Attached Form .
③ The radiation environmental impact assessment report pursuant to Article 10, Paragraph 5 of the Act shall include the matters of each subparagraph of Article 4, Paragraph 2 .
④ The site survey report pursuant to Article 10, Paragraph 5 of the Act shall include the matters listed in each item of Article 4, Paragraph 3, Item 2 .
⑤ In Article 10, Paragraph 5 of the Act , “other documents prescribed by Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs. <Newly added Sep. 8, 2026>
1. Documents relating to the work pursuant to Paragraph 1, such as the excavation work plan and the concrete work plan for rock protection and reinforcement.
2. Articles of Incorporation (applicable only to corporations)
Article 8 (Technical Capability) The phrase “having secured the technical capability necessary for the construction of power generation nuclear reactors and related facilities prescribed by the Decree of the Prime Minister” in Article 11, subparagraph 1 of the Act means having met all of the requirements of each of the following subparagraphs.
1. The organizations and departments necessary for the construction of the reactor facility shall be established, and the responsibilities and authorities required for the performance of duties shall be clearly assigned.
2. It shall have an engineering and technical support organization for reviewing safety-related matters arising during the construction of the nuclear reactor facility.
3. Persons engaged in the construction of the power plant shall possess the qualifications and experience commensurate with their responsibilities and authority.
4. A system must be established to analyze construction cases of nuclear reactor facilities and reflect them in design and construction.
5. Establish test and inspection plans for safety-related structures, systems, and equipment.
Article 9 (Application for Standard Design Approval, etc.) ①The application for approval pursuant to Article 22, Paragraph 1 of the Enforcement Decree shall be in the form of Annex 6 .
② The standard design technical specifications pursuant to Article 12, Paragraph 2 of the Act shall contain the following items. However, matters that are not suitable for inclusion, such as matters related to the construction or operation of the relevant reactor, may be omitted.
1. General matters of each of the following items
A. Definition of Terms
B. Matters Applicable to All
C. List of Figures, Symbols, and Abbreviations
2. Matters concerning the characteristics of the site
3. Design standards, design details, and design, construction, and performance verification plans for nuclear reactor facilities regarding the matters in each of the following subparagraphs (hereinafter referred to as the “Verification Plan”)
a. Structures, parts, equipment, and systems
B. Nuclear reactor
C. Reactor Coolant System and Interconnected Systems
D. Engineered safety equipment
E. Instrumentation and Control Systems
B. Power System
G. Auxiliary Systems
Ah. Steam and power conversion systems
Z. Radioactive Waste Management
C. Radiation Protection
K. Initial test plan
Ta. Ergonomics
F. Emergency Response Facilities
4. Other matters concerning design requirements, as listed in the following subparagraphs
a. Power system outside of power plants
B. Final heat removal source
C. Water pump structures and ventilation systems
③ In Article 12, Paragraph 2 of the Act , “other documents prescribed by Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs. <Amended June 30, 2016>
1. Description of the intended use of the reactor
2. Description of Technical Capability for Reactor Design
3. Standard Design Safety Analysis Report
4. Plan for preparing an accident management plan prepared in accordance with the guidelines established and notified by the Committee
5. Articles of Incorporation (applicable only to corporations)
④ The Standard Design Safety Analysis Report under Paragraph 3, Subparagraph 3 shall state the matters in each of the following subparagraphs. However, matters deemed unsuitable for inclusion, such as the purpose of use of the relevant reactor facility, differences in principle, or matters related to the construction and operation of the reactor facility, may be omitted. <Amended June 30, 2016>
1. Matters of each subparagraph of Article 4, Paragraph 3 (excluding Subparagraph 14).
2. Matters concerning the initial test, each of the following items
A. Overview of Test Plan and Objectives
B. Test Organization and Personnel
C. Test Procedures and Schedule
D. Test Method
E. Use of operational and testing experience from other similar reactor facilities
f. Matters concerning the pilot application of power plant operation procedures and accident management plans
G. Initial nuclear fuel loading and reaching criticality
Ah. Content of the exam
J. Review and Evaluation Contents of Test Results
C. Records regarding the exam
K. Applicable technical standards for each individual test
⑤ The standard design safety analysis report pursuant to Paragraph 4 shall describe detailed technical information at a level that can verify the safety of the standard design.
⑥ Deleted <June 30, 2016>
⑦ The Committee that receives the application for authorization pursuant to Article 12, Paragraph 2 of the Act shall verify the applicant’s certificate of corporate registration (only applicable if it is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act.
⑧ When the Committee has authorized the standard design of a nuclear reactor facility pursuant to the main text of Article 12, Paragraph 1 of the Act , it shall issue an authorization certificate in the form of Annex 7 to the applicant.
Article 10 (Implementation of Verification Plan) ①applying for a construction permit for a power generation nuclear reactor facility under Article 10 of the Act and an operation permit for a power generation nuclear reactor under Article 20 of the Act in accordance with the standard design approved under Article 12, Paragraph 1 of the Act shall implement a verification plan.
② If necessary pursuant to Paragraph 1, the Committee may verify whether the verification plan has been implemented through pre-use inspection pursuant to Article 27 of the Enforcement Decree and quality assurance inspection pursuant to Article 31 of the Enforcement Decree .
Article 11 (Application for Change of Standard Design Approval) ①The application for approval of change pursuant to Article 23 of the Enforcement Decree shall be in the form of Annex 8 .
② The application form under Paragraph 1 must be accompanied by the following documents:
1. Comparison table of the documents attached to the application for standard design approval, before and after the change
2. Standard Design Authorization Certificate
Article 12 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by the Decree of the Prime Minister” in the proviso to Article 12, Paragraph 1 of the Act refers to the name and address of a person who has received approval for a standard design (in the case of a corporation, its name, address, and the name of its representative). <Amended June 30, 2016>
② Any person who intends to report a change pursuant to the proviso of Article 12, Paragraph 1 of the Act shall submit to the Committee, within 30 days from the date the cause for the report occurred, a report in Form No. 4 attached hereto, with documents proving the changes attached.
Article 13 (Preparation of Measurement Management Regulations) The Measurement Management Regulations pursuant to Article 25 of the Enforcement Decree shall include the following matters in accordance with the guidelines determined and notified by the Committee .
1. Job Duties and Organization
2. Major Measurement Points, Measurement Methods, and Measuring Instruments
3. Procedures for the Import, Export, and Weight Management of Nuclear Materials Among Internationally Regulated Materials (hereinafter referred to as “Specified Nuclear Materials”)
4. Education and Training
5. Records and Reports
6. Other matters directly related to the weighing and management of specific nuclear materials
Article 14 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by Decree of the Prime Minister” in the proviso to Article 15, Paragraph 1 of the Act refers to any of the matters falling under any of the following subparagraphs.
