주택법 시행규칙
288575 · 2026-08-04
Ministry of Land, Infrastructure and Transport ( Housing Construction Operations Division - Project Plan Approval ), 044-201-3370
Ministry of Land, Infrastructure and Transport ( Housing Construction Operations Division - Housing Supervision System ), 044-201-3378
Ministry of Land, Infrastructure and Transport ( Housing Maintenance Policy Division - Apartment Remodeling ), 044-201-3386
Ministry of Land, Infrastructure and Transport ( Housing Fund Division - National Housing Bonds ), 044-201-3344
Ministry of Land, Infrastructure and Transport ( Housing Fund Division - Housing Supply Order ), 044-201-3345
Ministry of Land, Infrastructure and Transport ( Housing Policy Division - Housing Cooperative System ), 044-201-3332
Ministry of Land, Infrastructure and Transport ( Housing Fund Division - Housing Supply Procedures ), 044-201-3343
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of this Rule is to prescribe matters delegated by the Housing Act and the Enforcement Decree of the same Act, and matters necessary for the implementation thereof.
Article 2 ( Method of Calculating Exclusive Residential Area ) The method of calculating the exclusive residential area (referring to an area used solely for residential purposes; hereinafter the same applies) pursuant to the latter part of Subparagraph 6 of Article 2 of the Housing Act (hereinafter referred to as the “Act”) shall be in accordance with the standards set forth in each of the following subparagraphs. <Amended Apr. 2, 2018>
1. In the case of a detached house: the area obtained by excluding the basement (excluding any area used as a living room), warehouses, garages, and toilets separated from the main building from the floor area (referring to the floor area under Article 119 (1) 3 of the Enforcement Decree of the Building Act; hereinafter the same shall apply). Provided that, where the house falls under the category of a multi-family house under subparagraph 1 (c) of Appendix 1 of the Enforcement Decree of the Building Act, the area of parts on the above-ground floors of the main building jointly used by two or more households, such as corridors, stairs, and entrance halls, shall also be excluded from the floor area.
2. In the case of multi-family housing: the area calculated based on the inner line of the exterior wall. However, common areas jointly used by two or more households that fall under any of the following items shall be excluded, and in such cases, the remaining area of the exterior walls after deducting the exclusive residential area from the floor area shall be added to the common area.
a. Common areas on the above-ground floors of multi-family housing, such as corridors, stairs, and entrance halls
b. Other common areas, such as underground floors and management offices, excluding the common areas referred to in item (a)
Article 3 (Roads Serving as Criteria for Classification of Housing Complexes) ① The term “roads prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 5, Paragraph 1, Subparagraph 1 of the Enforcement Decree of the Housing Act (hereinafter referred to as the “Decree”) refers to arterial roads, auxiliary arterial roads, collector roads, and local roads with a width of 8 meters or more pursuant to Article 9, Subparagraph 3 of the Rules on the Determination, Structure, and Installation Standards of Urban and Rural Planning Facilities. <Amended July 2, 2019>
② In Article 5, Paragraph 2, Subparagraph 1 of the Enforcement Decree, the term “standards prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to those that satisfy all of the requirements of each of the following subparagraphs. <Newly added July 2, 2019>
1. It must be a collector road or local road pursuant to Article 9, Subparagraph 3, Item (c) or (d) of the “Rules on the Determination, Structure, and Installation Standards of Urban and Rural Planning Facilities”
2. The road width must be less than 15 meters.
3. The road shall be operated with a design speed of 30 kilometers per hour or less, or with the travel speed of motor vehicles, etc., restricted to 30 kilometers per hour or less. Provided, that this shall not apply where the road to be maintained or modified is a pedestrian-priority road under Article 9, subparagraph 1 (d) of the Rules on the Determination, Structure, and Installation Standards of Urban and County Planning Facilities.
③ Roads under Article 5 , Paragraph 2 of the Enforcement Decree shall be equipped with underpasses, overpasses, crosswalks, and other similar facilities in accordance with Subparagraph 2 of the same Paragraph. However, an exception may be made if the road to be installed is a pedestrian-priority road pursuant to Article 9, Subparagraph 1, Item ( d) of the Rules on the Determination, Structure, and Installation Standards of Urban and Rural Planning Facilities . <Newly added July 2, 2019>
Chapter 2 Construction of Housing, etc.
Section 1 Housing Construction Business Operators, etc.
Article 4 (Application for Registration of Housing Construction Projects, etc.) (1) A person who intends to register a housing construction project or a housing site preparation project pursuant to Article 4 of the Act and Article 15 (1) of the Enforcement Decree shall submit to the association of housing project operators under Article 85 (1) of the Act (hereinafter referred to as the “Association”) an application for registration in Attached Form No. 1 (including an application in the form of an electronic document), together with the following documents (including electronic documents). <Amended Jun. 2, 2017; Feb. 25, 2019>
1. Documents proving possession of capital in accordance with the registration standards, classified according to each of the following items
a. Corporation: Certificates regarding paid-in capital
B. Individual: Asset valuation report and supporting documents
2. The following documents proving that the applicant employs technical personnel in accordance with the registration standards:
a. Certificate of experience or certificate of possession of a construction engineer pursuant to Article 18, Paragraph 6 of the Enforcement Rule of the Construction Technology Promotion Act
B. Copy of employment contract
3. Documents verifying that the applicant has an office, such as a certificate of registered matters of the building or an office-use agreement
4. A housing construction project plan or a housing site preparation project plan for the following year
5. In cases where the applicant is an overseas national ( referring to a person subject to registration under Article 2 of the Overseas National Registration Act ) , a certified copy of the Overseas National Registration Register pursuant to Article 7 of the Overseas National Registration Act
② [Moved to Paragraph 6 <February 19, 2021> ]
(3) The register of housing construction project operators and the register of housing site preparation project operators under Article 15 (2) of the Enforcement Decree shall be in Attached Form No. 2, and the certificate of registration shall be in Attached Form No. 3. <Amended Jun. 2, 2017>
(4) The Association shall prepare and maintain a register of registered project operators in Attached Form No. 4 for each person who has registered a housing construction project or a housing site preparation project pursuant to Article 4 of the Act (hereinafter referred to as a “registered project operator”). <Amended Jun. 2, 2017>
(5) Where a registered project operator intends to report a change in registered matters pursuant to the main clause of Article 15 (3) of the Enforcement Decree, the operator shall submit to the Association a report of change in Attached Form No. 5, together with documents verifying the details of the change. Provided, that where the registered project operator is an individual, a change in the name of the registered project operator may be reported only in the case of inheritance. <Amended Jun. 2, 2017>
⑥ The Association that receives a registration application or a change notification pursuant to Paragraph 1 or 5 shall verify the documents set forth in each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 2 of the Electronic Government Act . However, if the applicant does not consent to the verification of the documents set forth in each of the following subparagraphs, the applicant shall be required to attach the relevant documents. <Newly added June 2, 2017; Feb. 19, 2021>
1. If the applicant is a corporation (excluding corporations where the representative or executive is a foreigner): Certificate of Corporate Registration
2. If the applicant is an individual: A copy of the resident registration record. However, if the applicant submits the application in person, the presentation of an identification document such as a resident registration card shall suffice.
3. In the case of a corporation where the applicant is a foreigner or the representative or executive is a foreigner: Certificate of Alien Registration pursuant to Article 88, Paragraph 2 of the Immigration Control Act . However, if the applicant submits a document falling under any of the following subparagraphs attached to the application for registration, the Certificate of Alien Registration shall not be verified.
a. In the case of a country that has concluded the “Convention Abolishing the Requirement of Legalization for Foreign Public Documents”: Documents issued by the government or other competent authority of such country, or a statement of the relevant foreign national notarized by a notary public, for which an Apostille certificate has been issued by the authority in such country authorized to issue such certificates.
B. In the case of a country that has not concluded the "Convention Abolishing the Requirement of Legalization for Foreign Public Documents": Documents issued by the government or other competent authority of such country, or a statement of the relevant foreign national notarized by a notary public, verified by the Korean consul residing in such country.
(7) When the Association issues a registration certificate to a registered project operator or receives a report of a change in registered matters, it shall notify the competent Mayor of a Special Metropolitan City, Metropolitan City, Special Self-Governing City, or the Governor of a Province or Special Self-Governing Province (hereinafter referred to as a “City/Do Governor”) of the details, and shall report them to the Minister of Land, Infrastructure and Transport quarterly. <Amended Jun. 2, 2017; Feb. 19, 2021>
(8) The term “minor changes prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 15 (3) of the Enforcement Decree means cases where the capital, number of technical personnel, or office area increases, or decreases to an extent that does not cause the relevant registration standards to be unmet. <Amended Jun. 2, 2017; Feb. 25, 2019; Feb. 19, 2021>
(9) The register of registered project operators under paragraph (4) shall be prepared and maintained in a manner that enables electronic processing, unless there are special circumstances that make electronic processing impossible. <Amended Jun. 2, 2017; Feb. 19, 2021>
Article 5 (Notification, etc., of Disposition Results Concerning Registered Project Operators) Where a City/Do Governor takes a disposition to cancel the registration of or suspend the business of a registered project operator pursuant to Article 8 (1) of the Act, the City/Do Governor shall notify the Association of the details without delay (including by electronic document), and the Association, upon receiving the notification, shall enter and maintain the details in the register of registered project operators.
Article 6 (Submission and Verification of Business Performance, etc.) (1) A registered project operator shall submit to the Association, by January 10 of each year, the operator's business performance for the previous year, business plan for the current year, and status of technical personnel employed, in Attached Form No. 6 (including submission by electronic document), pursuant to Article 10 (1) of the Act. In such cases, a statement of the technical personnel employed shall be attached.
(2) The Association shall compile the business performance, etc., submitted under paragraph (1) in Attached Form No. 7 and submit it to the Minister of Land, Infrastructure and Transport by January 31 of each year (including submission by electronic document).
(3) Where a registered project operator requests verification of its housing construction project performance among the business performance submitted to the Association, the Association may verify the performance in accordance with the standards in Attached Table 1 and issue a certificate of verification in Attached Form No. 8 (including issuance by electronic document).
(4) A registered project operator shall submit monthly housing sale plans and sales performance to the Association by the fifth day of each month (including submission by electronic document) pursuant to Article 10 (2) of the Act. The Association shall compile the information by Special Metropolitan City, Metropolitan City, Special Self-Governing City, Province, or Special Self-Governing Province (hereinafter referred to as a “City/Do”), notify the relevant City/Do Governor by the 15th day of each month (including notification by electronic document), and report the information to the Minister of Land, Infrastructure and Transport (including reporting by electronic document).
Section 2 Housing Association
Article 7 (Application for Approval of Establishment of Housing Associations, etc.) (1) The application form referred to in the part other than the subparagraphs of Article 20 (1) of the Enforcement Decree shall be in Attached Form No. 9.
(2) A project plan under Article 20 (1) 1 (a) 5) of the Enforcement Decree shall include the following matters:
1. Number of planned cooperative housing units
2. Lot number, land category, and registered owner of the planned cooperative housing construction site
3. The use under the urban or Gun management plan (meaning an urban or Gun management plan under Article 2 4 of the National Land Planning and Utilization Act; hereinafter the same shall apply)
4. Current Status of Site and Surroundings
(3) The documents referred to in Article 20 (1) 1 (a) 6) of the Enforcement Decree may be submitted using the consent form for land use in Attached Form No. 9-2. <Newly inserted Jun. 19, 2024>
④ In Article 20, Paragraph 1, Subparagraph 1, Item (a) 8) of the Enforcement Decree, the term “documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the documents set forth in each of the following subparagraphs. <Amended July 24, 2020; June 19, 2024>
1. Certificate of employment confirmed by the employer (applicable only to workplace housing cooperatives)
2. Documents confirming eligibility for membership
⑤ The Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, a County Governor, or a District Head ( the District Head refers to the head of an autonomous district; hereinafter referred to as “Mayor, County Governor, or District Head”) who receives an application for approval of establishment of a regional or workplace housing cooperative (including an application for approval of change due to the replacement or new admission of members) pursuant to Article 11, Paragraph 1 of the Act shall verify the certified copy of the member’s resident registration record through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act , and if the applicant does not consent to the verification, the applicant shall be required to submit the relevant document in person. <Amended Oct. 29, 2019; Jun. 19, 2024>
⑥ In Article 20, Paragraph 3 of the Enforcement Decree, the term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the matters in each of the following subparagraphs. <Amended June 2, 2017; May 31, 2019; July 24, 2020; June 19, 2024>
1. Amendment of the association bylaws (only applicable to matters under each subparagraph of Article 20, Paragraph 2 of the Enforcement Decree)
2. Borrowing of funds, the method, interest rate, and repayment method
3. Conclusion of contracts that impose a burden on members, other than those specified in the budget
3-2. Selection and change of the business agent pursuant to Article 11-2, Paragraph 1 of the Act (hereinafter referred to as the “Business Agent”) and conclusion of a business agency contract
4. Selection and Change of Contractor and Conclusion of Construction Contract
5. Appointment and dismissal of officers of the housing association
6. Finalization of the details of the allocation of project costs by member (including, in the case of a remodeling housing association, a plan for the allocation of additional costs that may arise if a change in structural design is required based on the results of the safety diagnosis pursuant to Article 68, Paragraph 4 of the Act) and changes
7. Budget proposal including usage plan for project expenses by detailed item
8. Resolution for Dissolution of the Association and Accounting Report at the Time of Dissolution
⑦ The Minister of Land, Infrastructure and Transport may prepare and distribute standard association bylaws and standard construction contracts for the smooth implementation of housing association projects and the protection of members' rights. <Amended June 19, 2024>
⑧ When a Mayor, County Governor, or District Head has authorized the establishment or change of a housing association pursuant to Article 11 , Paragraph 1 of the Act , they shall record it in the Register of Authorized Establishment of Housing Associations in the Attached Form No. 10 and issue a Certificate of Authorization in the Attached Form No. 11 to the applicant. <Amended June 19, 2024>
⑨ When a Mayor, County Governor, or District Head grants approval for the dissolution of a housing association pursuant to Article 11, Paragraph 1 of the Act , or revokes approval for the establishment of a housing association pursuant to Article 14, Paragraph 2 of the Act , they shall record the details in the Register of Approvals for Establishment of Housing Associations and retrieve the certificate of approval. <Amended June 19, 2024>
10. The register of approvals for the establishment of housing associations under Paragraph 7 shall be prepared and managed in a manner that enables electronic processing, unless there are special circumstances making electronic processing impossible. <Amended June 19, 2024>
Article 7-2 (Scope of Duties of Business Agents, etc.) (1) The term “matters prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 11-2 (2) 6 of the Act means the following duties. <Amended Jul. 24, 2020>
1. Support for General Assembly operational tasks, such as notification of the date, time, location, and agenda.
2. Support for managing elections of housing association officers
(2) Pursuant to Article 11-2 (4) of the Act, a business agent shall submit a business performance report to the housing association or its promoters within 20 days after the last day of the relevant quarter. <Newly inserted Jul. 24, 2020>
[This Article was newly established on June 2, 2017.]
