Railway Vehicle Operation Rules

236575 · 2021-10-26

Chapter 1 General Provisions Article 1 (Purpose) The purpose of this Rule is to prescribe matters necessary for the safe operation of railway vehicles, such as train formation, operation of railway vehicles, and signaling systems, in accordance with the provisions of Article 39 of the Railway Safety Act. Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Oct. 18, 2010, Oct. 26, 2021> 1. The term "station" refers to a place used for the purpose of boarding and alighting passengers (including passenger facilities and amenities), loading and unloading cargo, forming trains (referring to the operation of connecting or disconnecting railway vehicles), passing trains, or evacuating trains. 2. The term "main line" refers to a track commonly used for the operation of trains. 3. The term "siding" refers to a track other than the main line. 4. Delete<2021.10.26> 5. Delete<2021.10.26> 6. The term "vehicle" refers to a single railway car that is a component of a train. 7. The term "overhead line" refers to the overhead line and the structures supporting it. 8. The term "slow-speed car" refers to a passenger or freight car equipped with a brake cylinder for a through-brake, a pressure gauge, a conductor's valve, and a hand brake, and equipped with a cabin where train crew members can perform their duties. 9. The term "railway signal" refers to signals, telegrams, and signs pursuant to the provisions of Article 76. 10. The term "proceeding signal" refers to signals indicating the proceeding of a vehicle, such as proceed signals, deceleration signals, caution signals, warning signals, guidance signals, and in-vehicle signals (excluding stop signals). 11. The term "block" means occupying a section exclusively for the operation of a single train in order to prevent two or more trains from operating in that section simultaneously. 12. "Operation within the yard" refers to the operation of a train or vehicle within a station or vehicle depot by means of shunting signals. 13. "Shunting" refers to the operation of moving, connecting, or disconnecting vehicles by human power or by using a locomotive. 14. The term "marshal yard" refers to a place used for the shunting of rolling stock or the formation of trains. 15. The term "signal station" refers to a place installed for the operation and handling of train control systems, such as mounted signals. 16. The term "powered vehicle" refers to a railway vehicle manufactured for the purpose of moving along a track by means of a power generating device, such as a locomotive, electric multiple unit, or railcar. 17. The term "dangerous goods" refers to dangerous goods as defined in Article 44, Paragraph 1 of the Railway Safety Act. 18. "Unmanned operation" refers to a method in which a train operates automatically under remote control from a control room, without a person directly driving the train from inside. 19. "Operation handler" refers to a person who operates railway signals, track switches, or control panels. Article 3 (Scope of Application) The operation of railway vehicles on railways shall be governed by these Rules, except where otherwise specifically provided in other laws and regulations. Article 4 (Enactment and Amendment of Business Regulations, etc.) ① Railway operators and railway facility managers (hereinafter referred to as "Railway Operators, etc.") may separately establish detailed standards and procedures necessary for the safety management and operation of train operations, such as matters not specified in this Rule or matters varying by region (hereinafter referred to as "Operational Regulations" in this Article), within the scope of this Rule. <Amended Oct. 26, 2021> ② Railway operators, etc. shall consult in advance with other relevant railway operators, etc. in the cases of each of the following subparagraphs. <Amended 2021.10.26> 1. In case of intending to operate a train in a section managed by other railway operators, etc. 2. In the case of enacting or amending operational regulations in relation to train operations pursuant to Item 1 [Title Revised 2021.10.26] Article 5 (Responsibilities of Railway Operators, etc.) Railway operators, etc. shall take necessary measures to prevent railway accidents and to ensure the safe and smooth transportation of passengers and cargo in the operation of trains or rolling stock. Chapter 2 Railway Employees, etc. <Amended 2021.10.26> Article 6 (Education and Training, etc.) ① Railway operators, etc. shall provide necessary training in accordance with relevant laws and regulations, such as the Railway Safety Act, to persons falling under any of the following subparagraphs, and shall allow the relevant railway employees, etc. to perform their duties after confirming that they possess the knowledge and skills necessary for the performance of their duties. <Amended 2021.10.26> 1. Person engaged in the operation of railway vehicles pursuant to Article 2, Subparagraph 10, Item (a) of the Railway Safety Act (hereinafter referred to as "person engaged in operation duties") 2. Person assisting in railway vehicle operation duties (hereinafter referred to as "operation duty assistant") 3. Persons engaged in the duties of centrally controlling, monitoring, and supervising the operation of railway vehicles pursuant to Article 2, Subparagraph 10, Item (b) of the Railway Safety Act (hereinafter referred to as "control duty personnel") 4. Persons providing crew services to passengers pursuant to Article 2, Subparagraph 10, Item (c) of the Railway Safety Act (hereinafter referred to as "passenger crew") 5. Operation Manager 6. Person performing the task of connecting and disconnecting railway vehicles 7. Person performing shunting operations with a remotely controllable device ② Railway operators, etc. shall establish a safety management system to ensure that driving personnel, driving assistants, and passenger crew members can appropriately perform reporting, instructions, or supervision regarding matters necessary before boarding a railway vehicle or during the operation of the railway vehicle. <Amended 2021.10.26> ③ If a railway operator, etc. determines that a person performing the duties under the provisions of Paragraph 2 is unable to properly perform the said duties due to overwork or the like, they shall not allow such person to perform the duties. Article 7 (Railway personnel required to board a train) ① Trains shall be staffed with driving personnel and passenger crew. However, if it is deemed that there is no impediment to the safety of train operations in consideration of the condition of the relevant track, the type of rolling stock connected to the train, and the level of the railway vehicle's structure and equipment, railway personnel other than driving personnel may not be allowed to board or their numbers may be adjusted. <Amended Oct. 18, 2010, Oct. 26, 2021> ② Notwithstanding Paragraph 1, in the case of unmanned operation, a driver may not be required to be on board. <Newly added 2010.10.18, 2021.10.26> Chapter 3 Loading Limitations, etc. Article 8 (Restrictions on Vehicle Loading, etc.) ① When loading cargo onto a vehicle, the maximum allowable load capacity shall not be exceeded, taking into consideration the vehicle's structure and design strength. <Revised 2021.10.26> ② When loading cargo onto a vehicle, the weight burden must be evenly distributed, and care must be taken to ensure there is no risk of collapse or tipping over due to shaking during driving. <Amended 2021.10.26> ③ Cargo shall not be loaded or transported in vehicles exceeding the vehicle limits (referring to the limits of the vehicle's length, width, and height; hereinafter the same applies in this Article). However, cargo exceeding the vehicle limits (hereinafter referred to as "extra-large cargo") may be transported if measures necessary for the safe operation of the train are taken. <Amended 2021.10.26> ④ Detailed matters necessary for restrictions on cargo loading, etc. of vehicles pursuant to the provisions of Paragraphs 1 through 3 shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Newly added 2021.10.26> Article 9 (Transportation of Extra-Large Cargo) In cases where a railway operator, etc. intends to transport extra-large cargo pursuant to the proviso of Article 8, Paragraph 3, they shall transport it after investigating and reviewing in advance whether there are any obstacles in the relevant section that may impede train operations. <Amended Oct. 26, 2021> Chapter 4 Operation of Trains Section 1 Composition of the Train Article 10 (Maximum Number of Coupled Cars, etc.) The maximum number of coupled cars of a train shall be determined based on the traction force of the locomotive forming the train, the performance of the vehicles, the structure of the vehicles such as the frame, the strength of the coupling devices, and the current status of the operating tracks. Article 11 (Position of Locomotive Connection) A locomotive used for the operation of a train shall be connected to the front of the train. However, this shall not apply in any of the following cases: 1. In cases where two or more locomotives are coupled and the train is controlled by the locomotive located at the front 2. When using an auxiliary locomotive 3. In case of a breakdown on the track or train 4. When operating a rescue train, snow removal train, construction train, or test run train 5. When operating between a station and a siding branching off from the main line other than the station 6. In other cases where there are special circumstances Article 12 (Restrictions on Passenger Train Connections) ① Freight cars may not be connected to passenger trains. However, this shall not apply in the case of return transport or other special circumstances. ② When connecting freight cars in accordance with the provisions of the proviso to Paragraph 1, freight cars shall not be connected in the middle of passenger cars. ③ Damaged vehicles, non-powered locomotives, or freight cars loaded with cargo bearing the weight of two or more vehicles shall not be connected to a passenger train. Article 13 (Operating Position of Train) ① The train must be operated from the driver's cab of the leading car in the direction of travel. ② Notwithstanding Paragraph 1, in any of the following cases, the train may be operated from outside the driver's cab of the leading car in the direction of travel. <Amended Oct. 18, 2010> 1. Cases where a railway employee gives a signal at the front of the vehicle and the train is operated in accordance with that signal 2. In case of a fault in the track, overhead line, or vehicle 3. When operating a construction