1. Name and address of the person who obtained the construction permit (in the case of a corporation, its name and address and the name of its representative)
2. Name and location of the business office
② Any person who intends to report a change pursuant to the proviso of Article 15, Paragraph 1 of the Act shall submit to the Committee, within 30 days from the date the cause for the report occurred, a report in Form No. 4 attached hereto, with documents proving the changes attached.
Article 14-2 (Reporting of Contracts for Safety-Related Facilities) ① The report form pursuant to the first part of Article 15-2 of the Act is as follows:
1. Matters concerning the design and manufacture of safety-related facilities: Form No. 8-2
2. Matters concerning performance verification of safety-related facilities: Form No. 8-3
② The report form pursuant to Paragraph 1 shall be accompanied by the following documents:
1. Documents proving contract conclusion
2. Performance verification plan (limited to Paragraph 1, Subparagraph 2)
[This Article Newly Inserted Nov. 24, 2014]
Article 14-3 (Notification of Change in Contract for Safety-Related Facilities) ①The notification of change pursuant to the latter part of Article 15-2 of the Act shall be in the form of Annex 8-4 .
② Any person who intends to report a change pursuant to the latter part of Article 15-2 of the Act shall submit to the Committee, within 30 days from the date the cause for the report occurred, a report in Form No. 8-4 of the Appendix, with documents proving the changes attached.
[This Article Newly Inserted Nov. 24, 2014]
Article 14-4 (Application for Designation of Performance Verification Management Agency) ①The application form for designation of a performance verification management agency (hereinafter referred to as “performance verification management agency”) pursuant to Article 15-4, Paragraph 1 of the Act shall be in accordance with Form No. 8-5 of the Attached Form .
② The application form pursuant to Paragraph 1 shall be accompanied by the following documents:
1. Articles of Incorporation
2. Status of Corporations or Organizations
3. Matters concerning the permanent dedicated organization pursuant to Article 25-3, Paragraph 1, Subparagraph 1 of the Enforcement Decree
4. Documents proving specialized personnel pursuant to Article 25-3, Paragraph 1, Subparagraph 2 of the Enforcement Decree
5. Business regulations pursuant to Article 25-3, Paragraph 1, Subparagraph 3 of the Enforcement Decree
6. Performance Verification Management Task Execution Plan
③ The Committee that receives an application pursuant to Article 15-4, Paragraph 5 of the Act shall verify the applicant’s certificate of corporate registration (only applicable if it is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act.
④ When the Committee has designated a performance verification management agency in accordance with Article 15-4, Paragraph 1 of the Act , it shall issue a designation certificate in the form of Annex 8-6 .
[This Article Newly Inserted Nov. 24, 2014]
Article 15 (Application for Pre-use Inspection) ①The application form for inspection pursuant to Article 28 of the Enforcement Decree shall be as in Form No. 9 of the Attached Form .
② The application form under Paragraph 1 shall be submitted at least 30 days prior to the date of the inspection to be received whenever a cause for inspection under each subparagraph of Article 29, Paragraph 1 of the Enforcement Decree occurs. However, the inspections under subparagraphs 3 and 4 of the same paragraph may be applied for at once.
Article 15-2 (Report of Succession) ①A person who succeeds to the status of a person who has received a construction permit for a nuclear reactor facility pursuant to Article 19, Paragraph 1 of the Act shall submit a report in the form of Annex 9-2 to the Committee, attaching the documents classified according to each of the following subparagraphs.
1. In the case of the transfer or acquisition of a business
a. Permit
B. Copy of the Transfer and Assignment Agreement
C. Copy of the resolution of the General Assembly or the Board of Directors regarding the transfer or assignment (applicable only to corporations)
2. In the case of inheritance
a. Permit
B. A family relationship certificate pursuant to Article 15, Paragraph 1, Subparagraph 1 of the Act on Registration of Family Relations, etc. , and documents proving heirship
3. In the case of a merger
a. Permit
B. Copy of Merger Agreement
C. Copy of the resolution of the General Meeting or the Board of Directors regarding the merger
② When the Committee receives a report pursuant to Paragraph 1, it shall verify the certificate of corporate registration of the person who succeeded to the status through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act (only applicable in the case of a corporation). However, if the reporter does not consent to the verification, the relevant document shall be attached.
[This Article Newly Inserted May 3, 2018]
Section 2 Operation of Power Generation Reactors and Related Facilities
Article 16 (Application for Operation Permit, etc.) ①The application for an operation permit pursuant to Article 33 , Paragraph 1 of the Enforcement Decree shall be in the form of Annex No. 10 .
② The operational technical guidelines pursuant to Article 20, Paragraph 2 of the Act (hereinafter referred to as the “operational technical guidelines”) shall include the following matters in accordance with the guidelines determined and notified by the Committee .
1. Operation of nuclear reactor facilities
A. Use and Application
B. Safety limit
C. Operating restrictions and inspection requirements
D. Design characteristics
2. Radiation and Environment of Nuclear Reactor Facilities
A. Radiation Protection
B. Management of radioactive materials, etc.
C. Environmental protection from nuclear reactor facilities
3. Operation and Management of Nuclear Reactor Facilities
A. Organization and Functions
B. Inspection of nuclear reactor facilities
C. Matters to be taken by the operator in case of emergency
D. Plans and Guidelines
③ The final safety analysis report pursuant to Article 20, Paragraph 2 of the Act shall include the matters specified in each subparagraph of Article 9, Paragraph 4. However, matters that are not suitable for application due to differences in the purpose of use or principles of the reactor concerned, and matters that overlap with the contents of other attached documents pursuant to Article 20, Paragraph 2 of the Act , may not be included.
④ The accident management plan shall include the matters of each of the following subparagraphs in accordance with the guidelines prescribed and notified by the Committee . <Newly added June 30, 2016>
1. Matters concerning the scope of accident management
2. Matters concerning facilities used for accident management
3. Matters concerning accident management strategies and implementation systems
4. Matters concerning the evaluation of accident management capabilities (including probabilistic safety assessment)
5. Matters concerning the preparation of emergency operation procedures
6. Matters concerning the management of serious accidents
7. Matters concerning accident management education and training
8. Other matters determined by the Committee for accident management
⑤ The quality assurance plan pursuant to Article 20, Paragraph 2 of the Act shall state the matters set forth in each subparagraph of Article 4, Paragraph 4. <Amended June 30, 2016>
⑥ The discharge plan for radioactive materials, etc. in liquid and gaseous states pursuant to Article 20, Paragraph 2 of the Act (hereinafter referred to as the “Discharge Plan”) shall state the matters of each of the following subparagraphs in accordance with the guidelines prescribed and notified by the Committee . <Newly added Feb. 3, 2017>
1. Treatment facilities and monitoring equipment for radioactive materials, etc. in liquid and gaseous states
2. Plan for Sampling and Analysis of Radioactive Materials, etc. in Liquid and Gaseous State
3. Method for Calculating the Total Discharge Amount of Radioactive Materials, etc., in Liquid and Gaseous States
4. Total emissions by site, period, and radionuclide group calculated in accordance with Subparagraph 3
⑦ In Article 20, Paragraph 2 of the Act , the term “documents prescribed by the Decree of the Prime Minister” refers to the documents set forth in each of the following subparagraphs. <Amended June 30, 2016; Feb. 3, 2017>
1. Description of technical capability regarding reactor operation prepared in accordance with the guidelines established and notified by the Committee
2. Explanatory Note on the Nuclear Fuel Loading Plan
3. Deleted <June 30, 2016>
⑧ When the Committee grants an operating license for a nuclear reactor facility pursuant to the main clause of Article 20, Paragraph 1 of the Act , it shall issue a license certificate in the form of Annex 2 to the applicant. <Amended June 30, 2016; Feb. 3, 2017>
Article 17 (Application for Permission for Change) ①The application for permission for change pursuant to Article 34 of the Enforcement Decree shall be in the form of Annex No. 11 .
