철도안전법 시행규칙

285103 · 2026-03-24

Ministry of Land, Infrastructure and Transport ( Railway Safety Policy Division ), 044-201-4603 Article 1 (Purpose) The purpose of this ruleis to prescribe matters delegated by the Railway Safety Act and the Enforcement Decree of the same Act , and matters necessary for the implementation thereof. [Wholly Amended Dec. 10, 2012] Article 1-2 (Scope of Railway Accidents) The term “as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 2 , subparagraph 11 of the “Railway Safety Act” (hereinafter referred to as the “Act”)means any of the following: 1. Railway traffic accident: An accident related to the operation of railway vehicles that falls under any of the following items a. Collision accident: An accident in which a railway vehicle collides with or comes into contact with another railway vehicle or an obstacle (excluding animals and birds). B. Derailment: An accident in which a railway vehicle leaves the track C. Train fire accident: An accident in which a fire occurs in a railway vehicle D. Other railway traffic accidents: Accidents that do not fall under items A through C and are related to the operation of railway vehicles 2. Railway safety accident: An accident related to the management of railway facilities that falls under any of the following items. However, accidents caused by natural disasters pursuant to Article 3, Item 1, Subparagraph ( a) of the Framework Act on Disaster and Safety Management shall be excluded. A. Railway fire accident: An accident in which a fire occurs at a railway facility, such as a railway station or machine room. B. Accidents causing damage to railway facilities: Accidents in which railway facilities, such as bridges, tunnels, tracks, and signal, electrical, and communication equipment, are damaged. C. Other railway safety accidents: Accidents not falling under Subparagraphs A and B that are related to the management of railway facilities [This Article newly inserted Oct. 7, 2020] [Former Article 1-2 moved to Article 1-5 <October 7, 2020>] Article 1-3 (Scope of Near-accidents in Railways) The term “as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 2, subparagraph 12 of the Act refers to any of the following: 1. Cases where a train travels on a section for which it has not received operating permission 2. When a signal is displayed instructing the train to proceed despite an obstruction on the track where the train intends to operate. However, this shall not apply in cases where control approval has been obtained for restoration and maintenance. 3. When a train or railway vehicle passes a stop signal without authorization 4. In the case where a train or railway vehicle slides between stations 5. In cases where a train travels through a section where train operations have been suspended for construction or maintenance work 6. In the event of rail damage that impedes safe operation or track warping exceeding the allowable maintenance range 7. In the event that a failure, such as a crack, occurs in the wheels, axles, or axle bearings of a railway vehicle that impedes safe operation 8. In the event that explosives, etc., dangerous goods pursuant to Article 45 of the Enforcement Decree of the Railway Safety Act (hereinafter referred to as the “Decree”) or hazardous materials pursuant to Article 78 , Paragraph 1 are leaked from a railway vehicle 9. Things equivalent to the quasi-accidents in Nos. 1 through 8 that could lead to a railway accident [This Article Newly Inserted Oct. 7, 2020] Article 1-4 (Scope of Operational Obstacles) The term “as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 2, subparagraph 13 of the Act refers to any of the following: 1. Passing through a station without prior approval from control 2. Delays in operation classified according to each of the following items. However, delays in operation caused by other railway accidents or operational disruptions shall be excluded. a. High-speed trains and commuter trains: 20 minutes or more B. General passenger trains: 30 minutes or more C. Freight trains and other trains: 60 minutes or more [This Article Newly Inserted Oct. 7, 2020] Article 1-5 (Standards for Disclosure of Railway Safety Investment, etc.) ① When a railway operator discloses the budget scale of railway safety investment (hereinafter referred to as “railway safety investment”) pursuant to Article 6-2 , Paragraph 1 of the Act, it shall comply with the standards set forth in each of the following subparagraphs. <Amended Oct. 7, 2020> 1. The budget size shall include all of the following items: A. Budget for the replacement of railway rolling stock B. Budget for the improvement of railway facilities C. Budget for the installation of safety equipment D. Budget for railway safety education and training E. Budget for Railway Safety Research and Development F. Budget for Railway Safety Promotion (g) Other budgets related to railway safety as determined and notified by the Minister of Land, Infrastructure and Transport 2. Disclosure of the budget size that includes all of the following items A. Budget for railway safety investment and execution performance over the past three years B. Budget for railway safety investment for the relevant year C. Budget for railway safety investment over the next two years 3. Disclose the sources of funding for railway safety investment budgets separately, including state subsidies, local government subsidies, and funds from railway operators. 4. Disclosure shall include other budgets related to railway safety investment as determined and notified by the Minister of Land, Infrastructure and Transport. ② Railway operators must disclose the budget size for railway safety investments by the end of May each year. ③ The public announcement pursuant to Paragraph 2 shall be made by posting on the comprehensive railway safety information management system established pursuant to Article 71, Paragraph 1 of the Act and on the internet homepage of the relevant railway operator. ④ In addition to the matters prescribed in paragraphs 1 through 3, necessary matters concerning the disclosure standards and procedures, etc. for railway safety investments shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article newly inserted Jan. 4, 2019] [Moved from Article 1-2 Oct. 7, 2020>] Article 2 (Procedures for Application for Approval of Safety Management System, etc.) ① If a railway operator and a railway facility manager (hereinafter referred to as “Railway Operator, etc.”)intend to obtain approval for a safety management system pursuant to Article 7, Paragraph 1 of the Act (hereinafter referred to as the “Safety Management System”), they shall submit an application for approval of the railway safety management system in the form of Annex No. 1, attached with the documents set forth in each of the following subparagraphs, to the Minister of Land, Infrastructure and Transport no later than 90 days prior to the scheduled commencement date of railway operation or railway facility management. <Amended Aug. 10, 2016; Jan. 4, 2019> 1. Copy of the railway business license pursuant to the Railway Business Act or the Urban Railway Act 2. Documents regarding the organization and personnel structure, division of duties, and responsibilities 3. Documents concerning the railway safety management system specifying the matters of each of the following subparagraphs A. Overview of the Railway Safety Management System B. Railway Safety Management C. Documentation D. Risk Management E. Compliance with requirements F. Railway Accident Investigation and Reporting G. Internal Inspection Ah. Emergency response Okay. Education and training D. Safety Information K. Safety Culture 4. Documents concerning the train operation system specifying the matters of each of the following subparagraphs A. Overview of Railway Operations B. Railway business license C. Train Operation Organization and Personnel D. Train Operation Methods and Procedures E. Train Operation Plan B. Crew and Station Services G. Railway Control Operations Ah. Railway protection and maintenance of order J. Train Operation Record Management C. Matters concerning the management of entrusted work, such as supervision of the entrusted contractor. 5. Documents concerning the maintenance system specifying the matters of each of the following items A. Overview of Maintenance B. Maintenance Organization and Personnel c. Maintenance methods and procedures ( including maintenance methods reflecting the results of comprehensive test runs conducted pursuant to Article 38 of the Act (referring to completed results; hereinafter the same applies in this Article)) D. Maintenance Implementation Plan E. Maintenance Records B. Maintenance Facilities and Equipment d. Maintenance parts Ah. Railway rolling stock production supervisor J. Matters concerning the management of entrusted work, such as supervision of the entrusted contractor. 6. Report on the Results of Comprehensive Test Run Pursuant to Article 38 of the Act ② If a railway operator, etc. intends to change the safety management system approved pursuant to the main clause of Article 7, Paragraph 3 of the Act, they shall submit an application for approval of change to the railway safety management system in the form of Annex 1-2, attached with the documents specified in each of the following subparagraphs, to the Minister of Land, Infrastructure and Transport by 30 days prior to the scheduled commencement date of the changed railway operation or railway facility management (90 days prior in the case of changes pursuant to Article 3, Paragraph 1, Subparagraph 4 ) . <Amended Aug. 10, 2016; May 27, 2020> 1. Details of changes to the safety management system and supporting documents 2. Comparison Table and Commentary on the Pre- and Post-Change Versions ③ Notwithstanding Paragraphs 1 and 2, if a railway operator, etc. applies for approval or approval of modification of a safety management system, the documents pursuant to Paragraph 1, Subparagraph 5, Item (c) and Subparagraph 6 of the same Paragraph may be submitted no later than 14 days prior to the scheduled commencement date of railway operation or railway facility management. <Newly added Aug. 10, 2016; Jan. 4, 2019> ④ When the Minister of Land, Infrastructure and Transport receives an application for approval or approval of modification of a safety management system pursuant to Paragraphs 1 and 2, the Minister shall prepare a plan for inspections, etc. necessary for the approval or approval of modification within 15 days and notify the applicant. <Amended Aug. 10, 2016> [Wholly Amended Mar. 19, 2014] Article 3 (Minor Changes to the Safety Management System) ① The term “minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 7, Paragraph 3 of the Act refers to changes excluding matters falling under any of the following subparagraphs. <Amended Aug. 10, 2016; Oct. 23, 2019> 1. Change of the dedicated organization performing safety duties (excluding changes in the organizational department name) 2. Reduction in train operation or maintenance personnel 3. Increase in railway rolling stock or railway facilities falling under any of the following subparagraphs a. Bridges, tunnels, retaining walls B. Track (Rail) C. History, Depot, Platform Screen Doors D. Overhead lines, substations, receiving rooms, receiving and distribution lines E. Interlocking devices, train control devices, signal devices, track switching devices, track circuit devices, level crossing safety devices f. Communication line facilities, train radio facilities, transmission facilities 4. Construction or improvement of railway lines 5. Merger or transfer/acquisition of business 6. Reduction of maintenance items or increase in maintenance cycle 7. Changes to the train operation system or maintenance system due to a change in the consignment contractor ② In cases where a railway operator, etc. intends to change minor matters pursuant to the proviso to Article 7, Paragraph 3 of the Act , they shall submit a report on changes to the railway safety management system in the form of Annex 1-3, along with the documents listed in each of the following subparagraphs, to the Minister of Land, Infrastructure and Transport. 1. Details of changes to the safety management system and supporting documents 2. Comparison Table and Commentary on the Pre- and Post-Change Versions ③ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 2, he/she shall verify the attached documents in each subparagraph of Paragraph 2 and issue a confirmation of report on change of railway safety management system in the form of Annex 1-4 . [Wholly Amended Mar. 19, 2014] Article 4 (Method of Approval of Safety Management System and Issuance of Certificate, etc.) ①Inspections for the approval or modification of a safety management system pursuant to Article 7, Paragraph 4 of the Act shall be conducted by classifying them into document inspections and on-site inspections as specified in each of the following subparagraphs. However, on-site inspections may be omitted if it is possible to determine compliance with the technical standards required for safety management pursuant to Article 7 , Paragraph 5 of the Act (hereinafter referred to as “safety management standards”) solely through document inspections. 1. Document Inspection: Inspection to determine whether the documents submitted by the railway operator, etc., pursuant to Article 2, Paragraphs 1 and 2, comply with the safety management standards. 2. On-site Inspection: An inspection to verify the feasibility and effectiveness of the safety management system on-site. ② When the Minister of Land, Infrastructure and Transport conducts an inspection for the approval or modification of a safety management system pursuant to Article 7, Paragraph 4 of the Act regarding an urban railway under Article 3 , Subparagraph 2 of the Urban Railway Act , or an urban railway constructed or operated by a corporation entrusted with an urban railway construction project or urban railway transportation business pursuant to Article 24 or Article 42 of the same Act, the Minister may consult with the competent Mayor or Provincial Governor of the relevant urban railway. In this case, the Mayor or Provincial Governor who receives the request for consultation shall submit an opinion within 20 days from the date of receiving the request; if no opinion is submitted within that period, it shall be deemed that there is no opinion. <Newly added Jan. 20, 2017> ③ If the Minister of Land, Infrastructure and Transport recognizes, as a result of the inspection under Paragraph 1, that it conforms to the safety management standards, he/she shall issue a Certificate of Approval for the Railway Safety Management System in the form of Annex 2 to the applicant. <Amended Jan. 20, 2017> ④ Detailed standards, procedures, methods, etc. concerning the inspection under Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Jan. 20, 2017> [Wholly Amended Mar. 19, 2014] Article 5 (Notification of Safety Management Standards) ① When establishing safety management standards pursuant to Article 7, Paragraph 5 of the Act , the Minister of Land, Infrastructure and Transport may undergo deliberation by the Railway Technology Deliberation Committee pursuant to Article 44 regarding specialized technical matters. ② If the Minister of Land, Infrastructure and Transport establishes safety management standards pursuant to Article 7, Paragraph 5 of the Act , he/she shall publish them in the Official Gazette . [Wholly Amended Oct. 7, 2020] Article 6 (Maintenance and Inspection of Safety Management System, etc.) ① The Minister of Land, Infrastructure and Transportshall conduct a periodic inspection pursuant to Article 8, Paragraph 2, Subparagraph 1 of the Act once every year. <Amended Oct. 7, 2020> ② When the Minister of Land, Infrastructure and Transport intends to conduct a periodic inspection or an unscheduled inspection pursuant to Article 8, Paragraph 2 of the Act , he/she shall notify the railway operator, etc. subject to inspection of an inspection plan containing the details of each of the following subparagraphs at least 7 days prior to the inspection date. However, prior notification may be omitted in cases where an unscheduled inspection is conducted urgently due to the occurrence of a railway accident, a railway near-accident, or operational disruption (hereinafter referred to as “railway accident, etc.”); and if a reason for changing the inspection plan arises after the inspection has commenced, the inspection plan may be adjusted in consultation with the railway operator, etc. <Amended Aug. 10, 2016; Oct. 23, 2019; Oct. 7, 2020> 1. Composition of the Inspection Team 2. Examination Schedule and Location 3. Areas of Inspection and Inspection Items 4. Key Inspection Items 5. Other matters necessary for the inspection ③ The Minister of Land, Infrastructure and Transport may postpone or change the timing of the regular inspection of the safety management system if a railway operator, etc. requests a postponement for any of the following reasons: 1. Cases where the railway operator, etc. subject to inspection is under investigation or audit by judicial authorities or central administrative agencies 2. Cases where the Aviation and Railway Accident Investigation Committee, pursuant to Article 4, Paragraph 1 of the Act on the Investigation of Aviation and Railway Accidents , is conducting an investigation into a railway accident pursuant to Article 19 of the same Act 3. In the event of a major railway accident, natural disaster, or other unavoidable circumstances ④ Upon completion of a periodic inspection or an unscheduled inspection, the Minister of Land, Infrastructure and Transport shall prepare an inspection result report containing the matters of each of the following subparagraphs. <Amended Oct. 23, 2019> 1. Overview and Current Status of Safety Management System Inspections 2. Inspection Process and Content of the Safety Management System 3. Matters concerning corrective measures pursuant to Article 8, Paragraph 3 of the Act 4. The degree of implementation of the corrective action order pursuant to the corrective action plan submitted under Paragraph 6 5. Number of deaths and serious injuries resulting from railway accidents and amount of property damage resulting from railway accidents, etc. ⑤ When the Minister of Land, Infrastructure and Transport orders corrective measures to railway operators, etc. pursuant to Article 8, Paragraph 3 of the Act , he/she shall provide an appropriate period necessary for the correction. ⑥ When a railway operator, etc. receives an order for corrective action pursuant to Article 8, Paragraph 3 of the Act , they shall prepare a plan for corrective action and submit it to the Minister of Land, Infrastructure and Transport within 14 days, and when the corrective action is completed, they shall notify the Minister of Land, Infrastructure and Transport of the details of the correction without delay. ⑦ In addition to the matters specified in paragraphs 1 through 6, detailed standards, methods, and procedures for periodic inspections or occasional inspections shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 7 (Criteria for Dispositions such as Cancellation of Safety Management System Approval, etc.) The criteria for dispositions such as cancellation of approval of a safety management system of a railway operator, etc., or restriction or suspension of business operations pursuant to Article 9 of the Act are as set forth in Attached Table 1 . [Wholly Amended Mar. 19, 2014] Article 8 (Scope and Standards for Safety Management Level Assessment of Railway Operators, etc.) ① The scope and standards for the assessment of the safety management level of railway operators, etc. pursuant to Article 9-3, Paragraph 1 of the Act (hereinafter referred to as “safety management level assessment”) are as follows. However, in the case of a safety management level assessment for railway facility managers, the assessment may be conducted excluding Subparagraph 2. 1. Area of ​​Accident A. Number of railway traffic accidents B. Number of railway safety accidents C. Number of operational failures D. Number of casualties 2. Railway Safety Investment Sector: Budget Scale and Execution Performance of Railway Safety Investments 3. Safety Management Field A. Safety Maturity Level B. Performance record of periodic inspections 4. Other matters necessary for the safety management level assessment as determined and notified by the Minister of Land, Infrastructure and Transport ② The Minister of Land, Infrastructure and Transport shall conduct an assessment of the level of safety management by the end of March each year. ③ The safety management level assessment shall be conducted by written evaluation. However, if the Minister of Land, Infrastructure and Transport deems it necessary, an on-site evaluation may be conducted. ④ The Minister of Land, Infrastructure and Transport shall notify the relevant railway operator, etc. of the results of the safety management level assessment. In this case, if the relevant railway operator, etc. is a local public corporation under the Local Public Enterprises Act, the Minister may also notify the head of the local government that manages and supervises the business of the relevant local public corporation pursuant to Article 73, Paragraph 1 of the same Act. ⑤ In addition to the matters prescribed in paragraphs 1 through 4, necessary matters concerning standards, methods, and procedures, etc. for safety management level assessment shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Jan. 4, 2019] Article 9 (Eligibility for Designation as Excellent Railway Safety Operator, etc.) ① The Minister of Land, Infrastructure and Transport may designate railway operators, etc. whose safety management level evaluation results are of the highest grade as excellent railway safety operators (hereinafter referred to as “excellent railway safety operators”) pursuant to Article 9-4 , Paragraph 1 of the Act, and may have them use a mark indicating that they have been designated as excellent railway safety operators. ② The validity period of the designation as an excellent railway safety operator shall be one year from the date of designation. ③ In order for an excellent railway safety operator to display a mark indicating that they have been designated as an excellent railway safety operator pursuant to Paragraph 1, they must use the mark prescribed and notified by the Minister of Land, Infrastructure and Transport . ④ The Minister of Land, Infrastructure and Transport may provide support, such as awards, to excellent railway safety operators. ⑤ In addition to the matters prescribed in paragraphs 1 through 4, necessary matters regarding the designation, display, and support of excellent railway safety operators shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Jan. 4, 2019] Article 9-2 (Cancellation of Designation of Excellent Railway Safety Operator) In subparagraph 3 of Article 9-5 of the Act , “ other reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as becoming non-compliant with the designation criteria under Article 9-4, Paragraph 5 ” refers to the reasons in each of the following subparagraphs. 1. Cases where the result of the safety management level assessment is confirmed not to be the highest grade due to calculation errors, data errors, etc. 2. In cases where a mark other than the mark prescribed and notified by the Minister of Land, Infrastructure and Transport is used in violation of Article 9, Paragraph 3 [This Article Newly Inserted Jan. 4, 2019] Article 10 (Markings for Education and Training Railway Vehicles, etc.) The markings pursuant to Article 10, Paragraph 2 of the Enforcement Decree shall be in accordance with Form No. 3 of the Attached Form . <Amended Mar. 19, 2014; Oct. 7, 2020> [Wholly Amended Dec. 10, 2012] Article 11 (Types of Railway Vehicles Permitted by Driver's License Type) The types of railway vehicles that a person who has obtained a driver's license for each type of railway vehicle pursuant to Article 11 , Paragraph 1 of the Enforcement Decree may drive are as set forth in Table 1-2 . <Amended Mar. 19, 2014> [Wholly Amended Dec. 10, 2012] Article 11-2 (Register of Disqualification Grounds for Driver's License) In Article 12-2, Paragraph 3 of the Enforcement Decree, the term “form prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport”refers to the Register of Disqualification Grounds for Railway Vehicle Driver's License in Form No. 4-2 of the Appendix . [This Article Newly Inserted July 17, 2024] Article 12 (Method, Procedure, and Passing Criteria, etc. of Physical Examination) ①person who intends to undergo aphysical examination for a driver's license pursuant to Article 12, Paragraph 1 of the Act or a physical examination for a certificate of air traffic control qualification pursuant to Article 21-5, Paragraph 1 of the Act shall complete their personal records, such as their name and resident registration number, on the Physical Examination Judgment Form ( Form No. 4 ) and submit it to the medical institution conducting the physical examination pursuant to Article 13 of the Act (hereinafter referred to as the “physical examination medical institution”). <Amended July 25, 2017> ② The items and passing criteria for the physical examination pursuant to Article 12, Paragraph 3 and Article 21-5 , Paragraph 2 of the Act are as set forth in Item 1 of Attached Table 2. <Amended July 25, 2017> ③ The medical institution conducting the physical examination shall conduct a physical examination for each physical examination item of the physical examination judgment form in Annex 4, record whether the applicant passed, and issue the form to the applicant. ④ Other detailed matters necessary for the methods and procedures, etc. of physical examinations shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013> [Wholly Amended Dec. 10, 2012] Article 13 Deleted <December 10, 2012> Article 14 Deleted <December 10, 2012> Article 15 Deleted <December 10, 2012> Article 16 (Methods, Procedures, and Passing Criteria, etc. for Aptitude Tests) ①undergo a driving aptitude test pursuant to Article 15, Paragraph 1 of the Act (hereinafter referred to as the “Driving Aptitude Test”) or a traffic control aptitude test pursuant to Article 21-6, Paragraph 1 of the Act (hereinafter referred to as the “Traffic Control Aptitude Test”) shallcomplete the personal information, such as name and resident registration number, on the Aptitude Test Judgment Form in Annex No. 9 and submit it to the driving aptitude test agency pursuant to Article 15, Paragraph 4 of the Act (hereinafter referred to as the “Driving Aptitude Test Agency”) or the traffic control aptitude test agency pursuant to Article 21-6, Paragraph 3 of the Act (hereinafter referred to as the “Traffic Control Aptitude Test Agency”). <Amended July 25, 2017> ② The items and passing criteria for the aptitude test pursuant to Article 15, Paragraph 3 and Article 21-6 , Paragraph 2 of the Act are as set forth in Attached Table 4. <Amended July 25, 2017> ③ The driving aptitude test agency or the air traffic control aptitude test agency shall conduct the aptitude test for each item of the aptitude test judgment form ( Form No. 9) , record whether the applicant has passed or failed, and issue the form to the applicant. <Amended July 25, 2017> ④ Other detailed matters necessary for the methods, procedures, judgment criteria, and scoring criteria by item of the driving aptitude test or air traffic control aptitude test shall be determined by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] Article 17 (Procedures for Designation of Driving Aptitude Test Agencies or Air Traffic Control Aptitude Test Agencies, etc.) ① Any person who intends to be designated as a driving aptitude test agency or an air traffic control aptitude test agencyshall submit an application for designation as an aptitude test agency in the form of Annex No. 10 to the Minister of Land, Infrastructure and Transport, attaching the documents specified in each of the following subparagraphs. In this case, the Minister of Land , Infrastructure and Transport shall verify the Certificate of Corporate Registration (applicable only if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Mar. 23, 2013; July 25, 2017> 1. Operational Plan 2. Articles of incorporation or equivalent agreements (applicable only to corporations or other organizations) 3. Current status of specialized personnel responsible for driving aptitude tests or control aptitude tests, and documents proving their educational background, work experience, qualifications, etc. 4. List of Driving Aptitude Test Facilities or Control Aptitude Test Facilities 5. List of driving aptitude test equipment or control aptitude test equipment 6. Impression of the official seal used by the driver aptitude testing agency or the air traffic control aptitude testing agency ② When the Minister of Land, Infrastructure and Transport receives an application for designation as a driver aptitude test agency or a traffic control aptitude test agency pursuant to Paragraph 1, the Minister shall comprehensively review whether to grant the designation in accordance with Article 13, Paragraph 2 of the Enforcement Decree ( including cases where it is applied mutatis mutandis in Article 20-3 of the Enforcement Decree ), and if the applicant is deemed suitable for designation, issue a Certificate of Designation as an Aptitude Test Agency in the form of Annex 11 to the applicant. <Amended Mar. 23, 2013; July 25, 2017; Jan. 18, 2023> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 18 (Detailed Designation Criteria, etc. for Driver Aptitude Test Agencies and Air Traffic Control Aptitude Test Agencies) ① The detailed designation criteria for driver aptitude test agencies and air traffic control aptitude test agencies pursuant to Article 14 , Paragraph 2 and Article 20-3 of the Enforcement Decree areas set forth in Attached Table 5. <Amended July 25, 2017; Jan. 18, 2023> ② The Minister of Land, Infrastructure and Transport shall review every two years whether a driver aptitude testing agency or a traffic control aptitude testing agency complies with the designation criteria under Paragraph 1 and Article 14 , Paragraph 1 of the Enforcement Decree ( including cases where it is applied mutatis mutandis in Article 20-3 of the Enforcement Decree). <Amended Mar. 23, 2013; July 25, 2017; Jan. 18, 2023> ③ Notification of changes to driver aptitude testing agencies and air traffic control aptitude testing agencies pursuant to Article 15 and Article 20-3 of the Enforcement Decree shall be in accordance with Form No. 11-2 of the Appendix . <Amended Jul. 25, 2017; Jun. 23, 2021; Jan. 18, 2023> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 19 (Revocation of Designation and Suspension of Operations of Driver Aptitude Test Agencies and Air Traffic Control Aptitude Test Agencies) ① The standards for the revocation of designation and suspension of operations of driver aptitude test agencies and air traffic control aptitude test agencies pursuant to Article 15-2, Paragraph 2 and Article 21-6 , Paragraph 5 of the Act are as set forth in Attached Table 6. <Amended July 25, 2017> ② In the event that the Minister of Land, Infrastructure and Transport revokes the designation of a driving aptitude test agency or a traffic control aptitude test agency, or issues a disposition suspending operations, the Minister shall notify the driving aptitude test agency or the traffic control aptitude test agency of the administrative disposition to the designated agency in the form of Annex 11-3 without delay , and shall publish the fact in the Official Gazette. <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 20 (Period and Method, etc. of Driver Education and Training) ① Education and training pursuant to Article 16, Paragraph 1 of the Act (hereinafter referred to as “driver education and training”) shall be conducted using actual vehicles or driving simulators according to the type of driver’s license. <Amended July 25, 2017> ② Any person who intends to receive driver education and training shall apply for driver education and training to a driver education and training institution pursuant to Article 16, Paragraph 3 of the Act (hereinafter referred to as the “driver education and training institution”). <Amended July 25, 2017> ③ The subjects and hours of driver education and training are as set forth in Attached Table 7. <Amended July 25, 2017> ④ If it is difficult to open a driver education and training course due to a low number of applicants for that course, a driver education and training institution may, with the approval of the Minister of Land, Infrastructure and Transport, not open the relevant driver education and training course or implement it by changing the timing of the training. <Amended Mar. 23, 2013; July 25, 2017> ⑤ A driver education and training institution shall issue a driver education and training completion certificate in the form of Annex 12 to a person who has completed driver education and training. <Amended July 25, 2017> ⑥ Other detailed matters necessary for the procedures, methods, etc. of driver education and training shall be determined by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 21 (Procedures for Designation of Driver Education and Training Institutions, etc.) ① Any person who intends to be designated as a driver education and training institution shall submit to the Minister of Land, Infrastructure and Transport an application for designation as a driver education and training institution in the form of Annex 13, attaching the documents specified in each of the following subparagraphs. In this case, the Minister of Land, Infrastructure and Transport shallverify the Certificate of Corporate Registration (applicable only if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended Mar. 23, 2013; July 25, 2017> 1. Driver Education and Training Plan (including driver education and training evaluation plan) 2. Regulations on the Operation of Driver Education and Training Institutions 3. Articles of incorporation or equivalent agreements (limited to corporations or other organizations) 4. Documents proving the qualifications, educational background, experience, etc., of the instructor in charge of driver education and training, and duties 5. List of facilities, such as classrooms, required for driver education and training 6. List of equipment, such as railway vehicles or driving simulators, required for driver education and training 7. Impression of the official seal used by driver education and training institutions ② When the Minister of Land, Infrastructure and Transport receives an application for designation of a driver education and training institution pursuant to Paragraph 1, he/she shall issue a Certificate of Designation of a Driver Education and Training Institution in the form of Annex 14 to the applicant after comprehensively reviewing whether to grant the designation pursuant to Article 16, Paragraph 2 of the Enforcement Decree. <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 22 (Detailed Designation Criteria, etc. for Driver Education and Training Institutions) ①The detailed designation criteria for driver education and training institutions pursuant to Article 17, Paragraph 2 of the Enforcement Decree are as set forth in Attached Table 8. <Amended July 25, 2017> ② The Minister of Land, Infrastructure and Transport shall review every two years whether a driver education and training institution complies with the designation criteria under Paragraph 1 and Article 17 , Paragraph 1 of the Enforcement Decree. <Amended Mar. 23, 2013; July 25, 2017> ③ Notification of changes to driver education and training institutions pursuant to Article 18 of the Enforcement Decree shall be in accordance with Form No. 11-2 of the Attached Form . <Amended July 25, 2017> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 23 (Revocation of Designation and Suspension of Operations, etc. of Driver Education and Training Institutions) ①The standards for the revocation of designation and suspension of operations of driver education and training institutions pursuant to Article 15-2 of the Act, which is applied mutatis mutandis under Article 16, Paragraph 5 of the Act , are as set forth in Attached Table 9. <Amended Mar. 19, 2014; July 25, 2017; Dec. 20, 2023> ② In the event that the Minister of Land, Infrastructure and Transport revokes the designation of a driver education and training institution or