train, rescue train, or snow removal train 4. When operating between a station and a siding branching off from the main line other than that station 5. In the case of operating to test railway facilities or railway vehicles 6. When driving a specific predetermined section 6-2. Case of unmanned operation 7. Other unavoidable cases where the safe operation of the train is not impeded even if the driver does not operate from the driver's cab of the leading car in the direction of travel Article 14 (Braking System of Trains) A train composed of two or more carriages shall be equipped with a braking system that acts in conjunction with all carriages and can automatically stop the carriages when they are separated. However, this shall not apply in any of the following cases: 1. When performing vehicle coupling and uncoupling operations at a station 2. In the case of rescue trains and construction trains equipped with personnel capable of stopping the vehicles 3. In other cases where safety measures have been taken to prevent impact to other vehicles even when the vehicles are separated Article 15 (Braking Force of a Train) ① Trains must be equipped with sufficient braking capability according to the degree of track curvature and operating speed. ② Railway operators, etc. shall form a train such that the ratio of the number of braking axles (referring to the total number of axles capable of applying the required braking force) to the number of coupled axles (referring to the total number of axles of coupled vehicles) (hereinafter referred to as the "braking axle ratio") is 100. However, this shall not apply in cases where there are unavoidable reasons, such as when forming a train due to the occurrence of an emergency situation. ③ When forming a train, the vehicles shall be arranged so that the braking force is uniform for all vehicles. However, if the braking force of some vehicles is not applied due to a breakdown or other reasons, the operating speed shall be reduced according to the braking axle ratio. Article 16 (Connection of Gradients) ① A local speed car shall be connected to the rear of a train using a through brake (or the front in the case of propulsion operation). However, a local speed car may not be connected to freight trains. ② Notwithstanding the provisions of the proviso to Paragraph 1, express and sedans shall be connected to trains where train crews must be on board, such as military-exclusive trains or trains transporting dangerous goods. Article 17 (Testing of Braking Systems) In the event that a train is assembled or its composition is changed, the braking systems shall be tested to verify normal operation before the train is operated. Section 2 Operation of Trains Article 18 (Relationship between Railway Signaling and Operation) Railway vehicles shall be operated in accordance with the conditions indicated by signals, electronic signs, and markings. Article 19 (Boundaries of Stations) In cases where railway operators, etc. perform different operational handling inside and outside a station, they shall distinguish between the inside and outside and designate the boundary points and marking methods. Article 20 (Designation of Train Direction of Operation, etc.) ① Railway operators, etc. shall designate the direction of operation of trains in advance in the case of tracks where the route is divided into upstream, downstream, etc. ② In any of the following cases, a train may be operated on the track opposite to the track designated pursuant to the provisions of Paragraph 1. 1. In cases where trains are operated in accordance with a method mutually agreed upon with the railway operator, etc. pursuant to the provisions of Article 4, Paragraph 2 2. When operating on tracks within a station 3. When operating a construction train, rescue train, or snow removal train 4. When operating between a station and a siding branching off from the main line other than that station 5. When performing shunting operations 6. When operating for testing of the track or train 7. When driving in reverse 8. When operating a train in a section equipped with bidirectional signaling facilities 9. In cases where operation in the designated track direction is unavoidably impossible due to the handling of a railway accident or operational disruption (hereinafter referred to as "railway accident, etc.") or track maintenance work, etc. ③ In the event that there is a train operating on the opposite track pursuant to the provisions of Paragraph 2, the railway operator, etc. shall take necessary safety measures, such as controlling the operation of subsequent trains. Article 21 (Operation on Main Lines Outside Stations) A vehicle shall not be operated on the main line outside of a station unless it is converted into a train. However, this shall not apply in the case of shunting operations. Article 22 (Prohibition of Train Stopping Outside Stations) Trains shall not stop outside of designated stations. However, this shall not apply in any of the following cases: 1. Before entering a steep section with a gradient of 30/1000 or more 2. When a stop signal is displayed 3. In the event that a railway accident, etc. occurs or there is a risk of a railway accident, etc. occurring 4. Other cases where stopping is unavoidable for railway safety Article 23 (Train Operation Schedule) Railway operators, etc. shall determine the departure, passage, and arrival times of trains at stations and operate trains in accordance therewith. However, this shall not apply in unavoidable circumstances, such as when organizing and operating temporary trains urgently. Article 24 (Operational Adjustment) In the event that disruption in train operations occurs due to train delays caused by the occurrence of railway accidents, etc., resulting in changes to the train operating schedule, operational adjustments shall be made considering the type, class, destination, and connecting transport of the train, and measures shall be taken to restore normal operation. <Amended Jan. 2, 2019> Article 25 (Prevention of Accidents During Train Departure) When a railway operator, etc., initiates a train, they shall take measures to ensure the safety of passengers, such as checking whether a passenger is trapped in the carriage doors and verifying the closed status of the doors. Article 26 (Reverse Operation of Trains) ① A train shall not move backward. However, this shall not apply in any of the following cases: 1. In case of a fault in the track, overhead line, or vehicle 2. When a construction train, rescue train, or snow removal train needs to reverse for operational purposes 3. When reversing using the rear auxiliary locomotive 4. In cases where there are special circumstances, such as the occurrence of railway accidents, etc. ② In the event of reversing in accordance with the provisions of the proviso to Paragraph 1, measures shall be taken to ensure that the operation of other trains or vehicles is not hindered. Article 27 (Prevention of Disasters for Trains) In the event that there is a risk of disaster or danger to trains due to storms, heavy snowfall, floods, earthquakes, tsunamis, etc., railway operators, etc. shall take measures to prevent disasters and dangers, such as temporarily suspending train operations or limiting operating speeds, taking into consideration the situation. <Amended Oct. 26, 2021> Article 28 (Prohibition on Simultaneous Entry and Exit of Trains) Where two or more trains are entering or exiting a station and there is a risk of obstructing the paths of the trains to one another, two or more trains shall not be allowed to enter or exit the station simultaneously. However, this shall not apply in any of the following cases: 1. Where safety sidings, derailment switches, and derailment devices are installed 2. Case of guiding the train to enter at a slow speed 3. When entering a train operated by a single locomotive 4. Where trains entering from other directions have a clearance of at least 200 meters (150 meters in the case of multiple units/electric multiple units) from the departure signal or stopping position 5. Where trains entering from the same direction have a clearance of 100 meters or more at each stopping position Article 29 (Emergency Stopping of Trains, etc.) In the event that a railway accident, etc. occurs and it is necessary to stop a train urgently, measures necessary to stop the train, such as displaying a stop signal, shall be taken without delay. Article 30 (Temporary Suspension of Line Use) ① Trains or railway vehicles other than those related to the work or construction shall not be allowed to enter sections where work or construction that impedes train operations, such as track improvement or maintenance, is in progress. <Amended 2021.10.26> ② When the work or construction pursuant to the provisions of Paragraph 1 is completed, it shall be confirmed that there is no impediment to the operation of trains, and trains shall be operated. Article 31 (Prohibition of Movement After Requesting Rescue Train) ① If a train stops outside a station due to the occurrence of a railway accident, etc., and a rescue train is requested or a notification of rescue train operation is received, the said train shall not be moved. However, this shall not apply in any of the following cases: 1. In cases where there is a risk of railway accidents, etc. 2. If relocation to another location is necessary to perform emergency work ② When a railway employee moves a train or railway vehicle in accordance with the proviso to Paragraph 1, they shall, without delay, notify the driver of the rescue train, the control officer, or the person in charge of operation of the details and reason for the movement, and take safety measures, such as a stop signal, to protect the train. <Amended 2021.10.26> Article 32 (Operation in Case of Fire) ① In the event of a fire on a train, necessary measures must be taken promptly to extinguish the fire, evacuate passengers, or isolate the vehicle where the fire occurred from other vehicles. ② If a fire on a train occurs inside a bridge or tunnel, the principle is to first move the railway vehicle out of the bridge or tunnel; if it occurs in an underground section, the principle is to move it to the nearest station or out of the underground section. Article 32-2 (Ensuring Safety, etc. During Unmanned Operation) In the case of unmanned operation of a train, the matters in each of the following subparagraphs shall be observed. <Amended Oct. 26, 2021> 1. Railway personnel designated by the railway operator, etc. shall switch the driving method to unmanned driving mode before releasing the vehicle from the depot or before entering an unmanned driving section, and obtain confirmation of the unmanned driving function from control personnel. 