지적측량 시행규칙
267509 · 2025-03-27
Ministry of Land, Infrastructure and Transport ( Spatial Information System Division ), 044-201-4839
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of this Ruleis to prescribe matters delegated by the Act on the Establishment and Management of Spatial Information, etc. and the Enforcement Decree of the same Act , as well as matters necessary for the implementation thereof. <Amended Apr. 23, 2015>
Article 2 (Definitions) The meanings of terms used in this Rule are as follows:
1. “Known points” refers to survey reference points and boundary points according to the classifications in each of the following subparagraphs.
a. Basic surveying for establishing cadastral reference points pursuant to Article 8, Paragraph 1, Subparagraph 3 of the Enforcement Decree of the Act on the Establishment and Management of Spatial Information, etc. (hereinafter referred to as the “Decree” ) (hereinafter referred to as “Basic Surveying”): National reference points pursuant to Article 7, Paragraph 1, Subparagraph 1 of the Act on the Establishment and Management of Spatial Information, etc. (hereinafter referred to as the “Act”) or cadastral reference points pursuant to Subparagraph 3 of the same Paragraph (hereinafter referred to as “Cadastral Reference Points”)
B. Detailed survey pursuant to Article 5, Paragraph 1 : Boundary points on the ground that correspond to cadastral reference points or boundary points demarcating parcels on cadastral maps or forest maps.
2. “Network average calculation method” refers to a calculation method for finding the location of a cadastral triangulation point to be found by utilizing a cadastral triangulation network.
3. “Double angle method” refers to an observation method in which a single angle is observed two or more times and the accumulated value is averaged.
4. “Azimuth method” refers to a method of directly observing the angles formed to each traverse line in a clockwise direction based on the north of the meridian.
5. “The method of traversing” refers to a method of determining the location of a survey point by starting from a base point, sequentially observing the direction and distance of each side, and returning to the base point.
6. “Multi-angled wire method” refers to a method of configuring multiple wires in a combined form to eliminate errors by synthesizing the relationship between the errors generated in each wire and the related wires.
7. “Church law” refers to a method of determining the location of a point by the intersection of direction lines at a known or unknown point.
8. “Radial method” refers to a method of determining the location of a point to be measured by installing a measuring plate at a point or base point where all points to be measured are visible and measuring the distances and angles of several points.
9. “Vertical angle” refers to the angle formed by the line of sight with the horizontal line.
[This Article was newly added on Dec. 26, 2024.]
[Former Article 2 was moved to Article 2-2 <Dec. 26, 2024>]
Chapter 2 Installation and Management of Cadastral Reference Points
Article 2-2 (Installation and Management, etc. of Cadastral Reference Point Markers) ① The installation of cadastral reference point markers pursuant to Article 8, Paragraph 1 of the Act shall be in accordance with the standards set forth in each of the following subparagraphs. <Amended Apr. 23, 2015; Dec. 26, 2024>
1. The distance between cadastral triangulation markers shall be an average of 2 kilometers or more and 5 kilometers or less.
2. The distance between points of cadastral auxiliary triangulation markers shall be at least 1 kilometer and no more than 3 kilometers on average. However, in cases following the polygonal network traversal method, the distance shall be at least 0.5 kilometers and no more than 1 kilometer on average.
3. The distance between cadastral control point markers shall be at least 50 meters and no more than 500 meters on average.
② The cadastral authority shall investigate the condition of cadastral reference point markers at least once a year. In this case, if there is no longer a need to preserve cadastral reference point markers that have been lost or damaged, they may be disposed of.
③ When a cadastral reference point marker managed by the cadastral authority is lost or damaged, the cadastral authority shall reinstall or repair it.