imposes a disposition of suspension of business, he/she shall notify said driver education and training institution of the administrative disposition notice for the designated institution in the form of Annex 11-3 without delay and publish the fact in the Official Gazette. <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 24 (Subjects and Passing Criteria for Driver's License Examination) ①The railway vehicle driver's license examination pursuant to Article 17, Paragraph 1 of the Act (hereinafter referred to as the “driver's license examination”) shall be conducted by dividing it into a written examination and a skills test according to the type of driver's license pursuant to Article 11, Paragraph 1 of the Enforcement Decree. In this case, the skills test shall be conducted using an actual vehicle or a driving simulator. ② The subjects and passing criteria for the written test and skills test pursuant to Paragraph 1 are as set forth in Attached Table 10. In this case, the skills test may be taken only if the written test has been passed. ③ For persons who have passed the written examination pursuant to Paragraph 1, the passing of the written examination shall be deemed valid for driver's license examinations conducted up to December 31 of the year in which the date marking two years from the date of passing the written examination falls. ④ The Minister of Land, Infrastructure and Transport shall determine the detailed matters necessary for the methods and procedures of driver's license examinations, the selection of evaluation committee members for practical skills tests, etc. <Amended Mar. 23, 2013; July 25, 2017> [Wholly Amended Dec. 10, 2012] Article 25 (Publication of Plan for Driver's License Examination Implementation) ① When the Korea Transportation Safety Authority pursuant to the Korea Transportation Safety Authority Act (hereinafter referred to as the “Korea Transportation Safety Authority”) intends to conduct a driver's license examination, it shall publish the plan for the driver's license examination for the following year, including the schedule and subjects for the written and practical examinations, on its internet homepage, etc., by November 30 of each year. <Amended July 25, 2017; Jan. 4, 2019> ② The Korea Transportation Safety Authority may amend the implementation plan announced pursuant to Paragraph 1 if necessary, taking into consideration the demand for driver's license examinations, etc. In such cases, prior approval from the Minister of Land, Infrastructure and Transport must be obtained, and the details of the amendment shall be announced on the internet homepage, etc., at least 7 days prior to the date of the written examination or the practical examination (or the amended date if the date of the written examination or the practical examination is brought forward). <Amended Mar. 23, 2013; July 25, 2017; Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 26 (Submission of Application for Driver's License Examination, etc.) ① Any person intending to take the driver's license examination shall submit the application for the railway vehicle driver's license examination in the form of Annex 15 to the Korea Transportation Safety Authority by the deadline for the application for the written examination, attaching the documents specified in each of the following subparagraphs. However, the document specified in subparagraph 3 may be submitted by the deadline for the application for the practical skills examination. <Amended Jul. 25, 2017; Jan. 4, 2019; May 27, 2020; Jan. 18, 2023; Dec. 20, 2023; Apr. 9, 2024> 1. A physical examination judgment certificate issued by a medical institution (limited to those issued within 2 years prior to the date of receipt of the driver's license application) 2. Driving aptitude test judgment certificate issued by a driving aptitude testing agency (limited to those issued within 10 years prior to the date of receipt of the driver's license test application) 3. Certificate of completion of driver training issued by a driver training institution 3-2. Certificate of completion of railway driving-related educational subjects issued by the head of a university designated as a driving education and training institution pursuant to Article 16, Paragraph 3 of the Act ( applicable only in cases where completion of theoretical education subjects is sought pursuant to Item 7, Subparagraph (e) of Annex 7 ) 4. A copy of the railway vehicle driver's license (limited to cases where the holder of a railway vehicle driver's license intends to acquire another railway vehicle driver's license) 5. Copy of Air Traffic Control Certificate [ Submitted only by persons who have been issued an Air Traffic Control Certificate pursuant to Article 38-12, Paragraph 2 (hereinafter referred to as “Certificate Holders”)] 6. Certificate of driving experience (limited to cases applying for a high-speed rail vehicle driver's license) ② The Korea Transportation Safety Authority may not require the submission of the documents referred to in subparagraphs 1 through 5 of Paragraph 1 if such documents can be verified through the information system managed pursuant to subparagraph 7 of Paragraph 1 of Article 63 of the Enforcement Decree . <Amended Jul. 25, 2017; Jan. 4, 2019; Jan. 18, 2023> ③ When the Korea Transportation Safety Authority receives an application for a driver's license examination pursuant to Paragraph 1, it shall record it in the Railway Vehicle Driver's License Examination Application Receipt Register in Annex 16 and issue a driver's license examination admission ticket in Annex 15 to the applicant. However, if the fact of application receipt is managed in accordance with the information system managed pursuant to Article 63, Paragraph 1, Subparagraph 7 of the Enforcement Decree, the fact of application receipt may not be recorded in the Railway Vehicle Driver's License Examination Application Receipt Register. <Amended Jan. 4, 2019> ④ The Korea Transportation Safety Authority shall announce the date, time, and location of the driver's license examination on the Korea Transportation Safety Authority bulletin board or its website, etc., within 7 days of the deadline for receiving applications. <Amended Jul. 25, 2017; Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] [Title Amended July 25, 2017] Article 27 (Reissuance of Driver's License Examination Admission Ticket) If a person who has been issued a driver's license examination admission ticket loses the ticket or it becomes damaged and unusable, they shall apply to the Korea Transportation Safety Authority for reissuance by attaching one photograph (3.5 cm × 4.5 cm) ( including an application made using an information and communications network pursuant to Article 2, Paragraph 1, Subparagraph 1 of the Act on Promotion of Information and Communications Network Utilization and Information Protection, etc. ). The Korea Transportation Safety Authority shall reissue the driver's license examination admission ticket to the applicant after confirming the receipt of the application. <Amended Aug. 10, 2016; Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 28 (Posting of Examination Results, etc.) ① When the Korea Transportation Safety Authority conducts a driver's license examination and determines successful candidates, it shall post the results on the bulletin board of the Korea Transportation Safety Authority or on its internet homepage. <Amended Jul. 25, 2017; Jan. 4, 2019> ② When the Korea Transportation Safety Authority conducts a driver's license examination, it shall report data such as the status of applicants and successful candidates for the written and practical examinations by type of driver's license to the Minister of Land, Infrastructure and Transport. <Amended Mar. 14, 2008; Mar. 23, 2013; Jan. 4, 2019> Article 29 (Issuance of Driver's License, etc.) ① A person who has passed the driver's license examinationshall submit an application for (re)issuance of a railway vehicle driver's license in the form of Annex No. 17 to the Korea Transportation Safety Authority ( including submission via an information and communications network pursuant to Article 2, Paragraph 1, Subparagraph 1 of the Act on Promotion of Information and Communications Network Utilization and Information Protection, etc. ). <Amended Aug. 10, 2016; Jan. 4, 2019> ② The Korea Transportation Safety Authority, upon receiving an application for the issuance of a railway vehicle driver's license pursuant to Paragraph 1, shall issue a railway vehicle driver's license in the form of Annex 18 pursuant to Article 18, Paragraph 1 of the Act . <Amended July 25, 2017; Jan. 4, 2019> ③ In the event that a person who has been issued a railway vehicle driver's license pursuant to Paragraph 2 (hereinafter referred to as the “license holder”) loses the railway vehicle driver's license or it becomes worn out and unusable, they shall submit an application for (re)issuance of a railway vehicle driver's license in the form of Annex 17 to the Korea Transportation Safety Authority, attaching a statement of the reason for the loss or the worn-out driver's license. <Amended Jan. 4, 2019> ④ When the Korea Transportation Safety Authority issues or reissues a railway vehicle driver's license pursuant to Paragraphs 1 and 3, it shall record and manage such fact in the Railway Vehicle Driver's License Management Register in Annex 19. However, if the fact of issuance or reissuance of a railway vehicle driver's license is managed in accordance with the information system managed pursuant to Article 63, Paragraph 1, Subparagraph 7 of the Enforcement Decree , such fact may not be recorded and managed in the Railway Vehicle Driver's License Management Register in Annex 19. <Amended July 25, 2017; Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 30 (Change of Records on Railway Vehicle Driver's License) ① If a holder of a driver's license intends to change the records on a railway vehicle driver's license, such as their address, they shall apply for the change to the Korea Transportation Safety Authority by attaching documents proving such change. In this case, when the Korea Transportation Safety Authority changes the records, itshall record and manage such change in the Railway Vehicle Driver's License Management Register in the form of Annex 19. <Amended Jul. 25, 2017; Jan. 4, 2019> ② Notwithstanding the latter part of Paragraph 1, if changes to the recorded details of a railway vehicle driver's license are managed in accordance with the information system managed pursuant to Article 63, Paragraph 1, Subparagraph 7 of the Enforcement Decree , such changes may not be recorded and managed in the Railway Vehicle Driver's License Management Register in the Form of Annex 19. <Newly added July 25, 2017> [Wholly Amended Dec. 10, 2012] Article 31 (Procedure for Renewal of Driver's License) ①Any person who intends to renew a railway vehicle driver's license (hereinafter referred to as the “driver's license”) pursuant to Article 19, Paragraph 2 of the Act shall submit an application for renewal of the railway vehicle driver's license in the form of Annex 20, attached with the documents set forth in each of the following subparagraphs, to the Korea Transportation Safety Authority within six months prior to the expiration date of the driver's license's validity period. <Amended Jan. 4, 2019> 1. Railway Vehicle Driver's License 2. Documents proving compliance with each subparagraph of Article 19, Paragraph 3 of the Act ② The validity period of a driver's license renewed pursuant to Paragraph 1 shall be calculated from the day following the expiration date of the previous driver's license's validity period. [Wholly Amended Dec. 10, 2012] Article 32 (Experience, etc. Required for Driver's License Renewal) ① In Article 19, Paragraph 3, Subparagraph 1 of the Act , “experience engaged in driving duties of railway vehicles prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to experience of driving the relevant railway vehicle for at least six months within the validity period of the driver's license. <Amended Mar. 23, 2013> ② In Article 19, Paragraph 3, Subparagraph 1 of the Act , “experience of an equivalent or higher level” refers to experience of engaging in any of the duties falling under any of the following subparagraphs for two years or more. <Amended July 25, 2017> 1. Control operations 2. Driver education and training duties at driver education and training institutions 3. Duties of guiding, educating, managing, or supervising railway vehicle drivers while affiliated with the railway operator, etc. ③ In Article 19, Paragraph 3, Subparagraph 2 of the Act , “cases where education and training prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport has been received” refers to cases where at least 20 hours of education and training necessary for operating railway vehicles, conducted by a driver education and training institution or a railway operator, etc., have been received prior to the date of application for driver's license renewal. <Amended Mar. 23, 2013; July 25, 2017> ④ Detailed matters necessary for the renewal of a driver's license, such as the recognition of experience pursuant to Paragraphs 1 and 2 and the contents of education and training pursuant to Paragraph 3, shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013> [Wholly Amended Dec. 10, 2012] Article 33 (Notice of Driver's License Renewal) ① In the event that a person's driver's license has been suspended pursuant to Article 19, Paragraph 4 of the Act , the Korea Transportation Safety Authorityshall notify the holder of the relevant driver's license within 30 days from the date the validity of the said driver's license was suspended. <Amended Jan. 4, 2019> ② Pursuant to Article 19, Paragraph 6 of the Act , the Korea Transportation Safety Authority shall notify the holder of the relevant driver's license of the details regarding the renewal of the driver's license at least six months prior to the expiration date of the license's validity period. <Amended Jan. 4, 2019> ③ The notice regarding the renewal of the driver's license pursuant to Paragraph 2 shall be in accordance with the Railway Vehicle Driver's License Renewal Notice Form No. 21 . ④ If the address, etc. of the person to be notified pursuant to Paragraphs 1 and 2 cannot be verified by ordinary means or if the notice cannot be delivered, notice may be substituted by posting a public announcement on the bulletin board or website of the Korea Transportation Safety Authority for at least 14 days. <Amended Jul. 25, 2017; Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 34 (Notice, etc. of Disposition for Cancellation and Suspension of Effect of Driver's License) ① Whenthe Minister of Land, Infrastructure and Transport has issued a disposition for the cancellation or suspension of effect of a driver's license pursuant to Article 20, Paragraph 1 of the Act , he/she shall send the Notice of Disposition for Cancellation or Suspension of Effect of Railway Vehicle Driver's License in the form of Annex 22 to the person subject to the disposition. <Amended Mar. 23, 2013> ② If a person subject to disposition under Paragraph 1 is affiliated with a railway operator, etc., the Minister of Land, Infrastructure and Transport shall notify the railway operator, etc. of the fact of said disposition. <Amended Mar. 23, 2013> ③ If the address, etc. of the person subject to the disposition under Paragraph 1 cannot be verified by ordinary means, or if the Notice of Disposition for Cancellation or Suspension of Effect of a Railway Vehicle Driver's License (Form No. 22) cannot be served, the notice under Paragraph 1 may be substituted by posting a public announcement for at least 14 days on the bulletin board or website of the Korea Transportation Safety Authority, the driver's license examination agency. <Amended Jul. 25, 2017; Jan. 4, 2019> ④ A person who has received notice of a disposition to revoke or suspend the validity of a driver's license pursuant to Paragraph 1 shall return the driver's license to the Korea Transportation Safety Authority within 15 days from the date of receiving the notice. <Amended Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 35 (Detailed Standards for Dispositions of Revocation or Suspension of Validity of Driver's License) The detailed standards for dispositions of revocation or suspension of validity of a driver's license pursuant to Article 20 , Paragraph 5 of the Act are as set forth in Attached Table 10-2 . <Amended May 27, 2020> [Wholly Amended Dec. 10, 2012] Article 36 (Maintenance and Management of Driver's Licenses) The Korea Transportation Safety Authorityrecord and maintain matters concerning the issuance, renewal, cancellation, etc. of driver's licenses of holders in the Railway Vehicle Driver's License Issuance Register in the form of Annex 23. <Amended Jan. 4, 2019> [Wholly Amended Dec. 10, 2012] Article 37 (Practical Training for Driving Duties) The detailed standards for practical training that a person who intends to engage in the driving duties of a railway vehicle must complete pursuant to Article 21 of the Act are as set forth in Attached Table 11 . [Wholly Amended May 27, 2020] Article 38 (Management of Practical Training for Driving Duties, etc.) Whena person who intends to engage in driving duties for railway vehicles has completed practical training for driving duties pursuant to Article 37 , the railway operator, etc. shall record the section, etc., where practical training for driving duties was received in the Management Register of Practical Training for Driving Duties in Form No. 24 of the Appendix and notify the Korea Transportation Safety Authority of the details. [Wholly Amended Oct. 7, 2020] Article 38-2 (Period and Method of Control Education and Training, etc.) ① Control education and training pursuant to Article 21-7 of the Act (hereinafter referred to as “control education and training”) shall be conducted using a simulated control system. ② The subjects and training hours for air traffic control education and training are as set forth in Attached Table 11-2 . ③ An air traffic control education and training institution pursuant to Article 21-7, Paragraph 3 of the Act (hereinafter referred to as the “air traffic control education and training institution”) shall issue an air traffic control education and training completion certificate in the form of Annex 24-2 to persons who have completed air traffic control education and training. ④ Paragraphs 2 , 4 , and 6 of Article 20 shall apply mutatis mutandis to the application for air traffic control education and training, the opening of air traffic control education and training courses, and other procedures and methods of air traffic control education and training. In this case, “driving education and training” shall be deemed “air traffic control education and training,” and “driving education and training institution” shall be deemed “air traffic control education and training institution.” [This Article Newly Inserted July 25, 2017] Article 38-3 (Partial Exemption from Air Traffic Control Education and Training) ①The subjects and criteria for the partial exemption from air traffic control education and training pursuant to the proviso to Article 21-7, Paragraph 1 of the Act are as set forth in Table 11-2 . <Newly added Jan. 18, 2023> ② In Article 21-7, Paragraph 1, Subparagraph 1 of the Act , “subjects related to air traffic control duties prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to a subject whose educational content is identical to any one of the subjects of air traffic control education and training pursuant to Annex 11-2 . <Amended Jan. 18, 2023> [This Article Newly Inserted July 25, 2017] Article 38-4 (Procedures for Designation of Air Traffic Control Education and Training Institutions, etc.) ① Any person who intends to be designated as an air traffic control education and training institution shall submit to the Minister of Land, Infrastructure and Transport an application for designation as an air traffic control education and training institution in the form of Annex 24-3, attaching the documents listed in each of the following subparagraphs. In this case, the Minister of Land, Infrastructure and Transportshall verify the certificate of corporate registration (only applicable if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . 1. Air Traffic Control Education and Training Plan (including Air Traffic Control Education and Training Evaluation Plan) 2. Regulations on the Operation of Air Traffic Control Education and Training Institutions 3. Articles of incorporation or equivalent agreements (limited to corporations or other organizations) 4. Documents proving the qualifications, educational background, experience, etc., and duties of the instructor in charge of air traffic control education and training 5. List of facilities, such as classrooms, required for air traffic control education and training 6. List of equipment, such as simulated control systems, required for control education and training 7. Impression of the official seal used by the control education and training institution ② When the Minister of Land, Infrastructure and Transport receives an application for designation as an air traffic control education and training institution pursuant to Paragraph 1, he/she shall issue a Certificate of Designation as an Air Traffic Control Education and Training Institution in the form of Annex 24-4 to the applicant after comprehensively reviewing whether to grant the designation in accordance with Article 16, Paragraph 2 of the Enforcement Decree, which is applied mutatis mutandis by Article 20-4 of the Enforcement Decree. <Amended Jan. 18, 2023> [This Article Newly Inserted July 25, 2017] Article 38-5 (Detailed Designation Criteria, etc. for Air Traffic Control Education and Training Institutions) ①The detailed designation criteria for air traffic control education and training institutions pursuant to Article 20-4 of the Enforcement Decree are as set forth in Annex 11-3 . <Amended Jan. 18, 2023> ② The Minister of Land, Infrastructure and Transport shall review every two years whether an air traffic control education and training institution meets the designation criteria under Paragraph 1 and Article 17, Paragraph 1 of the Enforcement Decree, which is applied mutatis mutandis in Article 20-4 of the Enforcement Decree. <Amended Jan. 18, 2023> ③ Article 22, Paragraph 3 shall apply mutatis mutandis to the notification of changes to the air traffic control education and training institution . In this case, “driving education and training institution” shall be deemed to be “air traffic control education and training institution.” [This Article Newly Inserted July 25, 2017] Article 38-6 (Cancellation of Designation and Suspension of Operations of Air Traffic Control Education and Training Institutions, etc.) ① The standards for cancellation of designation and suspension of operations of air traffic control education and training institutions pursuant to Article 15-2 of the Act, which is applied mutatis mutandis in Article 21-7, Paragraph 5 of theAct, are as set forth in Table 9 . ② The provisions of Article 23, Paragraph 2 shall apply mutatis mutandis to the notification, etc. regarding the cancellation of designation or suspension of operations of an air traffic control education and training institution . In this case, “driving education and training institution” shall be deemed to be “air traffic control education and training institution.” [This Article Newly Inserted July 25, 2017] Article 38-7 (Subjects and Passing Criteria for Air Traffic Control Certification Examination) ① The practical examination among the air traffic control certification examinations pursuant to Article 21-8, Paragraph 1 of the Act (hereinafter referred to as the “air traffic control certification examination”) shall be conducted using a simulated air traffic control system. ② The subjects and passing criteria for the air traffic control certification examination are as set forth in Appendix 11-4 . In this case, the practical examination may be taken only if the written examination has been passed. ③ For persons who have passed the written examination among the air traffic control certification examinations, passing the written examination shall be deemed valid for any air traffic control certification examination conducted by December 31 of the year in which the date marking two years from the date of passing the written examination falls. ④ The Minister of Land, Infrastructure and Transport shall determine the necessary detailed matters regarding the methods and procedures of the air traffic control certification examination, the selection of practical examination evaluation committee members, etc. [This Article Newly Inserted July 25, 2017] Article 38-8 (Announcement of Implementation Plan for Air Traffic Control Qualification Examination) Article 25 shall apply mutatis mutandis to the announcement of the implementation plan for the Air Traffic Control Qualification Examination. In this case, “driver’s license examination” shall be deemed “air traffic control qualification examination,” and “written examination and skills examination” shall be deemed “theory examination and practical examination.” [This Article Newly Inserted July 25, 2017] Article 38-9 (Partial Exemption from Air Traffic Control Certification Examination) The subjects and criteria for partial exemption from the Air Traffic Control Certification Examination pursuant to Article 21-8, Paragraph 3 of the Act are as set forth in Table 11-4 . [Wholly Amended Jan. 18, 2023] Article 38-10 (Submission of Application for Air Traffic Control Certification Examination, etc.) ① Any person who intends to take the Air Traffic Control Certification Examination shall submit the application form for the Air Traffic Control Certification Examination in the form of Annex 24-5, along with the documents specified in each of the following subparagraphs, to the Korea Transportation Safety Authority. <Amended Jan. 4, 2019; Jan. 18, 2023> 1. Medical examination judgment certificate issued by a medical examination institution (limited to those issued within 2 years prior to the application submission date for the Air Traffic Control Certification Examination) 2. Air Traffic Control Aptitude Test Judgment issued by an air traffic control aptitude testing agency (limited to those issued within 10 years prior to the application date for the Air Traffic Control Certification Examination) 3. Certificate of Completion of Air Traffic Control Education and Training issued by an Air Traffic Control Education and Training Institution 4. Copy of railway vehicle driver's license (to be submitted only by holders of a railway vehicle driver's license) 5. Copy of Urban Railway Control Certificate (to be submitted only by holders of the Urban Railway Control Certificate) ② The Korea Transportation Safety Authority may not require the submission of the documents referred to in subparagraphs 1 through 4 of Paragraph 1 if such documents can be verified through the information system managed pursuant to subparagraph 7 of Paragraph 1 of the Enforcement Decree . <Amended Jan. 4, 2019> ③ When the Korea Transportation Safety Authority receives an application for the Air Traffic Control Certification Examination pursuant to Paragraph 1, it shall record it in the Air Traffic Control Certification Examination Application Receipt Register in Annex 24-6 and issue an Air Traffic Control Certification Examination Admission Ticket in Annex 24-5 to the applicant. However, if the fact of application receipt is managed in accordance with the information system managed pursuant to Article 63, Paragraph 1 , Subparagraph 7 of the Enforcement Decree, the fact of application receipt may not be recorded in the Air Traffic Control Certification Examination Application Receipt Register. <Amended Jan. 4, 2019> ④ The Korea Transportation Safety Authority shall announce the date, time, and location of the examination on the Korea Transportation Safety Authority bulletin board or its website, etc., within 7 days of the deadline for receiving applications for the Air Traffic Control Qualification Certification Examination. <Amended Jan. 4, 2019> [This Article Newly Inserted July 25, 2017] Article 38-11 (Reissuance of Air Traffic Control Qualification Examination Tickets, etc.) Articles 27 and 28 shall apply mutatis mutandis to the reissuance of air traffic control qualification examination tickets and the posting of air traffic control qualification examination results, etc.In this case, “driver’s license examination” shall be deemed “air traffic control qualification examination,” and “written examination and skills test” shall be deemed “theory examination and practical test.” [This Article Newly Inserted July 25, 2017] Article 38-12 (Issuance of Air Traffic Control Qualification Certificate, etc.) ① A person who has passed the air traffic control qualification examination shall submit to the Korea Transportation Safety Authority an application for the issuance of an air traffic control qualification certificate in the form of Annex 24-7 , attaching the documents set forth in each of the following subparagraphs (including submission via an information and communications network pursuant to Article 2, Paragraph 1 , Subparagraph 1 of the Act on Promotion of Information and Communications Network Utilization and Information Protection, etc. ). <Amended Jan. 4, 2019; Jan. 18, 2023> 1. Copy of Resident Registration Card 2. Passport photo (3.5 cm × 4.5 cm) ② The Korea Transportation Safety Authority, upon receiving an application for the issuance of a Traffic Control Qualification Certificate pursuant to Paragraph 1, shall issue a Railway Traffic Control Qualification Certificate in accordance with Form No. 24-8 of the Attached Form . <Amended Jan. 4, 2019> ③ If a holder of a Control Officer Qualification Certificate loses the certificate or if it becomes unusable due to wear or damage, they must submit an application for reissuance of the Control Officer Qualification Certificate in the form of Annex 24-7 to the Korea Transportation Safety Authority, attaching the documents specified in each of the following subparagraphs. <Amended Jan. 18, 2023> 1. Certificate of Air Traffic Control Qualification (submit only if worn out or damaged to the point of being unusable) 2. Statement of Reason for Loss (Submit only if lost) 3. Passport photo (3.5 cm × 4.5 cm) ④ The Korea Transportation Safety Authority, upon receiving an application for the reissuance of a Traffic Control Qualification Certificate pursuant to Paragraph 3, shall reissue the Railway Traffic Control Qualification Certificate in the form of Annex 24-8 . <Amended Jan. 4, 2019> ⑤ When the Korea Transportation Safety Authority issues or reissues a Certificate of Air Traffic Control Qualification pursuant to Paragraphs 2 and 4, it shall record and manage such fact in the Register of Certificates of Air Traffic Control Qualification in Annex 24-9 . However, if the fact of issuance or reissuance of a Certificate of Air Traffic Control Qualification is managed in accordance with the information system managed pursuant to Article 63 , Paragraph 1, Subparagraph 7 of the Enforcement Decree , such fact may not be recorded and managed in the Register of Certificates of Air Traffic Control Qualification in Annex 24-9 . <Amended Jan. 4, 2019> [This Article Newly Inserted July 25, 2017] Article 38-13 (Change of Recorded Details on Control Certificate) Article 30 shall apply mutatis mutandis to changes in the recorded details of a Control Certificate. In this case, “holder of a driver’s license” shall be deemed to be “holder of a control certificate,” “railway vehicle driver’s license” shall be deemed to be “control certificate,” and “railway vehicle driver’s license management ledger in Form No. 19 ” shall be deemed to be “control certificate management ledger in Form No. 24-9 .” [This Article Newly Inserted July 25, 2017] Article 38-14 (Procedure for Renewal of Air Traffic Control Qualification Certificate) ①Any person who intends to renew an air traffic control qualification certificate pursuant to Article 21-9 of the Act shall submit an application for renewal of the air traffic control qualification certificate in the form of Annex 24-10, attached with the documents specified in each of the following subparagraphs, to the Korea Transportation Safety Authority within six months prior to the expiration date of the validity period of the air traffic control qualification certificate. <Amended Jan. 4, 2019> 1. Air Traffic Control Certification 2. Documents proving that it falls under each subparagraph of Article 19, Paragraph 3 of the Act , which is applied mutatis mutandis pursuant to Article 21-9 of the Act ② The validity period of the air traffic control certification renewed pursuant to Paragraph 1 shall be calculated from the day following the expiration date of the previous air traffic control certification. [This Article Newly Inserted July 25, 2017] Article 38-15 (Experience, etc. Required for Renewal of Air Traffic Control Certificate) ① In Article 19, Paragraph 3, Subparagraph 1 of the Act , which is applied mutatis mutandis pursuant to Article 21-9 of the Act , “experience engaged in air traffic control duties prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to experience engaged in air traffic control duties for at least 6 months within the validity period of the air traffic control certificate. ② In Article 19 , Paragraph 3, Subparagraph 1 of the Act , which is applied mutatis mutandis pursuant to Article 21-9 of the Act , “experience of an equivalent or higher level” refers to experience of at least two years engaged in any of the following duties: 1. Air traffic control education and training duties at air traffic control education and training institutions 2. Duties of guiding, educating, managing, or supervising control personnel while affiliated with railway operators, etc. ③ In Article 19, Paragraph 3, Subparagraph 2 of the Act , which is applied mutatis mutandis pursuant to Article 21-9 of the Act , “cases where education and training prescribed by the Ministry of Land, Infrastructure and Transport has been received” refers to cases where education and training necessary for control operations conducted by a control education and training institution or a railway operator, etc., has been received for at least 40 hours prior to the date of application for renewal of the control qualification certificate. ④ Detailed matters necessary for the renewal of air traffic control certification, such as the recognition of experience pursuant to Paragraphs 1 and 2 and the content of education and training pursuant to Paragraph 3, shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted July 25, 2017] Article 38-16 (Notice of Renewal of Control Qualification Certificate) Article 33 shall applymutandis to the notice of renewal of a control qualification certificateNotice of Renewal of Railway Vehicle Driver’s License in Form No. 21 ” shall be deemed “Notice of Renewal of Control Qualification Certificate in Form No. 24-11 .” [This Article Newly Inserted July 25, 2017] Article 38-17 (Notice, etc. regarding the cancellation and suspension of validity of a control qualification certificate) Article 34 shall applymutatis mutandis to the notice, etc. regarding the cancellation and suspension of validity of a control qualification certificate“Notice of cancellation or suspension of validity of railway vehicle driver’s license in Form No. 22 ” in the Appendix shall be deemed “Notice of cancellation or suspension of validity of control qualification certificate in Form No. 24-12 in the Appendix,” and “driver’s license” shall be deemed “control qualification certificate.” [This Article Newly Inserted July 25, 2017] Article 38-18 (Detailed Standards for Cancellation or Suspension of Validity of Air Traffic Control Certificate) The detailed standards for cancellation or suspension of validity of an air traffic control certificate pursuant to Article 21-11, Paragraph 1 of the Act are as set forth in Table 11-5 . [This Article Newly Inserted July 25, 2017] Article 38-19 (Maintenance and Management of Air Traffic Control Qualification Certificates) The Korea Transportation Safety Authorityrecord and maintain matters concerning the issuance, renewal, cancellation, etc., of air traffic control qualification certificates of holders in the Air Traffic Control Qualification Certificate Issuance Register in the form of Annex 24-13 . <Amended Jan. 4, 2019> [This Article Newly Inserted July 25, 2017] Article 39 (Practical Training in Control Operations) ① Any person who intends to engage in control operations pursuant to Article 22 of the Act shall complete all of the practical training in control operations set forth in each of the following subparagraphs. 