2. Control personnel shall monitor the operational status of trains in real time and take necessary measures 3. Control personnel shall take the following measures if a train stops past the station's stop line: A. Blocking subsequent trains from entering the relevant station B. Have a railway employee designated by the railway operator, etc. board the train and manually move the train to the stop line C. If the measures under Subparagraph B are difficult, restart the train to the next station. 4. Railway operators, etc. shall station safety personnel at stations, etc., or have them patrol the area to ensure the safety of passengers during boarding and alighting and to respond promptly to emergencies such as system failures. [This Article Newly Established 2010.10.18] Article 33 (Operation of Special Purpose Trains) Railway operators, etc., shall establish and implement an operation plan for said special purpose trains when the operation of a train is necessary for a special purpose. Section 3. Train Operating Speed ​​ Article 34 (Operating Speed ​​of Trains) ① Trains shall be operated at a safe speed in accordance with the condition of the tracks and overhead lines, vehicle performance, driving methods, signal conditions, etc. ② Railway operators, etc. shall determine and operate the maximum speed of trains by track line and by type of rolling stock, taking into consideration each of the following subparagraphs. 1. Regarding the tracks, the degree of track curvature and the types and structure of track switches 2. Regarding overhead lines, speed limits by installation method Article 35 (Speed ​​Limitation by Operation Method, etc.) Railway operators, etc. shall separately determine and implement the operating speed limit for trains or vehicles in any of the following cases: <Amended Oct. 26, 2021> 1. When driving in a section where a slow-speed signal is displayed 2. In the case of propulsion operation (excluding cases where control is performed at the front of the train according to the centralized control method) 3. When operating a train in reverse 4. When operating an unlocked switch in the opposing direction 5. When performing shunting operations 6. In cases where a train is operated pursuant to the Messenger Act under Article 74 7. When operating in a hand signal display section 8. When performing command operation 9. When a driving employee is on board and driving in an unmanned driving section 10. Other cases deemed necessary for railway safety Article 36 (Stopping of Train or Vehicle) ① A train or vehicle shall not proceed beyond the point where a stop signal is displayed. However, this shall not apply in any of the following cases: 1. Delete <2021.10.26> 2. When a stop signal is displayed by hand signal 3. In the case where a stop signal is displayed at a distance where stopping is impossible due to signal failure, etc. ② Notwithstanding the provisions of Paragraph 1, a train or vehicle that has come to a stop due to a stop signal from an automatic block signal may proceed past the point where the stop signal is displayed by proceeding slowly in accordance with safety measures, such as speed limits, even while the stop signal is still being displayed. ③ When an automatic block signal installed with an additional slow-speed permit sign displays a stop signal, vehicles may proceed past the display point without stopping, even while the stop signal is being displayed, by proceeding slowly in accordance with safety measures such as speed limits. Article 37 (Progress of Train or Vehicle) When a signal instructing progress is displayed, a train or vehicle may proceed past that point at a speed no higher than the designated speed, in accordance with the instructions for each type of signal, to the point where the next signal is given. Article 38 (Slowing Down of Trains or Vehicles) ① A train or vehicle shall reduce its speed when a slow-speed signal is displayed. ② When a train or vehicle has passed a point where a signal to release slow speed is present, it may operate at normal speed. Section 4 Shunting Article 39 (Shunting) ① Railway operators, etc., when performing shunting operations, shall prepare a shunting operation plan including the matters in each of the following subparagraphs, distribute it to locomotive engineers, train operation personnel, and shunting workers, and conduct training on shunting operations. However, in the case of shunting operations involving movement merely to change tracks, a shunting operation plan may not be prepared. 1. Work Details 2. Target Vehicle 3. Shunting Operation Sequence 4. Roles by Worker 5. Shunting Signaling Method 6. Assignment of radio channel to be used during shunting 7. Other Safety Measures ② Shunting operators (including locomotive engineers) shall comply with the standards of each of the following subparagraphs when shunting rolling stock and trains. 1. Do not perform shunting operations to separate vehicles when the vehicle and train are moving. 2. Ensure that the operation of other trains is not obstructed during shunting. 3. Do not subject vehicles carrying passengers or vehicles loaded with dangerous goods such as explosives to impact. [Wholly Revised 2018.7.18] Article 40 (Locking and Maintaining of Correct Position of Track Switches) ① Track switches on the main line shall be used by interlocking them with the related signals and the tracks within their path. However, this shall not apply to tracks that are permanently locked or to backward-facing tracks that are operated in extremely infrequently. ② When passing an unlocked track switch in opposite directions, the tongue rail must be locked using a locking mechanism. ③ After using the track switch, it must be returned to its predetermined position without delay. Article 41 (Measures when a vehicle is stopped) When a vehicle is stopped on a siding, etc., necessary measures shall be taken to ensure that the vehicle does not move. Article 42 (Entry and Shunting of Trains) ① Shunting operations that may obstruct other trains are prohibited when the time for another train to enter the station is imminent. However, this shall not apply in urgent or unavoidable cases, such as when other trains cannot enter. ② When the arrival time of a train is imminent, shunting shall not be performed on the track where the train is scheduled to stop. However, this shall not apply after safety measures have been taken to ensure that the operation of the train is not hindered. Article 43 (Shunting Outside Stations) After another train has departed an adjacent station or signal box, shunting across the outer edge of the station signal for that train is prohibited. However, this shall not apply in cases where there are special grounds and sufficient safety measures have been taken. Delete Article 44 <2018.7.18> Article 45 (Manual Shunting) Input shunting using the vessel shall be approved by the control officer or the operations manager, and the operations manager shall supervise such operation. [Wholly Revised 2021.10.26] Chapter 5 Ensuring Safety Between Trains Section 1 General Provisions Article 46 (Ensuring Safety Between Trains) ① A train shall be operated in any of the following ways to ensure safety between trains. However, this shall not apply in cases where the train is operated within a station in accordance with the display or indication of railway signals or the instructions of the person managing operations at the station. <Amended 2021.10.26> 1. Method due to obstruction 2. Method using a device for securing a gap between trains (hereinafter referred to as "train control device") 3. Method by visual driving ② In the event of a block in a single-track section, trains from the opposite station shall not be allowed to enter the relevant section simultaneously. ③ In special cases, such as operating a rescue train or operating another construction train in a section where a construction train is present, and where measures have been taken to ensure the safety of train operations, the provisions of Paragraphs 1 and 2 may not apply. [Title Revised 2021.10.26] Article 47 (Prohibition of Signals Instructing Progress) No signal instructing progress shall be displayed where there is an obstruction to the path of a train or vehicle. Article 47-2 (Protection of Trains) ① Railway operators, etc. shall take protective measures in cases where a railway accident, etc. occurs and hinders the operation of trains on adjacent tracks, or where the stopping of other trains is necessary. ② Train operators must stop the train immediately upon confirming that another train has taken protective measures. [New article established 2021.10.26] Section 2 Method by Obstruction Article 48 (Method by Block) When using the method by block, it must be possible to display signals or prevent the entry of other trains according to the conditions of the block section on the path of the train concerned. Article 49 (Train Operation by Block) ① When operating trains using the block signaling method, the main line must be divided into block sections. However, the main line within a station may not be designated as a block section. ② Two or more trains may not operate simultaneously in a single block section. However, this shall not apply in cases falling under any of the following subparagraphs. <Amended 2021.10.26> 1. In the case of bringing a train in pursuant to Paragraphs 2 and 3 of Article 36 2. When operating a rescue train in a block section with a disabled train 3. When operating a construction train on a section where the track is closed 4. When the rear auxiliary locomotive is detached from the train in a block section 5. When guiding another train into a block section where a train is stopped 6. When operating a train using a train control device while the train is operating by the block signaling method, or when operating a train at a reduced speed on a line where visual operation is possible. 7. In other cases where there are special circumstances Article 50 (Classification of Blocking Methods) Blocking methods shall be classified as follows: <Amended Aug. 27, 2021, Oct. 26, 2021> 1. Regular Block Systems: Automatic Block System, Interlocking Block System, In-vehicle Signal Block System, Token Block System 2. Substitute Blocking Methods: Communication Type · Map Communication Type · Map Type · Command Type Article 51 (Functions of Automatic Block Signaling Devices) Block signals, station signals, and departure signals in block sections where the automatic block system is implemented shall be equipped with the functions of each of the following subparagraphs. <Amended Oct. 26, 2021> 1. Automatically display a stop signal when a train or vehicle is in the block section. 