Port Facility Equipment Management Rules

288185 · 2026-07-13

Article 1 (Purpose) The purpose of this Rule is to prescribe necessary matters concerning the reporting, self-inspection, and inspection of facilities and equipment, the exemption from facility and equipment inspection, and the delegation of inspection duties pursuant to Articles 31 through 35 of the Port Act and Articles 38 and 39 of the Enforcement Decree of the Port Act. <Amended July 30, 2020> [Wholly Revised 2011.7.13] Article 2 (Reporting of Facilities and Equipment) ① When a person who uses or manages port facilities (hereinafter referred to as "facility equipment") pursuant to Article 31, Paragraph 1 of the Port Act (hereinafter referred to as the "Act") (hereinafter referred to as the "Facility Equipment Manager") intends to install or remove facility equipment in a port, they shall submit a Facility Equipment Installation (Removal) Report in the form of Annex No. 1, along with the documents specified in each of the following subparagraphs, to the managing authority (for state-managed trade ports and state-managed coastal ports, this refers to the Head of the Regional Maritime Affairs and Fisheries Office; for locally-managed trade ports and locally-managed coastal ports, this refers to the Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province; hereinafter the same applies). <Amended Sep. 5, 2018; Jul. 30, 2020> 1. Port Facility and Equipment Register in Form No. 2 2. Certificate of Conformity for Facility and Equipment Inspection in the Attached Form No. 6 [In cases where manufacturing inspection is exempted pursuant to Article 10, Paragraph 1, Subparagraph 3, this refers to the completion report prepared in accordance with construction project management pursuant to Article 39, Paragraph 1, Subparagraph 1 of the Enforcement Decree of the Port Act (hereinafter referred to as the "Decree") or the completion inspection report prepared in accordance with supervision pursuant to Subparagraph 2 of the same Paragraph] ② The report under Paragraph 1 shall be made no later than 3 days prior to the commencement date of the installation or removal of the relevant facility equipment. However, among the attached documents required for a report on the installation of facility equipment, the Certificate of Inspection Compliance for Facility Equipment in Annex 6 may be submitted within 3 days from the date of issuance of said certificate. ③ In the event that any of the matters falling under any of the following subparagraphs are changed, a report of change must be submitted to the administrative authority within 30 days from the date of change by submitting a Report on Change of Installation of Facilities and Equipment in the form of Annex 3. 1. Name of Facility and Equipment Manager 2. Reporting Location of Facility Equipment ④ The change notification form pursuant to Paragraph 3 shall be accompanied by the documents specified in each of the following subparagraphs. 1. Register of Port Facilities and Equipment in Form No. 2 (shall not be submitted if only the company name has been changed) 2. Certificate of Inspection and Approval for Facilities and Equipment in the Form No. 6 (to be submitted only when changing the installed port) 3. Documents proving the changes [Wholly Revised 2011.7.13] Article 3 (Self-inspection of Facilities and Equipment) ① The facility and equipment manager shall conduct self-inspections of facilities and equipment in accordance with each of the following subparagraphs pursuant to Article 32, Paragraph 1 of the Act. <Amended July 30, 2020> 1. Weekly Inspection: An inspection conducted at least once a week to verify that facility equipment maintains normal function 2. Quarterly Inspection: An inspection conducted at least once every quarter to verify changes in the condition of the structures, operating devices, and safety devices of facility equipment and to determine whether maintenance or repair is required. 3. Special Inspection: An inspection conducted before use when the safety of facilities and equipment is a concern due to earthquakes, typhoons, accidents, etc. ② The facility and equipment manager shall, in accordance with Article 32, Paragraph 2 of the Act, record the matters set forth in each of the following subparagraphs for each piece of facility and equipment and retain them for one year. <Amended Jan. 2, 2017, Jul. 30, 2020> 1. Inspection Details and Maintenance/Repair Details 2. Fault/Accident Details [Wholly Revised 2011.7.13] Article 4 (Timing of Periodic Inspections) ① The periodic inspection pursuant to Article 33, Paragraph 1, Subparagraph 3 of the Act shall be conducted for the first time within 30 days before or after the date marking two years from the date of issuance of the Certificate of Conformity for Facility and Equipment Inspection in the Form No. 6 attached hereto for the manufacturing inspection or installation inspection pursuant to Subparagraph 1 or 2 of the same Paragraph. <Amended 2020.7.30> ② Any periodic inspection following the periodic inspection conducted pursuant to Paragraph 1 shall be carried out within 30 days before or after the date marking two years from the date of issuance of the Certificate of Conformity for Facility and Equipment Inspection in the form of Annex 6 for the immediately preceding periodic inspection. [Wholly Revised 2018.9.5] Article 5 (Application for Inspection) ① Any person who intends to undergo an inspection of facilities and equipment pursuant to each subparagraph of Article 33, Paragraph 