Railway Construction Rules

270629 · 2025-04-11

Chapter 1 General Provisions Article 1 (Purpose) The purpose of this Rule is to prescribe matters necessary for railway construction standards in accordance with Article 19 of the Act on the Construction of Railways and Maintenance of Railway Facilities. <Amended Mar. 20, 2019> Article 2 (Definitions) The meanings of terms used in this Rule are as follows. 1. The term "vehicle" refers to locomotives, passenger cars, freight cars, and special vehicles manufactured for the purpose of operating on railway tracks. 2. The term "train" refers to a vehicle assembled for the purpose of operating on a main line by connecting passenger cars or freight cars, etc., to a locomotive. 3. "Main line" refers to a track installed for the purpose of regular train operation. 4. "Siding" refers to a track other than the main line. 5. "Design speed" refers to the upper limit speed that serves as a standard when designing the relevant line. 6. The term "railway" refers to a facility composed of a track for operating vehicles and a roadbed or artificial structure supporting it. 7. "Gauge" refers to the shortest distance between the inner sides of the two rails, measured from a point 14 millimeters below the top surface of the rail. 8. "Cant" refers to laying the outer rail higher relative to the inner rail to allow vehicles to operate smoothly on curved sections. 9. "Station" means a place where railway facilities, etc., for the handling of passengers or cargo are installed [including marshalling yards (referring to a place where railway facilities, etc., are installed for the formation of trains or the shunting of rolling stock) and signal yards (referring to a place where railway facilities, etc., are installed for the passing or evacuation of trains)]. 10. "Track switch" refers to a device for changing the operating track of a vehicle or train, etc. 11. "Vertical curve" refers to a curve placed in the longitudinal section to enable vehicles to operate smoothly at points where the track gradient changes. 12. The term "track" refers to a facility composed of rails, sleepers, ballast, and accessories thereof. 13. "Ballpit" refers to a structural part composed of materials such as gravel or concrete that functions to widely distribute the vehicle load transmitted from the rails and sleepers across the roadbed and to fix the sleepers in fixed positions. 14. "Slack" refers to widening the track gauge relative to the outer rail to allow vehicles to pass smoothly through curved sections. 15. "Building clearance" refers to a certain space established on the track to ensure the safe operation of a vehicle. 16. The term "overhead line" refers collectively to facilities installed along a track to supply electrical energy to a locomotive, including overhead wires, supports, and related auxiliary equipment. 17. The term "base" refers to a place established for the purpose of handling cargo or storing vehicles, etc., and includes cargo bases, vehicle bases, parking bases, maintenance bases, and track bases, etc. 18. "Signal box" refers to a place installed for handling stationary signals (including train control systems) necessary solely for the operation of trains, without facilities for the crossing and evacuation of trains. 19. "Level crossing safety device" refers to various safety facilities installed at level crossings where a road and a railway intersect at a level to ensure the safety of the passage of trains, vehicles, and people. 20. "Train control system" refers to a system formed by organically combining interlocking devices, automatic train control devices, etc., to directly control train operation. 21. "Track circuit" refers to a circuit electrically configured to detect whether a train, etc., occupies a track. 22. The term "signal" refers to devices such as signals and signal markers installed at necessary locations, such as the boundary points of block sections and the starting points of sidings, to indicate whether train operation is possible. 23. "Block section" refers to a section of track divided into multiple segments designated to be occupied by only one train. 24. "Interlocking device" refers to a device in which the control or operation of signals, track switches, track circuits, etc., is operated sequentially according to a predetermined order. 25. "Communication facilities" refers to communication facilities, such as communication lines, for transmitting, receiving, or displaying information (voice, codes, text, images, etc.) regarding train operation and railway operation, and facilities attached thereto. 26. "Exclusive Electric Multiple Unit Line" refers to a railway line on which electric multiple units operate primarily for the purpose of handling urban traffic, and on which passenger or freight trains powered by diesel engines, etc., are not operated. Article 3 (Relationship with Other Laws) The “Rules on Urban Railway Construction” may apply mutatis mutandis to matters falling under any of the following subparagraphs. 