② The application form under Paragraph 1 must be accompanied by the following documents:
1. Comparison table of documents attached to the application for operation permit before and after change
2. Operating License
Article 18 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by Decree of the Prime Minister” in the proviso to Article 20, Paragraph 1 of the Act refers to any of the matters falling under any of the following subparagraphs. <Amended Nov. 24, 2014; Feb. 3, 2017>
1. Name and address of the person who received the operating permit (in the case of a corporation, its name and address and the name of the representative)
2. Name and location of the business office operating the nuclear reactor facility
3. Matters concerning changes to equipment or facilities that do not entail changes to safety-related equipment pursuant to Article 2, Item 22 of the Act, among the contents of the Technical Operational Guidelines, Final Safety Analysis Report, and Emission Plan ( limited to contents falling under Article 16, Paragraph 6, Item 1 or 2 ).
4. Matters concerning changes to the general organization, excluding the quality assurance system organization, within the contents of the Technical Operations Guidelines, Final Safety Analysis Report, and Quality Assurance Plan
5. Typographical errors, omissions, or other similar reasons where the cause of change is clear
6. Deleted <2014. 11. 24.>
② Any person who intends to file a report of change pursuant to the proviso to Article 20, Paragraph 1 of the Act shall submit a report in the form of Annex 4 to the Committee, attaching the documents set forth in each of the following subparagraphs. <Amended Nov. 24, 2014>
1. Documents proving the changes
2. Permit (applicable only in the case of Paragraph 1, Subparagraphs 1 and 2)
3. Deleted <2014. 11. 24.>
③ The report under Paragraph 2 shall be submitted within the period specified in each of the following subparagraphs. <Newly added Nov. 24, 2014>
1. Matters concerning changes under Paragraph 1, Subparagraphs 1 through 3: Within 30 days after the change (in the case of Subparagraph 3, if the change to equipment or facilities does not entail a change to safety-related equipment pursuant to Article 2, Subparagraph 22 of the Act and affects the performance of the functions of safety-related equipment, it shall be 30 days prior to the scheduled date of change).
2. Matters concerning the amendment of Paragraph 1, Subparagraphs 4 and 5: Within 20 days after the end of each half-year
Article 19 (Periodic Inspection) ①Periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree (including cases applied mutatis mutandis in Article 47 of the Enforcement Decree; hereinafter the same) shall be conducted for the facilities listed in each of the following subparagraphs by methods such as document review, on-site verification, witness inspection, or interview with the inspectee; the subjects of inspection for each facility and detailed inspection methods shall be determined and announced by the Committee . However, inspections may not be conducted for facilities that the Committee recognizes as not requiring inspection due to the design characteristics of the nuclear reactor facility . <Amended July 21, 2015>
1. Reactor body (including nuclear fuel)
2. Reactor Cooling System Facilities
3. Instrumentation and Control System Facilities
4. Facilities for handling and storing nuclear fuel materials
5. Radioactive Waste Disposal Facilities
6. Radiation Control Facilities
7. Reactor Containment Facility
8. Reactor Safety System Facilities
9. Power System Facilities
10. Power conversion system facilities
11. Other facilities related to the safety of nuclear reactors as determined and notified by the Committee
② Periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall be carried out within 20 months after the first commencement of commercial operation or after the inspection in the case of power generation reactors, and within 24 months in the case of research or educational reactors. However, if the Committee has separately designated an inspection period in consideration of the operational status or characteristics of the reactor, such designation shall apply.
③ Periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall be carried out during the period from the date the reactor is shut down for periodic maintenance or nuclear fuel replacement until the date full-output operation is resumed.
④ Any person who intends to undergo a periodic inspection pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall submit an application in the form of Annex 12 to the Committee by 30 days prior to the date of the inspection .
⑤ The application form under Paragraph 4 must be accompanied by a maintenance and testing plan containing the following items.
1. Major maintenance details by facility subject to inspection
2. Test plan in accordance with the Technical Operational Guidelines and the Final Safety Analysis Report
3. Characterization Test Plan for Nuclear Fuel and Reactor Based on Replacement Core Safety Analysis
4. Major Process Schedule for Testing and Maintenance
⑥ The Committee may permit the criticality of a reactor for a power increase test if the results of inspections conducted prior to the criticality of the relevant reactor comply with Article 21, Paragraph 1, Subparagraphs 2 and 3 of the Act . <Amended July 21, 2015>
⑦ When the Committee has completed the periodic inspection pursuant to Article 35, Paragraph 1 of the Enforcement Decree , it shall notify the operator of the relevant reactor in writing whether it has passed.
