전기사업법 시행규칙
291405 · 2026-10-16
Ministry of Climate, Energy and Environment ( Electricity Industry Policy Division ), 044-203-3888
Ministry of Climate, Energy and Environment ( Electricity Market Division ), 044-203-3915
Ministry of Climate, Energy and Environment ( System Operation Innovation Division ), 044-203-3939
Ministry of Climate, Energy and Environment ( Energy Safety and Efficiency Division ), 044-203-3983
Ministry of Climate, Energy and Environment ( Electricity Commission ), 044-203-4598
Article 1 (Purpose) The purpose of this Rule is to prescribe matters delegated by the Electric Utility Act and the Enforcement Decree of the same Act, and matters necessary for the implementation thereof.
[Wholly Amended Nov. 20, 2009]
Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Jan. 10, 2018; Apr. 1, 2021; Jul. 21, 2021>
1. “Substation” refers to the entire electrical equipment, including transformers, installed for the purpose of receiving electricity with a voltage of 50,000 volts or more from outside the substation, transforming it (meaning raising or lowering the voltage or changing the nature of the electricity), and transmitting it to a location outside the substation.
2. “Switching station” refers to an electrical facility for connecting or disconnecting transmission lines with a voltage of 50,000 volts or more at any of the following locations.
A. Between power plants
B. Between substations
C. Between power plants and substations
3. “Transmission line” means a power line connecting the following locations (excluding those exclusively used for communication; hereinafter the same applies) and electrical facilities belonging thereto.
A. Between power plants
B. Between substations
C. Between power plants and substations
4. “Distribution line” means a power line connecting the places in each of the following items and electrical equipment belonging thereto.
A. Power plants and electricity receiving facilities
B. Substations and Electricity Receiving Facilities
C. Transmission lines and electricity receiving facilities
D. Between electric receiving facilities
5. “Electric receiving facility” means an electric receiving facility pursuant to Article 2, subparagraph 1 of the Enforcement Rule of the Electric Safety Management Act .
6. “Receiving facility” means a receiving facility pursuant to Article 2, subparagraph 2 of the Enforcement Rule of the Electric Safety Management Act .
7. “In-premises power distribution facility” refers to an in-premises power distribution facility pursuant to Article 2, subparagraph 3 of the “Enforcement Rule of the Electric Safety Management Act.”
8. “Low voltage” means a voltage of 1,500 volts or less in direct current and a voltage of 1,000 volts or less in alternating current.
9. “High voltage” means a voltage exceeding 1,500 volts and not exceeding 7,000 volts in direct current, and a voltage exceeding 1,000 volts and not exceeding 7,000 volts in alternating current.
10. “Extra-high voltage” means a voltage exceeding 7,000 volts.
[Wholly Amended Nov. 20, 2009]
Article 3 (Scope of Electric Installations for General Use) ① Electric installations for general use under Article 2, subparagraph 18 of the Electric Utility Act (hereinafter referred to as the “Act”) shall be electric installations falling under any of the following subparagraphs. <Amended Feb. 28, 2017; Apr. 1, 2021>
1. Electric installations for using, at the receiving location (including an area where access by others is restricted by a wall, fence, or other structure; hereinafter the same applies), electricity received from another person at low voltage with a capacity of less than 75 kilowatts (or less than 100 kilowatts for manufacturing businesses or electric installations using off-peak electricity).
2. Power generation facilities with a capacity of 10 kilowatts or less corresponding to low voltage
② Notwithstanding Paragraph 1, electric installations falling under any of the following subparagraphs shall not be deemed electric installations for general use. <Amended Jan. 6, 2017; Feb. 21, 2020; Apr. 1, 2021; Aug. 7, 2024>
1. Electric installations installed at the same electricity-receiving location as electric installations for private use
2. Electric installations with a capacity of 20 kilowatts or more installed in hazardous facilities listed in the following items
a. Business premises manufacturing explosives (excluding toy fireworks) under Article 2, Paragraph 3 of the Act on the Safety Management of Guns, Swords, and Explosives
b. Class A coal mines under Article 3, Paragraph 1, Subparagraph 2, Item (a) of the Enforcement Decree of the Mine Safety Act
c. Business premises for city gas business under the City Gas Business Act; business premises for the storage, filling, and sale of liquefied petroleum gas under the Safety Control and Business of Liquefied Petroleum Gas Act; or manufacturing plants and storage facilities for high-pressure gas under the High-Pressure Gas Safety Control Act
d. Manufacturing or handling facilities for hazardous substances under Article 2, Paragraph 1, Subparagraphs 3 and 5 of the Act on the Safety Control of Hazardous Substances
3. Electric installations with a capacity of 20 kilowatts or more installed in facilities used by multiple persons, as specified in the following items
a. A performance venue pursuant to Article 2, Subparagraph 4 of the Performing Arts Act
b. Movie theaters pursuant to Article 2, Item 10 of the Act on the Promotion of Films and Video Materials
c. Entertainment establishments and karaoke bars pursuant to the Enforcement Decree of the Food Sanitation Act
d. Fitness centers pursuant to the Act on the Installation and Use of Sports Facilities
e. Large-scale stores and shopping districts pursuant to Article 2, Subparagraphs 3 and 7 of the Distribution Industry Development Act
f. Medical institutions pursuant to Article 3 of the Medical Service Act
g. Hotels under the Tourism Promotion Act
h. Assembly halls pursuant to Item 3(b) of Attached Table 2 to the Enforcement Decree of the Act on the Installation and Management of Firefighting Facilities
③ The scope of off-peak electricity under Paragraph 1, Subparagraph 1 (hereinafter referred to as “off-peak electricity”) shall be determined by the Minister of Climate, Energy and Environment. <Amended Mar. 23, 2013; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 3-2 (Scope of Dispersion-Type Electricity Systems) The term “as prescribed by Ordinance of the Ministry of Climate, Energy and Environment” in Article 2, subparagraph 21 of the Act means power generation facilities falling under any of the following subparagraphs. <Amended Oct. 1, 2025>
1. Power generation facilities with a capacity of 40,000 kilowatts or less (excluding those installed by persons specified in the items of subparagraph 2)
2. Power generation facilities with a capacity of 500,000 kilowatts or less installed by persons specified in the following items
a. An integrated energy supply business entity deemed to have obtained a license for an electricity generation business under Article 48 of the Integrated Energy Supply Act
b. A district electric business entity
c. A person who has installed electric installations for private use
[This Article Newly Inserted July 24, 2019]
Article 3-3 (Scope of Renewable Energy Electricity Storage and Sales Business) In Article 2, subparagraph 12-12 of the Act, the term “as prescribed by Ordinance of the Ministry of Climate, Energy and Environment” refers to a business utilizing renewable energy falling under any of subparagraphs (a) through (f) of Article 2, subparagraph 2 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy. <Amended June 14, 2024; October 1, 2025; August 27, 2026>
[This Article Newly Inserted May 1, 2024]
Article 4 (Application for a Permit for Electric Utility Business) ① Any person who intends to apply for a permit for an electric utility business pursuant to Article 7, Paragraph 1 of the Act shall submit to the Minister of Climate, Energy and Environment an application for an electric utility business permit in Form No. 1 (including an application in the form of an electronic document; hereinafter the same applies), attaching the documents set forth in each of the following subparagraphs (including electronic documents; hereinafter the same applies). However, a person who intends to obtain a permit for an electricity generation business with a power generation facility capacity of 3,000 kilowatts or less shall submit the application to the Mayor of a Special City, Metropolitan City, Special Self-Governing City, Governor of a Province, or Governor of a Special Self-Governing Province (hereinafter referred to as the “Mayor/Do Governor”). <Amended Mar. 23, 2013; Jul. 31, 2014; Sep. 29, 2020; Jan. 21, 2022; Oct. 1, 2025; Aug. 31, 2026>
1. A business plan prepared in accordance with the method of preparation in Attached Table 1. In this case, documents in accordance with Attached Table 1-2 must be attached.
2. Articles of Incorporation, Balance Sheet, and Income Statement (Applicable only if the applicant is a corporation; in the case of a corporation under establishment, only the Articles of Incorporation shall be submitted)
3. The shareholder register of the applicant (excluding applicants with a power generation capacity of 3,000 kilowatts or less; hereinafter the same applies in this subparagraph). In this case, if the applicant is a newly established corporation whose financial capacity cannot be assessed, the largest shareholder of the applicant shall be deemed the applicant.
4. Results of the collection of opinions pursuant to Article 4-2 of the Enforcement Decree of the Electric Utility Act (hereinafter referred to as the “Decree”) (applicable only to electricity generation businesses utilizing solar photovoltaic power and wind power among solar energy under Article 2, subparagraph 2 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy, and fuel cells under Article 2 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act)
5. Relevant documents prescribed by the relevant Act regarding the permits, licenses, etc. to be deemed granted pursuant to Article 7-3, Paragraph 1 of the Act
6. Deleted <July 31, 2014>
7. Deleted <July 31, 2014>
8. Deleted <July 31, 2014>
9. Deleted <July 31, 2014>
10. Deleted <July 31, 2014>
11. Deleted <July 31, 2014>
12. Deleted <July 31, 2014>
② Upon receiving an application under Paragraph 1, the Minister of Climate, Energy and Environment may hear opinions from the head of the competent local government regarding the results of the opinion collection under Paragraph 1, Subparagraph 4 (limited to cases of power generation businesses with a power generation facility capacity exceeding 3,000 kilowatts). <Newly added Sep. 29, 2020; Oct. 1, 2025>
③ The Minister of Climate, Energy and Environment or the Mayor or Provincial Governor who receives an application under Paragraph 1 shall verify the Certificate of Corporate Registration (applicable only to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Oct. 5, 2012; Mar. 23, 2013; Sep. 29, 2020; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 5 (Matters Requiring Permission for Change, etc.) ① In the latter part of Article 7, Paragraph 1 of the Act, the term “important matters prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” refers to the matters set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Dec. 1, 2022; Sep. 29, 2025; Oct. 1, 2025; Aug. 31, 2026; Oct. 16, 2026>
1. Business area or specific supply area
2. Supply voltage. However, cases where the supply voltage is changed due to reasons of the transmission or distribution business operator are excluded.
3. In the case of an electricity generation business or a district electric business, any of the following matters concerning electric installations for electricity generation
a. Installation location. However, cases where the installation location is changed within the same Eup, Myeon, or Dong and there is no change in the matters specified in each subparagraph of Article 7, Paragraph 3 , or other cases falling under the standards determined and notified by the Minister of Trade, Industry and Energy shall be excluded.
b. Facility capacity (excluding cases where the degree of change is 10% or less of the facility capacity for which a permit or change permit was obtained)
c. Type of prime mover (excluding cases where additional power generation facilities utilizing renewable energy under Article 2, subparagraph 2 of the Act on Promotion of Development, Use and Diffusion of New and Renewable Energy, or energy and hydrogen energy utilized in fuel cells, etc. under Article 2, subparagraphs 6 and 11 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act, are installed in power generation facilities with a permitted or modified capacity of 300,000 kilowatts or more)
d. Power generation facilities under Item 1(b) of Attached Table 5 [limited to cases where all generators among the power generation system facilities under the same item, and turbines (meaning machines that obtain rotational force by causing high-pressure liquid or gas to strike the blades of a rotor) and boilers among the prime mover facilities under Item 1(b) of Attached Table 5, are changed]
e. Change of connection location among the power system connection plans pursuant to Item 1, Subparagraph (g) of Annex 1. However, cases where the connection location is changed due to reasons of the transmission or distribution business operator are excluded.
