철도의 건설 및 철도시설 유지관리에 관한 법률 시행규칙
235129 · 2021-08-27
Ministry of Land, Infrastructure and Transport ( Railway Construction Division ), 044-201-3953, 3955
Ministry of Land, Infrastructure and Transport ( Railway Facilities Safety Division ), 044-201-4627, 4624
Article 1 (Purpose) The purpose of this Ruleis to prescribe matters delegated by the Act on the Construction of Railways and the Maintenance and Management of Railway Facilities and the Enforcement Decree of the same Act , as well as matters necessary for the implementation thereof. <Amended Mar. 20, 2019>
Article 2 (Notice of National Railway Network Construction Plan) When the Minister of Land, Infrastructure and Transport establishes or amends the National Railway Network Construction Plan (hereinafter referred to as the “Railway Network Plan”) pursuant to Article 4, Paragraph 5 of the “Act on the Construction of Railways and Maintenance of Railway Facilities” (hereinafter referred to as the “Act”), he/she shall publish the matters set forth in each of the following subparagraphs in the Official Gazette. <Amended Mar. 14, 2008; Mar. 23, 2013; Mar. 20, 2019>
1. Purpose and Duration of the Railway Network Plan
2. Investment amount by project in the railway network plan
3. Reasons for Decision and Change of Railway Network Plan
4. Matters concerning the improvement of the railway network system
5. Matters concerning the improvement of operation of railway-linked transportation means
Article 3 (Application for Designation of Implementer for Railway Construction Projects, etc.) ① The application form for designation of a railway construction project implementer pursuant to Article 13, Paragraph 1 of the Enforcement Decree of the Act on the Construction of Railways and Maintenance of Railway Facilities(hereinafter referred to as the “Decree”)shall be as attached Form No. 1. <Amended Mar. 20, 2019>
② When the Minister of Land, Infrastructure and Transport designates a railway construction project implementer pursuant to the provisions of Article 13, Paragraph 2 of the Enforcement Decree, he/she shall issue a Certificate of Designation of Railway Construction Project Implementer in the form of Annex 2 to the applicant. <Amended Mar. 14, 2008; Mar. 23, 2013>
Article 4 (Application for Approval of Implementation Plan, etc.) ①When a person implementing a railway construction project pursuant to the provisions of Article 8 of the Act (hereinafter referred to as the “Project Implementer”) intends to obtain approval for a railway construction project implementation plan (hereinafter referred to as the “Implementation Plan”) pursuant to the provisions of Article 9, Paragraph 1 of the Act, they shall submit an application for approval of the railway construction project implementation plan in the form of Annex 3, attached with the implementation plan, to the Minister of Land, Infrastructure and Transport. <Amended Mar. 14, 2008; Mar. 23, 2013>
② When a project implementer intends to amend the implementation plan pursuant to the provisions of Article 9, Paragraph 8 of the Act , they shall submit an application for approval of amendment to the railway construction project implementation plan in the form of Annex 4, attached with the documents specified in each of the following subparagraphs, to the Minister of Land, Infrastructure and Transport. <Amended Mar. 14, 2008; Mar. 23, 2013>
1. Details of changes to the implementation plan and reasons for the changes
2. Documents explaining the changes to the implementation plan
Article 5 (Installation of Replacement Public Facilities, etc.) In Subparagraph 4 of Article 16 of the Enforcement Decree , the term “facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport”refers to broadcasting facilities installed by a broadcasting business operator pursuant to the Broadcasting Act . <Amended Mar. 14, 2008; Mar. 23, 2013>
Article 6 (Completion Report, etc.) ①The construction completion report pursuant to the provisions of Article 17, Paragraph 1 of the Enforcement Decree shall be in accordance with Form No. 5 of the Attached Form .