[Moved from Article 2 <December 26, 2024>]
Article 3 (Management of Cadastral Reference Point Results, etc.) The management of cadastral reference point results pursuant to Article 27, Paragraph 1 of the Act shall be in accordance with each of the following subparagraphs. <Amended Dec. 26, 2024>
1. Cadastral triangulation results shall be managed by the Mayor of a Special City, Metropolitan City, Special Self-Governing City, or the Governor of a Province or Special Self-Governing Province (hereinafter referred to as the “City/Provincial Governor”), and cadastral auxiliary triangulation results and cadastral control point results shall be managed by the competent cadastral authority.
2. When the cadastral authority installs or changes a cadastral triangulation point, it shall notify the Mayor or Provincial Governor of the survey results.
3. If cadastral triangulation results differ due to changes in topography, features, etc., the competent cadastral authority shall correct the survey results without delay and notify the Mayor/Do Governor of the details.
Article 4 (Recording and Management of Cadastral Reference Point Results Table, etc.) ① When a City or Provincial Governor manages cadastral triangulation results pursuant to Article 3, they shall record and manage the following matters in the cadastral triangulation result table.
1. Names of Geodetic Triangulation Points and Reference Origin Names
2. Coordinates and Elevation
3. Longitude and latitude (limited to cases where necessary)
4. Meridian aberration
5. Name of the sighting point, azimuth, and distance
6. Location and Date of Survey
7. Other Notes
② When the cadastral authority manages cadastral auxiliary triangulation point results and cadastral control point results pursuant to Article 3, it shall record and manage the matters of each of the following subparagraphs in the cadastral auxiliary triangulation point result table and the cadastral control point result table. <Amended Dec. 26, 2024>
1. Number of cadastral auxiliary triangulation point or cadastral control point
1-2. Close-up photograph and sketch map of location (the sketch map of location may be replaced with a long-distance photograph or aerial photograph)
2. Coordinates and Rectangular Coordinate System Origin Name
3. Longitude and latitude (limited to cases where necessary)
4. Altitude (limited to cases where necessary)
5. Location and date of installation and reinstallation
6. Pilot Class and Pilot Name
7. Cover material
8. Number of cadastral map and forest map
9. Deleted <December 26, 2024>
10. Date of investigation, position and name of the investigator, and content of the investigation
③ The contents of the investigation under Paragraph 2, Subparagraph 10 shall record the presence or absence of cadastral auxiliary triangulation points and cadastral control point markers, the cause of the accident, and whether they conform to the boundary. In this case, if they do not conform to the boundary, the reason shall be recorded. <Amended Apr. 23, 2015>
Chapter 3 Methods and Procedures of Cadastral Surveying
Section 1 General Rules
Article 5 (Classification of Cadastral Surveying, etc.) ① Cadastral surveying shall be classified into basic surveying and detailed surveying for determining the boundaries and area of a single parcel. <Amended Apr. 23, 2015; Dec. 26, 2024>
② Cadastral surveying shall be conducted using methods such as plane table surveying, electronic plane table surveying, astradoxis surveying, radio or optical station surveying, photogrammetry, satellite surveying, and drone surveying. <Amended Dec. 26, 2024>
Article 6 (Standards for Implementation of Cadastral Surveying) ① Cadastral triangulation point surveying and cadastral auxiliary triangulation point surveying shall be conducted in any of the following cases:
1. Cases where the installation or reinstallation of cadastral triangulation points or auxiliary cadastral triangulation points is necessary due to the topography of the survey area
2. Cases where the installation of cadastral triangulation points or auxiliary cadastral triangulation points is necessary for the installation or reinstallation of cadastral control points
3. Cases where the installation of cadastral triangulation points or auxiliary cadastral triangulation points is necessary for detailed surveying
② Cadastral control point surveying shall be carried out in any of the following cases:
1. Cases where surveying for scale change is conducted pursuant to Article 83 of the Act
2. Cases where a cadastral survey is conducted due to urban development projects, etc. pursuant to Article 86 of the Act
3. Cases where detailed surveying is conducted in urban areas under Article 7, Subparagraph 1 of the National Land Planning and Utilization Act
4. If the area of the surveyed area is equal to or greater than the area corresponding to one sheet of the relevant cadastral map
5. When particularly necessary for detailed surveying
③ Detailed surveying shall be carried out in the cases of Article 23 , Paragraph 1 , Subparagraphs 2 , 3 , 4 , and 5 of the Act .