Article 19 (Periodic Inspection) ① Periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree (including cases applied mutatis mutandis in Article 47 of the Enforcement Decree; hereinafter the same) shall be conducted for the facilities listed in each of the following subparagraphs by methods such as document review, on-site verification, witness inspection, or interview with the inspectee. The subjects of inspection for each facility and detailed inspection methods shall be determined and announced by the Committee. However, inspections may not be conducted for facilities that the Committee recognizes as not requiring inspection due to the design characteristics of the nuclear reactor facility. <Amended July 21, 2015>
1. Reactor body (including nuclear fuel)
2. Reactor Cooling System Facilities
3. Instrumentation and Control System Facilities
4. Facilities for handling and storing nuclear fuel materials
5. Radioactive Waste Disposal Facilities
6. Radiation Control Facilities
7. Reactor Containment Facility
8. Reactor Safety System Facilities
9. Power System Facilities
10. Power conversion system facilities
11. Other facilities related to the safety of nuclear reactors as determined and notified by the Committee
② The timing of periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall be determined according to the classifications in each of the following subparagraphs. However, if the Committee has separately designated the timing of the inspection in consideration of the operational status or characteristics of the reactor, such designation shall apply. <Amended Apr. 25, 2024>
1. Power generation reactors (excluding cases of permanent shutdown): the times specified in each of the following subparagraphs
a. Date of commencement of initial commercial operation
b. The day following the date on which full-output operation resumed after regular maintenance or nuclear fuel replacement
2. Permanently shut down power reactors: At the time of each of the following items
a. Date of permanent suspension
B. Every two years starting from the date the inspection under Item A began
3. Research or educational reactors: The time of each of the following items
a. Within 24 months after the completion of the pre-use inspection pursuant to Article 27 of the Enforcement Decree, which is applied mutatis mutandis pursuant to Article 47 of the Enforcement Decree
B. Within every 24 months from the date the inspection under Subparagraph A began
③ Periodic inspections pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall be conducted during the periods classified in each of the following subparagraphs. <Amended Apr. 25, 2024>
1. Power generation reactors (excluding cases of permanent shutdown): the periods of each of the following items
a. From the date of initial commercial operation until the date of resumption of full-power operation after scheduled maintenance or nuclear fuel replacement
B. From the day following the date on which full-power operation resumed after regular maintenance or nuclear fuel replacement until the date on which full-power operation resumes after the next regular maintenance or nuclear fuel replacement
2. Permanently shut down power reactors: For 24 months from the date the inspection began
3. Research or educational reactors: From the date the reactor is shut down for scheduled maintenance or nuclear fuel replacement until the date full-power operation is resumed
④ Any person who intends to undergo a periodic inspection pursuant to Article 35, Paragraph 1 of the Enforcement Decree shall submit an application in the form of Annex 12 to the Committee by 30 days prior to the date of the inspection.
⑤ The application form under Paragraph 4 must be accompanied by a maintenance and testing plan containing the following items.
1. Major maintenance details by facility subject to inspection
2. Test plan in accordance with the Technical Operational Guidelines and the Final Safety Analysis Report
3. Characterization Test Plan for Nuclear Fuel and Reactor Based on Replacement Core Safety Analysis
4. Major Process Schedule for Testing and Maintenance
⑥ The Committee may permit the criticality of a reactor for a power increase test if the results of inspections conducted prior to the criticality of the relevant reactor comply with Article 21, Paragraph 1, Subparagraphs 2 and 3 of the Act. <Amended July 21, 2015>
⑦ When the Committee has completed the periodic inspection pursuant to Article 35, Paragraph 1 of the Enforcement Decree, it shall notify the operator of the relevant reactor in writing whether it has passed.
[Effective Date: Jan. 1, 2027] Article 19, Paragraph 2, Article 19, Paragraph 3
Article 20 (Detailed Contents of Periodic Safety Assessment) ① The detailed contents of the periodic safety assessment pursuant to Article 37 , Paragraph 1 of the Enforcement Decree are as follows: <Amended Nov. 24, 2014; Jun. 30, 2016; Sep. 8, 2026>
1. Matters concerning the design of the reactor facility: Confirming whether the design (including design documents) was made in accordance with standards valid at the time of evaluation of the reactor facility, and shall include the following items:
A. List and Classification of Safety-Important Structures, Systems, and Equipment
B. Design Documents (Original and Revised)
C. Differences between the technical standards applied during the design of the reactor facility and the current technical standards
D. Impact on safety of identified vulnerabilities in terms of deep defense
E. Characteristics of the area surrounding the reactor facility, including population density, industrial facilities, and transportation facilities (airports, roads, railways, etc.)
2. Matters concerning the actual condition of safety-critical structures, systems, and equipment: Confirming that the actual condition of safety-critical structures, systems, and equipment satisfies design requirements from the present until the next periodic safety assessment date and that such details are documented, it shall include the following items:
a. Information on the integrity and functional performance of safety-critical structures, systems, and equipment
B. Information regarding the current status of safety-critical structures, systems, and equipment, and ongoing or anticipated aging degradation (referring to physical or chemical processes that cause damage to the systems, structures, and equipment of a nuclear power plant over time or through use)
C. Test results to verify the functional performance capabilities of safety-critical structures, systems, and equipment
D. Inspection results and maintenance records of safety-critical structures, systems, and equipment
E. Operation history and current status of safety-critical structures, systems, and equipment
F. Status of support facilities inside and outside the power plant, including maintenance and repair workshops
3. Matters concerning deterministic safety analysis: This is intended to verify whether the existing deterministic safety analysis maintains validity by considering the actual condition of safety-critical structures, systems, and equipment, the expected condition at the time of the next periodic safety assessment, and current deterministic safety analysis methods and technical standards, and shall include the following items:
A. Comparison of the initial events, interpretation methods, and computer codes assumed for existing deterministic safety analysis with current technical standards
B. Radiation dose and radioactive material release limits under normal and accident conditions
C. Guidelines for Deterministic Safety Analysis Considering Single Failure Criteria, Redundancy, Diversity, and Independence
D. Various operating conditions expected to occur at least once during the power plant's lifespan
4. Matters concerning probabilistic safety assessment: Confirming whether the existing probabilistic safety assessment maintains validity by considering changes in the design and operating conditions of the reactor facility, current probabilistic safety assessment methods, and operating information and technology, and shall include the following items:
A. Comparison of assumptions, hypothetical initial events, evaluation methodologies, and computer codes considered in existing probabilistic safety assessments with current technology, and their current reflection in reactor facilities
B. Probabilistic safety assessment guidelines considering measures to be taken by drivers, common cause accidents, mutual influence, redundancy, and diversity
C. Linkage between accident management plans, probabilistic safety assessment models, and results
D. Evaluation and comparison of possible alternatives to eliminate design and operational vulnerabilities of the reactor facility derived from the probabilistic safety assessment results
5. Matters concerning risk analysis: Confirming the validity of protection for the reactor facility against internal and external risks by considering current analysis methods and technical standards regarding the design and site characteristics of the reactor facility, the actual condition of safety-critical structures, systems, and equipment, and the expected condition at the time of the next periodic safety assessment; and shall include the following items:
a. Estimated scale and frequency of occurrence of internal hazards (fire, flooding, dynamic behavior of pipes, flying debris, vapor release, spraying, toxic liquids and gases, explosions, etc.) and external hazards (floods including tsunamis, strong winds, fire, extreme temperatures, earthquakes, volcanic eruptions, aircraft collisions, toxic liquids and gases, explosions, etc.)