2. Automatically display a stop signal when a switch in a block section is not opened in the proper direction, or when a vehicle on a branch line or at an intersection obstructs the block section. 3. Automatically display a stop signal in the event of a fault in the blocking device 4. In single-track sections, when a signal indicating proceed in one direction is displayed, the signal light in the opposite direction shall automatically display a stop signal. [Title Revised 2021.10.26] Article 52 (Conditions for Interlocking Block Devices) Stations or signal boxes at both ends of a block section where the interlocking block system is implemented shall be equipped with interlocking block devices having the functions of each of the following subparagraphs. <Amended Oct. 26, 2021> 1. It shall be able to automatically display the following indications in conjunction with the signal device A. Train in block section B. No trains in the block section 2. When a train is in a block section, it shall not be possible to display a signal instructing progress on the signal boards of that section. 3. The marking under Subparagraph 1(a) shall not be changed unless a train that has entered a block section has passed through that section. 4. In a single-track section, if a block occurs in one direction, the signal light in the opposite direction shall automatically display a stop signal. Article 53 (Handling of Trains Entering Interlocked Block Sections) ① When intending to enter a block section, the marking under Article 52, Subparagraph 1, Item (b) must be checked, and approval must be obtained from the station or signal box ahead. <Amended 2021.10.26> ② The approval under Paragraph 1 shall be made by the indication under Article 52, Subparagraph 1, Item (a). <Amended 2021.10.26> ③ Approval under the provisions of Paragraph 1 cannot be granted when there is a train or vehicle in a block section. Article 54 (Function of In-Car Block Signaling Devices) In-car signals in sections where the in-car block signaling system is implemented shall be equipped with a function to automatically display a stop signal in any of the following cases. <Amended Oct. 26, 2021> 1. If there is a train or other vehicle in the block section 2. In cases where a track switch in a block section is not in the proper direction 3. When a train or vehicle on another track is entering a block section 4. In case of a failure in the ground equipment of the train control system 5. When the direction of the train's normal operating track is different [Title Revised 2021.10.26] Article 55 (Functions, etc. of Token Block Devices) ① Stations or signal boxes at both ends of a block section where the token block system is implemented shall be equipped with token block devices having the functions of each of the following subparagraphs. <Amended 2021.10.26> 1. Tokens cannot be retrieved unless handled cooperatively at the stations or signal boxes at both ends of the block section. 2. Only one token may be retrieved from the token blockers located at both ends of the block section, and no other token may be retrieved until the retrieved token has been inserted into the token blocker. 3. Tokens from adjacent block sections must not be inserted ② Only tokens exclusively for that section shall be inserted into the token block device pursuant to the provisions of Paragraph 1. ③ Tokens for adjacent block sections must have a different shape. 4. A train may not operate on a section without carrying a token for that section. However, this shall not apply in cases where there are special circumstances. [Title Revised 2021.10.26] Article 56 (Handling of Trains Entering Token Block Sections) ① When intending to enter a token block section, approval must be obtained from the operator in charge at the station or signal box in the direction of travel after confirming that there are no trains in the block section. <Revised 2021.10.26> ② A token used for the operation of a train shall not be used for the operation of another train unless it has been inserted into the token block device. However, this shall not apply in cases where there are special circumstances, such as operating a rescue train in a block section where a train has broken down. Article 57 (Communication Devices for Communication-based Substitute Blocking System) Dedicated communication facilities shall be installed in sections where the communication system is implemented. However, in any of the following cases, other communication facilities may be used in its place. 1. In the case of a light section 2. In case of a failure in dedicated communication equipment 3. In cases where dedicated communication facilities cannot be installed due to the occurrence of railway accidents, etc., or other unavoidable reasons Article 58 (Handling of Trains Entering Communication Block Sections) ① To enter a communication-based block section, approval must be obtained from a control officer or the person in charge of train operations. <Amended 2021.10.26> ② Control personnel or train operation officers may authorize the entry of a train only after confirming that there are no trains or vehicles in the block section. <Amended 2021.10.26> Article 59 (Implementation of Guidance Communication Methods) ① In sections where the map communication system is implemented, it shall be carried out after mutual consultation using the communication facilities at the stations or signal boxes at both ends of the block section. ② When implementing the map communication system, the stations or signal boxes at both ends of the block section shall issue a map sheet after mutual consultation. ③ The map markers pursuant to the provisions of Paragraph 2 shall be one per block section. Article 60 (Distinction in Use of Map Marks and Map Rights) ① In sections where the guidance communication system is implemented, if there is only one train to be directed into a block section in the same direction, a guidance ticket shall be issued; however, if two or more trains are to be directed consecutively into a block section in the same direction, a guidance ticket shall be issued for the last train, and guidance rights shall be issued for the remaining trains. ② Map tickets shall be issued after mutual consultation at the station or signal box holding the map ticket. Article 61 (Handling of Trains Entering Block Sections Using Map Communication System) A train shall not operate in a section without carrying a map ticket or map pass for the relevant section. However, this shall not apply in cases where there are special circumstances, such as operating a rescue train in a block section where a train has broken down. Article 62 (Contents to be Entered on Map Markers and Map Certificates) ① The station names at both ends of the section, the date of issue, and the train number used must be entered on the map. ② The section of use, the train used, the date of issue, and the map ticket number must be entered on the map ticket. Article 63 (Implementation of Guided Operations) Guided operations shall be implemented only when there is no need to operate subsequent trains in cases where trains are operated within a single block section between the site and the nearest station or signal box due to the handling of railway accidents, etc. or track maintenance work. Article 64 (Issuance of Maps) ① Map tables must be issued for sections where the map system is implemented. ② One map sheet shall be provided per block section, and a train may not operate in a section without carrying the map sheet for that section. Article 64-2 (Implementation of Directive Forms) ① The command system shall be implemented upon the approval of the control officer when the block section meets all of the requirements of the following subparagraphs. 1. Control personnel shall be able to monitor train operations 2. The operation communication device shall be functioning normally ② Control personnel shall comply with the following matters when conducting a dispatch ceremony. 1. Define the boundaries of the block section where the command formula will be implemented 2. Verify that there are no trains or rolling stock in the block section where the command ceremony is to be executed 3. Notify the engineer of a train entering a block section where commanding is being implemented of precautions such as the approval number, implementation section, and driving speed. [New article established 2021.10.26] Section 3 Method by Train Control Device <Revised 2021.10.26> Article 65 (Method by Train Control Device) A train control device that automatically maintains a distance between trains shall be capable of automatically decelerating or stopping the relevant train according to conditions such as the distance between the operating train and other trains on the same track, and the track. <Amended Oct. 26, 2021> [Title Revised 2021.10.26] Article 66 (Types of Train Control Devices) Train control devices shall be classified as follows: 1. Automatic Train Stop (ATS) 2. Automatic Train Control (ATC) 3. Automatic Train Protection (ATP) [Wholly Revised 2021.10.26] Article 67 (Functions of Train Control Devices) ① The automatic train stopping device must be able to automatically stop the train when the train's speed exceeds the displayed speed of the signal installed on the ground. ② Automatic train control devices and automatic train protection devices shall be equipped with the functions of each of the following subparagraphs. 1. A train in operation shall be able to automatically decelerate or stop at the speed indicated by control information according to operating conditions such as the distance from a preceding train, track curvature, and track switches. 2. Display the driving speed based on train control information and the actual train speed in real time on the device's operation screen. 