물류시설의 개발 및 운영에 관한 법률 시행규칙
285431 · 2026-04-07
Ministry of Land, Infrastructure and Transport ( Advanced Logistics Division ), 044-201-4007, 4008
Chapter 1 General Provisions <Newly Inserted Aug. 24, 2022>
Article 1 (Purpose) The purpose of this rule is to prescribe matters delegated by the Act on the Development and Management of Logistics Facilities and the Enforcement Decree of the same Act , as well as matters necessary for the implementation thereof.
Article 1-2 Deleted <Mar. 23, 2013>
Article 2 (Facilities in Logistics Complexes, etc.) ① In Article 2, Paragraph 2, Subparagraph 6 of the Enforcement Decree of the Act on the Development and Management of Logistics Facilities (hereinafter referred to as the “Decree”), the term “other facilities having logistics functions prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the facilities listed in each of the following subparagraphs. <Amended Mar. 14, 2008; Mar. 23, 2013>
1. A business place intended for joint use by a person intending to engage in the automobile sales business pursuant to Article 2, Subparagraph 7 of the Automobile Management Act or by automobile sales business operators
2. Automobile auction house pursuant to Article 60, Paragraph 1 of the Automobile Management Act
② In Subparagraph 5 of Article 2, Paragraph 3 of the Enforcement Decree , “other manufacturing and processing facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to drying, storage, and processing facilities for rice installed by agricultural cooperatives, etc., pursuant to Article 22, Paragraph 2 of the Grain Management Act . <Amended Mar. 14, 2008; Mar. 23, 2013>
③ In Article 2, Paragraph 4, Subparagraph 3 of the Enforcement Decree, “other facilities for enhancing the functions of a logistics complex as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to single-family homes, multi-family homes, lodging facilities, sports facilities, entertainment facilities, and neighborhood living facilities. <Amended Mar. 14, 2008; Mar. 23, 2013>
Chapter 2 Establishment of Comprehensive Plan for Logistics Facility Development <Newly Inserted Aug. 24, 2022>
Article 3 (Establishment of Comprehensive Plan for Logistics Facility Development) In Article 3, Paragraph 3, Subparagraph 3 of the Enforcement Decree, “other matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to a comparative table concerning major changes to the Comprehensive Plan for Logistics Facility Development. <Amended Mar. 14, 2008; Mar. 23, 2013>
Chapter 3 Logistics Terminal Business <Newly Inserted Aug. 24, 2022>
Article 4 (Application for Registration of Multimodal Logistics Terminal Business) A person who intends to register a multimodal logistics terminal business pursuant to Article 7, Paragraph 1 of the Act shall submit to the Minister of Land, Infrastructure and Transport a registration application form in Annex No. 1 (including an application in the form of an electronic document), attaching the documents specified in each of the following subparagraphs (including documents in the form of electronic documents). In this case, the Minister of Land, Infrastructure and Transport shall verify the certificate of corporate registration of the transferee (applicable only if the applicant is a corporation) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Aug. 4, 2010; Feb. 15, 2012; Nov. 29, 2012; Mar. 23, 2013>
1. Documents proving compliance with the registration standards pursuant to Article 7, Paragraph 4 of the Act
2. A floor plan with a scale of 1:500 or larger showing the layout of the site and facilities of the integrated logistics terminal
3. If the applicant (or an executive in the case of a corporation) is a foreigner, documents classified according to the following items that confirm that they do not fall under any of the grounds for disqualification specified in each subparagraph of Article 8 of the Act
a. In the case of a country that has concluded the “Convention Abolishing the Requirement of Legalization for Foreign Public Documents”: a document issued by the government or other competent authority of such country, or a statement of the relevant foreigner notarized by a notary public, for which an Apostille certificate has been issued by the authority in such country authorized to issue such certificates.
B. In the case of a country that has not concluded the "Convention Abolishing the Requirement of Legalization for Foreign Public Documents": a document issued by the government or other competent authority of the country concerned, or a statement of the relevant foreign national notarized by a notary public and verified by the Korean consul residing in the country concerned.