1. Practical training in control operations regarding the control and coordination of railway vehicle operations in the section where control duties are to be performed 2. Practical training in control operations regarding equipment handling methods and emergency procedures necessary for performing control duties ② Railway operators, etc. shall establish and implement a practical training plan regarding the items and training hours, etc. of practical training for control operations pursuant to Paragraph 1. In this case, the total practical training hours shall be at least 100 hours. ③ Notwithstanding Paragraph 2, for persons who have completed practical training in control operations and are required to complete practical training again due to a change in the section where control operations are to be performed or the equipment necessary for performing control operations, a separate practical training plan may be established and implemented. ④ The Minister of Land, Infrastructure and Transport shall determine and announce the necessary detailed matters regarding the methods and evaluations of practical training in control operations pursuant to Paragraph 1 . [Wholly Amended July 25, 2017] Article 39-2 (Management of Practical Training in Control Operations, etc.) ① When a railway operator, etc.has established a practical training plan pursuant to Article 39 , Paragraphs 2 and 3, it shall notify the Korea Transportation Safety Authority of the contents thereof. <Amended Jan. 4, 2019> ② When a person intending to engage in control duties has completed the practical training for control duties pursuant to Article 39, Paragraph 1, a railway operator, etc. shall record the section, etc., where the practical training was received in the Management Register of Practical Training for Control Duty Personnel (Form No. 25) and notify the Korea Transportation Safety Authority of the details. <Amended Jan. 4, 2019> ③ Railway operators, etc. shall not allow a person who intends to engage in control duties to perform control duties in a section other than the section where he/she received practical training in control duties pursuant to Article 39, Paragraph 1 . [This Article Newly Inserted July 25, 2017] Article 40 (Physical Examination for Personnel Engaged in Driving Duties, etc.) ①Physical examinations for railway personnel pursuant to Article 23, Paragraph 1 of the Act shall be conducted by classifying them as follows: 1. Initial Examination: A physical examination conducted before performing the relevant duties. 2. Periodic Examination: A physical examination conducted every two years after the initial examination. 3. Special Examination: A physical examination conducted when a railway operator, etc., recognizes that a railway employee is unable to properly perform their duties due to causing a railway accident, etc., or for reasons such as illness. ② Persons engaged in driving duties or air traffic control duties pursuant to Article 21, subparagraph 1 or 2 of the Enforcement Decree shall be deemed to have received the initial examination under Paragraph 1, subparagraph 1 on the date they receive the physical examination for a driver's license or a certificate of air traffic control qualification pursuant to Article 12 or Article 21-5 of the Act . However, a person who engages in driving duties or air traffic control duties after two years or more have elapsed from the date of receiving such physical examination must receive the initial examination under Paragraph 1, subparagraph 1. <Amended July 25, 2017> ③ Regular examinations shall be conducted within three months prior to the date marking two years from the date of the initial examination or regular examination (hereinafter referred to as the “expiration date of the physical examination validity period”). In this case, the validity period of the regular examination shall be calculated from the day following the expiration date of the physical examination validity period. ④ The methods and procedures, etc. for the physical examination under Paragraph 1 shall be governed by Article 12 , and the passing criteria shall be as set forth in Item 2 of Annex 2 . [Wholly Amended Dec. 10, 2012] Article 41 (Aptitude Test for Personnel Engaged in Driving Duties, etc.) ① The aptitude test for railway personnel pursuant to Article 23, Paragraph 1 of the Act shall be conducted by classifying as follows: <Amended Jan. 4, 2019> 1. Initial Test: An aptitude test conducted before performing the relevant job. 2. Periodic Examination: An aptitude test conducted every 10 years (every 5 years for those aged 50 or older) after the initial examination. 3. Special Examination: An aptitude test conducted when a railway operator, etc., recognizes that a railway employee is unable to properly perform their duties due to causing a railway accident, etc., or for reasons such as illness. ② Persons engaged in driving duties or air traffic control duties pursuant to Subparagraph 1 or 2 of Article 21 of the Enforcement Decree shall be deemed to have received the initial examination under Paragraph 1, Subparagraph 1 on the date they received the driving aptitude test or the air traffic control aptitude test. However, a person who engages in driving duties or air traffic control duties after 10 years (5 years in the case of being 50 years of age or older) have elapsed from the date of receiving the said driving aptitude test or air traffic control aptitude test shall receive the initial examination under Paragraph 1, Subparagraph 1. <Amended July 25, 2017; Jan. 4, 2019> ③ Periodic examinations shall be conducted within 12 months prior to the date marking 10 years (5 years in the case of being 50 years of age or older) from the date of the initial examination or periodic examination (hereinafter referred to as the “Aptitude Test Validity Period Expiration Date”). In this case, the validity period of the periodic examination shall be calculated from the day following the Aptitude Test Validity Period Expiration Date. <Amended Aug. 10, 2016; Jan. 4, 2019> ④ The methods and procedures, etc. for the aptitude test under Paragraph 1 shall be governed by Article 16 , and the passing criteria shall be as set forth in Table 13 . [Wholly Amended Dec. 10, 2012] Article 41-2 (Subjects of Safety Education for Railway Employees, etc.) ① Pursuant to Article 24, Paragraph 1 of the Act , the subjects for whom railway operators, etc. and employers engaged in railway operation or railway facilities, etc. under a contract with railway operators, etc. (hereinafter referred to as “employer” in this Article) are required to conduct education regarding railway safety (hereinafter referred to as “railway safety education”) are as follows: <Amended Oct. 7, 2020> 1. Persons falling under subparagraphs (a) through (d) of Article 2, subparagraph 10 of the Act 2. Persons falling under subparagraphs 2 through 5 and subparagraph 7 of Article 3 of the Enforcement Decree ② Railway operators, etc. and business owners shall conduct railway safety education for at least 6 hours every quarter through lectures and practical training. However, if education regarding the contents under Paragraph 3 is received in education conducted pursuant to other laws and regulations, such training hours shall be deemed to have been received as railway safety education. <Amended Oct. 7, 2020> ③ The contents of railway safety education are as set forth in Appendix 13-2 . ④ Railway operators, etc. and business owners may entrust railway safety education to specialized institutions performing safety-related duties, such as safety specialized institutions pursuant to Article 69 of the Act . <Amended Oct. 7, 2020> ⑤ In addition to the matters prescribed in paragraphs 1 through 4, the Minister of Land, Infrastructure and Transport shall determine and announce the detailed matters necessary for the evaluation methods, etc. of railway safety education . [This Article Newly Inserted Nov. 9, 2018] Article 41-3 (Job Training, etc. for Railway Employees) ① Any person falling under any of the following subparagraphs (excluding persons designated by the railway operator, etc. as railway job training personnel) shall receive job training conducted by the railway operator, etc. pursuant to Article 24, Paragraph 2 of the Act (hereinafter referred to as “railway job training”). 1. Persons falling under subparagraphs (a) through (c) of Article 2, subparagraph 10 of the Act 2. Persons falling under subparagraphs 4 through 5 and subparagraph 7 of Article 3 of the Enforcement Decree ② The content, time, and method of railway job training are as set forth in Appendix 13-3 . [This Article Newly Inserted Oct. 7, 2020] Article 42 (Application for Recognition as Railway Vehicle Maintenance Technician) A person who intends to be recognized as a railway vehicle maintenance technician (including recognition for a change in grade) pursuant to Article 24-2, Paragraph 1 of the Act shall submit an Application for Recognition as a Railway Vehicle Maintenance Technician in the form of Annex 25-2, attached with the documents specified in each of the following subparagraphs, to the Korea Transportation Safety Authority. <Amended July 17, 2024> 1. Confirmation of Railway Vehicle Maintenance Work Experience ( Form No. 25-3) 2. Copy of National Technical Qualification Certificate ( limited to categories of National Technical Qualifications included in the career points by qualification pursuant to Annex 1-3 of the Enforcement Decree ) 3. Graduation certificate or degree certificate (limited to applicable persons) 4. Photo 5. Certificate of Railway Vehicle Maintenance Experience (limited to cases of application for grade change recognition) 6. Certificate of Completion of Maintenance Education and Training (limited to cases of application for grade change recognition) [This Article Newly Inserted June 18, 2019] Article 42-2 (Issuance and Management of Railway Vehicle Maintenance Experience Certificate) ① When the Korea Transportation Safety Authorityreceives an application for recognition of a railway vehicle maintenance technician (including recognition of a change in grade) pursuant to Article 42, it shall issue a railway vehicle maintenance experience certificate in the form of Annex 25-4 to the applicant after confirming whether the applicant meets the standards for recognition of a railway vehicle maintenance technician pursuant to Article 21-2 of the Enforcement Decree . ② If the Korea Transportation Safety Authority determines that a person who has applied for recognition or grade change of railway vehicle maintenance technician pursuant to Article 42 is not in accordance with the standards for recognition of railway vehicle maintenance technician pursuant to Article 21-2 of the Enforcement Decree , it shall notify the applicant of the reason in writing. ③ A person who wishes to obtain a reissuance of a railway vehicle maintenance experience certificate must submit an application for reissuance of a railway vehicle maintenance experience certificate in the form of Annex 25-5 to the Korea Transportation Safety Authority with a photograph attached. ④ When the Korea Transportation Safety Authority receives an application for reissuance of a railway vehicle maintenance experience certificate pursuant to Paragraph 3, it shall reissue the railway vehicle maintenance experience certificate to the applicant unless there is a special reason. ⑤ When the Korea Transportation Safety Authority issues or reissues a railway vehicle maintenance experience certificate pursuant to Paragraph 1 or 4, it shall record and manage the facts regarding the issuance or reissuance in the railway vehicle maintenance experience certificate issuance register in the form of Annex 25-6 . However, if the facts regarding the issuance or reissuance of a railway vehicle maintenance experience certificate are managed through an information system pursuant to Article 63, Paragraph 1, Item 7 of the Enforcement Decree , it is not necessary to record and manage them separately. ⑥ The Korea Transportation Safety Authority shall submit the status of issuance (including reissuance) and cancellation of railway vehicle maintenance experience certificates to the Minister of Land, Infrastructure and Transport by the 15th of the following month, based on the last day of each half-year, in accordance with Form No. 25-7 . [This Article Newly Inserted June 18, 2019] Article 42-3 (Standards for Maintenance Education and Training, etc.) ①The timing and hours, etc. of maintenance education and training pursuant to Article 21-3, Paragraph 1 of the Enforcement Decree shall be as set forth in Table 13-4 . <Amended June 23, 2021> ② If a railway vehicle maintenance technician wishes to be recognized for a change of grade to a higher grade of railway vehicle maintenance technician, they must undergo maintenance education and training pursuant to Paragraph 1. [This Article Newly Inserted June 18, 2019] Article 42-4 (Detailed Designation Criteria, etc. for Maintenance Education and Training Institutions) ①The detailed designation criteria for maintenance education and training institutions pursuant to Article 21-4, Paragraph 1 of the Enforcement Decree (hereinafter referred to as “maintenance education and training institutions”) are as set forth in Table 13-5 . <Amended June 23, 2021> ② The Minister of Land, Infrastructure and Transport shall review every two years whether a maintenance education and training institution meets the designation criteria for maintenance education and training institutions under Paragraph 1. ③ Article 22, Paragraph 3 shall apply mutatis mutandis to the notification of changes to maintenance education and training institutions . In this case, “driver education and training institution” shall be deemed to be “maintenance education and training institution.” [This Article Newly Inserted June 18, 2019] Article 42-5 (Application for Designation as Maintenance Education and Training Institution, etc.) ①person who intends to be designated as a maintenance education and training institution pursuant to Article 21-4, Paragraph 2 of the Enforcement Decree shall submit to the Minister of Land, Infrastructure and Transport an application for designation as a maintenance education and training institution in the form of Annex 25-8, attaching the documents specified in each of the following subparagraphs. In this case, the Minister of Land , Infrastructure and Transport shall verify the certificate of corporate registration (applicable only if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. 1. Maintenance Education and Training Plan (including maintenance education and training evaluation plan) 2. Regulations on the Operation of Maintenance Education and Training Institutions 3. Articles of incorporation or equivalent agreements (limited to corporations and organizations) 4. Documents proving the qualifications, educational background, experience, etc., and duties of the instructor in charge of maintenance education and training 5. List of facilities, such as classrooms, required for maintenance education and training 6. Methods and Procedures for Conducting Practical Training Required for Maintenance Education and Training 7. Impression of the official seal used by the maintenance education and training institution ② When the Minister of Land, Infrastructure and Transport designates a maintenance education and training institution pursuant to Article 21-4, Paragraph 4 of the Enforcement Decree, he/she shall issue a certificate of designation as a maintenance education and training institution in the form of Annex 25-9 to the applicant. [This Article Newly Inserted June 18, 2019] Article 42-6 (Revocation of Designation, etc. of Maintenance Education and Training Institutions) ①The standards for the revocation of designation and suspension of business of maintenance education and training institutions pursuant to Article 15-2 of the Act , which is applied mutatis mutandis under Article 24-4, Paragraph 5 of the Act , are as set forth in Table 13-6 . <Amended June 23, 2021> ② In the event that the Minister of Land, Infrastructure and Transport cancels the designation of a maintenance education and training institution or imposes a suspension of business, he/she shall notify the maintenance education and training institution of the administrative disposition of the designated institution in the form of Annex 11-3 without delay and publish the fact in the Official Gazette. [This Article Newly Inserted June 18, 2019] Article 43 (Installation of Door Facilities for Boarding and Alighting) ① In the main text of Article 25-2 of the Act , “standards prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to 1,135 millimeters. ② The term “platforms used by various types of railway vehicles together, etc., as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 25-2 of the Act refers to a platform falling under any of the following subparagraphs, which the Railway Technology Deliberation Committee under Article 44 has deliberated and resolved that boarding and alighting door equipment (hereinafter referred to as “platform screen doors”) that opens and closes in conjunction with the train doors on the platform does not need to be installed. 1. In cases where it is difficult to install platform screen doors on a platform used by various types of railway vehicles due to differing train door locations. 2. A platform on the track side where trains do not stop, where safety facilities such as safety railings are installed to prevent passengers from falling onto the tracks. 3. Cases where it is deemed unnecessary to install platform screen doors considering the number of passengers boarding and alighting, the frequency of train operations, etc. [This Article Newly Inserted Feb. 21, 2019] Article 44 (Establishment of the Railway Technology Deliberation Committee) The Minister of Land, Infrastructure and Transport shall establish the Railway Technology Deliberation Committee (hereinafter referred to as the “Technology Committee”) to deliberate on the matters set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Mar. 19, 2014; Jan. 20, 2017; Mar. 20, 2019> 1. Enactment, amendment, or repeal of technical standards pursuant to Article 7 , Paragraph 5 , Article 26 , Paragraph 3 , Article 26-3 , Paragraph 2 , Article 27 , Paragraph 2 , and Article 27-2, Paragraph 2 of the Act 2. Selection, change, and cancellation of railway products subject to type approval pursuant to Article 27 , Paragraph 1 of the Act 3. Enactment, amendment, or abolition of standard specifications for railway vehicles and railway supplies pursuant to Article 34, Paragraph 1 of the Act 4. Designation of specialized agencies or organizations regarding railway safety pursuant to Article 63 , Paragraph 4 of the Enforcement Decree 5. Other matters required by the Minister of Land, Infrastructure and Transport [Wholly Amended Dec. 10, 2012] Article 45 (Composition and Operation of the Railway Technology Deliberation Committee, etc.) ① The Technology Committee shall be composed of no more than 15 members, including the Chairperson, and the Chairperson shall be elected from among the members. ② Specialized committees for each technical division (hereinafter referred to as “Specialized Committees”) may be established within the Technical Committee to review agenda items to be submitted to the Technical Committee in advance and to deliberate on agenda items delegated by the Technical Committee. ③ Except as otherwise provided in this Rule, matters necessary for the composition and operation, etc. of the Technical Committee and the Expert Committee shall be determined by the Minister of Land, Infrastructure and Transport . <Amended Mar. 14, 2008; Mar. 23, 2013> Article 46 (Procedures for Application for Type Approval of Railway Vehicles, etc.) ①person who intends to obtain type approval for a railway vehicle pursuant to Article 26, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for type approval of a railway vehicle in the form of Annex 26 , attaching the documents of each of the following subparagraphs. 1. Plan for Proof of Conformity and Evidentiary Data regarding the Technical Standards for Railway Vehicles pursuant to Article 26 , Paragraph 3 of the Act (hereinafter referred to as “Railway Vehicle Technical Standards”) 2. Design drawings, design specifications, and descriptions of the railway vehicle (limited to parts necessary for proving conformity) 3. Proof documents in cases eligible for exemption from type approval inspection pursuant to Article 26 , Paragraph 4 of the Act 4. Vehicle type test procedure pursuant to Article 48, Paragraph 1, Subparagraph 3 5. Other documents notified by the Minister of Land, Infrastructure and Transport as deemed necessary to prove compliance with the Railway Vehicle Technical Standards ② If you intend to change the matters for which railway vehicle type approval has been obtained pursuant to the main text of Article 26, Paragraph 2 of the Act , you must submit an application for approval of railway vehicle type change in the form of Annex 26-2 to the Minister of Land, Infrastructure and Transport, attaching the documents of each of the following subparagraphs. 1. Railway Vehicle Type Approval Certificate for the Relevant Railway Vehicle 2. The documents specified in each subparagraph of Paragraph 1 (limited to the parts being changed and the parts associated therewith) 3. Comparison Table and Commentary Before and After Changes ③ When the Minister of Land, Infrastructure and Transport receives an application for type approval or change approval of a railway vehicle pursuant to Paragraphs 1 and 2, he/she shall prepare a plan for inspections, etc. necessary for approval or change approval within 15 days and notify the applicant. [Wholly Amended Mar. 19, 2014] Article 47 (Changes to Minor Matters in Type Approval of Railway Vehicles) ① The phrase “cases where minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport are to be changed” in the proviso to Article 26, Paragraph 2 of the Act refers to any of the changes falling under any of the following subparagraphs. 1. Changes to the car body shape that do not affect the structural safety and performance of the railway vehicle 2. Changes to facilities that do not affect the safety of railway vehicles 3. Changes in the placement of devices or parts that do not affect weight distribution 4. Change in specifications of parts that can be proven to have the same performance 5. Other changes to matters recognized by the Minister of Land, Infrastructure and Transport as not affecting the safety and performance of railway vehicles ② In cases where minor matters are to be changed pursuant to the proviso of Article 26, Paragraph 2 of the Act , the following documents must be attached to the railway vehicle type change report form ( Form No. 27) and submitted to the Minister of Land, Infrastructure and Transport. 1. Railway Vehicle Type Approval Certificate for the Relevant Railway Vehicle 2. Documents proving compliance with each subparagraph of Paragraph 1 3. Comparison Table and Commentary Before and After Changes 4. Key specifications after change 5. Documentation proving conformity to the Railway Vehicle Technical Standards (limited to parts being changed and related parts) ③ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 2, he/she shall verify the attached documents in each subparagraph of Paragraph 2 and issue a railway vehicle type change report confirmation form in Annex 27-2 . [Wholly Amended Mar. 19, 2014] Article 48 (Method of Type Approval Inspection of Railway Vehicles and Issuance of Certificates, etc.) ① The type approval inspection of railway vehicles pursuant to Article 26, Paragraph 3 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. 1. Design Conformity Inspection: An inspection to determine whether the design of a railway vehicle conforms to the Railway Vehicle Technical Standards. 2. Conformity Inspection: An inspection to determine whether the railway vehicle has been manufactured in accordance with the design pursuant to Paragraph 1 at the parts, components, and finished vehicle stages. 3. Vehicle Type Test: A test to determine whether a railway vehicle conforms to the Railway Vehicle Technical Standards at the component, part, finished vehicle, and trial run stages. ② If the Minister of Land, Infrastructure and Transport recognizes that the vehicle conforms to the technical standards for railway vehicles as a result of the inspection under Paragraph 1, he/she shall issue a railway vehicle type approval certificate in Form No. 28 or a railway vehicle type change approval certificate in Form No. 28-2 to the applicant, attaching the type approval data collection. ③ If a person who has been issued a railway vehicle type approval certificate or a railway vehicle type change approval certificate pursuant to Paragraph 2 wishes to have the certificate reissued because it has been lost or damaged beyond repair, they must submit an application for reissuance of a railway vehicle type approval certificate in the form of Annex 29 to the Minister of Land, Infrastructure and Transport, attaching the certificate that has been damaged beyond repair (only applicable in cases where it has been damaged beyond repair). ④ Detailed standards, procedures, and methods for the type approval inspection of railway vehicles pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Mar. 19, 2014] Article 49 (Procedures for Exemption from Type Approval Inspection of Railway Vehicles, etc.) ①In Article 22, Paragraph 3, Subparagraph 3 of the Enforcement Decree, the term “inspection prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the design conformity inspection pursuant to Article 48 , Paragraph 1, Subparagraph 1 ; the conformity inspection pursuant to Subparagraph 2 of the same Paragraph; and the vehicle type test pursuant to Subparagraph 3 of the same Paragraph (excluding tests during the trial run phase). <Amended Aug. 10, 2016> ② If the Minister of Land, Infrastructure and Transport determines, as a result of reviewing the documents pursuant to Article 46, Paragraph 1, Subparagraph 3, that the relevant railway vehicle is eligible for exemption from type approval inspection, he/she shall notify the applicant of the fact and details of the exemption. [Wholly Amended Mar. 19, 2014] Article 50 (Order for Approval of Change of Railway Vehicle Type, etc.) ① When the Minister of Land, Infrastructure and Transport intends to order approval for a change pursuant to Article 26-2, Paragraph 2 of the Act , he/she shall notify the person who has received approval for the railway vehicle type by specifying the reasons. ② A person who has received an order for approval of change pursuant to Paragraph 1 shall apply for approval of change of railway vehicle type approval pursuant to the main text of Article 26, Paragraph 2 of the Act within 30 days from the date of notification of the order. [Wholly Amended Mar. 19, 2014] Article 51 (Application for Approval of Railway Rolling Stock Manufacturer, etc.) ①person who intends to obtain approval as a railway rolling stock manufacturer pursuant to Article 26-3, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for approval as a railway rolling stock manufacturer in the form of Annex 30 , attaching the documents specified in each of the following subparagraphs. However, if approval as a manufacturer is exempted pursuant to Article 23, Paragraph 1, Subparagraph 1 of the Enforcement Decree, only the document specified in Subparagraph 4 shall be attached. 1. Plan for Proof of Conformity and Evidentiary Data regarding the Technical Standards Required for the Manufacturing Management and Quality Maintenance of Railway Vehicles Pursuant to Article 26-3, Paragraph 2 of the Act (hereinafter referred to as the “Railway Vehicle Manufacturer Approval Standards”) 2. Railway Rolling Stock Quality Management System Document and Manual 3. Railway Vehicle Manufacturing Specifications and Manuals 4. Supporting documents in cases eligible for exemption from producer approval or producer approval inspection pursuant to Article 26-3, Paragraph 3 of the Act 5. Other documents notified by the Minister of Land, Infrastructure and Transport as deemed necessary to prove compliance with the railway rolling stock manufacturer approval standards ② If a person who has received approval as a railway vehicle manufacturer intends to change the matters approved as a railway vehicle manufacturer pursuant to the main text of Article 7 , Paragraph 3 of the Act , which is applied mutatis mutandis in Article 26-8 of the Act , he/she shall submit to the Minister of Land, Infrastructure and Transport an application for approval of change of railway vehicle manufacturer in the form of Annex 30-2 , attaching the documents of each of the following subparagraphs. 1. Certificate of Approval by the Manufacturer of the Relevant Railway Vehicle 2. The documents specified in each subparagraph of Paragraph 1 (limited to the parts being changed and the parts associated therewith) 3. Comparison Table and Commentary Before and After Changes ③ When the Minister of Land, Infrastructure and Transport receives an application for approval of a railway vehicle manufacturer or approval of a change pursuant to Paragraphs 1 and 2, he/she shall prepare a plan for inspections, etc. necessary for approval or approval of a change within 15 days and notify the applicant. [Wholly Amended Mar. 19, 2014] Article 52 (Change of Minor Matters in Approval of Railway Rolling Stock Manufacturers) ① The phrase “in cases where minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport are to be changed” in the proviso to Article 7, Paragraph 3 of the Act, which is applied mutatis mutandis in Article 26-8 of the Act , means any change falling under any of the following subparagraphs. 1. Changes to matters concerning the quality control organization or quality control manager due to organizational changes of the railway rolling stock manufacturer 2. Changes to the details of quality control regulations due to changes in laws, regulations, or administrative districts, etc. 3. Matters regarding inconsistencies between documents and changes to matters that do not affect the basic direction of the quality control regulations and for which the basis for the change is clear ② In cases where minor matters are to be changed pursuant to the proviso to Article 7, Paragraph 3 of the Act , which is applied mutatis mutandis in Article 26-8 of the Act , the following documents must be attached to the Railway Vehicle Manufacturer Approval Change Notification Form No. 31 and submitted to the Minister of Land, Infrastructure and Transport. 1. Certificate of Approval by the Manufacturer of the Relevant Railway Vehicle 2. Documents proving compliance with each subparagraph of Paragraph 1 3. Comparison Table and Commentary Before and After Changes 4. Railway Rolling Stock Quality Management System After Change 5. Documentation proving conformity to the railway rolling stock manufacturer approval standards (limited to the parts being changed and related parts) ③ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 2, he/she shall verify the attached documents in each subparagraph of Paragraph 2 and issue a Confirmation of Report on Change of Approval of Railway Vehicle Manufacturer in the form of Annex 31-2 . [Wholly Amended Mar. 19, 2014] Article 53 (Method of Railway Vehicle Manufacturer Approval Inspection and Issuance of Certificate, etc.) ①The railway vehicle manufacturer approval inspection pursuant to Article 26-3, Paragraph 2 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. 1. Quality Management System Conformity Inspection: An inspection to determine whether the quality management system of the relevant railway vehicle conforms to the railway vehicle manufacturer approval standards. 2. Manufacturing Inspection: An inspection verifying the application and maintenance of the quality management system for the relevant railway vehicle. ② If the Minister of Land, Infrastructure and Transport recognizes that the railway vehicle manufacturer meets the approval standards as a result of the inspection under Paragraph 1, he/she shall issue the documents specified in each of the following subparagraphs to the applicant. 1. Certificate of Approval for Railway Vehicle Manufacturer (Form No. 32) or Certificate of Approval for Change of Railway Vehicle Manufacturer (Form No. 32-2) 2. Manufacturer's Approval Designation containing a list of railway vehicle types that can be manufactured ③ If a person who has been issued a railway vehicle manufacturer approval certificate or a railway vehicle manufacturer change approval certificate pursuant to Paragraph 2, Item 1 wishes to have the certificate reissued because it has been lost or damaged beyond repair, they must submit an application for reissuance of a railway vehicle manufacturer approval certificate in the form of Annex 29 to the Minister of Land, Infrastructure and Transport, attaching the certificate that has been damaged beyond repair (only applicable if it has been damaged beyond repair). ④ Detailed standards, procedures, and methods for the railway vehicle manufacturer approval inspection pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 54 (Procedure for Exemption from Approval of Manufacturer, etc. of Railway Vehicles) If the Minister of Land, Infrastructure and Transport recognizes, as a result of reviewing the documents pursuant to Article 51, Paragraph 1, Subparagraph 4 , that a railway vehicle is subject to exemption from manufacturer approval or manufacturer approval inspection, he/she shall notify the applicant of the fact and details of the exemption. [Wholly Amended Mar. 19, 2014] Article 55 (Reporting of Succession to Status, etc.) ①A person succeeding to the status of railway rolling stock manufacturer approval pursuant to Article 26-5, Paragraph 2 of the Act shall submit a report on the succession of railway rolling stock manufacturer in the form of Annex 33 to the Minister of Land, Infrastructure and Transport, attaching the documents set forth in each of the following subparagraphs. <Amended Dec. 20, 2023> 1. Railway Rolling Stock Manufacturer's Approval Certificate 2. In the case of a business transfer: Documents proving the fact of transfer, such as a copy of the transfer agreement 3. In the case of business inheritance: Documents confirming the fact of inheriting the business 4. In the case of a business merger: Merger agreement and certificate of registration of the surviving entity or the entity newly established following the merger ② Upon receiving a report pursuant to Paragraph 1, the Minister of Land, Infrastructure and Transport shall issue a railway vehicle manufacturer approval certificate to the successor after verifying the fact of succession of status. [Wholly Amended Mar. 19, 2014] Article 56 (Application for Completion Inspection of Railway Vehicles, etc.) ①person who intends to undergo a completion inspection of railway vehicles pursuant to Article 26-6, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for completion inspection of railway vehicles in the form of Annex 34 , attaching the documents set forth in each of the following subparagraphs. <Amended Dec. 20, 2023> 1. Railway Vehicle Type Approval Certificate 2. Railway Rolling Stock Manufacturer's Approval Certificate 3. Plan and supporting documents for proving type identity with the type-approved design 4. Driving test procedure pursuant to Article 57, Paragraph 1, Subparagraph 2 5. Other documents designated by the Minister of Land, Infrastructure and Transport as necessary to prove formal identity ② When the Minister of Land, Infrastructure and Transport receives an application for a completion inspection pursuant to Paragraph 1, he/she shall prepare a plan for the completion inspection within 15 days and notify the applicant. [Wholly Amended Mar. 19, 2014] Article 57 (Method of Completion Inspection of Railway Vehicles and Issuance of Inspection Certificate, etc.) ① The completion inspection of railway vehicles pursuant to Article 26-6, Paragraph 1 of the Act shall be carried out in accordance with the classifications in each of the following subparagraphs. 