② In Article 17, Paragraph 1, Subparagraph 4 of the Enforcement Decree, the term “documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the documents listed in each of the following subparagraphs. <Amended Mar. 14, 2008; Mar. 23, 2013; Jan. 2, 2019; Mar. 20, 2019>
1. Completion Report by Individual Project ( Form No. 6)
2. Route map of the completed section
3. Longitudinal and Plan Views of the Track
4. Sketch Map of the Track List
5. Track markers such as distance markers, gradient markers, and curve markers
6. Station floor plan including route layout map
7. Building layout (limited to stations and railway depots)
8. Documents stating the status of implementation, etc. of consultation matters pursuant to Article 25 of the Environmental Impact Assessment Act , Article 22 of the Urban Traffic Management Promotion Act , and Article 6 of the Natural Disaster Countermeasures Act
9. Document listing the current status of structures such as tunnels and bridges
10. Land Detail Survey
11. Completion photos or drawings that allow distinguishing and identifying the situation before the commencement of construction and after completion
12. Construction Quality Inspection Report
13. Other documents recognized by the Minister of Land, Infrastructure and Transport as necessary for confirmation of completion
③ In the latter part of Article 16, Paragraph 1 of the Act , the term “head of an agency prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the head of a relevant central administrative agency, the head of a local government, the President of the Korea Railroad Corporation, the Chairman of the Korea National Railroad Corporation, and the head of any other specialized research institution or organization related to railway construction. <Amended Mar. 14, 2008; Mar. 23, 2013; Sep. 9, 2020>
④ When a project implementer intends to obtain permission for the use of land and facilities created or installed as a railway construction project prior to completion pursuant to the proviso of Article 16, Paragraph 4 of the Act , they shall submit an application for permission for use prior to completion in the form of Annex 7 to the Minister of Land, Infrastructure and Transport, attaching the documents specified in each of the following subparagraphs. <Amended Mar. 14, 2008; Mar. 23, 2013; Mar. 20, 2019>
1. Route map of the section intended for use prior to completion
2. Track Longitudinal and Plan Views
3. Track List Sketch Map
4. Current Status of Track Markers
5. Station floor plan including track layout
6. Building layout plan (limited to stations and railway depots)
7. Documents stating the status of implementation, etc. of consultation matters pursuant to Article 25 of the Environmental Impact Assessment Act , Article 22 of the Urban Traffic Management Promotion Act , and Article 6 of the Natural Disaster Countermeasures Act
8. Documents stating the current status of the structure
9. Photographs or drawings capable of distinguishing and identifying the situation at the time of the application for use permit prior to the commencement of construction and prior to completion
10. Construction Quality Inspection Report
11. Other documents recognized by the Minister of Land, Infrastructure and Transport as necessary for verifying the permit for use prior to completion
Article 7 (Maintenance and Management of Railway Facilities) ① A railway facility managershall maintain and manage railway facilities in accordance with the standards of each of the following subparagraphs pursuant to Article 19, Paragraph 2 of the Act . <Amended Aug. 27, 2021>
1. The railway facility manager shall identify the risks of the railway facilities under their jurisdiction and analyze their causes and effects to conduct a safety analysis in order to minimize the possibility of railway accidents.
2. To ensure the safe operation of trains and the safety of passengers on the tracks, install derailment prevention facilities, evacuation facilities, safety facilities, etc. on roadbeds, bridges, tunnels, etc., and inspect them periodically.
3. Install platforms, waiting rooms, evacuation routes, etc. at the station so that trains can stop and depart safely and passengers can move and wait safely and freely, and inspect them periodically.
4. Install safety facilities to protect users of railway crossings and the railway, and establish and implement measures such as traffic volume surveys and the deployment of management personnel.
5. Install and periodically inspect electric power facilities, railway signal control facilities, and railway information and communication facilities to ensure safe train operation and improve transportation efficiency.
② The Minister of Land, Infrastructure and Transport may establish and announce detailed standards necessary for the implementation of the standards set forth in Paragraph 1 .
[This Article was newly added on Mar. 20, 2019.]
[Formerly Article 7 was moved to Article 13 <Mar. 20, 2019>]
Article 8 (Ensuring Compatibility and Safety of Railway Facilities) ① When a project implementer or railway facility manager constructs or improves a railway pursuant to Article 19, Paragraph 3 of the Act , they shall ensure compatibility and safety by installing it in accordance with the standards of each of the following subparagraphs.
1. Establish plans regarding the structural design, technical requirements, and conformity evaluation criteria, etc., of railway facilities to ensure compatibility and safety.
2. Railway facilities shall ensure safety, reliability, availability, occupational safety and health, environmental protection, technical compatibility, and accessibility for the transportation vulnerable so that railway vehicles can be operated and utilized in an interconnected manner between railway lines.