1. Matters concerning dedicated electric multiple unit lines operating electric multiple units pursuant to Attached Table 1 2. Matters concerning lines dedicated to electric multiple units not specified in this rule [Wholly Revised 2025.4.11] Article 4 (Detailed Standards) The Minister of Land, Infrastructure and Transport may prescribe and announce detailed standards necessary for the implementation of the standards set forth in this Rule. <Amended Mar. 23, 2013> Chapter 2 Tracks Article 5 (Design Speed) The design speed of a railway line shall be determined in consideration of the economic and social conditions of the line, construction costs, the function of the line, and future traffic demand. However, if it is recognized that the stability of railway operations is ensured, the design speed may be set differently for each section of the line in consideration of the economic feasibility of railway construction or topographical conditions. Article 6 (Gauge) The standard gauge shall be 1,435 millimeters. Article 7 (Curve Radius) The curve radius shall be determined in consideration of design speed, etc., to ensure the safety of train operation and ride comfort. However, the curve radius may be reduced in sections before and after a station, and in cases where it is continuous with a siding and a turnout. Article 8 (Cant) ① In curved sections, cant corresponding to the curve radius and operating speed shall be provided to ensure the safety of train operation and ride comfort, and to equalize the pressure applied to the track; this cant shall be gradually increased or decreased beyond a certain length. ② Notwithstanding Paragraph 1, a cant may not be installed in places where it is difficult to install a cant, such as curves within a turnout, curves before and after it, or curves within a siding. Article 9 (Insertion of Relaxation Curve) ① Transition curves shall be installed between a straight section and a circular curve of the main line, or between two circular curves, to ensure the safety of train operations and ride comfort. <Revised Dec. 8, 2023> ② Notwithstanding Paragraph 1, transition curves may not be installed on curves with a large radius, circular curves consecutive to turnouts, or other circular curves where it is difficult to install a transition curve. In such cases, necessary measures must be taken in accordance with the standards prescribed by the Minister of Land, Infrastructure and Transport. <Newly added Dec. 8, 2023> Article 10 (Minimum Length of Straight and Circular Curves) For the main line, the minimum length of straight and circular curves between two cant change sections shall be at least a certain length, taking into consideration the design speed. <Revised Dec. 8, 2023> Article 11 (Track Gradient) The track gradient shall be determined in consideration of the nature and function of the relevant track and the characteristics of the operating vehicles. Article 12 (Vertical Curves) Where the track gradient changes, vertical curves shall be installed taking into consideration the operating speed of trains and the structure of rolling stock, so as not to impede the safety of train operations or ride comfort. However, this shall not apply if there is no risk of impediment to the safety of train operations. Article 13 (Slack) Slack shall be provided on circular curves, taking into consideration the radius of the curve of the track and the distance between the fixed axles of the rolling stock, etc., in order to prevent excessive lateral pressure from being applied to the track. However, this shall not apply in cases where there is no risk of excessive lateral pressure occurring on the track. <Amended Aug. 27, 2021> Article 14 (Building Clearance) ① The scope of building clearances shall be in accordance with the classifications in each of the following subparagraphs. <Amended Dec. 8, 2023, Apr. 11, 2025> 1. For straight sections: Appendix 2 2. For curved sections: Comply with all of the following criteria a. Expand the building clearance pursuant to Subparagraph 1 in consideration of cant and slack, etc. B. Provide a slope in the building clearance pursuant to Item 1 according to the size of the cant ② Notwithstanding Paragraph 1, in cases where it is recognized that the safety of train operation can be ensured considering the train's operating speed, vehicle size and structure, etc., and where verification of safety assurance has been conducted in accordance with the procedures prescribed by the Minister of Land, Infrastructure and Transport, the scope of the building clearance may be applied in a reduced manner. <Newly added 2023.12.8> ③ Buildings or other structures shall not be installed within the building limits set forth in Paragraphs 1 and 2. However, this shall not apply to temporary facilities necessary for overhead catenary lines and their suspension devices, and for track maintenance, provided that such facilities do not impede the operation of trains and vehicles. <Amended Dec. 8, 2023> Article 15 (Center-to-Center