4. If the applicant is a foreign investment enterprise, documents proving foreign investment pursuant to the Foreign Investment Promotion Act
Article 5 (Registration of Complex Logistics Terminal Business) When the Minister of Land, Infrastructure and Transport receives an application for registration pursuant to Article 4, he or she shall examine whether the application meets the registration standards under Article 7, Paragraph 4 of the Act and whether it falls under the grounds for disqualification for registration under Article 8 of the Act ; and if the Minister deems the contents of the application to be appropriate, he or she shall issue a Certificate of Registration in the form of Annex 2. <Amended Nov. 29, 2012; Mar. 23, 2013>
Article 6 (Change Registration of Integrated Logistics Terminal Business) ① When an integrated logistics terminal business operator intends to apply for change registration pursuant to Article 4, Paragraph 3 of the Enforcement Decree, the operator shall submit an application for change registration in the form of Annex 3 to the Minister of Land, Infrastructure and Transport, attaching documents proving the facts of the change. <Amended Nov. 29, 2012; Mar. 23, 2013; Dec. 30, 2016>
② Upon receiving an application for change of registration pursuant to Paragraph 1, the Minister of Land, Infrastructure and Transport shall examine whether it complies with the registration standards under Article 7 , Paragraph 4 of the Act and whether it falls under the grounds for disqualification from registration under Article 8 of the Act ; and if the Minister deems the contents of the application to be appropriate, shall grant the change of registration without delay. <Newly added Dec. 30, 2016>
Article 7 (Application for Approval of Logistics Terminal Construction) ①The application for approval of construction pursuant to Article 5, Paragraph 1 of the Enforcement Decree shall be in the form of Annex 4 .
② An application for authorization of construction work pursuant to Paragraph 1 shall be accompanied by a construction plan containing the following items:
1. Project Objectives and Overview
2. Location Map
3. Annual Investment Plan
4. Installation plan for buildings and structures, etc.
5. Installation plan for infrastructure (including drainage ditches)
6. Bird's-eye view and facility layout
7. Land map prepared based on a cadastral map or forest map
8. Land, buildings, or objects affixed to the land subject to expropriation or use, and in cases where there are rights other than ownership relating thereto, mining rights, fishing rights, and rights regarding the use of water (hereinafter referred to as “Land, etc.”; hereinafter the same applies), the details thereof, the owner, and the names and addresses of persons related pursuant to Article 2, Subparagraph 5 of the Act on Acquisition and Compensation of Land, etc. for Public Projects.
Article 8 (Application for Approval of Change in Implementation of Logistics Terminal Construction) ①The application for approval of change in implementation of construction pursuant to Article 5, Paragraph 1 of the Enforcement Decree shall be in the form of Annex No. 5 .
② The application for approval of a change in the execution of construction pursuant to Paragraph 1 shall be accompanied by documents stating the details of the change in the construction plan, as well as documents and drawings that can prove the details of the change.
③ In Article 5, Paragraph 2, Subparagraph 4 of the Enforcement Decree, “other facilities prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to parking lots, water supply systems, sewage systems, retention basins, canals, wharves, wastewater treatment facilities, and common utility tunnels. <Amended Mar. 14, 2008; Mar. 23, 2013>
④ The Minister of Land, Infrastructure and Transport or the Mayor of a Special City, Metropolitan City, Special Self-Governing City, or Governor of a Province or Special Self-Governing Province (hereinafter referred to as the “Mayor/Governor”) shall grant approval without delay if the contents of the application for approval of change comply with the structural and facility standards for logistics terminals pursuant to Article 9. <Newly added Dec. 30, 2016>
Article 9 (Structural and Facility Standards for Logistics Terminals) The structural and facility standards for logistics terminals pursuant to Article 9, Paragraph 4 of the Act are as set forth in Attached Table 1. <Amended Nov. 13, 2024>
Article 10 (Notice of Approval and Amendment of Logistics Terminal Construction Implementation) ① When the Minister of Land, Infrastructure and Transport or the Mayor or Provincial Governor has granted approval for the implementation of construction pursuant to Article 9, Paragraph 1 of the Act, they shall publish the matters set forth in each of the following subparagraphs in the Official Gazette pursuant to Paragraph 5 of the same Article . <Amended Nov. 29, 2012; Mar. 23, 2013; Dec. 30, 2016; Nov. 13, 2024>
1. Name of the business
2. Address and name of the project implementer (in the case of a corporation, its name, address, and the name of its representative)
3. Types of Logistics Terminals
4. Location and Area of the Project Implementation Site
5. Project implementation period (including the scheduled commencement and completion dates)