1 of the Act shall submit an application for facility and equipment inspection in the form of Annex 4 to the competent authority in accordance with the classifications in each of the following subparagraphs. However, if the inspection has been delegated pursuant to Article 35, Paragraph 1 of the Act, the application shall be submitted to the inspection agency. <Amended Sep. 5, 2018; Jul. 30, 2020> 1. Manufacturing Inspection: Submit the design specifications, drawings, capacity calculation sheets, strength calculation sheets, and dock design load review sheets attached no later than 30 days prior to the manufacture of the relevant facility equipment. However, in cases where design, fabrication, and installation are ordered simultaneously, and it is impossible to submit the drawings, capacity calculation sheets, strength calculation sheets, and dock design load review sheets no later than 30 days prior to the manufacture of the relevant facility equipment, only the design specifications may be submitted first. 2. Installation Inspection: Submit the design specifications, drawings, test reports, and dock design load review report attached no later than 15 days prior to the installation of the relevant facility equipment. 3. Periodic Inspection: Submit at least 15 days prior to conducting the periodic inspection of the relevant facility equipment 4. Unscheduled Inspection: Submit the design description, drawings, structural calculations, and pier design load review report attached no later than 15 days prior to the commencement of any of the following items. However, in the case of Item (a), the attached documents may be omitted. A. Relocation of Fixed Facility Equipment B. Major structural changes to facilities and equipment ② If the facility and equipment manager is unable to apply for a periodic inspection by the deadline specified in Paragraph 1, Subparagraph 3 due to maintenance or repair of the facility and equipment, occurrence of an accident, natural disaster, seizure, or other unavoidable reasons, they shall submit an Application for Postponement of Periodic Inspection of Facility and Equipment (including electronic documents) in the form of Annex 5, attached with documents proving the reason for the postponement, to the managing authority by the end of the periodic inspection cycle. ③ Upon receiving an application for postponement of a periodic inspection pursuant to Paragraph 2, the Administrative Agency shall decide whether to postpone the inspection within 5 days from the date of application and notify the applicant. ④ A person who has received a notice of refusal to postpone an inspection pursuant to Paragraph 3 shall apply for an inspection within 5 days from the date of receiving such notice. ⑤ The deferment period for periodic inspections under Paragraph 3 shall be within three months. In this case, the validity period of the inspection shall be deemed extended during the deferred period. [Wholly Revised 2011.7.13] Article 6 (Scope of Inspection Subjects) The scope of facilities and equipment subject to inspection by inspection type pursuant to Article 33, Paragraph 2 of the Act is as set forth in Attached Table 1. <Amended July 30, 2020> [Wholly Revised 2011.7.13] Article 7 (Inspection Method) ① The inspection methods for facilities and equipment subject to inspection by inspection type pursuant to Article 33, Paragraph 2 of the Act shall be in accordance with the facility and equipment inspection standards (hereinafter referred to as "facility and equipment inspection standards") prescribed and notified by the Minister of Oceans and Fisheries for each inspection type. <Amended Mar. 24, 2013; Jul. 30, 2020> ② The standards regarding manufacturing inspection among the facility and equipment inspection standards shall prescribe inspection items and their criteria with respect to the design parts, major structural parts, and each functional device of the subject facility and equipment. ③ The standards regarding installation inspection among the facility equipment inspection standards shall prescribe matters concerning the verification of the specifications of the subject facility equipment and matters concerning the inspection of driving devices, lifting devices, braking devices, etc. ④ The standards for periodic inspection among the facility and equipment inspection standards shall prescribe inspection items and criteria regarding the verification of safety concerning the structure, performance, and safety devices of facilities and equipment in use. ⑤ The standards regarding unscheduled inspections among the facility and equipment inspection standards shall be prescribed by classifying them into cases of relocating fixed facility and equipment and cases of altering the main structure. [Wholly Revised 2011.7.13] Article 8 (Processing of Inspection Results) ① The managing authority or the inspection agency shall issue a Certificate of Conformity in the Facility Equipment Inspection (Form No. 6) to the applicant within 2 days from the date of completion of the inspection for facilities equipment recognized as compliant with the Facility Equipment Inspection Standards as a result of the inspection. <Amended 2017.1.2> ② For facilities and equipment that do not conform to the facility and equipment inspection standards as a result of the inspection, the managing authority or the inspection agency shall issue a Notice of Non-conformity in Facility and Equipment Inspection (Form No. 7) to the applicant within 3 days from the date of