B. Results of the risk assessment performed considering the condition of the reactor facility, aging degradation, current safety standards, and environmental impact
C. Procedures including driver measures to prevent or mitigate internal and external hazards
6. Matters concerning equipment verification: Confirming whether the major safety-related equipment of the reactor facility has been verified to perform its intended safety functions during the period up to 10 years from the evaluation reference date, and shall include the following items:
a. List of devices and management procedures included in the device verification plan
B. Device Verification Methods and Quality Assurance
C. Analysis of the impact of equipment failure on equipment verification and appropriate corrective measures to maintain equipment verification
D. Verified protection measures for equipment against adverse environmental conditions
E. Physical condition and functionality of the verified device
f. Records of verification measures taken during the period the device was installed
7. Matters concerning aging deterioration: Confirming whether the aging deterioration of structures, systems, and equipment of the reactor facility is effectively managed to maintain the required safety margin, and whether an appropriate aging deterioration management plan has been established for the safe operation of the nuclear power plant in the future, and shall include the following items:
A. Classification and Selection of Structures, Systems, and Equipment Subject to Evaluation
B. Analysis of aging deterioration phenomena by structure, system, and equipment subject to evaluation
C. Functional and safety margins of structures, systems, and equipment due to aging deterioration
D. Prediction of the point of performance failure and future state of structures, systems, and equipment
E. Measures to mitigate aging deterioration of structures, systems, and equipment and management plan
8. Matters concerning safety performance: Confirming trends in changes in safety performance through the investigation and analysis of records regarding the safety performance and operational experience of the reactor facility, and shall include the following items:
A. Implementation system for the classification of safety-related incidents and root cause analysis results
B. Method for selecting and recording safety-related operational data, including maintenance, testing, and inspection
C. Trend analysis of safety-related driving data and the degree to which safety systems are unable to function
D. Analysis of safety performance indicators
E. Records regarding radiation exposure doses to workers within the power plant, radiation monitoring data inside and outside the power plant, and amounts of radioactive material released
9. Matters concerning the utilization of nuclear power plant operating experience and research results: In order to verify whether operating experience and safety research results from other similar reactor facilities are appropriately reflected, it shall include the following items:
A. Appropriateness of plans and systems for reflecting reactor facility operating experience and research results
B. Reflection of Reactor Facility Operation Experience and Research Results, and Measures
10. Matters concerning procedures for operation and maintenance, etc.: In order to verify whether procedures for the operation, maintenance, inspection, testing, modification, and emergency response of the reactor facility have been prepared in accordance with appropriate standards, and shall include the following items:
A. System for Establishing and Revising Safety-Related Procedures
B. Plan for Periodic Review and Supplementation of Procedures
C. Clarity of procedures considering the principles of human factors
D. Consistency between the design, operational experience, assumptions and results of safety analysis of the reactor facility and the procedures
E. Accident management plan to maintain and restore essential safety functions
11. Matters concerning organization, management system, and safety culture: In order to verify whether the organization and administration are being operated appropriately for the safe operation of the reactor facility, and shall include the following items:
a. Safety system including implementation of safety objectives and safety priority principles
B. Document defining the roles and responsibilities of individuals and organizations
C. Methods for maintaining the organic structure of nuclear reactor facility operations
D. System for utilizing external personnel and experts
E. Employee Training Facilities and Plans
f. Regular quality assurance audits including independent evaluators and quality assurance plans
G. Diagnosis, analysis, and periodic evaluation of safety culture, and an implementation system for promoting safety culture
12. Matters concerning human factors: Intended to verify the management status of various human factors that may affect the safe operation of the reactor facility, and shall include the following items:
a. Employee management levels including restrictions on shift work and overtime
B. Whether qualified employees regularly perform their duties
C. Training plan for initial retraining and capability enhancement, including the use of simulated control panels
D. Analysis of Human Resource Requirements and Workload
E. Analysis of the Human-Machine Linkage System
13. Matters concerning the radiation emergency plan pursuant to Article 20 of the Act on Protection of Nuclear Facilities, etc. and Measures for Radiation Disaster Prevention: These are intended to verify whether the radiation emergency plan is appropriately established and maintained in preparation for the occurrence of a radiation emergency or radiation disaster pursuant to Article 2, Paragraph 1 , Subparagraphs 7 and 8 of the same Act, and shall include matters pursuant to Annex 3 of the Enforcement Rule of the same Act.
14. Matters concerning radiation environmental impact: In order to verify whether the environmental impact monitoring plan for reactor facilities has been properly established and is being implemented, it shall include the following items:
a. Release limits and release records for all leakage routes potentially contaminated by radioactivity
B. Alarm device for unplanned effluent discharge from within the power plant
C. Radiation exposure dose to residents near nuclear reactor facilities
D. Radiation environmental monitoring of areas outside the power plant
E. Publication and distribution of environmental monitoring data
② In cases where the facility is to be operated continuously (hereinafter referred to as “continued operation”) after the expiration of the design lifespan of a nuclear reactor facility pursuant to Article 21, Paragraph 3 of the Act , the detailed contents of the life assessment for major equipment considering the continued operation period under Article 37, Paragraph 2 of the Enforcement Decree shall confirm whether the functions of major structures, systems, and equipment are secured during the continued operation period, and shall include the matters of each of the following subparagraphs. <Amended Sep. 8, 2026>
1. Classification and Selection of Structures, Systems, and Equipment Subject to Life Assessment
2. Analysis of the impact on the lifespan of structures, systems, and equipment
3. Life assessment of the relevant structures, systems, and equipment considering surrounding effects during the period of continued operation
③ The details of the verification of validity pursuant to the latter part of Article 37, Paragraph 2 of the Enforcement Decree are as follows. < Newly added Sep. 8, 2026>
1. Evaluate whether the safety measures based on the results of the safety assessment under Article 36 , Paragraph 4 of the Enforcement Decree are valid with respect to matters where there are differences between the technical standards at the time of the safety assessment and the latest technical standards at the time of validity verification.
2. If it is necessary to change the contents of safety measures or add safety measures based on the evaluation results under Subparagraph 1, include a plan for changing safety measures or an implementation plan; and if there are special circumstances where a change is unnecessary or difficult to make, include the reasons, etc.
Article 21 (Methods and Standards for Periodic Safety Assessment) ①The regulations applicable to the technical standards under Article 38, Paragraph 1, Subparagraph 4 of the Enforcement Decree shall be determined by the Committee Rules .
② In addition to the matters prescribed in Paragraph 1, the safety level and safety measures of the nuclear reactor facility over time shall satisfy the standards of each of the following subparagraphs. <Amended Nov. 24, 2014>
1. Reactor facilities shall be capable of maintaining safety functions against aging degradation phenomena that may occur over time, and shall ensure that a safety margin is secured to guarantee safety for the period up to 10 years after the evaluation reference date.
2. Operators of power reactors shall establish and implement an aging deterioration management plan for reactor facilities to ensure the safety functions and safety margins of structures, systems, and equipment.