6. If land, etc. exists, its detailed items, the owner, and the names and addresses of persons related pursuant to Article 2, Subparagraph 5 of the Act on Acquisition and Compensation of Land, etc. for Public Projects
② When the Minister of Land, Infrastructure and Transport or the Mayor or Provincial Governor has granted approval for a change in the implementation of construction work pursuant to the latter part of Article 9 , Paragraph 1 of the Act , they shall publish the matters set forth in each of the following subparagraphs in the Official Gazette pursuant to Paragraph 5 of the same Article . <Amended Nov. 29, 2012; Mar. 23, 2013; Nov. 13, 2024>
1. Name of the business
2. Address and name of the project implementer (in the case of a corporation, its name, address, and the name of its representative)
3. Reasons and Details of Approval for Change
Article 11 (Reporting of Business Succession) ① Any person intending to report the transfer or acquisition of a complex logistics terminal business pursuant to Article 14, Paragraph 2 of the Act shall submit to the Minister of Land, Infrastructure and Transport the Report on Transfer or Acquisition in Annex 6 (including a report in electronic form) within 30 days from the date of succession of rights and obligations, and any person intending to report the merger of a corporation that is a complex logistics terminal business operator shall submit to the Minister of Land, Infrastructure and Transport the Report on Corporate Merger in Annex 7 (including a report in electronic form) within 30 days from the date of succession of rights and obligations. <Amended Nov. 29, 2012; Mar. 23, 2013; Aug. 6, 2015>
② Each report form under Paragraph 1 shall be accompanied by documents (including documents in the form of electronic documents) classified according to the following subparagraphs. <Amended Nov. 29, 2012>
1. In the case of reporting the transfer or acquisition of a business
a. Copy of the assignment and transfer agreement
B. If the assignee (or an executive in the case of a corporation) is a foreigner, the documents under Article 4 , Subparagraph 3
C. In the case where the assignee is a foreign-invested enterprise, documents proving foreign investment pursuant to the Foreign Investment Promotion Act
2. In the case of a corporate merger report
a. Copy of the Merger Agreement
B. Statement of business fixed assets of the corporation involved in the merger within the last year
c. In cases where an executive of the corporation that survives after the merger or is established pursuant to the merger is a foreigner, the documents under Article 4, Subparagraph 3
D. In cases where the surviving entity after the merger or the entity established pursuant to the merger is a foreign-invested enterprise, documents proving foreign investment in accordance with the Foreign Investment Promotion Act
③ The Minister of Land, Infrastructure and Transport who receives the report under Paragraph 1 shall verify the information in each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended Aug. 4, 2010; Nov. 29, 2012; Mar. 23, 2013>
1. In the case of a report on the transfer or acquisition of a business: Certificate of Corporate Registration (applicable only if the transferee is a corporation)
2. In the case of a corporate merger report: Certificate of incorporation of the corporation that survives after the merger or is established pursuant to the merger
Article 12 (Reporting of Suspension or Closure of Business, etc.) ① Any person who intends to report the suspension or closure of a complex logistics terminal business or the dissolution of a corporation operating a complex logistics terminal for reasons other than a merger pursuant to Article 15 of the Act shall submit the Report on Suspension, Closure, or Dissolution in the form of Annex 8 to the Minister of Land, Infrastructure and Transport within 7 days from the date of suspension, closure, or dissolution. <Amended Nov. 29, 2012; Mar. 23, 2013>
② The report of business closure or dissolution pursuant to Paragraph 1 shall be accompanied by the following documents:
1. In the case where the party intending to close the business is a corporation, documents proving the corporation's decision regarding the cessation of business
2. In cases where a corporation is dissolved for reasons other than a merger, documents proving the dissolution of the corporation
Article 13 (Standards for Administrative Dispositions) The standards for dispositions pursuant to Article 17, Paragraph 2 of the Act are as set forth in Attached Table 2 .
Chapter 4 Warehousing Business <Newly Inserted Aug. 24, 2022>
Article 13-2 (Certification Standards for Smart Logistics Centers) ① The standards for certification of smart logistics centers pursuant to Article 21-4, Paragraph 1 of the Act (hereinafter referred to as “Smart Logistics Center Certification”) are as follows: <Amended Apr. 1, 2025>
1. The level of advanced technology and automation in logistics processing functional areas such as receiving, storage, and sorting must be excellent.
2. The structural performance of the facility and the efficiency, safety, and eco-friendliness levels of infrastructure areas, such as warehouse management systems, must be excellent.