completion of the inspection, clearly stating the items and reasons. In this case, the facility and equipment manager shall supplement the items deemed non-conforming and apply for a re-inspection within 30 days from the date of receiving the non-conformity judgment. ③ When an inspection agency inspects facilities and equipment, it shall submit the Facility and Equipment Inspection Result Report in the form of Annex 8 to the managing authority and the applicant within 5 days from the date of completion of the inspection, and the managing authority and the applicant shall record and manage the inspection results in the Port Facility and Equipment Register in the form of Annex 2. [Wholly Revised 2011.7.13] Article 9 (Inspection Fee) ① The inspection fees pursuant to Article 33, Paragraph 3 of the Act shall be subject to the standards for remuneration for engineering projects pursuant to Article 31 of the Engineering Industry Promotion Act. <Amended July 30, 2020> ② The inspection fee pursuant to Paragraph 1 shall be paid at the time of application for inspection. However, in the case of manufacturing inspections or unscheduled inspections, the fee may be paid in installments until the completion of the inspection through consultation between the applicant and the administrative authority or the inspection agency. [Wholly Revised 2011.7.13] Article 10 (Classification of Exemption from Inspection) ① The exemption from inspection under Article 34, Paragraph 1 of the Act shall be in accordance with the classifications in each of the following subparagraphs. <Amended 2020.7.30> 1. Cases falling under Article 34, Paragraph 1, Subparagraph 1 of the Act [applicable only to power receiving equipment among facility equipment]: Periodic inspection under Article 33, Paragraph 1, Subparagraph 3 of the Act 2. Cases falling under Article 34, Paragraph 1, Subparagraph 2 of the Act: Periodic inspection under Article 33, Paragraph 1, Subparagraph 3 of the Act 3. Cases falling under Article 39, Paragraph 1, Subparagraph 1 or 2 of the Enforcement Decree: Manufacturing inspection under Article 33, Paragraph 1, Subparagraph 1 of the Act 4. Cases falling under Article 39, Paragraph 1, Subparagraph 3 of the Enforcement Decree: Periodic inspection under Article 33, Paragraph 1, Subparagraph 3 of the Act ② The input standards for technical personnel and facilities pursuant to Article 39, Paragraph 2 of the Enforcement Decree are as set forth in Attached Table 2. <Amended July 30, 2020> [Wholly Revised 2011.7.13] Article 11 (Self-Inspection) ① The technical personnel and facilities and equipment that a facility and equipment manager must possess when intending to conduct a self-inspection pursuant to Article 34, Paragraph 2 of the Act are as set forth in Attached Table 3. <Amended 2020.7.30> ② The facility and equipment manager shall prepare an inspection report for each piece of facility and equipment pursuant to Article 34, Paragraph 2 of the Act after conducting an inspection in accordance with the facility and equipment inspection standards. <Amended 2020.7.30> ③ If a facility and equipment manager intends to undergo a written review pursuant to Article 34, Paragraph 2 of the Act, they shall submit the documents specified in each of the following subparagraphs to the managing authority no later than 15 days prior to the end of the periodic inspection cycle. <Amended 2020.7.30> 1. Documents proving the qualifications and permanent employment of technical personnel 2. Specifications of 보유 inspection facilities 3. Internal Inspection Report [Wholly Revised 2011.7.13] Article 12 (Inspection Agencies) ① Any person who intends to be designated as an inspection agency pursuant to Article 35, Paragraph 2 of the Act shall submit an application for designation as an inspection agency for facilities and equipment (including applications submitted as electronic documents) in the form of Annex 9, attached with the documents specified in each of the following subparagraphs, to the Minister of Oceans and Fisheries in the case of state-managed trade ports and state-managed coastal ports, and to the Mayor of a Special City, Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province in the case of locally-managed trade ports and locally-managed coastal ports, respectively. <Amended Mar. 24, 2013; Sep. 5, 2018; Jul. 30, 2020> 1. Certificate of Registration of an Engineering Business Operator pursuant to Article 21, Paragraph 1 of the Engineering Industry Promotion Act 2. Articles of Incorporation (To be submitted only by corporations) 3. Documents proving the technician's qualifications and permanent employment 4. Specifications of 보유 inspection facilities ② When the Minister of Oceans and Fisheries or the Mayor of a Special City, Metropolitan City, or Province, or the Governor of a Special Self-Governing Province receives an application pursuant to Paragraph 1, if the applicant is a corporation, they shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Mar. 24, 2013> ③ The standards for technical personnel and facilities pursuant to Article 35, Paragraph 2 of the Act are as set forth in Attached Table 4. <Amended July 30, 2020> ④ Upon receiving an application for designation under Paragraph 1, the Minister of Oceans and Fisheries or the Mayor of a Special City, Metropolitan City, or Province, or the Governor of a Special Self-Governing Province, shall designate a person who meets the possession standards under Paragraph 3 as an inspection agency and issue a Certificate of Designation as a