1. Completed Vehicle Inspection: An inspection to verify that a railway vehicle complies with the Railway Vehicle Technical Standards and has been manufactured according to the type-approved design, including ensuring the safety of major components directly related to safety. 2. Running Test: An inspection conducted to finally verify, through trial runs on operating tracks, whether the railway vehicle has secured performance and safety in accordance with type approval. ② If the Minister of Land, Infrastructure and Transport recognizes, as a result of the inspection under Paragraph 1, that the railway vehicle conforms to the Technical Standards for Railway Vehicles and has been manufactured in accordance with the type-approved design , the Minister shall issue a Certificate of Completion Inspection of Railway Vehicles in the form of Annex 35 to the applicant. <Amended Oct. 7, 2020> ③ The detailed standards, procedures, and methods required for the completion inspection under Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] [Title Amended Oct. 7, 2020] Article 58 (Criteria for Dispositions such as Cancellation of Approval of Railway Vehicle Manufacturer, etc.) The criteria for dispositions such as cancellation of approval of railway vehicle manufacturer or restriction or suspension of business pursuant to Article 26-7 of the Act are as set forth in Table 14 . [Wholly Amended Mar. 19, 2014] Article 59 (Maintenance of Railway Vehicle Quality Management System, etc.) ① The Minister of Land, Infrastructure and Transport shall conduct a regular inspection of the railway vehicle quality management system once every year in accordance with Article 8, Paragraph 2 of the Act, which is applied mutatis mutandis by Article 26-8 of the Act , and may conduct inspections at any time if deemed necessary to ensure the safety and quality of railway vehicles, etc. ② If the Minister of Land, Infrastructure and Transport intends to conduct a regular inspection or an unscheduled inspection pursuant to Paragraph 1, he/she shall notify the person who has received approval from the railway vehicle manufacturer of an inspection plan containing the contents of each of the following subparagraphs at least 15 days prior to the inspection date. 1. Composition of the Inspection Team 2. Examination Schedule and Location 3. Areas of Inspection and Inspection Items 4. Key Inspection Items 5. Other matters necessary for the inspection ③ When the Minister of Land, Infrastructure and Transport has completed a periodic inspection or an unscheduled inspection, he/she shall prepare an inspection result report containing the following items: 1. Overview and Current Status of Inspection in the Railway Rolling Stock Quality Management System 2. Inspection Process and Content of the Railway Rolling Stock Quality Management System 3. Matters for corrective measures pursuant to Article 8, Paragraph 3, applied mutatis mutandis by Article 26-8 of the Act ④ In cases where the Minister of Land, Infrastructure and Transport orders corrective measures to a person who has received approval as a railway vehicle manufacturer pursuant to Article 8 , Paragraph 3 of the Act , which is applied mutatis mutandis under Article 26-8 of the Act , the Minister shall grant an appropriate period necessary for the correction. <Amended Aug. 10, 2016> ⑤ A person who has received approval as a railway vehicle manufacturer and has received a corrective action order pursuant to Article 8, Paragraph 3 , which is applied mutatis mutandis in Article 26-8 of the Act , shall notify the Minister of Land, Infrastructure and Transport of the details of the corrective action without delay once the corrective action has been completed. ⑥ In addition to the matters specified in paragraphs 1 through 5, detailed standards, methods, and procedures for periodic inspections or occasional inspections shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 60 (Procedure for Application for Type Approval of Railway Products, etc.) ①person who intends to obtain type approval for railway products pursuant to Article 27, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for type approval of railway products in the form of Annex 36 , attaching the documents of each of the following subparagraphs. 1. Plan for Proof of Conformity and Evidentiary Data regarding the Technical Standards for Railway Products pursuant to Article 27 , Paragraph 2 of the Act (hereinafter referred to as “Technical Standards for Railway Products”) 2. Design drawings, design specifications, and manuals for railway equipment 3. Proof documents in cases falling under the exemption from type approval inspection pursuant to Article 26, Paragraph 4 of the Act , which is applied mutatis mutandis by Article 27, Paragraph 4 of the Act 4. Product type test procedure pursuant to Article 61, Paragraph 1, Subparagraph 3 5. Other documents notified by the Minister of Land, Infrastructure and Transport as deemed necessary to prove compliance with the Technical Standards for Railway Equipment ② In order to change matters for which type approval for railway products has been obtained pursuant to the main text of Article 26, Paragraph 2 of the Act, which is applied mutatis mutandis in Article 27, Paragraph 4 of the Act, an application for approval of type change of railway products in Form No. 36-2 of the Appendix must be submitted to the Minister of Land, Infrastructure and Transport, attaching the documents of each of the following subparagraphs. 1. Type Approval Certificate for the Relevant Railway Equipment 2. The documents specified in each subparagraph of Paragraph 1 (limited to the parts being changed and the parts associated therewith) 3. Comparison Table and Commentary Before and After Changes ③ When the Minister of Land, Infrastructure and Transport receives an application for type approval or change approval of railway products pursuant to Paragraphs 1 and 2, he/she shall prepare a plan for inspections, etc. necessary for approval or change approval within 15 days and notify the applicant. [Wholly Amended Mar. 19, 2014] Article 61 (Change of Minor Matters in Type Approval of Railway Equipment) ① The phrase “in cases where minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport are to be changed” in the proviso to Article 26 , Paragraph 2 of the Act, which is applied mutatis mutandis in Article 27, Paragraph 4 of the Act , means any change falling under any of the following subparagraphs. 1. Shape changes that do not affect the safety and performance of railway products 2. Changes to facilities that do not affect the safety of railway equipment 3. Changes in the placement of devices or parts that do not affect weight distribution and size 4. Change in specifications of parts that can be proven to have the same performance 5. Any other changes to matters recognized by the Minister of Land, Infrastructure and Transport as not affecting the safety and performance of railway products ② In cases where minor matters are to be changed pursuant to the proviso to Article 26, Paragraph 2 of the Act , which is applied mutatis mutandis in Article 27, Paragraph 4 of the Act , a report on change of type of railway equipment in Form No. 37 of the Appendix must be submitted to the Minister of Land, Infrastructure and Transport, with the following documents attached. 1. Type Approval Certificate for the Relevant Railway Equipment 2. Documents proving compliance with each subparagraph of Paragraph 1 3. Comparison Table and Commentary Before and After Changes 4. Key specifications after change 5. Documentation proving conformity to the Technical Standards for Railway Equipment (limited to parts being changed and related parts) ③ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 2, he/she shall verify the attached documents in each subparagraph of Paragraph 2 and issue a Confirmation of Report on Change of Type of Railway Equipment in the form of Annex 37-2 . [Wholly Amended Mar. 19, 2014] Article 62 (Method of Type Approval Inspection of Railway Goods and Issuance of Certificates, etc.) ① The type approval inspection of railway goods pursuant to Article 27, Paragraph 2 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. 1. Design Conformity Inspection: An inspection to determine whether the design of railway equipment conforms to the Technical Standards for Railway Equipment. 2. Conformity Inspection: An inspection to determine whether railway products have been manufactured in accordance with the design pursuant to Paragraph 1 at the part, component, and finished product stages. 3. Product Type Test: A test to determine whether railway products conform to the Technical Standards for Railway Products at the part, component, finished product, and commissioning stages. ② If the Minister of Land, Infrastructure and Transport recognizes, as a result of the inspection under Paragraph 1, that the product conforms to the Technical Standards for Railway Products, the Minister shall issue to the applicant a Certificate of Type Approval for Railway Products in Form No. 38 or a Certificate of Approval for Type Change for Railway Products in Form No. 38-2 , attaching the Type Approval Data Collection. <Amended Dec. 20, 2023> ③ When the Minister of Land, Infrastructure and Transport issues a certificate of type approval for railway equipment or a certificate of type change approval for railway equipment pursuant to Paragraph 2, he/she may designate the railway vehicle or railway facility to which the relevant railway equipment is to be installed. ④ If a person who has been issued a certificate of type approval for railway supplies or a certificate of type change approval for railway supplies pursuant to Paragraph 2 wishes to have the certificate reissued because it has been lost or is worn out and unusable, they must submit to the Minister of Land, Infrastructure and Transport an application for reissuance of a certificate of type approval for railway supplies in the form of Annex 29 , attaching the certificate that is worn out and unusable (only applicable in cases where it is worn out and unusable). ⑤ Detailed standards, procedures, and methods for type approval inspection of railway products pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 63 (Procedure for Exemption from Type Approval Inspection of Railway Products) If the Minister of Land, Infrastructure and Transport recognizes, as a result of reviewing the documents pursuant to Article 60, Paragraph 1, Subparagraph 3, that the relevant railway products are subject to exemption from type approval inspection, he/she shall notify the applicant of the fact and details of the exemption. [Wholly Amended Mar. 19, 2014] Article 64 (Application for Approval of Railway Goods Manufacturer, etc.) ①person who intends to obtain approval as a manufacturer of railway goods pursuant to Article 27-2, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for approval as a manufacturer of railway goods in the form of Annex 39 , attaching the documents specified in each of the following subparagraphs. However, in cases where approval as a manufacturer is exempted pursuant to Article 28, Paragraph 1 of the Enforcement Decree, only the document specified in subparagraph 4 shall be attached. 1. Plan for Proof of Conformity and Evidentiary Data regarding the Technical Standards Required for the Manufacturing Management and Quality Maintenance of Railway Equipment Pursuant to Article 27-2, Paragraph 2 of the Act (hereinafter referred to as the “Railway Equipment Manufacturer Approval Standards”) 2. Railway Supplies Quality Management System Document and Manual 3. Railway Equipment Manufacturing Specifications and Instructions 4. Supporting documents in cases eligible for exemption from producer approval or producer approval inspection pursuant to Article 26-3, Paragraph 3 of the Act , which is applied mutatis mutandis by Article 27-2, Paragraph 4 of the Act . 5. Other documents notified by the Minister of Land, Infrastructure and Transport as deemed necessary to prove compliance with the railway equipment manufacturer approval standards. ② If a person who has received approval as a manufacturer of railway products intends to change the matters approved as a manufacturer of railway products pursuant to the main text of Article 7, Paragraph 3 of the Act , which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act, he/she shall submit to the Minister of Land, Infrastructure and Transport an application for approval of change of manufacturer of railway products in the form of Annex 39-2 , attaching the documents of each of the following subparagraphs. 1. Railway Equipment Manufacturer's Approval Certificate for the Relevant Railway Equipment 2. The documents specified in each subparagraph of Paragraph 1 (limited to the parts being changed and the parts associated therewith) 3. Comparison Table and Commentary Before and After Changes ③ When the Minister of Land, Infrastructure and Transport receives an application for approval of a railway product manufacturer or approval of a change pursuant to Paragraphs 1 and 2, he/she shall prepare a plan for inspections, etc. necessary for approval or approval of a change within 15 days and notify the applicant. [Wholly Amended Mar. 19, 2014] Article 65 (Change of Minor Matters in Approval of Railway Equipment Manufacturers) ① The phrase “cases where minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport are changed” in the proviso to Article 7, Paragraph 3 of the Act , which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act , refers to any of the following cases: 1. Changes to matters concerning the quality control organization or quality control manager due to organizational changes of the railway equipment manufacturer 2. Changes to the detailed contents of the quality control regulations due to changes in laws or administrative districts, etc. 3. Matters with inconsistencies between documents and changes to matters that do not affect the basic direction of the quality control regulations and for which the basis for the change is clear ② In cases where minor matters are to be changed pursuant to the proviso to Article 7, Paragraph 3 of the Act , which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act , a report on change of manufacturer of railway goods in Form No. 40 of the Appendix must be submitted to the Minister of Land, Infrastructure and Transport, attaching the documents of each of the following subparagraphs. 1. Railway Equipment Manufacturer's Approval Certificate for the Relevant Railway Equipment 2. Documents proving compliance with each subparagraph of Paragraph 1 3. Comparison Table and Commentary Before and After Changes 4. Quality Management System for Railway Supplies After Change 5. Documentation proving conformity to the Railway Equipment Manufacturer Approval Standards (limited to the changed parts and related parts) ③ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 2, he/she shall verify the attached documents in each subparagraph of Paragraph 2 and issue a Confirmation of Report on Change of Approval for Railway Goods Manufacturer in the form of Annex 40-2 . [Wholly Amended Mar. 19, 2014] Article 66 (Method of Manufacturer Approval Inspection and Issuance of Certificate, etc.) ①The manufacturer approval inspection of railway products pursuant to Article 27-2, Paragraph 2 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. 1. Inspection of Quality Management System Conformity: An inspection to determine whether the quality management system of the relevant railway product conforms to the Railway Product Manufacturer Approval Standards. 2. Manufacturing Inspection: An inspection to verify the application and maintenance of the quality management system for the relevant railway product. ② If the Minister of Land, Infrastructure and Transport recognizes that the product conforms to the standards for approval of railway product manufacturers as a result of the inspection under Paragraph 1, he/she shall issue the documents specified in each of the following subparagraphs to the applicant. 1. Certificate of Approval for Railway Equipment Manufacturer (Form No. 41) or Certificate of Approval for Change of Railway Equipment Manufacturer (Form No. 41-2) 2. Manufacturer's Approval Designation containing a list of the types of railway products that can be manufactured ③ If a person who has been issued a certificate of approval for a railway product manufacturer or a certificate of approval for a change in a railway product manufacturer pursuant to Paragraph 2, Item 1 wishes to have the certificate reissued because it has been lost or damaged beyond repair, they must submit an application for reissuance of a certificate of approval for a railway product manufacturer in the form of Annex 29 to the Minister of Land, Infrastructure and Transport, attaching the certificate that has been damaged beyond repair (only applicable if it has been damaged beyond repair). ④ Detailed standards, procedures, and methods for the inspection of railway product manufacturers' approval pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 67 (Procedure for Exemption from Manufacturer Approval, etc. for Railway Goods) If the Minister of Land, Infrastructure and Transport recognizes, as a result of reviewing the documents pursuant to Article 64, Paragraph 1, Subparagraph 4, that railway goods are subject to exemption from manufacturer approval or manufacturer approval inspection, the Minister shall notify the applicant of the fact and details of the exemption. <Amended Oct. 2, 2015> [Wholly Amended Mar. 19, 2014] Article 68 (Marking of Type-Approved Railway Products) ① A person who has received approval as a manufacturer of railway products pursuant to Article 27-2, Paragraph 3 of the Act shall affix a mark to the relevant railway products indicating that they are type-approved railway products (hereinafter referred to as “type-approved products”) by including the matters in each of the following subparagraphs. 1. Type Approved Product Name and Type Approval Number 2. Date of manufacture of type-approved product 3. Name of the manufacturer of the type-approved product (including a mark or abbreviation indicating that it is the manufacturer) 4. Name of the Type Approval Agency ② The marking of the type-approved product pursuant to Paragraph 1 shall follow the standard design prescribed and notified by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 69 (Reporting of Succession to Status, etc.) ①A person succeeding to the status of railway product manufacturer approval pursuant to Article 26-5, Paragraph 2 of the Act , which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act , shall submit to the Minister of Land, Infrastructure and Transport a report on succession to railway product manufacturer in the form of Annex 42 , attaching the documents of each of the following subparagraphs. 1. Railway Equipment Manufacturer's Approval Certificate 2. In the case of a business transfer: Documents proving the fact of transfer, such as a copy of the transfer agreement 3. In the case of business inheritance: Documents confirming the fact of inheriting the business 4. In the case of a business merger: Merger agreement and certificate of registration of the surviving entity or the entity newly established following the merger ② Upon receiving a report pursuant to Paragraph 1, the Minister of Land, Infrastructure and Transport shall issue a Certificate of Approval for Manufacturer of Railway Equipment to the successor in status after verifying the fact of succession in status. [Wholly Amended Mar. 19, 2014] Article 70 (Standards for Dispositions, such as Cancellation of Approval for Railway Goods Manufacturers, etc.) The standards for dispositions, such as the cancellation of approval for railway goods manufacturers or the restriction or suspension of business, pursuant to Article 26-7 of the Act , which is appliedmutatis mutandis under Article 27-2, Paragraph 4 of the Act , are as set forth in Attached Table 15. <Amended Dec. 20, 2023> [Wholly Amended Mar. 19, 2014] Article 71 (Maintenance of Quality Management System for Railway Products, etc.) ① The Minister of Land, Infrastructure and Transportshall conduct a regular inspection of the quality management system for railway products once every year in accordance with Article 8, Paragraph 2 of the Act , which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act , and may conduct inspections at any time if deemed necessary to ensure the safety and quality of railway products, etc. ② If the Minister of Land, Infrastructure and Transport intends to conduct a regular inspection or an unscheduled inspection pursuant to Paragraph 1, he/she shall notify the person who has received approval as a manufacturer of railway products of an inspection plan containing the contents of each of the following subparagraphs at least 15 days prior to the inspection date. 1. Composition of the Inspection Team 2. Examination Schedule and Location 3. Areas of Inspection and Inspection Items 4. Key Inspection Items 5. Other matters necessary for the inspection ③ When the Minister of Land, Infrastructure and Transport has completed a periodic inspection or an unscheduled inspection, he/she shall prepare an inspection result report containing the following items: 1. Overview and Current Status of Inspection in the Railway Supplies Quality Management System 2. Inspection Process and Content of the Railway Supplies Quality Management System 3. Matters for corrective measures pursuant to Article 8, Paragraph 3, which are applied mutatis mutandis by Article 27-2, Paragraph 4 of the Act ④ In cases where the Minister of Land, Infrastructure and Transport orders corrective measures to a person who has received approval as a manufacturer of railway products pursuant to Article 8, Paragraph 3 of the Act , which is applied mutatis mutandis under Article 27-2, Paragraph 4 of the Act, the Minister shall grant an appropriate period necessary for the correction. <Amended Dec. 20, 2023> ⑤ A person who has received approval as a manufacturer of railway products and has been ordered to take corrective measures pursuant to Article 8, Paragraph 3, which is applied mutatis mutandis in Article 27-2, Paragraph 4 of the Act , shall notify the Minister of Land, Infrastructure and Transport of the details of the corrective measures without delay once the corrective measures have been completed. ⑥ In addition to the matters specified in paragraphs 1 through 5, detailed standards, methods, and procedures for periodic inspections or occasional inspections shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 71-2 (Entrustment of Inspection Duties) In Article 28-2, Paragraph 2 of the Enforcement Decree, “duties prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the inspection of finished vehicles pursuant to Article 57, Paragraph 1 , Item 1 . [This Article Newly Inserted Oct. 7, 2020] Article 72 (Subjects of Post-Management of Type Approval, etc.) ① The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 31, Paragraph 1, Subparagraph 5 of the Act refers to any of the following matters: 1. Railway Operational Suitability Investigation for Railway Vehicles or Equipment Involved in Accidents 2. Railway Operation Suitability Survey for Railway Vehicles or Railway Equipment in Long-Term Operation 3. Investigation into whether there are defects in railway vehicles or railway equipment 4. Other matters concerning the safety and quality of railway vehicles or railway equipment that the Minister of Land, Infrastructure and Transport deems necessary and notifies. ② The identification card indicating the authority of a public official pursuant to Article 31, Paragraph 3 of the Act shall be in accordance with Form No. 43 of the Attached Form . [Wholly Amended Mar. 19, 2014] Article 72-2 (Stable Supply of Railway Vehicle Parts, etc.) ① A person who has sold a railway vehicle after receiving a completion inspection pursuant to Article 31, Paragraph 4 of the Act (hereinafter referred to as the “Railway Vehicle Seller”) shall supply the parts specified in each of the following subparagraphs to the person who purchased the railway vehicle (including a person who maintains the railway vehicle in accordance with a contract with the person who purchased the railway vehicle; hereinafter referred to as the “Railway Vehicle Buyer”) for at least 20 years from the date of receiving the completion inspection of the railway vehicle. However, if the Railway Vehicle Seller agrees with the Railway Vehicle Buyer through consultation that the use of parts other than those supplied by the Railway Vehicle Seller is permitted, the Railway Vehicle Seller may not supply the said parts to the Railway Vehicle Buyer. 1. Railway equipment designated by the Minister of Land, Infrastructure and Transport as subject to type approval pursuant to Article 26 of the Railway Safety Act 2. Parts of a railway vehicle that, in the event of a failure in the power transmission system (engine, transmission, reduction gear, traction motor, etc.), driving/braking system, or control system, cannot continue to operate under its own power and require towing by another railway vehicle to operate. 3. Other parts agreed to be supplied pursuant to the contract between the railway vehicle seller and the railway vehicle buyer ② The type and specifications of the parts provided by the railway vehicle seller to the railway vehicle buyer pursuant to Paragraph 1 must match the railway vehicle sold by the railway vehicle seller. ③ When determining the price of parts that they sell or supply, the seller of railway rolling stock must make a reasonable determination in accordance with the principle of good faith, taking into consideration the manufacturing cost (including development costs) of the said parts. [This Article Newly Inserted June 18, 2019] Article 72-3 (Provision of Data, Technical Guidance, and Implementation of Education) ① Pursuant to Article 31, Paragraph 4 of the Act , a seller of railway rolling stock shall provide the following data to the buyer of the relevant railway rolling stock. 1. Maintenance technical documents regarding operation and maintenance methods, etc., for the railway vehicle system and individual components of each device so that the relevant railway vehicle can be operated and maintained in optimal condition. 2. Manuals on railway vehicle operation and major system operation methods, emergency procedures, safety rules and procedures, etc., and fault repair procedures 3. Various technical documents agreed to be supplied pursuant to the contract between the railway vehicle seller and the railway vehicle buyer 4. A fault diagnostic device for the relevant railway vehicle (including software for the smooth operation of the fault diagnostic device) and its user manual 5. Special tools, testing equipment, and manuals for use required for railway vehicle maintenance 6. Other materials to be provided pursuant to the contract between the railway rolling stock seller and the railway rolling stock buyer ② The maintenance technical documentation pursuant to Paragraph 1, Item 1 shall include the following items: 1. Parts inventory management, replacement cycles for major parts, and record management matters 2. Status of facilities or equipment, etc. required for maintenance 3. Planning and details of maintenance processes (routine maintenance, scheduled maintenance, irregular maintenance, etc.) 4. Technical documentation detailing all functions and measures required for each maintenance stage to ensure the railway vehicle remains in optimal condition ③ The seller of railway vehicles shall provide technical guidance or training to the buyer of railway vehicles in accordance with the methods specified in each of the following subparagraphs. 1. Audiovisual education through the provision of video recordings such as CDs and DVDs 2. Written education through the provision of textbooks and reference materials 3. Other methods pursuant to a contract or agreement between the railway rolling stock seller and the railway rolling stock buyer. ④ The railway vehicle seller shall conduct group training or on-site training for the relevant railway vehicle buyer in any of the following cases. In this case, the railway vehicle seller and the railway vehicle buyer shall consult on the timing, target, duration, content, and costs of the group training or on-site training. 1. When the railway vehicle seller deems it necessary for the effective dissemination of the relevant railway vehicle maintenance technology 2. When a railway rolling stock purchaser requests group training or on-site training to effectively learn the maintenance technology for the relevant railway rolling stock ⑤ The seller of the railway vehicle shall provide the materials pursuant to Paragraph 1 to the buyer of the railway vehicle and conduct the training pursuant to Paragraph 4 or 5 no later than three months prior to the scheduled delivery date of the railway vehicle. However, if the buyer of the railway vehicle makes a separate request or if the seller of the railway vehicle and the buyer of the railway vehicle agree, the timing, duration, and method of technical guidance or training may be determined separately. ⑥ In cases where a seller of a railway vehicle provides equipment, devices, etc., such as diagnostic tools, and technical guidance and training to the buyer of the railway vehicle for a fee, the costs must be determined according to reasonable standards based on the prices of similar equipment and items and similar training costs. [This Article Newly Inserted June 18, 2019] Article 72-4 (Order to Perform against a Railway Vehicle Seller) ① If the Minister of Land, Infrastructure and Transport intends to issue an order to perform against a railway vehicle seller pursuant to Article 31, Paragraph 6 of the Act , he/she shall notify the seller in writing (including electronic documents) by specifying the specific measures to be performed and the period of performance, etc. ② Before notifying the enforcement order under Paragraph 1, the Minister of Land, Infrastructure and Transport may hear the opinions of experts in relevant fields, such as railway vehicle parts manufacturers, railway vehicle precision safety inspection agencies, or academia, for the purpose of mediating disputes between the seller of the railway vehicle and the buyer of the railway vehicle. [This Article Newly Inserted June 18, 2019] Article 73 (Submission and Reporting of Corrective Action Plan, etc.) ① A manufacturer of railway vehicles or railway equipment that has received a suspension order pursuant to the main clause of Article 32, Paragraph 2 of the Act shall submit a corrective action plan containing the matters of each of the following subparagraphs to the Minister of Land, Infrastructure and Transport. 1. Name, type approval number, and date of manufacture of the relevant railway vehicle or railway equipment 2. Circumstances, extent, and consequences of the violation regarding the relevant railway vehicle or railway equipment 3. Number of units manufactured and sold of the relevant railway vehicles or railway supplies 4. Corrective action plan, such as recall, refund, replacement, repair, and improvement of the relevant railway vehicles or railway equipment 5. Notice or public announcement to the owner, possessor, manager, etc., of the relevant railway vehicle or railway equipment ② In the proviso to Article 32, Paragraph 2 of the Act , “minor cases prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the following cases: 1. Violation of changes in shape that do not affect structural safety and performance 2. Violation of changes to facilities that do not affect safety 3. Violation of changes in the placement of devices or parts that do not affect weight distribution 4. Violation of changing specifications for parts that can be proven to have equivalent performance 5. Violation of changes in the manufacturing process that do not affect safety, performance, and quality 6. Other cases where the Minister of Land, Infrastructure and Transport recognizes and notifies that it does not affect the safety and performance of railway vehicles or railway equipment. ③ In cases where a manufacturer of railway vehicles or railway equipment takes corrective measures, in accordance with Article 32 , Paragraph 4 of the Act , they shall report the progress of the corrective measures to the Minister of Land, Infrastructure and Transport within 20 days after the end of each quarter until the corrective measures are completed, and when the corrective measures are completed, they shall report the details of the corrective measures to the Minister of Land, Infrastructure and Transport within 20 days after completion. [Wholly Amended Mar. 19, 2014] Article 74 (Establishment of Railway Standard Specifications, etc.) ① When the Minister of Land, Infrastructure and Transport intends to establish, amend, or abolish standard specifications for railway vehicles or railway products pursuant to Article 34 of the Act (hereinafter referred to as “Railway Standard Specifications”), he/she must undergo deliberation by the Technical Committee. ② The Minister of Land, Infrastructure and Transport may hold public hearings, etc., to hear the opinions of interested parties if necessary when establishing, amending, or abolishing railway standard specifications. ③ When the Minister of Land, Infrastructure and Transport establishes a railway standard specification, he/she shall publish the name, number, and date of establishment, etc., of the said railway standard specification in the Official Gazette. The same shall apply when amending or abolishing a railway standard specification that has been published. ④ The Minister of Land, Infrastructure and Transport may verify the validity of the railway standard specifications every three years from the date of notifying the railway standard specifications pursuant to Paragraph 3, and if necessary, revise or abolish the railway standard specifications. However, if it is recognized that it is necessary to revise or abolish the railway standard specifications due to improvements in railway technology, etc., the railway standard specifications may be revised or abolished within three years. ⑤ Any person with an interest in the enactment, amendment, or abolition of railway standard specifications may submit an opinion statement on the enactment, amendment, or abolition of railway standard specifications in the form of Annex No. 44, along with the documents listed in each of the following subparagraphs, to the Korea Railroad Research Institute (hereinafter referred to as the “Korea Railroad Research Institute”) pursuant to the “Act on the Establishment, Operation, and Promotion of Government-funded Research Institutions in the Science and Technology Field .” 1. Proposal for the enactment, revision, or abolition of railway standard specifications 2. Statement of Opinion on Proposed Enactment, Revision, or Abolition of Railway Standard Specifications ⑥ The Korea Railroad Research Institute, having received the opinion statement pursuant to Paragraph 5, shall review it and notify the relevant interested parties of the results of the review. ⑦ Detailed matters necessary for the management, etc. of railway standard specifications shall be determined and announced by the Minister of Land, Infrastructure and Transport . [Wholly Amended Mar. 19, 2014] Article 75 (Timing and Procedures, etc., of Comprehensive Test Runs) ① Comprehensive test runs conducted by a railway operator, etc. pursuant to Article 38, Paragraph 1 of the Act (hereinafter referred to as “comprehensive test runs”) shall be conducted prior to the commencement of business operations on the relevant railway line. <Amended Mar. 19, 2014> ② Comprehensive test runs shall be conducted jointly with the railway operator. In this case, the railway operator shall comply with any request for support, such as railway rolling stock and required personnel, from the railway facility manager to ensure the smooth execution of the comprehensive test run, unless there is a special reason not to. ③ Before conducting a comprehensive test run, the railway facility manager shall consult with the railway operator and establish a comprehensive test run plan that includes the matters of each of the following subparagraphs. 