3. Consider the interactions between railway facilities and other railway facilities, and between railway facilities and railway rolling stock.
② When constructing or improving a railway, the project implementer or railway facility manager must verify the compatibility and safety of railway facilities at each stage, such as design, manufacturing, and construction.
③ The Minister of Land, Infrastructure and Transport may establish and announce detailed standards necessary for verifying the compatibility and safety of railway facilities pursuant to paragraphs 1 and 2 .
[This Article Newly Inserted Mar. 20, 2019]
Article 9 (Life Cycle Management of Railway Facilities) In Article 27, Paragraph 1 of the Act , “history information of railway facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the matters in each of the following subparagraphs.
1. Matters concerning the name, location, specifications, performance, installation date, and design documents, etc. of railway facilities
2. Matters concerning the inspection, etc. of railway facilities, such as results of periodic inspections, detailed diagnoses, emergency inspections, and performance evaluations of railway facilities
3. Matters concerning breakdowns, functional failures, etc. of railway facilities
4. Matters concerning the timing, costs, personnel, etc., of repairs, reinforcements, etc. of railway facilities
[This Article Newly Inserted Mar. 20, 2019]
Article 10 (Implementation of Emergency Inspections, etc.) ① The Minister of Land ,Infrastructure and Transport and the Mayor of a Special City, Metropolitan City, or Governor of a Province (hereinafter referred to as “City/Provincial Governor”) shall notify the relevant railway facility manager in writing of the purpose, date, time, and subject of the emergency inspection in accordance with Article 29 , Paragraph 3 , Article 30 , Paragraph 2 , and Article 31, Paragraph 4 of the Act. However, if the purpose of the emergency inspection cannot be achieved by written notification, notification may be given orally or by telephone, etc.
② When the Minister of Land, Infrastructure and Transport and the mayor or provincial governor conduct an emergency inspection pursuant to Paragraph 1, they shall notify the relevant railway facility manager of the inspection results in writing within 5 days from the date the emergency inspection is completed.
[This Article Newly Inserted Mar. 20, 2019]
Article 10-2 (Method of Evaluation of Result Report, etc.) ① The evaluation items for the result report pursuant to Article 33-2, Paragraph 1 of the Act are as follows:
1. Methods for investigation, measurement, and evaluation of the safety, etc. of railway facilities and results thereof
2. Methods for Repairing and Reinforcing Railway Facilities
3. Comprehensive Review of the Results Report
4. Other items related to the safety of railway facilities that the Minister of Land, Infrastructure and Transport deems necessary to evaluate and notifies thereof.
② The evaluation grades pursuant to Article 33-2, Paragraph 1 of the Act shall be classified into appropriate, unsatisfactory, poor, and very poor. In this case, the detailed criteria for the evaluation grades shall be determined and announced by the Minister of Land, Infrastructure and Transport .
③ The National Land and Infrastructure Safety Management Institute pursuant to the National Land and Infrastructure Safety Management Institute Act (hereinafter referred to as the “National Land and Infrastructure Safety Management Institute”) and the Korea Transportation Safety Authority pursuant to the Korea Transportation Safety Authority Act (hereinafter referred to as the “Korea Transportation Safety Authority”) shall notify the results thereof to the persons listed in each of the following subparagraphs when they have conducted an evaluation pursuant to Article 33-2, Paragraph 1 of the Act .
1. Railway facility manager
2. Specialized railway facility safety diagnosis agency that performed precision diagnosis or performance evaluation
3. The head of a central administrative agency or the head of a local government that guides and supervises the agencies under subparagraphs 1 and 2
④ Railway facility managers and specialized railway facility safety diagnosis agencies that have received notification pursuant to Paragraph 3 may file an objection with the National Institute of Land and Infrastructure and the Korea Transportation Safety Authority within 7 days from the date of receiving the notification.
⑤ The National Institute of Land and Infrastructure and the Korea Transportation Safety Authority, having received an objection pursuant to Paragraph 4, shall notify the person filing the objection and the head of the central administrative agency or local government pursuant to Paragraph 3, Subparagraph 3 of the result of the objection within 14 days from the date of receipt of the objection.