③ Among the technical standards under Paragraphs 1 and 2, if the Committee recognizes that certain provisions cannot be applied as is to the relevant reactor facility due to the purpose of use, differences in principles, or design characteristics of the facility, or that safety will not be compromised even if they are not applied, certain provisions may not be applied.
④ Pursuant to Article 38, Paragraph 2 of the Enforcement Decree, the operator of a power generation nuclear reactor shall conduct a safety assessment by utilizing technical standards that reflect the latest domestic and international operating experience and research results to enhance the safety of structures, systems, and equipment, and shall ensure that the safety of the reactor and related facilities is secured as a result. In this case, the Committee shall determine and announce the detailed matters regarding the technical standards. <Amended Sep. 8, 2026>
⑤ The evaluation of the detailed contents of the periodic safety assessments under each of the following subparagraphs may be substituted with the evaluation, approval, or investigation prescribed in the respective subparagraph. In this case, the operator of a power generation nuclear reactor shall submit documents proving that such evaluation or investigation has been conducted or approval obtained, together with the evaluation report submitted pursuant to Article 36 , Paragraphs 2 , 4, or 5 of the Enforcement Decree. < Newly added Sep. 8, 2026>
1. Matters concerning aging deterioration under Article 20 , Paragraph 1, Subparagraph 7 : Safety assessment conducted on structures, systems, and equipment included in the evaluation subjects under Article 20, Paragraph 2, Subparagraph 1 of these Rules in order to continue operation pursuant to Article 21, Paragraph 3 of the Act.
2. Matters concerning the emergency plan under Article 20 , Paragraph 1, Subparagraph 13 : Approval of a change to the radiation emergency plan pursuant to Article 20 of the Act on Protection of Nuclear Facilities, etc. and Radiation Disaster Prevention Measures , made within the evaluation cycle pursuant to Article 36, Paragraph 1 of the Enforcement Decree
3. Matters concerning radiation environmental impact under Article 20 , Paragraph 1, Subparagraph 14 : Radiation environmental survey under Article 104 of the Act conducted within the evaluation cycle pursuant to Article 36, Paragraph 1 of the Enforcement Decree
[Title amended Sep. 8, 2026]
Article 22 (Application for Approval of Decommissioning of Nuclear Reactor Facilities, etc.) ①person who intends to obtain approval for the decommissioning of a nuclear reactor facility pursuant to the first part of Article 28, Paragraph 1 of the Act shall submit to the Committee an application in the form of Annex 13 , attached with the documents set forth in each of the following subparagraphs. <Amended July 21, 2015>
1. The final decommissioning plan for the reactor facility prepared by reflecting all matters changed after the drafting of the draft decommissioning plan pursuant to Article 103, Paragraph 3 of the Act (hereinafter referred to as the “Draft Decommissioning Plan”).
2. Documents pursuant to each subparagraph of Paragraph 3
② If a person who has received approval for the decommissioning of a nuclear reactor facility pursuant to the latter part of Article 28, Paragraph 1 of the Act intends to change the approved matters, he/she shall submit to the Committee an application in the form of Annex 14, attaching a comparison table of the matters before and after the change among the documents attached to the application for decommissioning approval pursuant to each subparagraph of Paragraph 1. <Amended July 21, 2015>
③ In Article 28, Paragraph 2 of the Act , the term “documents prescribed by the Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs. <Newly added July 21, 2015>
1. Quality Assurance Plan for Dismantling
2. Documents regarding opinions notified pursuant to Article 144 , Paragraph 2 of the Enforcement Decree
3. Results of hearing opinions pursuant to the latter part of Article 145, Paragraph 5 of the Enforcement Decree or results of holding a public hearing pursuant to Article 145, Paragraph 6 of the Enforcement Decree
[Title amended July 21, 2015]
Article 23 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by Decree of the Prime Minister” in the proviso to Article 28, Paragraph 1 of the Act refers to any of the matters falling under any of the following subparagraphs. <Amended May 3, 2018>
1. Name and address of the person who received approval (in the case of a corporation, its name and address and the name of the representative)
2. Name and location of the business office operating the nuclear reactor facility
3. Typographical errors, omissions, or other similar reasons where the cause of the change is clear
② Any person who intends to report a change pursuant to the proviso of Article 28, Paragraph 1 of the Act shall submit to the Committee, within 30 days from the date the cause for the report occurred, a report in Form No. 4 attached hereto, with documents proving the changes attached.
Article 23-2 (Reporting of Decommissioning Status and Verification/Inspection) ① Any person who intends to report the decommissioning status of a nuclear reactor facility to the Committee pursuant to the first part of Article 28, Paragraph 3 of the Act shall report the following matters to the Committee every six months.
1. Status of Nuclear Reactor Facility Decommissioning
2. Status of Radioactive Contamination Removal
3. Current Status of Radiation Safety Management
4. Current Status of Radioactive Waste Management
② Upon receiving a report pursuant to Paragraph 1, the Committee shall verify and inspect the dismantling status through methods such as document review, on-site verification, witness inspection, or interview with the subject, in accordance with the latter part of Article 28, Paragraph 3 of the Act. In this case, the specific method for verifying and inspecting the dismantling status shall be determined by the Committee and announced .
[This Article Newly Inserted July 21, 2015]
Article 23-3 (Report on Completion of Decommissioning) When the decommissioning of a nuclear reactor facility is completed pursuant to Article 28, Paragraph 4 of the Act , a report shall be submitted to the Committee by attaching the Final Site Condition Report pursuant to Article 23-4 to the Report on Completion of Decommissioning of the Nuclear Reactor Facility in accordance with Form No. 14-2 of the Annex, which contains the mattersset forth in each of the following subparagraphs. <Amended Aug. 8, 2016>
1. Dissolution Strategy and Progress
2. Status of Reactor Facilities and Sites Before and After Decommissioning
3. Status of Final Radiation and Radioactivity at Reactor Facilities and Sites, and Status of Radioactive Waste Management
4. Radiation exposure dose of radiation workers participating in decommissioning
5. Abnormal events that occurred during the dismantling process
[This Article Newly Inserted July 21, 2015]
Article 23-4 (Final Site Condition Report) The term “documents prescribed by the Decree of the Prime Minister” in Article 28, Paragraph 5 of the Act refers to a final site condition report including the matters of each of the following subparagraphs.
1. Investigation plan, methods, and results regarding radiation and radioactivity levels at the final site condition
2. Site Reuse Plan
[This Article Newly Inserted July 21, 2015]
Article 23-5 (Inspection of Completion of Decommissioning) When the decommissioning of a nuclear reactor facility is completed pursuant to Article 28, Paragraph 6 of the Act , the Committeeshall inspect the matters in each of the following subparagraphs.