Facility and Equipment Inspection Agency in the form of Annex 10. <Amended Mar. 24, 2013> [Wholly Revised 2011.7.13] Article 13 (Notification) If facilities and equipment under its jurisdiction are located within the jurisdictional area pursuant to Article 4, Paragraph 3 of the Port Authority Act, the Managing Authority shall notify the President of the competent Port Authority of the results processed in accordance with Articles 2 and 8. [Wholly Revised 2011.7.13] Article 14 (Submission of Status of Facility and Equipment Management, etc.) The managing authority shall ascertain the status of management of facilities and equipment under its jurisdiction as of December 31 of each year and submit the status of facility and equipment management and inspection plan in the form of Annex No. 11 to the Minister of Oceans and Fisheries by January 31 of the following year. <Amended Mar. 24, 2013> [Wholly Revised 2011.7.13] Delete Article 15 <2026.7.13> ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 1] <Amended July 30, 2020> Facility Equipment [ ] Installation Report [ ]Demolition ※ The applicant should not fill in the dark-colored fields, and mark √ in the appropriate box [ ]. (Front) ───────────┬───────────┬───────────────────────────── Receipt No. Receipt Date Processing Period 3 days ───────────┴───────────┴───────────────────────────── ─────┬─────────────────────────────────────────────── Reporter Company Name ├────────────────┬────────────────────────────── Name (Name of representative in the case of a corporation) Date of birth (Corporate Registration Number) ├────────────────┴────────────────────────────── Address (Phone Number: ) ─────┴─────────────────────────────────────────────── ─────┬─────────────────────────────────────────────── Report Details Facility Equipment Name ├─────────────────────────────────────────────── Management Number ├─────────────────────────────────────────────── Installation Date (Removal Date) ├─────────────────────────────────────────────── Reason for removal ─────┴─────────────────────────────────────────────── In accordance with Article 31 of the Port Act and Article 2, Paragraph 1 of the Rules on the Management of Port Facilities and Equipment, the notification of installation (removal) of facilities and equipment 입니다. Year Month Day Applicant (Signature or Seal) To the Director of the Regional Maritime Affairs and Fisheries Office Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ──────────┬────────────────────────────────────┬───── Attachment 1. Fee for the Port Facilities and Equipment Register (Form No. 2 of the "Rules on the Management of Port Facilities and Equipment") (Facility equipment 2. Certificate of Inspection and Approval for Facility Equipment in Form No. 6 of the "Rules on the Management of Port Facility Equipment" (same None only in cases where manufacturing inspection is exempted pursuant to Rule Article 10, Paragraph 1, Subparagraph 3, 「Article Submitting) Completion report prepared in accordance with responsible supervision pursuant to Article 24, Paragraph 1, Subparagraph 1 of the Enforcement Decree of the Construction Act or refers to the completion inspection report prepared in accordance with the supervision pursuant to Subparagraph 2 of the same paragraph c) ──────────┴────────────────────────────────────┴───── 210mm×297mm[White Paper 80g/㎡ (Recycled)] (Back) ━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ─────────────────────── This report will be processed as follows. ┏━━━━━━━━━━┯━━━━━━━━━━┓ Reporter Processing Agency ┃ ├──────────┨ Head of Regional Maritime Affairs and Fisheries Office · Mayor of Special City · Mayor of Metropolitan City · Governor of Province or Governor of a Special Self-Governing Province ┠──────────┼──────────┨ ┃ │ ┃ ┃┌──────┐ │ ┌──────┐┃ Fill out report ▶ Submit ┃│ ├──┼─ │ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Confirm ┃ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Drafting · Approval Result Notification ◀ ┃│ │ ─┼──┤ │┃ ┃│ │ │ │ │┃ ┃│ │ │ └─────┬┘┃ ┃└──────┘ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Grand Finale ┃ │ └──────┘┃ ┃ │ ┃ ┗━━━━━━━━━━┷━━━━━━━━━━┛ Original file: /LSW/flDownload.do?flSeq=166956391 Original file: /LSW/flDownload.do?flSeq=166956393 Original file: /LSW/flDownload.do?flSeq=166956395 Original file: /LSW/flDownload.do?flSeq=166956397 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 2] <Amended June 23, 2014> (front) Port Facility Equipment Register ┏━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━┓ Facility Equipment Name Management Number ┠────────────────────────┼───────────────────────┨ Installation Port Dock ┠────────────────────────┼───────────────────────┨ Purpose (Cargo Handled) Owner ┠────────────────────────┼───────────────────────┨ Manufacturing/Installation Inspection Date Manager ┠────────────────────────┼───────────────────────┨ Inspection Pass Number Creator ┠────────────────────────┼───────────────────────┨ Inspection agency price / Million won per unit ┠────────────────────────┴───────────────────────┨ Key Specifications ┠────────────────────────┬───────────────────────┨ Loading/Unloading Capacity (Carrying Capacity) ( ) ton/hour (piece/hour) Empty Weight ton ┠────────────────────────┼───────────────────────┨ Rated Load Ton Max Wheel Load Ton/Piece (Maximum Ground Load) (Ton/Square Meter) ┠────────────────────────┼───────────────────────┨ Rail Clearance Meter Rated Horsepower Horsepower ┠────────────────────────┼───────────────────────┨ Length × Width × Height Cubic Meters