② Smart Logistics Center Certification is classified into five grades. <Amended Apr. 1, 2025>
③ The detailed certification standards by grade for smart logistics center certification under Paragraph 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Apr. 1, 2025>
[This Article Newly Inserted Dec. 23, 2020]
Article 13-3 (Procedures and Methods for Smart Logistics Center Certification) ①A person who owns or leases and operates a logistics warehouse pursuant to Article 2, Subparagraph 5-2 of the Act may apply for Smart Logistics Center Certification to the head of a certification body pursuant to Paragraph 2 of the same Article (hereinafter referred to as the “Certification Body”) pursuant to Article 21-4, Paragraph 3 of the Act , with respect to a logistics warehouse for which approval for use has been obtained pursuant to Article 22 of the Building Act. <Amended Apr. 1, 2025>
② Any person who intends to apply for Smart Logistics Center certification pursuant to Paragraph 1 shall submit the Smart Logistics Center Certification Application Form (Form No. 8-6), accompanied by the documents specified in the following subparagraphs and a portable storage device, etc. containing those documents, to the head of the certification body. <Amended Apr. 1, 2025>
1. Self-assessment report and supporting materials in accordance with the certification standards under Article 13-2 , Paragraph 1
2. Logistics Center Design Drawings and Design Specifications by Logistics Processing Field, such as Receiving, Storage, and Sorting
3. Confirmation of Design Change (limited to cases where the design drawings in Item 2 have been changed)
4. Specifications of Introduced Facilities and Equipment
5. Logistics Center Operations Manual
6. Quality, Safety, and Environmental Management Manual (if available)
7. Logistics Information System Technical Specifications and Integration Technical Specifications between Logistics Center Operations and Systems
8. A copy of the Smart Logistics Center Preliminary Certification in accordance with Form No. 8-9 ( only applicable if preliminary certification has been obtained pursuant to Article 13-5 )
9. Certificate of Corporate Registration or Certificate of Business Registration
10. Other documents that the head of the certification body determines and announces as necessary for smart logistics center certification
③ Upon receiving an application for certification under Paragraph 1, the head of the certification body shall conduct a document review and form a certification review team consisting of no more than five persons from among the professional certification review personnel under Article 13-7, Paragraph 4, to conduct an on-site inspection based on the results of the document review. <Amended Apr. 1, 2025>
④ The head of the certification body shall determine whether to grant certification and the grade in consideration of the results of the examination under Paragraph 3; if the application under Paragraph 1 does not meet the certification standards, the head shall notify the applicant of the result, and if it meets the certification standards, the head shall issue a Smart Logistics Center Certificate in the form of Annex 8-7 to the applicant. <Amended Apr. 1, 2025>
⑤ When the head of the certification body notifies the applicant or issues a Smart Logistics Center certification pursuant to Paragraph 4, he/ she shall prepare a certification review result report containing the review details and scores, certification status and grade, in accordance with the certification standards under Article 13-2, Paragraph 1, and submit it to the Minister of Land, Infrastructure and Transport. <Amended Apr. 1, 2025>
⑥ Upon receiving the report on the results of the certification examination pursuant to Paragraph 5, the Minister of Land, Infrastructure and Transport shall publish matters concerning the certification of smart logistics centers in the Official Gazette or on the website of the Ministry of Land, Infrastructure and Transport. <Newly added Apr. 1, 2025>
⑦ If the applicant has an objection to the results of the certification examination under Paragraph 4, the applicant may apply for a re-examination to the head of the certification body within 14 days from the date of receiving the notification. In this case, the applicant for the re-examination shall additionally pay the costs necessary for the re-examination to the head of the certification body. <Amended Apr. 1, 2025>
⑧ Detailed matters concerning the preparation of attached documents under each subparagraph of Paragraph 2 and the application for re-examination pursuant to Paragraph 7 shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Apr. 1, 2025>
[This Article newly inserted Dec. 23, 2020]
[Title amended Apr. 1, 2025]
Article 13-4 (Use of Certification Mark, etc.) ① A person who has obtained Smart Logistics Center certification may use a mark indicating certification (hereinafter referred to as the “Certification Mark”) on packaging, containers, promotional materials, etc., that they produce or handle. <Amended Apr. 1, 2025>
② Necessary matters concerning the design and display method of the certification mark, etc. shall be determined and announced by the Minister of Land, Infrastructure and Transport .
[This Article Newly Inserted Dec. 23, 2020]
Article 13-5 (Application for Preliminary Certification, etc.) ① If necessary to receive support pursuant to Article 21-7, Paragraph 2 of the Act , a person who intends to own or lease and operate a smart logistics center may obtain preliminary certification for a smart logistics center (hereinafter referred to as “preliminary certification”) based on contents reflected in the building design prior to smart logistics center certification (hereinafter referred to as “main certification”). <Amended Apr. 1, 2025>
② Any person seeking preliminary certification shall submit to the head of the certification body the Application for Preliminary Certification of a Smart Logistics Center in the form of Annex 8-8 , attaching the documents specified in Article 13-3, Paragraph 2 , Subparagraphs 1 through 7 , and Subparagraphs 9 and 10 of the same paragraph, as well as a portable storage device, etc., on which said documents are stored. <Amended Apr. 1, 2025>
③ Upon receiving an application pursuant to Paragraph 2, the head of the certification body shall, after going through the procedures pursuant to Paragraph 3 of Article 13-3, issue a preliminary certification for a smart logistics center in the form of Annex 8-9 to the applicant if it meets the certification standards, and report this to the Minister of Land, Infrastructure and Transport. However, an on-site inspection pursuant to Paragraph 3 of Article 13-3 may be conducted if necessary.