Article 7 (Methods of Cadastral Surveying, etc.) ① The method of cadastral surveying pursuant to Article 23, Paragraph 2 of the Act shall be in accordance with any one of the following subparagraphs. <Amended Mar. 23, 2013; Dec. 26, 2024>
1. Cadastral Triangulation Survey: Based on satellite reference points, integrated reference points, triangulation points, and cadastral triangulation points, surveys shall be conducted in accordance with the orthogonal surveying method, radio or optical surveying method, satellite surveying method, and surveying methods approved by the Minister of Land, Infrastructure and Transport, provided that calculations shall follow the average calculation method or the network average calculation method.
2. Cadastral Auxiliary Triangulation Survey: Based on satellite reference points, integrated reference points, triangulation points, cadastral triangulation points, and cadastral auxiliary triangulation points, surveys shall be conducted in accordance with the orthogonal surveying method, radio or optical surveying method, satellite surveying method, and surveying methods approved by the Minister of Land, Infrastructure and Transport, provided that the calculations shall follow the intersection method or the polygonal network traverse method.
3. Cadastral Control Point Survey: Based on satellite control points, integrated control points, triangulation points, and cadastral control points, surveys shall be conducted in accordance with the traverse surveying method, radio or optical surveying method, satellite surveying method, and surveying methods approved by the Minister of Land, Infrastructure and Transport; provided, however, that calculations shall follow the Traverse Method, the Intersection Method, and the Polygonal Network Traverse Method.
4. Detailed Survey: Based on satellite control points, integrated control points, cadastral control points, and boundary points, survey shall be conducted in accordance with the traverse surveying method, plane table surveying method, electronic plane table surveying method, satellite surveying method, and drone surveying method.
② Matters necessary for the methods and procedures, etc. of satellite surveying and drone surveying shall be separately determined by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013; Dec. 26, 2024>
③ The procedure for cadastral reference point surveying pursuant to Article 23, Paragraph 1, Item 1 of the Act shall follow the order of the following items.
1. Formulation of a plan
2. Preparation and Field Trip
3. Selection and Key Marking
4. Observations, Calculations, and Preparation of Results Sheets
④ Software used for calculations and the preparation of results in cadastral surveying shall be determined by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013>
Section 2 Basic Surveying
Article 8 (Cadastral Triangulation Survey) ① When conducting a cadastral triangulation survey, cadastral triangulation markers must be installed in advance.
② The names of cadastral triangulation points shall be determined by selecting two characters from the name of the Special City, Metropolitan City, Special Self-Governing City, Province, or Special Self-Governing Province (hereinafter referred to as “City/Province”) where the survey area is located, and assigning a serial number at the City/Province level. <Amended Dec. 26, 2024>
③ Geodetic triangulation points must be composed of a central polygonal network, an interpolation network, a quadrilateral network, a triangular chain, or a network of three sides or more.
④ Each interior angle of a triangle shall be between 30 degrees and 120 degrees. However, this shall not apply in cases where the net mean method and trilateration are used.
⑤ The process of observation and calculation for determining cadastral triangulation points must be recorded in the cadastral triangulation survey log.
Article 9 (Observation and Calculation of Cadastral Triangulation Points) ① The observation and calculation of cadastral triangulation points according to the traverse surveying method shall be in accordance with the standards of each of the following subparagraphs.
1. Use a longitude and latitude of at least 10 seconds for observation.
2. Horizontal angle observation shall follow the directional observation method of the three major cycles (the outlines shall be 0, 60, and 120 degrees).