⑥ Any person who has been requested to modify or supplement a result report pursuant to Article 33-2, Paragraph 3 of the Act shall submit the modified or supplemented result report within the period specified in each of the following subparagraphs from the date of receiving the notification pursuant to Paragraph 3. In this case, the period for filing an objection pursuant to Paragraphs 4 and 5 shall be excluded when calculating the period.
1. Detailed Diagnosis Result Report: Within 3 months
2. Performance Evaluation Result Report: Within 2 months
⑦ The National Institute of Land and Infrastructure and the Korea Transportation Safety Authority may extend the submission period under Paragraph 6 if they recognize that there are unavoidable reasons why the result report cannot be modified or supplemented within that period, such as when a railway facility is under construction or the person who performed the precision diagnosis or performance evaluation has ceased operations.
[This Article Newly Inserted June 23, 2021]
Article 11 (Evaluation of Safety and Convenience Levels of Railway Stations) ① The items for the evaluation of safety and convenience levels of railway stations pursuant to Article 34, Paragraph 1 of the Act (hereinafter referred to as the “railway station evaluation”) are as follows:
1. Structural Safety
2. Safety facilities for preventing passenger safety accidents
3. Mobility
4. Congestion
5. Other items deemed necessary by the Minister of Land, Infrastructure and Transport as evaluation criteria for railway stations
② If the Minister of Land, Infrastructure and Transport intends to conduct an evaluation of a railway station, he/she shall establish a plan for conducting the evaluation of the railway station that includes the evaluation items, standards and periods, and the subjects and periods of on-site inspections pursuant to each subparagraph of Paragraph 1, and notify the relevant railway facility manager at least two weeks prior to conducting the evaluation.
③ The Minister of Land, Infrastructure and Transport may form and operate a railway station evaluation team consisting of persons with extensive professional knowledge and experience in railway station evaluation, etc., if necessary to ensure objectivity and fairness in railway station evaluations.
[This Article Newly Inserted Mar. 20, 2019]
Article 12 (Suspension of duties of railway facility managers) The standards for the suspension of duties of railway facility managers pursuant to Article 37, Paragraph 1 of the Act are as set forth in the attached table .
[This Article Newly Inserted Mar. 20, 2019]
Article 13 (Identification Card of Inspector Officials) The identification card of an inspector official pursuant to Article 40, Paragraph 2 of the Act shall be in the form of Annex 8 .
[Wholly Amended Mar. 20, 2019]
[Moved from Article 7 <Mar. 20, 2019>]
Article 14 (Inspection of Maintenance Status of Railway Facilities, etc.) ①Public officials inspecting the maintenance status of railway facilities pursuant to Article 41, Paragraph 1 of the Act shall record and manage the inspection date and time and inspection details, etc. in the inspection ledger in Form No. 9 of the Appendix .
② The Minister of Land, Infrastructure and Transport and the mayors and governors of cities and provinces may, in accordance with Article 41, Paragraph 5 of the Act , publish the results of an inspection of the maintenance status of railway facilities if any of the following subparagraphs are found .
1. Cases where urgent repairs, reinforcement, or restrictions on use are necessary due to defects in railway facilities
2. In cases where there is a risk of endangering public safety due to failure to faithfully perform maintenance and management of railway facilities in violation of relevant laws and regulations
③ When the Minister of Land, Infrastructure and Transport and the mayors and provincial governors publish the results of the status inspection pursuant to Paragraph 2, they shall include the following matters:
1. Name and Location of Railway Facilities
2. Safety Status of Railway Facilities and Maintenance Status of Railway Facility Managers
3. Matters requiring action or correction
4. Other matters necessary for the safety of the relevant railway facilities
[This Article Newly Inserted Mar. 20, 2019]
Article 15 (Notification of Subcontracting) Any person who intends to notify the fact of subcontracting pursuant to Article 44-2, Paragraph 2 of the Act shall submit the notification of the fact of subcontracting in the form of Annex 10 , with the subcontracting agreement attached, to the railway facility manager.
[Wholly Amended June 23, 2021]
Article 16 (Application for Registration of Specialized Agency for Safety Diagnosis of Railway Facilities) ①Any person who intends to register as a specialized agency for safety diagnosis of railway facilities pursuant to Article 44-3, Paragraph 1 of the Act shall submit to the Mayor or Provincial Governor an application for registration of a specialized agency for safety diagnosis of railway facilities (including electronic documents) in the form of Annex No. 11, attaching the documents (including electronic documents) of each of the following subparagraphs.
