Rules on the Calculation, etc. of Sale Prices of Multi-unit Housing
288503 · 2026-07-29
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of these Rules is to prescribe matters concerning the optional item system for housing subject to the price ceiling system, the method of calculating sale prices, and the methods and procedures for public disclosure of sale prices, etc., in accordance with Article 54, Paragraph 1, Subparagraph 2, Item (b) and Article 57 of the Housing Act. <Amended Apr. 14, 2011; Aug. 12, 2016>
Article 2 (Scope of Application) This Rule applies to multi-unit housing supplied to the general public by a project entity {including a building owner who, having obtained a building permit pursuant to Article 11 of the Building Act, constructs and supplies housing and facilities other than housing in the same building with a number of units exceeding that stipulated in Article 15, Paragraph 1 of the Housing Act (hereinafter referred to as the "Act"); hereinafter the same applies} after obtaining approval for resident recruitment pursuant to Article 54, Paragraph 1 of the Act {in cases where the project entity falls under any of the following subparagraphs, this refers to the public notice of resident recruitment}. <Amended Mar. 4, 2010; Oct. 30, 2014; Aug. 12, 2016>
1. The State, local governments, the Korea Land and Housing Corporation pursuant to the "Korea Land and Housing Corporation Act" (hereinafter referred to as "Korea Land and Housing Corporation"), or a local corporation established for the purpose of housing construction business pursuant to Article 49 of the "Local Public Enterprises Act" (hereinafter referred to as "Local Corporation")
2. A real estate investment company in which a person falling under Item 1 has invested, either individually or jointly, in an amount exceeding 50% of the total shares
Chapter 2 Optional Items, etc.
Article 3 (Basic Optional Items, etc.)
① Pursuant to Article 54, Paragraph 1, Subparagraph 2, Item (b) of the Act, items included in the sale price under Article 7, Paragraph 1 that the occupant may directly select and construct or install (hereinafter referred to as "Basic Optional Items") shall be items other than those listed in each of the following subparagraphs, such as wallpaper, flooring materials, kitchenware, and lighting fixtures, as determined and notified by the Minister of Land, Infrastructure and Transport. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
1. Items related to fire fighting facilities
2. Items related to foundation finishing, such as insulation, waterproofing, and plastering
3. Electric wires, communication lines, and piping required for electrical work, plumbing work, etc.
4. Other items that may affect the structure of the building
② The Minister of Land, Infrastructure and Transport shall announce the amount of the portion excluding basic optional items among the standard construction costs (hereinafter referred to as "standard construction costs") pursuant to Article 57, Paragraph 4 of the Act. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
③ The project owner shall publish the notice of tenant recruitment pursuant to Article 21, Paragraph 1 of the "Rules on Housing Supply" (hereinafter referred to as the "Notice of Tenant Recruitment") including the matters of each of the following subparagraphs. <Amended 2015.12.29>
1. Types of Basic Optional Items
2. The sale price of the portion excluding basic optional items among the sale price pursuant to Article 7, Paragraph 1
Article 4 (Optional Items Presented in the Tenant Recruitment Notice)
① Items not included in the sale price pursuant to Article 7, Paragraph 1, which the project owner presents in the notice of resident recruitment and allows residents to additionally select (hereinafter referred to as "additional selection items") shall be as follows: <Amended 2011.11.14, 2012.3.9, 2013.3.23, 2014.10.30, 2019.8.22, 2026.2.11>
1. Balcony Extension
2. Installation of System Air Conditioner (referring to the type embedded in the ceiling)
3. Installation of built-in home appliances falling under any of the following items
A. Ovens, cooktops, dishwashers, refrigerators (including freezers), kimchi refrigerators, washing machines, and kitchen televisions
B. Home Automation, Home Theater Systems
C. Other items determined by the project owner after hearing the opinion of the approving authority prior to the application for approval of tenant recruitment
4. Installation of built-in furniture falling under any of the following items
A. Wardrobe, storage cabinet, shoe cabinet
B. Other items determined by the project owner after hearing the opinion of the approving authority prior to the application for approval of tenant recruitment
5. Installation of convenience facilities that are not mandatory for installation in apartments among the convenience facilities pursuant to Subparagraph 4, Item (b) of Annex 2 of the Enforcement Decree of the Act on the Guarantee of Convenience Promotion for Persons with Disabilities, the Elderly, Pregnant Women, etc.