[Title amended on July 24, 2020.]
Article 7-3 (Report of Recruitment of Housing Association Members) (1) A person who intends to report the recruitment of housing association members pursuant to Article 11-3 (1) of the Act shall submit to the competent mayor, county governor, or head of a Gu a report in Attached Form No. 11-2, together with the following documents. <Amended Jul. 24, 2020; Jun. 19, 2024>
1. Materials concerning the entities recruiting housing association members, such as a list of the promoters of the housing association
1-2. Documents verifying that the promoters of the housing association meet the qualifications under Article 24-3 (1) of the Enforcement Decree
2. The lot number, land category, registered owner, and use under the urban or Gun management plan of the planned housing construction site
2-2. A land-use consent form in Attached Form No. 9-2 or other documents proving that the right to use at least 50 percent of the relevant housing construction site has been secured
3. A draft public notice for recruitment of housing association members that includes all of the following matters:
a. An overview of the project, including housing construction and supply plans
b. The current status and plan for securing the right to use or ownership of the land (including the area and percentage of land secured)
c. The entity responsible for managing the housing association's funds and the management plan
4. Forms of the application for membership in the housing association and the membership contract
5. Where a business agent has been selected, the following documents:
a. Documents verifying that the business agent has the capital or appraised value of assets required under Article 24-2 of the Enforcement Decree (in the case of appraised asset value, including an asset appraisal report)
b. Business agency agreement
(2) The term “cases prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 24-3 (1) 1 (a) of the Enforcement Decree means cases where a person holds a right to purchase a housing unit before completion, etc., under Article 2 7-2 of the Rules on Housing Supply. <Newly inserted Jul. 24, 2020; Jun. 23, 2026>
(3) Where a mayor, county governor, or head of a Gu intends to accept a report under paragraph (1), he or she shall request the Minister of Land, Infrastructure and Transport to conduct a computerized search using the housing information network established under the Act on Promotion of Information and Communications Network Utilization and Information Protection, etc., to verify whether the promoters meet the qualifications under Article 24-3 (1) 1 or 2 of the Enforcement Decree. <Newly inserted Jul. 24, 2020>
④ The Mayor, County Governor, or District Head shall decide whether to accept the report and notify the relevant parties within 15 days from the date the report form under Paragraph 1 is received. <Amended July 24, 2020>
(5) Where a report under paragraph (1) is accepted, the relevant details shall be entered in the register of reports in Attached Form No. 11-3, and a certificate of acceptance of the report in Attached Form No. 11-4 shall be issued to the person who filed the report. <Amended Jul. 24, 2020>
[This Article Newly Inserted June 2, 2017]
Article 7-4 (Public Recruitment of Housing Association Members) (1) A person who intends to recruit housing association members pursuant to Article 11-3 (1) of the Act shall publicly announce the recruitment, after the report of recruitment of housing association members under Article 7-3 has been accepted, by the method applicable to each of the following categories:
1. Regional housing associations: Posting in a daily newspaper widely accessible to residents in the area targeted for recruitment under Article 2 11 (a) of the Act, and on the website of the competent Si, Gun, or autonomous Gu
2. Workplace housing associations: Posting on the website of the workplace targeted for recruitment of members
② The notice of recruitment of members shall include the following matters. <Amended Oct. 29, 2019; Jul. 24, 2020>
1. The name and address of the entity recruiting housing association members, such as the promoters of the housing association (in the case of a corporation, the corporate name, name of the representative, address of the corporation, and corporate registration number)
2. Where a business agent under Article 11-2 (1) of the Act has been selected, the name and address of the business agent (in the case of a corporation, the corporate name, name of the representative, address of the corporation, and corporate registration number)
3. Lot number, land category, and area of the planned housing construction site
4. The current status and plan for securing the right to use or ownership of the land (including the area and percentage of land secured)
5. Planned number of housing units and planned construction period
6. Number of households to be recruited and recruitment period
7. Where members are recruited in phases, information on the recruitment of members, including the number of households to be recruited during each phase
8. Housing supply area and land area per unit or household
9. Eligibility for membership, required documents for application, application date and time, and location
10. Matters concerning the financial burden of members, such as the timing and method of payment of down payments and contributions
11. The entity responsible for managing the housing association's funds and the management plan
12. The date, time, place, and method of announcing successful applicants for housing association membership
13. Matters concerning the handling of ineligible persons and contract cancellation
14. Contract details, such as the date and place of the membership contract
15. Matters concerning the method of assigning building and unit numbers, etc.
15-2. The fact that building and unit numbers will be assigned after the date of approval of the project plan under Article 15 of the Act, and the method for determining and notifying the specific date of assignment
16. The date of application (or scheduled date of application) for approval of establishment of the housing association, the scheduled date of application for approval of the project plan, the scheduled date of commencement of construction, and the scheduled date of move-in
17. Matters concerning the rights and obligations of members
18. Other matters to be noted when joining the association, such as additional contributions, that the Mayor, County Governor, or District Head deems necessary.
③ Any person intending to recruit members shall post the matters that applicants need to know, in addition to the matters listed in each subparagraph of Paragraph 2, and other necessary matters at the place of application for membership, and then prepare a separate guide and provide it to the applicants.
[This Article Newly Inserted June 2, 2017]
Article 7-5 (Confirmation of Explanation of Housing Association Membership Contract) The recruiting entity shall, pursuant to Article 11-4 (2) of the Act, obtain the applicant's confirmation on the confirmation of explanation of the housing association membership contract in Attached Form No. 11-5 and provide the confirmed form to the applicant.
[This Article Newly Inserted July 24, 2020]
Article 8 (Verification of Membership Qualifications, etc.) (1) The term “cases prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in the part other than items 1) and 2) of Article 21 (1) 1 (a) of the Enforcement Decree means cases where a person holds a pre-sale right or other right referred to in Article 2 7-2 of the Rules on Housing Supply. <Amended Jun. 23, 2026>
(2) The term “standards prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 21 (1) 1 (a) 1) and 2) of the Enforcement Decree means the following standards, respectively: <Amended Jun. 23, 2026>
1. In the case of acquiring a house through inheritance, bequest, or marriage to a homeowner, if the acquired house is disposed of within six months from the date of notification of disqualification by the project entity pursuant to Article 52, Paragraph 3 of the "Rules on Housing Supply," the acquired house shall be deemed not to be owned.
2. Where the head of a household or a member of a household in which only one person (including the head of the household) owns one house with an exclusive residential area of 85 square meters or less acquires, through inheritance, bequest, or marriage to the owner of a house, a house subject to restrictions on resale under Article 64 (1) of the Act (limited to a house with an exclusive residential area of 85 square meters or less), the existing house (hereinafter referred to as the “existing house”) shall be deemed not to be owned if it is disposed of within six months from the date on which the project entity notifies the person of disqualification pursuant to Article 52 (3) of the Rules on Housing Supply. Provided, that where the existing house is also subject to restrictions on resale under Article 64 (1) of the Act, if either the existing house or the acquired house is disposed of within six months from the earlier of the date on which the resale restriction on the existing house expires and the date on which the resale restriction on the acquired house expires, the house so disposed of shall be deemed not to be owned.
3. In cases other than Subparagraphs 1 and 2, Article 53 of the "Rules on Housing Supply" shall apply mutatis mutandis.
(3) Where a mayor, county governor, or head of a Gu intends to take any of the following actions concerning a regional housing association or a workplace housing association, he or she shall request the Minister of Land, Infrastructure and Transport to conduct a computerized search using the housing information network established under the Act on Promotion of Information and Communications Network Utilization and Information Protection, etc., to verify whether the relevant members meet the qualifications under Article 21 (1) 1 and 2 of the Enforcement Decree. <Amended Oct. 29, 2019>
1. Granting approval for the establishment of a housing association under Article 11 of the Act (including approval for a change due to replacement of or admission of new members)
2. Granting approval of a project plan for the relevant housing association under Article 15 of the Act
3. Conducting an inspection for use or granting temporary approval for use of housing constructed by the relevant housing association under Article 49 of the Act
Article 9 (Additional Recruitment of Members of Regional and Workplace Housing Associations, etc.) Where a regional housing association or a workplace housing association intends to obtain approval for additional recruitment of members pursuant to Article 22 (1) 1 of the Enforcement Decree, it shall prepare an additional recruitment plan including the following matters and submit it to the mayor, county governor, or head of a Gu:
1. Name and address of the housing association and name of the representative
2. Establishment Approval Number, Approval Date, and Number of Members
3. Where the housing association implements the project jointly with a registered project operator pursuant to Article 5 (2) of the Act: the name and address of the registered project operator and the name of its representative
4. Location and area of the site for housing construction by the housing association
5. Planned number of housing units to be constructed by the housing association and planned construction period
6. Number of households for additional recruitment and recruitment period
7. Housing supply area per unit or per household
8. Project Overview Including Ancillary Facilities, Welfare Facilities, etc.
9. Scheduled date of application for business plan approval, scheduled date of commencement of construction, and scheduled date of move-in
10. Eligibility for Membership, Required Documents for Application, Application Date and Time, and Location
11. Matters concerning the financial burden of members, such as the timing and method of payment of member contributions
12. Date, time, place, and method of announcing successful applicants
13. Matters concerning the handling of duplicate winners or ineligible winners and contract cancellation
14. Other matters requested by the Mayor, County Governor, or District Head as deemed necessary
Article 10 (Report of Establishment of Workplace Housing Associations, etc.) (1) The report of establishment under Article 24 (1) of the Enforcement Decree shall be in Attached Form No. 12.
(2) Upon receipt of a report of establishment under paragraph (1), the mayor, county governor, or head of a Gu shall verify the details of the report, enter them in the register of reports of establishment of workplace housing associations in Attached Form No. 13, and issue a certificate of acceptance of the report in Attached Form No. 14 to the person who filed the report.
(3) Where a mayor, county governor, or head of a Gu receives a report of dissolution of a workplace housing association pursuant to the latter part of Article 11 (5) of the Act, he or she shall enter the details in the register of reports of establishment of workplace housing associations and retrieve the certificate of acceptance of the report.
(4) The register of reports of establishment of workplace housing associations under paragraph (2) shall be prepared and maintained in a manner that enables electronic processing, unless there are special circumstances that make electronic processing impossible.
⑤ The method of supplying housing pursuant to Article 24 , Paragraph 2 of the Enforcement Decree shall be determined by the “Rules on Housing Supply.”
Article 10-2 (Deposit of Membership Fees, etc.) (1) The term “application for deposit of membership fees, etc. prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 24-5 (3) of the Enforcement Decree means the application for deposit of membership fees, etc. in Attached Form No. 14-2.
(2) The term “certificate prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 24-5 (5) of the Enforcement Decree means the certificate of deposit of membership fees, etc. in Attached Form No. 14-3.
[This Article Newly Inserted July 24, 2020]
Article 10-3 (Withdrawal of Subscription for Membership in a Housing Association) (1) The term “request form for withdrawal of subscription prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 24-6 (1) of the Enforcement Decree means the request form for withdrawal of subscription in Attached Form No. 14-4.
(2) The receipt under Article 24-6 (2) of the Enforcement Decree shall be in Attached Form No. 14-4.
[This Article Newly Inserted July 24, 2020]
Article 10-4 (Payment and Refund of Membership Fees, etc.) (1) The term “request form prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 24-7 (1) of the Enforcement Decree means the request form for refund of membership fees, etc. in Attached Form No. 14-5. A copy of the request for withdrawal of subscription shall be attached when submitting the request form.
(2) The term “request form prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in the latter part of Article 24-7 (2) of the Enforcement Decree means the request form for payment of membership fees, etc. in Attached Form No. 14-5. A copy of the trust business operator's business agency agreement under Article 11-2 (3) of the Act shall be attached when submitting the request form.
[This Article Newly Inserted July 24, 2020]
Article 11 (Reporting of Performance and Disclosure of Data) ① The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 12, Paragraph 1, Subparagraph 3 of the Act refers to the matters in each of the following subparagraphs. <Newly added July 24, 2020>
1. Progress in filing reports, obtaining approvals, and securing permits, etc., under relevant statutes necessary for housing association projects
2. Status of contracts concluded with designers, construction contractors, business agents, etc.
3. Matters concerning revenue and expenses
4. Progress of housing construction works
5. Matters concerning the borrowing of funds
(2) The promoters or officers of a housing association shall prepare a performance report on the housing association within 30 days after the last day of the relevant quarter pursuant to Article 12 (1) of the Act. <Newly inserted Jul. 24, 2020>
(3) Where an officer or promoter of a housing association discloses information concerning Article 12 (2) 5 of the Act on the Internet, he or she may disclose only an outline of the information with the consent of at least 50 percent of the members. <Amended Jul. 24, 2020>
④ A request for inspection or copying by a member of a housing association pursuant to Article 12, Paragraph 3 of the Act shall be made in writing or as an electronic document stating the purpose of use, etc. <Amended July 24, 2020>
(5) The term “documents and data prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport, such as annual fund management plans and records of fund execution” in Article 12 (4) of the Act means the following documents and data. <Newly inserted Jun. 11, 2020; Jul. 24, 2020>
1. Data on fund management plans and fund execution performance of the previous year
2. Documents concerning the selection or replacement of registered project operators in the previous year
3. Documents concerning the selection or replacement of business agents in the previous year
4. Documents concerning the appointment or dismissal of officers of the housing association in the previous year
5. Data on the status of securing land use rights and ownership as of December 31 of the previous year
(6) The promoters or officers of a housing association shall submit to the mayor, county governor, or head of a Gu, by the end of February each year, the documents and data under each subparagraph of paragraph (5), pursuant to Article 12 (4) of the Act. <Newly inserted Jun. 11, 2020; Jul. 24, 2020>
[Title amended July 24, 2020]
Article 11-2 (Notification of Results of General Meetings) The promoters of a housing association shall notify the competent mayor, county governor, or head of a Gu in writing of the results of a general meeting within 10 days from the date on which the general meeting is held, pursuant to Article 14-2 (5) of the Act.