3. The angular tolerance for horizontal angles shall comply with the following table.
② The observation and calculation of cadastral triangulation points using radio or optical surveying methods shall be in accordance with the standards of each of the following subparagraphs.
1. For radio or optical distance measuring instruments, use a precision instrument with a standard deviation of ±[5 millimeters + 5 ppm] or greater.
2. The distance between points shall be measured five times; if the intersection of the maximum and minimum values is 1/100,000 or less of the average, the average shall be used as the measured distance, and the distance shall be calculated based on the planar distance projected onto the origin.
3. The interior angles of a triangle shall be calculated based on the planar distances of the three sides, and the provisions of Paragraph 1, Subparagraph 3 shall apply mutatis mutandis to the difference from the known angles.
③ When observing cadastral triangulation points pursuant to Paragraphs 1 and 2, the observation and calculation of vertical angles shall be in accordance with the standards in each of the following subparagraphs. <Amended Jan. 17, 2014; Dec. 26, 2024>
1. Observe twice at each station using both the standard and reverse methods.
2. When the intersection of the maximum and minimum observations is within 30 seconds, the average value shall be taken as the vertical angle.
3. When the result of calculating the elevation of the target point from two base points is less than or equal to the intersection, the average value shall be used as the elevation. In this case, it refers to the planar distance from the base point to the target point expressed in kilometers.
④ Calculations of cadastral triangulation points shall be performed using true numbers in accordance with the average calculation method or the network average calculation method based on the angle and edge conventions, and the calculation units shall be as specified in the following table. <Amended Jan. 17, 2014>
Article 10 (Cadastral Triangulation Auxiliary Point Survey) ① When necessary for cadastral triangulation auxiliary point surveying, cadastral triangulation auxiliary point markers must be installed in advance.
② Cadastral auxiliary triangulation points shall be assigned serial numbers according to the order of installation for each survey area; however, in the case of installing permanent markers, serial numbers shall be assigned for each city, county, or district. In this case, the prefix “Bo” shall be placed before the serial number of the cadastral auxiliary triangulation point.
③ Geodetic triangulation auxiliary points must be constructed as an intersection network or an intersection polygonal network.
④ When conducting cadastral auxiliary triangulation surveys using the church method according to the surveying method of the latitude and equatorial method and the surveying method of the radio or optical station, the following standards shall apply.
1. Follow the three-way intersection. However, if it is unavoidable due to the terrain and the determination is to be made by the two-way intersection, each interior angle may be observed, and if the difference between the sum of the observations of each interior angle and 180 degrees is within ±40 seconds, the result may be distributed evenly among each interior angle.
2. Each interior angle of a triangle shall be between 30 degrees and 120 degrees.
⑤ When conducting cadastral auxiliary triangulation surveys using the polygonal traverse method in accordance with radio or optical surveying methods, the standards in each of the following subparagraphs shall apply. <Amended Jan. 17, 2014>
1. Follow the combined polygonal method including three or more known points.
2. The number of points on a single path (referring to between a base point and an intersection point, or between two intersection points) shall be five or fewer, including the base point and the intersection point.
3. The distance of one line (referring to the total sum of distances between a base point and an intersection point, or between intersection points) shall be 4 kilometers or less.
⑥ The process of observation and calculation for determining cadastral auxiliary triangulation points must be recorded in the cadastral auxiliary triangulation survey log.
Article 11 (Observation and Calculation of Cadastral Auxiliary Triangulation Points) ① The observation and calculation of cadastral auxiliary triangulation points in accordance with the surveying method of latitude and equatorial notation and the church law shall be in accordance with the standards of each of the following subparagraphs.
1. Use a girdle with a reading of 20 seconds or more for observation.
2. Horizontal angle observation shall follow the directional observation method of the 2nd division (contour diagrams shall be 0 degrees and 90 degrees).
3. The angular tolerance for horizontal angles shall be in accordance with the following table. In this case, the difference between the sum of the observed interior angles of the triangle and 180 degrees shall apply when all interior angles are observed.