6. Installation of items notified by the Minister of Land, Infrastructure and Transport after hearing the opinions of the relevant industry, as deemed necessary due to technological advancements or changes in residential life
② Notwithstanding Paragraph 1, if the project entity issues a notice of tenant recruitment after the construction process has reached 60% completion, it may exclude the balcony expansion specified in Paragraph 1, Item 1 from the additional optional items and supply the housing as a separate cost not included in the sale price pursuant to Article 7, Paragraph 1. In this case, approval regarding the installation of the balcony must be obtained from the authority approving tenant recruitment pursuant to Article 20, Paragraph 1 of the "Rules on Housing Supply," and the notice of tenant recruitment must specify that the housing will be supplied as a balcony-extended type. <Newly Added 2026.2.11>
③ If the project owner designates any of the items in Paragraph 1 as additional optional items, it shall indicate the associated costs separately from the sale price of the relevant housing unit in the tenant recruitment notice. <Amended 2011.11.14, 2026.2.11>
④ Detailed matters concerning the installation and supply of additional optional items shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Newly added 2011.11.14, 2013.3.23, 2026.2.11>
[Title Revised 2014.10.30]
Article 5 (Housing Allocation, etc. for Persons Directly Constructing and Installing Basic Optional Items)
① The project owner may determine and announce the order of allocation by building for housing units to be preferentially supplied to those who intend to individually construct and install basic optional items in the tenant recruitment notice.
② When the Project Owner supplies housing pursuant to Paragraph 1, it shall preferentially allocate buildings and households by lottery to residents who intend to construct or install basic optional items, in accordance with the building-by-building allocation order pursuant to Paragraph 1.
Article 6 (Construction and Installation Period, etc. of Basic Optional Items) Necessary matters, such as the construction and installation period of basic optional items and precautions for residents, shall be determined by the Minister of Land, Infrastructure and Transport and announced by public notice. <Amended Mar. 14, 2008; Nov. 14, 2011; Mar. 23, 2013>
Chapter 3 Method of Calculating Sale Price, etc.
Article 7 (Method of Calculating Sale Price, etc. for Housing Subject to the Sale Price Cap System)
① The method for calculating the sale price of housing subject to the price ceiling system under Article 57, Paragraph 1 of the Act is as follows. <Amended Aug. 12, 2016>
Sale Price = Standard Construction Cost + Additional Construction Costs + Land Cost
② Standard construction costs are classified into above-ground construction costs and basement construction costs.
③ The Minister of Land, Infrastructure and Transport shall announce the Construction Cost Index for Multi-Family Housing (referring to an index calculated in consideration of price fluctuations of construction materials, etc. input into housing construction, which indicates the rise or fall of housing construction costs; hereinafter the same applies) and the Standard Construction Cost Reflecting the Index (hereinafter referred to as "Construction Cost Index, etc." in this Article) as of March 1 and September 15 of each year. <Amended 2008.3.14, 2008.6.30, 2013.3.23, 2017.8.29, 2022.7.15>
④ Notwithstanding Paragraph 3, if the price of major construction materials input into housing construction specified in Annex 1 changes by 15 percent or more three months after the Construction Cost Index, etc. has been announced pursuant to Paragraph 3, the Minister of Land, Infrastructure and Transport shall adjust and announce the Construction Cost Index, etc. in consideration of the price change of the relevant materials. <Newly added 2008.6.30, 2010.3.4, 2013.3.23, 2022.7.15>
⑤ Notwithstanding Paragraphs 3 and 4, the Minister of Land, Infrastructure and Transport may, in cases where the Construction Cost Index, etc. has been publicly notified pursuant to the same Paragraph, adjust and publicly notify the Construction Cost Index, etc. notified pursuant to the same Paragraph in cases falling under any of the following subparagraphs. The same shall apply even after the Construction Cost Index, etc. has been publicly notified pursuant to this Paragraph. <Newly Added 2022.7.15>
1. In cases where the sum of the price fluctuation rates of ready-mix concrete and high-strength reinforcing steel, respectively, among the construction materials specified in Attached Table 1 (referring to those calculated based on the prices at the time of calculating the construction cost index, etc. notified pursuant to Paragraphs 3, 4, and this Paragraph; hereinafter the same applies in Subparagraph 2) is 15 percent or more
2. If the sum of the price fluctuation rates of each of the construction materials specified in Attached Table 1—window and door glass, reinforced plywood flooring, and aluminum formwork—is 30 percent or more
Article 8 (Costs Added to the Supply Price of Public Housing Land) The land-related costs added to the supply price of public housing land pursuant to Article 57, Paragraph 3, Subparagraph 1 of the Act shall be the costs set forth in each of the following subparagraphs, excluding the school land contribution fee pursuant to Article 2, Subparagraph 3 of the Special Act on Securing School Sites, etc.