3. In the event that the train must be stopped, it shall be able to automatically engage the braking system to stop at the target stop. [Wholly Revised 2021.10.26] Deleted <2021.10.26> Deleted <2021.10.26> Section 4 Method by Clockwork Operation Article 70 (Method by Clock Operation) ① The method of clockwork operation shall be implemented only in cases where it is necessary to operate the train by a method other than those specified in Article 50, subparagraphs 1 and 2, due to a failure of signaling equipment or communication devices, etc. ② The operating speed of railway vehicles shall be operated at a speed no higher than the speed at which the train can be stopped within the forward visibility range. ③ Trains operating in the same direction shall maintain a sufficient distance from the preceding train. Article 71 (Visual Operation in Single-Track Sections) In single-track sections, safety measures to prevent accidents shall be taken, such as not operating a train in the opposite direction when operating a train in one direction. Article 72 (Operation of Trains by Visual Clock) The operation of trains by visual clock shall be carried out in any one of the following ways. However, this shall not apply in cases where the railway operator, etc. has specifically determined otherwise, such as the operation of a single locomotive for consultation purposes. <Amended Aug. 27, 2021> 1. In the case of double-track operation A. Timekeeping Method B. Messenger Method 2. In case of single-line operation A. Guiding Time Interval Method B. Messenger Method Article 73 (Enforcement of the Timekeeping Act or Guided Timekeeping Act) ① When implementing the interval method or the guided interval method, it must be confirmed that there are no trains or vehicles in the block section before operating the first train. ② The interval method shall be implemented by the train operation officer at the station or signal box at one end of the block section. <Revised 2021.10.26> ③ The guidance interval method shall be implemented after the train operator at the station or signal box at one end of the block section dispatches a qualified person and consults with the train operator at the opposite station or signal box. However, in the event of a communication loss in a section where the guidance communication method is being implemented, the method may be implemented without dispatching a qualified person for the first train departing from the station or signal box holding the guidance ticket. <Amended 2021.10.26> Article 74 (Enforcement of the Messenger Law) ① When introducing another train into a block section where a train or vehicle is stopped, the train must be operated in accordance with the messenger method. ② The signaling method shall be implemented by the train operation personnel at the stations or signal boxes located at both ends of the block section through consultation. However, in any of the following cases, it may be implemented without consultation. <Amended 2021.10.26> 1. When implementing the messenger method in a block section where the map method is implemented due to track faults, etc. 2. Cases other than Item 1 where consultation is impossible due to telephone outage ③ In cases falling under Paragraph 2, Subparagraph 2, a train or vehicle shall not be operated beyond the place where the relevant train or vehicle is stopped. Article 75 (Messenger) ① Messengers must be selected for sections where the Messenger Act is implemented. ② The messenger referred to in Paragraph 1 shall be limited to one person per block section. ③ Delete <2021.10.26> 4. In sections where the Messenger Act is enforced, a train may not be operated without the messenger for the relevant section on board. Chapter 6 Railway Signaling Section 1 General Provisions Article 76 (Railway Signaling) Railway signals shall be implemented as classified in the following subparagraphs. 1. Signals shall be those that indicate operating conditions to trains or vehicles using shapes, colors, sounds, etc. 2. The preceding number shall be the expression of intent between relevant employees through shapes, colors, sounds, etc. 3. The sign shall indicate the location, direction, conditions, etc. of an object by its shape or color, etc. Article 77 (Signals, etc., during Day or Night) In the case of signals, signals, and signs that use different display methods for day and night, the daytime method shall be used from sunrise until sunset, and the nighttime method shall be used from sunset until sunrise of the following day. However, even in the period from sunrise to sunset, if it is difficult to confirm the signals, signals, or signs according to the daytime method, the nighttime method shall be followed. [Wholly Revised 2021.10.26] Article 78 (Signals in Underground Sections and Tunnels) Signals, electronic signs, and markers in underground sections and tunnels shall be in accordance with nighttime protocols. However, this shall not apply to underground sections that are short enough to allow light to pass through, inside tunnels where lighting facilities are installed, or within the premises of underground stations. Article 79 (Presumption of Limitation Signal) ① If a signal is not displayed at the designated place where it is to be displayed, or if the display is inaccurate, it shall be deemed that a stop signal has been displayed. ② When a fixed signal, a temporary signal, and a hand signal each display different signals, the operation shall be restricted to the maximum extent by the display of the signal. However, if prior notice has been given, the notified signal shall be followed. Article 80 (Prohibition of Combined Use of Signals) A single signal shall be used for a single purpose on a single line. However, this shall not apply to a signal equipped with a route indicator. Section 2 Mounted Signal Article 81 (Fixed Signals) A fixed signal refers to a signal that indicates the operating conditions of a train or vehicle at a designated location by means of colored lights or a series of lights. Article 82 (Types of Fixed Signals) The types and uses of fixed signals are as follows: <Amended Oct. 26, 2021> 1. Main Signal A. Station Signal: Displaying a signal to a train intending to enter a station B. Departure Signal: Displaying a signal to a train intending to leave the station C. Block Signal: Displaying a signal to a train intending to enter a block section D. Protective Signal: Displaying a signal to a train intending to pass through a point requiring special protection E. Guiding Signal: Displaying a signal to the train to be guided when a stop signal is displayed on the station signal. B. Shunting Signal: Displaying a signal to shunting vehicles or trains in a section where the onboard signal block system is implemented. 2. Dependent Signal A. Distant Signal: A signal that displays a warning signal to a train regarding the signal displayed by the main signal, subordinate to station signals, departure signals, block signals, and protective signals. B. Pass Signal: Subordinate to the departure signal, it advances the signal displayed by the signal to trains entering the station and displays a signal indicating whether the train may pass through the station. C. Relay Signal: A device that displays a relay signal of the signal displayed by the main signal to a train, subordinate to station signals, departure signals, block signals, and protective signals. 3. Signal Accessories A. Route Indicator: A device attached to station signals, departure signals, route opening indicators, and shunting signals that indicates the route to a train or vehicle. B. Route Preview Signal: A device that provides advance notice to a train of the route displayed on the next station signal or departure signal, subordinate to the station signal or departure signal. C. Route Opening Indicator: A device installed at the branching point of a main line where trains using onboard signaling operate to indicate the route opening status. 4. In-car signal: A signal displayed by installing it inside the locomotive Article 83 (In-vehicle Signals) The types of in-vehicle signals and their speed limits are as follows: 1. Stop Signal: A signal to stop a train operating in a section where train operation is hindered 2. 15 Signal: A signal for a train that has stopped due to a stop signal, requiring it to operate at a speed of 15 kilometers per hour or less. 3. Yard Signal: A signal for shunting vehicles requiring them to operate at a speed of 25 kilometers per hour or less 4. Proceed signal: A signal to drive the train at a speed below a designated speed Article 84 (Signal Display Method) The display method of a stationary signal shall be as follows: <Amended Oct. 26, 2021> 1. Station Signals, Departure Signals, Block Signals, and Guard Signals <img src="http://www.law.go.kr/flDownload.do?flSeq=35568568" alt="img35568568" > ┌────┬─────────────────────────────────┐ Type Signal Display Method │ ├───────┬───────┬────┬────────────┤ 5th Aspect 4th Aspect 3rd Aspect 2nd Aspect │ ├───────┼───────┼────┼───┬────────┤ Color equation Color equation Color equation Color equation Complete equation │ │ │ │ │ ├────┬───┤ Day Night ├────┼───────┼───────┼────┼───┼────┼───┤ Stop signal Red light Red light Red light Level/Horizontal red light ├────┼───────┼───────┼────┼───┼────┼───┤ Warning signal Upper: Orange light Sub: Orange-yellow ├────┼───────┼───────┼────┼───┼────┼───┤ Warning signal Yellow light Yellow light Yellow light ├────┼───────┼───────┼────┼───┼────┼───┤ Deceleration signal Upper: Yellow light Upper: Yellow light Sub:Green light Sub:Green light ├────┼───────┼───────┼────┼───┼────┼───┤ Proceed signal Green light Green light Green light Left/Down Green light Aroma 45° └────┴───────┴───────┴────┴───┴────┴───┘ </img> 2. Guiding Signal (Light Array Type): White Light Array, Left/Downward 45 degrees 3. Shunting Signal <img src="http://www.law.go.kr/flDownload.do?flSeq=35568569" alt="img35568569" > ┌────┬────────────────────────────┐ Type Signal Display Method │ ├───────────┬────────────────┤ Identification-type color light │ │ ├────────┬───────┤ In-car signal block section Other sections ├────┼───────────┼────────┼───────┤ Stop signal White light row Horizontal Red light Red light Non-induction light off ├────┼───────────┼────────┼───────┤ Proceed signal White light column downward to the left 45 degrees Yellow light Blue light Non-induction light illuminates Non-induction light illuminates └────┴───────────┴────────┴───────┘ </img> 4. Distant signaling device (including through signaling device) <img src="http://www.law.go.kr/flDownload.do?flSeq=35568570" alt="img35568570" > ┌────────────────────┬────────────────┐ Type Signal Display Method │ ├────┬───────────┤ Color light type Semaphore type │ │ ├──────┬────┤ Day Night ├───────────────┬────┼────┼──────┼────┤ When the main signal gives a stop signal, caution signal yellow light horizontal yellow light ├───────────────┼────┼────┼──────┼────┤ New proceed signal where the main signal indicates proceed Green light Downward/Left Green light When performing a 45-degree arc └───────────────┴────┴────┴──────┴────┘ </img> 5. Repeater <img src="http://www.law.go.kr/flDownload.do?flSeq=35568572" alt="img35568572" > ┌──────────┬──────────────┬────────┐ Types Column type Color type ├──────────┼────┬─────────┼────────┤ Main signal light stop relay white light column (3 lights) horizontal red light If a stop signal is given ├──────────┼────┼─────────┼────────┤ Main signal restricts progress relay white light sequence (3 lights) Main signal signal indicating a 45-degree downward left advance In case of color light Progress relay white light column (3 lights) vertical └──────────┴────┴─────────┴────────┘ </img> 6. In-vehicle signal <img src="http://www.law.go.kr/flDownload.do?flSeq=35568573" alt="img35568573" > ┌───────┬───────────────────────┐ Type Signal Display Method ├───────┼───────────────────────┤ Stop signal red square light illuminated ├───────┼───────────────────────┤ 15 Signal Red circular light illuminates ("15" indication) ├───────┼───────────────────────┤ Yard signal: Yellow rectangular light and red circular light (25-light signal) illuminate ├───────┼───────────────────────┤ Proceed signal red circular light (corresponding signal) illuminates └───────┴───────────────────────┘ </img> Article 85 (Basic Principles of Signal Display) ① The basic principles of a stationary signal device in the absence of separate operation are as follows: <Revised 2021.10.26> 1. Station signal: Stop signal 2. Start signal: Stop signal 3. Block signals (excluding automatic block signals): Stop signal 4. Cover Signal: Stop Signal 5. Induction signal: Does not display a signal. 