1. Method and Procedure for Comprehensive Test Run 2. Evaluation Items and Criteria, etc. 3. Schedule of Comprehensive Test Run 4. Organization and Personnel Requirements for Conducting Comprehensive Test Run 5. Test equipment and devices used for comprehensive test runs 6. Education and training plan for personnel conducting comprehensive test runs 7. Safety Management Organization and Safety Management Plan 8. Emergency Response Plan 9. Other matters necessary for the efficient implementation of comprehensive test runs and ensuring safety ④ Before conducting a comprehensive test run, the railway facility manager shall conduct a preliminary review, such as reviewing documents explaining the results of the function and performance inspection of railway facilities installed on the relevant railway line, in conjunction with the railway operator. ⑤ Comprehensive test runs shall be conducted in order, divided into the procedures of each of the following subparagraphs. 1. Facility Verification Test: A test conducted to verify and inspect the safety status of railway facilities, the operational suitability of railway vehicles, the interface with railway facilities, and the normal functioning of railway facilities while gradually increasing the speed of railway vehicles up to the maximum speed permitted on the relevant railway line. 2. Commercial Trial Operation: A test conducted after the completion of facility verification tests to prepare for the commencement of operations, simulating actual operating conditions based on the train operation plan to check the train operation system and the proficiency of railway personnel. ⑥ When a railway facility manager conducts a comprehensive test run on a railway line that has been improved from an existing line, it may consult with the railway operator to adjust the comprehensive test run schedule pursuant to Paragraph 2 or omit some of the procedures. ⑦ When a railway facility manager conducts a comprehensive test run pursuant to Paragraphs 5 and 6, they shall, in conjunction with the railway operator, verify the details of the comprehensive test run, the results of its implementation, and the measures taken, record and manage such details, and report the results to the Minister of Land, Infrastructure and Transport. <Amended Mar. 19, 2014> ⑧ Railway operators, etc., shall improve or correct railway facilities pursuant to Article 75-2, Paragraph 2, or train operation systems or preparations for operation, if they receive an order for improvement or correction. After completing the improvement or correction, they shall conduct a comprehensive test run again and report the results to the Minister of Land, Infrastructure and Transport. In this case, some of the comprehensive test run procedures under each subparagraph of Paragraph 5 may be omitted. <Amended Mar. 19, 2014; Aug. 10, 2016> ⑨ When a railway operator, etc. conducts a comprehensive test run, they shall designate a safety manager to perform the duties set forth in each of the following subparagraphs. <Amended Mar. 19, 2014> 1. Inspection and verification of safety measures prescribed by relevant laws and regulations, such as the Industrial Safety and Health Act 2. Safety inspection prior to comprehensive test run and supervision of safety management during comprehensive test run 3. Safety control of railway vehicles used in comprehensive test runs 4. Inspection and verification of safety equipment used in comprehensive test runs 5. Safety training for participants in the comprehensive test run 10. Other matters necessary for the detailed procedures, methods, etc. of comprehensive test operations shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013> [Wholly Amended Dec. 10, 2012] Article 75-2 (Review of Results of Comprehensive Test Run and Order for Improvement, etc.) ① The review of the results of a comprehensive test run conducted pursuant to Article 38, Paragraph 2 of the Act shall be carried out in order, classified into the procedures of each of the following subparagraphs. <Amended Mar. 20, 2019> 1. Review of compliance with technical standards pursuant to Article 19, Paragraphs 1 and 2 of the Act on the Construction of Railways and Maintenance of Railway Facilities 2. Review of the safety of railway facilities and train operation systems 3. Review of the adequacy of preparations for normal operation ② When the Minister of Land, Infrastructure and Transport conducts a review pursuant to Paragraph 1 regarding an urban railway under Article 3 , Subparagraph 2 of the Urban Railway Act, or an urban railway constructed or operated by a corporation entrusted with an urban railway construction project or urban railway transportation business pursuant to Article 24 or Article 42 of the same Act , the Minister may consult with the Mayor or Provincial Governor having jurisdiction over the relevant urban railway. In this case, the Mayor or Provincial Governor who receives the request for consultation shall submit an opinion within 7 days from the date of receiving the request; if no opinion is submitted within that period, it shall be deemed that there is no opinion. <Newly added Jan. 20, 2017> ③ If, as a result of the review under Paragraph 1, it is determined that improvement or supplementation is necessary for the relevant railway facilities or for the train operation system or operational preparations, the Minister of Land, Infrastructure and Transport may order the railway operator, etc. to improve or rectify such matters pursuant to Article 38 , Paragraph 2 of the Act . <Amended Jan. 20, 2017> ④ Matters necessary for the detailed standards, procedures, and methods for reviewing the results of comprehensive test runs pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Jan. 20, 2017> [This Article Newly Inserted Mar. 19, 2014] Article 75-3 (Application for Approval of Railway Vehicle Modification, etc.) ①In accordance with the main text of Article 38-2, Paragraph 2 of the Act , any person who owns or operates a railway vehicle (hereinafter referred to as “owner, etc.”) shall, in order to obtain approval for the modification of a railway vehicle, submit an application for approval of railway vehicle modification in accordance with Form No. 45 of the Appendix to the Minister of Land, Infrastructure and Transport, attaching the documents of each of the following subparagraphs. 1. Documents regarding the railway vehicles and quantities subject to modification 2. Documents regarding the scope, reason, and work schedule of the modification 3. Comparison Table of Specifications Before and After Modification 4. Documents regarding personnel, equipment, facilities, and parts or devices required for the modification 5. Documents regarding the current status of the organization, personnel, and equipment, etc., of the prospective modification worker, and the details of the parts, components, and services required for the modification work. However, if the prospective modification worker has not yet been selected, documents regarding the selection criteria for the prospective modification worker. 6. Modification Work Order 7. Technical documents proving that the modifications to be made conform to the Railway Vehicle Technical Standards ② When the Minister of Land, Infrastructure and Transport receives an application for approval of modification of a railway vehicle pursuant to Paragraph 1, he/she shall notify the applicant of a modification inspection plan containing the inspection details, timing, methods, and procedures necessary for the approval of modification within 15 days from the date of receipt of the application. [This Article Newly Inserted Nov. 9, 2018] Article 75-4 (Minor Modification of Railway Rolling Stock) ① The phrase “cases where minor modifications are made as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 38-2, Paragraph 2 of the Act refers to any of the following cases: <Amended Aug. 4, 2020> 1. In cases where the strength of the railway vehicle, such as the allowable load capacity, changes to less than 5% due to modifications to the railway vehicle structure, such as the car body structure 2. In cases where the weight and weight distribution of the relevant railway vehicle change to below the standards set forth in each of the following subparagraphs due to changes or replacements in equipment a. Power cars (locomotives) for high-speed and conventional railways: 2/100 B. Passenger cars, freight cars, electric multiple units, and diesel multiple units of high-speed and conventional railways: 4/100 C. Urban rail rolling stock: 5/100 3. Modification or alteration of a device or part that does not fall under any of the following subparagraphs a. Among the running gear, the running gear frame, wheels, and axles B. Braking control device and controller among the braking system C. Inverter and converter among the propulsion system D. Auxiliary power supply E. On-board signaling device (referring to a device installed on a railway vehicle to receive information regarding train operating conditions, etc. from a signaling device installed on the ground and to provide information necessary for the operation of the railway vehicle, such as speed reduction or stopping, to the driver's cab of the railway vehicle) b. On-board communication device G. Integrated Control System A. Parts or devices subject to fire testing in accordance with the Technical Standards for Railway Vehicles . However, parts or devices that meet the fire safety standards under Article 9, Paragraph 1 of the Act on Prevention of Fire, Installation and Maintenance of Firefighting Facilities and Safety Management are excluded. 4. In cases where the equipment is changed to equipment for which type approval has been obtained from the Minister of Land, Infrastructure and Transport pursuant to Article 27 of the Act (limited to cases where both the requirements under Subparagraphs 1 and 2 are satisfied and the owner, etc. has confirmed that the equipment installed on the ground and the parts and components of the railway vehicle are interconnected to ensure smooth functionality) 5. Changes to devices or parts for performance improvement pursuant to a contract with the railway vehicle manufacturer 6. Cases where approval has been obtained from the Korea Railroad Research Institute pursuant to the “Act on the Establishment, Operation, and Promotion of Government-funded Research Institutions, etc. in the Science and Technology Field” for the modification of a representative train set for the purpose of reviewing and testing the feasibility and suitability of railway vehicle modification. 7. Cases where the breakdown or operational disruption of a railway vehicle increases after modification compared to the devices or parts prior to modification, and the devices or parts are urgently replaced with those prior to modification. 8. Other cases recognized by the Minister of Land, Infrastructure and Transport as having a negligible impact on the safety, performance, etc., of railway vehicles ② When applying Paragraph 1, any case falling under any of the following subparagraphs shall not be deemed a modification of railway rolling stock. <Amended Aug. 4, 2020> 1. Replacement or exchange of parts or components performed routinely and repeatedly in accordance with the railway rolling stock maintenance (inspection or repair, etc.) plan. 1-2. Changes to devices or parts pursuant to a warranty contract with the railway vehicle manufacturer 2. Cases where work is performed to improve aesthetics or durability, such as interior or exterior painting of the vehicle. 3. Vehicle maintenance for enhancing passenger convenience and comfort, as well as cleanliness, hygiene, and disease prevention 4. Modification of software not associated with the devices listed in each of the following items a. Towing device B. Braking system C. Control devices related to the safe operation of the vehicle or passenger safety D. Signal and communication devices 5. Improvement of body shape and interior facilities 6. Change in the placement of railway vehicle devices or parts 7. Modification of specifications for parts that can demonstrate or prove performance equivalent to or greater than that of existing parts 8. In cases where the owner, etc. operates the relevant railway vehicle on a dedicated track for test runs or on a track in operation that is not intended for passenger or freight transport, for the purpose of a preliminary review regarding the feasibility, etc. of railway vehicle modification, from 30 minutes after the end of the previous commercial operation until 30 minutes before the start of the next commercial operation (limited to cases where the owner, etc. establishes and implements measures to ensure safe operation) 9. Modification of railway vehicles operating exclusively on dedicated railway lines pursuant to the Railway Business Act 10. Other cases recognized by the Minister of Land, Infrastructure and Transport as matters equivalent to Subparagraphs 1 through 7 ③ If an owner, etc. wishes to report minor modifications to a railway vehicle pursuant to Paragraph 1, they must submit a railway vehicle modification report in accordance with Form No. 45-2 of the attached document to the Minister of Land, Infrastructure and Transport, attaching the documents listed in each of the following subparagraphs, at least 10 days prior to the scheduled start date of the modification work on the relevant railway vehicle. 1. Documents proving that it falls under any of the subparagraphs of Paragraph 1 2. The documents under Article 75-3, Paragraph 1, Subparagraphs 1 through 6 related to Subparagraph 1 ④ If the Minister of Land, Infrastructure and Transport determines that the railway vehicle modification report submitted by the owner, etc. pursuant to Paragraph 3 is appropriate, he/she shall issue a railway vehicle modification report confirmation certificate in accordance with Form No. 45-3 of the attached document . [This Article Newly Inserted Nov. 9, 2018] Article 75-5 (Persons Recognized as Having the Capacity to Modify Railway Vehicles) In Article 38-2, Paragraph 3 of the Act , “persons recognized as having the appropriate modification capacity as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the following persons: 1. Persons with experience in manufacturing the railway vehicle subject to modification or a railway vehicle with similar performance capabilities. 2. Persons with a track record of manufacturing and delivering parts or devices subject to modification. 3. Persons with a track record of maintaining parts or devices subject to modification, or parts or devices with similar performance, for at least one year. 4. Certification maintenance organization pursuant to Article 38-7 , Paragraph 2 of the Act 5. A person who develops new technology for parts or devices, etc., capable of securing performance equivalent to or greater than that of the parts or devices, etc. prior to modification, and installs or improves said parts or devices on railway vehicles. [This Article Newly Inserted Nov. 9, 2018] Article 75-6 (Inspection for Approval of Modification, etc.) ① The inspection for approval of modification pursuant to Article 38-2, Paragraph 4 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. 1. Modification Conformity Inspection: Technical document inspection to determine whether the modification of a railway vehicle conforms to the Railway Vehicle Technical Standards. 2. Inspection of Conformity to Modification: An inspection to determine whether the modification work on the representative train set of the relevant railway vehicle has been carried out in accordance with the technical documents pursuant to Item 1. 3. Modification Type Test: A test to determine whether the modification of a railway vehicle conforms to the Railway Vehicle Technical Standards at the parts, components, finished vehicle, and trial run stages. ② If the Minister of Land, Infrastructure and Transport recognizes that the vehicle conforms to the railway vehicle technical standards as a result of the inspection for approval of modification pursuant to Paragraph 1, he/she shall issue a certificate of approval of modification of a railway vehicle in accordance with Form No. 45-4 of the attached document to the applicant, attaching the railway vehicle modification approval data booklet. ③ In addition to the matters specified in Paragraphs 1 and 2, detailed matters concerning the procedures and methods, etc. for approval of modification shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Nov. 9, 2018] Article 75-7 (Criteria for Disposition Restricting the Operation of Railway Vehicles) The criteria for disposition restricting the operation of railway vehicles against owners, etc. pursuant to Article 38-3, Paragraph 1 of the Act are as set forth in Table 16 . [This Article Newly Inserted Nov. 9, 2018] Article 75-8 (Order for Railway Vehicle Maintenance or Restoration, etc.) ① When the Minister of Land, Infrastructure and Transport orders a railway operator, etc. to maintain railway vehicles or restore the original condition pursuant to Article 38-6, Paragraph 3 of the Act , he/she shall give a period necessary for the correction. ② When the Minister of Land, Infrastructure and Transport orders railway operators, etc. to maintain railway vehicles or restore them to their original condition pursuant to Paragraph 1, he/she shall notify them in writing (including electronic documents; hereinafter the same applies in this Article) by specifying the railway vehicles subject to maintenance and the reasons, etc. ③ In the event that a railway operator, etc. receives an order from the Minister of Land, Infrastructure and Transport for railway vehicle maintenance or restoration to the original condition pursuant to Article 38-6, Paragraph 3 of the Act , they must prepare a plan for corrective measures and submit it in writing to the Minister of Land, Infrastructure and Transport within 14 days from the date of receiving such order, and if the corrective measures are completed, they must notify the Minister of Land, Infrastructure and Transport in writing of the details of the correction without delay. ④ In Article 38-6, Paragraph 3, Subparagraph 3 of the Act , “railway accidents or operational disruptions, etc. prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the following cases: 1. In the event that a train accident or dangerous accident subject to reporting under Article 61 of the Act and Article 86, Paragraph 3 of these Rules occurs due to a defect in a railway vehicle, such as a breakdown of the railway vehicle 2. In cases where fatalities occur due to a railway accident caused by a defect in railway vehicles, such as a breakdown. 3. In cases where delayed operation subject to reporting under Article 61 of the Act and Article 86, Paragraph 3 of these Rules occurs three or more times in a year due to a failure of the same part, component, or device, etc. 4. Other cases determined and announced by the Minister of Land, Infrastructure and Transport to ensure railway operational safety , etc. [This Article Newly Inserted June 18, 2019] Article 75-9 (Application for Maintenance Organization Certification, etc.) ① The maintenance organization certification standards pursuant to Article 38-7, Paragraph 1 of the Act (hereinafter referred to as “maintenance organization certification standards”) are as follows: 1. Ensure that the maintenance organization is staffed with personnel capable of properly performing its duties. 2. Equip facilities, equipment, etc. suitable for the scope of work of the maintenance organization. 3. Establish railway vehicle maintenance manuals, inspection systems, and quality management systems suitable for the scope of work of the maintenance organization. ② Any person who intends to obtain certification of a railway vehicle maintenance organization pursuant to Article 38-7, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport, by attaching materials proving that the organization meets the standards for certification of a railway vehicle maintenance organization, in the form of Annex 45-5, at least 60 days prior to the scheduled commencement of railway vehicle maintenance operations. ③ In order for a person who has received certification for a railway vehicle maintenance organization pursuant to Article 38-7, Paragraph 1 of the Act (hereinafter referred to as the “certified maintenance organization”) to receive certification for a change of certification for the certified maintenance organization pursuant to Paragraph 2 of the same Article, they must submit an application for certification for a change of certification for the certified maintenance organization in the form of Annex 45-6, attached with the following documents, to the Minister of Land, Infrastructure and Transport no later than 30 days prior to the scheduled date of application of the changes. 1. Details of the proposed change and supporting documents 2. Comparison Table and Instructions Before and After Change ④ In addition to the matters set forth in Paragraphs 1 and 2, detailed standards, methods, and procedures, etc. regarding the certification of maintenance organizations shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted June 18, 2019] Article 75-10 (Issuance of Maintenance Organization Certification, etc.) ① When the Minister of Land, Infrastructure and Transportreceives an application for certification or change of certification of a railway vehicle maintenance organization pursuant to Article 75-9, Paragraphs 2 and 3, he/she shall verify whether it conforms to the standards for certification of a maintenance organization pursuant to Article 75-9, Paragraph 1 . ② If the Minister of Land, Infrastructure and Transport recognizes that the organization meets the maintenance organization certification standards as a result of the verification under Paragraph 1, he/she shall issue a railway vehicle maintenance organization certification in the form of Annex 45-7 to the applicant, attaching the operating standards (hereinafter referred to as “maintenance organization operating standards”) that define the types, scope, methods, and quality control procedures of railway vehicle maintenance. ③ Certified maintenance organizations must operate their maintenance organizations in accordance with the maintenance organization operation standards. ④ Detailed standards, procedures, and methods pursuant to Paragraph 1 and detailed matters concerning the standards for the operation of maintenance organizations, etc. pursuant to Paragraph 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport . ⑤ When the Minister of Land, Infrastructure and Transport issues a railway vehicle maintenance organization certification pursuant to Paragraph 2, he/she shall publish the fact in the Official Gazette . [This Article Newly Inserted June 18, 2019] Article 75-11 (Minor Changes to Certification Standards for Maintenance Organizations, etc.) ① The term “minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 38-7, Paragraph 1 of the Act refers to a maintenance organization falling under any of the following subparagraphs. <Amended Oct. 31, 2025> 1. An organization with fewer than 50 people permanently engaged in railway rolling stock maintenance. 2. Among small enterprises under Article 8 of the Enforcement Decree of the Framework Act on Small and Medium Enterprises, enterprises whose main business is transportation and warehousing (referring to transportation and warehousing according to the major classification of the Korean Standard Industrial Classification notified by the Minister of National Data Protection under Article 22 of the Statistics Act ) 3. An organization that maintains railway vehicles operating exclusively on dedicated railway lines pursuant to the Railway Business Act ② In the proviso to Article 38-7, Paragraph 2 of the Act , “changes to minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to changes to any of the matters falling under any of the following subparagraphs. 1. Changes within a range of 10% or less of the personnel performing work related to railway vehicle maintenance, based on the workplace for railway vehicle maintenance. 2. Changes within the scope of 10,000 square meters or less of the land area directly used for railway vehicle maintenance, based on the workplace for railway vehicle maintenance. 3. Other changes to facilities or equipment that do not cause a significant impact on the safety and quality of railway rolling stock maintenance. ③ Notwithstanding Paragraph 2, a certified maintenance organization may not file a report regarding a change in maintenance organization certification (hereinafter referred to as “report on change of certification” in this Article) in any of the following cases: 1. In cases where the personnel performing duties related to railway vehicle maintenance change by 5% or less, based on the workplace for railway vehicle maintenance 2. In cases where the area directly used for railway vehicle maintenance changes within a range of 3,000 square meters or less, based on the workplace for railway vehicle maintenance 3. Replacement or improvement of facilities or equipment, etc. for railway vehicle maintenance 4. Other changes that do not affect the safety and quality of railway vehicle maintenance ④ In order for a certified maintenance organization to report a minor change to the certified maintenance organization pursuant to the proviso of Article 38-7, Paragraph 2 of the Act , it must submit a report on the change of certified maintenance organization in Form No. 45-8 of the attached document to the Minister of Land, Infrastructure and Transport, attaching the documents of each of the following subparagraphs. 1. Planned changes and supporting documents 2. Comparison Table and Instructions Before and After Change ⑤ When the Minister of Land, Infrastructure and Transport receives a report on a change of certified maintenance organization pursuant to Paragraph 4, he/she shall verify whether it conforms to the maintenance organization certification standards and then issue a confirmation of the report on a change of certified maintenance organization in the form of Annex 45-9 . ⑥ In addition to the matters specified in paragraphs 2 through 5, detailed methods and procedures, etc. regarding the notification of change of certification shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted June 18, 2019] Article 75-12 (Cancellation of Certification of Certified Maintenance Organization, etc.) ① The term “railway accidents and serious operational disruptions prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 38-10, Paragraph 1, Subparagraph 2 of the Act refers to any of the following cases: 1. In the event of a fatality due to a railway accident 2. In the event that property damage of 500 million won or more occurs due to a railway accident or operational disruption ② The criteria for dispositions such as cancellation of maintenance organization certification, restriction or suspension of business, etc., pursuant to Article 38-10, Paragraph 2 of the Act are as set forth in Table 17 . ③ When the Minister of Land, Infrastructure and Transport has taken action pursuant to Paragraph 2, he/she shall notify the certified maintenance organization of the administrative action of the designated agency in the form of Annex 11-3 without delay and publish the fact in the Official Gazette. [This Article Newly Inserted June 18, 2019] Article 75-13 (Timing of Implementation of Detailed Safety Diagnosis) ① Pursuant to Article 38-12, Paragraph 1 of the Act, the owner, etc. shall undergo a detailed safety diagnosis regarding the physical usability and safety performance, etc. of the relevant railway vehicle (hereinafter referred to as the “Initial Detailed Safety Diagnosis”) before the expiration of the period classified in each of the following subparagraphs. However, if a detailed safety diagnosis is received before the expiration of the period classified in each of the following subparagraphs due to frequent breakdowns, fires, collisions, etc., such detailed safety diagnosis shall be deemed the Initial Detailed Safety Diagnosis. <Amended Oct. 7, 2020> 1. Railway vehicles for which a purchase contract was concluded on or after March 19, 2014: 20 years from the date of issuance of the Certificate of Completion Inspection of Railway Vehicles pursuant to Article 26-6, Paragraph 2 of the Act 2. Railway vehicles for which purchase contracts were concluded by March 18, 2014: 20 years from the date commercial trial operation commenced pursuant to Article 75, Paragraph 5, Subparagraph 2 ② Notwithstanding Paragraph 1, the Minister of Land, Infrastructure and Transport may separately determine the timing and method of the initial precision safety inspection, etc., taking into consideration the special characteristics of railway vehicle maintenance, such as maintenance cycles and methods; and railway vehicles pursuant to Article 26, Paragraph 4, Subparagraph 4 of the Act , such as railway vehicles for accident recovery, work, or testing, and railway vehicles operating exclusively on dedicated railway lines pursuant to the Railway Business Act, may undergo the initial precision safety inspection prior to the expected lifespan specified in the manufacturing manual or purchase contract of the relevant railway vehicle. <Amended Aug. 27, 2021> ③ Owners, etc. shall undergo a re-detailed safety inspection (hereinafter referred to as “periodic detailed safety inspection”) regarding the physical usability and safety performance, etc. of railway vehicles recognized as being capable of continued use as a result of the detailed safety inspections conducted pursuant to Paragraphs 1 and 2, every five years based on the periods specified in each subparagraph of Paragraph 1; the same shall apply even if the vehicles are recognized as capable of continued use as a result of the periodic detailed safety inspection. However, the Minister of Land, Infrastructure and Transport may separately determine the timing and method, etc., of the periodic detailed safety inspection, taking into consideration the special characteristics of railway vehicle maintenance, such as maintenance cycles and methods. <Amended Aug. 27, 2021> ④ Notwithstanding Paragraph 3, for railway vehicles where a serious accident such as a collision, rear-end collision, derailment, or fire occurs during operation after the initial detailed safety inspection or periodic detailed safety inspection, and where a detailed safety inspection of the safety or performance of the railway vehicle is required, a detailed safety inspection must be conducted before the railway vehicle is put into operation. In this case, the timing of the periodic detailed safety inspection shall be calculated based on the date on which continued use was deemed appropriate as a result of the previous periodic detailed safety inspection. ⑤ Notwithstanding Paragraph 3, for a railway vehicle in which repetitive failures due to the electrical or mechanical characteristics of electrical or electronic devices or their components occur three or more times (based on actual operating train units) after the initial precision safety inspection or periodic precision safety inspection, a condition assessment and safety assessment based on the failure characteristics of the railway vehicle must be carried out within one year from the date the repetitive failures occurred three times. [This Article Newly Inserted June 18, 2019] Article 75-14 (Application for Detailed Safety Diagnosis, etc.) ① Owners, etc. shall submit an application for detailed safety diagnosis of railway vehicles in the form of Annex 45-10, attached with documents proving or supporting the matters in each of the following subparagraphs, to a detailed safety diagnosis agency designated by the Minister of Land, Infrastructure and Transport pursuant to Article 38-13, Paragraph 1 of the Act (hereinafter referred to as the “Detailed Safety Diagnosis Agency”) no later than 60 days prior to the completion date of the detailed safety diagnosis of railway vehicles subject to detailed safety diagnosis. <Amended Jan. 18, 2023> 1. Detailed Safety Diagnosis Plan 2. Technical data such as manufacturing specifications, drawings, inspection reports, and tolerances for precise safety diagnosis assessment 3. History of serious accidents involving railway vehicles (limited to applicable cases) 4. Details of replacement of major parts of railway vehicles (limited to applicable cases) 5. Details of modifications and repairs to items subject to detailed safety inspection (limited to applicable cases) 6. Test reports for electrical characteristics inspection and wire degradation inspection (an inspection that measures chemical and physical changes in wires due to external and internal influences) (limited to applicable cases) ② The detailed safety diagnosis plan pursuant to Paragraph 1, Subparagraph 1 shall include the following items: 1. Vehicles and Quantity Subject to Detailed Safety Inspection 2. Target Items by Vehicle Model Subject to Precision Safety Inspection 3. Schedule and Location of Detailed Safety Inspection 4. Safety Management Plan 5. Matters concerning the use of equipment, etc. to be used for precise safety inspection 6. Other reference materials necessary for the detailed safety diagnosis ③ The precision safety diagnosis agency may request supplementation of the precision safety diagnosis application submitted by the owner, etc. pursuant to Paragraph 1. ④ When a precision safety inspection agency receives an application for a precision safety inspection of railway vehicles pursuant to Paragraph 1, it shall review the submitted documents, consult with the applicant to finalize the precision safety inspection plan, and notify the applicant and the Korea Transportation Safety Authority thereof. <Amended Jan. 18, 2023> ⑤ If a change to the detailed safety diagnosis plan under Paragraph 4 is necessary, the applicant for the detailed safety diagnosis may request the change by submitting the documents listed in the following subparagraphs to the detailed safety diagnosis agency. In this case, the detailed safety diagnosis agency that receives the request may review the safety impact of the changes and, if deemed appropriate, change the detailed safety diagnosis plan. 1. Content to be changed 2. Reasons for the proposed change and explanatory materials [This Article Newly Inserted June 18, 2019] Article 75-15 (Extension or Deferral of Detailed Safety Inspection of Railway Vehicles) ① Pursuant to Article 38-12, Paragraph 3 of the Act, if an owner, etc. wishes to receive an extension or deferral of the detailed safety inspection period from the Minister of Land, Infrastructure and Transport due to railway vehicles subject to detailed safety inspection being concentrated at a specific time or other unavoidable reasons, they must apply to the Minister of Land, Infrastructure and Transport no later than five years prior to the scheduled inspection date, specifying the type and quantity of railway vehicles for which the extension or deferral is sought, the period for which the extension or deferral is sought, and the reason thereof. However, if there are urgent reasons, etc., the application may be made one year prior to the scheduled inspection date. ② When the Minister of Land, Infrastructure and Transport receives an application from the owner, etc., for an extension or deferment of the precise safety inspection period pursuant to Paragraph 1, the Minister may extend or defer the precise safety inspection period for the relevant railway vehicle after reviewing the feasibility regarding the train operation plan, whether inspections or maintenance of a nature similar to the precise safety inspection are being carried out, conditions for conducting the precise safety inspection, and the safety of the railway vehicle. [This Article Newly Inserted June 18, 2019] Article 75-16 (Methods for Detailed Safety Diagnosis of Railway Vehicles, etc.) ①Detailed safety diagnosis pursuant to Article 38-12, Paragraph 1 of the Act shall be carried out in accordance with the classifications in each of the following subparagraphs. 