1. Cost of installing soundproofing facilities: Costs incurred to reduce noise levels in consideration of general conditions such as the location of the housing and the surrounding environment. However, this is limited to cases where it is not included in the land development cost.
2. In cases where part or all of the land costs, such as advance payments or interim payments, have been paid to receive the supply of residential land, the period interest on the land price calculated in accordance with Annex 1-2 from the date of such payment. However, if the project entity that developed the residential land supplies the land itself, the period interest shall be calculated by considering the commencement date of the housing construction project as the payment date and the land supply price as the land price; provided, the calculation period for capital costs included in the land development cost of the relevant land shall be from the commencement date of the land development project (in cases where land, etc. is acquired or used through negotiation or expropriation pursuant to the Act on Acquisition and Compensation of Land, etc. for Public Projects, it refers to the date of public announcement of the compensation plan pursuant to Article 15 of the same Act) to the commencement date of the housing construction project.
3. Necessary expenses such as taxes and public charges and registration fees arising from the supply of residential land, and additional costs resulting from the change of ownership of the residential land (limited to cases where documents recognized by public institutions, such as a notarized contract, are submitted)
4. Other expenses related to residential land that are recognized by supporting documents as necessary by the Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, a County Governor, or a District Head (the District Head refers to the head of an autonomous district; hereinafter referred to as "Mayor, County Governor, or District Head") following deliberation by the Sale Price Review Committee pursuant to Article 59 of the Act (hereinafter referred to as the "Sale Price Review Committee").
[Wholly Revised 2026.2.11]
Article 9 (Costs Added to the Appraisal Value of Land Other than Public Housing Land) In accordance with the main text of the part other than each item of Article 57, Paragraph 3, Subparagraph 2 of the Act, the costs related to land added to the appraised value of land other than public housing land shall be the costs set forth in each of the following subparagraphs.
1. Costs pursuant to Article 8, Subparagraph 1
2. Installation costs of trunk facilities borne by the project owner pursuant to Article 28 of the Act
3. Installation costs of urban parks pursuant to Article 2, Subparagraph 3 of the "Act on Urban Parks and Green Spaces, etc."
4. Cost of Removal of Obstructions: Costs incurred when the demolition or relocation of structures, etc. within the building site is unavoidable
5. Value of private land incorporated due to the opening of the access road (referring to the appraised value)
6. Appraisal fees pursuant to Article 13, Paragraph 1, Subparagraph 1. Provided, however, that appraisal fees pursuant to Article 12, Paragraph 2, Subparagraph 2 be excluded.
7. Review fee pursuant to Article 13, Paragraph 1, Subparagraph 2
8. Costs incurred in the implementation of projects for the construction of multi-unit housing, such as urban renewal projects under the Urban and Residential Environment Improvement Act, which fall under each of the following subparagraphs. In this case, the specific standards and methods for calculating costs shall be determined and announced by the Minister of Land, Infrastructure and Transport.
A. Compensation costs for business losses pursuant to Article 77, Paragraph 1 of the Act on Acquisition and Compensation of Land, etc. for Public Projects, and costs necessary for residential relocation and transportation of movable property pursuant to Article 78, Paragraph 6 of the same Act
B. Costs of eviction lawsuits related to the acquisition and management of building land
C. Interest expenses incurred on relocation costs of persons relocating due to land development
D. Costs incurred in holding general meetings of associations, etc., pursuant to the Urban and Residential Environment Improvement Act, for making decisions related to the acquisition and management of residential land during the implementation of redevelopment projects, etc. (including cases where implementation is carried out jointly with other project entities).
9. Other expenses related to residential land that the Mayor, County Governor, or District Head deems necessary following deliberation by the Sale Price Review Committee, and which are confirmed by supporting documents.
[Wholly Revised 2026.2.11]
Article 9-2 (Costs Added to the Purchase Price of Land Other than Public Housing Land) Pursuant to the proviso of the part other than each item of Article 57, Paragraph 3, Subparagraph 2 of the Act, the costs related to land added to the purchase price of land other than public housing land shall be the costs set forth in each of the following subparagraphs.