② Any person who intends to obtain a permit for change pursuant to the latter part of Article 7, Paragraph 1 of the Act shall submit to the Minister of Climate, Energy and Environment or the Mayor/Do Governor an application for change of business permit in the form of Annex 3 , attached with documents proving the details of the change ( including relevant documents prescribed by the relevant Act in cases where deemed approval, etc. is sought pursuant to Article 7-3 , Paragraph 1 of the Act). <Amended Mar. 23, 2013; Sep. 29, 2020; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 6 (Electric Utility Business Permit Certificate) The Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a power generation facility capacity of 3,000 kilowatts or less) shall issue a permit certificate for an electric utility business in Form No. 4 or Form No. 5 when granting a permit (including a permit for change) for an electric utility business pursuant to Article 7(1) of the Act. <Amended Mar. 23, 2013; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 7 (Criteria for Examination of Permission) ① The criteria for examining financial capability pursuant to Article 7, Paragraph 5, Subparagraph 1 of the Act shall be as follows: <Amended July 31, 2014>
1. The required amount and financing plan under Item 1, Subparagraph (j) of Attached Table 1 must be specific and feasible.
2. The credit rating pursuant to Item 1(a) of Attached Table 1-2 shall be favorable
② The criteria for the examination of technical capability pursuant to Article 7, Paragraph 5, Subparagraph 1 of the Act are as follows: <Amended July 31, 2014>
1. The construction and operation plans for electrical facilities under Item 1(d) and (e) of Attached Table 1 shall be specific and feasible.
2. A specific plan for securing technical personnel capable of constructing and operating the electric installations under subparagraph 1 must be presented.
③ The criteria for examining whether an electric utility business under Article 7, Paragraph 5, subparagraph 2 of the Act can be carried out as planned are as follows: <Newly added Jul. 31, 2014>
1. The level of demand in the area where electrical facilities are planned to be constructed must be high.
2. The plans under Items (f) through (j) of Subparagraph 1 of Attached Table 1 must be specific and feasible.
3. Be able to complete the power plant on time and operate the power generation business continuously and stably
④ The examination of whether the business areas of two or more electric distribution business entities or the specific supply areas of district electric business entities overlap, in whole or in part, pursuant to Article 7, Paragraph 5, subparagraph 3 of the Act, shall be based on the electricity user's point of receiving power. <Newly added Apr. 22, 2022; Sep. 29, 2025>
⑤ When the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a power generation facility capacity of 3,000 kilowatts or less) examines whether the operation of the electric power system will be impeded pursuant to Article 7, Paragraph 5, subparagraph 4-2 of the Act, the Minister or Mayor/Do Governor shall hear the opinions of electric transmission business entities, electric distribution business entities, and the Korea Power Exchange under Article 35 of the Act (hereinafter referred to as the “Korea Power Exchange”) regarding the electric power system interconnection plan under Item 1(g) of Attached Table 1. <Newly added Sep. 29, 2025; Oct. 1, 2025>
⑥ The Minister of Trade, Industry and Energy shall determine and announce detailed examination standards pursuant to the provisions of paragraphs 1 through 5. <Newly added July 31, 2014; April 22, 2022; September 29, 2025>
[Wholly Amended Nov. 20, 2009]
Article 7-2 (Registration and Amendment of Registration of New Electric Utility Business, etc.) ① Any person who intends to register a new electric utility business pursuant to Article 7-2(1) of the Act shall submit an application for registration of a new electric utility business in Form No. 5-2, together with documents proving that the registration requirements under Article 4-3(1) of the Decree have been met and a business plan, to the Intelligent Power Grid Association under Article 20 of the Act on the Promotion of the Development and Use of the Intelligent Power Grid or the Korea Power Exchange (hereinafter referred to as the “Intelligent Power Grid Association, etc.” in this Article). <Amended Sep. 29, 2020; May 1, 2024; Aug. 7, 2024; Sep. 29, 2025>
② The business plan pursuant to Paragraph 1 shall include the business name, business details, preparation period, scheduled start date of business, and budget management plan.
③ A new electric utility business entity that intends to register a change pursuant to Article 7-2(4) of the Act shall submit an application for registration of change of a new electric utility business in Form No. 5-2, together with documents proving the changes, to the Intelligent Power Grid Association, etc. within 30 days from the date on which any of the matters specified in Article 4-3(2) of the Decree is changed. <Amended May 1, 2024; Aug. 7, 2024>
④ Upon receiving an application under paragraph 1 or 3, the Intelligent Power Grid Association, etc. shall verify the applicant’s Certificate of Corporate Registration (applicable only to corporations) or Certificate of Business Registration (meaning a Certificate of Business Registration excluding the Resident Registration Number; hereinafter the same applies in this Article) through the joint use of administrative information pursuant to Article 36(1) of the Electronic Government Act; if the applicant does not consent to verification of the Certificate of Business Registration, the applicant shall be required to attach that document. <Amended May 1, 2024; Aug. 7, 2024>
⑤ Upon receiving an application pursuant to Paragraph 1 or 3, the Intelligent Power Grid Association, etc. shall verify the contents of the application and notify the Minister of Climate, Energy and Environment of the results. <Amended Aug. 7, 2024; Oct. 1, 2025>
⑥ Where the Minister of Climate, Energy and Environment registers or amends the registration of a new electric utility business pursuant to Article 7-2(1) or (4) of the Act, the Minister shall issue to the applicant a Certificate of Registration for a New Electric Utility Business in Form No. 5-3. <Amended Oct. 1, 2025>
[This Article Newly Inserted Dec. 13, 2018]
Article 8 (Notification of Commencement of Business) A person who intends to report the commencement of business pursuant to Article 9(4) of the Act shall submit a Notification of Commencement of Business in Form No. 6, together with documents proving the commencement of business (in the case of an electricity generation business entity, documents proving the first electricity transaction), to the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a facility capacity of 3,000 kilowatts or less). In this case, an electricity generation business entity that has received an interim restoration order under Article 39(2) of the Mountainous Districts Management Act (including an inspection of completion of restoration under that paragraph) shall also submit documents proving that the restoration was completed before the electricity transaction pursuant to Article 31-2(1) of the Act. <Amended Oct. 1, 2025>
[Wholly Amended Sep. 29, 2020]
Article 9 (Application for Approval of Transfer of Business or Division or Merger of a Corporation) ① A person who intends to obtain approval for the transfer of a business or the division or merger of a corporation pursuant to Article 10(1), subparagraphs 1 and 2 of the Act shall submit an application for approval of transfer of business in Form No. 7 or an application for approval of merger (division) of a corporation in Form No. 8, together with the documents specified in each of the following subparagraphs, to the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a power generation facility capacity of 3,000 kilowatts or less). <Amended Mar. 23, 2013; Jul. 31, 2014; Jan. 27, 2015; Sep. 29, 2020; Jan. 21, 2022; Oct. 1, 2025>
1. Statement of Reasons for Transfer or Statement of Reasons for Division/Merger
2. Copy of the division plan or the agreement regarding the acquisition and merger
3. Documents specifying the total amount of funds required for the acquisition and the method of financing (applicable only to business acquisition)
4. If there are conditions for division or merger, a document stating the details of such conditions
5. Where the transferee or either party to a division or merger is a corporation other than an electric utility business entity, its articles of incorporation and the balance sheet and income statement as of the end of the immediately preceding fiscal year
6. Articles of incorporation of a corporation established or continuing through transfer, division, or merger
7. In the case of the transfer, division, or merger of an electricity generation business, a copy of the permit proving that permission has been granted under Article 33(1) of the River Act for the use of water for power generation with respect to existing facilities or facilities under construction, or under Article 20 of the Nuclear Safety Act for the operation of a power reactor and related facilities.
8. In the case of a solar power generation business, documents proving that the business commenced during the preparation period pursuant to Article 9, Paragraph 1 of the Act ( referring to documents proving any of the items in Article 5-2 of the Enforcement Decree ).
② Any person who intends to obtain approval for the acquisition of shares pursuant to Article 10(1), subparagraph 3 of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval of acquisition of shares in Form No. 8-2, together with the documents specified in each of the following subparagraphs. <Newly added Jan. 27, 2015; Dec. 13, 2018; Sep. 29, 2020; Oct. 1, 2025>
1. Documents proving the acquisition of shares, such as a copy of the share acquisition agreement
2. The following materials concerning the person intending to acquire the shares and the electric utility business entities, etc. (items (a) and (b) apply only to corporations)
A. Articles of Incorporation
B. Shareholder Status
C. Business Status
3. Materials regarding the purpose and reason for the acquisition of shares
4. A plan for exercising influence over the management of the electric utility business entity pursuant to Article 5, subparagraph 3 or 4 of the Decree (to be submitted only if applicable)
5. Business plan after stock acquisition
6. In the case of a solar power generation business, documents proving that the business commenced during the preparation period pursuant to Article 9, Paragraph 1 of the Act ( referring to documents proving any of the subparagraphs of Article 5-2 of the Enforcement Decree ).