4. The units of calculation shall follow the following table.
5. When the intersection of the positions calculated from two triangles ( referred to as [a specific term, hereinafter the same) is 0.30 meters or less, the average value shall be used as the location of the cadastral auxiliary triangulation point. In this case, the azimuth and distance between the base point and the sub-point shall be newly calculated and determined based on the average value.
② The observation and calculation of auxiliary cadastral triangulation points according to radio or optical surveying methods and the church law shall be in accordance with the standards of each of the following subparagraphs.
1. Paragraphs 2 and 3 of Article 9 shall apply mutatis mutandis to the method of measuring distances between points and vertical angles.
2. Paragraph 1, Subparagraph 3 shall apply mutatis mutandis to the difference from the known angle.
3. The provisions of Paragraph 1, Subparagraphs 4 and 5 shall apply mutatis mutandis to the unit of calculation and the connecting intersection of positions calculated from two triangles.
③ The observation and calculation of auxiliary cadastral triangulation points based on the traverse surveying method, radio or optical surveying method, and the polygonal network traverse method shall be in accordance with the standards of each of the following subparagraphs.
1. The provisions of subparagraphs 1 through 4 of Paragraph 1 shall apply mutatis mutandis to the methods of observation and calculation, and Paragraphs 2 and 3 of Paragraph 9 shall apply mutatis mutandis to the methods of observation of distance between points and vertical angles. However, horizontal angle observation of cadastral auxiliary points according to the polygonal network method may follow the angle-doubling method according to subparagraph 3 of Article 13 , and the intersection of the first measured angle and the average of three measured angles shall be within 30 seconds.
2. The occlusion error between the average azimuth and the observed azimuth for each traverse shall be within [amount]. In this case, n refers to the number of sides including the occlusion side.
3. The connection error per conductor shall be 0.05 × S meters or less. In this case, S refers to the number obtained by dividing the distance of the conductor by 1,000.
4. Article 14, Paragraph 2 shall apply mutatis mutandis to the distribution of angle measurement errors.
5. Article 15, Paragraph 2 shall apply mutatis mutandis to the distribution of longitudinal and transverse errors.
Article 12 (Cadastral Control Point Survey) ① When conducting a cadastral control point survey, cadastral control point markers must be installed in advance.
③ The traverse lines for cadastral control point surveying shall be classified into first-order and second-order traverse lines according to the criteria in each of the following subparagraphs.
1. First-order traverses shall be traverses or polygonal network traverses connecting satellite reference points, integrated reference points, triangulation points, cadastral triangulation points, and cadastral auxiliary triangulation points.
2. Second-order traverses shall be traverses connecting satellite reference points, integrated reference points, triangulation points, cadastral triangulation points, and auxiliary cadastral triangulation points with cadastral control points, or connecting cadastral control points to one another.
3. First-class conductors shall be listed in alphabetical order (Ga-Na-Da), and second-class conductors shall be listed in alphabetical order (G-N-D).
④ Cadastral control points must be composed of combined lines, closed lines, round-trip lines, and polygonal network lines.
⑤ When conducting cadastral control point surveys using the traverse method according to the surveying method of the latitude and equatorial method, the standards of each of the following subparagraphs shall apply.
1. Traverse lines shall follow combined traverse lines connecting satellite reference points, integrated reference points, triangulation points, cadastral triangulation points, cadastral auxiliary triangulation points, and cadastral control points. However, if unavoidable due to topography, closed traverse lines or round-trip traverse lines may be followed.
2. The number of points in one line shall be 40 or fewer. However, if unavoidable due to topography, it may be up to 50 points.
⑥ When conducting cadastral control point surveying using the polygonal network traverse method in accordance with the traverse surveying method or the radio or optical surveying method, the standards in each of the following subparagraphs shall apply. <Amended Jan. 17, 2014>
1. Follow the combined polygonal method including three or more known points.
2. The number of points per line shall be 20 or fewer.
⑦ The process of observation and calculation for determining the results of cadastral control points must be recorded in the cadastral control point survey register.