④ The preliminary certification under Paragraph 3 shall remain in effect until the final certification is obtained. However, if the certification is not applied for within one year after it becomes possible to apply for certification under Article 13-3 Paragraph 1, the preliminary certification shall lose its validity.
⑤ Article 13-4 shall apply mutatis mutandis to the use, etc. of the preliminary certification mark by a person who has received preliminary certification pursuant to Paragraph 3. In this case, if the person who has received preliminary certification intends to use the fact of receiving preliminary certification for advertising or other purposes, they must notify that the content may change upon receiving the final certification.
⑥ A person who has received preliminary certification pursuant to Paragraph 3 shall, in the case of receiving support pursuant to Paragraph 2 of Article 21-7 of the Act , obtain final certification in accordance with the preliminary certification within the validity period of the preliminary certification pursuant to the proviso of Paragraph 4.
⑦ The provisions of Paragraphs 6 through 8 of Article 13-3 shall apply mutatis mutandis to the preparation of documents attached to preliminary certification pursuant to Paragraph 2, the public announcement of matters concerning preliminary certification, and the re-examination . <Amended Apr. 1, 2025>
[This Article was newly added on Dec. 23, 2020.]
[Former Article 13-5 was moved to Article 13-10 <Dec. 23, 2020>]
Article 13-6 (Criteria and Procedures for Designation of Certification Bodies, etc.) ① Any person who intends to be designated as a certification body must meet all of the requirements of each of the following subparagraphs. <Amended Apr. 1, 2025>
1. It must be a public institution pursuant to Article 4 of the Act on the Operation of Public Institutions or a government-funded research institute pursuant to the Act on the Establishment, Operation, and Promotion of Government-Funded Research Institutions, etc.
2. The dedicated personnel, organization, and work execution system required to perform smart logistics center certification tasks shall be appropriate.
3. Must possess expertise regarding advanced logistics facilities, equipment, and operating systems.
4. Possess the capability to perform education, consulting, research, development, and promotion related to Smart Logistics Center Certification.
5. Must meet other standards prescribed and notified by the Minister of Land, Infrastructure and Transport
② When the Minister of Land, Infrastructure and Transport intends to designate a certification body, he/she shall announce the matters of each of the following subparagraphs through the internet homepage, etc., for at least one month.
1. Application Period and Method
2. Designation Criteria
3. Evaluation Methods and Procedures
4. Other matters necessary for the designation of a certification body
③ Any person who intends to be designated as a certification body shall submit to the Minister of Land, Infrastructure and Transport, within the application period excluding the items of Paragraph 2, an application for designation as a smart logistics center certification body in accordance with Form No. 8-10 of the Appendix, with the following documents attached.
1. Description of the dedicated organization and work execution system to perform certification tasks
2. Certification Body's Regulations on Processing Certification Business
3. Documents proving that the requirements under Paragraph 1 are met
4. Articles of Incorporation (applicable only if the applicant is a corporation or an affiliated institution of a corporation)
5. Other documents specified in the announcement pursuant to Paragraph 2
④ Upon receiving an application pursuant to Paragraph 3, the Minister of Land, Infrastructure and Transport shall verify, through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act , a Certificate of Corporate Registration if the applicant is a corporation or an affiliated institution of a corporation, and a Certificate of Business Registration (referring to a Certificate of Business Registration excluding the Resident Registration Number; hereinafter the same applies in this Paragraph) if the applicant is an individual. However, if the applicant does not consent to the verification of the Certificate of Business Registration, the applicant shall be required to attach the Certificate of Business Registration. <Amended Apr. 1, 2025>
⑤ Upon receiving an application pursuant to Paragraph 3, the Minister of Land, Infrastructure and Transport shall, after deliberation by the Logistics Facilities Subcommittee under Article 19 , Paragraph 1, Subparagraph 2 of the Framework Act on Logistics Policy , issue a certificate of designation as a smart logistics center certification body to the applicant in accordance with Form No. 8-11 of the attached document if the applicant meets the criteria for designation as a certification body pursuant to Paragraph 1, and shall announce this.
[This Article was newly added on Dec. 23, 2020.]