1. Condition Assessment: Dimensional and Visual Inspection of Railway Vehicles 2. Safety Assessment: Defect Inspection, Electrical Characteristics Inspection, and Wire Deterioration Inspection 3. Performance Evaluation: Reverse driving test, braking test, vibration test, and ride comfort test ② In addition to the matters set forth in Article 75-14 and Paragraph 1, necessary matters concerning the timing, standards, methods, and procedures, etc. of precise safety inspections shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted June 18, 2019] Article 75-17 (Criteria and Procedures for Designation of Precision Safety Inspection Agency, etc.) ①Any person who intends to be designated as a precision safety inspection agency pursuant to Article 38-13, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for designation as a precision safety inspection agency for railway vehicles in the form of Annex 45-11 , attaching the documents of each of the following subparagraphs. 1. Operational Plan 2. Articles of incorporation or equivalent agreements (applicable only to corporations or organizations) 3. Current status of specialized personnel responsible for precise safety inspections and documents proving the qualifications, education, and experience of technical personnel 4. Regulations on Precision Safety Diagnosis Work 5. List of facilities and equipment required for precise safety inspection 6. Impression of the official seal used by the precision safety inspection agency ② The criteria for designating a precision safety inspection agency pursuant to Article 38-13 , Paragraph 1 of the Act are as follows: 1. Establish a permanent dedicated organization capable of performing precise safety inspection work. 2. Secure technical personnel capable of performing precision safety inspection work. 3. Be equipped with facilities and equipment to perform precise safety inspection work. 4. Establish operational regulations regarding the operation, etc. of the precision safety inspection agency. 5. There must not be any record of the designation as a precision safety inspection agency being revoked or business suspended pursuant to Article 38-13, Paragraph 3 of the Act within one year from the date of application for designation. 6. If work other than the precise safety diagnosis is being performed, there shall be no risk that the precise safety diagnosis work will be performed unfairly as a result of performing such work. 7. Not a manufacturer or seller of railway vehicles 8. In addition, it must comply with the detailed criteria for the designation of precision safety inspection agencies determined and notified by the Minister of Land, Infrastructure and Transport. ③ The Minister of Land, Infrastructure and Transport, upon receiving an application for designation as a precision safety inspection agency pursuant to Paragraph 1, shall review whether to designate the agency in accordance with the designation criteria in each subparagraph of Paragraph 2, and if deemed appropriate, issue a certificate of designation as a precision safety inspection agency for railway vehicles in the form of Annex 45-12 to the applicant. ④ The Minister of Land, Infrastructure and Transport shall review annually whether a precision safety inspection agency meets the designation criteria under paragraph 2. ⑤ If a person designated as a precision safety diagnosis agency by the Minister of Land, Infrastructure and Transport pursuant to Paragraph 3 has a change in its name, representative, address, or other matters that have a significant impact on the performance of precision safety diagnosis work, it must notify the Minister of Land, Infrastructure and Transport of such fact within 15 days from the date the cause occurred. ⑥ When the Minister of Land, Infrastructure and Transport designates a precision safety inspection agency pursuant to Paragraph 3 or receives a notification pursuant to Paragraph 5, he/she shall publish it in the Official Gazette without delay. However, minor matters determined and published by the Minister of Land, Infrastructure and Transport shall be excluded. ⑦ Other matters necessary for the designation standards and procedures of precision safety inspection agencies shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted June 18, 2019] Article 75-18 (Duties of Precision Safety Inspection Agencies) The scope of duties of precision safety inspection agencies is as follows: 1. Implementation of precise safety inspections on railway vehicles in the relevant business field 2. Investigation and review of items and standards for precise safety diagnosis 3. Request for enactment and revision of items and standards for precise safety inspection 4. Duties regarding the preservation and protection of records of precise safety inspections 5. Other tasks deemed necessary by the Minister of Land, Infrastructure and Transport [This Article Newly Inserted June 18, 2019] Article 75-19 (Cancellation of Designation of Precision Safety Inspection Agency, etc.) ①The standards for cancellation of designation and suspension of business of a precision safety inspection agency pursuant to Article 38-13, Paragraph 3 of the Act are as set forth in Table 18 . ② In cases where the Minister of Land, Infrastructure and Transport cancels the designation of a precision safety diagnosis agency or imposes a disposition of suspension of business pursuant to Article 38-13, Paragraph 3 of the Act , he/she shall notify the precision safety diagnosis agency of the administrative disposition of the precision safety diagnosis agency in the form of Annex 11-3 without delay and publish the fact in the Official Gazette. [This Article Newly Inserted June 18, 2019] Article 75-20 (Evaluation of Results of Detailed Safety Diagnosis) ① The Korea Transportation Safety Authority shall evaluate the results of the relevant detailed safety diagnosis (hereinafter referred to as “results of detailed safety diagnosis”) performed by a detailed safety diagnosis agency pursuant to Article 38-14, Paragraph 1 of the Act in any of the following cases : 1. Cases where defects posing a serious risk to railway operational safety, such as cracks in the frame or body on which the wheels are mounted, are discovered within 5 years after a detailed safety inspection, and the owner, etc. requests it 2. Cases where it is recognized that there is a risk of a substandard diagnosis as a precision safety diagnosis agency conducts the diagnosis in violation of the Act or an order issued pursuant to the Act 3. Other cases determined and notified by the Minister of Land, Infrastructure and Transport to prevent deficiencies in precise safety inspections ② When the Korea Transportation Safety Authority evaluates the results of a detailed safety diagnosis, it must include the following items in the evaluation: 1. Appropriateness of the evaluation methods and results pursuant to each subparagraph of Article 75-16 , Paragraph 1 2. Comprehensive Review of the Detailed Safety Diagnosis Report 3. Other matters determined and notified by the Minister of Land, Infrastructure and Transport for the operational safety of railway vehicles ③ The evaluation of the results of the detailed safety diagnosis shall be conducted using the methods specified in each of the following subparagraphs. However, if it is deemed that the diagnosis of substandard quality can be determined solely through document evaluation, the on-site evaluation may be omitted. 1. Document Evaluation: An evaluation conducted on the detailed safety diagnosis plan and detailed safety diagnosis result report submitted by the detailed safety diagnosis agency to determine whether the detailed safety diagnosis was properly performed in accordance with the implementation guidelines under Article 75-16, Paragraph 2 . 2. On-site evaluation: An evaluation conducted on-site to verify the facts. ④ When the Korea Transportation Safety Authority evaluates the results of a detailed safety diagnosis, it shall notify the results to the persons or institutions listed in the following subparagraphs after the evaluation is completed. However, if a poor diagnosis by the detailed safety diagnosis agency is confirmed before the evaluation of the results is completed, the fact shall be reported immediately to the Minister of Land, Infrastructure and Transport. 1. Owners, etc. who requested a detailed safety diagnosis pursuant to Article 38-12, Paragraphs 1 and 2 of the Act 2. A precision safety inspection agency that performed the precision safety inspection of railway vehicles pursuant to Article 38-12 , Paragraph 5 of the Act 3. Minister of Land, Infrastructure and Transport ⑤ In addition to the matters prescribed in paragraphs 1 through 4, the Minister of Land, Infrastructure and Transport shall determine and announce the necessary detailed matters regarding the standards for evaluating the results of the detailed safety diagnosis, notification of results, and follow-up measures . [This Article Newly Inserted Jan. 18, 2023] Article 76 (Scope and Contents of Railway Traffic Control Services, etc.) ① Cases falling under any of the following subparagraphs shall beexcluded from the scope of railway traffic control services (hereinafter referred to as “control services”) performed by the Minister of Land, Infrastructure and Transport pursuant to Article 39-2 of the Act . <Amended Dec. 20, 2023> 1. When operating railway vehicles on a newly constructed or improved line prior to normal operation 2. Cases where railway vehicles are operated at vehicle maintenance depots and vehicle holding facilities for the repair and maintenance of railway vehicles pursuant to Article 3, Subparagraph 2 , Item B of the Framework Act on the Development of the Railway Industry ② The contents of the control duties performed by the Minister of Land, Infrastructure and Transport pursuant to Article 39-2, Paragraph 4 of the Act are as follows: <Amended Dec. 20, 2023> 1. Centralized control, supervision, and monitoring of railway vehicle operation 2. Services for providing advice and information related to the operation of railway vehicles, such as the operational status of railway facilities 3. Train operation control duties in the event of an act falling under any of the subparagraphs of Article 45, Paragraph 1 of the Act within a railway protection zone 4. Duties regarding accident recovery, directing of emergency rescue and relief in the event of railway accidents, etc., and reporting and disseminating the situation to relevant agencies 5. Other matters instructed by the Minister of Land, Infrastructure and Transport for the safe operation of railway vehicles, etc. ③ Railway operators, etc. shall promptly notify the Minister of Land, Infrastructure and Transport if a railway accident, etc. occurs or if there is suspicion that railway facilities or railway vehicles, etc. are not in a normal state. ④ Detailed standards, procedures, and methods regarding control operations shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Mar. 19, 2014] Article 76-2 Deleted <June 23, 2021> Article 76-3 (Standards for Storage and Storage Period of Video Records) ① Railway operators, etc. shall store video records recorded on video recording devices for the storage period prescribed in the Guidelines for the Operation and Management of Video Recording Devices pursuant to Article 32 of the Enforcement Decree (hereinafter referred to as the “storage period”). In this case, the storage period shall be at least three days. <Amended May 27, 2020> ② Railway operators, etc. shall delete video records for which the retention period has expired. However, if a request for the provision of video records is received within the retention period in accordance with any of the subparagraphs of Article 39-3, Paragraph 4 of the Act , such video records shall not be deleted until they are provided. <Amended May 27, 2020> [This Article was newly added on Jan. 20, 2017.] [Formerly Article 76-3 was moved to Article 76-5 <Jan. 20, 2017>] Article 76-4 (Matters to be Complied With by Personnel Engaged in Driving Duties) ① The term “measures prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport before the departure of a railway vehicle” in Article 40-2, Paragraph 1, Subparagraph 1 of the Act refers to each of the following subparagraphs. 1. When a railway vehicle departs from a vehicle maintenance depot pursuant to Article 3, Subparagraph 2, Item ( b) of the Framework Act on the Development of the Railway Industry, verify whether there are any abnormalities in the functions of each of the following items: a. Functions of devices related to driving control B. Braking system function C. Other functions of various instrument panels used while driving 2. When a railway vehicle departs from a station, check whether passengers have boarded or alighted. However, this shall not apply if a passenger crew member checks on their behalf. ② In Article 40-2, Paragraph 1, Subparagraph 2 of the Act , “safety rules regarding the operation of railway vehicles prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to each of the following subparagraphs. 1. Operate railway vehicles in accordance with railway signals. 2. Electronic devices, such as mobile phones, shall not be used during the operation of railway vehicles. However, this shall not apply in cases falling under any of the following subparagraphs where the railway operator has permitted use in advance to the extent that it does not impair the safety of operation. a. In the event of an emergency, such as a railway accident or a malfunction of a railway vehicle B. Cases where the use of electronic devices is necessary for the safe operation of railway vehicles c. Other cases where the railway operator determines that it does not impede the safe operation of railway vehicles 3. Operate in accordance with the speed limits for each section determined by the railway operator. 4. Do not reverse the train. However, this shall not apply if instructed by a control officer due to reasons such as the occurrence of an emergency. 5. No stopping shall be made except at stations. However, this shall not apply in cases where stopping is required for the safe operation of railway vehicles, such as in compliance with stop signals. 6. If any abnormalities are detected in the operating section, report them immediately to the control center personnel. 7. Follow the instructions of control personnel. [This Article newly inserted Aug. 10, 2016] [Moved from Article 76-2; former Article 76-4 moved to Article 76-6 <Jan. 20, 2017>] Article 76-5 (Compliance Requirements for Air Traffic Control Personnel) ① Pursuant to Article 40-2, Paragraph 2 , Subparagraph 1 of the Act , air traffic control personnel shall provide the information in each of the following subparagraphs to drivers, passenger crew members, orpersons pursuant to Article 3, Subparagraph 4 of the Enforcement Decree . 1. Information regarding changes in train operations, such as train departures, stops, and route changes 2. Information in each of the following items that may affect train operations a. Information on changes to construction and work around railway tracks where vehicles operate B. Information related to railway accidents, etc. C. Disaster-related information D. Information regarding terrorist incidents or other emergency situations ② In Article 40-2, Paragraph 2, Subparagraph 2 of the Act , “measures prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to each of the following subparagraphs. <Amended Dec. 30, 2016; Oct. 7, 2020> 1. In the event of a railway accident, ascertain the current status of the accident site, including whether measures have been taken for passenger evacuation and railway vehicle protection. 2. If necessary to manage railway accidents, etc., take the following measures: a. Control of train operations at the accident site B. Request support from relevant agencies, such as medical institutions and fire departments C. Request for dispatch of railway personnel for accident recovery D. Instruction to take measures to prevent railway vehicles from rolling in order to prevent secondary accidents. E. Instructions for necessary measures for passenger evacuation, such as announcements f. Measures to cut off the electricity supply to the overhead line (referring to a device that supplies electricity to railway vehicles through the tracks) d. Operation instructions for rescue trains or temporary trains Ah. Adjustment of train operating intervals 3. Record and manage the causes of railway accidents, delay times, etc., factually. [This Article was newly added on Aug. 10, 2016.] [Moved from Article 76-3 on Jan. 20, 2017.] Article 76-6 (Compliance Requirements for Work Supervisors) ①A work supervisor pursuant to Article 2, subparagraph 10, item (e) of the Act (hereinafter referred to as “work supervisor”) shall conduct safety training for workers, including the following matters, before performing work, in accordance with Article 40-2, paragraph 3, subparagraph 1 of the Act . 1. Work plan for the relevant work day (including workload, work schedule, work sequence, work method, duties for each worker and method of movement to the workplace, etc.) 2. Matters concerning the protection of workers, such as the wearing of safety equipment 3. Safety measures for risk factors based on work characteristics and site conditions 4. Matters concerning communication methods between work supervisors and workers, work control methods, and compliance therewith 5. Matters concerning the prevention of railway accidents in the case of work using equipment such as construction machinery 6. Other matters necessary for the prevention of safety accidents as determined and notified by the Minister of Land, Infrastructure and Transport ② In Article 40-2, Paragraph 3, Subparagraph 2 of the Act , “measures concerning work safety prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to each of the following subparagraphs. 1. Adjustment and supplementation of work plans, etc. in accordance with the adjustment contents under Article 40-2, Paragraph 4 , Subparagraphs 1 and 2 of the Act 2. Measures for each of the following items before performing the work a. Checking the status of workers' safety equipment B. Inspection of safety equipment and facilities required for the work c. Other measures necessary prior to the performance of work as determined and notified by the Minister of Land, Infrastructure and Transport 3. Prohibition of leaving the work site during working hours 4. Measures such as train protection in the event of an emergency during work 5. Verify whether the work interferes with train operations 6. Report to your supervisor upon completion of the task. 7. Other matters necessary for occupational safety as determined and notified by the Minister of Land, Infrastructure and Transport [This Article was newly added on Jan. 4, 2019.] [Formerly Article 76-6 was moved to Article 76-8 <Jan. 4, 2019>] Article 76-7 (Matters to be Complied With by Railway Operation Safety Managers) In Article 40-2, Paragraph 4, Subparagraph 3 of the Act , “matters concerning train operation and work safety prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to each of the following subparagraphs. <Amended Apr. 9, 2024> 1. Notify the work supervisor of the details of the adjustments pursuant to Article 40-2, Paragraph 4 , Subparagraphs 1 and 2 of the Act 2. Duties pursuant to Article 59, Paragraph 2, Subparagraph 1 of the Enforcement Decree 3. Measures for each of the following items before performing the work a. Inspection of the safety equipment wearing status and portable items of train operation monitors assigned pursuant to Article 407, Paragraph 1 of the "Rules on Industrial Safety and Health Standards" B. Other measures necessary prior to the performance of work as determined and notified by the Minister of Land, Infrastructure and Transport 4. Establishment of a communication system with the manager in charge of the station under jurisdiction (including persons handling railway signals, track switches, or control panels, etc. at the station; hereinafter the same applies in Article 76-9 ) and the work supervisor. 5. Prohibition of leaving the work site during working hours 6. Measures regarding the readjustment of work schedules and train operation schedules in the event of work delays or emergencies during work 7. Other matters necessary for train operation and work safety as determined and notified by the Minister of Land, Infrastructure and Transport [This Article Newly Inserted Jan. 4, 2019] Article 76-8 (Follow-up Measures, etc. in the Occurrence of Railway Accidents, etc.) ① Pursuant to the main text of Article 40-2, Paragraph 5 of the Act , drivers and passenger crew members shall implement the follow-up measures set forth in each of the following subparagraphs. In this case, drivers and passenger crew members may divide their respective roles regarding the follow-up measures and implement them accordingly. <Amended Jan. 4, 2019> 1. Disseminate information regarding railway accidents, etc., to control personnel or railway personnel at adjacent stations. 2. Provide announcements inside the railway vehicle. However, if announcements cannot be made using a broadcasting device, announcements must be made using a loudspeaker or similar device. 3. Evacuate passengers from railway vehicles if necessary to ensure passenger safety. 4. Take measures to prevent railway vehicles from rolling in order to prevent secondary accidents. 5. Open the emergency doors of railway vehicles if necessary to ensure passenger safety. 6. In the event of casualties, provide emergency treatment to patients or assist in their urgent transport to a medical institution. ② In the proviso to Article 40-2, Paragraph 5 of the Act , the phrase “cases prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as cases where transfer to a medical institution is necessary” refers to any of the following cases: <Amended Jan. 4, 2019> 1. Cases where a driver or passenger crew member needs to be transported to a medical institution due to serious injury, etc. 2. When notified by control personnel or the person in charge of managing railway accidents, etc. that it is possible to leave the scene of the railway accident, etc. 3. Cases where it is necessary to leave the scene for the safety of drivers and passenger crew after safely evacuating passengers [This Article was newly added on Aug. 10, 2016.] [Moved from Article 76-6 on Jan. 4, 2019.] Article 76-9 (Preparation of Consultation Documents Related to Construction and Management Work of Railway Facilities, etc.) ① When a railway operation safety manager, a manager in charge of a station under jurisdiction, and a person engaged in control dutiespursuant to Article 40-2, Paragraph 6 of the Act and Paragraph 4, Subparagraph 2 of the same Act , they shall prepare a consultation document containing the matters of each of the following subparagraphs. 1. Name and Affiliation of the Parties to the Consultation 2. Date, section, content, and personnel of the work subject to consultation 3. Results of consultations on work schedule and train operation schedule 4. Details of control approvals for control personnel based on the results of the consultation under Item 3 5. Other matters deemed necessary for work safety as determined and notified by the Minister of Land, Infrastructure and Transport ② The railway operation safety manager, the manager in charge of the relevant station, and the control personnel shall each retain the consultation document prepared pursuant to Paragraph 1 for three months from the date of completion of the work subject to consultation. <Amended July 17, 2024> [This Article Newly Inserted April 9, 2024] Article 77 (Exceptions to the Prohibition on Carrying Hazardous Goods) The phrase “cases for the performance of specific duties prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 42, Paragraph 1 of the Act refers to cases where any person falling under any of the following subparagraphs carries or loads hazardous goods in order to perform their duties. <Amended Mar. 23, 2013; Dec. 20, 2023; Sep. 27, 2024> 1. State public officials engaged in railway police duties pursuant to Article 5, Subparagraph 11 of the Act on Persons Authorized to Perform the Duties of Judicial Police Officers and the Scope of Their Duties (hereinafter referred to as “Special Railway Judicial Police Officers”) 2. Persons performing the duties of a police officer pursuant to Article 2 of the Act on the Execution of Duties by Police Officers 3. Security guards pursuant to Article 2 of the Security Services Act 4. Soldiers escorting a military train transporting dangerous goods [Wholly Amended Dec. 10, 2012] Article 78 (Types of Hazardous Goods, etc.) ① The types of hazardous goods pursuant to Article 42, Paragraph 2 of the Act are as follows: <Amended Aug. 10, 2016; Dec. 20, 2023> 1. Explosives: Gunpowder, explosives, chemical products, and other explosive substances pursuant to the Act on the Safe Management of Firearms, Swords, Explosives, etc. 2. High-pressure gas: Substances having a critical temperature below 50 degrees Celsius; substances having an absolute pressure exceeding 300 kilopascals at 50 degrees Celsius (referring to pressure where vacuum is zero; hereinafter the same applies); substances having an absolute pressure exceeding 280 kilopascals at 21.1 degrees Celsius or 730 kilopascals at 54.4 degrees Celsius; or flammable substances in a liquid state having an absolute gas pressure exceeding 280 kilopascals at 37.8 degrees Celsius (referring to gas pressure where vacuum is zero). 3. Flammable liquids: Liquids with a flash point of 60.5°C or lower according to the closed-circuit flash point test, or liquids with a flash point of 65.6°C or lower according to the open-circuit flash point test. 4. Flammable substances: Substances specified in each of the following items a. Flammable solid: A flammable solid that is easily ignited by a fire source or the like and can promote a fire. B. Spontaneous combustible substances: Substances that generate heat or are prone to spontaneous combustion due to friction, moisture absorption, chemical changes, etc., under normal transportation conditions. C. Other flammable substances: Substances that react with water to produce flammable gases. 5. Oxidizing substances: Substances specified in each of the following items a. Oxidizing substances: Substances that have the property of oxidizing other substances, excluding organic peroxides. B. Organic peroxides: Organic substances that have the property of oxidizing other substances. 6. Toxic substances: Substances specified in each of the following items a. Toxic substance: A substance that causes strong toxic effects or irritation when inhaled, contacted, or ingested by a person. B. Substances that easily transmit toxins: Live pathogens and substances recognized as containing live pathogens or having pathogens attached. 7. Radioactive materials: Nuclear materials and radioactive materials pursuant to Article 2 of the Atomic Energy Safety Act , or materials contaminated by such materials, having a radioactivity concentration of 74 kilobecquerels per kilogram (0.002 microcuries per gram) or higher. 8. Corrosive substances: Substances that cause severe harm to biological tissues through chemical reactions upon contact, or substances that cause material damage upon contact with train bodies, cargo, etc. 9. Anesthetic substances: Substances with anesthetic properties or substances of similar nature that cause extreme pain or discomfort, preventing cabin crew from performing normal duties. 10. Firearms, bladed weapons, etc.: Firearms, bladed weapons, and weapons equivalent thereto pursuant to the Act on the Safe Management of Firearms, Bladed Weapons, Explosives, etc. 11. Other hazardous substances: Substances other than those in subparagraphs 1 through 10 that may cause harm to humans or material damage to goods loaded on the train due to chemical changes, etc. ② Railway operators, etc. may permit the carrying or loading of hazardous goods pursuant to Paragraph 1 after reviewing the appropriateness of such carrying or loading, as well as the appropriateness of packaging and safety measures. In this case, a label indicating that the relevant hazardous goods are hazardous goods must be affixed to a conspicuous place, such as the outer surface of the packaging. [Wholly Amended Dec. 10, 2012] Article 79 (Places Prohibited from Passenger Entry) In Article 47, Paragraph 1, Subparagraph 1 of the Act , the term “places prohibited from passenger entry prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the places listed in each of the following subparagraphs. <Amended Mar. 23, 2013; Jan. 4, 2019> 1. Driver's cab 2. Engine room 3. Power Generation Room 4. Broadcasting Room [Wholly Amended Dec. 10, 2012] Article 80 (Prohibited Acts on Passenger Trains) The term “acts prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 47, Paragraph 1, Subparagraph 7 of the Act refers to any of the following acts: <Amended Mar. 23, 2013; Jan. 4, 2019> 1. The act of boarding or carrying animals or plants that may pose a risk of harm to passengers on a passenger train without safety measures. 2. The act of a person with a legally designated infectious disease posing a risk of transmission to others boarding a passenger train without the permission of a railway employee. 3. Acts that cause inconvenience to passengers by soliciting donations, selling or distributing goods, or giving speeches or making solicitations without the permission of railway employees. [Wholly Amended Dec. 10, 2012] Article 80-2 (Method of Providing Notice on Prohibited Acts on Passenger Trains) When a railway operator provides notice of prohibited acts on passenger trains pursuant to Article 47, Paragraph 4 of the Act , it shall provide such notice at railway facilities, such as passenger trains and platforms, in any of the following ways. <Amended Sep. 27, 2024> 1. Installation of postings or information boards regarding prohibited behaviors on passenger trains 2. Guidance via video or audio [This Article Newly Inserted June 23, 2021] Article 81 (Zones Prohibited from Stockpiling Explosives, etc.) In Article 48, Paragraph 1, Subparagraph 4 of the Act , the term “zones or facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the zones or facilities listed in each of the following subparagraphs. <Amended Mar. 23, 2013; Sep. 27, 2024> 1. Stations and tracks (including structures supporting stations or tracks and surrounding areas) 2. Railway History 3. Railway bridge 4. Railway tunnel [Wholly Amended Dec. 10, 2012] Article 82 (Explosives, etc. Prohibited from Storage) In Article 48, Paragraph 1, Subparagraph 4 of the Act , the term “explosives or highly flammable objects prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to dangerous goods under Articles 44 and 45 of the Enforcement Decree that possess explosive power capable of damaging surrounding objects, cause fire, or generate harmful smoke, thereby posing a risk of harm to passengers or the general public. <Amended Mar. 23, 2013; Sep. 27, 2024> [Wholly Amended Dec. 10, 2012] Article 83 (Railway Facilities Prohibited from Entry) The term “railway facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 48, Paragraph 1, Subparagraph 5 of the Act refers to the railway facilities listed in each of the following subparagraphs. <Amended Mar. 23, 2013; Sep. 27, 2024> 1. Places where hazardous materials are loaded or stored 2. Installation locations for signal and communication equipment and installation locations for power equipment and control facilities 3. Locations with refueling facilities for railway operations 4. Railway Rolling Stock Maintenance Facilities [Wholly Amended Dec. 10, 2012] Article 84 (Hazardous Substances That May Hinder Train Operations) In Article 48, Paragraph 1, Subparagraph 7 of the Act , the term “hazardous substances prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to industrial waste or household waste that may hinder train operations by damaging railway facilities or railway vehicles or by interfering with their normal function or operation. <Amended Mar. 23, 2013; Sep. 27, 2024> [Wholly Amended Dec. 10, 2012] Article 85 (Prohibited Acts for the Maintenance of Order) The term “prohibited acts prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 48, Paragraph 1, Subparagraph 11 of the Act refers to any of the following acts: <Amended Mar. 23, 2013; Aug. 10, 2016; Sep. 27, 2024> 1. The act of smoking in railway facilities or railway vehicles where smoking is prohibited. 2. The act of attaching or distributing advertisements on railway facilities or railway vehicles without the permission of railway employees. 3. The act of soliciting donations, selling or distributing goods, or giving speeches or making solicitations at a railway facility without the permission of a railway employee. 4. Hunting using firearms along the tracks without the permission of railway employees [Wholly Amended Dec. 10, 2012] Article 85-2 (Methods and Procedures for Conducting Security Screening, etc.) ① The scope of conducting security screening (hereinafter referred to as “security screening”) conducted pursuant to Article 48-2, Paragraph 1 of the Act shall be as classified in each of the following subparagraphs. 1. Comprehensive Screening: Conducted on all subjects subject to security screening at stations designated by the Minister of Land, Infrastructure and Transport in cases where the Minister deems it necessary to strengthen security screening, such as during a major national event or upon receiving notification of terrorism risks from national intelligence agencies. 2. Partial Search: Conducted on persons and goods determined to have carried or loaded hazardous goods prohibited from carrying or loading pursuant to Article 42 of the Act (hereinafter referred to as “hazardous goods”), or in cases where it is deemed inappropriate to conduct a full search pursuant to Subparagraph 1. ② Security screening for the detection of hazardous materials shall be conducted using security screening equipment pursuant to Article 48-2, Paragraph 1 of the Act (hereinafter referred to as “security screening equipment”). However, in any of the cases falling under any of the following subparagraphs, the passenger’s person or belongings may be searched directly or moved to a specific location for screening with the passenger’s consent. <Amended Oct. 23, 2019> 1. When the security screening equipment sounds an alarm 2. Cases where hazardous materials are suspected of being carried or concealed 3. Cases where the contents cannot be read as a result of searching through security screening equipment 4. In cases where the security screening equipment does not operate properly due to errors, etc. 5. When deemed necessary upon obtaining information related to security threats ③ When the Minister of Land, Infrastructure and Transport intends to have a security screening conducted pursuant to Article 48-2, Paragraph 1 of the Act, he/she shall notify the railway operator, etc. of the security screening plan in advance. However, in cases where an urgent security screening is necessary, such as when a crime has already occurred or there is a risk of it occurring, prior notification may be omitted. ④ Railway operators, etc. who have been notified of a security screening implementation plan pursuant to the main text of Paragraph 3 shall post the schedule, location, target, and method of security screening, etc., in a notice so that passengers can be aware of the said implementation plan. ⑤ When a special judicial police officer of a railway conducts a security search pursuant to Article 48-2 of the Act , he/she shall present his/her identification card to the person subject to the search, state his/her affiliation and name, and explain the purpose and reason for the search. However, in any of the following cases, a search may be conducted without prior explanation. 1. Cases where the security screening plan has been announced in advance through notices at the security screening area, etc. 2. When searching items declared as suspicious objects or baggage left unattended for a long time [This Article Newly Inserted Mar. 19, 2014] Article 85-3 (Types of Security Screening Equipment) ① The types of security screening equipment under Article 48-2, Paragraph 1 of the Act shall be as classified in each of the following subparagraphs. <Amended Jan. 4, 2019; Oct. 23, 2019> 1. Equipment for searching, detecting, and analyzing hazardous materials: X-ray scanning equipment, metal detectors (including walk-through metal detectors and portable metal detectors), explosive detection equipment, explosive trace detection equipment, liquid explosive detection equipment, etc. 2. Equipment worn or carried for safety during security screening: stab-proof vests, bulletproof vests, explosion-proof blankets, etc. 3. Deleted <2019. 1. 4.> ② Deleted <2019. 10. 23.> ③ Deleted <2019. 1. 4.