Distance of Orbits) ① In the case of straight sections, the center-to-center spacing of the track shall be determined in consideration of the maximum width of the vehicle clearance (referring to the limits of length, width, and height of a railway vehicle measured while stationary on the track to ensure the safety of the railway vehicle), safe operation of the vehicle, and convenience for maintenance. ② In the case of curved sections, the track center-to-center spacing shall be determined by adding a value equivalent to the expansion of the construction clearance according to the curve radius. Article 16 (Width of Construction Surface) In the case of straight sections, the width of the construction surface (referring to the surface serving as the standard for constructing the subgrade) shall be determined in such a manner that it maintains the function of the track structure and enables the installation of electric poles and common conduits, as well as the securing of safe evacuation space for maintenance personnel; in the case of curved sections, it shall be determined in consideration of the influence of cant. Article 17 (Precautions for Track Design) ① Track structures shall be designed to ensure the safety of train operation, including by taking into account standard train loads. ② The track structure, including the type and thickness of the ballast and the weight of the rails, shall be determined in accordance with the design speed of the relevant track and the tonnage of passing trains. ③ When designing track structures, life cycle costs must be considered. ④ Safety equipment and disaster preparedness facilities shall be installed on track structures such as bridges and tunnels, and protective facilities shall be installed in places where there is a risk of impeding train safety. ⑤ When designing a track, the structure connecting to adjacent tracks, the vehicle power system, the platform type, and the signaling system shall be considered to enable smooth train operation with adjacent tracks (including tracks currently under planning) in the future. Article 18 (Railway Crossing Facilities) ① As a general rule, grade-separated facilities shall be installed at intersections of roads and railways. However, temporary level crossings may be installed where temporarily necessary, such as during construction. ② Power lines crossing level crossings or station premises shall be installed underground. However, if unavoidable due to topographical conditions, they may be installed above ground after consultation with the facility management agency. Article 19 (Track Markings) Track markings necessary for the maintenance of the tracks and the safe operation of trains shall be installed on the tracks. Chapter 3 Stations and Bases Article 20 (Installation of Stations) Stations shall be installed at appropriate locations, taking into consideration topographical conditions, traffic demand, economic feasibility, and distance from nearby stations. Article 21 (Facilities of Stations and Signal Boxes) ① Stations and signal boxes shall be equipped with facilities necessary according to their functions, etc. ② Among the stations, simple stations shall be installed only with facilities for passengers. Article 22 (Track layout within stations) ① Tracks within a station shall be routed in a manner suitable for train operation. ② The tracks within the station shall be provided with an effective length (the maximum length of the relevant track capable of accommodating trains without hindering the entry and exit of trains and vehicles on adjacent tracks) to be suitable for train operations. ③ Safety sidings shall be installed within stations on single-track sections and within stations where two or more trains or vehicles depart or enter simultaneously. However, they may not be installed if safety sidings are unnecessary due to the installation of operational safety equipment. 4. Tracks shall not be branched or level crossings shall not be made at places other than stations or signal boxes. However, this shall not apply if safety facilities, such as operational safety equipment, are installed. Article 23 (Platform) ① Platforms shall be installed in straight sections. However, if unavoidable due to topographical conditions, they may be installed in curved sections. ② The number and length of platforms shall be installed based on a scale calculated in consideration of transport demand, the frequency of train operations, and the types of trains. ③ The height of the platform shall be determined in consideration of the types of vehicles stopping there, etc. ④ The width of the platform shall be installed in consideration of transportation demand, structures and facilities erected within the platform, etc. ⑤ Various structures consisting of columns and walls erected on the platform shall be installed at a certain distance from the track-side end of the platform. Article 24 (Convenience and Safety Facilities on Platforms) ① Platform passageways and stairs shall be installed with