③ The Minister of Climate, Energy and Environment or the Mayor/Do Governor who receives an application under paragraph 1 or 2 shall verify the Certificate of Corporate Registration (applicable only to corporations other than electric utility business entities) through the joint use of administrative information pursuant to Article 36(1) of the Electronic Government Act. <Amended Oct. 5, 2012; Mar. 23, 2013; Jan. 27, 2015; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 9-2 (Reporting of Acquisition of Facilities through Auction, etc.) ① A person who intends to conduct an electric utility business pursuant to Article 10-2(1) of the Act shall file a report with the Minister of Climate, Energy and Environment by attaching the documents specified in each of the following subparagraphs to the Report on Acquisition of Business Facilities of an Electric Utility Business Entity in Form No. 8-4. <Amended Oct. 1, 2025>
1. Documents proving the acquisition of facilities, such as through auction
2. A business plan after the electric utility business entity's acquisition of its business facilities
② Upon receiving a report under paragraph 1, the Minister of Climate, Energy and Environment shall verify the Certificate of Corporate Registration (applicable only to corporations other than electric utility business entities) through the joint use of administrative information pursuant to Article 36(1) of the Electronic Government Act. <Amended Oct. 1, 2025>
[This Article Newly Inserted July 26, 2019]
Article 10 (Public Notice of Approval for Transfer of Business or Division or Merger of a Corporation, etc.) Where the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a facility capacity of 3,000 kilowatts or less) grants approval for the transfer of an electric utility business or the division or merger of a corporation, the Minister or Mayor/Do Governor shall, pursuant to Article 10(3) of the Act, publicly announce the following matters within 10 days from the date of approval. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Name (in the case of a corporation, the name and the name of the representative) and address of the parties to the transfer or division/merger
2. Details of transfer or division/merger
3. Scheduled date of transfer or division/merger
[Wholly Amended Nov. 20, 2009]
Article 10-2 (Reporting of Succession to the Status of a New Electric Utility Business Entity) A person who succeeds to the status of a new electric utility business entity pursuant to Article 11(2) of the Act shall file a report with the Minister of Climate, Energy and Environment by attaching to the Report on Succession to the Status of a New Electric Utility Business Entity in Form No. 8-3 the documents specified in each of the following subparagraphs. <Amended Oct. 21, 2021; Aug. 7, 2024; Oct. 1, 2025>
1. In the case of a transfer: A copy of the transfer agreement
2. In the case of inheritance: A family relationship certificate pursuant to Article 15, Paragraph 1, Subparagraph 1 of the Act on Registration of Family Relations, etc. , and documents proving heirship
3. In the case of a corporate merger or division: a copy of the merger agreement or division plan
[This Article Newly Inserted Dec. 13, 2018]
Article 11 Deleted <December 13, 2018>
Article 12 Deleted <December 13, 2018>
Article 13 (Request for Bulk Supply of Electricity) Where a person intending to use a large quantity of electricity requests an electric sales business entity in advance to supply electricity pursuant to Article 5-5, subparagraph 5 of the Decree, the request shall be made using the Notice of Scheduled Power Reception in Form No. 9. <Amended Dec. 13, 2018; Jun. 14, 2024>
[Wholly Amended July 28, 2016]
Article 14 (Contents of Usage Fees and Conditions of Use for Electric Installations for Transmission and Distribution) The usage fees and other conditions of use for electric installations for transmission and distribution under Article 15(1) of the Act shall include the following matters. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Usage Fees
2. Method of measuring electricity trading volume and method of calculating charges
3. Matters concerning liability between electric transmission business entities and electric distribution business entities, and between such entities and users of electric installations for transmission and distribution
4. Methods and procedures for applying to use electric installations for transmission and distribution
5. Standards for and methods of bearing costs, such as construction costs, to be borne by users of electric installations for transmission and distribution
6. Connection points and connection standards between electric transmission business entities or electric distribution business entities and users of electric installations for transmission and distribution
7. Other matters concerning the protection of the interests of users of electric installations for transmission and distribution, as determined and publicly notified by the Minister of Climate, Energy and Environment
[Wholly Amended Nov. 20, 2009]
Article 15 (Application for Approval of Usage Fees and Conditions of Use for Electric Installations for Transmission and Distribution) ① Any person who intends to obtain approval for the usage fees and other conditions of use for electric installations for transmission and distribution pursuant to Article 15(1) of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval of the usage fees and other conditions of use for electric installations for transmission (distribution) in Form No. 10, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Proposed usage fees and other conditions of use for electric installations for transmission and distribution
2. An explanatory statement regarding the basis for calculating the usage fees for electric installations for transmission and distribution or the method of determining the amount
3. Annual Estimated Business Profit and Loss Statement ( Form No. 2 ) for the three years from the commencement of business
4. An installation or investment plan for electric installations for transmission and distribution
② Any person who intends to obtain approval for a change under the latter part of Article 15(1) of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval of a change to the usage fees or other conditions of use for electric installations for transmission (distribution) in Form No. 11, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Statement of Reason for Change
2. Comparison Table of the Contents of the Section to be Changed
3. Where a person intends to change any of the matters under Article 14, subparagraphs 1, 2, or 5, an explanatory statement regarding the basis for calculating the amount or the method of determining the amount, and the annual estimated business profit and loss statement in Form No. 2 for the three years from the effective date of the change
[Wholly Amended Nov. 20, 2009]
Article 16 (Contents of Basic Terms and Conditions of Supply) ① The basic terms and conditions of supply prepared by an electric sales business entity pursuant to Article 16(1) of the Act shall include the following matters:
1. Supply area
2. Types of supply
3. Supply Voltage and Frequency
4. Electricity bill
5. Matters concerning the entity responsible for installing electric installations, such as watt-hour meters, the details of such installations, and the allocation of costs for electric installation work
6. Measurement of Power Supply and Energy Consumption, and Calculation of Charges
7. Point of demarcation of liability between electric sales business entities and electricity users
8. Matters concerning the method of using electricity and restrictions on the use of equipment, such as machinery and appliances
9. In cases where supply conditions other than those specified in Subparagraphs 1 through 8 are determined, the contents thereof
[Wholly Amended Nov. 20, 2009]
Article 17 (Application for Approval of Basic Terms and Conditions of Supply) ① Any person who intends to obtain approval of the basic terms and conditions of supply pursuant to Article 16(1) of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval of the basic terms and conditions of supply in Form No. 12, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Draft Basic Supply Terms and Conditions
2. Explanatory statement regarding the basis for calculation or the method for determining the amount of electricity charges and other costs borne by the electricity user
3. Annual Estimated Business Profit and Loss Statement ( Form No. 2 ) for the three years from the effective date of the Basic Supply Terms and Conditions
② Any person who intends to obtain approval of a change to the basic terms and conditions of supply under the latter part of Article 16(1) of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval of a change to the basic terms and conditions of supply in Form No. 13, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Statement of Reason for Change
2. Comparison Table of the Contents of the Section to be Changed
3. Where a person intends to change any of the matters under Article 16, subparagraphs 4 through 6, an explanatory statement regarding the basis for calculating the amount or the method of determining the amount, and the annual estimated business profit and loss statement in Form No. 2 for the three years from the effective date of the change
[Wholly Amended Nov. 20, 2009]
Article 17-2 (Reporting of Terms and Conditions for New Electric Utility Business, etc.) ① A new electric utility business entity that intends to report the terms and conditions for a new electric utility business under the first part of Article 16-2(1) of the Act shall submit to the Korea Power Exchange a Report on Terms and Conditions for a New Electric Utility Business in Form No. 13-2, together with the documents specified in each of the following subparagraphs. <Amended Sep. 29, 2025>
1. Terms and conditions for the new electric utility business
2. Basis for calculating fees or prices
② A new electric utility business entity that intends to report a change to the terms and conditions for a new electric utility business under the latter part of Article 16-2(1) of the Act shall submit to the Korea Power Exchange a Report on Changes to the Terms and Conditions for a New Electric Utility Business in Form No. 13-2, together with the documents specified in each of the following subparagraphs.
1. A comparison table of the former and amended terms and conditions for the new electric utility business
2. Reasons and grounds for the amendment to the terms and conditions for the new electric utility business
③ In Article 16-2, Paragraph 3, Subparagraph 6 of the Act , “matters prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” refers to the matters in each of the following subparagraphs. <Amended Oct. 1, 2025>
1. Not to demand unreasonable costs or other burdens equivalent thereto from persons specified in each item of Article 16-2, Paragraph 3, Subparagraph 2 of the Act (hereinafter referred to as “consumers” in this Article).
2. The new electric utility business entity shall not use its superior bargaining position to induce or compel consumers to engage in unfair transactions.
[This Article was newly added on Dec. 13, 2018.]
[Formerly Article 17-2 was moved to Article 17-3 <Dec. 13, 2018>]
Article 17-3 (Electricity Trading by District Electric Business Entities and Electric Sales Business Entities) In Article 16-3(1) of the Act, the term “reasons prescribed by Ordinance of the Ministry of Climate, Energy and Environment” means any of the reasons falling under the following subparagraphs. <Amended Mar. 23, 2013; Dec. 13, 2018; Oct. 1, 2025>
1. Cases where the generated electricity falls short of or exceeds the demand of a specific supply area
2. Regular inspection and maintenance of generators
3. Where, after a permit under Article 7(1) of the Act has been granted, electricity demand arises in the specific supply area for which the permit was granted during the preparation period under Article 9 of the Act due to unforeseen circumstances, such as a change in the schedule of a housing site development project, and the Minister of Climate, Energy and Environment deems it necessary to supply electricity
[Wholly Amended Nov. 20, 2009]
[Moved from Article 17-2 Dec. 13, 2018>]
Article 17-4 (Supply of Electricity by Entities Engaged in the Renewable Energy Electricity Supply Business) ① Where an entity engaged in the renewable energy electricity supply business supplies electricity produced using renewable energy pursuant to Article 16-5(1) of the Act, it shall verify the quantity supplied through an electricity meter capable of measuring the quantity of electricity traded by time period. <Amended May 1, 2024>
② Entities engaged in the renewable energy electricity supply business, the Korea Power Exchange, and electric sales business entities shall provide one another with the following information for the stable supply of electricity. <Amended May 1, 2024; Oct. 1, 2025>
1. Power generation by time of day
2. Electricity usage by time of day
3. Other matters deemed necessary by the Minister of Climate, Energy and Environment for the stable supply of electricity
③ In addition to the matters prescribed in paragraphs 1 and 2, matters necessary for the supply of electricity by entities engaged in the renewable energy electricity supply business pursuant to Article 16-5(1) of the Act shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended May 1, 2024; Oct. 1, 2025>
[This Article Newly Inserted Oct. 21, 2021]
Article 17-5 (Supply of Electricity by Renewable Energy Electricity Storage and Sales Business Entities) ① Where a renewable energy electricity storage and sales business entity supplies electricity produced using renewable energy to an electricity user after charging it into an electricity storage device pursuant to Article 16-5(1) of the Act, the entity shall verify the quantity supplied through an electricity meter capable of measuring the quantity of electricity traded by time period.
② Renewable energy generation business entities, renewable energy electricity storage and sales business entities, the Korea Power Exchange, and electric sales business entities shall provide one another with the following information for the stable supply of electricity. <Amended Oct. 1, 2025>
1. Power generation by renewable energy generation business entities, by time period
2. Charging and discharging quantities of renewable energy electricity storage and sales business entities, by time period
3. Electricity usage by time of day
4. Other matters deemed necessary by the Minister of Climate, Energy and Environment for the stable supply of electricity
③ In addition to the matters prescribed in paragraphs 1 and 2, matters necessary for the supply of electricity by renewable energy electricity storage and sales business entities pursuant to Article 16-5(1) of the Act shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended Oct. 1, 2025>
[This Article Newly Inserted May 1, 2024]
Article 17-6 (Supply of Electricity by Entities Engaged in the Business of Supplying Electricity to Electric Transmission Constraint Areas) ① Where an entity engaged in the business of supplying electricity to electric transmission constraint areas supplies electricity it has generated to electricity users without going through the electricity market pursuant to the main clause of Article 16-5(2) of the Act, it shall verify the quantity supplied through an electricity meter capable of measuring the quantity of electricity traded by time period.
② Entities engaged in the business of supplying electricity to electric transmission constraint areas, the Korea Power Exchange, and electric sales business entities shall provide one another with the following information for the stable supply of electricity. <Amended Oct. 1, 2025>
1. Power generation by entities engaged in the business of supplying electricity to electric transmission constraint areas, by time period
2. Electricity usage by time of day
3. Other matters deemed necessary by the Minister of Climate, Energy and Environment for the stable supply of electricity
③ In addition to the matters prescribed in paragraphs 1 and 2, matters necessary for the supply of electricity by entities engaged in the business of supplying electricity to electric transmission constraint areas pursuant to Article 16-5(2) of the Act shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended Oct. 1, 2025>
[This Article newly inserted Aug. 7, 2024]
[Formerly Article 17-6 moved to Article 17-7 <Aug. 7, 2024>]
Article 17-7 (Supply of Electricity by Electric Vehicle Charging Business Entities) ① Where an electric vehicle charging business entity supplies electricity produced using renewable energy to an electric vehicle pursuant to Article 16-5(3) of the Act, it shall verify the quantity supplied through an electricity meter capable of measuring the quantity of electricity traded by time period. <Amended Aug. 7, 2024>
② Renewable energy generation business entities, electric vehicle charging business entities, the Korea Power Exchange, and electric sales business entities shall provide one another with the following information for the stable supply of electricity. <Amended Oct. 1, 2025>
1. Power generation by renewable energy generation business entities, by time period
2. Charging and discharging quantities of electric vehicle charging business entities, by time period
3. Other matters deemed necessary by the Minister of Climate, Energy and Environment for the stable supply of electricity
③ In addition to the matters prescribed in paragraphs 1 and 2, matters necessary for the supply of electricity to electric vehicles by electric vehicle charging business entities pursuant to Article 16-5(3) of the Act shall be determined and publicly notified by the Minister of Climate, Energy and Environment. <Amended Aug. 7, 2024; Oct. 1, 2025>
[This Article newly inserted May 1, 2024]
[Moved from Article 17-6 <Aug. 7, 2024>]
Article 18 (Quality Standards for Electricity) Electric utility business entities and new electric utility business entities shall ensure, pursuant to Article 18(1) of the Act, that the electricity they supply is maintained within the ranges of standard voltage, standard frequency, and allowable tolerances specified in Attached Table 3. <Amended Dec. 13, 2018>
[Wholly Amended Nov. 20, 2009]
Article 19 (Measurement of Voltage and Frequency) ① Electric utility business entities and the Korea Power Exchange shall, pursuant to Article 18(2) of the Act, measure the following matters at least once a year and retain the measurement results for three years.