[Formerly Article 13-6 was moved to Article 13-11 <Dec. 23, 2020>]
Article 13-7 (Organization and Operation of Certification Bodies) ① A certification body shall establish a Certification Operations Committee (hereinafter referred to as the “Certification Operations Committee”) to deliberate on matters related to the operation of the Smart Logistics Center Certification System. <Amended Apr. 1, 2025>
② The Certification Operations Committee shall be composed of no more than seven members, including one Chairperson, with consideration for gender balance; the Chairperson shall be elected from among the members. <Amended Apr. 1, 2025>
③ The members of the Certification Operations Committee shall be the persons specified in each of the following subparagraphs. <Amended Apr. 1, 2025>
1. One person designated by the Minister of Land, Infrastructure and Transport from among public officials of Grade 4 or higher at the Ministry of Land, Infrastructure and Transport
2. No more than five persons appointed by the head of the certification body who fall under any of the following subparagraphs
a. Associate professors or higher-ranking individuals teaching logistics and architecture-related subjects at a university
B. Persons at the level of Senior Research Fellow or higher at research institutions related to logistics and construction
C. Persons at the executive level or higher in logistics and construction-related organizations
D. Persons recognized by the Chairperson as having qualifications equivalent to or higher than those specified in Subparagraphs A through C.
3. One person designated by the head of the certification body as the head of the dedicated organization affiliated with the certification body
④ The head of the certification body must form a team of at least 50 professionals capable of conducting certification audits while taking gender into consideration.
⑤ The head of the certification body shall prepare and maintain a certification audit register and retain it together with the original audit data for three years. In this case, the certification audit register and the original audit data may be retained as electronic documents or digitized documents pursuant to Article 5 of the Framework Act on Electronic Documents and Electronic Transactions . <Amended Nov. 13, 2024>
⑥ The head of the certification body shall submit quarterly certification audit results to the Minister of Land, Infrastructure and Transport within 30 days from the end of each quarter.
⑦ In addition to the matters prescribed in Paragraphs 1 through 6, matters necessary for the composition and operation, etc., of the Certification Operations Committee and specialized personnel for certification audits shall be determined and announced by the Minister of Land, Infrastructure and Transport . <Amended Apr. 1, 2025>
[This Article Newly Inserted Dec. 23, 2020]
Article 13-8 (Inspection, etc. regarding Smart Logistics Center Certification) ① The head of the certification body shall conduct a regular inspection every three years based on the date of certification pursuant to Article 21-4, Paragraph 6 of the Act .
② The head of the certification body may conduct an unscheduled inspection if it is determined that a smart logistics center fails to maintain the certification standards under Article 13-2 .
③ If the head of the certification body determines, based on the inspection results under paragraphs 1 and 2, that the smart logistics center maintains the certification standards under Article 13-2 , the validity period of the certification may be extended within the range of 3 years.
④ Matters necessary for the detailed procedures, etc. of the inspection pursuant to Paragraphs 1 and 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport .
[This Article newly inserted Dec. 23, 2020]
[Title amended Apr. 1, 2025]
Article 13-9 (Criteria for Revocation of Designation, etc. of Certification Bodies) The criteria for dispositions such as revocation of designation and suspension of business of certification bodies pursuant to Article 21-6 of the Act are as set forth in Attached Table 2-2 .
[This Article Newly Inserted Dec. 23, 2020]
Article 13-10 (Projects Subject to Financial Support) The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 21-7, subparagraph 5 of the Act refers to the matters set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Dec. 23, 2020; Mar. 28, 2025>
1. Matters concerning the improvement of the management structure of the logistics warehouse business
2. Matters concerning the efficient improvement of logistics warehouse facilities and equipment
3. Education and training for logistics warehouse operators and related personnel
4. Survey and Research on International Trends in the Warehousing Industry
5. Other cases where a local government provides support, as determined by the ordinance of the relevant local government regarding the rationalization of logistics warehouse business management.
[This Article was newly added on Feb. 15, 2012.]
[Moved from Article 13-5 on Dec. 23, 2020.]
Article 13-11 (Mutatis Mutandis Application of Provisions) Articles 11 through 13 shall apply mutatis mutandis to reports on business succession, suspension or closure of business, and dissolution (limited to corporations dissolved for reasons other than a merger), and to cancellation of registration or suspension of business of logistics warehouse businesses, with respect to Articles 14, 15, and 17 of the Act as applied mutatis mutandis under Article 21-10 of the Act. <Amended Dec. 23, 2020; Aug. 24, 2022>
[This Article was newly added on Feb. 15, 2012.]
[Moved from Article 13-6 on Dec. 23, 2020.]