passenger safety in mind. ② The width and length of the platform roof shall be installed in consideration of the scale of the platform, the length of the train, and the type of train, etc. Article 25 (Turnback) The length of a turnback for a locomotive (referring to a device that changes the forward and backward direction of a locomotive) shall be 27 meters or more. Article 26 (Blocks and Anti-rolling Equipment, etc.) ① Stoppers shall be installed at the end of the track to prevent vehicles from deviating from the track section. ② Safety equipment must be installed in locations where there is a risk of damage caused by a vehicle deviating from its designated position and rolling, or a train overshooting its stopping position. Chapter 4 Electric Railway Power Article 27 (Receiving Voltage) The voltage of the receiving line of an electric railway substation shall be determined in consideration of the receiving capacity, the receiving distance, and the power system connected thereto. Article 28 (Receiving Lines) ① The method and configuration of the receiving lines of an electric railway substation shall be determined by considering the size and characteristics of the load, geographical conditions, environmental conditions, power flow, voltage drop, receiving stability, circuit resonance, and operational rationality. ② Power receiving lines shall be installed via overhead or underground methods depending on installation conditions, such as topographical conditions, and backup lines must be secured in preparation for emergencies. Article 29 (Location of Railway Substations) ① The locations of railway substations, power supply sectioning stations, etc., shall be based on the load center of the power supply section, but shall be determined in consideration of construction and operation aspects. ② The spacing of railway substations shall be determined at a distance capable of maintaining the minimum limit of overhead line voltage and detecting fault currents occurring in the power supply system, provided that train operation plans, the importance of track sections, and future transport demand are taken into consideration. Article 30 (Capacity of Railway Substations) The capacity of railway substations shall be determined in consideration of future transport demand, normal power supply, and extended power supply. Article 31 (Types of Railway Substations, etc.) Railway substations, power supply sectioning stations, auxiliary power supply sectioning stations, parallel power supply sectioning stations, etc. shall be of the indoor type; however, considering the environment and economic feasibility, they may be of the outdoor type. Article 32 (Configuration of Power Supply System) The power supply system shall be configured considering the size and nature of the load and voltage drop, and power supply sectioning stations shall be installed between railway substations to supply power by direction. Article 33 (Control of Railway Substations, etc.) The control and monitoring of railway substations, power supply sectioning stations, etc. shall be carried out from the Electric Command Center using a centralized remote monitoring and control system, and the necessary facilities for this purpose shall be installed. Article 34 (Nominal Voltage of Overhead Lines) The nominal voltage of overhead lines shall be a voltage among standard electric railway voltages that possesses safety and economic feasibility for the equipment, etc., for the relevant voltage. Article 35 (Overhead Line Climbing Method) The overhead line cabling shall utilize a method that possesses economic efficiency and ease of maintenance among systems recognized for their safety and reliability. Article 36 (Standardization of Overhead Line Equipment, etc.) ① Equipment specifications and system dimensions of overhead contact lines shall be classified into appropriate speed classes to induce standardization, thereby enabling the improvement of equipment quality. ② The overhead line shall be designed to have performance suitable for the design speed. Article 37 (Height of Overhead Line) The nominal height of the overhead line (the height from the upper surface of the rail at the point where the curve tensioning fitting is installed to the overhead line) shall be within the range of 5,000 millimeters or more and 5,400 millimeters or less under all temperature conditions, and the nominal height of the relevant track shall be determined in consideration of vehicle clearance, cargo height, safety, economic efficiency, and current collection performance. However, in the case of existing operating lines, the height of the overhead line may be reduced in sections where structures such as tunnels, overpasses, or bridges are already installed or in sections adjacent thereto. Article 38 (Displacement of Overhead Line) The displacement of the overhead line (the distance to the left or right from the center of the track perpendicular to the upper surface of the rail at the point where the curve tensioning fitting or support