1. In the case of electricity generation business entities and electric transmission business entities: voltage and frequency
2. In the case of electric distribution business entities and electric sales business entities: voltage
3. In the case of the Korea Power Exchange, frequency
② Electric utility business entities and the Korea Power Exchange shall determine the measurement standards, measurement methods, retention methods, etc. for voltage and frequency under paragraph 1 and submit them to the Minister of Climate, Energy and Environment. <Amended Mar. 23, 2013; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 19-2 (Application Mutatis Mutandis to District Electric Business Entities) The provisions of Articles 13 through 17 shall apply mutatis mutandis to district electric business entities. In this case, “electric sales business entity” shall be deemed to be “district electric business entity.”
[Wholly Amended Nov. 20, 2009]
Article 20 (Minor Amendment to the Basic Plan) Matters that may be amended without undergoing deliberation by the Electric Power Policy Deliberation Council pursuant to Article 47-2 of the Act , pursuant to the proviso to Article 15, Paragraph 3 of the Enforcement Decree, are as follows: <Amended Jan. 27, 2015>
1. Where the commencement, completion, or construction period of construction work for installing electric installations is adjusted within a period of up to two years
2. Where the capacity of each electric installation is changed within a range of 20 percent of that capacity
3. Where the capacity of electric installations is changed within a range of 5 percent of the annual capacity of electric installations newly constructed or abolished
[Wholly Amended Nov. 20, 2009]
Article 21 (Reporting of Installation Plans for Electric Installations and Electricity Supply Plans) An electric utility business entity that intends to report an installation plan for electric installations and an electricity supply plan pursuant to Article 26 of the Act shall submit to the Minister of Climate, Energy and Environment a Report on the Installation Plan for Electric Installations in Form No. 14 and a Report on the Electricity Supply Plan in Form No. 15, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. The following documents shall be attached to the report on the installation plan for electric installations:
a. A statement of reasons for installing the electric installations
B. Annual Construction Cost Statement
c. Documents specifying the annual and monthly electricity generation plans and the amount of electricity for self-consumption (applicable only to electricity generation business entities)
d. An installation plan for electric installations prepared in accordance with the particulars to be entered for each electric installation in Attached Table 4
2. The following documents shall be attached to the report on the electricity supply plan:
a. Maximum Power Supply Plan ( Form No. 16)
B. Specification of Power Generation Plan ( Form No. 17)
C. Maintenance Plan Specification ( Form No. 18)
D. Fuel Plan Specification Form No. 19
e. Specification of Power Receiving Plan (Form No. 20)
f. Transmission plan specifications in Form No. 21
[Wholly Amended Nov. 20, 2009]
Article 21-2 (Standards for Electric Installations for Transmission, etc.) The Minister of Climate, Energy and Environment shall determine and publicly notify, pursuant to Article 27 of the Act, the standards for facilities that electric transmission business entities, electric distribution business entities, and district electric business entities must have in order to transmit or distribute electricity smoothly in response to changes in electricity demand and supply. <Amended Mar. 23, 2013; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 22 (Application for Approval of Plans for Manufacturing and Supplying Nuclear Power Plant Fuel, etc.) ① Any person who intends to obtain approval for a plan for manufacturing and supplying nuclear power plant fuel pursuant to Article 28 of the Act shall submit to the Minister of Climate, Energy and Environment, for each manufacturing facility, an application for approval of a plan for manufacturing and supplying nuclear power plant fuel (refining, conversion, and processing) in Form No. 22, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Overview of Manufacturing Facilities
2. Construction Schedule for Manufacturing Facilities
3. Documents listing the annual construction cost breakdown and procurement methods
4. Documents outlining the annual production plan for the five years from the completion date of the manufacturing facility
5. Production Cost Statement and Income Statement
6. Copy of Supply Contract
7. If permission, etc. from a relevant administrative agency is required, a copy of such permission, etc.
② A person who intends to change any matter approved pursuant to paragraph 1 shall submit to the Minister of Climate, Energy and Environment an application for approval of a change to the plan for manufacturing and supplying nuclear power plant fuel (refining, conversion, and processing) in Form No. 23, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Statement of Reason for Change
2. Description of Modification Work Overview
3. Documents proving the changes
[Wholly Amended Nov. 20, 2009]
Article 22-2 (Electricity Trading by District Electric Business Entities) In Article 19(4), subparagraph 3 of the Enforcement Decree, the term “period prescribed by Ordinance of the Ministry of Climate, Energy and Environment” means the period from March 1 to November 30 of each year. <Amended Mar. 23, 2013; Feb. 28, 2017; Oct. 1, 2025>
[This Article Newly Inserted Nov. 20, 2009]
Article 22-3 (Application for Lifting or Deferment of a Business Suspension Order) ① An electricity generation business entity that intends to apply for the lifting of a business suspension order pursuant to Article 19-2(2) of the Decree shall submit to the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases of electricity generation businesses with a power generation facility capacity of 3,000 kilowatts or less; hereinafter the same applies in this Article) an application for lifting of a business suspension order in Form No. 53, together with documents proving completion of the interim restoration order under Article 39(2) of the Management of Mountainous Districts Act (including the inspection of completion of restoration under that paragraph). <Amended Oct. 1, 2025>
② An electricity generation business entity that intends to apply for deferment of a business suspension order pursuant to Article 19-2(4) of the Decree shall submit to the Minister of Climate, Energy and Environment or the Mayor/Do Governor an application for deferment of a business suspension order in Form No. 54, together with documents proving that it falls under any of the subparagraphs of Article 19-2(3) of the Decree. <Amended Oct. 1, 2025>
[This Article was newly added on Sep. 29, 2020.]
[Formerly Article 22-3 was moved to Article 22-4 <September 29, 2020>]
Article 22-4 (Application for Approval of a Contract for Differences) An electricity generation business entity or an electricity purchaser that intends to apply for approval or approval of a change to a contract for differences pursuant to Article 34(3) of the Act and Article 20-4(2) and (3) of the Decree shall submit to the Minister of Climate, Energy and Environment an application for approval (or approval of a change) to execute a contract for differences in Form No. 23-2, together with the documents specified in each of the following subparagraphs. <Amended Oct. 1, 2025>
1. A copy of the difference agreement (limited to those including a signature and seal)
2. Documents proving the details of the difference contract, such as documents regarding the calculation of the reference price
[This Article was newly added on Nov. 21, 2014]
[Moved from Article 22-3 on Sep. 29, 2020>]
Article 23 (Funding Sources for the Operating Expenses of the Korea Power Exchange) In Article 40, Paragraph 1, Subparagraph 3 of the Act , “other revenue prescribed by the Ordinance of the Ministry of Climate, Energy and Environment” refers to the revenues set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Contributions from members or non-members and capital contributions from members
2. Interest income generated from depositing assets in a financial institution
[Wholly Amended Nov. 20, 2009]
Article 24 (Reporting of Electricity Trading Fees) Where the Korea Power Exchange intends to report fees pursuant to Article 40(2) of the Act, it shall submit to the Minister of Climate, Energy and Environment a Report on Electricity Trading Fees in Form No. 24, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. Copy of the Board of Directors' resolution of the Korea Power Exchange for the determination of fees
2. Explanation regarding the basis for calculating fees or the method for determining the amount
[Wholly Amended Nov. 20, 2009]
Article 25 (Partial Performance of Power System Operation Duties) The Minister of Climate, Energy and Environment may, pursuant to Article 45(3) of the Act, have an electric transmission business entity or an electric distribution business entity perform part of the power system operation duties for transmission lines or distribution lines of 154 kilovolts or less. <Amended Mar. 23, 2013; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 26 (Composition of Expert Committees, etc.) ① Pursuant to Article 59, Paragraph 1 of the Act , the Electricity Commission may constitute expert committees regarding the fields of law and dispute mediation, electricity rates, consumer protection, power systems, structural reform, and market making.
② Each specialized committee shall be composed of no more than 15 members, including one chairperson.
③ The chairperson and members of each specialized committee shall be appointed by the chairperson of the Electricity Commission from among persons with extensive knowledge and experience in the relevant field.
④ The term of office for a member shall be two years, and they may serve consecutive terms.
⑤ Each specialized committee may appoint a secretary to handle administrative affairs, and the secretary shall be appointed by the chairperson of the specialized committee from among public officials of Grade 5 or higher belonging to the Electricity Commission.
[Wholly Amended Nov. 20, 2009]
Article 27 (Functions and Operation of the Expert Committee) ① The Expert Committee shall perform the following functions:
1. Professional research and review of agenda items in the relevant field
2. Advisory on the Electricity Commission's decision-making
3. Other matters concerning specialized matters in the field of electricity for which the Chairperson of the Electricity Commission requests research or review
② The expert committee shall be convened when the chairperson of the expert committee deems it necessary or when the chairperson of the Electricity Commission requests it.
③ Meetings of the Expert Committee shall be opened with the attendance of a majority of the registered members and decisions shall be made by the approval of a majority of the members present.
[Wholly Amended Nov. 20, 2009]
Article 28 (Construction Plans Requiring Approval or Notification) ① The construction plans for the installation or modification of electric installations for electric utility business that require approval or notification under the first part of Article 61(1) and the first part of Article 61(3) of the Act are specified in Attached Table 5.
② In Article 61(2) of the Act, the term “minor matters prescribed by Ordinance of the Ministry of Climate, Energy and Environment” means matters other than those prescribed in Attached Table 6. <Amended Mar. 23, 2013; Oct. 1, 2025>
③ Deleted <2021. 4. 1.>
④ Deleted <2021. 4. 1.>
[Wholly Amended Nov. 20, 2009]
Article 29 (Application for Approval of Construction Plans, etc.) ① A person who intends to apply for approval or approval of a change to a construction plan under Article 61 of the Act shall submit to the Minister of Climate, Energy and Environment an application for approval (or approval of a change) of a construction plan in Form No. 25, together with documents prepared in accordance with the method for applying for approval of a construction plan set forth in Attached Table 8. <Amended Apr. 1, 2021; Oct. 1, 2025>
② A person who intends to report a construction plan or a change thereto under Article 61 of the Act shall submit to the Minister of Climate, Energy and Environment or the Mayor/Do Governor a Construction Plan Report (or Report of Change) in Form No. 26, together with documents prepared in accordance with the method for reporting a construction plan set forth in Attached Table 8. <Amended Apr. 1, 2021; Oct. 1, 2025>
[Wholly Amended Nov. 20, 2009]
Article 30 (Standards and Procedures, etc. for Unavoidable Construction) ① A person who has carried out unavoidable construction pursuant to Article 61(4) of the Act shall submit a Report on Unavoidable Construction in Form No. 27 to the Minister of Climate, Energy and Environment or the Mayor/Do Governor (limited to cases involving power generation facilities of less than 10,000 kilowatts or transmission or substation facilities with a voltage of less than 200,000 volts) within 10 days from the commencement date of construction. <Amended Mar. 23, 2013; Apr. 1, 2021; Oct. 1, 2025>
② The report referred to in Paragraph 1 shall be accompanied by the documents set forth in each of the following subparagraphs. <Amended Apr. 1, 2021>
1. Document outlining the overview and necessity of the project
2. If construction is required pursuant to Article 61 of the Act after the relevant construction, the construction plan
③ In cases where construction is carried out due to unavoidable circumstances pursuant to Article 61, Paragraph 4 of the Act , the matters in each of the following subparagraphs shall be observed. <Amended Apr. 1, 2021>
1. Obtain confirmation of the construction plan from the Electrical Safety Manager and ensure that construction is carried out under the supervision of the Electrical Safety Manager.