6. Shunting Signal: Stop Signal 7. Remote Signal: Caution Signal ② Automatic block signals and semi-automatic block signals shall, by default, display a signal indicating proceed. However, in the case of single-track sections, they shall, by default, display a stop signal. <Revised 2021.10.26> ③ Onboard signals shall, by default, display proceed signals. <Revised 2021.10.26> [Title Revised 2021.10.26] Article 86 (Backlight Installation) Where it is necessary to identify the display of a mounted signal from the rear, backlighting shall be installed. Article 87 (Arrangement of Signals) When displaying two or more signals of the same type on a single pole, the top one shall be for the leftmost track, and sequentially for the rightmost tracks. Article 88 (Order of Signal Displays) A distant signal shall not display a proceed signal prior to the primary signal displaying a proceed signal, nor shall a three-position signal display a caution or proceed signal prior to the first signal on the rear side of the signal displaying a proceed signal. Article 89 (Restoration of Signals) When a train passes a point where a fixed signal is installed, guidance signals shall not display a signal each time the train passes such point; distant signals shall display a caution signal, and other signals shall display a stop signal. Section 3 Temporary Signal Article 90 (Temporary Signals) In cases where the condition of the track makes normal operation temporarily impossible, temporary signals shall be installed outside that section. Article 91 (Types of Temporary Signals) The types and uses of temporary signals are as follows: <Amended Oct. 26, 2021> 1. Slow-down signal: An instruction for a train or vehicle intending to enter a section where slow-down operation is required to proceed slowly within the said section. 2. Slow-down Warning Signal: A device that warns a train intending to proceed toward a slow-down signal that a slow-down signal is displayed ahead. 3. Slow Speed ​​Release Signal: An instruction to release the slow speed for a train intending to enter a slow speed zone 4. Balise: A transmitting and receiving antenna installed ahead of a section requiring slow operation that sends ground information to the train to automatically induce deceleration. Article 92 (Signal Display Method) ① The signal display method of temporary signals is as follows. <Revised 2021.10.26> <img src="http://www.law.go.kr/flDownload.do?flSeq=108999861" alt="img108999861" > ┌──────┬──────────────────────────┐ Type Signal Display Method │ ├──────────────┬───────────┤ Day Night ├──────┼──────────────┼───────────┤ Slow down signal Orange-yellow disc with a white border Orange-yellow light or reflector ├──────┼──────────────┼───────────┤ Slow-down warning signal drawing 3 black triangles drawing 3 black triangles White triangle white light or reflector ├──────┼──────────────┼───────────┤ Slow speed release signal Green disc with white border Green light or reflector └──────┴──────────────┴───────────┘ </img> ② Slow speed signals and slow speed warning signals shall display the slow speed. Section 4 Hand Signals Article 93 (Method of Displaying Hand Signals) Hand signals used in cases where signal devices are not installed or cannot be used shall be displayed as follows: 1. Stop signal A. Daytime: Red flag. However, if there is no red flag, raise both arms high or hurriedly wave something other than a green flag. B. Night: Red light. However, if there is no red light, quickly wave something other than a green light. 2. Slow down signal A. Day: Hold the red and green flags together and cross them high above your head. B. Night: Flashing green light 3. Proceed signal A. Daytime: Green flag. However, when there is no green flag, raise one arm high. B. Night: Green light Article 94 (Measures for Cases Where Normal Operation on the Track Is Difficult) In cases where normal operation on the track is difficult and a train must be stopped or slowed down, and where temporary signals cannot be installed, measures shall be taken in accordance with the classifications in each of the following subparagraphs. However, if measures to stop or slow down the train have been taken via the train's radio telephone, the measures in accordance with the classifications in each of the following subparagraphs may be omitted. 1. Cases where the train must be stopped: Display a stop signal at a point at least 200 meters ahead of the location where the railway accident, etc. occurred. 2. Cases where the train must be slowed: Display the slow signal at the beginning of the slow zone and the proceed signal at the end of the slow zone. [Wholly Revised 2021.10.26] Delete Section 5 <2021.10.26> Delete Article 95 <2021.10.26> Deleted <2021.10.26> Article 97 Deleted <2021.10.26> Section 6 Previous Sign Article 98 (Signal Display) Signals for trains or rolling stock shall be displayed using a signal device. However, if a signal device is not installed or is malfunctioning, signals may be displayed via hand signal or radio telephone. Article 99 (Departure Signal) A departure signal must be given when intending to depart a train. Article 100 (Whistle Signal) In any of the following cases, the engineer shall sound the whistle signal. 1. When warning of danger 2. In the event of an emergency Article 101 (Shunting Signaling Method) ① Shunting operators (including locomotive engineers) shall signal shunting in the following ways so that they can visually confirm each other. <Amended Aug. 27, 2021> 1. Come here A. Daytime: Wave the green flag from side to side. However, in unavoidable circumstances, this may be substituted by moving one arm from side to side. B. Night: Shake the green light left and right. 2. Go Away Jeonho A. Daytime: Wave the green flag up and down. However, in unavoidable circumstances, this may be substituted by moving one arm up and down. B. Night: Wave the green light up and down. 3. Stop signal A. Daytime: Red flag. However, in unavoidable circumstances, raising both arms high may substitute for this. B. Night: Red light ② Notwithstanding Paragraph 1, in any of the following cases, shunting signals may be made using a radio telephone. <Amended 2021.10.26> 1. In the case of shunting at an unmanned station or a station staffed by a single person 2. In the case of shunting with a single-person powered car 3. In the case of shunting simply to change the track by remotely controlling the signal 4. Cases where it is difficult to assign shunting signalers considering terrain and track conditions 5. When shunting using a remotely controllable device [Wholly Revised 2018.7.18] Article 102 (Preceding Work Subparagraph) In any of the following cases, the method specified in the preceding subparagraph shall be determined, and work shall be carried out in accordance with said subparagraph. 1. When indicating a stopping position for the handling of passengers or cargo 2. When an employee on board the leading car of the train makes necessary operational contact with the railway vehicle operator during reverse or forward operation 3. When prohibiting the movement of the vehicle in the event of inspection, repair, connection, or release 4. When communicating regarding the handling of a track switch between a signal operator or a shunting signal operator and a track switch operator 5. When testing the train's through brake Section 7 Cover Article 103 (Signs on Trains) Trains or locomotives in shunting operations shall display signs. Article 104 (Safety Signs) Safety signs shall be installed for the safe operation of trains or vehicles. Revision ⊙Ministry of Land, Infrastructure and Transport Decree No. 907 The Partial Amendment to the Rules on the Operation of Railway Vehicles is hereby promulgated as follows. October 26, 2021 Minister of Land, Infrastructure and Transport (Seal) Partial Amendment to the Railway Vehicle Operation Rules Part of the Railway Vehicle Operation Rules is amended as follows. Subparagraphs 4 and 5 of Article 2 are deleted, and Subparagraph 19 is newly added to the same article as follows. 19. "Operation handler" refers to a person who operates railway signals, track switches, or control panels. The title of Article 4, "(Enactment of Business Regulations)," shall be changed to "(Enactment, Amendment, etc. of Business Regulations)," and in Paragraph 1 of the same article, "procedure" shall be changed to "procedure (hereinafter referred to as 'business regulations' in this article)." Article 4, Paragraph 2 shall be as follows. ② Railway operators, etc. shall consult in advance with other relevant railway operators, etc. in the cases of each of the following subparagraphs. 1. In case of intending to operate a train in a section managed by other railway operators, etc. 2. In the case of enacting or amending operational regulations in relation to train operations pursuant to Item 1 The title of Chapter 2, "Railway Employees," shall be changed to "Railway Employees, etc." Article 6, Paragraph 1 shall be as follows. ① Railway operators, etc. shall provide necessary training in accordance with relevant laws and regulations, such as the Railway Safety Act, to persons falling under any of the following subparagraphs, and shall allow the relevant railway employees, etc. to perform their duties after confirming that they possess the knowledge and skills necessary for the performance of their duties. 