[This Article was newly added on July 24, 2020.]
[Formerly Article 11-2 was moved to Article 11-3 <July 24, 2020>]
Article 11-3 (Construction Guarantee) In Article 14-4, Paragraph 1 of the Act , the term “construction guarantee certificate of an institution prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the guarantee certificates set forth in the following subparagraphs for housing supplied to members of the association. <Amended July 24, 2020>
1. A guarantee issued by a mutual aid association pursuant to the Framework Act on the Construction Industry
2. A guarantee issued by the Korea Housing & Urban Guarantee Corporation pursuant to the Housing & Urban Fund Act
3. A payment guarantee issued by a bank pursuant to Article 2, Paragraph 1, Subparagraph 2 of the Banking Act , the Korea Development Bank pursuant to the Korea Development Bank Act , the Export-Import Bank of Korea pursuant to the Export-Import Bank of Korea Act , or the Industrial Bank of Korea pursuant to the Industrial Bank of Korea Act.
4. Guarantee insurance policy issued by an insurance company pursuant to the Insurance Business Act
[This Article was newly added on June 2, 2017.]
[Moved from Article 11-2 on July 24, 2020.]
Section 3 Approval of Business Plan, etc.
Article 12 (Application for Approval of Business Plan, etc.) ① The application form and business plan pursuant to Article 27, Paragraph 6, Subparagraph 1 , Items ( a) and ( b) of the Enforcement Decree shall be in accordance with Form No. 15 of the Attached Form .
② The construction design documents pursuant to the main text of Subparagraph 1, Item (d) of Article 27, Paragraph 6 of the Enforcement Decree and the main text of Subparagraph 2, Item (c) of the same paragraph are as shown in Attached Table 2 .
(3) The term “drawings prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 27 (6) 1 (d) and the proviso to Article 27 (6) 2 (c) of the Enforcement Decree means the location map, topographic map, and plan drawing among the drawings set forth in Attached Table 2.
④ In Article 27, Paragraph 6, Subparagraph 1, Item (k ) of the Enforcement Decree, the term “documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the documents set forth in each of the following subparagraphs. <Amended June 19, 2024>
1. Plan for the Installation of Trunk Facilities (Scale from 1:10,000 to 1:50,000)
2. Where the project entity has not secured ownership of the land, a consent form for land use in Attached Form No. 9-2 or other documents consenting to the use of the land (where the right to use land scheduled to be developed and supplied as a housing site under relevant statutes, such as the Housing Site Development Promotion Act, has been secured, documents verifying that right). Provided, that this shall not apply where the project entity falls under any of the following items:
A. State
B. Local government
C. Korea Land and Housing Corporation pursuant to the Korea Land and Housing Corporation Act (hereinafter referred to as the “Korea Land and Housing Corporation”)
d. A local public corporation established for the purpose of carrying out a housing construction project pursuant to Article 49 of the Local Public Enterprises Act (hereinafter referred to as a “local public corporation”)
E. Rental business operators designated pursuant to Article 20, Paragraph 1 of the Special Act on Private Rental Housing
3. Among the design drawings prepared pursuant to Article 43 (1) of the Enforcement Decree, the drawings designated and publicly notified by the Minister of Land, Infrastructure and Transport
4. Documents pursuant to Attached Table 3 (applicable only when the State, a local government, or the Korea Land and Housing Corporation applies for project plan approval)
5. Documents issued by the Association verifying whether an administrative disposition has been taken against a registered project operator (including computerized information data managed by the Association)
6. Documents proving designation pursuant to Article 20, Paragraph 1 of the Special Act on Private Rental Housing (applicable only to rental business operators designated pursuant to the same paragraph)
7. Documents specified in each subparagraph of Article 28, Paragraph 2 (applicable only to remodeling)
(5) The application form and project plan referred to in Article 27 (6) 2 (a) and (b) of the Enforcement Decree shall be in Attached Form No. 15.
⑥ The supply plan pursuant to Article 27, Paragraph 6, Subparagraph 2, Item (e) of the Enforcement Decree shall include the following items and shall attach subdivision drawings by land use and supply recipient.
1. Location and Area of the Site
2. Persons eligible to receive the land
3. Use of the land
4. Timing, Method, and Conditions of Supply
⑦ In Article 27, Paragraph 6, Subparagraph 2, Item (f) of the Enforcement Decree, “documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the documents under Paragraph 4, Subparagraphs 1, 2, and 5.
(8) The authority approving the project plan (meaning the Minister of Land, Infrastructure and Transport, a City/Do Governor, or a mayor or county governor who approves housing construction project plans and housing site preparation project plans pursuant to Article 15 of the Act and Article 90 of the Enforcement Decree; hereinafter the same shall apply) that receives an application for approval under Article 15 (1) or (3) of the Act shall verify, through the joint use of administrative information under Article 36 (1) of the Electronic Government Act, the certificate of registered matters concerning the land (except where the project entity is the State, a local government, the Korea Land and Housing Corporation, or a local public corporation) and the confirmation of the land use plan.
(9) Where the authority approving the project plan approves a project plan pursuant to Article 15 (1) or (3) of the Act, it shall issue an approval certificate in Attached Form No. 16 to the applicant.
(10) A City/Do Governor shall prepare, as of the last day of each month, a report on the results of approval of housing construction project plans in Attached Form No. 17 and a report on housing construction performance in Attached Form No. 18, and shall send them to the Minister of Land, Infrastructure and Transport by the 15th day of the following month (including sending by electronic document). Provided, that where the relevant information is entered into the Multi-Family Housing Management Information System under Article 88 of the Multi-Family Housing Management Act, it shall be deemed to have been sent.
Article 13 (Application for Approval of Changes to Project Plans, etc.) (1) Where a project entity intends to obtain approval for a change to a project plan under the main text of Article 15 (4) of the Act, it shall submit to the authority approving the project plan an application in Attached Form No. 15, together with the details of the change to the project plan and supporting documents (including submission by electronic document).
(2) Where the authority approving the project plan approves a change to the project plan under the main text of Article 15 (4) of the Act, it shall issue an approval certificate in Attached Form No. 16 to the applicant.
(3) After a project entity has published a public notice inviting prospective occupants (in cases where a project entity under Article 5 (2) or (3) of the Act constructs housing, this means approval of the project plan under Article 15 (1) or (3) of the Act; hereinafter the same shall apply in this Article), the authority approving the project plan shall not approve any change to the project plan falling under any of the following subparagraphs. Provided, that this shall not apply where the project entity has notified prospective occupants in advance of the proposed change to the project plan and obtained the consent of at least 80 percent of the prospective occupants (where a housing complex is constructed and supplied in separate sections under Article 15 (3) of the Act and occupants have moved into an existing section, those occupants shall also be included for subparagraph 2; hereinafter the same shall apply in this paragraph and paragraph (4)). <Amended Sep. 14, 2018>
1. An increase in project costs that results in a change in the supply price of housing (only applicable to housing for which a supply contract has been concluded).
2. Changes in the housing supply area per unit or household (referring to the area of housing supplied by the project developer that is included in the floor area; hereinafter the same applies) and land share. However, cases falling under any of the following subparagraphs shall be excluded.
a. An increase or decrease of 2 percent or less of the common area (referring to the common area pursuant to Article 2, Subparagraph 2, Item a ) or land share per household or family. In this case, the reduction of the land share is limited to cases where the project plan approval authority recognizes that the reduction of the land share is unavoidable due to a cadastral survey pursuant to Article 2, Subparagraph 4-2 of the "Act on the Establishment and Management of Spatial Information," and where the project entity has notified the prospective occupant of the details and reasons for the reduction of the land share.
b. A change in the housing supply area per household of a building of multi-family housing for which there are no prospective occupants
(4) Where a project entity obtains approval for a change to the project plan under paragraph (2) after publishing a public notice inviting prospective occupants, it shall notify the prospective occupants of the details in writing within 14 days.
(5) The term “cases where minor matters prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport are changed” in the proviso to Article 15 (4) of the Act means any of the following cases. Provided, that subparagraphs 1, 3, and 7 shall apply only where the project entity is the State, a local government, the Korea Land and Housing Corporation, or a local public corporation.
1. An increase or decrease in project expenses within 20 percent of the total project expenses. However, this shall not apply where the Housing and Urban Fund (meaning the Housing and Urban Fund under the Housing and Urban Fund Act) provided to support construction of national housing is increased.
2. A change in installation standards for ancillary and welfare facilities that are not buildings, provided that it meets all of the requirements of the following subparagraphs.
a. The change must be to a standard equal to or higher than the installation standards for the relevant ancillary and welfare facilities.
b. A change that does not involve a change in location (excluding a change in the location of building equipment under Article 2 (1) 4 of the Building Act)
3. An increase or decrease in area within the range of 20 percent of the site area. However, this shall not apply in cases involving a change in the district boundary or creating a need to expropriate the land or objects affixed to the land and rights other than ownership rights relating to the land or objects.
4. Changes in the location or area of the internal structure within a scope that does not change the number of households or the housing supply area per household ( limited to changes within 10 percent of the area approved for the business plan pursuant to Article 15 of the Act )
5. Change of interior and exterior materials ( limited to cases where the quality of the materials is equal to or better than that of the materials at the time of obtaining the project plan approval pursuant to Article 15 of the Act )
6. A change arising from the implementation of matters imposed as conditions of approval of the project plan. Provided, that this shall not apply where a change to the public facilities installation plan is necessary.
7. Adjustment of building layout and change in road alignment within the housing complex, to the extent that the design and location by use of the buildings are not altered
8. Change of matters falling under any of the subparagraphs of Article 12, Paragraph 3 of the Enforcement Decree of the Building Act
⑥ When the project entity changes any of the matters listed in each subparagraph of Paragraph 5, it shall notify the project plan approval authority of the details of the change without delay (including notification by electronic document). In this case, the project plan approval authority shall verify whether the details of the change notified by the project entity fall within the scope of each subparagraph of Paragraph 5.
⑦ The authority approving the project plan (only applicable where the authority approving the project plan and the authority inspecting for use are different) shall notify the authority inspecting for use of the details of the change in any of the following cases ( referring to the Governor of a City or Province or the Mayor, County Head, or District Head who conducts an inspection for use or grants temporary approval for use pursuant to Article 49 of the Act and Article 90 of the Enforcement Decree ; hereinafter the same applies). <Newly added April 1, 2020>
1. Where a certificate of approval for a change to the project plan has been issued pursuant to paragraph (2)
2. If, as a result of verification pursuant to the latter part of Paragraph 6, the changes fall within the scope of each subparagraph of Paragraph 5
Article 14 (Application for Approval of Sample Design Documents) Any person who intends to obtain approval for sample design documents pursuant to Article 29, Paragraph 1 of the Enforcement Decree shall submit the documents specified in each of the following subparagraphs attached to the sample design documents to the Minister of Land, Infrastructure and Transport (including submission via electronic documents). <Amended Aug. 27, 2021>
1. Finish schedule
2. Floor plans and unit floor plans for each floor (including basement floors)
3. Elevations (Front, Rear, and Side)
4. Section drawings (including the stairway section)
5. Structural drawings (columns, beams, slabs, and foundations)
6. Structural Calculation Sheet
7. Facility Diagrams (Water Supply, Sanitation, Electricity, and Firefighting)
8. Window and Door Drawings
Article 15 (Extension of the Period for Commencement of Construction and Report of Commencement) (1) Where a project entity intends to extend the period for commencing construction pursuant to the proviso to the part other than the subparagraphs of Article 16 (1) of the Act, it shall submit to the authority approving the project plan an application for extension of the commencement period in Attached Form No. 19 (including submission by electronic document).
(2) Where a project entity intends to report commencement of construction pursuant to Article 16 (2) of the Act (meaning commencement of construction for each section where approval of a project plan has been obtained under Article 15 (3) of the Act), it shall submit to the authority approving the project plan a report of commencement of construction in Attached Form No. 20, together with the following documents (including submission by electronic document). Provided, that documents under subparagraphs 2 through 5 shall apply only to housing construction projects. <Amended Apr. 1, 2020>
1. Copies of contracts among the parties involved in the project
2. Drawings of earth-retaining structures (applicable only where two or more basement floors are to be constructed)
3. Among the design drawings prepared pursuant to Article 43 (1) of the Enforcement Decree, the drawings designated and publicly notified by the Minister of Land, Infrastructure and Transport
4. Supervision plan and supervision opinion of the supervisor ( referring to a person designated as a supervisor for housing construction work pursuant to Article 43, Paragraph 1 of the Act ; hereinafter the same applies)
5. The scheduled construction progress chart reviewed and confirmed by the supervisor pursuant to Article 49 (1) 3 of the Enforcement Decree
(3) Upon receiving an application for extension of the commencement period or a report of commencement of construction under paragraphs (1) and (2), the authority approving the project plan shall issue to the applicant or reporting person a certificate of extension of the commencement period in Attached Form No. 21 or a certificate of acceptance of the commencement report in Attached Form No. 22.
Article 16 (Transfer Price of Land Allotted in Recompense for Development Costs) (1) The transfer price of land allotted in recompense for development costs under Article 31 (3) of the Act shall be calculated on the basis of the arithmetic mean of the appraisal prices determined by at least two appraisal corporations, etc. (hereinafter referred to as “appraisal corporations, etc.”) under Article 2 4 of the Act on Appraisal and Certified Appraisers. <Amended Aug. 31, 2016; Jul. 24, 2020>
② The phrase “cases prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as cases where rental housing is constructed” in the proviso to Article 31, Paragraph 3 of the Act refers to cases where rental housing with an exclusive residential area of 85 square meters or less is constructed, or national housing with an exclusive residential area of 60 square meters or less is constructed.
(3) The term “development cost prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 31 (3) of the Act means the cost calculated in accordance with the Attached Table to the Enforcement Rule of the Housing Site Development Promotion Act.