is installed) shall be installed so that the overhead line does not exceed the current collection range of the pantograph collector plate even under the worst operating conditions during train stopping and operation, while ensuring that the pantograph collector plate wears as evenly as possible. Article 39 (Grounding Facilities) ① Appropriate grounding facilities must be installed to protect people and others by suppressing the rise in rail potential even in the event of accidents such as overhead line ground faults, and to prevent damage caused by lightning strikes and electric shock caused by induction. ② All grounding shall be of a common grounding system connected to one another. Article 40 (Insulation Clearance) Regarding energized parts of overhead contact lines to which constant voltage is applied, a minimum insulation clearance shall be ensured from the ground, structures, other wires, vegetation, etc., even under the worst-case conditions, based on voltage levels and the presence of contaminated areas. Article 41 (Location of Overhead Feeder Lines) The installation location of overhead feeder lines installed as bare wires shall be determined in consideration of building clearance, safety, economic feasibility, and insulation clearance. <Amended Dec. 8, 2023> [Title revised 2023.12.8] Article 42 (Strength of Overhead Catenary System Facilities) Supports and facilities for overhead catenary lines shall be designed reflecting safety factors regarding maximum wind speed, snowfall, and maximum and minimum temperature conditions, as well as topographical characteristics, and shall take into account seismic loads, etc. Article 43 (Electrical Separation Devices) For the purpose of limiting power supply suspension sections and facilitating maintenance work in the event of an anomaly, catenary lines shall be equipped with electrically separable separation devices at regular intervals or where operationally necessary; appropriate separation distances shall be maintained between electrically separated facilities. Article 44 (Crossing with Overhead Transmission and Distribution Lines) In principle, AC overhead catenary lines shall not be installed crossing overhead transmission and distribution lines with different voltage levels (excluding those installed outside of railway-exclusive sites) or overhead low-voltage lines; however, if cross installation is unavoidable due to site conditions, it may be permitted by establishing separate installation standards. Article 45 (Safety Facilities for Level Crossings and Overpasses) ① When installing an overhead catenary system at a level crossing where vehicles can pass, beams or span wires must be installed on both sides of the track or above the road, and danger signs must be affixed. ② Where overhead catenary lines are installed under overpasses, elevated platforms, or bridges, etc., and there is a risk of harm to the general public, safety equipment must be installed. Article 46 (Tunnel Lighting) For the safe operation of the railway and the safety of passengers in emergencies, lighting facilities and guide lighting facilities shall be installed within tunnels of a certain length or longer. However, if separate disaster prevention standards are prescribed in laws and regulations related to construction or fire safety, such standards shall apply. Chapter 5 Signals and Communications Article 47 (Signal Devices) ① The structure and shape of railway signal display devices and indicators shall be designed so as not to cause confusion. ② The signaling system shall be a ground signaling system or an onboard signaling system, etc.; however, the optimal system shall be selected in consideration of train operating intervals, track capacity (the maximum number of trains that can operate on the track per day), etc., as well as the safety and efficiency of train operations. ③ In sections adopting an in-car signaling system and a communication-based train control system, facilities for transmitting various signal information necessary for train operation to the train driver must be installed. Article 48 (Track Switching Devices) Electric track switches shall be installed on main lines and major sidings where tracks branch off to ensure the safety of trains. However, manual mechanical track switches may be installed on non-essential sidings. Article 49 (Installation of Track Circuits) ① Track circuits that detect the presence or absence of a train or vehicle occupancy shall be installed to control interlocking devices, including signals and track switches, and other signaling facilities. However, in the case of communication-based train control devices, they may be replaced with suitable equipment. ② The track circuit shall be configured as a closed-loop track circuit. However, if necessary, an open-loop track circuit may be installed in combination. Article 50 (Interlocking Devices) In order to ensure efficient and safe train operation and rolling stock shunting, stations, signal boxes, and depots equipped with signals and