1. A list of the representative and officers of a corporation and a document stating whether said representative and officers fall under subparagraphs 1 through 5 of Article 44-4 of the Act .
2. In cases where an executive of a corporation is a foreigner, documents confirming that they do not fall under subparagraphs 1 through 5 of Article 44-4 of the Act (limited to documents issued by the government or other competent authority of the relevant country, or a statement of the executive notarized by a notary public and verified by a Korean consul stationed in the relevant country).
3. Status of technical personnel by registration field and certificate of career for construction engineers regarding technical personnel ( Form No. 12)
4. Equipment ownership status by registration field as per Form No. 13 and documents confirming whether the equipment has undergone inspection and calibration in accordance with the National Standards Framework Act and the Metrology Act (in cases where the equipment is not subject to inspection or calibration, documents proving that it possesses the required performance).
5. Documents proving capital
② The mayor or provincial governor who receives a registration application form pursuant to Paragraph 1 shall verify the information in each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . However, if the applicant does not consent to the verification of the information in Subparagraph 1, the applicant shall be required to attach a document containing such information.
1. Certificate of Alien Registration pursuant to Article 88 of the Immigration Control Act (applicable only if the representative, executive, or technical personnel is a foreigner residing in Korea)
2. Certificate of Corporate Registration (applicable only if the applicant is a corporation)
③ Upon receiving a registration application pursuant to Paragraph 1, the Mayor or Provincial Governor shall verify the details of the application and issue a registration certificate in the form of Annex 14 , and record and maintain the registration details and the fact of issuance in the Register of Specialized Railway Facility Safety Diagnosis Agencies in the form of Annex 15 and the Register of Registration Certificate Issuance in the form of Annex 16. In this case, unless there is a special reason why electronic processing is impossible, the Register of Specialized Railway Facility Safety Diagnosis Agencies and the Register of Registration Certificate Issuance shall each be recorded and maintained in a manner that enables electronic processing.
[This Article Newly Inserted June 23, 2021]
Article 17 (Change Registration, etc. of Specialized Agency for Safety Diagnosis of Railway Facilities) ①In order to report a change pursuant to Article 44-3, Paragraph 3 of the Act , a specialized agency for safety diagnosis of railway facilities must submit to the Mayor/Do Governor a report on changes to registered matters of a specialized agency for safety diagnosis of railway facilities in the form of Annex 17 , with documents proving the changes attached.
② A person who wishes to have a registration certificate reissued pursuant to Article 44-3, Paragraph 4 of the Act must submit an application in the form of Annex 11 to the mayor or provincial governor.
③ Any person who intends to report suspension, resumption, or closure pursuant to Article 44-3, Paragraph 5 of the Act shall submit to the Mayor or Provincial Governor the Report on Suspension, Resumption, or Closure of Railway Facility Safety Diagnosis Agency in Form No. 18 of the Appendix, along with documents proving the suspension, resumption, and closure, and the original registration certificate of the Railway Facility Safety Diagnosis Agency (applicable only in the case of closure).
[This Article Newly Inserted June 23, 2021]
Article 18 (Reporting of Transfer of Specialized Railway Facility Safety Diagnosis Agency, etc.) ① Ifa specialized railway facility safety diagnosis agency intends to report the transfer of business pursuant to Article 44-8, Paragraph 1 of the Act , it shall submit to the competent mayor or provincial governor, jointly with the transferee, the Report on Transfer and Acquisition of Specialized Railway Facility Safety Diagnosis Agency in Form No. 19 of the Attached Form, attaching the documents listed in each of the following subparagraphs.
1. Copy of the Assignment Agreement
2. Documents under each subparagraph of Article 16, Paragraph 1 concerning the assignee
② In the event that a specialized railway facility safety diagnosis agency intends to file a merger report pursuant to Article 44-8, Paragraph 1 of the Act , its representative and the representative of the corporation surviving after the merger or the corporation established by the merger shall jointly submit the report on corporate merger of a specialized railway facility safety diagnosis agency in Form No. 20 of the Appendix, along with the documents listed in each of the following subparagraphs, to the competent mayor or provincial governor of the corporation surviving after the merger or the corporation established by the merger.