1. Costs pursuant to Article 8, Subparagraph 1
2. Costs pursuant to Article 9, subparagraph 8
3. Installation costs of trunk facilities borne by the project owner pursuant to Article 28 of the Act
4. Installation costs of urban parks pursuant to Article 2, Subparagraph 3 of the "Act on Urban Parks and Green Spaces, etc."
5. Costs for Removal of Obstructions (Refers to the costs required for the removal or relocation of structures, etc. within the building site when such removal or relocation is unavoidable)
6. Value of private land incorporated due to the opening of an access road (referring to a purchase price within an amount equivalent to 120% of the appraised value)
7. Appraisal fees pursuant to Article 13, Paragraph 1, Subparagraph 1. Provided, however, that appraisal fees pursuant to Article 12, Paragraph 2, Subparagraph 2 be excluded.
8. Review fee pursuant to Article 13, Paragraph 1, Subparagraph 2
9. Taxes and public charges (in the case of taxes and public charges arising from ownership, limited to those imposed up to the time of application for approval of tenant recruitment, and aggregated only up to 3 years from the time of initial imposition), registration fees, etc.
10. Other expenses related to residential land that the Mayor, County Governor, or District Head deems necessary following deliberation by the Sale Price Review Committee, and which are confirmed by supporting documents
[Wholly Revised 2026.2.11]
Article 10 (Appraisal Procedures for Land Other than Public Housing Land)
① After applying for approval of a housing construction project plan on land other than public land, the project owner shall apply to the Mayor, County Governor, or District Head for an appraisal of the land price prior to the application date for approval of resident recruitment. In this case, the project owner shall submit the materials necessary for the appraisal.
② The Mayor, County Governor, or District Head (in the case of a project owner that is the State, a local government, the Korea Land and Housing Corporation, or a local public corporation, this refers to the head of the relevant agency; hereinafter the same applies in this Article and Article 12) shall request an appraisal of the land price from two appraisal corporations, etc. (hereinafter referred to as "appraisal institutions") that meet the standards notified by the Minister of Land, Infrastructure and Transport pursuant to Article 3, Paragraph 5 of the Act on the Public Announcement of Real Estate Prices and Article 7, Paragraph 5 of the Enforcement Decree of the same Act. In this case, if any of the following subparagraphs applies, one appraisal institution recommended by the person specified in the subparagraph must be included. <Revised 2008.3.14, 2010.3.4, 2013.3.23, 2016.8.31, 2019.10.29, 2022.1.21>
1. In the case of a Mayor, County Head, or District Head (excluding Special Self-Governing City Mayors and Special Self-Governing Province Governors): Special City Mayor, Metropolitan City Mayor, or Provincial Governor
2. In the case of the State, local governments, the Korea Land and Housing Corporation, or local corporations: the Mayor of a Special City, Metropolitan City, Special Self-Governing City, Governor of a Province, or Governor of a Special Self-Governing Province having jurisdiction over the relevant housing site
③ An appraisal institution commissioned to conduct an appraisal pursuant to Paragraph 2 shall appraise land other than public housing land based on the date on which the project owner applied for the appraisal of the land price pursuant to Paragraph 1 (in the case of a project owner that is the State, a local government, the Korea Land and Housing Corporation, or a local public corporation, this refers to the date on which the head of the relevant institution requested the appraisal of the land price; hereinafter referred to as the "application date" in this Article and Article 11). <Amended Mar. 4, 2010>
④ An appraisal institution shall complete the appraisal within 20 days from the date of receiving the request for appraisal pursuant to Paragraph 2 and submit an appraisal report in accordance with the “Rules on Appraisal.” However, if there are unavoidable circumstances recognized by the Mayor, County Governor, or District Head, this period may be extended within a range of 10 days. <Amended 2019.10.29>
⑤ The Mayor, County Governor, or District Head shall request the Korea Real Estate Institute (referring to the Korea Real Estate Institute pursuant to the "Korea Real Estate Institute Act"; hereinafter the same) to review whether the appraisal submitted pursuant to Paragraph 4 has been conducted in compliance with Article 57 of the Act and this Rule. <Newly added 2019.10.29, 2020.12.11>
⑥ The Korea Real Estate Institute, having received a request to review an appraisal report pursuant to Paragraph 5, shall submit the results of the review to the Mayor, County Governor, or District Head within 15 days from the date of receiving the request. However, if there are unavoidable circumstances recognized by the Mayor, County Governor, or District Head, this period may be extended within a range of 5 days. <Newly added 2019.10.29, 2020.12.11>