Section 4. Construction of Housing
Article 17 (Matters to Be Prescribed by the Rules on Housing Construction Standards, etc.) The following matters shall be prescribed by the Rules on Housing Construction Standards, etc.:
1. Certification standards, certification procedures, and fees, etc. for long-life housing pursuant to Article 38 of the Act
2. Quality management standards for products recognized for floor impact sound performance grades pursuant to Article 41, Paragraph 2, Subparagraph 3 of the Act
3. Performance Standards, Production Standards, and Recognition Procedures for Industrialized Housing Pursuant to Article 51 of the Act
4. Persons possessing technical capabilities pursuant to Article 53 , Paragraph 2 of the Act
Section 5. Supervision and Use Inspection of Housing
Article 18 (Standards for Placement of Supervisors, etc.) ① In Article 47, Paragraph 4, Subparagraph 1 of the Enforcement Decree, “persons having supervisory qualifications prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to persons classified according to each of the following subparagraphs. <Amended Feb. 25, 2019>
1. In the case of the Chief Supervisor who oversees supervision duties
a. Housing construction projects for fewer than 1,000 households: a special-grade construction engineer or an advanced-grade construction engineer performing construction project management duties under Appendix 1, subparagraph 2 of the Enforcement Decree of the Construction Technology Promotion Act. Provided, that in the case of a housing construction project for fewer than 300 households, a person who meets all of the following requirements shall also be included:
1) Must be an architect or assistant architect under the Architects Act
2) The grade calculated according to the construction engineer competency index under Appendix 1, subparagraph 2 of the Enforcement Decree of the Construction Technology Promotion Act shall be equivalent to that of a special-grade or advanced-grade construction engineer performing construction project management duties.
3) The person shall have completed the basic and specialized training under Appendix 3, subparagraph 2 (b) of the Enforcement Decree of the Construction Technology Promotion Act.
b. Housing construction projects for 1,000 or more households: a special-grade construction engineer performing construction project management duties under Appendix 1, subparagraph 2 of the Enforcement Decree of the Construction Technology Promotion Act
2. In the case of supervisors for each construction field: construction engineers performing construction project management duties under Appendix 1, subparagraph 2 of the Enforcement Decree of the Construction Technology Promotion Act. Provided, that in the case of a housing construction project for fewer than 300 households, persons who meet all of the following requirements shall also be included:
a. Must be an architect or assistant architect under the Architects Act
b. The grade calculated according to the construction engineer competency index under Appendix 1, subparagraph 2 of the Enforcement Decree of the Construction Technology Promotion Act shall be equivalent to that of an entry-level or higher construction engineer performing construction project management duties.
c. The person shall have completed the basic and specialized training under Appendix 3, subparagraph 2 (b) of the Enforcement Decree of the Construction Technology Promotion Act.
(2) The supervisor shall prepare a deployment plan for supervisors in consultation with the project entity and report the plan to both the authority approving the project plan and the project entity (including reporting by electronic document). The same shall apply where the deployment plan is changed. <Amended Dec. 30, 2016>
(3) The term “major construction processes prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 49 (1) 4 of the Enforcement Decree means the following processes. <Newly inserted Apr. 1, 2020>
1. Construction of underground structures
2. Rooftop frame and elevator shaft construction
3. Plastering work on the interior floors of the units
4. Elevator Installation Work
5. Underground pipeline installation work
(4) Pursuant to Article 44 (2) of the Act, the supervisor shall report the status of performance of supervision duties to the authority approving the project plan (where only a remodeling permit under Article 66 (1) of the Act has been obtained, meaning the permitting authority; hereinafter the same shall apply in this Article and Article 20) and the project entity in accordance with each of the following categories (including reporting by electronic document), and shall submit a final report upon completion of the supervision duties (including submission by electronic document). In such cases, the reports on the status of performance of supervision duties and the final report shall be made using the supervision report in Attached Form No. 22-2. <Amended Apr. 1, 2020; Aug. 2, 2024>
1. Duties under Article 49 (1) 4 of the Enforcement Decree: the scheduled completion dates, according to the planned construction progress schedule, of the processes under each subparagraph of paragraph (3)
2. Duties under Article 49 (1) 5 of the Enforcement Decree: when a delay in construction occurs. In such cases, a report shall be made in accordance with the standards determined and publicly notified by the Minister of Land, Infrastructure and Transport.
3. Status of performance of supervision duties other than those under subparagraphs 1 and 2: quarterly
Article 18-2 (Deposit and Payment of Construction Supervision Fees, etc.) (1) Where a project entity enters into a contract with a supervisor under Article 43 (3) of the Act (hereinafter referred to as the “contract” in this Article), the project entity shall notify the authority approving the project plan of the details of the contract. Upon receiving the notification, the authority approving the project plan shall immediately inform the project entity and the supervisor of the methods for depositing and paying the construction supervision fees.
(2) The project entity shall deposit the relevant construction supervision fee with the authority approving the project plan no later than 14 days before the scheduled payment date specified in the contract.
(3) The supervisor shall request payment of the construction supervision fee from the authority approving the project plan no later than seven days before the scheduled payment date specified in the contract, and the authority approving the project plan shall pay the fee after verifying the status of performance of supervision duties under Article 18 (4). <Amended Aug. 2, 2024>
(4) Notwithstanding paragraphs (2) and (3), where the contract separately prescribes matters concerning the deposit and payment of construction supervision fees in circumstances such as payment of an advance, rescission or termination of the contract, or temporary suspension of supervision services, the contract shall govern.
(5) Where the authority approving the project plan pays construction supervision fees under paragraph (3) or (4), it shall immediately notify the project entity of such payment.
(6) Matters necessary for the deposit and payment of construction supervision fees, etc., other than those prescribed in paragraphs (1) through (5), shall be determined by the City/Do Governor, mayor, or county governor.
[This Article Newly Inserted Sep. 14, 2018]
Article 19 (Cooperation with Professional Engineers in Architectural Structures) (1) The term “cases prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 46 (1) 3 of the Act means any of the following cases: <Amended May 21, 2018>
1. Cases where demolition work is carried out on major structural components of a building, such as load-bearing walls, columns, floors, and beams, and a change in the scope or method of demolition is necessary.
2. Cases where reinforcement work is performed on the main structural parts of a building, such as load-bearing walls, columns, floors, and beams, and a change in construction methods or materials is necessary.
3. Where new technology or a new construction method is applied to reinforcement work on major structural parts of a building, such as load-bearing walls, columns, floors, and beams, and a specialized institution determines, based on a safety review under Article 69 (3) of the Act, that cooperation of a professional engineer in architectural structures under the National Technical Qualifications Act is necessary
② In Article 46, Paragraph 1, Subparagraph 4 of the Act , “cases prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the following cases:
1. Cases where changes to construction methods or materials are required for the joint between the existing and the expanded sections during structural work for vertical or horizontal expansion
2. Cases where excavation work around a building affects structural safety
③ In Article 46, Paragraph 2 of the Act , “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to defects in load-bearing structural parts under Article 53-2, Paragraph 4, Subparagraph 1 of the Enforcement Decree. < Newly added Aug. 4, 2026>
Article 20 (Reporting of Correction Order or Replacement Order to Supervisor) Ifthe project plan approval authority issues a correction order or a replacement order to a supervisor pursuant to Article 48, Paragraph 2 of the Act , it shall report to the Minister of Land, Infrastructure and Transport within 7 days from the date of issuing the correction order or replacement order pursuant to Paragraph 3 of the same Article .
Article 20-2 (Procedures and Methods of Pre-Visits, etc.) (1) A project entity shall conduct a pre-visit under Article 48-2 (1) of the Act (hereinafter referred to as a “pre-visit”) for at least two days no later than 45 days before the start of the designated move-in period specified in the housing supply contract.
(2) Where a project entity intends to conduct a pre-visit, it shall prepare a pre-visit plan including matters necessary for the pre-visit, such as the period and method of the pre-visit, submit the plan to the authority conducting the inspection for use, and notify prospective occupants of the details in writing (including by electronic document). In such cases, the plan shall be submitted and the notification made no later than one month before the start of the pre-visit period. <Amended Aug. 2, 2024>
(3) A project entity shall conduct a pre-visit only after obtaining confirmation from the supervisor that the exclusive-use areas and common areas (limited to stairs, corridors, elevators, and entrances) have been constructed in accordance with the design documents. <Newly inserted Aug. 2, 2024>
(4) Notwithstanding paragraph (1), where a cause falling under Article 53-2 (5) 1 or 3 of the Enforcement Decree occurs after the project entity has submitted the pre-visit plan to the authority conducting the inspection for use under paragraph (2), the project entity may postpone the start date of the pre-visit period by up to 15 days. <Newly inserted Aug. 2, 2024>
(5) Where a project entity intends to postpone the start date of the pre-visit period under paragraph (4), it shall submit the following materials to the authority conducting the inspection for use and obtain confirmation no later than 10 days before the start date of the pre-visit period. In such cases, the project entity that has obtained confirmation shall immediately notify prospective occupants of the details in writing (including by electronic document). <Newly inserted Aug. 2, 2024>
1. A pre-visit plan that includes the postponed start date of the pre-visit period
2. Materials that can objectively prove the reason for postponement
(6) A project entity shall provide prospective occupants with a checklist necessary for the pre-visit, referring to the standard form under Article 48-2 (6) of the Act. <Amended Aug. 2, 2024>
[This Article Newly Inserted Jan. 22, 2021]
Article 20-3 (Method of Preparing an Action Plan) Where a project entity prepares an action plan under Article 53-2 (2) of the Enforcement Decree, it shall include the following matters for each detailed type of defect in construction work determined and publicly notified by the Minister of Land, Infrastructure and Transport:
1. Details of defects for which prospective occupants of each household have requested remedial action
2. Whether it is a serious defect pursuant to Article 53-2, Paragraph 4 of the Enforcement Decree
3. Methods and Schedule for Remedial Actions for Defects
[This Article Newly Inserted Jan. 22, 2021]
Article 20-4 (Inspection Procedures, etc., of the Quality Inspection Team) (1) Where the multi-family housing concerned falls under Article 53-5 (1) of the Enforcement Decree, the authority conducting the inspection for use that has received a pre-visit plan from the project entity under Article 20-2 (2) shall, without delay, request the City/Do Governor (meaning, where the authority has been delegated under the latter part of Article 48-3 (1) of the Act, the mayor of a large city; hereinafter the same shall apply in this Article) to have the multi-family housing quality inspection team (hereinafter referred to as the “quality inspection team”) conduct an inspection under the former part of the same paragraph.
(2) The City/Do Governor who receives a request for a quality inspection under paragraph (1) shall ensure that the quality inspection team inspects the quality of the relevant multi-family housing under Article 53-5 (2) of the Enforcement Decree within 10 days from the end of the pre-visit period.
(3) A City/Do Governor shall notify the authority conducting the inspection for use and the project entity of an inspection plan, including the date and time of inspection, matters to be inspected, and composition of the quality inspection team, no later than seven days before the inspection begins.
(4) The authority conducting the inspection for use that has been notified of the inspection plan under paragraph (3) shall select at least three households for inspection of the exclusive-use areas of the households under Article 53-5 (2) 2 of the Enforcement Decree and notify the quality inspection team. In such cases, the specific number of households to be inspected and the criteria for selecting the households shall be determined by ordinance of the relevant City/Do in consideration of the circumstances of the housing complex, such as the size of the multi-family housing (where authority has been delegated to the mayor of a large city under the latter part of Article 48-3 (1) of the Act, meaning that large city).
(5) After conducting a quality inspection, the quality inspection team shall submit the inspection results to the City/Do Governor and the authority conducting the inspection for use within five days from the date the inspection is completed.
[This Article Newly Inserted Jan. 22, 2021]
Article 20-5 (Request for Materials by the Authority Conducting the Inspection for Use) The term “documents and related materials prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport, such as the construction status of multi-family housing” in the former part of Article 48-3 (4) of the Act means materials concerning the construction status of multi-family housing, including the construction overview and progress.
[This Article Newly Inserted Jan. 22, 2021]
Article 21 (Inspection for Use, etc.) (1) A person who intends to undergo an inspection for use or obtain temporary approval for use under Article 49 of the Act and Article 56 (2) of the Enforcement Decree shall submit to the authority conducting the inspection for use an application in Attached Form No. 23, together with the following documents (including submission by electronic document). <Amended Apr. 1, 2020>
1. The supervisor's opinion (applicable only to housing construction projects)
2. A certificate of construction issued by the construction contractor (applicable only where the Council of Prospective Occupants applies for an inspection for use or temporary approval for use pursuant to the proviso to Article 55 (1) of the Enforcement Decree)
(2) Where the verification under Article 54 (3) or Article 56 (3) of the Enforcement Decree confirms that the requirements are satisfied, the authority conducting the inspection for use shall issue to the applicant a certificate of inspection for use in Attached Form No. 24 or a certificate of temporary approval for use in Attached Form No. 25.
Article 22 (Composition of the Council of Prospective Occupants) Where the Council of Prospective Occupants is required to undergo an inspection for use pursuant to the proviso to Article 55 (1) of the Enforcement Decree, the authority conducting the inspection for use shall convene a meeting composed of prospective occupants to notify them of the relevant matters and shall post a notice of the meeting at the construction site for at least 10 days. In such cases, the prospective occupants shall, with the consent of a majority of them, form a Council of Prospective Occupants consisting of no more than 10 prospective occupants.
Chapter 3 Supply of Housing
Article 23 (Supply of Housing, etc.) (1) The following matters shall be prescribed by the Rules on Housing Supply:
1. Supply of housing pursuant to Article 54 of the Act
2. Housing subscription savings under Article 56 of the Act
3. Building standards for model houses pursuant to Article 60 of the Act
4. Restrictions on eligibility of prospective occupants under Article 65 (5) of the Act
② The method of calculating the sale price, etc. pursuant to Article 57 of the Act shall be determined by the “Rules on the Calculation, etc. of Sale Prices of Multi-Family Housing . ”
Article 23-2 (Application for Purchase of Housing, etc., Subject to the Price Ceiling System) (1) The term “application for purchase prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 60-2 (3) of the Enforcement Decree means the application for purchase of housing, etc., subject to the price ceiling system in Attached Form No. 25-2. The following documents shall be attached when submitting the application. <Amended Jul. 6, 2021>
1. A copy of the housing sale contract
2. Certificate of Seal Impression or Confirmation of Personal Signature under Article 2, Subparagraph 3 of the Act on Confirmation of Personal Signature, etc.