1. Person engaged in the operation of railway vehicles pursuant to Article 2, Subparagraph 10, Item (a) of the Railway Safety Act (hereinafter referred to as "person engaged in operation duties") 2. Person assisting in railway vehicle operation duties (hereinafter referred to as "operation duty assistant") 3. Persons engaged in the duties of centrally controlling, monitoring, and supervising the operation of railway vehicles pursuant to Article 2, Subparagraph 10, Item (b) of the Railway Safety Act (hereinafter referred to as "control duty personnel") 4. Persons providing crew services to passengers pursuant to Article 2, Subparagraph 10, Item (c) of the Railway Safety Act (hereinafter referred to as "passenger crew") 5. Operation Manager 6. Person performing the task of connecting and disconnecting railway vehicles 7. Person performing shunting operations with a remotely controllable device In Article 6, Paragraph 2, "persons engaged in railway vehicle operation duties (including assistants for operation duties), persons on board trains performing duties related to the operation of railway vehicles such as train protection and operation of braking systems, etc." shall be changed to "persons engaged in operation duties, assistants for operation duties, and passenger crew," and "safety management system" shall be changed to "safety management system." In the main text of Article 7, Paragraph 1, "railway vehicle drivers and persons performing duties such as guiding passengers, protecting the train, operating braking systems, or handling various signals while on board a train" shall be changed to "operators and passenger crew members"; in the proviso of the same paragraph, "relevant" shall be changed to "corresponding," "when considering" to "in consideration," "other than railway vehicle drivers" to "other than operators"; and "not or" to "not or"; and in Paragraph 2 of the same article, "railway vehicle drivers shall not be boarded" shall be changed to "operators may not be boarded". In Article 8, Paragraph 1, replace "shall not be made" with "should not be made"; in Paragraph 2 of the same article, replace "shall be made so that the burden is evenly distributed, and during operation" with "shall be made evenly distributed, and during operation" and "shall be made" with "shall be made"; in the main text of Paragraph 3 of the same article, replace "limits on the length, width, and height of railway vehicles (hereinafter referred to as "vehicle limits")" with "vehicle limits (referring to the limits on the length, width, and height of vehicles; hereinafter the same applies in this article)" and replace "shall not be loaded or transported" with "shall not be loaded or transported"; and in the proviso of the same paragraph, replace "take measures and vehicle limits and building limits (referring to a certain space established on the track to ensure the safe operation of vehicles)" with "in the case of taking measures, vehicle limits" and replace "in the case of transport, cargo may be transported exceeding vehicle limits" It shall be changed to "may transport," and Paragraph 4 shall be newly added to the same Article as follows. ④ Detailed matters necessary for restrictions on cargo loading, etc. of vehicles pursuant to the provisions of Paragraphs 1 through 3 shall be determined and announced by the Minister of Land, Infrastructure and Transport. In Article 9, "intending to transport oversized cargo, etc. pursuant to the provisions of the proviso to Article 8, Paragraph 3" shall be changed to "intending to transport oversized cargo pursuant to the proviso to Article 8, Paragraph 3"; "relevant" shall be changed to "relevant"; "whether or not there is, etc." shall be changed to "whether or not there is"; and "shall transport" shall be changed to "must transport". In Article 27, "storms, heavy snowfall, floods, earthquakes, and tsunamis" shall be changed to "railway operators, etc. shall [take] storms, heavy snowfall, floods, earthquakes, and tsunamis"; "when there is concern" shall be changed to "in cases where there is concern"; and "shall take measures to prevent disasters and risks" shall be changed to "shall take measures to prevent disasters and risks". In Article 30, Paragraph 1, "Trains shall not be allowed to enter a section where work or construction is being carried out" shall be changed to "Trains or railway vehicles other than those related to work or construction shall not be allowed to enter a section where work or construction is in progress." Article 31, Paragraph 2 shall be as follows. ② When a railway employee moves a train or railway vehicle in accordance with the proviso to Paragraph 1, they shall, without delay, notify the driver of the rescue train, the control officer, or the person in charge of operation of the details and reason for the movement, and take safety measures, such as a stop signal, to protect the train. In the part other than the subparagraphs of Article 32-2, "shall comply" shall be changed to "must comply," and in the part other than the items of Subparagraphs 1, 2, and 3 of the same article, "personnel engaged in unmanned operation control duties" shall be changed to "personnel engaged in control duties," respectively. In the part other than the subparagraphs of Article 35, replace "when applicable" with "in applicable case"; in Subparagraph 1 of the same article, replace "time" with "case"; in Subparagraph 2 of the same article, replace "time (excluding cases where the train is controlled at the front by the General Control Method)" with "case (excluding cases where the train is controlled at the front by the General Control Method)"; in Subparagraph 3 of the same article, replace "time" with "case"; in Subparagraph 4 of the same article, replace "not" with "not" and "time" with "case"; in Subparagraph 5 of the same article, replace "time" with "case"; in Subparagraph 6 of the same article, replace "pursuant to the provisions of Article 74" with "according to Article 74" and "time" with "case"; in Subparagraphs 7 and 8 of the same article, replace "time" with "case" respectively; and amend Subparagraph 9 of the same article as follows, and the same article In Item 10, "time" shall be changed to "case". 9. When a driving employee is on board and driving in an unmanned driving section Article 36, Paragraph 1, Subparagraph 1 is deleted. Article 45 shall be as follows. Article 45 (Manual Shunting) Input shunting using the vessel shall be approved by the control officer or the operations manager, and the operations manager shall supervise such operation. The title of Article 46, "(Securing Safety Between Trains)," shall be changed to "(Securing Safety Between Trains); in the main text of the part other than the subparagraphs of Paragraph 1 of the same Article, "between trains" shall be changed to "between trains" and "shall operate" shall be changed to "must operate"; in the proviso of the part other than the subparagraphs of the same Paragraph, "person managing" shall be changed to "person managing" and "shall not be so" shall be changed to "shall not be so"; in Subparagraph 2 of the same Paragraph, "between trains pursuant to the provisions of Article 66" shall be changed to "between trains" and ""automatic train control device" shall be changed to ""train control device"; and in Subparagraph 3 of the same Paragraph, "visual operation" shall be changed to "visual operation". Article 47-2 is newly added to Section 1 of Chapter 5 as follows. Article 47-2 (Protection of Trains) ① Railway operators, etc. shall take protective measures in cases where a railway accident, etc. occurs and hinders the operation of trains on adjacent tracks, or where the stopping of other trains is necessary. ② Train operators must stop the train immediately upon confirming that another train has taken protective measures. The part other than the subparagraphs of Article 49, Paragraph 2 shall be as follows. Two or more trains may not operate simultaneously in a single block section. However, this shall not apply in cases falling under any of the following subparagraphs. Article 49, Paragraph 2, Subparagraph 1 shall be amended as follows; in Subparagraphs 2 through 5 of the same paragraph, "when" shall be changed to "in case"; in Subparagraph 6 of the same paragraph, "by method by automatic train control device or" shall be changed to "operating by train control device or" and "when" shall be changed to "in case"; and in Subparagraph 7, "when" shall be changed to "in case". 1. In the case of bringing a train in pursuant to Paragraphs 2 and 3 of Article 36 Article 50, subparagraph 2 shall be as follows. 2. Substitute Blocking Methods: Communication Type · Map Communication Type · Map Type · Command Type The title of Article 51, "(Conditions for Automatic Blocking Devices)" shall be changed to "(Functions of Automatic Blocking Devices)," and in the part other than the subparagraphs of the same article, "shall provide conditions" shall be changed to "shall provide functions." In the part other than the subparagraphs of Article 52, replace "interlocking block devices shall be installed, provided that the conditions of each of the following subparagraphs are met" with "interlocking block devices equipped with the functions of each of the following subparagraphs must be installed," amend subparagraphs (a) and (b) of subparagraph 1 of the same article as follows, and in subparagraph 3 of the same article, replace ""located in a train block section" with "subparagraph (a) of subparagraph 1." A. Train in block section B. No trains in the block section In Article 53, Paragraph 1, replace "of 'not in the train block section' when intending to allow entry" with "of Article 52, Subparagraph 1, Item (b) in cases where entry is intended," and replace "must obtain" with "must receive," and amend Paragraph 2 of the same Article as follows. ② The approval under Paragraph 1 shall be made by the indication under Article 52, Subparagraph 1, Item (a). The title of Article 54, "(Conditions for the Installation of In-Car Signal Block Devices)" shall be changed to "(Functions of In-Car Signal Block Devices)"; in the part other than the subparagraphs of the same article, "in cases falling under any of the following subparagraphs" shall be changed to "in cases of the following subparagraphs"; "shall display" shall be changed to "shall be equipped with a displaying function"; and in subparagraph 4 of the same article, "automatic train control device" shall be changed to "train control device". The title of Article 55, "(Conditions for the Requirement of a Token Block Device)" shall be changed to "(Functions, etc. of a Token Block Device)", and in the part other than the subparagraphs of Paragraph 1 of the same Article, "shall install a Token Block Device that meets the conditions" shall be changed to "shall install a Token Block Device that is equipped with the functions". In Article 56, Paragraph 1, "when intending to cause entry" shall be changed to "in the case of intending to cause entry," "intending to operate" to "intending to operate," and "must obtain approval from the person in charge of operation" to "must obtain approval from the person in charge of operation." In Article 58, Paragraph 1, "in the case of intending to allow entry" shall be changed to "in the case of intending to allow entry," and "must obtain approval from the person in charge of vehicle operation" shall be changed to "must obtain approval from the person in charge of operation." In Paragraph 2 of the same article, "person in charge of vehicle operation" shall be changed to "person in charge of operation," "without confirmation" shall be changed to "only when confirmed," and "shall not approve" shall be changed to "may approve." Article 64-2 is newly added to Section 2 of Chapter 5 as follows. Article 64-2 (Implementation of Command Ceremonies) ① Command ceremonies shall be implemented upon the approval of control personnel when a block section meets all of the requirements of each of the following subparagraphs. 