Article 11 (Appraisal Standards, etc. for Land Other than Public Housing Land)
① The appraisal pursuant to Article 10 shall be conducted based on the officially assessed land price of a standard plot under the Act on the Public Announcement of Real Estate Prices (hereinafter referred to as "officially assessed land price of a standard plot") in accordance with the method based on the officially assessed land price pursuant to Article 2, Subparagraph 9 of the Rules on Appraisal. In this case, the officially assessed land price of a standard plot shall be based on the officially assessed land price of the standard plot closest to the date of application among the officially assessed land prices of standard plots announced at the time of the application date of the relevant land. <Amended 2019.10.29>
② The appraisal institution shall review the reasonableness of the value appraised pursuant to Paragraph 1 by comparing it with the respective appraised values, taking into consideration the estimated costs required for the development of land falling under each of the following subparagraphs. <Newly added 2019.10.29>
1. The relevant land
2. Land recognized as having a use value similar to the land in question
③ Land in a raw state where land development has not yet been completed shall be evaluated assuming the state in which land development is completed, and its usage status shall be assessed based on the building site. In this case, development profits that have not been realized or materialized as of the application date shall not be reflected. <Amended 2019.10.29>
④ The appraised value of land other than public land pursuant to the main text of the part other than each item of Article 57, Paragraph 3, Subparagraph 2 of the Act shall be determined by calculating the arithmetic mean of the appraised values for land assessed by appraisal institutions. <Amended May 4, 2009; Aug. 12, 2016; Oct. 29, 2019>
⑤ The project owner shall include the appraised value of the land assessed by an appraisal institution and the said appraisal institution in the tenant recruitment announcement and publish them. <Amended 2019.10.29>
Article 12 (Revaluation of Land Other than Public Housing Land)
① If the Mayor, County Governor, or District Head determines, as a result of the review by the Korea Real Estate Institute pursuant to Article 10, Paragraph 5, that the appraisal report submitted pursuant to Paragraph 4 of the same Article was evaluated in violation of relevant laws and regulations, or was evaluated unfairly—such as by showing a significant difference from the officially assessed standard land price subject to comparison without reasonable grounds—they shall require the relevant appraisal institution to conduct a re-evaluation, specifying the reasons. <Newly added 2019.10.29, 2020.12.11>
② The Mayor, County Governor, or District Head shall request a re-evaluation of the land price from two other appraisal institutions in any of the following cases. In this case, the latter part of Article 10, Paragraph 2 shall apply to the selection of appraisal institutions. <Amended 2019.10.29>
1. If the highest appraised value among the appraised values of the building land assessed by an appraisal institution (including the results of re-evaluation pursuant to Paragraph 1) exceeds 110 percent of the lowest appraised value
2. In the event that the project entity raises an objection to the appraisal results (including the results of the re-evaluation pursuant to Paragraph 1)
3. In cases falling under the grounds of Paragraph 1, where there are special circumstances preventing a re-evaluation from the relevant appraisal institution
③ The revaluation of land prices corresponding to the grounds under Paragraph 2, Subparagraph 2 shall be limited to a single time. <Amended 2019.10.29>
4. Articles 10 and 11 shall apply mutatis mutandis to the procedures and standards for appraisal pursuant to Paragraphs 1 and 2. <Amended 2019.10.29>
⑤ In cases where the land price has been re-evaluated pursuant to Paragraphs 1 and 2, the re-evaluated appraised value shall be deemed the final appraised value. <Amended 2019.10.29>
Article 13 (Costs relating to appraisal)
① The project owner shall bear all costs specified in the following subparagraphs regarding the appraisal of the land price.
1. Appraisal fees required for appraisal pursuant to Article 10, Paragraph 2 and Article 12, Paragraph 2
2. Review fee pursuant to Article 10, Paragraph 5
② The fees pursuant to Paragraph 1 shall be in accordance with each of the following subparagraphs.
1. Appraisal fee pursuant to Paragraph 1, Subparagraph 1: An amount in accordance with the standards announced by the Minister of Land, Infrastructure and Transport pursuant to Article 23 of the Act on Appraisal and Appraisers and Article 22 of the Enforcement Decree of the same Act, including actual expenses.