2. Ensure that construction does not cause harm to people or impede the safety of surrounding buildings or other facilities.
[Wholly Amended Nov. 20, 2009]
Article 31 (Subjects, Standards, and Procedures of Pre-use Inspection, etc.) ① Electric installations subject to pre-use inspection pursuant to Article 63 of the Act are electric installations for which installation or alteration work is carried out after obtaining approval of a construction plan or filing a report pursuant to Article 61 of the Act (excluding electric installations of nuclear power plants). Provided, however, that this shall not apply in any of the following cases: <Amended Mar. 23, 2013; Apr. 1, 2021; Oct. 1, 2025>
1. Where electric installations are temporarily used for the purpose of testing them
2. Where part of an electric installation has been completed and it is necessary to temporarily use that completed part to test other electric installations
3. Cases publicly notified by the Minister of Climate, Energy and Environment as involving no impediment to safety, in consideration of the details of the electric installation work and the conditions at the installation site
② Pre-use inspection of welded parts of the electric installations under paragraph 1 shall be performed on boilers, turbines, pressure vessels, liquefied gas storage tanks, liquefied gas vaporizers, gas holders, towers of wind power plants, and refrigeration equipment of power plants, as well as on pipes with an outer diameter of 150 millimeters or more designed for a pressure equal to or greater than any of the pressures specified in the following subparagraphs. However, valves, nozzles, and reinforcing materials with a diameter of 61 millimeters or less shall be excluded from pre-use inspection where welding is performed to attach them discontinuously. <Amended Apr. 22, 2022>
1. For containers or pipes using water with a maximum operating temperature of less than 100 degrees Celsius, the maximum operating pressure is 20 kilograms per square centimeter
2. In the case of containers or pipes for liquefied gas, the maximum operating pressure is 0 kilograms per square centimeter
3. In the case of containers other than those specified in Subparagraphs 1 and 2, the maximum operating pressure is 1 kilogram per square centimeter
4. In the case of pipes other than those specified in Subparagraphs 1 and 2, the maximum operating pressure is 10 kilograms per square centimeter (5 kilograms per square centimeter in the case of longitudinal joints).
③ The standards for pre-use inspection are as follows: <Amended Mar. 23, 2013; Apr. 1, 2021; Oct. 1, 2025>
1. The installation and alteration work on electric installations shall conform to the construction plan approved or reported pursuant to Article 61 of the Act.
2. They shall comply with the technical standards.
3. It shall comply with the methods, procedures, etc. for inspection and verification notified by the Minister of Climate, Energy and Environment pursuant to Article 18 of the Electric Safety Management Act.
④ The timing of pre-use inspections is as set forth in Attached Table 9.
⑤ A person who intends to undergo a pre-use inspection shall submit an application for pre-use inspection in Form No. 28, together with the documents specified in each of the following subparagraphs, to the Korea Electrical Safety Corporation under Article 30 of the Electrical Safety Management Act (hereinafter referred to as the “Safety Corporation”) no later than seven days before the intended inspection date. However, the document specified in subparagraph 5 may be submitted by the date of the pre-use inspection. <Amended Apr. 1, 2021; Apr. 22, 2022; Oct. 1, 2025>
1. A copy of the approval of the construction plan or the acknowledgment of receipt of the report
2. Design documents pursuant to Article 2, Subparagraph 3 of the Electric Power Technology Management Act and confirmation of placement of supervisory personnel pursuant to Article 12-2, Paragraph 4 of the same Act
3. Documents verifying self-supervision (applicable only when the electrical safety manager conducts self-supervision)
4. Copy of Certificate of Reporting the Appointment of Electrical Safety Manager
5. Other documents necessary for conducting pre-use inspections as prescribed and notified by the Minister of Climate, Energy and Environment
[Wholly Amended Nov. 20, 2009]
Article 31-2 (Standards for Permitting Temporary Use of Electric Installations, etc.) ① Cases in which temporary use of electric installations may be permitted pursuant to Article 64(2) of the Act are any of the following. <Amended Apr. 1, 2021>
1. Cases where the generator's output is lower than the authorized or reported output but is recognized as not impeding safety during use
2. Where protective fences, etc. that are not directly related to electricity transmission or power reception have not been installed, but safety measures have been taken to prevent people from approaching
3. Where, among electric installations for which a construction plan has been approved or reported, alternating or standby facilities or emergency standby generators have not been completed, but the main facilities are deemed not to impede the use or safety of electricity
4. Cases where temporary use of electrical facilities is deemed to pose no safety risk and urgent use is unavoidable
② The period of temporary use of electric installations under Article 64(2) of the Act shall not exceed three months. However, where special circumstances are recognized that prevent the cause for temporary use from being resolved during that period, the period may be extended, provided that the total period of temporary use does not exceed one year.
③ When the Safety Corporation has permitted the temporary use of electrical facilities in accordance with the first part of Article 64, Paragraph 1 of the Act , it shall notify the applicant for the pre-use inspection by writing the reason for permission, the period of use, the scope of use, etc., in the inspection confirmation certificate in Form No. 29 .
[Wholly Amended Nov. 20, 2009]
Article 32 Deleted <April 1, 2021>
Article 33 (Qualifications of Electric Installation Inspectors) ① Inspections under Article 63 of the Act shall be performed by a person who falls under any of the following subparagraphs from among persons holding technical qualifications in the fields of electricity, safety management (electrical safety), civil engineering, or mechanical engineering under the National Technical Qualifications Act. However, a person who has obtained a Master Craftsman, Engineer, or Industrial Engineer qualification but has not completed the period of practical experience required under subparagraph 2 or 3 shall perform only auxiliary duties in inspections conducted by electric installation inspectors under subparagraphs 1 through 3. <Amended Apr. 1, 2021; Jul. 21, 2021; Nov. 8, 2023; Dec. 20, 2023>
1. Person who has obtained the Professional Engineer qualification in the relevant field
2. A person who has obtained a Master Craftsman or Engineer qualification in the relevant field and has at least 4 years of practical experience in the relevant field after obtaining the qualification.
3. A person who has obtained an Industrial Engineer qualification in the relevant field and has at least 6 years of practical experience in the relevant field after obtaining the qualification.
② Self-inspections pursuant to Article 65-2 of the Act shall be performed by a person falling under any of the following subparagraphs for each relevant field. <Newly added July 21, 2021>
1. Persons listed in each subparagraph of Paragraph 1
2. Electric power engineer pursuant to Article 2, Subparagraph 2 of the Electric Power Technology Management Act
3. Construction engineer pursuant to Article 2, Item 8 of the Construction Technology Promotion Act
[Wholly Amended Nov. 20, 2009]
Article 34 (Notification of Inspection Results, etc.) ① Where the Safety Corporation conducts an inspection pursuant to Article 31, it shall issue an Inspection Confirmation Certificate in Form No. 29 to the inspection applicant within five days from the date of completion of the inspection. However, if the inspection result is a failure, it shall notify the applicant of the details and reasons for the failure and the deadline for reinspection. <Amended Apr. 1, 2021>
② The Safety Corporation shall report to the Minister of Climate, Energy and Environment or the Mayor/Do Governor any person who uses electric installations without undergoing inspection at the time specified under Article 31(4). <Amended Mar. 23, 2013; Apr. 1, 2021; Oct. 1, 2025>
③ Deleted <2021. 4. 1.>
[Wholly Amended Nov. 20, 2009]
Article 35 (Subjects, Standards, and Procedures for Self-Inspection by Electric Transmission and Distribution Business Entities) ① Pursuant to Article 65-2 of the Act, the electric installations subject to self-inspection by electric transmission and distribution business entities and the inspection cycles are as set forth in Attached Table 10.
② The standards for self-inspection pursuant to Paragraph 1 are as follows:
1. Technical standards pursuant to Article 67 of the Act
2. Standards for inspection items, procedures, etc. independently established by electric transmission and distribution business entities
③ After conducting self-inspections pursuant to paragraphs 1 and 2, electric transmission and distribution business entities shall report the following matters to the Minister of Climate, Energy and Environment by January 31 of the year following the year in which the relevant inspection was conducted. <Amended Oct. 1, 2025>
1. Results of self-inspection prepared in accordance with Form No. 30
2. Details of actions taken regarding matters deemed non-compliant during inspection, reasons for unaddressed matters, and future action plans
[This Article Newly Inserted July 21, 2021]
Article 35-2 Deleted <April 1, 2021>
Article 35-3 Deleted <April 1, 2021>
Article 35-4 Deleted <April 1, 2021>
Article 36 Deleted <April 1, 2021>
Article 37 Deleted <April 1, 2021>
Article 37-2 Deleted <April 1, 2021>
Article 38 Deleted <April 1, 2021>
Article 38-2 Deleted <April 1, 2021>
Article 38-3 Deleted <April 1, 2021>
Article 39 (Designation of Underwater Wire Protection Zones) ① A person who intends to apply for designation of an underwater wire protection zone pursuant to Article 69(1) of the Act shall submit to the Minister of Climate, Energy and Environment an application for designation of a protection zone in Form No. 35, together with the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025>
1. A location map of the underwater wire protection zone (map at a scale of 1:250,000)
2. A document specifying the coordinates of the object to be protected and the boundaries of the protection zone
② Where an electric utility business entity designated as an underwater wire protection zone pursuant to Article 69 of the Act intends to change the details of the designation, it shall obtain approval for the change of designation by submitting an application for change of designation of a protection zone in Form No. 35, together with documents specifying the changed details.