1. Copy of Merger Agreement
2. Merger Notice
3. A copy of the resolution of the General Meeting or the Founding General Meeting that resolved matters concerning the merger
4. Documents under each subparagraph of Article 16, Paragraph 1 concerning the surviving corporation after the merger or the corporation established by the merger
[This Article Newly Inserted June 23, 2021]
ADDENDA <Ministry of Construction and Transportation Decree No. 00448, July 1, 2005>
① (Enforcement Date) This rule shall take effect on the date of its promulgation.
② (Repeal of Other Acts) The Enforcement Rules of the High-Speed Railway Construction Promotion Act and the Enforcement Rules of the Public Railway Construction Promotion Act are hereby repealed.
③ (Amendment of Other Laws) The Rules on the Determination, Structure, and Installation Standards of Urban Planning Facilities are partially amended as follows:
In Article 22, subparagraph 1, “Article 2, paragraph 1 of the Railway Act” shall be changed to “Article 2, subparagraph 1 of the Railway Construction Act,” subparagraph 3 of the same article shall be deleted, and in subparagraph 4 of the same article, “state-owned railway business pursuant to the provisions of Article 2, subparagraph 1 of the Act on Special Cases Concerning the Operation of State-Owned Railways” shall be changed to “business pursuant to the provisions of Article 7 of the Korea Rail Network Authority Act and Article 9, paragraph 1 of the Korea Railroad Corporation Act.”
In Article 24, subparagraph 2, “Railway Act, Urban Railway Act, Public Railway Construction Promotion Act, or High-Speed Railway Construction Promotion Act” shall be changed to “Railway Construction Act or Urban Railway Act”.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 4, Mar. 14, 2008> (Partial Amendment to the Rules on Appraisal, etc. pursuant to the Amendment of the Government Organization Act)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 473, June 11, 2012> (Partial Amendment to the Enforcement Rules of the Port Order Act, etc. for the Shortening of Administrative Processing Periods and Rationalization of Fees, etc.)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Articles 2 through 5 omitted
Article 6 (Application of the Amendment to the Enforcement Rules of the Railway Construction Act) The amended provisions of Form No. 5 of the Enforcement Rules of the Railway Construction Act shall apply starting from the first application for the completion of a railway construction project after the enforcement of these Rules.
Articles 7 and 8 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 5 omitted
Article 6 (Amendment of Other Laws) ① through <100> omitted
<101> The Enforcement Rules of the Railway Construction Act are partially amended as follows.
In the part other than the numbered items of Article 2, Article 3, Paragraph 2, Article 4, Paragraph 1, the part other than the numbered items of Paragraph 2 of the same article, Article 6, Paragraph 2, Item 13, the part other than the numbered items of Paragraph 4 of the same article, Item 11 of the same paragraph, the front of Form No. 1, Form No. 2, the front of Form No. 3, the front of Form No. 4, the front of Form No. 5, Form No. 7, and Form No. 8, “Minister of Land, Transport and Maritime Affairs” shall be changed to “Minister of Land, Infrastructure and Transport”.
In Article 5, the part other than the subparagraphs of Article 6, Paragraph 2, and Paragraph 3 of the same article, “Ordinance of the Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ordinance of the Ministry of Land, Infrastructure and Transport”.
In the processing agency column on the back of Form No. 1, the processing agency (responsible department) column on the back of Form No. 3, the processing agency column on the back of Form No. 4, and the processing agency (responsible department) column on the back of Form No. 5, “Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ministry of Land, Infrastructure and Transport”.
<102> through <126> omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 120, Aug. 7, 2014> (Partial Amendment to the Enforcement Rules of the Framework Act on the Construction Industry, etc. for the Protection of Personal Information)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures Concerning Forms) Forms in use under the previous regulations at the time of the enforcement of this Rule shall continue to be used; however, parts where the Resident Registration Number has been deleted or revised to the Date of Birth pursuant to this Rule shall be deleted or modified for use.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 575, Jan. 2, 2019> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Six Laws for the Standardization of Japanese-style Terminology)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 609, Mar. 20, 2019>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) ① The Enforcement Rules of the Act on the Recovery of Development Profits are partially amended as follows:
In Article 4, Paragraph 4, Subparagraph 1, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
② The Enforcement Rules for the Organization of the Ministry of Land, Infrastructure and Transport and its affiliated agencies are partially amended as follows.