Handling (Loading) Capacity Thermal Insulation ┗━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━┛ 210mm×297mm[White Paper 80g/㎡ (Recycled)] (Back) What is Facility and Equipment Inspection ┏━━━━┯━━━━━┯━━━━━┯━━━━━┯━━━┯━━━┓ Serial Number Inspection Classification Inspection Date Validity Period Administrative Agency Contact Person ┠────┼─────┼─────┼─────┼───┼───┨ ┃1 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃2 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃3 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃4 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃5 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃6 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃7 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃8 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃9 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃10 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃11 │ │ │ │ │ ┃ ┠────┼─────┼─────┼─────┼───┼───┨ ┃12 │ │ │ │ │ ┃ ┗━━━━┷━━━━━┷━━━━━┷━━━━━┷━━━┷━━━┛ Facility Equipment General Drawing ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ Original file: /LSW/flDownload.do?flSeq=166956399 Original file: /LSW/flDownload.do?flSeq=166956401 Original file: /LSW/flDownload.do?flSeq=166956403 Original file: /LSW/flDownload.do?flSeq=166956405 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 3] <Amended July 30, 2020> Notification of Installation Change of Facility and Equipment ※ The applicant should not fill in the dark-colored fields. (Front) ──────────┬───────────┬─────────────────────────────── Receipt No. Receipt Date Processing Period 3 days ──────────┴───────────┴─────────────────────────────── ────┬─────┬─────────────────────────────────────────── Declarant's Business Name (Title) Originally │ ├─────────────────────────────────────────── Change ├─────┴──────────┬──────────────────────────────── Name (Name of representative in the case of a corporation) Date of birth (Corporate Registration Number) ├────────────────┴──────────────────────────────── Address (Phone Number: ) ────┴───────────────────────────────────────────────── ────────────────────────────────────────────────────── Facility Equipment Name ────────────────────────────────────────────────────── Management Number ──────────┬─────────────────────────────────────────── Ports and docks of installation Original ├─────────────────────────────────────────── Change ──────────┴─────────────────────────────────────────── Installation Date ────────────────────────────────────────────────────── Reason for change ────────────────────────────────────────────────────── I hereby report as above in accordance with Article 31 of the Port Act and Article 2, Paragraph 3 of the Rules on the Management of Port Facilities and Equipment. Year Month Day Applicant (Signature or Seal) To the Director of the Regional Maritime Affairs and Fisheries Office Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province or Governor of a Special Self-Governing Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬──────────────────────────────────────────┬───── Attached Document 1. Port Facilities and Equipment Register in Annex 2 of the "Rules on the Management of Port Facilities and Equipment" (Fee in case only the company name is changed does not submit) None 2. Certificate of Conformity for Facility and Equipment Inspection in accordance with Form No. 6 of the "Rules on the Management of Port Facilities and Equipment" (Changing the port ) 3. Documents proving the changes ─────┴──────────────────────────────────────────┴───── 210mm×297mm[White Paper 80g/㎡ (Recycled)] (Back) ━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ──────────────────────────── This report will be processed as follows. ┏━━━━━━━━━━┯━━━━━━━━━━━━━━━┓ Reporter Processing Agency ┃ ├───────────────┨ Head of a Regional Maritime Affairs and Fisheries Office, Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province or Governor of a Special Self-Governing Province ┠──────────┼───────────────┨ ┃ │ ┃ ┃┌──────┐ │ ┌─────┐┃ Fill out report ▶ Submit ┃│ ├──┼─ │ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └┬────┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌─────┐┃ Confirm ┃ │ └┬────┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃┌──────┐ │ ┌─────┐┃ Notification of Results ◀ Drafting/Approval ┃│ │ ─┼────────┤ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └┬────┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌─────┐┃ Grand Finale ┃ │ └─────┘┃ ┃ │ ┃ ┗━━━━━━━━━━┷━━━━━━━━━━━━━━━┛ Original file: /LSW/flDownload.do?flSeq=166956407 Original file: /LSW/flDownload.do?flSeq=166956409 Original file: /LSW/flDownload.do?flSeq=166956411 Original file: /LSW/flDownload.do?flSeq=166956413 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 4] <Amended July 30, 2020> Facility Equipment Inspection Application Form ※ The applicant should not fill in dark-colored fields, and mark a √ in the appropriate box [ ]. Sum (Front) 입니다. ───────┬───────┬───────────────────────────────────────────── Receipt No. Receipt Date Processing Period Manufacturing Inspection: Until the date manufacturing is completed Installation Inspection/Routine Inspection: 15 days Scheduled check-up: 30 days ───────┴───────┴───────────────────────────────────────────── ─────┬─────────────────────────────────────────────────────── Inspection Type [ ] Manufacturing Inspection [ ] Installation Inspection [ ] Scheduled Inspection [ ] Unscheduled Inspection ─────┴─────────────────────────────────────────────────────── ─────┬─────────────────────────────────────────────────────── Applicant Company Name ├─────────────────────────────────────────────────────── Address ├─────────────────────────────────────────────────────── Phone Number (Fax) ─────┴─────────────────────────────────────────────────────── ─────┬─────────────────────────────────────────────────────── Application Details Facility Equipment Name ├─────────────────────────────────────────────────────── Management Number ├────────┬────────────────────────────────────────────── Desired Test Period Test Location ├────────┴────────────────────────────────────────────── Manufacturer's Trademark ├─────────────────────────────────────────────────────── Inspection Request Details ─────┴─────────────────────────────────────────────────────── Inspection of facilities and equipment pursuant to Article 33, Paragraph 1 of the Port Act and Article 5, Paragraph 1 of the Rules on the Management of Port Facilities and Equipment . Year Month Day Applicant (Signature or Seal) To the Director of the Regional Maritime Affairs and Fisheries Office Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province Head of the inspection agency ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ──────┬─────────────────────────────────────┬──────────────── Attachments 1. Manufacturing Inspection: Design specifications, drawings, capacity calculations, strength calculations, and dock construction inspection fees Calculated Load Review Sheet 2. Installation Inspection: Design specifications, drawings, test reports, and dock design load review sheets of the “Engineering Industry Promotion Act” 3. Periodic Inspection: Design specifications, drawings, structural calculations for structural changes, and engineering company pursuant to Part 31 Two design load review documents in accordance with the business fee standards ──────┴─────────────────────────────────────┴──────────────── 210mm×297mm[White Paper 80g/㎡ (Recycled)] (Back) ━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ─────────────────────── This application will be processed as follows. ┏━━━━━━━━━━┯━━━━━━━━━━┓ Applicant Processing Agency ┃ ├──────────┨ Head of Regional Maritime Affairs and Fisheries Office · Mayor of Special City · Mayor of Metropolitan City · Governor of Province · Governor of Special Self-Governing Province or inspection agency ┠──────────┼──────────┨ ┃ │ ┃ ┃┌──────┐ │ ┌──────┐┃ Fill out application ▶ Submit ┃│ ├──┼─ │ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Test ┃ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃┌──────┐ │ ┌──────┐┃ Result Notification ◀ Create Inspection Report ┃│ │ ─┼──┤ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Head of Regional Maritime Affairs and Fisheries Office, Mayor of Special City · Mayor of Metropolitan City · Governor of Province · To the Governor of a Special Self-Governing Province Report (if inspected by an agency) ┃ │ └──────┘┃ ┃ │ ┃ ┗━━━━━━━━━━┷━━━━━━━━━━┛ Original file: /LSW/flDownload.do?flSeq=166956415 Original file: /LSW/flDownload.do?flSeq=166956417 Original file: /LSW/flDownload.do?flSeq=166956419 Original file: /LSW/flDownload.do?flSeq=166956421 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 5] <Amended Sep. 5, 2018> Application for Postponement of Periodic Inspection of Facilities and Equipment ※ The applicant should not fill in the dark-colored fields. (Front) ────────┬─────────────────────────┬─────────── Receipt No. Receipt Date Processing Period 5 days ────────┴─────────────────────────┴─────────── ─────┬──────────────────────────────────────── Applicant Company Name ├───────────────────────────┬──────────── Name (Name of representative in the case of a corporation) Date of birth (Corporate Registration Number) ├───────────────────────────┴──────────── Address (Phone Number: ) ─────┴──────────────────────────────────────── ─────┬─────────┬────────────────────────────── Application Details Facility/Equipment Name Management Number ├─────────┼────────────────────────────── Installation Location Usage ├─────────┴────────────────────────────── Inspection Validity Period ├──────────────────────────────────────── │ Reason for postponement of examination │ │ │ ─────┴──────────────────────────────────────── I hereby apply for a postponement of the periodic inspection of facilities and equipment pursuant to Article 5, Paragraph 2 of the "Rules on the Management of Port Facilities and Equipment." Year Month Day Applicant (Signature or Seal) To the Director of the Regional Maritime Affairs and Fisheries Office Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ──────┬──────────────────────────────────┬──── Attached Documents: 1 copy of document proving the reason for postponement Fee │ ├──── None ──────┴──────────────────────────────────┴──── 210mm×297mm[White Paper 80g/㎡ (Recycled)] (Back) ━━━━━━━━━━━━━━━━━━━━━━━ ━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ─────────────────────── This application will be processed as follows. ┏━━━━━━━━━━┯━━━━━━━━━━┓ Applicant Processing Agency ┃ ├──────────┨ Head of Regional Maritime Affairs and Fisheries Office · Mayor of Special City · Mayor of Metropolitan City · Governor of Province or Governor of a Special Self-Governing Province ┠──────────┼──────────┨ ┃ │ ┃ ┃┌──────┐ │ ┌──────┐┃ Fill out application ▶ Submit ┃│ ├──┼─ │ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Confirm ┃ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃┌──────┐ │ ┌──────┐┃ Notification of Result ◀ Draft/Approval ┃│ │ ─┼──┤ │┃ ┃│ │ │ │ │┃ ┃└──────┘ │ └─────┬┘┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──────┐┃ Large Intestine Organization ┃ │ └──────┘┃ ┃ │ ┃ ┗━━━━━━━━━━┷━━━━━━━━━━┛ Original file: /LSW/flDownload.do?flSeq=166956423 Original file: /LSW/flDownload.do?flSeq=166956425 Original file: /LSW/flDownload.do?flSeq=166956427 Original file: /LSW/flDownload.do?flSeq=166956429 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 6] <Amended July 30, 2020> ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ Facility Equipment Inspection Certificate ┠───────────────────────────────────────────┨ Test Type ┠───────────────────────────────────────────┨ Test Applicant ┠───────────────────────────────────────────┨ Inspection Location ┠───────────────────────────────────────────┨ Inspection Period Year Month Day ~ Year Month Day ( Days) ┠───────────────────────────────────────────┨ Inspection Items ┠─────┬─────────────────────────────────────┨ Facility Equipment Name Management Number ┠─────┼─────────────────────────────────────┨ Pass Number Chief Inspector ┠─────┴─────────────────────────────────────┨ Recommendations for Correction ┠───────────────────────────────────────────┨ ┃ ┃ Certificate of Conformity for Facility and Equipment Inspection pursuant to Article 33 of the Port Act and Article 8, Paragraph 1 of the Rules on the Management of Port Facilities and Equipment . ┃ ┃ ┃ ┃ ┃ ┃ Year Month Day ┃ ┃ ┃ ┃ ┃ ┏━━┓ ┃ Seal of the Head of the Regional Maritime Affairs and Fisheries Office Mayor of Special City · Mayor of Metropolitan City · Governor of Province or Governor of a Special Self-Governing Province Head of the inspection agency ┃ ┗━━┛ ┃ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 210mm×297mm[White Paper 80g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=166956431 Original file: /LSW/flDownload.do?flSeq=166956433 Original file: /LSW/flDownload.do?flSeq=166956435 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 7] <Amended July 30, 2020> ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ Notice of Facility Equipment Inspection Non-conformity ┠───────────────────────────────────────────────┨ Test Type ┠───────────────────────────────────────────────┨ Test Applicant ┠───────────────────────────────────────────────┨ Inspection Location ┠───────────────────────────────────────────────┨ Inspection Period Year Month Day ~ Year Month Day ( Days) ┠───────────────────────────────────────────────┨ Inspection Items ┠──────┬────────────────────────────────────────┨ Facility Equipment Name Management Number ┠──────┼────────────────────────────────────────┨ Non-conforming Item Responsible Inspector ┠──────┴────────────────────────────────────────┨ Reason for Non-conformity ┃ ┃ ┃ ┃ ┠───────────────────────────────────────────────┨ ┃ ┃ In accordance with Article 33 of the Port Act and Article 8, Paragraph 2 of the Rules on the Management of Port Facilities and Equipment, the results of the facility and equipment inspection shall be notified Please re-inspect after supplementing the parts that failed to meet the sludge standards. ┃ ┃ ┃ ┃ Year Month Day ┃ ┃ ┃ ┃ ┃ ┏━━┓ ┃ Seal of the Head of the Regional Maritime Affairs and Fisheries Office Mayor of Special City · Mayor of Metropolitan City · Governor of Province or Governor of a Special Self-Governing Province Head of the inspection agency ┃ ┗━━┛ ┃ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 210mm×297mm[White Paper 80g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=166956437 Original file: /LSW/flDownload.do?flSeq=166956439 Original file: /LSW/flDownload.do?flSeq=166956441 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 8] <Amended Sep. 5, 2018> Facility Equipment Inspection Result Report Inspection Agency Name: ─────┬─────┬────┬───┬────┬───┬──────────────── Inspection Type Facility/Equipment Name Management Number Applicant Implementation Period Fee Inspection Result (Specification) ─────┼─────┼────┼───┼────┼───┼──────────────── │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ ─────┴─────┴────┴───┴────┴───┴──────────────── In accordance with Article 8, Paragraph 3 of the "Rules on the Management of Port Facilities and Equipment," the results of the facility and equipment inspection are reported as above. Year Month Day Head of Inspection Agency [Seal] ────────────────────────────────────────────── To the Director of the Regional Maritime Affairs and Fisheries Office Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 210mm×297mm[White Paper 80g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=166956443 Original file: /LSW/flDownload.do?flSeq=166956445 Original file: /LSW/flDownload.do?flSeq=166956447 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 9] <Amended July 30, 2020> Application for Designation as Facility and Equipment Inspection Agency ※ The applicant does not fill in the dark-colored fields. ──────────┬───────────────────────┬────────────── Receipt No. Receipt Date Processing Period 14 days ──────────┴───────────────────────┴────────────── ────┬──────────────────────────────────────────── Applicant Company Name ├───────────────────┬──────────────────────── Name (Name of representative in the case of a corporation) Date of birth (Corporate Registration Number) ├───────────────────┴──────────────────────── Address (Phone Number: ) ────┴──────────────────────────────────────────── ───────────────────────────────────────────────── Pursuant to Article 35, Paragraph 2 of the Port Act and Article 12, Paragraph 1 of the Rules on the Management of Port Facilities and