(2) The Korea Land and Housing Corporation that receives the application for purchase under paragraph (1) pursuant to Article 60-2 (3) of the Enforcement Decree (where the project entity is a public housing project operator under Article 4 of the Special Act on Public Housing, meaning that public housing project operator; hereinafter the same shall apply in Articles 23-4 and 26-2) shall verify the extract of the resident registration record and the certificate of registered matters of the building through the joint use of administrative information under Article 36 (2) of the Electronic Government Act. Provided, that where the applicant does not consent to verification of the extract of the resident registration record, the applicant shall be required to attach the relevant document. <Amended Jun. 19, 2024>
[This Article Newly Inserted Feb. 19, 2021]
[Title Amended Jul. 6, 2021]
Article 23-3 (Confirmation of Residence) (1) The term “application for confirmation of residence prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 60-3 (1) of the Enforcement Decree means the application for confirmation of residence in Attached Form No. 25-3.
(2) The term “certificate of residence prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 60-3 (2) of the Enforcement Decree means the certificate of residence in Attached Form No. 25-4.
③ When the head of a local government confirms the fact of residence of a person subject to the residence obligation under Paragraph 1 of the same Article 57-2 (hereinafter referred to as the “person subject to residence obligation”) pursuant to Paragraph 6 of the Act , the period of residence shall be calculated according to the methods of each of the following subparagraphs.
1. When calculating the period deemed to be a period of residence in the relevant dwelling under the proviso to the part other than the subparagraphs of Article 57-2 (1) of the Act and Article 60-2 (2) 1 of the Enforcement Decree, periods during which it is impossible to reside in the dwelling, such as where the dwelling is leased and the lease term has not expired, shall be excluded from the period deemed to be a period of residence.
2. The date on which the person obligated to reside moves into the relevant dwelling shall be included in the period of residence.
3. The date on which the person obligated to reside vacates the relevant dwelling shall be included in the period of residence.
4. Where the period of residence of a person subject to the residence obligation who suspended and later resumed residence in the relevant dwelling under Article 3 of the Addenda to the partial amendment of the Housing Act (Act No. 20393) is aggregated, 30 days of the aggregated period expressed in years, months, and days shall be calculated as one month.
[Wholly revised June 19, 2024]
Article 23-4 (Resupply of Purchased Housing, etc., Subject to the Price Ceiling System) (1) Where the Korea Land and Housing Corporation resupplies housing under Article 57-2 (7) and Article 64 (6) of the Act, it shall resupply the housing according to each of the following categories. <Amended Jun. 19, 2024>
1. In the case of land-lease housing for sale or public housing for sale under Article 2, Subparagraph 1 , Item B of the Special Act on Public Housing, it shall be supplied to persons who meet the occupant qualifications set forth in Annex 6 of the Enforcement Rules of the same Act.
2. In the case of other housing, it shall be supplied in accordance with Articles 27 and 28 of the "Rules on Housing Supply."
(2) Where the Korea Land and Housing Corporation resupplies housing under paragraph (1), the resupply price shall not exceed the sum of the amounts specified for each of the following categories. <Amended Jun. 19, 2024>
1. Where the Corporation resupplies housing purchased after receiving an application for purchase under the proviso to Article 57-2 (2) or Article 57-2 (8) of the Act, or purchased from a person who violated Article 57-2 (1) or (7) of the Act: the sum of the amounts under the following items
a. Purchase costs pursuant to Article 57-2, Paragraph 4 of the Act (hereinafter referred to as “purchase costs”)
b. Interest calculated by applying the average interest rate of one-year time deposits at a bank under the Banking Act (hereinafter referred to as the “average interest rate”) to the amount under item (a)
C. Incidental expenses incurred in the acquisition and ownership of a house, such as acquisition tax, property tax, and registration fees (hereinafter referred to as “incidental expenses”)
2. Where the Corporation resupplies housing preferentially purchased under the proviso to Article 64 (2) of the Act: the sum of the amounts under the following items
a. The purchase amount under Appendix 3-2 of the Enforcement Decree
b. Interest calculated by applying the average interest rate to the amount under item (a)
C. Incidental expenses
3. Where housing purchased under Article 78-2 (3) of the Act is resupplied: the sum of the amounts under the following items
a. Amount according to the following classifications
1) In the case of a house for which a purchase application has been received pursuant to Article 78-2, Paragraph 1 of the Act : the amount pursuant to Article 82-2, Paragraph 4 of the Enforcement Decree
2) In the case of a house resold in violation of Article 64, Paragraph 1 of the Act : Purchase costs
b. Interest calculated by applying the average interest rate to the amount under item (a)
C. Incidental expenses
[This Article Newly Inserted Feb. 19, 2021]
[Title Amended Jul. 6, 2021]
Article 23-5 (Identification Card of Investigative Officials) The term “identification card prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 57-3 (3) of the Act means the identification card in Attached Form No. 25-5. <Amended Jun. 19, 2024>
[This Article Newly Inserted Feb. 19, 2021]
Article 24 (Scope of Financial Institutions That May Establish Mortgage Rights, etc., Without Consent of Occupants) The term “institutions prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 71 1 (e) of the Enforcement Decree means the following institutions:
1. Cooperatives under the Agricultural Cooperatives Act , the National Federation of Agricultural Cooperatives, and Nonghyup Bank
2. Fisheries cooperatives pursuant to the Fisheries Cooperatives Act and the National Federation of Fisheries Cooperatives
3. Credit cooperatives under the Credit Cooperatives Act and the Korea Federation of Credit Cooperatives
4. Community Credit Cooperatives and the Central Federation of Community Credit Cooperatives pursuant to the Community Credit Cooperatives Act
5. Forestry cooperatives and the Korea Forestry Cooperative Federation pursuant to the Forestry Cooperatives Act
6. Korea Housing Finance Corporation pursuant to the Korea Housing Finance Corporation Act
7. Postal offices pursuant to the Postal Savings and Insurance Act
Article 25 (Number of Persons with First-Priority Status for Housing Subscription among Criteria for Designating Overheated Speculation Zones) The term “number of persons prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 72-2 (1) 3 (c) of the Enforcement Decree means the number of persons with first-priority status for housing subscription under Article 27 (1) 1 and Article 28 (1) 1 of the Rules on Housing Supply.
[Wholly Amended Feb. 11, 2022]
Article 25-2 Deleted <February 11, 2022>
Article 25-3 Deleted <February 11, 2022>
Article 25-4 (Procedure for Lifting the Designation of an Area Subject to Adjustment) (1) Where the Minister of Land, Infrastructure and Transport receives a request to lift the designation of an area subject to adjustment pursuant to Article 63-2 (7) of the Act, the Minister shall, after deliberation by the Housing Policy Deliberation Committee under Article 8 of the Framework Act on Housing, decide whether to lift the designation within 40 days from the date of receipt of the request and notify the City/Do Governor or the mayor, county governor, or head of a Gu having jurisdiction over the relevant area of the result. <Amended Oct. 29, 2019>
② Deleted <February 11, 2022>
[This Article newly inserted Nov. 8, 2017]
[Moved from Article 25-3 <October 29, 2019>]
Article 26 (Persons Eligible for Special Supply) (1) The term “persons prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport, such as persons with disabilities and newlyweds” in Appendix 3, subparagraph 4 (b) 1) of the Enforcement Decree means persons eligible for special supply under Articles 35 through 47 of the Rules on Housing Supply.
② Deleted <September 23, 2020>
(3) The term “persons prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport, such as persons with disabilities and newlyweds” in Appendix 3, subparagraph 5 (a) of the Enforcement Decree means persons eligible for special supply under Articles 35 through 47 of the Rules on Housing Supply.
[Wholly revised Oct. 29, 2019]
Article 26-2 (Application for Consent to Resale of Housing, etc., Subject to the Price Ceiling System) (1) A person who intends to obtain consent to resale under Article 73 (4) of the Enforcement Decree shall submit to the Korea Land and Housing Corporation an application for consent to resale in Attached Form No. 25-6, together with the following documents, pursuant to paragraph (5) of the same Article:
1. A copy of the housing sale contract
2. Certificate of Seal Impression or Confirmation of Personal Signature pursuant to the Act on Confirmation of Personal Signature, etc.
(2) Upon receiving the application for consent under paragraph (1), the Korea Land and Housing Corporation shall verify the extract of the resident registration record and the certificate of registered matters of the building through the joint use of administrative information under Article 36 (2) of the Electronic Government Act. Provided, that where the applicant does not consent to verification of the extract of the resident registration record, the applicant shall be required to attach the relevant document.
[This Article Newly Inserted June 19, 2024]
Article 27 (Application for Cancellation of Supplementary Registration for Housing, etc., Subject to the Price Ceiling System) Where supplementary registration has been made for housing falling under Article 64 (1) 3, 4, or 6 of the Act pursuant to Article 64 (4) of the Act, the owner of the housing may apply for cancellation of the supplementary registration after the period of restriction on resale under Article 73 of the Enforcement Decree has expired. <Amended Nov. 8, 2017; Jun. 19, 2024>
Chapter 4 Remodeling
Article 28 (Application for Remodeling, etc.) (1) The application for permission under Article 75 (2) of the Enforcement Decree shall be in Attached Form No. 26.
② In Article 75 , Paragraph 2 of the Enforcement Decree, “documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the documents in each of the following subparagraphs.
1. Documents and drawings referred to in each subparagraph of Article 6 (1) of the Enforcement Rule of the Building Act, according to the type of building to be remodeled. Provided, that in the case of remodeling that includes an extension, the structural plan (including a plan for retaining existing structural members, such as load-bearing walls, columns, and beams), geological survey report, and specifications among the architectural plans under Appendix 3, subparagraph 1 of the Enforcement Rule of the Building Act shall also be included.
2. Consent form from the occupant pursuant to Item 1 of Annex 4 of the Enforcement Decree and documents proving the exercise of the right to demand sale pursuant to Article 22 of the Act
3. Where an action that increases or decreases the number of households, such as combining or dividing households, is taken: floor plans before and after the change
4. In the case of remodeling that increases the number of households pursuant to Article 2, Subparagraph 25, Item (c) of the Act (hereinafter referred to as “remodeling that increases the number of households”), a plan for changes in rights pursuant to Article 67 of the Act
5. In the case of expansion-type remodeling pursuant to Article 68 , Paragraph 1 of the Act , the safety diagnosis report pursuant to Paragraph 5 of the same Article
6. In the case of a housing association for remodeling: a copy of the certificate of approval for establishment of the housing association
(3) Where an application for a remodeling permit under Article 75 (2) of the Enforcement Decree is received, the mayor, county governor, or head of a Gu shall issue a remodeling permit certificate in Attached Form No. 27 if the application meets the standards under Appendix 4 of the Enforcement Decree.
(4) A person who intends to undergo an inspection for use in connection with remodeling under Article 66 (7) of the Act shall submit to the mayor, county governor, or head of a Gu an application in Attached Form No. 28, together with the following documents.
1. The supervisor's opinion (applicable only where the remodeling is subject to supervision under the Building Act)
2. A certificate of construction issued by the construction contractor
(5) Upon receiving an application under paragraph (4), the mayor, county governor, or head of a Gu shall verify whether the subject of the inspection for use conforms to the approved matters and shall issue a certificate of inspection for use in Attached Form No. 29.
Article 29 (Report on Safety Diagnosis Results) The report on the results of a safety diagnosis pursuant to Article 68, Paragraph 5 of the Act shall include the following matters: <Amended Feb. 9, 2018>
1. An opinion on whether the building subject to remodeling can be extended and whether a reconstruction project under Article 2 2 (c) of the Act on the Improvement of Urban Areas and Residential Environments will be implemented
2. Results of detailed verification regarding the structural safety of the building and the necessity of changing the structural design ( limited to safety diagnosis pursuant to Article 68, Paragraph 4 of the Act )
Article 30 (Adjustment of Timing for Remodeling That Increases the Number of Households) Where a Special Metropolitan City Mayor, Metropolitan City Mayor, mayor of a large city (meaning a large city under Article 175 of the Local Autonomy Act), or a mayor, county governor, or head of a Gu receives a request from the Minister of Land, Infrastructure and Transport under Article 74 (1) of the Act, the recipient shall report to the Minister, within 30 days from the date of receipt, a plan of measures for changing the basic remodeling plan or adjusting the timing of approval or permission of the project plan for remodeling that increases the number of households. In such cases, where there are special grounds for being unable to comply with the request, the recipient shall notify the Minister of those grounds.
Chapter 5 Supplementary Provisions
Article 31 (Standard Lease Agreement) The term “standard lease agreement prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 78 (3) of the Act means the standard land lease agreement for land-lease housing for sale in Attached Form No. 30.
Article 32 (Time and Method of Calculation of Appraised Value) ①The appraisal pursuant to the latter part of Subparagraph 2, Paragraph 1 of Article 81 of the Enforcement Decree shall be assessed based on the officially assessed land price pursuant to the Act on the Public Announcement of Real Estate Prices, specifically the officially assessed land price of the relevant land at the time closest to the date of the request for appraisal among the officially assessed land prices of the land at the time of the request for appraisal. <Amended Aug. 31, 2016>
(2) Where the appraised value is calculated under paragraph (1), it shall be calculated as the arithmetic mean of the values appraised by at least two appraisal corporations, etc. <Amended Jul. 24, 2020>
(3) When an appraisal corporation, etc. conducts an appraisal under paragraph (2), land for which housing site preparation has not been completed shall be appraised on the assumption that housing site preparation has been completed, and its use shall be appraised on the basis of a building site. <Amended Jul. 24, 2020>
Article 32-2 (Application for Purchase of Land-Lease Housing for Sale) (1) The term “application for purchase prescribed by Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 82-2 (1) of the Enforcement Decree means the application for purchase of land-lease housing for sale in Attached Form No. 30-2. The following documents shall be attached when submitting the application:
1. A copy of the housing sale contract
2. Certificate of Seal Impression or Confirmation of Personal Signature pursuant to Article 2, Subparagraph 3 of the Act on Confirmation of Personal Signature, etc.