[Wholly Amended Nov. 20, 2009]
Article 40 Deleted <April 1, 2021>
Article 41 Deleted <April 1, 2021>
Article 42 Deleted <April 1, 2021>
Article 43 Deleted <April 1, 2021>
Article 44 Deleted <April 1, 2021>
Article 44-2 Deleted <April 1, 2021>
Article 45 Deleted <April 1, 2021>
Article 45-2 Deleted <April 1, 2021>
Article 45-3 Deleted <April 1, 2021>
Article 46 Deleted <April 1, 2021>
Article 46-2 Deleted <April 1, 2021>
Article 46-3 Deleted <April 1, 2021>
Article 46-4 Deleted <April 1, 2021>
Article 47 Deleted <April 1, 2021>
Article 48 Deleted <December 31, 2008>
Article 49 Deleted <December 31, 2008>
Article 50 Deleted <December 31, 2008>
Article 50-2 Deleted <April 1, 2021>
Article 50-3 Deleted <April 1, 2021>
Article 51 Deleted <April 1, 2021>
Article 52 Deleted <April 1, 2021>
Article 53 (Review of Regulations) ① The Minister of Climate, Energy and Environment shall review the validity of the matters set forth in each of the following subparagraphs every three years based on the reference dates specified in each of the following subparagraphs (meaning no later than January 1 of the year marking every third year) and take measures such as improvements. <Amended Feb. 28, 2017; Sep. 29, 2020; Oct. 1, 2025>
1. Criteria for examining the financial and technical capabilities of an applicant for an electric utility business permit pursuant to Article 7(1) and (2): January 1, 2017
2. Deleted <Aug. 3, 2020>
3. Documents required to apply for approval of a contract for differences under Article 22-4: January 1, 2015
4. Deleted <Aug. 3, 2020>
5. Deleted <Aug. 3, 2020>
6. Deleted <Aug. 3, 2020>
7. Deleted <2021. 4. 1.>
8. Deleted <August 3, 2020>
② The Minister of Climate, Energy and Environment shall review the validity of the matters specified in each of the following subparagraphs every two years, based on the reference dates specified therein (meaning until the day before the same date as the reference date in every second year), and shall take measures such as improvements. <Newly added Dec. 31, 2014; Oct. 1, 2025>
1. Deleted <February 28, 2017>
2. Scope of changes to important matters subject to a permit for change to an electric utility business under Article 5(1): January 1, 2015
3. Deleted <February 28, 2017>
4. Deleted <February 28, 2017>
5. Documents to be submitted and matters to be observed when reporting unavoidable construction under Article 30: January 1, 2015
6. Criteria and period for permitting temporary use of electric installations under Article 31-2(1) and (2): January 1, 2015
7. Deleted <February 28, 2017>
8. Deleted <February 28, 2017>
9. Deleted <February 28, 2017>
10. Deleted <February 28, 2017>
11. Deleted <February 28, 2017>
12. Deleted <2021. 4. 1.>
13. Deleted <February 28, 2017>
[This Article Newly Inserted Nov. 21, 2014]
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 122, Apr. 7, 2001>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) ① The Enforcement Rules of the Special Measures Act on Deregulation of Business Activities shall be amended as follows:
In Article 5, subparagraph 3, “Article 2, subparagraph 8 of the Electric Utility Act” shall be changed to “Article 2, subparagraph 15 of the Electric Utility Act”.
② The Enforcement Rules of the Mining Safety Act are amended as follows:
In Article 33, Paragraph 1, subparagraph 4, “Article 45(2) of the Electric Utility Act” shall be changed to “Article 73(2) of the Electric Utility Act”.
③ The Enforcement Rules of the Electric Power Technology Management Act are amended as follows:
In Article 13, “Article 39 of the Electric Utility Act” shall be changed to “Article 67 of the Electric Utility Act”.
Article 3 (Relationship with Other Laws and Regulations) Where other laws and regulations cite provisions of the former Enforcement Rule of the Electric Utility Act at the time this Rule enters into force, if this Rule contains corresponding provisions, the corresponding provisions of this Rule shall be deemed to have been cited.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 141, Aug. 10, 2001>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 183, Sep. 28, 2002>
① (Enforcement Date) This rule shall take effect on the date of its promulgation.
② (Transitional Measures concerning Inspections of Electric Installations for General Use) Notwithstanding the amended provisions of Article 35-2, for electric installations for general use found non-compliant as a result of the second inspection conducted under the former Article 35(1), subparagraph 3(a) before this Rule entered into force, a third inspection shall be conducted under the former Article 35(1), subparagraph 3(b).
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 193, Dec. 31, 2002>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 230, Apr. 20, 2004> (Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 11 omitted
Article 12 (Amendment of Other Laws) ① to ⑤ Omitted
⑥ The Enforcement Rule of the Electric Utility Act shall be amended as follows.
In Article 3, Paragraph 2, Subparagraph 2, Item (c), “Liquefied Petroleum Gas Safety and Business Management Act” shall be changed to “Liquefied Petroleum Gas Safety Management and Business Act.”
Article 13 Omitted
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 244, Aug. 9, 2004>
① (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 35-2, Paragraph 1 shall enter into force on January 1, 2005.
② (Transitional Measures concerning the Timing of Periodic Inspections of Electric Installations for General Use) Notwithstanding the amended provisions of Article 35-2(1), subparagraph 3, the first periodic inspection after this Rule enters into force of electric installations under Article 35-2(1), subparagraph 3 shall be conducted in accordance with the following categories.
1. Facilities subject to regular inspection from January 1, 2003 to August 31, 2003: From January 1, 2005 to December 31, 2005
2. Facilities regularly inspected from September 1, 2003 to April 30, 2004: From January 1, 2006 to December 31, 2006
3. Facilities subject to regular inspection from May 1, 2004 to December 31, 2004: From January 1, 2007 to December 31, 2007
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 254, Feb. 2, 2005> (Partial Amendment to the Enforcement Rules of the Act on Measurement, etc. for the Processing of Electronic Civil Petitions)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 279, May 17, 2005>
① (Enforcement Date) This rule shall take effect on May 18, 2005.
② (Transitional Measures concerning Standards for Calculating Nuclear Power Plant Decommissioning Reserves) The amended provisions of Attached Table 16 shall also apply to nuclear power plant decommissioning reserves accrued before this Rule enters into force.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 303, Sep. 1, 2005>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 369, Oct. 4, 2006> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for the Joint Use of Administrative Information and Document Reduction)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 412, July 11, 2007>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 1, Mar. 3, 2008> (Enforcement Rule of the Organizational Structure of the Ministry of Knowledge Economy and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Articles 2 through 4 omitted
Article 5 (Amendment of Other Laws) ① through ㊼ Omitted
48. The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Article 3(3); Article 4(1) (excluding the subparagraphs); Article 5(2); Article 6; Article 8; Article 9(1) (excluding the subparagraphs); Article 10 (excluding the subparagraphs); Article 12(1), (2), and (4); Article 14, subparagraph 7; Article 15(1) and (2) (excluding the subparagraphs); Article 17(1) and (2) (excluding the subparagraphs); Article 19(2); Article 21 (excluding the subparagraphs); Article 21-2; Article 22(1) and (2) (excluding the subparagraphs); Article 24(1) (excluding the subparagraphs); Article 25; Article 30(1); Article 31(1), subparagraph 3, and (3), subparagraph 3; Article 32(1) (excluding the subparagraphs) and (3), subparagraph 2; Article 34(2) and (3); Article 38(1), subparagraph 3; Article 39(1) (excluding the subparagraphs); Article 45(1) (excluding the subparagraphs); Article 46(1), proviso, and (2); Article 46-2(1) (excluding the subparagraphs); Article 46-3(1) (excluding the subparagraphs); Article 48(1) and (2) (excluding the subparagraphs); Article 49(2) (excluding the subparagraphs); Article 50-2(1); Article 50-3(1) and (2); Attached Tables 2, 3, 8, 11, 15, 16, and 17; and Forms No. 3, 4, 5, 6, 8, 10, 11, 12, 13, 14, 15, 22, 23, 24, 25, 26, 27, 28, 30-3, 34, 38, 38-2, 40, 43, 44, 45, 46, 47, 48, 49, 50, and 52, the term “Minister of Commerce, Industry and Energy” shall be changed to “Minister of Knowledge Economy,” respectively.
In the part other than the subparagraphs of Article 5, Paragraph 1; the part other than the subparagraphs of Article 17-2; the part other than the subparagraphs of Article 23; Article 28, Paragraph 2; the part other than the subparagraphs of Article 45-2, Paragraph 1; and the part other than the subparagraphs of Article 49, Paragraph 1, the term “Ordinance of the Ministry of Commerce, Industry and Energy” shall be changed to “Ordinance of the Ministry of Knowledge Economy.”
In Forms No. 1, No. 3, No. 7, No. 8, No. 10, No. 11, No. 12, No. 13, No. 22, No. 25, and No. 26, “Ministry of Commerce, Industry and Energy” shall be changed to “Ministry of Knowledge Economy”.
In Form No. 42, “Minister of Government Administration and Home Affairs” shall be changed to “Minister of Public Administration and Security,” and “Ministry of Government Administration and Home Affairs” shall be changed to “Ministry of Public Administration and Security.”
Omitted from ㊾ to <64>
ADDENDA <Ministry of Knowledge Economy Decree No. 41, Dec. 31, 2008> (Enforcement Rule of the Radioactive Waste Management Act)
Article 1 (Enforcement Date) This rule shall enter into force on January 1, 2009.
Article 2 (Amendment of Other Laws) ① The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Article 8, “Article 9, Paragraph 4 of the Act (including cases where it is applied mutatis mutandis in Article 86 of the Act)” shall be changed to “Article 9, Paragraph 4 of the Act”.
In the part other than the subparagraphs of Article 9, Paragraph 1, “Article 10, Paragraph 1 of the Act (including cases where it is applied mutatis mutandis in Article 86 of the Act)” shall be changed to “Article 10, Paragraph 1 of the Act,” and in Subparagraph 7 of the same paragraph, “power generation business or radioactive waste management business” shall be changed to “power generation business.”
In the part other than the subparagraphs of Article 10, “Article 10, Paragraph 3 of the Act (including cases where it is applied mutatis mutandis in Article 86 of the Act)” shall be changed to “Article 10, Paragraph 3 of the Act”.
Articles 48 through 50 are deleted.
Attached Table 16 shall be deleted.
In the column following the business details column of Form No. 6, “Articles 9 and 86 of the Electric Power Business Act” shall be changed to “Article 9 of the Electric Utility Act”; in subparagraph 1 of the instructions for entering business details in the same form, “in the case of an electric utility business entity, the Electric Utility Act” shall be changed to “the Electric Utility Act”; and subparagraph 2 of the same column shall be deleted.
In the column following the scheduled date of transfer on the front of Form No. 7, “Articles 10 and 86 of the Electric Power Business Act” shall be changed to “Article 10 of the Electric Utility Act,” “electric utility business (radioactive waste management business)” shall be changed to “electric utility business,” and “Minister of Commerce, Industry and Energy” shall be changed to “Minister of Knowledge Economy”; in subparagraph 6 of the attached documents column on the back of the same form, “electricity generation business or radioactive waste management business” shall be changed to “electricity generation business.”
In the column following the scheduled date of merger (division) on the front of Form No. 8, “Articles 10 and 86 of the Electric Power Business Act” shall be changed to “Article 10 of the Electric Utility Act”; and in subparagraph 6 of the attached documents column on the back of the same form, “electricity generation business or radioactive waste management business” shall be changed to “electricity generation business.”
Forms No. 43 through No. 45 are each deleted.
② Omitted
Article 3 Omitted
ADDENDA <Ministry of Knowledge Economy Decree No. 103, Nov. 20, 2009>
This rule shall take effect on November 22, 2009.
ADDENDA <Ministry of Knowledge Economy Decree No. 207, Oct. 19, 2011> (Partial Amendment to the Enforcement Rules of the Special Act on the Designation and Operation of Free Economic Zones, etc., for the Comprehensive Revision of Legal Basis for the Processing of Personal Information, Including Resident Registration Numbers)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures Concerning the Revision of Forms) Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used.