1. Control personnel shall be able to monitor train operations 2. The operation communication device shall be functioning normally ② Control personnel shall comply with the following matters when conducting a dispatch ceremony. 1. Define the boundaries of the block section where the command formula will be implemented 2. Verify that there are no trains or rolling stock in the block section where the command ceremony is to be executed 3. Notify the engineer of a train entering a block section where commanding is being implemented of precautions such as the approval number, implementation section, and driving speed. The title of Chapter 5, Section 3, "Method by Automatic Train Control Device" shall be changed to "Method by Train Control Device". The title of Article 65, "(Method by automatic train control device)" shall be changed to "(Method by train control device)", and in the part of the same article other than the title, "between trains" shall be changed to "between trains", "automatic train control device" to "train control device", "automatically applicable" to "automatically applicable", and "should be existing" to "should be existing". Article 66 shall be as follows. Article 66 (Types of Train Control Devices) Train control devices shall be classified as follows: 1. Automatic Train Stop (ATS) 2. Automatic Train Control (ATC) 3. Automatic Train Protection (ATP) Article 67 shall be as follows. Article 67 (Functions of Train Control Devices) ① An automatic train stop device shall be capable of automatically stopping a train when the train's speed exceeds the indicated speed of a signal installed on the ground. ② Automatic train control devices and automatic train protection devices shall be equipped with the functions of each of the following subparagraphs. 1. A train in operation shall be able to automatically decelerate or stop at the speed indicated by control information according to operating conditions such as the distance from a preceding train, track curvature, and track switches. 2. Display the driving speed based on train control information and the actual train speed in real time on the device's operation screen. 3. In the event that the train must be stopped, it shall be able to automatically engage the braking system to stop at the target stop. Articles 68 and 69 are hereby deleted. In Article 73, Paragraph 2, "person in charge of vehicle operation handling" shall be changed to "person in charge of operation handling"; in the main text of Paragraph 3 of the same article, "person in charge of vehicle operation handling" shall be changed to "person in charge of operation handling" and "shall implement this" shall be changed to "should implement"; and in the proviso of the same paragraph, "telephone outage in the section where the guidance communication system is being implemented" shall be changed to "communication interruption in the section where the guidance communication system is being implemented" and "shall not apply when operating the first train" shall be changed to "it may be implemented without dispatching a qualified person for the first train departing." In the main text of the part other than the subparagraphs of Article 74, Paragraph 2, "person in charge of vehicle operation handling" shall be changed to "person in charge of operation handling," and "shall be implemented" shall be changed to "must be implemented." Additionally, in the proviso of the part other than the subparagraphs of the same paragraph, "shall not be so" shall be changed to "may be implemented without consultation." Article 75, Paragraph 3 is deleted. Article 77 is as follows. Article 77 (Signals, etc., during Day or Night) In the case of signals, signals, and signs that use different display methods for day and night, the daytime method shall be used from sunrise until sunset, and the nighttime method shall be used from sunset until sunrise of the following day. However, even in the period from sunrise to sunset, if it is difficult to confirm the signals, signals, or signs according to the daytime method, the nighttime method shall be followed. Article 82, subparagraph 2, item (a) shall be as follows. A. Distant Signal: A signal that displays a warning signal to a train regarding the signal displayed by the main signal, subordinate to station signals, departure signals, block signals, and protective signals. In Article 82, Subparagraph 2, Item (b), change "pass signal: on departure signal" to "pass signal: on departure signal," "regarding the train" to "on the train," and "whether or not" to "whether or not," and amend Item (c) of the same subparagraph as follows. C. Relay Signal: A device that displays a relay signal of the signal displayed by the main signal to a train, subordinate to station signals, departure signals, block signals, and protective signals. Article 82, subparagraph 3, item (c) shall be as follows. C. Route Opening Indicator: A device installed at the branching point of a main line where trains using onboard signaling operate to indicate the route opening status. Subparagraph 4 is added to Article 82 as follows. 4. In-car signal: A signal displayed by installing it inside the locomotive In the part other than the table in Article 84, Subparagraph 6, "in-vehicle signal" shall be changed to "in-vehicle signal". The title of Article 85, "(Positioning of Signal Displays)" shall be changed to "(Basic Principles of Signal Displays)"; in the part other than the subparagraphs of Paragraph 1 of the same Article, "positioning" shall be changed to "basic principles"; in the main text and proviso of Paragraph 2 of the same Article, "by positioning" shall be changed to "basically" respectively; and in Paragraph 3 of the same Article, "in-vehicle signal" shall be changed to "in-vehicle signal" and "by positioning" shall be changed to "basically". Subparagraph 4 is added to Article 91 as follows. 4. Balise: A transmitting and receiving antenna installed ahead of a section requiring slow operation that sends ground information to the train to automatically induce deceleration. In the night section of the table for slow speed signals under Article 92, Paragraph 1, "light yellow light" shall be changed to "light yellow light or reflector," and in the night section of the same table for slow speed advance signal, "white light" shall be changed to "white light or reflector," and in the night section of the same table for slow speed release signal, "green light" shall be changed to "green light or reflector." Article 94 shall be as follows. Article 94 (Measures for Cases Where Normal Operation on the Track Is Difficult) In cases where normal operation on the track is difficult and a train must be stopped or slowed down, and where temporary signals cannot be installed, measures shall be taken in accordance with the classifications in each of the following subparagraphs. However, if measures to stop or slow down the train have been taken via the train's radio telephone, the measures in accordance with the classifications in each of the following subparagraphs may be omitted. 1. Cases where the train must be stopped: Display a stop signal at a point at least 200 meters ahead of the location where the railway accident, etc. occurred. 2. Cases where the train must be slowed: Display the slow signal at the beginning of the slow zone and the proceed signal at the end of the slow zone. Chapter 6, Section 5 (Articles 95 through 97) is deleted. In the part other than the subparagraphs of Article 101, Paragraph 2, "wireless telephone" shall be changed to "wireless telephone," and Subparagraph 5 shall be newly added to the same paragraph as follows. 5. When shunting using a remotely controllable device Supplementary Provisions This rule shall take effect from the date of its promulgation. Reason for Enactment/Amendment [Partial revision] ◇ Reasons for Amendment and Key Contents In order to ensure the safe operation of railway vehicles, new standards are established in accordance with advancements in railway technology, such as adding personnel performing shunting operations using remotely controllable devices to the list of subjects for whom railway operators, etc. must receive necessary training in accordance with relevant laws and regulations; requiring railway operators, etc. to set and enforce separate speed limits when a railway vehicle driver is on board in unmanned operation sections; and classifying train control devices into automatic train stop devices, automatic train control devices, and automatic train protection devices to define their functions. This is intended to improve and supplement certain shortcomings observed in the operation of the current system, such as requiring railway operators, etc. to consult with other railway operators, etc. in advance when establishing or revising detailed standards and procedures regarding train operations in sections managed by other railway operators, etc.; adding the command-based block system to the substitute block system, which is one of the block-based operation methods for ensuring safety between trains; and abolishing special signals no longer used in the field to reflect the changed railway operating environment. <Provided by the Ministry of Land, Infrastructure and Transport>