In Article 14, Paragraph 6, Subparagraph 3, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
③ The Rules on the Determination, Structure, and Installation Standards of Urban and County Planning Facilities are partially amended as follows.
Article 22, subparagraph 1 shall be as follows.
1. Railway pursuant to Article 2, Subparagraph 1 of the Act on the Construction of Railways and Maintenance of Railway Facilities
In Article 24, subparagraph 2, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
④ Part of the Enforcement Rules of the Passenger Transport Business Act is amended as follows.
In Article 13, subparagraph 1, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
⑤ The Enforcement Rules of the Sustainable Transport and Logistics Development Act are partially amended as follows.
In Article 8, subparagraph 4, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
⑥ Part of the Enforcement Rules of the Special Act on Underground Safety Management is amended as follows.
In the part other than the items in the detailed contents column of Item 1 of Annex 3, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
⑦ Part of the Railway Construction Rules is amended as follows.
In Article 1, “the Railway Construction Act” shall be changed to “the Act on the Construction of Railways and Maintenance of Railway Facilities”.
⑧ Part of the Enforcement Rules of the Railway Business Act is amended as follows.
In the first part of Article 2, Paragraph 1, “pursuant to the provisions of Article 9 of the Railway Construction Act” shall be changed to “pursuant to Article 9 of the Railway Construction and Maintenance of Railway Facilities Act”.
⑨ Part of the Enforcement Rules of the Railway Safety Act is amended as follows.
Article 42 is deleted.
In Article 44, subparagraph 1, “Article 7, paragraph 5 and Article 25, paragraph 1 of the Act” shall be changed to “Article 7, paragraph 5 of the Act”.
In Article 75-2, Paragraph 1, Subparagraph 1, “Article 25, Paragraph 1 of the Act” shall be changed to “Article 19, Paragraphs 1 and 2 of the Act on the Construction of Railways and Maintenance of Railway Facilities”.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 758, Sep. 9, 2020> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 9 Ministerial Decrees to Reflect the Name Change of Korea Rail Network Authority)
This rule shall take effect on September 10, 2020.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 861, June 23, 2021>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Decrees for the Reorganization of Difficult Legal Terms)
This rule shall take effect from the date of its promulgation. <Proviso omitted>
[Attached Table] Criteria for Suspension of Business (Related to Article 12)
[Attachment Form No. 1] Application for Designation of Railway Construction Project Operator
[Attachment Form No. 2] Designation of Railway Construction Project Operator
[Attachment Form No. 3] Application for Approval of Railway Construction Project Implementation Plan
[Attachment Form No. 4] Application for Approval of Change to Railway Construction Project Implementation Plan
[Attachment Form No. 5] Construction Completion Report
[Attachment Form No. 6] Completion Report by Individual Project
[Attachment Form No. 7] Application for Permission for Pre-completion Use
[Attachment Form No. 8] Inspector ID (Railway Construction Project)
[Attachment Form No. 9] Status Inspection Log
[Attachment Form No. 10] Notification of Subcontracting
[Attachment Form No. 11] Application for Specialized Railway Facility Safety Diagnosis Agency (New Registration, Reissuance of Registration Certificate)
[Attachment Form No. 12] Status of Technical Personnel
[Attachment Form No. 13] Equipment Holdings
[Attachment Form No. 14] Registration Certificate for Specialized Railway Facility Safety Diagnosis Agency
[Attachment Form No. 15] Register of Specialized Railway Facility Safety Diagnosis Agencies
[Attachment Form No. 16] Register of Issuances for Registration Certificates of Specialized Railway Facility Safety Diagnosis Agencies
[Attachment Form No. 17] Notification of Change in Registration Details for Specialized Railway Facility Safety Diagnosis Agency
[Attachment Form No. 18] Report on Specialized Railway Facility Safety Diagnosis Agency (Suspension, Resumption, Closure)
[Attachment Form No. 19] Report on Transfer and Acquisition of Specialized Railway Facility Safety Diagnosis Agency
[Attachment Form No. 20] Report on Corporate Merger of Specialized Railway Facility Safety Diagnosis Agencies