1. Whether demolition was carried out in accordance with the demolition plan
2. Whether the contents of the demolition completion report pursuant to Article 28 , Paragraph 5 of the Act correspond to the status of demolition completion
3. Whether the contents of the final site condition report pursuant to Article 23-4 comply with the reuse standards for sites and remaining buildings determined and notified by the Committee
[This Article Newly Inserted July 21, 2015]
Article 24 (Applicable Provisions) Articles 13 , 14 , and 15-2 shall apply mutatis mutandisto persons who have obtained an operation permit pursuant to Article 20 of the Act . <Amended May 3, 2018>
Section 3 Construction and Operation of Research Reactors, etc.
Article 25 (Application for Construction Permit and Operation Permit, etc.) ①The application for a construction permit and the application for an operation permit pursuant to Article 43, Paragraph 1 of the Enforcement Decree shall be in the form of Annex No. 15 and Annex No. 15-2, respectively . <Amended Nov. 24, 2014>
② The provisions of Article 4, Paragraphs 2 through 5 shall apply mutatis mutandis to the preparation of the Radiation Environmental Impact Assessment Report, the Preliminary Safety Analysis Report, the Quality Assurance Plan for Construction, and the Decommissioning Plan for Research or Educational Reactors and Related Facilities (hereinafter referred to as “Research, etc.”) pursuant to Article 30 , Paragraph 2 of the Act. In this case, “Power Generation Reactors and Related Facilities” and “Reactor Facilities” shall be deemed to be “Research, etc. Reactor Facilities,” and “Accident Management Plan” shall be deemed to be “Emergency Operation Procedures.” <Amended June 30, 2016>
③ Paragraphs 2 , 3 , and 5 of Article 16 shall apply mutatis mutandis to the preparation of technical operating guidelines, final safety analysis reports, or quality assurance plans regarding operation pursuant to Article 30-2 , Paragraph 2 of the Act . In this case, “reactor facility” shall be deemed to be “research reactor facility, etc.” <Newly added June 30, 2016>
④ In Article 30, Paragraph 2 of the Act , “other documents prescribed by Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs. <Amended Nov. 24, 2014; Jul. 21, 2015; Jun. 30, 2016>
1. Explanatory statement regarding the purpose of use of nuclear reactor facilities for research purposes, etc., pursuant to the first part of Article 30, Paragraph 1 of the Act
2. Description of technical capability regarding the installation of research-purpose reactor facilities, etc., prepared in accordance with the guidelines established and notified by the Committee
3. Articles of Incorporation (applicable only to corporations)
⑤ In Article 30-2, Paragraph 2 of the Act , “other documents prescribed by Decree of the Prime Minister” refers to the documents set forth in each of the following subparagraphs. <Newly added Nov. 24, 2014; Jun. 30, 2016>
1. Description of technical capability regarding the operation of research reactor facilities, etc., prepared in accordance with the guidelines established and notified by the Committee
2. Explanatory Note on the Nuclear Fuel Loading Plan
3. Description of the technical basis and verification methods to be applied when preparing the Emergency Operation Procedure
4. Articles of Incorporation (applicable only to corporations)
⑥ The Committee that receives an application for permission pursuant to Article 30 , Paragraph 2 or Article 30-2, Paragraph 2 of the Act shall verify the applicant’s Certificate of Corporate Registration (applicable only in the case of a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended Nov. 24, 2014; Jun. 30, 2016>
⑦ When the Committee has granted a construction permit for a nuclear reactor facility for research purposes, etc., pursuant to the first part of the main clause of Article 30, Paragraph 1 of the Act, or an operation permit for a nuclear reactor facility for research purposes, etc., pursuant to the first part of the main clause of Article 30-2, Paragraph 1 of the Act, it shall issue a permit certificate in the form of Annex No. 2 to the applicant. <Amended Nov. 24, 2014; Jun. 30, 2016>
[Title amended Nov. 24, 2014]
Article 26 (Application for Permission for Change) ①The application form for a construction change permit and the application form for an operation change permit pursuant to Article 44 of the Enforcement Decree shall be Form No. 16 and Form No. 16-2 , respectively . <Amended Nov. 24, 2014>
② The application form under Paragraph 1 must be accompanied by the following documents:
1. Comparison table of documents attached to the permit application before and after change
2. Permit
Article 27 (Report of Entry and Departure of Foreign Nuclear Vessels) ①The report of entry or departure pursuant to Article 45, Paragraph 1 of the Enforcement Decree shall be in the form of Annex 17 .
② The matters that the Committee must notify the Minister of Oceans and Fisheries for the prevention of disasters pursuant to Article 31 , Paragraph 2 of the Act are as follows:
1. Limit on reactor heat output
2. Distance from the mooring location to the residential area
3. The time it takes from the time an emergency occurs until the nuclear vessel is towed by a tugboat
4. Other matters that the Committee deems necessary to prevent nuclear fuel materials, materials contaminated thereby, or disasters caused by the reactor.
Article 28 (Notification of Change of Entry/Departure of Foreign Nuclear Vessel) Any person who intends to make a notification of change pursuant to Article 45, Paragraph 2 of the Enforcement Decree shall submit a notification form in Annex 18 to the Committee.
Article 29 (Reporting of Suspension, Closure, etc. of Business) Any person who intends to make a report pursuant to Article 33, Paragraph 1 of the Act shall submit a report in the form of Annex No. 19 to the Committee. <Amended Mar. 9, 2023>
Article 30 (Applicable Mutatis Mutandis) The provisions of Articles 6 , 13 , 14, 14-2 , 14-3 , 15 ,, 18 through 23 ,and 23-2 through 23-5 shall apply mutatis mutandis to persons who intend to obtain or have obtained a construction permit or,“nuclear reactor facility” shall be deemed to be “nuclear reactor facility for research purposes, etc.” <Amended Nov. 24 , 2014 ; Jul. 21, 2015; May 3, 2018>
Chapter 3 Nuclear Fuel Cycle Facilities
Section 1. Construction of Nuclear Fuel Cycle Facilities <Amended Oct. 23, 2025>
Article 31 (Application for Construction Permit) ①The application for a construction permit pursuant to Article 48 of the Enforcement Decree shall be in the form of Annex No. 20 .
② Regarding the preparation of the radiation environmental impact assessment report pursuant to Subparagraph 1 of Article 35 , Paragraph 2 of the Act , the quality assurance plan for the construction of nuclear fuel cycle facilities pursuant to Subparagraph 3 of the same Paragraph, and the nuclear fuel cycle facility decommissioning plan pursuant to Subparagraph 4 of the same Paragraph, Article 4 , Paragraph 2 (excluding Subparagraphs 5 and 6), Paragraphs 4 and 5 shall apply mutatis mutandis. In this case, “ Article 10, Paragraph 2 of the Act ” shall be deemed to be “ Article 35, Paragraph 2 of the Act ,” and “nuclear reactor facility” shall be deemed to be “nuclear fuel cycle facility.”