> [This Article was newly established on Mar. 19, 2014.] [Title amended on Oct. 23, 2019.] Article 85-4 (Establishment and Operation of Railway Security Information System, etc.) ① The Minister of Land, Infrastructure and Transport shall establish and operate a railway security information system to establish and operate the railway security information system (hereinafter referred to as the “railway security information system”) pursuant to Article 48-2, Paragraph 2 of the Act . ② The information that the Minister of Land, Infrastructure and Transport may request from railway operators pursuant to Article 48-2, Paragraph 3 of the Act is as follows: 1. Statistics related to security screening pursuant to Article 48-2, Paragraph 1 of the Act (including the number of security screenings and details of security screening equipment usage, etc.) 2. Information regarding training, etc. for employees conducting security screening pursuant to Article 48-2, Paragraph 1 of the Act 3. Information on railway vehicle operation 4. Other information necessary for railway security and public order as determined and notified by the Minister of Land, Infrastructure and Transport ③ The Minister of Land, Infrastructure and Transport may share necessary information with relevant agencies or link related systems to establish and operate a railway security information system. [This Article Newly Inserted Jan. 4, 2019] Article 85-5 (Performance Certification Standards for Security Screening Equipment) The performance certification standards for security screening equipment pursuant to Article 48-3, Paragraph 1 of the Act are as follows: 1. Establish a quality management system as defined by the International Organization for Standardization (ISO). 2. It shall be equipped with other performance, functions, safety, etc., as prescribed and notified by the Minister of Land, Infrastructure and Transport. [This Article was newly added on Oct. 23, 2019.] [Formerly Article 85-5 was moved to Article 85-10 <Oct. 23, 2019>] Article 85-6 (Application for Performance Certification of Security Screening Equipment, etc.) ①Any person who intends to obtain performance certification of security screening equipment pursuant to Article 48-3, Paragraph 1 of the Act shall submit an application for performance certification of railway security screening equipment in the form of Annex 45-13, along with the documents listed in each of the following subparagraphs, to the Korea Railroad Research Institute established pursuant to Article 8 of the Act on the Establishment, Operation, and Promotion of Government-funded Research Institutions, etc. in the Science and Technology Field (hereinafter referred to as the “Korea Railroad Research Institute”). In this case, the Korea Railroad Research Institute shallverify the certificate of corporate registration (applicable only if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . 1. Copy of Business Registration Certificate 2. Documents proving agency status (limited to cases where an agent applies) 3. Documents regarding the performance specifications of security screening equipment and test items (test kits) 4. Structure and external view of security screening equipment 5. Instruction manual on the use, operation, and maintenance of security screening equipment 6. Documents proving compliance with the standards under Article 85-5 ② Upon receiving an application pursuant to Paragraph 1, the Korea Railroad Research Institute shall request a testing institution pursuant to Paragraph 1 of Article 48-4 of the Act (hereinafter referred to as the “testing institution”) to conduct a test evaluating the performance of security screening equipment (hereinafter referred to as the “performance test”). However, if it is recognized that the performance certification standards have been met based on the documents pursuant to Paragraph 1, Item 6, the Korea Railroad Research Institute may not request a performance test for that part. ③ The testing agency shall prepare a performance test plan, conduct a performance test, and submit the railway security screening equipment performance test results report in the form of Annex 45-14 to the Korea Railroad Research Institute. ④ If the Korea Railroad Research Institute recognizes that the results of the performance test under Paragraph 3 are in accordance with the performance certification standards, etc., under Article 85-5, it shall issue a railway security screening equipment performance certification certificate in the form of Annex 45-15 to the applicant, and if they are not in accordance with the results, it shall notify the applicant of the results. ⑤ The Korea Railroad Research Institute may form and operate a Performance Certification Review Committee to deliberate on whether a product meets the performance certification standards pursuant to Article 85-5 . ⑥ Detailed matters necessary for the request for performance testing pursuant to Paragraph 2 and the composition and operation of the Performance Certification Review Committee pursuant to Paragraph 5 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Oct. 23, 2019] Article 85-7 (Performance Inspection of Security Screening Equipment) The Korea Railroad Research Institute shall, in accordance with Article 48-3, Paragraph 4 of the Act , conduct inspections according to the classifications in each of the following subparagraphs to verify whether security screening equipment is continuously maintaining its performance during operation. 1. Regular inspection: Once a year 2. Unscheduled Inspections: When deemed necessary to maintain the performance of security screening equipment, etc. [This Article Newly Inserted Oct. 23, 2019] Article 85-8 (Designation of Testing Institutions, etc.) ① In Article 48-4, Paragraph 2 of the Act , “designation standards prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport”refers to the standards set forth in Annex 19 . ② A person who intends to be designated as a testing institution pursuant to Article 48-4, Paragraph 2 of the Act shall submit to the Minister of Land, Infrastructure and Transport an application for designation as a testing institution for railway security screening equipment in the form of Annex 45-16 , attaching the documents listed in each of the following subparagraphs. In this case, the Minister of Land, Infrastructure and Transport shall verify the certificate of corporate registration (only applicable if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36 , Paragraph 1 of the Electronic Government Act. 1. Business registration certificate and seal certificate (limited to corporations) 2. Articles of incorporation of a corporation or bylaws of an organization 3. A project plan specifying the organization, personnel, test facilities, etc., for conducting performance tests 4. Quality management regulations compliant with international standards established by the International Organization for Standardization (ISO) or the International Electrotechnical Commission (IEC) 5. Documents proving that the criteria for designation as a testing institution under Paragraph 1 have been met ③ When the Minister of Land, Infrastructure and Transport receives an application for designation as a testing institution pursuant to Paragraph 2, he/she shall prepare an evaluation plan including on-site evaluation, etc., notify the applicant, and conduct an evaluation in accordance with said evaluation plan. ④ When the Minister of Land, Infrastructure and Transport recognizes, as a result of the examination under Paragraph 3, that the designation criteria under Paragraph 1 have been met, he/she shall issue a designation certificate for a railway security screening equipment testing institution in the form of Annex 45-17 and publish the following matters in the Official Gazette. 1. Name of the testing institution 2. Location of the testing institution 3. Date of Designation and Designation Number of Testing Institution 4. Scope of Work Performance by the Testing Institution ⑤ An institution designated as a testing institution pursuant to Paragraph 4 shall submit to the Minister of Land, Infrastructure and Transport regulations on the operation of testing institutions that include the following matters. 1. Organization, personnel, and testing facilities of the testing institution 2. Procedures and Methods for Exam Registration and Execution 3. Duties and Training of Examiners 4. Security management of examiners, examination processes, etc. ⑥ The Minister of Land, Infrastructure and Transport may form and operate a Testing Institution Designation Review Committee if necessary for the review under paragraph 3. [This Article Newly Inserted Oct. 23, 2019] Article 85-9 (Cancellation of Designation of Testing Institution, etc.) ①The detailed standards for the cancellation of designation or suspension of business of a testing institution pursuant to Article 48-4, Paragraph 3 of the Act are as set forth in Attached Table 20 . ② If the Minister of Land, Infrastructure and Transport cancels the designation of a testing institution or orders the suspension of its operations pursuant to Paragraph 1, he/she shall notify the relevant testing institution of such fact and publish it in the Official Gazette without delay. ③ A testing institution that has received a notice of cancellation of designation or suspension of business pursuant to Paragraph 2 shall return the railway security screening equipment testing institution designation certificate to the Minister of Land, Infrastructure and Transport within 15 days from the date of receiving such notice. [This Article Newly Inserted Oct. 23, 2019] Article 85-10 (Standards for Use of Duty Equipment) Pursuant to Article 48-5, Paragraph 1 of the Act , the standards for the use of duty equipment used by special judicial police officers of railways shall be as follows: <Amended Oct. 23, 2019; Aug. 27, 2021; Sep. 27, 2024> 1. In the case of gas sprayers or gas-launching guns (including those also used for firing rubber bullets; hereinafter the same applies): Use them within the minimum necessary range when required for the arrest of a criminal or prevention of escape, protection of the life and body of others or railway special judicial police officers, or suppression of resistance to the execution of official duties, but do not fire at the face of the opponent from a distance of less than 1 meter. However, when firing rubber bullets with a gas-launching gun, do not fire at the face of the opponent even from a distance exceeding 1 meter. 2. In the case of stun guns: Do not use on persons under the age of 14 or pregnant women; and when using a stun gun equipped with an electrode dart launcher, do not fire the electrode darts toward the opponent's face. 3. In the case of batons: They may be used within the minimum necessary scope when required to prevent harm to the life or body of others or railway special judicial police officers, or danger to public facilities or property, and harm to life or body shall be minimized. 4. In the case of handcuffs and restraints: They shall be used to the minimum extent necessary for the execution of arrest warrants or detention warrants, for the escort or detention of persons subject to a judgment or disposition restricting their physical liberty in accordance with legal procedures, or to prevent suicide or self-harm by criminals, intoxicated persons, or persons with mental disorders. [This Article newly inserted Jan. 4, 2019] [Moved from Article 85-5 <October 23, 2019>] Article 85-11 (Safety Education and Safety Inspection of Duty Equipment) ①Safety education pursuant to Article 48-5, Paragraph 3 of the Act shall be conducted by the head of the Railway Police or the head of the local Railway Police (hereinafter referred to as “head of the Railway Police, etc.”) pursuant to Article 40 or Article 42 of the “Organization of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies” regarding safety rules, usage methods, and emergency measures in the event of danger of duty equipment, in accordance with the classifications in each of the following subparagraphs. 1. Initial Safety Training: Conducted immediately after being assigned to the department using the relevant job equipment. 2. Regular Safety Training: Conducted every six months starting from the date of the previous safety training. ② Safety inspections pursuant to Article 48-5, Paragraph 3 of the Act shall be conducted by the head of the railway police force, etc., every six months for each piece of equipment according to the classifications in each of the following subparagraphs. 1. In the case of gas injectors: Presence of defects in safety devices and cracks in the chemical tank, etc. 2. In the case of gas-powered guns: whether the caliber has been arbitrarily modified and whether the force required to pull the trigger is 1 kilogram or more, etc. 3. In the case of electric shock devices: Presence or absence of electrical leakage due to inherent defects, functional impairment, cracks, etc. [This Article Newly Inserted Sep. 27, 2024] Article 86 (Mandatory Reporting of Railway Accidents, etc.) ① When a railway accident, etc. pursuant to Article 61, Paragraph 1 of the Act occurs, a railway operator, etc. shall immediately report the matters set forth in each of the following subparagraphs to the Minister of Land, Infrastructure and Transport. <Amended Mar. 23, 2013> 1. Date and Time and Location of the Accident 2. Details of casualties and damages 3. Circumstances of the accident 4. Accident response and recovery plan, etc. ② When a railway accident, etc. pursuant to Article 61, Paragraph 2 of the Act occurs, a railway operator, etc. shall report it to the Minister of Land, Infrastructure and Transport in accordance with the classifications in each of the following subparagraphs. <Amended Mar. 23, 2013> 1. Initial Report: Status of accidents, etc. 2. Interim Report: Accident response and recovery status, etc. 3. Conclusion Report: Results of accident containment and recovery, etc. ③ Detailed matters concerning the procedures and methods, etc. for reporting under Paragraphs 1 and 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Mar. 23, 2013> [Wholly Amended Dec. 10, 2012] [Title Amended Oct. 7, 2020] Article 87 (Reporting of breakdowns, defects, or functional impairments occurring in railway vehicles) ① The term “breakdowns, defects, or functional impairments prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 61-2, Paragraph 1 of the Act refers to any breakdown, defect, or functional impairment falling under any of the following subparagraphs. 1. Failure, defect, or functional impairment of railway vehicles caused by a design or manufacturing different from the details approved under Articles 26 and 26-3 of the Act 2. Failure, defect, or functional impairment of railway products caused by a design or manufacturing different from the details approved under Articles 27 and 27-2 of the Act 3. Failure, defect, or functional impairment of railway vehicles and railway equipment requiring repair or compensation for damages 4. Any other failure, defect, or functional impairment equivalent to the failure, defect, or functional impairment under subparagraphs 1 through 3 ② In Article 61-2, Paragraph 2 of the Act , “failure, defect, or functional impairment prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” means a failure, defect, or functional impairment falling under any of the following subparagraphs ( excluding failures, defects, or functional impairments reported pursuant to Article 61 of the Act ). 1. Structural damage requiring heavy maintenance of railway vehicles (referring to the complete disassembly of railway vehicles for inspection or replacement, or the maintenance of railway vehicles severely damaged by derailment, fire, etc.) 2. Failures of on-board signaling devices, propulsion systems, running gear, and other major railway vehicle components that have a significant impact on vehicle safety 3. Cracks, permanent deformation, or corrosion of the railway vehicle structure exceeding the maximum permissible range according to the technical standards notified pursuant to Article 26, Paragraph 3 , Article 26-3 , Paragraph 2 , Article 27, Paragraph 2 , and Article 27-2, Paragraph 2 of the Act (if the manufacturer provides technical data, it refers to the maximum permissible range according to such technical data). 4. Any other failure, defect, or functional impairment equivalent to the failure, defect, or functional impairment under subparagraphs 1 through 3 ③ Any person who intends to make a report pursuant to Article 61-2, Paragraphs 1 and 2 of the Act shall submit a report on breakdown, defect, or functional impairment in the form of Annex 45-18 to the Minister of Land, Infrastructure and Transport, or report to the Minister of Land, Infrastructure and Transport by the method prescribed and notified by the Minister of Land, Infrastructure and Transport. ④ When the Minister of Land, Infrastructure and Transport receives a report pursuant to Paragraph 3, he/she shall notify relevant agencies, etc. thereof. ⑤ Necessary matters regarding the contents and methods of notification pursuant to Paragraph 4 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Oct. 7, 2020] Article 88 (Procedures for Voluntary Reporting on Railway Safety, etc.) ①Any person who intends to make a voluntary report on railway safety pursuant to Article 61-3, Paragraph 1 of the Act shall submit the voluntary report on railway safety in the form of Annex 45-19 to the President of the Korea Transportation Safety Authority or report to the President of the Korea Transportation Safety Authority by the method prescribed and notified by the Minister of Land , Infrastructure and Transport. ② The Chairman of the Korea Transportation Safety Authority shall notify relevant agencies, etc., upon receiving a report pursuant to Paragraph 1. ③ Necessary matters regarding the contents and methods of notification pursuant to Paragraph 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport . [This Article Newly Inserted Oct. 7, 2020] Article 89 Deleted <June 21, 2006> Article 90 Deleted <June 21, 2006> Article 91 (Education and Training of Railway Safety Professionals) ①The education and training of railway safety professionals pursuant to Article 60 , Paragraph 1 of the Enforcement Decree and Annex 5 of the Enforcement Decree shall be in accordance with Annex 24. <Amended Dec. 20, 2023> ② The Minister of Land, Infrastructure and Transport shall determine the detailed matters necessary for the methods, procedures, etc. of education and training under Paragraph 1. <Amended Mar. 23, 2013> [Wholly Amended Dec. 10, 2012] Article 92 (Procedures for Granting Qualifications of Railway Safety Professionals, etc.) ①Any person who intends to be granted qualifications as a railway safety professional pursuant to Article 60-2, Paragraph 1 of the Enforcement Decree shall submit an application for the granting of qualifications as a railway safety professional (reissuance of certificate) in the form of Annex No. 46 , attached with the documents set forth in each of the following subparagraphs, to the specialized safety agency designated pursuant to Article 69, Paragraph 5 of the Act (hereinafter referred to as the “Specialized Safety Agency”). <Amended May 22, 2014; Aug. 10, 2016; June 18, 2019> 1. Documents verifying work experience 2. Certificate of Completion of Education and Training (limited to applicable persons) 3. A copy of the career handbook of an electrical construction technician under the Electric Construction Business Act , a power engineer under the Electric Power Technology Management Act , an information and communications technician under the Information and Communications Construction Business Act , or a construction technology career certificate under the Construction Technology Promotion Act (limited to applicable persons) 4. Copy of National Technical Qualification Certificate (limited to those applicable) 5. Copy of railway vehicle maintenance experience certificate pursuant to this Act (limited to applicable persons) 6. Photograph (3.5 cm × 4.5 cm) ② If the applicant under Paragraph 1 meets the qualification standards under Paragraphs 1 and 2 of Article 60 of the Enforcement Decree , the safety specialized agency shall issue a certificate of qualification for railway safety professionals in the form of Annex 47 to the applicant. ③ If a person who has been issued a Certificate of Qualification for Railway Safety Professionals pursuant to Paragraph 2 loses the Certificate of Qualification for Railway Safety Professionals, or if the Certificate becomes unusable due to wear or damage, they must apply to a specialized safety agency by attaching the documents specified in each of the following subparagraphs to the Application for Reissuance of the Certificate of Qualification for Railway Safety Professionals in the form of Annex 46. <Amended Jan. 18, 2023> 1. Certificate of Professional Railway Safety Qualification (Submit only if worn out or damaged to the point of being unusable) 2. Statement of Reason for Loss (Submit only if lost) 3. Passport photo (3.5 cm × 4.5 cm) ④ A specialized safety agency that receives an application for reissuance pursuant to Paragraph 3 shall reissue the Certificate of Qualification for Railway Safety Professionals to the applicant after verifying the fact of qualification granting and the grounds for reissuance. <Newly added Jan. 18, 2023> ⑤ The specialized safety agency shall maintain and manage data regarding the issuance of qualification certificates, etc., of persons who have obtained qualifications in the relevant field. <Amended Jan. 18, 2023> [Wholly Amended Dec. 10, 2012] Article 92-2 (Designation of Specialized Safety Agencies by Sector) Pursuant to Article 60-3, Paragraph 3 of the Enforcement Decree , the Minister of Land, Infrastructure and Transportmay designate specialized agencies classified by the following sectors. <Amended Mar. 23, 2013; Jun. 18, 2019> 1. Railway Operation Safety Sector 2. Electric Railway Sector 3. Railway Signaling Field 4. Railway Track Sector 5. Railway Rolling Stock Sector [This Article Newly Inserted Dec. 10, 2012] Article 92-3 (Detailed Designation Criteria for Safety Specialized Agencies, etc.) ①The detailed designation criteria for safety specialized agencies pursuant to Article 60-3, Paragraph 4 of the Enforcement Decree are as set forth in Table 25 . ② Notification of changes to the safety specialized agency pursuant to Article 60-5 , Paragraph 1 of the Enforcement Decree shall be in accordance with Form No. 11-2 of the Attached Form . [This Article Newly Inserted Dec. 10, 2012] Article 92-4 (Application for Designation as a Specialized Safety Agency, etc.) ①Any person who intends to be designated as a specialized safety agency pursuant to Article 60-4, Paragraph 1 of the Enforcement Decree shall submit to the Minister of Land, Infrastructure and Transport an application for designation as a specialized railway safety agency (including electronic documents) in the form of Annex 47-2 , attaching the documents set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Jun. 18, 2019> 1. Business Regulations on the Operation of Specialized Safety Agencies, etc. 2. Operational plan including education and training (including education and training evaluation plan) 3. Articles of incorporation or equivalent agreements (applicable only to corporations or other organizations) 4. Documents proving the qualifications, educational background, work experience, etc. of persons performing safety duties, such as education and training and inspection of railway facilities and rolling stock 5. List of facilities, equipment, etc., such as classrooms required for education and training, and inspection of railway facilities and rolling stock 6. Impression of the official seal used by a specialized safety agency ② The designation certificate for a specialized railway safety agency pursuant to Article 60-4, Paragraph 3 of the Enforcement Decree shall be in accordance with Form No. 47-3 of the Attached Form . [This Article Newly Inserted Dec. 10, 2012] Article 92-5 (Cancellation of Designation and Suspension of Business of Safety Specialized Agencies, etc.) ①The standards for cancellation of designation and suspension of business of safety specialized agencies pursuant to Article 15-2 of the Act, which is applied mutatis mutandis in Article 69, Paragraph 7 of the Act , are as set forth in Table 26 . ② In the event that the Minister of Land, Infrastructure and Transport cancels the designation of a specialized safety agency or issues a disposition suspending its operations, he/she shall notify the specialized safety agency of the administrative disposition of the designated agency in the form of Annex 11-3 without delay and publish the fact in the Official Gazette. [This Article Newly Inserted Jan. 20, 2017] Article 92-6 (Standards for Placement of Railway Operation Safety Managers, etc.) ①The standards for placement of railway operation safety managers pursuant to Article 69-2, Paragraph 2 of the Act are as set forth in Table 27 . ② The railway operation safety manager shall prepare a work status log in the form of Annex 47-4 regarding the duties performed during the period of assignment and submit it to the railway operator, etc. ③ Notwithstanding Paragraph 2, the Railway Operation Safety Manager may substitute the preparation of a work status log corresponding to the work period performed in accordance with the contents of the consultation under Article 40-2, Paragraph 6 of the Act with the preparation of a written consultation document pursuant to Article 76-9, Paragraph 1. In this case, a copy of the said written consultation document must be submitted to the railway operator, etc. <Newly added Apr. 9, 2024; Jul. 17, 2024> [This Article Newly Inserted Oct. 23, 2019] Article 92-7 (Regular Training for Railway Safety Professionals) ①The frequency, content, and procedures for regular training of railway safety professionals pursuant to Article 69-3, Paragraph 1 of the Act are as set forth in Table 28 . ② Regular training for railway safety specialists shall be conducted by a specialized safety agency. ③ In addition to the matters prescribed in Paragraphs 1 and 2, the Minister of Land, Infrastructure and Transport shall determine and announce the detailed matters necessary for the regular training of railway safety professionals . [This Article Newly Inserted Oct. 23, 2019] Article 92-8 (Cancellation or Suspension of Qualification of Railway Operation Safety Manager) ①The detailed standards for the cancellation or suspension of the validity of the qualification of a railway operation safety manager pursuant to Article 69-5, Paragraph 1 of the Act are as set forth in Attached Table 29. <Amended Dec. 20, 2023> ② Article 34 shall apply mutatis mutandis to the notification, etc. regarding the disposition of cancellation and suspension of effect of the qualification of a railway operation safety manager pursuant to Article 69-5, Paragraph 1 of the Act . In this case, “driver’s license” shall be deemed “qualification of a railway operation safety manager,” “ Article 20, Paragraph 1 of the Act ” shall be deemed “ Article 69-5, Paragraph 1 of the Act ,” “ Notice of disposition of cancellation or suspension of effect of railway vehicle driver’s license in Form No. 22 ” in the Appendix shall be deemed “Notice of disposition of cancellation or suspension of effect of qualification of railway operation safety manager in Form No. 47-5 in the Appendix,” “Korea Transportation Safety Authority, which is the driver’s license examination agency” shall be deemed “relevant safety specialized agency,” and “driver’s license” in the Korea Transportation Safety Authority shall be deemed “certificate of qualification of a railway operation safety manager in the relevant safety specialized agency.” <Amended Dec. 20, 2023> [This Article Newly Inserted Oct. 23, 2019] Article 93 (Identification Card of Inspection Officials) The identification card pursuant to Article 73, Paragraph 4 of the Act shall be in accordance with Form No. 48 of the Attached Form . [Wholly Amended Dec. 10, 2012] Article 94 (Procedure for Determining Fees) ①When an agency or entrusted institution pursuant to the proviso to Article 74, Paragraph 1 of the Act (hereinafter referred to as “agency or entrusted institution” in this Article) intends to establish standards for fees pursuant to Paragraph 2 of the same Article , it shall collect opinions from interested parties by posting the contents on the institution’s website for 20 days. However, if deemed urgent, it may post the contents on the website for 10 days after explaining the reason. ② In cases where an implementing agency or entrusted agency establishes standards for fees pursuant to Paragraph 1 and obtains approval from the Minister of Land, Infrastructure and Transport, it shall disclose said fees and calculation details on the internet homepage of the relevant agency. <Amended Mar. 23, 2013> [This Article Newly Inserted Dec. 15, 2011] Article 95 Deleted <December 30, 2016> Article 96 (Review of Regulations) The Minister of Land, Infrastructure and Transport shall review the validity of the matters set forth in each of the following subparagraphs every three years, starting from January 1, 2020 (meaning before January 1 of the year marking every third year), and take measures such as improvements. <Amended May 27, 2020; March 12, 2026> 1. Deleted <March 12, 2026> 2. Deleted <March 12, 2026> 3. Deleted <May 27, 2020> 4. Types of hazardous goods pursuant to Article 78, etc. 5. Detailed designation criteria for specialized safety agencies pursuant to Article 92-3 and Annex 25 , etc. [Wholly revised Dec. 30, 2016] ADDENDA <Ministry of Construction and Transportation Decree No. 00456, July 13, 2005> ① (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the provisions of Articles 11, 24, 26 through 41 and 57 through 75 shall enter into force on July 1, 2006. ② (Special provisions regarding the previously extended service life) Among railway vehicles whose service life was extended after passing a precision diagnosis conducted internally by railway operators, etc. (including the former head of the Korea Railroad Administration) prior to July 1, 2006, if the expiration date of the extended service life is June 30, 2008 or later, June 30, 2008 shall be deemed the expiration date of the service life of the said railway vehicle. ③ (Transitional measures concerning the service life of electric locomotives) Notwithstanding the provisions of Article 70 and Annex 21, the service life of electric locomotives manufactured prior to January 1, 1991, among railway vehicles in operation as of July 1, 2006, shall be the service life previously determined by the Administrator of the Korea Railroad Administration. ADDENDA <Ministry of Construction and Transportation Decree No. 522, June 21, 2006> (Enforcement Rule of the Act on Aviation and Railway Accident Investigation) Article 1 (Enforcement Date)  This rule shall enter into force on July 9, 2006. Article 2 (Amendment of Other Laws)  ① The Enforcement Rules of the Railway Safety Act are partially amended as follows: In Article 7, subparagraph 2, “the Railway Accident Investigation Committee pursuant to Article 51, paragraph 1 of the Act (hereinafter referred to as the “Railway Accident Investigation Committee”) pursuant to Article 62 of the Act” shall be changed to “the Aviation and Railway Accident Investigation Committee pursuant to Article 4, paragraph 1 of the Act on Aviation and Railway Accident Investigation pursuant to Article 19 of the same Act”. In Article 86, Paragraph 2, “Article 61, Paragraph 3 of the Act” shall be changed to “Article 61, Paragraph 2 of the Act”. Articles 87 through 90 are deleted. Form No. 45 attached hereto is deleted. ② Omitted ADDENDA <Ministry of Construction and Transportation Decree No. 530, Aug. 7, 2006> (Partial Amendment to the Enforcement Rules of the Act on the Recapture of Development Profits, etc. for the Joint Use of Administrative Information and Document Reduction) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 4, Mar. 14, 2008> (Partial Amendment to the Rules on Appraisal, etc. pursuant to the Amendment of the Government Organization Act) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 77, Dec. 16, 2008> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 103, Feb. 27, 2009> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Standards for Administrative Dispositions)  Standards for administrative dispositions for violations committed prior to the enforcement of this Rule shall be in accordance with the amended provisions of Annex 3, Annex 6, Annex 9, Annex 11, Annex 16, Annex 18, Annex 20, and Annex 23. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 143, June 25, 2009> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 195, Dec. 21, 2009> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 232, Mar. 30, 2010> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Education and Training)  The amended provisions of Article 20 shall also apply to persons who are receiving education and training in accordance with the previous provisions prior to the enforcement of this Rule. Article 3 (Transitional Measures Concerning Professors in Educational and Training Institutions)  Persons who, at the time of the enforcement of this Rule, hold professor qualifications in the theoretical field at educational and training institutions pursuant to the previous regulations shall be deemed to hold professor qualifications pursuant to the amended regulations of Item 1, Subparagraph (a) of Annex 8. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 283, Sep. 16, 2010> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the Service Life of Railway Vehicles)  The amended provisions of Article 70 shall apply to railway vehicles first ordered by railway operators, etc. after the enforcement of this Rule. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 330, Feb. 9, 2011> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Following the Abolition of the Validity Period of Quality Certification)  A quality certification for railway products under the former regulations at the time of the enforcement of this rule shall be deemed a quality certification under the revised regulations of Form No. 27 attached hereto. However, if a person who has received a quality certification under the former regulations requests it, the head of the quality certification body shall replace it with a quality certification under the revised regulations of Form No. 27 attached hereto. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 350, Apr. 11, 2011> (Partial Amendment to the Enforcement Rules of the Act on the Joint Use of Administrative Information and Document Reduction, etc.) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 411, Dec. 15, 2011> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the Examination of Designation Criteria)  The amended provisions of Article 18, Paragraph 2 and Article 22, Paragraph 2 shall apply starting from the examination conducted by the Minister of Land, Transport and Maritime Affairs in 2011. Article 3 (Applicability to Fee Determination)  The amended provisions of Article 94 shall apply starting from the fee standards first determined after the enforcement of this Rule. ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 549, Dec. 10, 2012> This rule shall enter into force on the date of its promulgation. However, Article 25 shall enter into force on January 1, 2013. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2  through 5 omitted Article 6 (Amendment of Other Laws)  ① through <106> Omitted <107> The Enforcement Rules of the Railway Safety Act are partially amended as follows. Article 2, Paragraphs 1 and 3; Article 4, Paragraphs 1 and 3; Article 6, Paragraphs 2 and 3; Article 7 (excluding the numbered clauses); Article 12, Paragraph 4; Article 16, Paragraph 4; the first and second parts of Article 17, Paragraph 1 (excluding the numbered clauses); Paragraph 2 of the same article; Article 18, Paragraph 2; Article 19, Paragraph 2; Article 20, Paragraphs 4 and 6; the first and second parts of Article 21, Paragraph 1 (excluding the numbered clauses); Paragraph 2 of the same article; Article 22, Paragraph 2; Article 23, Paragraph 2; Article 24, Paragraph 4; the second part of Article 25, Paragraph 2; Article 28, Paragraph 2; Article 32, Paragraph 4; Article 34, Paragraphs 1 and 2; Article 37, Paragraph 4; Article 39, Paragraphs 3 through 5; Article 42, Paragraph 4; Article 43, Paragraph 1, Item 1; Paragraph 2 of the same article; Article 44 The part other than the numbered clauses, Article 4, Paragraph 3; Article 47, Paragraph 2, the part other than the numbered clauses; Article 49, Paragraph 2; Article 50, Paragraph 1; the part other than the items of Article 51, Paragraph 2, Subparagraph 2; Article 51, Paragraph 3; the first and second parts other than the numbered clauses of Article 51, Paragraph 1; Article 51, Paragraph 2; Article 52, Paragraph 2; Article 53, Paragraph 1; Article 54, Paragraph 2; Article 56, Paragraphs 1 and 2; the first part of Article 56, Paragraph 3; the main text of Article 56, Paragraph 4; Article 56, Paragraph 7; Article 57, Subparagraph 6; Article 59, Paragraph 2, the part other than the numbered clauses; Article 60, Paragraph 4; the first and second parts other than the numbered clauses of Article 61, Paragraph 1; Article 61, Paragraph 2; Article 62, Paragraph 2; Article 63, Paragraph 2; the part other than the numbered clauses of Article 65, Paragraph 2; Article 66, Paragraph 4 The first and second parts of the part other than the subparagraphs of Article 67, Paragraph 1, and Paragraph 2 of the same article; Article 68, Paragraph 2; Article 69, Paragraph 2; the second part of Article 71, Paragraph 3; Paragraph 4 of the same article; the first and second parts of the part other than the subparagraphs of Article 72, Paragraph 1; Paragraph 2 of the same article; Article 73, Paragraph 2; Article 74, Paragraph 2; Article 75, Paragraph 10; the part other than the subparagraphs of Article 86, Paragraph 1; the part other than the subparagraphs of Paragraph 2 of the same article; Paragraph 3 of the same article; Article 91, Paragraph 2; the part other than the subparagraphs of Article 92-2; the part other than the subparagraphs of Article 92-4, Paragraph 1; Article 94, Paragraph 2; Note No. 4 of Annex 1; Subparagraph (a) of Annex 5, Subparagraph 4 (a) of the same table; the first part of Subparagraph (b) of the same table; the proviso to Note No. 5 of Annex 8, Subparagraph 3 (b); Subparagraph 4 of the same table; Subparagraph (k) of Annex 8; Annex 14 Subparagraph 2, Item (c), Appendix 15 Subparagraph 2, Item (c), Appendix 17 Subparagraph 2, Item (a), proviso, Subparagraph (b) 1), Subparagraph 3, Item (c), Appendix 19 Subparagraph 2, Item (c), Appendix 22 Subparagraph 2, Item (a), proviso, Appendix 22 Subparagraph 3, Item (c), Attached Form No. 1, Attached Form No. 2, Attached Form No. 10, Attached Form No. 11, Attached Form No. 11-2, Attached Form No. 11-3, Attached Form No. 13, Attached Form No. 14, Attached Form No. 17, Attached Form No. 20, Attached Form No. 22, Attached Form No. 28, Attached Form No. 29, Front and Back of Attached Form No. 31, Attached Form No. 35, Attached Form No. 36, Attached Form No. 39, Attached Form No. 40, Attached In the front and back of Form No. 43, Annex Form No. 44, Annex Form No. 47-2, Annex Form No. 47-3, and Annex Form No. 48, “Minister of Land, Transport and Maritime Affairs” shall be changed to “Minister of Land, Infrastructure and Transport”. In the parts other than the numbered clauses of Article 3, the parts other than the numbered clauses of Article 5, the parts other than the numbered clauses of Article 7, paragraphs 1 and 3 of Article 32, the parts other than the numbered clauses of Article 57, Article 70, the parts other than the numbered clauses of Article 77, the parts other than the numbered clauses of Article 79, the parts other than the numbered clauses of Article 80, the parts other than the numbered clauses of Article 81, Article 82, the parts other than the numbered clauses of Article 83, Article 84, and the parts other than the numbered clauses of Article 85, “Ordinance of the Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ordinance of the Ministry of Land, Infrastructure and Transport”. In the processing procedure section of Form No. 1, Form No. 2, Form No. 10, Form No. 11-2, Form No. 13, the processing procedure section on the back of Form No. 26, Form No. 28, Form No. 32, Form No. 35, Form No. 39, Form No. 43, and Form No. 47-2, “Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ministry of Land, Infrastructure and Transport”. <108> through <126> omitted ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 54, Dec. 30, 2013> (Partial Amendment to the Enforcement Rules of the Act on the Recapture of Development Profits, etc. for the Establishment of Regulatory Review Periods Pursuant to the Amendment of the Framework Act on Administrative Regulations) This rule shall take effect on January 1, 2014. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 81, Mar. 19, 2014> Article 1 (Enforcement Date)  This rule shall enter into force on March 19, 2014. Article 2 (Repeal of Other Laws)  The Ministerial Ordinances set forth in each of the following subparagraphs shall be repealed. 1. Rules on Safety Standards for Railway Facilities 2. Rules on Safety Standards for Railway Vehicles 3. Rules on Safety Standards for Urban Railway Vehicles 4. Rules on Safety Standards for Urban Railway Facilities 5. "Rules on the Management of Urban Railway Vehicles" Article 3 (Amendment of Other Laws)  ① The Enforcement Rules of the Urban Railway Act are partially amended as follows: Articles 3 and 4 are deleted. ② The Enforcement Rules of the Railway Business Act are partially amended as follows. In Article 17, “the records shall be preserved in accordance with the provisions of the Rules on Safety Standards for Railway Vehicles” shall be changed to “the records shall be preserved for three years.” Delete the service life column for railway vehicles in Appendix 1, and make the specifications column for railway vehicles as follows. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 94, May 22, 2014> Article 1 (Enforcement Date)  This rule shall enter into force on May 23, 2014. Articles 2  through 6 omitted Article 7 (Amendment of Other Laws)  ① through ⑦ Omitted ⑧ Part of the Enforcement Rules of the Railway Safety Act is amended as follows. In Article 92, Paragraph 1, Subparagraph 3, “construction engineer career certificate pursuant to the Construction Technology Management Act” shall be changed to “construction technology career certificate pursuant to the Construction Technology Promotion Act.” ⑨ Omitted ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 169, Dec. 31, 2014> (Partial Amendment to the Enforcement Rules of the Act on the Sale of Buildings, etc. for the Establishment of Regulatory Review Periods, etc.) This rule shall take effect on January 1, 2015. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 236, Oct. 2, 2015> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 352, Aug. 10, 2016> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Administrative Dispositions)  The amended provisions of Nos. 5, 9, and 11 of Annex 11 shall also apply to administrative dispositions for violations committed prior to the enforcement of this rule. Article 3 (Transitional Measures Concerning Approval of Safety Management System) Notwithstanding  the amended provisions of Article 2, Paragraph 1, in cases where an application for approval of a safety management system was made in accordance with the former regulations prior to the enforcement of this Rule, or where an implementation plan, business plan, etc., for the construction of the relevant railway was approved, the former regulations shall apply. Article 4 (Transitional Measures Concerning Approval of Change or Notification of Change of Safety Management System)  In cases where an application for approval of change or notification of change of a railway safety management system was made in accordance with the former regulations prior to the enforcement of this Rule, the former regulations shall apply notwithstanding the amended provisions of Article 2, Paragraph 2 and Article 3, Paragraph 1. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 380, Dec. 30, 2016> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Standards for Administrative Dispositions)  Notwithstanding the amended provisions of Subparagraph 2, Item (b) of Annex 1, the standards for administrative dispositions for violations committed prior to the enforcement of this Rule shall be governed by the former provisions. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 382, ​​Dec. 30, 2016> (Partial Amendment to the Enforcement Rules of the Act on Appraisal and Appraisers, etc. for the Establishment of Regulatory Review Periods, etc.) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2  through 4 omitted ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 392, Jan. 20, 2017> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Articles 76-2 and 76-3 shall enter into force on January 20, 2017. Article 2 (Applicability to Approval or Modification Approval of Safety Management System)  The amended provisions of Article 4, Paragraph 2 shall apply from the time an application for approval or modification of a safety management system is submitted after the enforcement of this Rule. Article 3 (Applicability to the Review of Results of Comprehensive Test Runs)  The amended provisions of Article 75-2, Paragraph 2 shall apply from the time a railway operator, etc. reports the results of a comprehensive test run to the Minister of Land, Infrastructure and Transport pursuant to Article 38, Paragraph 1 of the Act following the enforcement of this Rule. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 442, July 25, 2017> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 454, Oct. 20, 2017> (Partial Amendment to Four Ministry of Land, Infrastructure and Transport Decrees, including the Enforcement Rule of the Act on the Recapture of Development Profits, for the Correction of Unreasonable Discrimination Based on Educational Background in Qualification Requirements) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 489, Feb. 9, 2018> This rule shall take effect on February 10, 2018. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 554, Nov. 9, 2018> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 581, Jan. 4, 2019> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Changes in Aptitude Test Cycles for Persons Engaged in Driving Duties, etc.)  Persons who are 50 years of age or older at the time of enforcement of this Rule and for whom 5 years have passed since receiving the initial test (including cases where the initial test is deemed to have been received pursuant to the main text of Paragraph 2 of the same Article; hereinafter the same applies in this Article) or periodic test pursuant to Article 41, Paragraph 1, Subparagraph 1 or 2, shall undergo an aptitude test in accordance with the classifications in each of the following subparagraphs, notwithstanding the amended provisions of Article 41. 1. Persons for whom at least six months remain until the date marking the tenth anniversary of receiving the initial inspection or periodic inspection under Article 41, Paragraph 1, Subparagraph 1 or 2: Must undergo a periodic inspection pursuant to the amended provisions of Article 41, Paragraph 1, Subparagraph 2, or an initial inspection pursuant to the amended provisions of the proviso to Paragraph 2 of the same Article within six months of the enforcement of this Rule. 2. Persons with less than 6 months remaining until the date marking the 10th anniversary of receiving the initial inspection or periodic inspection under Article 41, Paragraph 1, Subparagraph 1 or 2: Must receive a periodic inspection pursuant to the amended provisions of Article 41, Paragraph 1, Subparagraph 2, or an initial inspection pursuant to the amended provisions of the proviso to Paragraph 2 of the same article before the date marking the 10th anniversary. Article 3 (Transitional Measures Concerning Forms)  Forms No. 4, No. 9, No. 12, No. 15, No. 24-2, and No. 24-5 of the former attached forms at the time of the enforcement of this rule may be used together with the amended forms pursuant to this rule (limited to the part amended for resident registration numbers; hereinafter the same applies in this article) or modified in part to fit the contents of the amended forms until March 30, 2019. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 598, Feb. 21, 2019> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 609, Mar. 20, 2019> (Enforcement Rule of the Act on the Construction of Railways and Maintenance of Railway Facilities) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Amendment of Other Laws)  ① through ⑧ Omitted ⑨ Part of the Enforcement Rules of the Railway Safety Act is amended as follows. Article 42 is deleted. In Article 44, subparagraph 1, “Article 7, paragraph 5 and Article 25, paragraph 1 of the Act” shall be changed to “Article 7, paragraph 5 of the Act”. In Article 75-2, Paragraph 1, Subparagraph 1, “Article 25, Paragraph 1 of the Act” shall be changed to “Article 19, Paragraphs 1 and 2 of the Act on the Construction of Railways and Maintenance of Railway Facilities”. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 626, June 18, 2019> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Amendment of Other Laws)  Part of the Enforcement Rules of the Railway Business Act is amended as follows. Articles 17 and 18 are deleted. Article 3 (Special Provisions Concerning Detailed Safety Diagnosis, etc.)  ① Notwithstanding the amended provisions of Article 75-13, Paragraph 1, the timing of the first detailed safety diagnosis for railway vehicles acquired by December 31, 2007 shall be in accordance with the classifications in each of the following subparagraphs. 1. Railway vehicles acquired prior to December 31, 1996: Until the end of their expected lifespan according to the technical standards of the railway safety management system 2. Railway vehicles acquired from January 1, 1997, to December 31, 2000: Up to 25 years prior to the date the commercial trial operation under Article 75, Paragraph 5, Subparagraph 2 commenced 3. Railway vehicles acquired from January 1, 2001, to December 31, 2003: Prior to December 31, 2026 4. Railway vehicles acquired from January 1, 2004, to December 31, 2006: Prior to December 31, 2027 5. Railway vehicles acquired from January 1, 2007, to December 31, 2007: Until December 31, 2028 ② Railway vehicles for which a detailed diagnosis or self-safety diagnosis was performed by March 18, 2014, in accordance with the previous regulations, and railway vehicles for which a detailed safety diagnosis was performed in accordance with the technical standards for the railway safety management system notified by the Minister of Land, Infrastructure and Transport pursuant to Article 7, Paragraph 5 of the Act at the time of enforcement of this Rule, shall be deemed to have received the initial detailed safety diagnosis pursuant to the amended provisions of Article 75-13, Paragraph 1. ③ High-speed railway vehicles that underwent Half Life Operation prior to the enforcement of this Rule shall be deemed to have received the initial detailed safety inspection pursuant to the amended provisions of Article 75-13, Paragraph 1. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 662, Oct. 23, 2019> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Training Hours for Acquiring Railway Vehicle Driver's License and Railway Traffic Control Qualification)  For persons who received a reduction in training hours for acquiring a railway vehicle driver's license and railway traffic control qualification in accordance with the former regulations at the time of the enforcement of this rule, the former regulations shall apply notwithstanding the amended provisions of Annex 7 and Annex 11. Article 3 (Transitional Measures Concerning Regular Training for Railway Safety Professionals)  When applying the amended provisions of Article 92-7 to persons who were granted qualifications as railway safety professionals at the time of the enforcement of this Rule, the enforcement date of this Rule shall be deemed the date on which the qualification was acquired. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 731, May 27, 2020> Article 1 (Enforcement Date)  This Rule shall enter into force on May 27, 2020. However, the amended provisions of Annex 7 shall enter into force on January 1, 2021. Article 2 (Transitional Measures concerning Passing Standards for Railway Vehicle Driver's License Examination)  Notwithstanding the amended provisions of Annex 10, the former provisions shall apply to those who submitted an application for a railway vehicle driver's license examination before the enforcement of this rule. Article 3 (Transitional Measures concerning Standards for Revocation or Suspension of Driver's License)  Notwithstanding the amended provisions of Annex 10-2, the former provisions shall apply to violations committed prior to the enforcement of this rule. Article 4 (Transitional Measures concerning Practical Training and Education)  Practical training and education received under the former regulations prior to the enforcement of this Rule shall be deemed as education under the amended regulations of Item 1 of Annex 11. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 752, Aug. 4, 2020> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Reporting Railway Vehicle Modifications)  The amended provisions of Article 75-4 shall apply from the time a device or part is changed pursuant to a warranty contract after the enforcement of this Rule. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 767, Oct. 7, 2020> Article 1 (Enforcement Date)  This Rule shall enter into force on October 8, 2020. However, the amended provisions of Article 71-2 shall enter into force on December 10, 2020. Article 2 (Transitional Measures Concerning the Cycle of Railway Job Training)  Persons performing railway duties pursuant to the amended provisions of Article 41-3, Paragraph 1 at the time of enforcement of this Rule shall calculate the cycle of railway job training based on January 1, 2021, notwithstanding the amended provisions of the main text of Subparagraph 2, Item (a) of Annex 13-3. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 859, June 23, 2021> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Decrees for the Reorganization of Difficult Legal Terms) This rule shall take effect from the date of its promulgation. <Proviso omitted> ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1168, Dec. 19, 2022> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Three Acts for the Expansion of the Scope of Recognition of Practical Experience Required for Qualification Acquisition, etc.) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1189, Jan. 18, 2023> Article 1 (Enforcement Date)  This rule shall enter into force on January 19, 2023. Article 2 (Applicability to the Submission of Attached Documents for Driver's License Examination Application)  ① The amended provisions of the proviso to Article 26, Paragraph 1 shall apply to the railway vehicle driver's license skills examination for which applications are received on or after July 1, 2023. ② The amended provisions of Article 26, Paragraph 1, Subparagraph 5 and Form No. 15 shall apply to the written examination for a railway vehicle driver's license for which an application is received on or after February 1, 2023. Article 3 (Applicability to the Submission of Attached Documents for Application for Detailed Safety Diagnosis)  The amended provisions of Article 75-14, Paragraph 1, Subparagraph 2 shall apply from the time an application for detailed safety diagnosis is submitted after the enforcement of this Rule. Article 4 (Applicability to driving license test subjects and passing criteria for persons who have obtained a control qualification certificate)  The amended provisions of Nos. 1 and 4 of Annex 10 shall apply to the written test for a railway vehicle driving license for which an application is received on or after February 1, 2023. Article 5 (Applicability to Air Traffic Control Education and Training by Type of Air Traffic Control Certification)  The amended provisions of Subparagraphs 1 and 2 of Table 11-2 and Form 24-2 of the Appendix shall apply from the time of taking the Air Traffic Control Certification Examination specified in the 2024 Air Traffic Control Certification Examination Implementation Plan announced pursuant to Articles 25 and 38-8. Article 6 (Applicability to Subjects and Passing Criteria of Air Traffic Control Certification Exams by Type of Air Traffic Control Certification)  The amended provisions of Annex 11-4 shall apply from the time of taking the air traffic control certification exam specified in the 2024 Air Traffic Control Certification Exam Implementation Plan announced pursuant to Articles 25 and 38-8. Article 7 (Transitional Measures Concerning Education Hours and Training Subjects for Obtaining a Driver's License for Holders of Air Traffic Control Certificates)  Persons who have completed the education and training pursuant to Item 1 of Annex 7 prior to the enforcement of this Rule shall be deemed to have completed the education and training pursuant to the amended provisions of Items (a) and (b) of Item 3 of the same Annex, respectively. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1285, Dec. 20, 2023> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 13-2 shall enter into force on April 19, 2024, and the amended provisions of Annex 7 shall enter into force on July 1, 2024. Article 2 (Applicability to Subjects of Railway Vehicle Driver's License Examination)  The amended provisions of Annex 10 shall apply to railway vehicle driver's license skills examinations for which applications are received on or after July 1, 2024. Article 3 (Transitional Measures Concerning Railway Vehicle Driving Education and Training)  If railway vehicle driving education and training was received in accordance with the previous regulations before July 1, 2024, it shall be deemed that driving education and training was received in accordance with the amended regulations of Annex 7. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1323, Apr. 9, 2024> This rule will take effect on April 10, 2024. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1364, July 17, 2024> This rule will take effect on July 17, 2024. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1392, Sep. 27, 2024> This rule will take effect on September 27, 2024. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1400, Nov. 12, 2024> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Three Acts, Including the Enforcement Rule of the Multi-Family Housing Management Act, for the Support of Business Revitalization of Small Business Owners, etc.) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1531, Oct. 31, 2025> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws to Reflect Government Organizational Reorganization) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1569, Mar. 12, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws for the Reorganization of Regulatory Review Periods) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1571, Mar. 24, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Two Acts for the Reorganization of Standards for Personnel, Facilities, etc. to Alleviate the Burden on Business Operators) This rule shall take effect from the date of its promulgation. [Appendix 1] Disposition Standards Related to Safety Management System (Related to Article 7) [Attached Table 1-2] Railway Vehicles Permitted for Operation by Type of Railway Vehicle Driver's License (Related to Article 11) [Appendix 2] Physical Examination Items and Criteria for Disqualification (Related to Article 12, Paragraph 2 and Article 40, Paragraph 4) [Appendix 4] Aptitude Test Items and Disqualification Criteria (Related to Article 16, Paragraph 2) [Appendix 5] Detailed Designation Criteria for Driving Aptitude Test Agencies or Air Traffic Control Aptitude Test Agencies (Related to Article 18, Paragraph 1) [Appendix 6] Criteria for Revocation of Designation and Suspension of Operations of Driver Aptitude Test Agencies and Air Traffic Control Aptitude Test Agencies (Related to Article 19, Paragraph 1) [Attached Table 7] Training Hours and Subjects by Course for Obtaining a Driver's License (Related to Article 20, Paragraph 3) [Appendix 8] Detailed Designation Criteria for Driver Education and Training Institutions (Related to Article 22, Paragraph 1) [Appendix 9] Criteria for Revocation of Designation and Suspension of Business of Driver Education and Training Institutions (Related to Article 23, Paragraph 1) [Attached Table 10] Subjects and Passing Criteria for Railway Vehicle Driving License Examination (Related to Article 24, Paragraph 2) [Attached Table 10-2] Detailed Standards for Driver's License Revocation and Suspension of Effect (Related to Article 35) [Appendix 11] Detailed Standards for Practical Training and Education (Related to Article 37) [Attached Table 11-2] Subjects and Training Hours for Air Traffic Control Education and Training (Related to Article 38-2, Paragraph 2) [Attached Table 11-3] Detailed Designation Criteria for Air Traffic Control Education and Training Institutions (Related to Article 38-5, Paragraph 1) [Attached Table 11-4] Subjects and Passing Criteria, etc. for the Air Traffic Control Certification Examination (Related to Article 38-7, Paragraph 2 and Article 38-9) [Attached Table 11-5] Detailed Criteria for Cancellation or Suspension of Validity of Air Traffic Control Certificate (Related to Article 38-18) [Appendix 13] Aptitude Test Items and Disqualification Criteria for Personnel Engaged in Driving Duties, etc. (Related to Article 41, Paragraph 4) [Attached Table 13-2] Contents of Safety Education for Railway Employees (Related to Article 41-2, Paragraph 3) [Attached Table 13-3] Content, Time, Method, etc. of Railway Job Training (Related to Article 41-3, Paragraph 2) [Attached Table 13-4] Timing and Hours of Maintenance Education and Training, etc. (Related to Article 42-3) [Attached Table 13-5] Detailed Designation Criteria for Maintenance Education and Training Institutions (Related to Article 42-4, Paragraph 1) [Appendix 13-6] Criteria for Revocation of Designation and Suspension of Operations of Maintenance Education and Training Institutions (Related to Article 42-6, Paragraph 1) [Appendix 14] Disposition Standards Regarding Approval of Railway Rolling Stock Manufacturers (Related to Article 58, Paragraph 1) [Appendix 15] Disposition Standards Regarding Approval of Railway Equipment Manufacturers (Related to Article 70) [Appendix 16] Disposition Standards Regarding Restrictions on the Operation of Railway Vehicles (Related to Article 75-7) [Appendix 17] Disposition Standards Related to Certified Maintenance Organizations (Related to Article 75-12, Paragraph 2) [Appendix 18] Criteria for Revocation of Designation and Suspension of Business of Precision Safety Inspection Agencies (Related to Article 75-19, Paragraph 1) [Appendix 19] Criteria for Designation of Testing Institutions (Related to Article 85-8, Paragraph 1) [Appendix 20] Criteria for Revocation of Designation and Suspension of Business of Testing Institutions (Related to Article 85-9, Paragraph 1) [Appendix 24] Education and Training of Railway Safety Professionals (Related to Article 91, Paragraph 1) [Appendix 25] Detailed Designation Criteria for Specialized Railway Safety Agencies (Related to Article 92-3) [Appendix 26] Criteria for Revocation of Designation and Suspension of Operations of Specialized Safety Agencies (Related to Article 92-5, Paragraph 1) [Appendix 27] Placement Standards for Railway Operation Safety Managers, etc. (Related to Article 92-6, Paragraph 1) [Appendix 28] Regular Training for Railway Safety Professionals (Related to Article 92-7, Paragraph 2) [Appendix 29] Detailed Criteria for Revocation of Qualification and Suspension of Validity of Railway Operation Safety Managers (Related to Article 92-8) [Attachment Form No. 1] Application for Approval of Railway Safety Management System [Attachment Form No. 1-2] Application for Approval of Change to Railway Safety Management System [Attachment Form No. 1-3] Notification of Change to Railway Safety Management System [Attachment Form No. 1-4] Confirmation of Change Report for Railway Safety Management System [Attachment Form No. 2] Certificate of Approval for Railway Safety Management System [Attachment Form No. 3] Markings for Training Railway Vehicles, etc. [Attachment Form No. 4] Physical Examination Decision [Attachment Form No. 4-2] Register of Notifications for Grounds for Disqualification from Railway Vehicle Driver's License [Attachment Form No. 9] Aptitude Test Decision [Attachment Form No. 10] Application for Designation as an Aptitude Test Agency [Attachment Form No. 11] Designation Certificate for Aptitude Testing Agencies [Form No. 11-2] Notification of Changes to Designated Agency [Form No. 11-3] Administrative Disposition by Designated Agency [Attachment Form No. 12] Certificate of Completion for Specialized Driving Education and Training [Attachment Form No. 13] Application for Designation as a Driver Education and Training Institution [Attachment Form No. 14] Designation Certificate for Driver Education and Training Institution [Attachment Form No. 15] Application for Railway Vehicle Driver's License Examination [Attachment Form No. 16] Railway Vehicle Driver's License Examination Application Receipt Register [Attachment Form No. 17] Application for Railway Vehicle Driver's License (Issuance, Reissuance) [Attachment Form No. 18] Railway Vehicle Driver's License [Attachment Form No. 19] Railway Vehicle Driver's License Management Register [Attachment Form No. 20] Application for Renewal of Railway Vehicle Driver's License [Attachment Form No. 21] Notice of Renewal of Railway Vehicle Driver's License [Attachment Form No. 22] Notice of Revocation or Suspension of Railway Vehicle Driver's License [Attachment Form No. 23] Railway Vehicle Driver's License Issuance Register [Attachment Form No. 24] Practical Training Management Register for Driving Workers (Driver's License Holders) [Form No. 24-2] Certificate of Completion for Air Traffic Control Education and Training [Form No. 24-3] Application for Designation as Air Traffic Control Education and Training Institution [Form No. 24-4] Designation Certificate for Air Traffic Control Education and Training Institution [Attachment Form No. 24-5] Application for Air Traffic Control Certification Examination [Attachment Form No. 24-6] Registration Register for Air Traffic Control Certification Examination [Attachment Form No. 24-7] Application for (Railway, Urban Railway) Railway Traffic Controller Qualification Certificate (Issuance, Reissuance) [Form No. 24-8] Railway Traffic Controller Qualification Certificate [Form No. 24-9] Control Certification Management Register [Form No. 24-10] Application for Renewal of Control Certification [Form No. 24-11] Notice of Renewal of Control Certification [Form No. 24-12] Notice of Cancellation or Suspension of Air Traffic Control Certification [Form No. 24-13] Control Certification Issuance Register [Attachment Form No. 25] Management Register for Practical Training of Control Personnel [Form No. 25-2] Application for Railway Vehicle Maintenance Technician (Recognition, Grade Change) [Form No. 25-3] Confirmation of Railway Vehicle Maintenance Work Experience [Form No. 25-4] Railway Vehicle Maintenance Experience Certificate [Form No. 25-5] Application for Reissuance of Railway Vehicle Maintenance Experience Certificate [Form No. 25-6] Register of Issuance of Railway Vehicle Maintenance Experience Certificates [Form No. 25-7] Status of Issuance and Cancellation of Railway Vehicle Maintenance Experience Certificates [Form No. 25-8] Application for Designation as a Maintenance Education and Training Institution [Form No. 25-9] Designation Certificate for Maintenance Education and Training Institution [Attachment Form No. 26] Application for Railway Vehicle Type Approval [Form No. 26-2] Application for Approval of Railway Vehicle Type Change [Attachment Form No. 27] Notification of Change of Railway Vehicle Type [Form No. 27-2] Confirmation of Railway Vehicle Type Change Report [Form No. 28] Railway Vehicle Type Approval Certificate [Form No. 28-2] Certificate of Approval for Change of Railway Vehicle Type [Attachment Form No. 29] Application for Reissuance of Type Approval/Manufacturer Approval Certificate [Attachment Form No. 30] Application for Approval of Railway Vehicle Manufacturer [Form No. 30-2] Application for Approval of Change of Railway Rolling Stock Manufacturer [Attachment Form No. 31] Notification of Change in Railway Vehicle Manufacturer Approval [Form No. 31-2] Confirmation of Notification of Change in Railway Vehicle Manufacturer Approval [Form No. 32] Certificate of Approval for Railway Vehicle Manufacturer [Form No. 32-2] Certificate of Approval for Change of Railway Rolling Stock Manufacturer [Attachment Form No. 33] Notification of Succession of Railway Vehicle Manufacturer [Attachment Form No. 34] Application for Railway Vehicle Completion Inspection [Form No. 35] Railway Vehicle Completion Inspection Certificate [Attachment Form No. 36] Application for Type Approval of Railway Equipment [Form No. 36-2] Application for Approval of Type Change of Railway Equipment [Attachment Form No. 37] Notification of Change of Type for Railway Equipment [Form No. 37-2] Confirmation of Notification of Change of Type for Railway Equipment [Form No. 38] Certificate of Type Approval for Railway Equipment [Form No. 38-2] Certificate of Approval for Type Change of Railway Equipment [Attachment Form No. 39] Application for Approval of Railway Equipment Manufacturer [Form No. 39-2] Application for Approval of Change of Railway Equipment Manufacturer [Attachment Form No. 40] Notification of Change of Railway Equipment Manufacturer [Form No. 40-2] Confirmation of Notification of Change in Approval for Railway Equipment Manufacturers [Attachment Form No. 41] Certificate of Approval for Railway Equipment Manufacturer [Form No. 41-2] Certificate of Approval for Change of Railway Equipment Manufacturer [Attachment Form No. 42] Notification of Succession of Railway Equipment Manufacturer [Attachment Form No. 43] Railway Type Approval Post-Management Inspection Official ID Card [Attachment Form No. 44] Opinion on Railway Standard Specifications (Enactment, Revision, Abolition) [Attachment Form No. 45] Application for Approval of Railway Vehicle Modification [Form No. 45-2] Railway Vehicle Modification Report [Form No. 45-3] Confirmation of Railway Vehicle Modification Report [Form No. 45-4] Certificate of Approval for Railway Vehicle Modification [Form No. 45-5] Application for Certification of Railway Rolling Stock Maintenance Organization [Form No. 45-6] Application for Certification of Change of Certified Maintenance Organization [Form No. 45-7] Railway Rolling Stock Maintenance Organization Certification [Form No. 45-8] Notification of Change in Certified Maintenance Organization [Form No. 45-9] Confirmation of Change Notification for Certified Maintenance Organization [Form No. 45-10] Application for Detailed Safety Diagnosis of Railway Vehicles [Form No. 45-11] Application for Designation as a Railway Vehicle Precision Safety Inspection Agency [Form No. 45-12] Designation Certificate for Railway Vehicle Precision Safety Inspection Agency [Form No. 45-13] Application for Performance Certification of Railway Security Screening Equipment [Form No. 45-14] Railway Security Screening Equipment Performance Test Results [Form No. 45-15] Railway Security Screening Equipment Performance Certification [Form No. 45-16] Application for Designation of Railway Security Screening Equipment Testing Institution [Form No. 45-17] Designation Certificate for Railway Security Screening Equipment Testing Institution [Form No. 45-18] Report on Breakdown, Defect, and Functional Failure [Form No. 45-19] Railway Safety Voluntary Report [Attachment Form No. 46] Application for Railway Safety Specialists (Qualification Grant, Reissuance of Qualification Certificate) [Form No. 47] Certificate of Qualification for Railway Safety Professionals [Form No. 47-2] Application for Designation as a Specialized Railway Safety Agency [Form No. 47-3] Designation Certificate for Specialized Railway Safety Agency [Form No. 47-4] Railway Operation Safety Manager Work Status Log [Form No. 47-5] Notice of Revocation or Suspension of Qualification for Railway Operation Safety Manager [Attachment No. 48] Prosecutor Official ID Card