track switches shall be equipped with interlocking devices suitable for the location. Article 51 (Train Control System) In order to enhance the safety of train operations, increase train speeds, and expand track capacity, a train control system composed of interlocking devices and various control devices shall be installed. Article 52 (Automatic Train Stopping Device) An automatic train stopping device shall be installed to prevent train collisions and rear-end collisions. However, this may be omitted if equipment including the function of an automatic train stopping device is installed. Article 53 (Blocking Device) A device for ensuring blocking shall be capable of displaying a signal according to the conditions of the blocking section on the route or guaranteeing blocking. Article 54 (Train Centralized Control System, etc.) ① Centralized train control systems shall be installed in sections where it is advantageous to centrally implement the handling of signaling equipment and the control of train operations on a fixed section basis. ② A signal remote control device may be installed where it is advantageous for one station to handle the signaling facilities of another station. Article 55 (Level Crossing Safety Devices) Level crossing safety devices shall be installed at places where a road and a railway intersect at a level to ensure the safe operation of trains, pedestrians, and vehicles. Article 56 (Protection of Signaling Equipment) ① Safety devices, etc., must be installed to prevent damage to signal equipment in the event of abnormal voltage caused by lightning strikes or overhead line ground faults. ② If necessary, signal facilities shall be equipped with grounding systems to protect human lives and prevent damage to signal equipment, and a common grounding method shall be the principle. ③ Signaling equipment in AC overhead line sections shall be installed to prevent interference from power induction voltage or electromagnetic waves, etc. Article 57 (Power Supply System for Signal Equipment) In principle, the power supply system for signal equipment shall be installed in a redundant manner. Article 58 (Communication Facilities, etc.) Communication facilities and communication lines shall be installed to ensure the stability of the facilities and to enable convenient use by users. Article 59 (Transmission Facilities) Transmission facilities shall be installed to stably transmit various types of information, such as voice, codes, characters, and images, necessary for train operation and railway operation. Article 60 (Train Radio Equipment) Train radio equipment shall be installed to promote safe and efficient train operation and to enable efficient work activities between railway operators and maintenance personnel. Article 61 (Automation Facilities for Station Services) Railway stations shall be equipped with facilities to automate station operations, such as ticket sales, ticket checking and collection, and various accounting and statistics related thereto. Article 62 (Protection of Communication Facilities) Wired and wireless communication facilities shall be installed to prevent interference from power-induced voltage, electromagnetic waves, lightning, etc. Revision ⊙Ministry of Land, Infrastructure and Transport Decree No. 1480 The Partial Amendment to the Rules on Railway Construction is hereby promulgated as follows. April 11, 2025 Minister of Land, Infrastructure and Transport (Seal) Partial Amendment to the Railway Construction Rules Part of the Railway Construction Rules is amended as follows. Article 3 shall be as follows. Article 3 (Relationship with Other Laws) The “Rules on Urban Railway Construction” may apply mutatis mutandis to matters falling under any of the following subparagraphs. 1. Matters concerning dedicated electric multiple unit lines operating electric multiple units pursuant to Attached Table 1 2. Matters concerning lines dedicated to electric multiple units not specified in this rule In Article 14, Paragraph 1, Subparagraph 1, "Appendix 1" shall be changed to "Appendix 2". Mark 1 is renumbered as Mark 2, and Mark 1 is newly established as attached. Supplementary Provisions This rule shall take effect from the date of its promulgation. <img src="http://www.law.go.kr/flDownload.do?flSeq=150931801" alt="img150931801" > [Start 1] Electric multiple units on dedicated electric multiple unit lines to which the "Rules for the Construction of Urban Railways" may be applied mutatis mutandis (related to Article 3, Paragraph 1) </img> Reason for Enactment/Amendment [Partial revision] ◇ Reasons for Amendment and Key Contents The purpose is to allow the "Rules for the Construction of Urban Railways" to be applied mutatis mutandis to matters concerning dedicated electric multiple units (EMUs) operating medium-sized EMUs with an axle load of 16 tons or less and light rail EMUs with an axle load of 13.5 tons or less, in order to flexibly apply railway construction standards. <Provided by the Ministry of Land, Infrastructure and Transport>