2. Review fee pursuant to Subparagraph 2: 10% of the amount pursuant to Subparagraph 1
[Wholly Revised 2019.10.29]
Article 14 (Standard Construction Costs and Costs Added to Standard Construction Costs, etc.)
① When calculating construction costs pursuant to Article 57, Paragraph 4 of the Act, the standard construction cost refers to the standard construction cost notified at the time closest to the date of application for approval of tenant recruitment (or the date of public notice of tenant recruitment in cases where the project owner is the State, a local government, the Korea Land and Housing Corporation, or a local public corporation). <Amended Mar. 4, 2010; Aug. 12, 2016>
② In the first part of Article 57, Paragraph 4 of the Act, the phrase "amount obtained by adding an amount prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport" refers to an amount calculated in accordance with the itemized contents and calculation methods set forth in Annex 1-3, as a cost added to the basic construction cost. <Amended 2008.3.14, 2010.3.4, 2013.3.23, 2016.8.12>
③ The Mayor, County Governor, or District Head may, in accordance with the latter part of Article 57, Paragraph 4 of the Act, separately determine and announce the standard construction cost within the range of 95% to 105% of the standard construction cost, taking into consideration the characteristics of the relevant region. <Amended Aug. 12, 2016; Aug. 27, 2021>
④ In cases where a Mayor, County Governor, or District Head intends to separately determine and announce the standard construction cost pursuant to the latter part of Article 57, Paragraph 4 of the Act, they shall undergo deliberation by the Sale Price Review Committee. In this case, they shall submit objective data regarding the difference, etc., between the standard unit prices for major materials announced by the Minister of Land, Infrastructure and Transport and the material prices in the relevant region. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
⑤ The Sale Price Review Committee may request data regarding ground surveys from the supplier of public housing land if necessary to review the appropriateness of costs related to foundation and ground work for buildings, such as pile driving costs performed for the construction of multi-unit housing, among the costs added to the standard construction cost under Paragraph 2 of this Article pursuant to Article 63, Subparagraph 3 of the Enforcement Decree of the Housing Act. In this case, the recipient of the request shall submit the relevant data within 5 days from the date of receipt of the request. <Newly Added 2026.2.11>
Chapter 4 Public Announcement of Sale Prices
Article 15 (Public Announcement of Sale Prices for Housing Supplied on Public Land)
① In Article 57, Paragraph 5 of the Act, the term "detailed classification prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport" refers to the classification pursuant to Annex 2. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
② In Article 57, Paragraph 5, Subparagraph 4 of the Act, "costs prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport" refers to costs added to the standard construction cost pursuant to Article 14, Paragraph 2. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
Article 16 (Public Announcement of Sale Prices for Housing Supplied on Land Other than Public Land)
① Pursuant to the provisions of Article 57, Paragraph 6, Subparagraphs 1 through 7 of the Act, the details of the itemized public disclosure of sale prices for housing supplied on land other than public land are as set forth in Attached Table 3. <Amended Aug. 12, 2016>
② In Article 57, Paragraph 6, Subparagraph 7 of the Act, "costs prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport" refers to costs added to the standard construction cost pursuant to Article 14, Paragraph 2. <Amended Mar. 14, 2008; Mar. 23, 2013; Aug. 12, 2016>
Revision
⊙Ministry of Land, Infrastructure and Transport Decree No. 1605 (July 29, 2026)
Partial Amendment to the Rules on Housing Construction Standards, etc.
[Body omitted]
Supplementary Provisions
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 Omitted
Article 3 (Amendment of Other Laws) Part of the Rules on the Calculation, etc. of Sale Prices of Multi-Unit Housing is amended as follows.
In Item 11 of Annex 1-3, "the proviso to Article 6-2, Item 2 of the 'Rules on Housing Construction Standards, etc.'" shall be changed to "the proviso to the part other than the items of Article 6-2, Paragraph 1, Item 2 of the 'Rules on Housing Construction Standards, etc.'".
Reason for Enactment/Amendment
[Partial revision]
◇ Reasons for Amendment and Key Contents
This is intended to allow the installation of mechanical parking lots equipped with a mechanical device that uses a parking robot to lift a vehicle or carrier after the driver exits and moves it to a parking space for parking, in order to secure parking spaces within multi-unit housing complexes, provided that the project plan approval authority approves it.