(2) Upon receiving the application for purchase under paragraph (1) pursuant to Article 82-2 (1) of the Enforcement Decree, the Korea Land and Housing Corporation shall verify the extract of the resident registration record and the certificate of registered matters of the building through the joint use of administrative information under Article 36 (2) of the Electronic Government Act. Provided, that where the applicant does not consent to verification of the extract of the resident registration record, the applicant shall be required to attach the extract of the resident registration record.
[This Article Newly Inserted July 6, 2021]
Article 33 (Matters to be Recorded on Housing Redemption Bonds, etc.) ① The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 83, Paragraph 2 of the Enforcement Decree refers to the matters in each of the following subparagraphs.
1. Issuing Authority
2. Issuance amount
3. Issuance Conditions
4. Timing and Procedure of Repayment
(2) The register of housing redemption bonds under Article 83 (3) of the Enforcement Decree shall be in Attached Form No. 31.
Article 34 (Notice of Offering for Housing Redemption Bonds) ① The notice of offering for housing redemption bonds pursuant to Article 85, Paragraph 4 of the Enforcement Decree shall include the following matters:
1. Name of Housing Redemption Bond
2. Construction location of the housing subject to repayment
3. The supply area per unit or household of the housing subject to redemption, the number of households, and the amount of housing redemption bonds for each household
4. Matters concerning eligibility to apply for housing redemption bonds, priority, and recruitment methods
5. Matters concerning the issuance terms of housing redemption bonds, such as interest rates, methods of paying interest, and methods of paying the purchase price
6. Scheduled repayment date
7. Matters concerning the redemption method of housing redemption bonds
8. Contents of Article 86 , Paragraph 3 of the Enforcement Decree and each subparagraph of Article 35, Paragraph 1 of these Rules
(2) With respect to the eligibility and priority of applicants for housing redemption bonds under paragraph (1) 4, the eligibility and priority of occupants of private housing under Articles 28 and 29 through 32 of the Rules on Housing Supply shall apply mutatis mutandis.
(3) Where the issuer of housing redemption bonds intends to offer the bonds for subscription, it shall publicly announce the matters under each subparagraph of paragraph (1) in a daily newspaper at least once, no later than seven days before the offering.
Article 35 (Transfer, etc. of Housing Redemption Bonds) ① The phrase “cases where there are unavoidable reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as overseas emigration” in the proviso to Article 86, Paragraph 3 of the Enforcement Decree refers to any of the following cases:
1. Cases where all members of a household (referring to members of a household including the head of the household; hereinafter the same applies in this Article) relocate to a different administrative district due to circumstances regarding the employment or livelihood of a household member, medical treatment, schooling, or marriage.
2. Cases where all household members move to a house acquired through inheritance
3. Cases where all household members emigrate overseas or intend to stay overseas for two years or more
(2) A person who intends to transfer, terminate before maturity, or inherit housing redemption bonds shall submit to the issuer documents proving that the person falls under any of the subparagraphs of paragraph (1), or documents proving that the person is an heir. In such cases, the issuer shall promptly change the name of the bondholder and record the change in the register of housing redemption bonds and on the bond.
③ When repaying housing redemption bonds, if the bondholder so desires, the principal and interest of the housing redemption bonds may be repaid in cash.
Article 36 (Report on Operation of the Special Account for National Housing Projects) The quarterly report on the operation of the Special Account for National Housing Projects under Article 88 (2) of the Enforcement Decree shall be in Attached Form No. 32.
Article 37 (Establishment and Operation of Housing Information System) The Minister of Land, Infrastructure and Transport may establish and operate databases containing the following matters pursuant to Article 89 (1) of the Enforcement Decree:
1. Approval of a project plan under Article 15 (1) or (3) of the Act
2. Approval of commencement of construction under Article 16 (1) of the Act
3. Inspection for use and temporary approval for use under Article 49 (1) of the Act
4. Approval of housing supply pursuant to Article 54 , Paragraph 1 of the Act
Article 38 (Standards for Payment of Rewards, etc.) (1) The report form under Article 92 (1) of the Enforcement Decree shall be in Attached Form No. 33.
(2) The application form under Article 92 (4) of the Enforcement Decree shall be in Attached Form No. 34.
(3) A reward under Article 92 (4) of the Enforcement Decree shall be paid in an amount not exceeding 10 million won. The specific payment criteria and amounts shall be as set forth in Attached Table 4.
(4) A City/Do Governor may withhold payment of a reward in any of the following cases:
1. In cases where the reported resale or brokerage act (hereinafter referred to as “misconduct”) has already been disclosed to media outlets, etc., or is already under investigation
2. Cases where the relevant administrative agency has already become aware of the reported misconduct through fact-finding investigations, etc.
(5) Where a City/Do Governor does not pay a reward under paragraph (3), the City/Do Governor shall notify the person who filed the report of the reason for nonpayment.
Article 39 (Identification Card of Inspection Officials) The identification card under Article 93 (3) of the Act shall be in Attached Form No. 35.
Article 40 Deleted <Mar. 12, 2026>
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 353, Aug. 12, 2016>
Article 1 (Enforcement Date) This Rule shall enter into force on August 12, 2016. However, Article 3, Paragraph 9 of the Addenda shall enter into force on September 1, 2016.
Article 2 (Repeal of Other Laws) The Enforcement Rule of the Special Measures Act for the Promotion of Supply of Land-Lease Housing is hereby repealed.
Article 3 (Amendment of Other Laws) ① The Enforcement Rules of the Act on the Recovery of Development Profits are partially amended as follows:
In Article 6, subparagraph 1, “Article 106 (1) 1 of the Enforcement Decree of the Housing Act” shall be changed to “Article 21 (1) 1 of the Enforcement Decree of the Housing and Urban Fund Act.”
(2) The Enforcement Rule of the Construction Technology Promotion Act is amended as follows.
In Article 20, Paragraph 2, “Article 9 of the Housing Act” shall be changed to “Article 4 of the Housing Act”.
(3) The Enforcement Rule of the Building Act is amended as follows.
In Article 2-5, Subparagraph 1, Item (a) 1), “Article 3, Paragraph 1, Item 2 of the Enforcement Decree of the Housing Act” shall be changed to “Article 10, Paragraph 1, Item 1 of the Enforcement Decree of the Housing Act,” and in Item (c) of the same subparagraph, “Article 16 of the Housing Act” shall be changed to “Article 15 of the Housing Act.”
In the proviso to Article 6, Paragraph 1, Subparagraph 1-2, Item (c), “Article 15, Paragraph 1 of the Enforcement Decree of the Housing Act” shall be changed to “Article 27, Paragraph 1 of the Enforcement Decree of the Housing Act,” and “Article 16 of the Housing Act” shall be changed to “Article 15 of the Housing Act.”
(4) The Enforcement Rule of the Special Act on Public Housing is amended as follows.
In Article 7, Paragraph 1, Subparagraph 4, “Article 41 of the Housing Act” shall be changed to “Article 63 of the Housing Act”.
In the part other than the subparagraphs of Article 24, Paragraph 1, “the proviso to Article 41-2, Paragraph 2 of the Housing Act and Article 10, Paragraph 4 of the Special Measures Act for the Promotion of Supply of Land-Lease Housing” shall be changed to “the proviso to Article 64, Paragraph 2 of the Housing Act”.
⑤ The Rules on the Calculation, etc. of Sale Prices of Multi-Family Housing are partially amended as follows.
In Article 1, “Article 38, Paragraph 1, Subparagraph 3 and Article 38-2 of the Housing Act” shall be changed to “Article 54, Paragraph 1, Subparagraph 2, Item (b) and Article 57 of the Housing Act”.
In the part other than the subparagraphs of Article 2, “Article 16, Paragraph 1 of the Housing Act (hereinafter referred to as the “Act”)” shall be changed to “Article 15, Paragraph 1 of the Housing Act (hereinafter referred to as the “Act”)”, and “Article 38, Paragraph 1 of the Act” shall be changed to “Article 54, Paragraph 1 of the Act”.
In the part other than the subparagraphs of Article 3, Paragraph 1, “Article 38, Paragraph 1, Subparagraph 3 of the Act” shall be changed to “Article 54, Paragraph 1, Subparagraph 2, Item (b) of the Act,” and in Paragraph 2 of the same Article, “Article 38-2, Paragraph 3 of the Act” shall be changed to “Article 57, Paragraph 4 of the Act.”
In the part other than the formula of Article 7, Paragraph 1, “Article 38-2, Paragraph 1 of the Act” shall be changed to “Article 57, Paragraph 1 of the Act”.
In the part other than the subparagraphs of Article 8, Paragraph 1, “Article 38-2, Paragraph 2, Subparagraph 1 of the Act” shall be changed to “Article 57, Paragraph 3, Subparagraph 1 of the Act,” and in Subparagraph 5 of the same paragraph, “Article 38-4 of the Act” shall be changed to “Article 59 of the Act.”
In the part other than the subparagraphs of Article 9, Paragraph 1, “the main text of the part other than the items of Article 38-2, Paragraph 2, Subparagraph 2 of the Act” shall be changed to “the main text of the part other than the items of Article 57, Paragraph 3, Subparagraph 2 of the Act,” and in Subparagraph 2 of the same paragraph, “Article 23 of the Act” shall be changed to “Article 28 of the Act.”
In the part other than the subparagraphs of Article 9-2, Paragraph 1, “the proviso to the part other than the items of Article 38-2, Paragraph 2, Subparagraph 2 of the Act” shall be changed to “the proviso to the part other than the items of Article 57, Paragraph 3, Subparagraph 2 of the Act,” and in Subparagraph 2 of the same paragraph, “Article 23 of the Act” shall be changed to “Article 28 of the Act.”
In Article 11, Paragraph 3, “the main text of the part other than the items of Article 38-2, Paragraph 2, Subparagraph 2 of the Act” shall be changed to “the main text of the part other than the items of Article 57, Paragraph 3, Subparagraph 2 of the Act”.
In Article 14 (1), “Article 38-2 (3) of the Act” shall be changed to “Article 57 (4) of the Act”; in paragraph (2) of the same Article, the phrase “the amount added as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the former part of Article 38-3 (3) of the Act shall be changed to “the amount obtained by adding an amount prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the former part of Article 57 (4) of the Act; and in the former parts of paragraphs (3) and (4) of the same Article, “the latter part of Article 38-2 (3) of the Act” shall each be changed to “the latter part of Article 57 (4) of the Act.”
In Article 15, Paragraph 1, “Article 38-2, Paragraph 4 of the Act” shall be changed to “Article 57, Paragraph 5 of the Act” and “the Ordinance of the Ministry of Land, Infrastructure and Transport” shall be changed to “the Ordinance of the Ministry of Land, Infrastructure and Transport”; and in Paragraph 2 of the same Article, “Article 38-2, Paragraph 4, Subparagraph 4 of the Act” shall be changed to “Article 57, Paragraph 5, Subparagraph 4 of the Act” and “otherwise the Ordinance of the Ministry of Land, Infrastructure and Transport” shall be changed to “the Ordinance of the Ministry of Land, Infrastructure and Transport”.
In Article 16 (1), “Article 38-2 (5) 1 through 7 of the Act” shall be changed to “Article 57 (6) 1 through 7 of the Act”; and in paragraph (2) of the same Article, “Article 38-2 (5) 7 of the Act” shall be changed to “Article 57 (6) 7 of the Act,” and the phrase “other matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” shall be changed to “prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport.”
In Appendix 1-3, subparagraph 3, “Article 21-2 of the Act” shall be changed to “Article 39 of the Act,” and in subparagraph 10, “Article 2 16 of the Act” shall be changed to “Article 2 21 of the Act.”
In Appendix 3, subparagraph 1, “Article 38-2 (2) of the Act” shall be changed to “Article 57 (3) of the Act.”
⑥ The Enforcement Rule on the Organization of the Ministry of Land, Infrastructure and Transport and Its Affiliated Agencies is partially amended as follows.
Article 8, Paragraph 4, Subparagraph 8 shall be amended as follows, and in Subparagraph 18 of Paragraph 5 of the same article, “Article 41-2 of the Housing Act” shall be changed to “Article 64 of the Housing Act,” and in Subparagraph 19 of the same paragraph, “Article 75 of the Housing Act” shall be changed to “Article 56 of the Housing Act.”
8. Designation and Removal of Speculative Overheating Zones Pursuant to Article 63 of the Housing Act
⑦ The Enforcement Rule of the Special Act on Enterprise City Development is partially amended as follows.
In Article 13, Paragraph 3, Subparagraph 1, Item (a) 2), “Article 2, Subparagraph 3 of the Housing Act” shall be changed to “Article 2, Subparagraph 6 of the Housing Act”.
⑧ The Rules on Green Building Certification are partially amended as follows.
In the main text of the part other than the subparagraphs of Article 6 (1), “Article 29 of the Housing Act” shall be changed to “Article 49 of the Housing Act.”
In the main text and proviso of Article 11, Paragraph 1, “Article 16 of the Housing Act” shall be changed to “Article 15 of the Housing Act”.
⑨ The partial amendment to the Rules on Green Building Certification (Ministry of Land, Infrastructure and Transport Ordinance No. 318) is amended as follows.
In Article 8, Paragraph 4, “Article 29 of the Housing Act” shall be changed to “Article 49 of the Housing Act”.
⑩ The Enforcement Rule of the Act on the Improvement of Urban Areas and Residential Environments is partially amended as follows.
In Article 15 (4) 2, “Attached Form No. 20 of the Enforcement Rule of the Housing Act” shall be changed to “Attached Form No. 23 of the Enforcement Rule of the Housing Act.”
⑪ The Enforcement Rule of the Special Act on Private Rental Housing is partially amended as follows.
In Article 20, Paragraph 1, Subparagraph 1, “Article 16 of the Housing Act” shall be changed to “Article 15 of the Housing Act”.
12 Part of the Enforcement Rules of the Act on Reporting Real Estate Transactions is amended as follows.
Article 2, Paragraph 4 is deleted.
⑬ The Enforcement Rule of the Act on Support for Improving the Quality of Life of Tenants in Long-Term Public Rental Housing is partially amended as follows.
In Article 3, Paragraph 2, Subparagraph 2, “Article 23, Paragraph 1 of the Enforcement Decree of the Housing Act” shall be changed to “Article 43, Paragraph 1 of the Enforcement Decree of the Housing Act”.
14. Part of the Rules on Housing Construction Standards, etc. is amended as follows.
In Article 1, “Articles 21-2, 21-6, and 35, Paragraph 1 of the Housing Act” shall be changed to “Articles 38, 39, and 51, Paragraph 1 of the Housing Act”.