③ The preliminary safety analysis report pursuant to Article 35, Paragraph 2, Subparagraph 2 of the Act shall contain the following matters. However, matters that are not suitable for application due to differences in the purpose of use or principles of the facility, or matters that overlap with matters prepared in the documents under each subparagraph of Article 35, Paragraph 2 of the Act , may be omitted.
1. General matters of each of the following items
A. Overview of the Permit Application
B. Key Characteristics of Nuclear Fuel Cycle Facilities and Their Sites
C. Comparison with other similar nuclear fuel cycle facilities
D. Contracting Parties and Scope of Liability Regarding the Construction of the Nuclear Fuel Cycle Facility
E. Technical data to be additionally submitted
2. Matters concerning the site in each of the following subparagraphs
A. Geographical Characteristics and Population Status
B. Surrounding industrial, transportation, and military facilities
C. Weather Characteristics
D. Characteristics of the ocean
E. Hydrological characteristics
B. Geological, seismic, and geotechnical characteristics
3. The following matters concerning the structures, systems, equipment, and installation of the facility
a. Whether it conforms to design standards
B. Classification of Structures, Systems, and Equipment
C. Design of equipment affecting safety
4. Matters concerning the design, operation, and management of the major facilities listed in each of the following items
a. Structures
B. Process Equipment
C. Instrumentation and Control Equipment
D. Power facilities
E. Process support facilities
B. Ventilation Equipment
G. Fire protection equipment
5. The following matters concerning the management of radioactive waste
A. Solid Waste Management System
B. Liquid Waste Management System
C. Gaseous Waste Management System
6. Matters concerning radiation protection, each of the following items
A. Protection plan for radiation workers
B. Radiation Source
C. Radiation Protection Design
D. Method for evaluating radiation dose
E. Health Physics Planning
7. The following matters concerning the organization
A. Management System
B. Job Education and Training
C. Management Procedures
8. Matters concerning nuclear criticality safety and accident analysis
9. Matters concerning safety measures and safety management regarding operation
10. Matters concerning quality assurance
④ In Article 35, Paragraph 2, Subparagraph 5 of the Act , “documents prescribed by the Decree of the Prime Minister” refers to the documents listed in each of the following subparagraphs.
1. Description of technical capability regarding the construction of a nuclear fuel cycle facility containing the following items
a. Rights relating to technology, such as patents, concerning refining, conversion, processing, or spent nuclear fuel treatment
B. Overview of methods for refining, conversion, processing, or spent nuclear fuel treatment according to special technology, or equivalent methods
C. Profiles of Key Engineers
D. Other matters concerning technical capabilities related to refining, conversion, processing, or spent nuclear fuel treatment
2. Articles of Incorporation (applicable only to corporations)
⑤ The Committee that receives the application for a construction permit pursuant to Article 48 of the Enforcement Decree shall verify the applicant’s certificate of corporate registration (only applicable if it is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act.
⑥ When the Committee grants a construction permit for a nuclear fuel cycle facility pursuant to Article 35, Paragraph 1 of the Act , it shall issue a permit certificate in the form of Annex 21 to the applicant.
[Wholly Amended Oct. 23, 2025]
Article 32 (Application for Permission for Change) ①The application for permission for change pursuant to Article 52 of the Enforcement Decree shall be in the form of Annex No. 22 .
② The application for a change of permit under Paragraph 1 must be accompanied by the following documents:
1. Comparison table of documents attached to the permit application before and after change
2. Permit
[Wholly Amended Oct. 23, 2025]
Article 33 (Notification of Change of Minor Matters) ① The term “minor matters prescribed by Decree of the Prime Minister” in the proviso to Article 35, Paragraph 3 of the Act refers to any of the matters falling under any of the following subparagraphs.
1. Name and address of the person who has obtained the construction permit for the nuclear fuel cycle facility (hereinafter referred to as the “nuclear fuel cycle facility constructor”) (in the case of a corporation, its name and address and the name of its representative)
2. Name and location of the business office
3. Construction Schedule for Nuclear Fuel Cycle Facility
4. Matters concerning a reduction in the types of nuclear materials handled at nuclear fuel cycle facilities, a reduction in the annual planned handling volume, or a change in the nuclear material acquisition plan
5. Matters concerning changes to equipment or facilities that do not affect nuclear criticality safety and accident analysis among the contents of the preliminary safety analysis report pursuant to Article 35, Paragraph 2, Subparagraph 2 of the Act
6. Matters concerning changes to general organizations other than the quality assurance system organization among the contents of the preliminary safety analysis report pursuant to Article 35 , Paragraph 2, Subparagraph 2 of the Act and the quality assurance plan for the construction of nuclear fuel cycle facilities pursuant to Subparagraph 3 of the same Paragraph.
7. Typographical errors, omissions, or other similar reasons where the cause of the change is clear
② Any person who intends to report a change of minor matters pursuant to the proviso of Article 35, Paragraph 3 of the Act shall submit to the Committee a change report in the form of Annex 4 , attaching the documents of each of the following subparagraphs.
1. Documents proving the changes
2. Permit (applicable only in the case of Paragraph 1, Subparagraphs 1 and 2)
③ The change report under Paragraph 2 must be submitted within the period specified in each of the following subparagraphs.
1. Matters concerning the changes to Paragraph 1, Subparagraphs 1 through 4: Within 30 days of the change
2. Matters concerning the changes to Paragraph 1, Subparagraphs 5 through 7: Within 6 months after the change
[Wholly Amended Oct. 23, 2025]
[Attachment Form No. 104] Application for Reissuance of Nuclear-Related License
[Form No. 104-2] Application for Recognition of Experience for Reactor Operator License
[Form No. 104-3] Application for Renewal of Reactor Operator License
[Form No. 104-4] Certificate of Experience in Reactor Operation
[Attachment Form No. 104-5] Health Examination Form (Radiation Workers, Frequent Visitors, Radiation-Related Workers)
[Attachment Form No. 105] Report on Transfer and Assignment (Radioactive Materials, etc., Radiation Generating Devices)
[Attachment Form No. 106] Notification of Cancellation of Permit, etc. / Cessation of Business (Use)
[Attachment Form No. 107] Inspection Sample Collection Certificate
[Attachment Form No. 108] Inspector Certificate
[Attachment Form No. 109] Application for Approval of Specific Technology Subject Report
[Attachment Form No. 110] Draft Radiation Environmental Impact Assessment Viewing Register
[Attachment Form No. 110-2] Viewing Register for Draft Demolition Plan
[Attachment Form No. 111] Submission of Resident Opinions
[Attachment Form No. 112] Application for Statement
[Attachment Form No. 113] Notice of Public Hearing Results
[Attachment Form No. 114] Application for Continuing Education
[Attachment Form No. 115] Application for Reissuance of Nuclear-Related Licenses, etc.