Equipment, facility and equipment inspection agency . Year Month Day Applicant (Signature or Seal) To the Minister of Oceans and Fisheries Mayor of a Special City, Mayor of a Metropolitan City, Governor of a Province, or Governor of a Special Self-Governing Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ──────┬─────────────────────────────────────┬──── Applicant 1. Fee for the Certificate of Registration of an Engineering Business Operator pursuant to Article 21, Paragraph 1 of the Engineering Industry Promotion Act Submission Documents 2. Articles of Incorporation (Submit only if applicable to a corporation) 3. No documents proving technician qualifications and regular employment 4. Specification of 보유 inspection facilities ──────┼─────────────────────────────────────┤ Official in Charge Certificate of Corporate Registration Checklist ──────┴─────────────────────────────────────┴──── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ───────────────────────────────────────────────── ┌──────┐ ┌─────┐ ┌─────┐ ┌─────────┐ ┌──────┐ Application Form Submission ? Receipt ? Review/Confirmation ? Drafting/Approval ? Designation Notification └──────┘ └─────┘ └─────┘ └─────────┘ └──────┘ Applicant Processing Authority: Minister of Oceans and Fisheries, Mayor of Special City/Metropolitan City/Governor of a Province or Governor of a Special Self-Governing Province ───────────────────────────────────────────────── 210mm×297mm[White Paper 80g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=166956449 Original file: /LSW/flDownload.do?flSeq=166956451 Original file: /LSW/flDownload.do?flSeq=166956453 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 10] <Amended July 30, 2020> ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ No. ┃ ┃ Designation Certificate for Facility and Equipment Inspection Agency ┃ ┃ ┃ ┃ ┃ ┃ Name ┃ ┃ Representative Name ┃ ┃ ┃ ┃ ┃ ┃ The above corporation pursuant to Article 35 of the "Port Act" and Article 12 of the "Rules on the Management of Port Facilities and Equipment" Designated as a facility and equipment inspection agency pursuant to Paragraph 4. ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ Year Month Day ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┏━━┓ ┃ Seal of the Minister of Oceans and Fisheries Mayor of Special City · Mayor of Metropolitan City · Governor of Province or Governor of a Special Self-Governing Province ┃ ┗━━┛ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 210mm×297mm[white paper 120g/㎡] Original file: /LSW/flDownload.do?flSeq=166956455 Original file: /LSW/flDownload.do?flSeq=166956457 Original file: /LSW/flDownload.do?flSeq=166956459 ■ Rules on the Management of Port Facilities and Equipment [Attachment Form No. 11] <Amended June 23, 2014> Facility and Equipment Management Status and Inspection Plan ○ Port: ────┬───┬──┬──┬───┬──┬───────────────┬────┬───── Pier Name Equipment Name Specification Management Equipment Collection Manufacturing Recent Equipment Inspection Equipment Price In-house Inspection Number Liza Year (million won) Implementation Status Type Reference Date Period Result Inspection Engine ────┴───┴──┴──┴───┴──┴──┴───┴──┴──┴──┴────┴───── 1. Status of Facility and Equipment Installation in the Previous Year ────┬───┬──┬──┬───┬──┬──┬───┬──┬──┬──┬────┬───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┴───┴──┴──┴───┴──┴──┴───┴──┴──┴──┴────┴───── 2. Status of Facility and Equipment Removal in the Previous Year ────┬───┬──┬──┬───┬──┬──┬───┬──┬──┬──┬────┬───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┴───┴──┴──┴───┴──┴──┴───┴──┴──┴──┴────┴───── 3. Status of Facility and Equipment Inspections for the Previous Year ────┬───┬──┬──┬───┬──┬──┬───┬──┬──┬──┬────┬───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┴───┴──┴──┴───┴──┴──┴───┴──┴──┴──┴────┴───── 4. Facility and Equipment Inspection Plan for the Relevant Year ────┬───┬──┬──┬───┬──┬──┬───┬──┬──┬──┬────┬───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┼───┼──┼──┼───┼──┼──┼───┼──┼──┼──┼────┼───── │ │ │ │ │ │ │ │ │ │ │ │ ────┴───┴──┴──┴───┴──┴──┴───┴──┴──┴──┴────┴───── Special Notes (Port Facility Equipment Installation Plan, etc.) ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 210mm×297mm[White Paper 80g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=166956461 Original file: /LSW/flDownload.do?flSeq=166956463 ​​ Original file: /LSW/flDownload.do?flSeq=166956465 Revision ⊙Ministry of Oceans and Fisheries Decree No. 807 (July 13, 2026) Ministry of Oceans and Fisheries Decree on the Partial Amendment of 18 Laws for the Reorganization of Regulatory Review Periods Articles 1 through 13 Omitted Article 14 (Amendment to the "Rules on the Management of Port Facilities and Equipment") The Rules on the Management of Port Facilities and Equipment are partially amended as follows. Article 15 is deleted. Articles 15 through 18 omitted Supplementary Provisions This rule shall take effect from the date of its promulgation. Reason for Enactment/Amendment [Batch Revision] ◇ Reasons for Amendment and Key Contents The purpose is to revise 18 ordinances of the Ministry of Oceans and Fisheries, including the Enforcement Rule of the Act on the Management and Reclamation of Public Waters, by removing the established review periods for 31 regulations—such as the collection and calculation methods of occupation and usage fees for public waters—where there is no practical benefit in reviewing them due to the necessity of maintaining administrative regulations. <Provided by the Ministry of Oceans and Fisheries>