In subparagraph 6 of Article 3-2, “Article 16 of the Housing Act (hereinafter referred to as the “Act”)” shall be changed to “Article 15 of the Housing Act (hereinafter referred to as the “Act”)”.
In Article 6-2, subparagraph 3, “Article 3, Paragraph 1 of the Enforcement Decree of the Housing Act” shall be changed to “Article 10, Paragraph 1 of the Enforcement Decree of the Housing Act”.
In Article 12, Paragraph 2, “pursuant to the provisions of Article 16 of the Act” shall be changed to “pursuant to Article 15 of the Act”.
In Article 12-2, “the part other than the subparagraphs of Article 21-2 of the Act” shall be changed to “the part other than the subparagraphs of Article 39 of the Act”.
In the first part of Article 12-4, excluding the subparagraphs, “Article 21-4, Paragraph 2, Subparagraph 3 of the Act” shall be changed to “Article 41, Paragraph 2, Subparagraph 3 of the Act”.
In Article 13, “pursuant to the provisions of Article 35, Paragraph 1 of the Act” shall be changed to “pursuant to Article 51, Paragraph 1 of the Act”.
In Article 14, “Article 37, Paragraph 2 of the Act” shall be changed to “Article 53, Paragraph 2 of the Act”.
In Article 16, Paragraph 1, “Article 2, Subparagraph 7 of the Act” shall be changed to “Article 2, Subparagraph 10 of the Act,” and “Article 16, Paragraph 1 of the Act” shall be changed to “Article 15, Paragraph 1 of the Act.”
In Article 22, “Article 21-6, Paragraph 7 of the Act” shall be changed to “Article 38, Paragraph 7 of the Act”.
In the proviso to subitem 5 (a) of item (b) of subparagraph 1 of Appendix 6, “Article 16 (1) of the Housing Act” shall be changed to “Article 15 (1) of the Housing Act.”
15. Part of the Rules on Housing Supply is amended as follows.
In Article 1, “Article 38 (excluding Article 38 (1) 3), Article 38-4, Article 39, Article 41, and Article 41-2 of the Housing Act” shall be changed to “Article 54 (excluding Article 54 (1) 2 (b)), Article 60, and Articles 63 through 65 of the Housing Act.”
In Article 2 1, “Article 38 of the Housing Act (hereinafter referred to as the “Act”)” shall be changed to “Article 54 of the Housing Act (hereinafter referred to as the “Act”)”; in subparagraph 6 of the same Article, “Article 9 of the Act” shall be changed to “Article 4 of the Act”; in the proviso to the part other than the items of subparagraph 7 of the same Article, “Article 39 (2) of the Act” shall be changed to “Article 65 (2) of the Act”; in item (f) of the same subparagraph, “Article 69 of the Act” shall be changed to “Article 80 of the Act”; in item (g) of the same subparagraph, “the proviso to Article 41-2 (2) and (3) of the Act” shall be changed to “the proviso to Article 64 (2) and (3) of the Act”; and in subparagraph 8 (c) of the same Article, “Article 75 (2) of the Act” shall be changed to “Article 56 (2) of the Act.”
In Article 3 (1), “Article 16 (1) of the Act” shall be changed to “Article 15 (1) of the Act,” “Article 29 of the Act” shall be changed to “Article 49 of the Act,” and “Article 16 of the Act” shall be changed to “Article 15 of the Act”; in the proviso to the part other than the subparagraphs of Article 3 (2), “Article 16 (1) of the Act” shall be changed to “Article 15 (1) of the Act”; in item (a) of subparagraph 1 of the same paragraph, “Article 10 (3) of the Act” shall be changed to “Article 5 (3) of the Act”; in subparagraph 2 of the same paragraph, “Article 69 of the Act” shall be changed to “Article 80 of the Act”; in subparagraph 5 of the same paragraph, “Article 10 (2) of the Act” shall be changed to “Article 5 (2) of the Act”; in subparagraph 6 of the same paragraph, “the proviso to Article 41-2 (2) and (3) of the Act” shall be changed to “the proviso to Article 64 (2) and (3) of the Act”; and in subparagraph 9 of the same paragraph, “Article 2 4 of the Act” shall be changed to “Article 2 20 of the Act,” “the proviso to Article 3 (2) of the Enforcement Decree of the Housing Act (hereinafter referred to as the “Decree”)” shall be changed to “the proviso to Article 10 (2) of the Decree,” and “Article 16 (1) of the Act” shall be changed to “Article 15 (1) of the Act.”
In Article 4, Paragraph 1, Subparagraph 1, “national housing, etc.” shall be changed to “national housing”; in the proviso to Subparagraph 2 of the same paragraph, “Article 2, Subparagraph 4 of the Special Measures Act for the Promotion of Supply of Land-Lease Housing” shall be changed to “Article 2, Subparagraph 9 of the Housing Act”; in the main text of the part other than the subparagraphs of Paragraph 2 of the same article, “national housing, etc.” shall be changed to “national housing”; in the main text of Paragraph 4 of the same article, “Article 75, Paragraph 2 of the Act” shall be changed to “Article 56, Paragraph 2 of the Act”; and in the latter part of Paragraph 5 of the same article, “Article 41, Paragraph 1 of the Act” shall be changed to “Article 63, Paragraph 1 of the Act”.
In the main text of Article 11, Paragraph 1 and Paragraph 2 of the same article, “national housing, etc.” shall be changed to “national housing.”
In the part other than the subparagraphs of Article 15 (1), “Article 12 of the Enforcement Decree” shall be changed to “Article 16 of the Enforcement Decree”; in the main text of the part other than the items of subparagraph 1 of the same paragraph, “Article 16 (2) of the Act” shall be changed to “Article 15 (3) of the Act,” and “Article 40 (6) of the Act” shall be changed to “Article 61 (6) of the Act”; in the proviso to the part other than the items of the same subparagraph, “Articles 18-2 and 18-3 of the Act” shall be changed to “Articles 22 and 23 of the Act,” and “Article 29 of the Act” shall be changed to “Article 49 of the Act”; in item (b) of the same subparagraph, “Article 18-3 (2) and (3) of the Act” shall be changed to “Article 23 (2) and (3) of the Act”; in item (c) of the same subparagraph, “Article 16 of the Act” shall be changed to “Article 15 of the Act,” and “Article 18-3 (2) and (3) of the Act” shall be changed to “Article 23 (2) and (3) of the Act”; in the part other than the subparagraphs of Article 15 (2), “Article 13 (1) of the Enforcement Decree” shall be changed to “Article 17 (1) of the Enforcement Decree”; in the part other than the subparagraphs of Article 15 (3), “item (c) and subitems 6), 7), 11), and 12) of item (h) of subparagraph 2 of Appendix 1 of the Enforcement Decree” shall be changed to “item (c) and subitems 6) and 7) of item (j) of subparagraph 2 of Appendix 1 of the Enforcement Decree”; and in Article 15 (4), “the Housing Policy Deliberation Committee under Article 84 of the Act” shall be changed to “the Housing Policy Deliberation Committee under Article 8 of the Framework Act on Housing.”
In Article 16, Paragraph 1, Subparagraph 1, “Article 44, Paragraph 2, Subparagraph 1 or 2 of the Enforcement Decree” shall be changed to “Article 71, Subparagraph 1 or 2 of the Enforcement Decree,” and in the latter part of Subparagraph 2 of the same paragraph, “Article 29 of the Act” shall be changed to “Article 49 of the Act.”
In Article 17, “Article 26, Paragraph 1 of the Enforcement Decree” shall be changed to “Article 47, Paragraph 1 of the Enforcement Decree”.
In the proviso to Article 20, Paragraph 4, “Article 38-2 of the Act” shall be changed to “Article 57 of the Act,” and in Subparagraph 5 of Paragraph 5 of the same Article, “Article 81, Paragraph 1 of the Act” shall be changed to “Article 85, Paragraph 1 of the Act.”
In Article 21 (6), “National Housing” shall be changed to “National Housing that receives support from the Housing and Urban Fund.”
In Article 22, Paragraph 1, “Article 38-4, Paragraph 2 of the Act” shall be changed to “Article 60, Paragraph 2 of the Act”.
In Article 23, Paragraph 1, “national housing, etc.” shall be changed to “national housing.”
In Article 25, Paragraph 6, “Article 15, Paragraph 4, Subparagraph 2 of the Enforcement Decree” shall be changed to “Article 27, Paragraph 3, Subparagraph 2 of the Enforcement Decree”.
In the title of Article 27 and in the part other than the subparagraphs of Paragraph 1 of the same article, “national housing, etc.” shall be changed to “national housing.”
In Article 28, Paragraph 9, Subparagraph 2, “Article 29 of the Act” shall be changed to “Article 49 of the Act”.
In Article 29, Paragraph 3, Subparagraph 2, “Article 29 of the Act” shall be changed to “Article 49 of the Act”.
In Article 31, “Article 16, Paragraph 1 of the Act” shall be changed to “Article 15, Paragraph 1 of the Act”.
In the main text of Article 33, Paragraph 1, “Article 32, Paragraph 5 of the Act” shall be changed to “Article 11, Paragraph 5 of the Act,” and in Paragraph 2 of the same Article, “National Housing, etc.” shall be changed to “National Housing.”
In the title of Article 35, the part other than the subparagraphs of Paragraph 1 of the same article, the main text of Article 42, the part other than the subparagraphs of Article 43, the part other than the subparagraphs of Article 45, Paragraph 2 of Article 46, and Subparagraph 1 of Article 48, “national housing, etc.” shall be changed to “national housing.”
In Article 50, Paragraph 4, “Article 20, Paragraph 1 of the Enforcement Decree” shall be changed to “Article 44, Paragraph 1 of the Enforcement Decree”.
In the first part of Article 52, Paragraph 5, “Article 10, Paragraph 3 of the Act” shall be changed to “Article 5, Paragraph 3 of the Act”.
In Article 53, subparagraph 4, “Article 10, paragraph 3 of the Act” shall be changed to “Article 5, paragraph 3 of the Act”.
In the part other than the subparagraphs of Article 56, Paragraph 1, “Article 39, Paragraph 5 of the Act” shall be changed to “Article 65, Paragraph 5 of the Act,” and in Paragraph 2 of the same Article, “Article 39, Paragraph 1 of the Act” shall be changed to “Article 65, Paragraph 1 of the Act.”
In Article 57, Paragraph 4, Subparagraph 5, “Article 16 of the Act, Article 32 of the Act” shall be changed to “Article 11 of the Act, Article 15 of the Act,” and in Paragraph 7, Subparagraph 1 of the same article, “Article 39, Paragraph 1 of the Act” shall be changed to “Article 65, Paragraph 1 of the Act.”
In Article 60, Paragraph 4, Subparagraph 4, Items (a) and (b), “the proviso to Article 29, Paragraph 1 of the Act” shall be changed to “the proviso to Article 49, Paragraph 1 of the Act” respectively.
In Article 62, Paragraph 1, “Article 16 of the Act” shall be changed to “Article 15 of the Act”.
In Article 63, Paragraph 1, Subparagraph 4, “national housing, etc.” shall be changed to “national housing.”
16. The Rules on Certification of Intelligent Buildings are partially amended as follows.
In the main text of Article 6, Paragraph 1, excluding the subparagraphs, “Article 29 of the Housing Act” shall be changed to “Article 49 of the Housing Act”.
In the main text of Article 11, Paragraph 1, “Article 16 of the Housing Act” shall be changed to “Article 15 of the Housing Act”.
17. Part of the Enforcement Rule of the Housing Site Development Promotion Act is amended as follows.
In the first part of Article 7, Paragraph 3, “Article 2, Subparagraph 3 of the Housing Act” shall be changed to “Article 2, Subparagraph 6 of the Housing Act”.
In Article 10, Paragraph 2, Subparagraph 3, “pursuant to the provisions of Article 41 of the Housing Act” shall be changed to “pursuant to Article 63 of the Housing Act,” and in Article 10, Paragraph 3, Subparagraph 3, “Article 2, Subparagraph 7 of the Housing Act” shall be changed to “Article 2, Subparagraph 10 of the Housing Act.”
Article 5 (Relationship with Other Laws and Regulations) Where, at the time this Rule enters into force, other laws and regulations refer to the former Enforcement Rule of the Housing Act or its provisions, and this Rule contains corresponding provisions, such references shall be deemed to refer to this Rule or the corresponding provisions of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 357, Aug. 31, 2016> (Enforcement Rule of the Act on Appraisal and Certified Appraisers)
Article 1 (Enforcement Date) This rule shall enter into force on September 1, 2016.
Article 2 (Amendment of Other Laws) ① through ⑨ Omitted
⑩ The Enforcement Rule of the Housing Act is partially amended as follows.
In Article 16 (1), “Article 2 9 of the Act on Public Announcement of Real Estate Prices and Appraisal” shall be changed to “Article 2 4 of the Act on Appraisal and Certified Appraisers.”
11 Omitted
Article 3 Omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 358, Aug. 31, 2016> (Enforcement Rule of the Act on Public Announcement of Real Estate Prices)
Article 1 (Enforcement Date) This Decree shall enter into force on September 1, 2016.
Article 2 (Amendment of Other Laws) ① through ④ Omitted
⑤ The Enforcement Rule of the Housing Act is amended as follows.
In Article 32 (1), “the Act on Public Announcement of Real Estate Prices and Appraisal” shall be changed to “the Act on Public Announcement of Real Estate Prices.”
Article 3 Omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 369, Oct. 31, 2016>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 382, Dec. 30, 2016> (Partial Amendment to the Enforcement Rule of the Act on Appraisal and Certified Appraisers, etc., for Establishing Regulatory Review Periods, etc.)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 4 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 425, June 2, 2017>
Article 1 (Enforcement Date) This rule shall enter into force on June 3, 2017.
Article 2 (Transitional Measures Concerning Documents, etc., to Be Submitted upon Application for Registration of Housing Construction Projects, etc.) Where an application for registration of a housing construction project or a housing site preparation project was filed at the time this Rule enters into force, the former provisions shall apply notwithstanding the amended provisions of Article 4 (1) 2 (a).