ADDENDA <Ministry of Knowledge Economy Decree No. 271, Oct. 5, 2012> (Partial Amendment to the Enforcement Rules of the Act on Weights and Measures, etc. for the Improvement of Legal Forms)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures Concerning the Revision of Forms) Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Energy and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 6 omitted
Article 7 (Amendment of Other Laws) ① through ㊷ Omitted
48. The Enforcement Rule of the Electric Utility Act is partially amended as follows.
Article 3, Paragraph 3; Article 4, Paragraph 1 (excluding the numbered items), Paragraph 2 of the same article; Article 5, Paragraph 2; Article 6; Article 8; Article 9, Paragraph 1 (excluding the numbered items), Paragraph 2 of the same article; Article 10 (excluding the numbered items); Article 12, Paragraph 1; Article 12, Paragraph 2 (main text); Paragraph 4 of the same article; Article 14, Item 7; Article 15, Paragraph 1 (excluding the numbered items), Paragraph 2 (excluding the numbered items); Article 17, Paragraph 1 (excluding the numbered items), Paragraph 2 (excluding the numbered items); Article 17-2, Item 3; Article 19, Paragraph 2; Article 21 (excluding the numbered items); Article 21-2; Article 22, Paragraph 1 (excluding the numbered items), Paragraph 2 (excluding the numbered items); Article 24 (excluding the numbered items); Article 25; Article 30, Paragraph 1; Article 31, Paragraph 1, Item 3; Paragraph 3, Item 3, In the proviso of Article 32, Paragraph 1 (excluding the numbered items), Paragraph 3, Item 2 of the same article, Paragraphs 2 and 3 of Article 34, Paragraph 1, Item 3 of Article 38, Paragraph 1 (excluding the numbered items), Paragraph 1 of Article 39 (excluding the numbered items), Paragraph 1 of Article 45 (excluding the numbered items), the proviso of Article 46, Paragraph 1, Paragraph 2 of the same article, Paragraph 1 of Article 46-2 (excluding the numbered items), the main text of Paragraph 2 of the same article (excluding the numbered items), Paragraph 1 of Article 46-3 (excluding the numbered items), Paragraph 1 of Article 50-2, and Paragraphs 1 and 2 of Article 50-3, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In the part other than the subparagraphs of Article 5, Paragraph 1; the part other than the subparagraphs of Article 17-2; Article 22-2; the part other than the subparagraphs of Article 23; Article 28, Paragraph 2; and the part other than the subparagraphs of Article 45-2, Paragraph 1, the term “Ordinance of the Ministry of Knowledge Economy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Energy.”
In items 7 through 10 of Annex 2, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In Item 3 of Annex 3, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In the column for institutions subject to submission in Item 1 of Annex 8, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In the inspection standards and methods column of other items in Annex 11, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In Item 3 of Annex 15, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In Attached Table 17, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy.”
In Form No. 1, Forms No. 3 through 8, Forms No. 10 through 15, Forms No. 22 through 27, Form No. 35, Form No. 43, Form No. 44, Forms No. 46 through 50, and Form No. 52, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”.
In Form No. 1, Form No. 3, Forms No. 6 through No. 8, Forms No. 10 through No. 13, Form No. 22, Form No. 25, and Form No. 26, “Ministry of Knowledge Economy” shall be changed to “Ministry of Trade, Industry and Energy”.
In the front of Form No. 28, the front of Form No. 33, Form No. 41, and Form No. 43, “Ordinance of the Ministry of Knowledge Economy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Energy”.
In Form No. 40, “Minister of Knowledge Economy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Energy.”
In Form No. 45, “Minister of Public Administration and Security” shall be changed to “Minister of Safety and Security.”
Items 44 through 63 omitted
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 32, Nov. 8, 2013>
Article 1 (Enforcement Date) This rule shall enter into force three months after the date of its promulgation.
Article 2 (Applicability to the Scope of Delegated Electrical Safety Management Duties) The amended provisions of Attached Table 13 shall apply from the time the scope of delegated electrical safety management duties is newly determined due to the conclusion, renewal, expiration, etc. of a contract for the delegation of electrical safety management duties after this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 70, July 31, 2014>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Applications for Business Permits, etc.) The amended provisions of Article 4(1), Article 7, Attached Table 1, and Attached Table 1-2 shall apply to applications for an electric utility business permit filed after this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 93, Nov. 21, 2014>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 106, Dec. 31, 2014> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for Regulatory Reform, Including Setting Regulatory Review Periods)
This rule shall take effect on January 1, 2015.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 115, Jan. 27, 2015>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 164, Nov. 6, 2015>
This rule shall take effect three months after the date of promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 203, July 28, 2016>
Article 1 (Enforcement Date) This Rule shall enter into force on July 28, 2016. However, the amended provisions of Attached Table 15 shall enter into force on October 1, 2016.
Article 2 (Transitional Measures concerning the Timing of Periodic Inspections of Campsite Business Facilities) Electric installations at campsite business facilities that underwent a pre-use inspection or periodic inspection before this Rule entered into force shall undergo periodic inspections in accordance with the amended provisions of Article 35-2(1), subparagraph 1, based on each of the following criteria.
1. Camping facilities for which one year has not passed since the pre-use inspection or periodic inspection was conducted prior to the enforcement of this rule: Within two months before or after the month in which the one-year mark is reached.
2. Campsite facilities for which one year has passed since the pre-use inspection or periodic inspection was conducted prior to the enforcement of this rule: Within two months after the enforcement of this rule.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 235, Jan. 6, 2017> (Enforcement Rule of the Mine Safety Act)
Article 1 (Enforcement Date) This rule shall enter into force on January 7, 2017.
Articles 2 and 3 omitted
Article 4 (Amendment of Other Laws) ① and ② Omitted
③ The Enforcement Rule of the Electric Utility Act is partially amended as follows.
Article 3, Paragraph 2, Subparagraph 2, Item (b) shall be as follows.
b. Class A coal mines under Article 3(1), subparagraph 2(a) of the Enforcement Decree of the Mine Safety Act
Article 5 omitted
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 248, Feb. 28, 2017>
This rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 52 shall enter into force on March 2, 2017.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 265, July 26, 2017> (Enforcement Rules of the Organizational Structure of the Ministry of Trade, Industry and Energy and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Articles 2 and 3 omitted
Article 4 (Amendment of Other Laws) ① through ⑦ Omitted
⑧ The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Form No. 45, “Minister of Public Safety and Security” shall be changed to “Minister of the Interior and Safety.”
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 286, Jan. 10, 2018>
This rule shall take effect on January 1, 2021.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 293, Apr. 9, 2018>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Special Provisions concerning the Timing of Periodic Inspections for District Electric Business Entities) District electric business entities that passed the pre-use inspection under Article 63 of the Act before this Rule entered into force shall undergo a periodic inspection under the amended provisions of Item 1 of Attached Table 10 (applicable only to electric installations for transmission, transformation, and distribution) within two years from the date this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 321, Dec. 13, 2018>
This rule will take effect on December 13, 2018.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 342, July 24, 2019>
This rule will take effect on July 24, 2019.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 343, July 26, 2019>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 362, Feb. 21, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Special Provisions concerning Periodic Inspections of Electric Installations at Traditional Market Stores) Notwithstanding the amended provisions of Article 38-2(1), the first periodic inspection of electric installations at traditional market stores recognized under the Special Act on the Promotion of Traditional Markets and Shopping Districts as of the date this Rule enters into force shall be conducted by December 31, 2020.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 375, Apr. 8, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Special Provisions concerning Periodic Inspections) Notwithstanding the amended provisions of Item 1(7) and Item 2(a)(7) of Attached Table 10, electric utility business entities and owners or occupants of electric installations for private use that, as of the date this Rule enters into force, have undergone a pre-use inspection (or a periodic inspection, where a periodic inspection has been conducted; hereinafter the same applies) of electric storage devices or electric installation systems under the former provisions shall undergo periodic inspections of the relevant installations in accordance with the following categories.
1. Where one year has elapsed since the pre-use inspection was conducted as of the date this Rule enters into force [two years in the case of installations falling under the amended provisions of Item 1(7)(b) and Item 2(a)(7)(b) of Attached Table 10]: within six months from the date this Rule enters into force
2. Where one year has not elapsed since the pre-use inspection was conducted as of the date this Rule enters into force [two years in the case of installations falling under the amended provisions of Item 1(7)(b) and Item 2(a)(7)(b) of Attached Table 10]: within one year from the date this Rule enters into force
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 384, Aug. 3, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures concerning Periodic Inspections of Electric Installations for General Use Installed in Senior Citizen Centers) Electric installations for general use installed in senior citizen centers, among leisure and welfare facilities for older persons under the Welfare of Senior Citizens Act, that underwent a pre-use inspection or periodic inspection under the former provisions as of the date this Rule enters into force shall undergo periodic inspections under the amended provisions of Article 35-2(1), subparagraph 1, in accordance with the following categories.
1. In cases where one year has not passed since the pre-use inspection or periodic inspection at the time of enforcement of this rule: Within two months before or after the month in which the one-year anniversary falls.
2. In cases where one year has passed since the pre-use inspection or periodic inspection was conducted at the time of the enforcement of this rule: Within two months from the date of enforcement of this rule.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 395, Sep. 29, 2020>
This rule shall take effect on October 1, 2020.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 414, Apr. 1, 2021>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Pre-use Inspections of Fuel Cell Power Generation Facilities) The timing for pre-use inspections of installation or alteration work on fuel cell power generation facilities exceeding 100 kilowatts under the amended provisions of Item 11(a) of Attached Table 9 shall apply to construction work commencing on or after April 1, 2022.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 427, July 21, 2021>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Self-Inspections) Self-inspections of electric installations of electric transmission and distribution business entities that were installed and in use before this Rule enters into force shall be conducted by applying the inspection cycle for each electric installation under the amended provisions of Attached Table 10, as of April 1, 2021.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 435, Oct. 21, 2021>
This rule shall take effect on October 21, 2021.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 448, Jan. 21, 2022> (Partial Amendment to 36 Ministry of Trade, Industry and Energy Decrees, including the Enforcement Rule of the High-Pressure Gas Safety Management Act)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 463, Apr. 22, 2022>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of the main text of Article 31(2) (excluding the subparagraphs) and items 6 and 7 of Attached Table 9 shall enter into force one year after the date of promulgation.
Article 2 (Applicability to Criteria for Examination of Permits) The amended provisions of Article 7(4) shall apply to applications for a permit for an electric distribution business or a district electric business filed after this Rule enters into force.
Article 3 (Applicability to Pre-use Inspections) ① The amended provisions of the main text of Article 31(2), Item 6(b) and Item 7 of Attached Table 9 shall apply to applications for approval or reports of construction plans for electric installations for electric utility business filed after the effective date specified in the proviso to Article 1 of the Addenda.
② The amended provisions of the proviso to Article 31(5), subparagraph 5 of the same paragraph, Item 8(c) of Attached Table 9, and Form No. 28 shall apply to applications for approval or reports of construction plans for electric installations for electric utility business filed after this Rule enters into force.
Article 4 (Applicability to Approval or Notification of Construction Plans for Electric Installations for Electric Utility Business) The amended provisions of Attached Table 5 shall apply to applications for approval or reports of construction plans for electric installations for electric utility business filed after this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 493, Dec. 1, 2022>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 527, Nov. 8, 2023>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 532, Dec. 6, 2023>
Article 1 (Enforcement Date) This rule shall enter into force on July 1, 2024.