Chapter 5 Development and Operation of Logistics Complexes <Newly Inserted Aug. 24, 2022>
Article 14 (Logistics Complex Designation Register, etc.) A person designating a logistics complex pursuant to Article 22 , Paragraph 1 or Article 22-2, Paragraph 1 of the Act (hereinafter referred to as the “Logistics Complex Designation Authority”) shall prepare and maintain the registers set forth in each of the following subparagraphs and record matters concerning the designation of the logistics complex, the person designated as the implementer of the logistics complex development project pursuant to Article 27 , Paragraph 1 of the Act (hereinafter referred to as the “Implementer”), and the implementation of the logistics complex development project. <Amended June 30, 2016; August 24, 2022>
1. Logistics Complex Designation Register ( Form No. 9)
2. Logistics Complex Development Project Implementer Designation Register ( Form No. 10)
3. Logistics Complex Development Project Implementation Register ( Form No. 11)
Article 15 (Request for Designation of General Logistics Complex) A request for the designation of a general logistics complex pursuant to Article 22, Paragraph 4 of the Act shall be in accordance with Form No. 12 of the Attached Form . <Amended June 30, 2016>
[Title amended June 30, 2016]
Article 15-2 (Consent form, etc. for designation of urban high-tech logistics complex) The consent form, withdrawal of consent form, or consent form for designation of a representative pursuant to Article 14-3 , Paragraph 2 of the Enforcement Decree shall be in accordance with Form No. 12-2 , Form No. 12-3 , or Form No. 12-4 of the Attached Forms .
[This Article was newly established on June 30, 2016.]
Article 15-3 (Procedure for Housing Supply to Employees, etc. of Tenant Companies) The qualifications and selection methods for housing specially supplied to employees, etc. of tenant companies pursuant to Article 14-4, Paragraph 1 of the Enforcement Decree shall be in accordance with the provisions of the “Rules on Housing Supply.”
[This Article was newly established on June 30, 2016.]
Article 16 (Minor Amendment to Guidelines for Logistics Complex Development) In the latter part of Article 22-6, Paragraph 2 of the Act , the term “minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the matters under Article 15, Paragraph 1, Subparagraph 6 of the Enforcement Decree. <Amended Mar. 23, 2013; Jun. 30, 2016>
[Wholly Amended Aug. 4, 2010]
Article 16-2 (Procedure for Verification of Actual Demand for Logistics Complexes) ①The evaluation criteria and evaluation methods, etc. for the verification of actual demand pursuant to Article 22-7, Paragraph 1 of the Act (hereinafter referred to as “verification of actual demand”) are as set forth in Table 2-3 .
② If the Minister of Land, Infrastructure and Transport or the Mayor or Provincial Governor deems it necessary to conduct the verification of actual demand under Paragraph 1, they may require the submission of the following documents from a person requesting the designation of a general logistics complex pursuant to Article 22 , Paragraph 4 of the Act , a person applying for the designation of an urban high-tech logistics complex pursuant to Article 22-2 , Paragraph 2 of the Act, and a person seeking designation as an implementer of a logistics complex development project pursuant to Article 27, Paragraph 1 of the Act (hereinafter referred to as “designation requesters, etc.”). <Amended Oct. 12, 2021>
1. Business plan of the designation requester, etc.
2. Financial statements of the designation requester, etc.
3. Letter of commitment or financing plan of the designation requester, etc. (including annual investment plans)
4. Consent to participate in the business of an occupant company or a person intending to purchase or lease land, facilities, etc. of the relevant logistics complex pursuant to Article 27 , Paragraph 5 of the Act (hereinafter referred to as “occupant company, etc.”) (including the current status of the logistics business of the occupant company, etc. and the occupancy plan)
5. Financial statements of tenant companies, etc.
6. Other documents deemed necessary by the Minister of Land, Infrastructure and Transport or the Mayor/Do Governor for the verification of actual demand
③ When the Minister of Land, Infrastructure and Transport or the mayor or provincial governor conducts verification of actual demand pursuant to Paragraph 1, they must undergo deliberation and resolution by the Actual Demand Verification Committee pursuant to Paragraph 2 of Article 22-7 of the Act .
[Wholly Amended Dec. 23, 2020]
Article 16-3 (Notification of Results of Verification of Actual Demand) The Minister of Land, Infrastructure and Transport or the Mayor or Provincial Governor shall notify the applicant for designation of a logistics complex, etc., of the results of the deliberation in writing within 14 days from the date the deliberation and resolution pursuant to Article 16-2, Paragraph 3 are completed. However, if the deliberation results determine that there is no actual demand for the logistics complex pursuant to Subparagraph 2, Item (c) of Annex 2-3 , the reason for such determination and the average score for each evaluation item shall be notified. <Amended Jun. 30, 2016; Dec. 23, 2020; Oct. 12, 2021>
[This Article Newly Inserted June 10, 2016]
Article 16-4 (Functions and Composition of the Actual Demand Verification Committee) ① The Actual Demand Verification Committee pursuant to Article 22-7, Paragraph 2 of the Act (hereinafter referred to as the “Actual Demand Verification Committee”) shall deliberate and resolve the matters set forth in each of the following subparagraphs. <Amended Jun. 30, 2016; Oct. 12, 2021>
1. Matters concerning the feasibility of demand for the logistics complex, such as occupancy demand from tenant companies, etc.