Article 3 (Transitional Measures Concerning Amendment of Forms) The former Attached Forms Nos. 1, 9, and 12 in use at the time this Rule enters into force may be used together with the corresponding forms under this Rule until Aug. 31, 2017.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 463, Nov. 8, 2017>
This rule will take effect on November 10, 2017.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 491, Feb. 9, 2018> (Enforcement Rule of the Act on the Improvement of Urban Areas and Residential Environments)
Article 1 (Enforcement Date) This rule shall enter into force on February 9, 2018.
Article 2 omitted
Article 3 (Amendment of Other Laws) ① through ④ Omitted
⑤ The Enforcement Rule of the Housing Act is amended as follows.
In Article 29, subparagraph 1, “housing reconstruction project” shall be changed to “reconstruction project”.
Article 4 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 504, Apr. 2, 2018>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 515, May 21, 2018>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 543, Sep. 14, 2018>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 596, Feb. 25, 2019> (Enforcement Rule of the Construction Technology Promotion Act)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) ① through ⑤ Omitted
⑥ The Enforcement Rule of the Housing Act is amended as follows.
In Article 4 (1) 2 (a), “construction technician” shall each be changed to “construction engineer,” and in paragraph (7) of the same Article, “number of technicians” shall be changed to “number of construction engineers.”
In the main text of Article 18 (1) 1 (a), excluding 1), 2), and 3), “special-grade technician or senior technician” shall be changed to “special-grade construction engineer or advanced-grade construction engineer”; in item (a) 2) of the same subparagraph, “construction technician” shall be changed to “construction engineer” and “special-grade technician or senior technician” shall be changed to “special-grade construction engineer or advanced-grade construction engineer”; in item (b) of the same subparagraph, “special-grade technician” shall be changed to “special-grade construction engineer”; and in the main text of Article 18 (1) 2, excluding the items, and item (b) of the same subparagraph, “construction technician” shall each be changed to “construction engineer.”
On the front of Attached Form No. 1, “technician (a technician belonging to the asset management company in the case of a commissioned-management real estate investment company)” shall be changed to “construction engineer (a construction engineer belonging to the asset management company in the case of a commissioned-management real estate investment company),” and in subparagraph 2 (a) of the list of attached documents on the same page, “construction technician” shall be changed to “construction engineer.”
In the section on the status of technical personnel held in Attached Form No. 7, “architectural-field technician (excluding a professional engineer in the architectural field)” shall be changed to “construction engineer in the architectural field (excluding a professional engineer in the architectural field),” “civil-engineering-field technician” to “construction engineer in the civil engineering field,” “mechanical-field technician” to “construction engineer in the mechanical field,” “electrical-field technician” to “construction engineer in the electrical field,” and “safety-management technician” to “construction engineer in the safety management field.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 624, May 31, 2019>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Matters Subject to Resolution by General Meeting) The amended provisions of Article 7 (5) 6 concerning housing associations for remodeling shall apply to cases where a permit for vertical-extension remodeling is granted under Article 66 (1) of the Act after this Rule enters into force.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 634, July 2, 2019>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 666, Oct. 29, 2019>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 26 shall enter into force on October 29, 2019.
Article 2 (Applicability to Public Recruitment of Members) The amended provisions of Article 7-4, Paragraph 2, Subparagraphs 15 and 15-2 shall apply from the time a report on member recruitment is filed pursuant to Article 11-3, Paragraph 1 of the Act following the enforcement of this Rule.
Article 3 (Applicability to the Lifting of Designation of Speculative Overheating District) The amended provisions of Article 25-2 shall also apply to cases where, prior to the enforcement of this Rule, it was notified that the designation would be maintained pursuant to Article 63, Paragraph 8 of the Act, and six months have not elapsed since the date of such notification.
Article 4 (Applicability to Lifting the Designation of Areas Subject to Adjustment) The amended provisions of Article 25-4 (2) shall also apply to cases where, before this Rule enters into force, a notice has been received that the designation will be maintained pursuant to former Article 25-3, and six months have not elapsed since the date of receipt of the notice.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 714, Apr. 1, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on June 11, 2020. However, the amended provisions of Article 13, Paragraph 7 and Article 21, Paragraph 1 shall enter into force on the date of promulgation.
Article 2 (Applicability to Submission of Scheduled Construction Progress Charts) The amended provisions of Article 15 (2) 5 and the reverse side of Attached Form No. 20 shall apply to housing construction projects for which a report of commencement of construction is filed under Article 16 (2) of the Act after this Rule enters into force.
Article 3 (Applicability to the Reporting Obligation of Supervisors) The amended provisions of Article 18, Paragraph 4 shall apply to housing construction projects for which a commencement of construction report is filed in accordance with Article 16, Paragraph 2 of the Act after the enforcement of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 736, June 11, 2020>
This rule will take effect on June 11, 2020.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 750, July 24, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on Jul. 24, 2020. Provided, that the amended provisions of Articles 10-2 through 10-4 and Attached Forms Nos. 14-2 through 14-5 shall enter into force on Dec. 11, 2020.
Article 2 (Applicability to Matters Resolved by General Assembly) The amended provisions of Article 7, Paragraph 5, Subparagraph 7 shall apply to housing associations that apply for approval of establishment pursuant to Article 11, Paragraph 1 of the Act after the enforcement of this rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 759, Sep. 23, 2020>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 814, Jan. 22, 2021>
This rule shall take effect on January 24, 2021.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 823, Feb. 19, 2021>
Article 1 (Enforcement Date) This rule shall enter into force on February 19, 2021.
Article 2 (Amendment of Other Laws) (1) The Enforcement Rule of the Special Act on Public Housing is amended as follows.
In the part other than the subparagraphs of Article 24, Paragraph 1, “Article 49-5, Paragraph 3 and Article 49-6, Paragraph 2 of the Act” shall be changed to “Article 49-6, Paragraph 2 of the Act”.
Article 34 is deleted.
In the part other than the subparagraphs of Article 34-2, “Article 49 (3) and Article 50 (1) of the Enforcement Decree” shall be changed to “Article 50 (1) of the Enforcement Decree,” and the phrase “each in Attached Form No. 7-2” shall be changed to “in Attached Form No. 7-2.”
Article 35 is deleted.
In Article 35-2, Paragraph 1, “Article 49-5, Paragraph 7 and Article 49-6, Paragraph 4 of the Act” shall be changed to “Article 49-6, Paragraph 4 of the Act,” and in Paragraph 2, Subparagraph 1 of the same Article, “Article 49-5, Paragraph 4 of the Act” shall be changed to “Article 57-2, Paragraph 4 of the Housing Act.”
The section for indicating housing in Attached Form No. 7-2 shall be amended as follows, and in the same form, “Article 49-5 (2) and Article 49-6 (1) of the Special Act on Public Housing, and Article 49 (3) and Article 50 (1) of the Enforcement Decree of the same Act” shall be changed to “Article 49-6 (1) of the Special Act on Public Housing and Article 50 (1) of the Enforcement Decree of the same Act.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 869, July 6, 2021>
This rule will take effect on July 6, 2021.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendments to 80 Ordinances of the Ministry of Land, Infrastructure and Transport for the Improvement of Difficult Legal Terms)
This rule shall take effect from the date of its promulgation. <Proviso omitted>
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1107, Feb. 11, 2022>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) (1) The Enforcement Rule of the Building Act is amended as follows.
In Article 2-5, Subparagraph 1, Item (a) 1), “studio type” shall be changed to “small type”.
② The Rules on Housing Construction Standards, etc. are partially amended as follows.
In Article 6-2, subparagraph 3, “studio-type housing under Article 10 (1) of the Enforcement Decree of the Housing Act” shall be changed to “small-sized housing under Article 10 (1) 1 of the Enforcement Decree of the Housing Act.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1154, Oct. 18, 2022>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Standards for Verification of Housing Construction Performance) The amended provisions of Attached Table 1 shall apply to cases where, after this Rule enters into force, approval of a project plan under Article 15 of the Act (including cases where a housing construction project is carried out without approval of a project plan pursuant to the proviso to Article 15 (1) of the Act, but excluding approval of a change under Article 15 (4) of the Act) or a building permit under the Building Act (excluding a permit for change or a report of change) is obtained.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1176, Jan. 2, 2023>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1346, June 19, 2024>
This rule shall enter into force on June 20, 2024. However, the amended provisions of Article 23-2, Paragraph 2, Article 23-4, and Article 27 shall enter into force on June 27, 2024.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1373, Aug. 2, 2024>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 20-2, Paragraphs 3 through 5 shall enter into force six months after the date of its promulgation.
Article 2 (Applicability to Pre-Visits) The amended provisions of Article 20-2 (3) through (5) shall apply to cases where the contents of a pre-visit plan are notified to prospective occupants under Article 20-2 (2) after the effective date specified in the proviso to Article 1 of the Addenda.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1444, Jan. 21, 2025>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1466, Mar. 25, 2025>
This rule shall take effect one year after the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1569, Mar. 12, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws for the Reorganization of Regulatory Review Periods)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1598, June 23, 2026>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Qualification Standards for Promoters of Housing Associations) The amended provisions of Article 7-3, Paragraph 2 shall apply from the time a report on the recruitment of members (including a report of change) is filed pursuant to Article 11-3, Paragraph 1 of the Act after the enforcement of this Rule.
Article 3 (Applicability to Verification of Membership Qualifications, etc.) The amended provisions of Article 8, Paragraph 1 and Paragraph 2, Subparagraphs 1 and 2 shall apply from the time an application falling under any of the following subparagraphs is made after the enforcement of this Rule.
1. Application for approval of establishment of a housing association pursuant to Article 11 of the Act (including approval for change due to replacement or new membership)
2. Application for approval of a project plan under Article 15 of the Act
3. Application for inspection for use or temporary approval for use under Article 49 of the Act
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1610, Aug. 4, 2026>
This rule will take effect on August 4, 2026.
[Attached Table 1] Verification Standards for Housing Construction Performance (Related to Article 6, Paragraph 3)
[Attached Table 2] Construction design documents submitted by the State, etc. upon application for project plan approval (related to Article 12, Paragraph 2)
[Attached Table 3] Documents to be submitted when the State, etc. applies for approval of housing construction project plan (Related to Article 12, Paragraph 4)
[Attached Table 4] Payment Criteria and Standard Amounts for Rewards for Reporting Violations (Related to Article 38 (3))
[Attached Form No. 1] Application for Registration of a Housing Construction Project or a Housing Site Preparation Project
[Attached Form No. 2] Register of Housing Construction Project Operators and Housing Site Preparation Project Operators
[Attached Form No. 3] Certificate of Registration of a Housing Construction Project Operator (or Housing Site Preparation Project Operator)
[Attached Form No. 4] Register of Registered Project Operators
[Attached Form No. 5] Report of Change in Registered Matters (Housing Construction Project or Housing Site Preparation Project)
[Attached Form No. 6] Business Performance, Business Plan, and Status of Technical Personnel Employed
[Attached Form No. 7] Report on Business Performance, Business Plan, and Status of Technical Personnel Employed
[Attached Form No. 8] Certificate of Verification of Housing Construction Project Performance
[Attached Form No. 9] Application for Approval of Establishment, Change, or Dissolution of a Housing Association
[Attached Form No. 9-2] Consent to Use of Land
[Attached Form No. 10] Register of Approvals for Establishment of Housing Associations
[Attached Form No. 11] Certificate of Approval for Establishment (or Change or Dissolution) of a Housing Association
[Attached Form No. 11-2] Report of Recruitment of Members of a Regional Housing Association or Workplace Housing Association (or Report of Change)
[Attached Form No. 11-3] Register of Reports on Recruitment of Members of Regional and Workplace Housing Associations
[Attached Form No. 11-4] Certificate of Acceptance of Report on Recruitment of Members of a Regional Housing Association or Workplace Housing Association
[Attached Form No. 11-5] Confirmation of Explanation of Housing Association Membership Contract
[Attached Form No. 12] Report of Establishment of Workplace Housing Association
[Attached Form No. 13] Register of Reports of Establishment of Workplace Housing Associations
[Attached Form No. 14] Certificate of Acceptance of Report of Establishment of Workplace Housing Association
[Attached Form No. 14-2] Application for Deposit of Membership Fees, etc.
[Attached Form No. 14-3] Certificate of Deposit of Membership Fees, etc.
[Attached Form No. 14-4] Request for Withdrawal of Subscription
[Attached Form No. 14-5] Membership Fees, etc. (Request for Payment or Request for Refund)
[Attached Form No. 15] Application for Approval of Project Plan (or Approval of Change)
[Attached Form No. 16] Certificate of Approval of Project Plan (or Approval of Change)
[Attached Form No. 17] Report on Results of Approval of Housing Construction Project Plan (or Change)
[Attachment Form No. 18] Housing Construction Performance Report
[Attachment Form No. 19] Application for Postponement of Commencement of Construction
[Attachment Form No. 20] Commencement of Construction Report
[Attachment Form No. 21] Confirmation of Postponement of Commencement of Construction
[Attached Form No. 22] Certificate of Acceptance of Report of Commencement of Construction
[Attached Form No. 22-2] Supervision Report
[Attached Form No. 23] Application for Inspection for Use or Temporary Approval for Use
[Attached Form No. 24] Certificate of Inspection for Use
[Attached Form No. 25] Certificate of Temporary Approval for Use
[Attached Form No. 25-2] Application for Purchase of Housing Subject to the Price Ceiling System, etc.
[Attached Form No. 25-3] Application for Confirmation of Residence
[Attached Form No. 25-4] Certificate of Residence
[Attached Form No. 25-5] Residence Obligation Status Investigator ID Card
[Attached Form No. 25-6] Application for Consent to Resale
[Attached Form No. 26] Application for Remodeling Permit
[Attached Form No. 27] Remodeling Permit Certificate
[Attached Form No. 28] Application for Inspection for Use of Remodeled Housing
[Attached Form No. 29] Certificate of Inspection for Use of Remodeled Housing
[Attached Form No. 30] Standard Lease Agreement (Land Lease Agreement for Land-Lease Housing for Sale)
[Attached Form No. 30-2] Application for Purchase of Land-Lease Housing for Sale
[Attachment Form No. 31] Housing Redemption Bond Register
[Attachment Form No. 32] Report on the Operation Status of the Special Account for National Housing Projects
[Attachment Form No. 33] Report of Misconduct
[Attached Form No. 34] Application for Payment of Reward for Reporting Violations
[Attached Form No. 35] Identification Card of Inspection Official