Article 2 (Applicability to Approval or Notification of Construction Plans for Uninterruptible Power Supply Systems) The amended provisions of Attached Tables 5, 6, and 8, and subparagraph 13 of Attached Table 9 shall apply to applications for approval or reports of construction plans for uninterruptible power supply systems filed after this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 540, Dec. 20, 2023>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Applications for Approval of Construction Plans, etc.) The amended provisions of subparagraph 2 of Attached Table 8 shall apply to applications for approval or reports of construction plans (including applications for approval of changes or reports of changes) filed after this Rule enters into force.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 557, May 1, 2024>
This rule shall take effect on May 1, 2024.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 560, June 14, 2024>
This rule will take effect on June 14, 2024.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 569, Aug. 7, 2024>
This rule will take effect on August 7, 2024.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 606, June 13, 2025>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Trade, Industry and Energy Decree No. 621, Sep. 29, 2025>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 1, Oct. 1, 2025> (Enforcement Rule on the Organization of the Ministry of Climate, Energy and Environment and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, among the Ministerial Ordinances amended pursuant to Article 6 of the Addenda, the parts amending Ministerial Ordinances that were promulgated prior to the enforcement of this Rule but whose effective date has not yet arrived shall enter into force on the respective effective dates of those Ordinances.
Articles 2 through 5 omitted
Article 6 (Amendment of Other Laws) ① through <60> Omitted
<61> The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Article 3(3); the main text of Article 4(1) (excluding the subparagraphs); Article 4(2) and (3); Article 5(2); Article 6; Article 7(5); Article 7-2(5) and (6); the first sentence of Article 8; Article 9(1) and (2) (excluding the subparagraphs) and (3); Article 9-2(1) (excluding the subparagraphs) and (2); Article 10 and Article 10-2 (excluding the subparagraphs); Article 14, subparagraph 7; Article 15(1) and (2) (excluding the subparagraphs); Article 17(1) and (2) (excluding the subparagraphs); Article 17-3, subparagraph 3; Article 17-4(2), subparagraph 3, and (3); Article 17-5(2), subparagraph 4, and (3); Article 17-6(2), subparagraph 3, and (3); Article 17-7(2), subparagraph 3, and (3); Article 19(2); Article 21 (excluding the subparagraphs); Article 21-2; Article 22(1) and (2) (excluding the subparagraphs); Article 22-3(1) and (2); Article 22-4 (excluding the subparagraphs); Article 24 (excluding the subparagraphs); Article 25; Article 29(1) and (2); Article 30(1); Article 31(1), subparagraph 3, (3), subparagraph 3, and (5), subparagraph 5; Article 34(2); Article 35(3) (excluding the subparagraphs); Article 39(1) (excluding the subparagraphs); and Article 53(1) and (2) (excluding the subparagraphs), the term “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment,” respectively.
In Article 3-2 (excluding the subparagraphs); Article 3-3; Article 5(1) (excluding the subparagraphs); Article 17-2(3) (excluding the subparagraphs); Article 17-3 (excluding the subparagraphs); Article 22-2; Article 23 (excluding the subparagraphs); and Article 28(2), the term “Ordinance of the Ministry of Trade, Industry and Energy” shall be changed to “Ordinance of the Ministry of Climate, Energy and Environment,” respectively.
In Item 3 of Attached Table 3; the column for institutions to which applications for approval or reports are submitted in Item 1 of Attached Table 8; the column for institutions to which applications for approval of changes or reports of changes are submitted in the same item; and Note 2 of Attached Table 10, the term “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment,” respectively.
In Forms No. 1, 3, 4, 5, 5-2, 5-3, 6, 7, 8, 8-2, 8-3, 8-4, 10, 11, the front of Form No. 12, 13, 13-2, 14, 15, 22, 23, 23-2, 24, 25, 26, 27, the front of Form No. 28 (subparagraph 5 of the attached-documents section), 35, 53, and 54, the term “Minister of Trade, Industry and Energy” shall be changed to “Minister of Climate, Energy and Environment,” respectively.
In the processing procedure section of Form No. 1, Form No. 3, Form No. 6, Form No. 7, Form No. 8, Form No. 8-2, Form No. 8-4, Form No. 10, Form No. 11, the front processing procedure section of Form No. 12, Form No. 13, Form No. 22, Form No. 23-2, Form No. 25, Form No. 26, Form No. 53, and Form No. 54, “Ministry of Trade, Industry and Energy” shall be changed to “Ministry of Climate, Energy and Environment”.
In the fee section on the front of Form No. 28, “Ordinance of the Ministry of Trade, Industry and Energy” shall be changed to “Ordinance of the Ministry of Climate, Energy and Environment.”
<62> through <98> omitted
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 54, Aug. 27, 2026> (Enforcement Rule of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy)
Article 1 (Enforcement Date) This rule shall enter into force on September 18, 2026.
Articles 2 and 3 omitted
Article 4 (Amendment of Other Laws) ① through ⑤ Omitted
⑥ The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Article 3-3, “Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be changed to “Act on Promotion of Development, Utilization and Dissemination of Renewable Energy.”
In Note 3 of Item 1 of Attached Table 8, “Act on Promotion of Development, Use and Dissemination of New and Renewable Energy” shall be changed to “Act on Promotion of Development, Use and Dissemination of Renewable Energy.”
In subparagraph 3 of the attachment instructions for Form No. 26, “Article 2 of the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be changed to “Article 2, subparagraph 2(a) of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy.”
⑦ Omitted
Article 5 omitted
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 56, Aug. 31, 2026> (Enforcement Rule of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management)
Article 1 (Enforcement Date) This rule shall enter into force on September 18, 2026.
Article 2 (Amendment of Other Laws) ① through ⑦ Omitted
⑧ The Enforcement Rule of the Electric Utility Act is partially amended as follows.
In Article 4(1), subparagraph 4, “Article 2 of the Act on Promotion of Development, Use and Dissemination of New and Renewable Energy” shall be changed to “Article 2, subparagraph 2 of the Act on Promotion of Development, Use and Dissemination of Renewable Energy,” and “fuel cells” shall be changed to “fuel cells under Article 2 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act.”
In Article 5(1), subparagraph 3(c), “new and renewable energy under Article 2 of the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be changed to “renewable energy under Article 2, subparagraph 2 of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy, or energy and hydrogen energy utilized in fuel cells, etc. under Article 2, subparagraphs 6 and 11 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act.”
In the proviso to subparagraph 3(a) of Attached Table 1-2, “fuel cells under Article 2, subparagraph 1(b) of the Act on Promotion of Development, Use and Dissemination of New and Renewable Energy or solar energy and wind power generation facilities under Article 2, subparagraphs 2(a) and (b) of the same Act” shall be changed to “solar energy and wind power generation facilities under Article 2, subparagraph 2(a) and (b) of the Act on Promotion of Development, Use and Dissemination of Renewable Energy, or fuel cells under Article 2 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act.”
In subparagraph 4 of the attachment instructions in Form No. 1, “solar photovoltaic power and wind power among solar energy under Article 2 of the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy” shall be changed to “solar photovoltaic power among solar energy under Article 2, subparagraph 2(a) of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy, and wind power under item (b) of the same subparagraph”; and “fuel cells” shall be changed to “fuel cells under Article 2 of the Hydrogen Economy Promotion and Hydrogen Safety Management Act.”
Items 9 through 13 omitted
Article 3 Omitted
ADDENDA <Ministry of Climate, Energy and Environment Decree No. 63, Oct. 16, 2026>
This rule shall take effect from the date of its promulgation.
[Attached Table 1] Method of Preparing a Business Plan (Related to Article 4(1), subparagraph 1)
[Attached Table 1-2] Documents Required for a Business Plan (Related to Article 4(1), subparagraph 1)
[Attached Table 3] Standard Voltage, Standard Frequency, and Allowable Tolerances (Related to Article 18)
[Attached Table 4] Particulars to Be Entered for Each Electric Installation (Related to Article 21, subparagraph 1(d))
[Attached Table 5] Construction Plans for Electric Installations for Electric Utility Business Requiring Approval or Notification (Related to Article 28(1))
[Attached Table 6] Matters Requiring Approval upon Changes to Construction Plans for Electric Installations for Electric Utility Business (Related to Article 28(2))
[Attached Table 8] Methods of Applying for Approval of and Reporting Construction Plans (Related to Article 29)
[Attached Table 9] Timing of Pre-use Inspection (Related to Article 31, Paragraph 4)
[Attached Table 10] Electric Installations Subject to Self-Inspection and Inspection Cycles (Related to Article 35(1))
[Form No. 1] Application for an Electric Utility Business Permit
[Form No. 2] Estimated Business Profit and Loss Statement
[Form No. 3] Application for Change of an Electric Utility Business Permit
[Form No. 4] Electric Utility Business Permit Certificate (Electricity Generation Business, District Electric Business)
[Form No. 5] Electric Utility Business Permit Certificate (Electric Transmission Business, Electric Distribution Business, Electric Sales Business)
[Form No. 5-2] Application for Registration or Amendment of Registration of a New Electric Utility Business
[Form No. 5-3] Certificate of Registration for a New Electric Utility Business (Electric Vehicle Charging Business, Small-Scale Electricity Brokerage Business, Entity Engaged in the Renewable Energy Electricity Supply Business, Integrated Power Plant Business, Renewable Energy Electricity Storage and Sales Business, Entity Engaged in the Business of Supplying Electricity to Electric Transmission Constraint Areas)
[Form No. 6] Notification of Commencement of Business
[Form No. 7] Application for Approval of Transfer of Business
[Attachment Form No. 8] Application for Approval of Corporate Merger (Division)
[Form No. 8-2] Application for Approval of Acquisition of Shares
[Form No. 8-3] Report on Succession to the Status of a New Electric Utility Business Entity
[Form No. 8-4] Report on Acquisition of Business Facilities of an Electric Utility Business Entity
[Form No. 9] Notice of Scheduled Power Reception
[Form No. 10] Application for Approval of Usage Fees and Other Conditions of Use for Electric Installations for Transmission (Distribution)
[Form No. 11] Application for Approval of Changes to Usage Fees and Other Conditions of Use for Electric Installations for Transmission (Distribution)
[Form No. 12] Application for Approval of Basic Terms and Conditions of Supply
[Form No. 13] Application for Approval of Changes to Basic Terms and Conditions of Supply
[Form No. 13-2] Terms and Conditions for a New Electric Utility Business (Report, Report of Change)
[Form No. 14] Report on Installation Plan for Electric Installations
[Form No. 15] Report on Electricity Supply Plan
[Form No. 16] Maximum Electricity Supply Plan
[Form No. 17] Specification of Power Generation Plan
[Form No. 18] Specification of Maintenance Plan
[Form No. 19] Fuel Plan Specification (Steam, Nuclear, and Internal Combustion Power Plants)
[Form No. 20] Specification of Power Receiving Plan
[Form No. 21] Specification of Power Transmission Plan
[Form No. 22] Application for Approval of Plan for Manufacturing and Supplying Nuclear Power Plant Fuel (Refining, Conversion, and Processing)
[Form No. 23] Application for Approval of Changes to the Plan for Manufacturing and Supplying Nuclear Power Plant Fuel (Refining, Conversion, and Processing)
[Form No. 23-2] Application for Approval (or Approval of a Change) to Execute a Contract for Differences
[Form No. 24] Report on Electricity Trading Fees
[Form No. 25] Application for Approval (or Approval of a Change) of a Construction Plan
[Form No. 26] Construction Plan Report (Report of Change)
[Form No. 27] Report on Unavoidable Construction
[Form No. 28] Application for Pre-use Inspection
[Form No. 29] Pre-use Inspection Certificate
[Form No. 30] Self-Inspection Results Report
[Form No. 35] Application for Designation (or Change of Designation) of a Protection Zone
[Form No. 53] Application for Lifting of a Business Suspension Order
[Form No. 54] Application for Deferment of a Business Suspension Order