Article 13 (Observation and Calculation of Cadastral Control Points) The observation and calculation of cadastral control points based on the traverse method, radio or optical method, and the traverse method or polygonal network traverse method shall be in accordance with the standards set forth in each of the following subparagraphs.
1. For the observation of horizontal angles, the double angle method shall be followed for urban areas, areas subject to scale changes, and areas where the Boundary Point Coordinate Register is implemented; for other areas, the double angle method and the azimuth method shall be used in combination.
2. Use a girder with a reading of 20 seconds or more for observation.
3. Observations and calculations shall follow the following table.
4. When measuring the distance between points, two measurements shall be taken, and if the difference between the measurements is 1/3,000 of the average value or less, the average value shall be used as the distance between points. In this case, if the distance between points is an oblique distance, it shall be calculated as a horizontal distance.
5. When observing the vertical angle, observe the upward angle and the downward angle; if the intersection is within 90 seconds, take the average value as the vertical angle.
Article 14 (Permissible Range of Block Error and Distribution of Angle Measurement Error when Observing Angles at Cadastral Control Points) ① The permissible range of block error when observing angles at cadastral control points according to the Traverse Method and the Polygonal Traverse Method shall be in accordance with the standards in each of the following subparagraphs. In this case, n refers to the number of sides including the blocked side.
1. When using the angle-divided method: The intersection of the average value of the first measured angle and the third measured angle shall be within 30 seconds, and the block error between the base bearing angle or average bearing angle of a first-order conductor and the observed bearing angle shall be within [no limit] for first-order conductors and within [no limit] for second-order conductors.
2. When using the azimuth method: The block error of a single conductor shall be within minutes for first-order conductors and within minutes for second-order conductors.
[Attachment Form No. 19] Coordinate Conversion Calculation Sheet (B·L→X·Y)
[Attachment Form No. 20] Cadastral Triangulation Point Results Table
[Attachment Form No. 21] Cadastral Triangulation Auxiliary Survey Register
[Attachment Form No. 22] Calculation Sheet for Azimuth Angle of Cadastral Auxiliary Points
[Attachment Form No. 23] Church Store Account Book
[Attachment Form No. 24] Rear Intersection Point Calculation Sheet (2-Point Method)
[Attachment Form No. 25] Rear Church Law Calculation Sheet (3-Point Method)
[Attachment Form No. 26] Intersection Polygonal Network Calculation Sheet
[Attachment Form No. 27] Intersection Polygonal Network Calculation Sheet (X-Y Type)
[Attachment Form No. 28] Intersection Polygon Network Calculation Section (H·A Type)
[Attachment Form No. 29] Multi-point Coordinate Calculation Sheet
[Attachment Form No. 30] Cadastral Survey Record
[Attachment Form No. 31] Angle Observation and Distance Measuring Unit
[Attachment Form No. 32] Azimuth Observation and Distance Measurement Unit
[Attachment Form No. 33] Calculation Sheet for Traverse Survey (Angle Method)
[Attachment Form No. 34] Cadastral Survey Calculation Sheet (Azimuth Method)
[Attachment Form No. 35] Results Table (Cadastral Triangulation Auxiliary Points, Cadastral Control Points)
[Attachment Form No. 36] Boundary Point Observation Sheet
[Attachment Form No. 37] Calculation Sheet for Coordinate Area and Distance Between Boundary Points
[Attachment Form No. 38] Intersection Calculation Sheet
[Attachment Form No. 39] Boundary Point Coordinate Survey Record
[Attachment Form No. 40] Area Measurement Register
[Attachment Form No. 41] Cadastral Survey Results Register
[Attachment Form No. 42] Cadastral (Boundary Restoration/Current Status) Survey Results Register