2. Matters concerning the business execution capabilities of the requesting party, etc.
3. Matters concerning the impact on surrounding logistics complexes
4. Other matters deemed necessary by the Minister of Land, Infrastructure and Transport
② The Actual Demand Verification Committee shall be composed of at least 20 and not more than 40 members, including one Chairperson and one Vice Chairperson, and shall be formed with consideration for gender. <Amended Sep. 20, 2017>
③ The chairperson and vice-chairperson of the Actual Demand Verification Committee shall be elected by mutual consent from among the members who are not public officials.
④ Members of the Actual Demand Verification Committee (hereinafter referred to as “Members”) shall be appointed by the Minister of Land, Infrastructure and Transport from among persons falling under any of the following subparagraphs. <Amended Sep. 20, 2017>
1. Persons with at least 5 years of research or practical experience in the fields of logistics, transportation, or urban planning.
2. Persons with at least 5 years of research or practical experience in the field of finance or accounting.
⑤ The term of office for a member shall be two years, and they may be reappointed only once. However, the term of office for a member newly appointed due to the resignation, etc., shall be the remaining period of the previous member's term.
⑥ The Committee for Verification of Actual Demand shall have a secretary and a clerk to handle the committee's affairs. In this case, the secretary and the clerk shall be designated by the Minister of Land, Infrastructure and Transport from among public officials belonging to the Ministry of Land, Infrastructure and Transport.
[This Article Newly Inserted June 10, 2016]
[Title Amended June 30, 2016]
Article 16-5 (Disqualification, Recusal, and Avoidance of Members of the Actual Demand Verification Committee) ① A member shall be disqualified from the deliberation and resolution of the Actual Demand Verification Committee if he/she falls under any of the following subparagraphs.
1. Where a committee member, their spouse, or former spouse becomes a party to the relevant matter (including officers if the party is a corporation, organization, etc.; hereinafter the same applies in this subparagraph and subparagraph 2) or is a joint rights holder or joint obligor with a party to the matter.
2. Where a member is or was a relative of a party to the relevant agenda item
3. Where a member has provided testimony, statement, consultation, research, services (including subcontracting), appraisal, or investigation regarding the relevant agenda item
4. Where a committee member, or the corporation or organization to which the member belongs, is or was an agent of a party to the relevant agenda item.
5. Where a company, etc., where a member is currently serving as an executive or employee, or where they have been employed within the last three years, has provided testimony, statement, advice, research, services (including subcontracting), appraisal, or investigation regarding the relevant matter
② If there are circumstances where it is difficult to expect fair deliberation and decision-making from a member, a party may file a request for recusal with the Actual Demand Verification Committee, and the Actual Demand Verification Committee shall decide on such matter by resolution. In this case, the member who is the subject of the request for recusal shall not participate in the resolution.
③ If a member falls under any of the grounds for disqualification pursuant to each subparagraph of Paragraph 1, he/she shall recuse himself/herself from the deliberation and resolution of the relevant matter.
[This Article Newly Inserted June 10, 2016]
Article 16-6 (Dismissal of Members of the Actual Demand Verification Committee) The Minister of Land, Infrastructure and Transport may dismiss a member appointed pursuant to Article 16-4, Paragraph 4, if the member falls under any of the following subparagraphs.
1. Cases where duties become impossible to perform due to mental or physical disability or overseas business trips lasting six months or more
2. In the case of misconduct related to official duties
3. Cases where a member is deemed unsuitable due to negligence of duty, damage to reputation, or other reasons
4. Cases where a member expresses that it is difficult to perform their duties.
5. Cases where avoidance is not performed despite falling under any of the subparagraphs of Article 16-5, Paragraph 1
[This Article Newly Inserted June 10, 2016]
Article 16-7 (Duties of the Chairperson of the Actual Demand Verification Committee) ① The Chairperson of the Actual Demand Verification Committee represents the Actual Demand Verification Committee and oversees the affairs of the Actual Demand Verification Committee.
② When the Chairperson is unable to perform their duties due to unavoidable circumstances, the Vice Chairperson shall act in their place; and when both the Chairperson and the Vice Chairperson are unable to perform their duties due to unavoidable circumstances, a member designated in advance by the Chairperson shall act in their place.
[This Article Newly Inserted June 10, 2016]
Article 16-8 (Operation of the Actual Demand Verification Committee) ① Meetings of the Actual Demand Verification Committee may be convened by the Minister of Land, Infrastructure and Transport or the Chairperson at any time if they deem it necessary. <Amended Apr. 1, 2025>
② The meeting under Paragraph 1 shall be composed of a total of 11 to 15 members by selecting, for each meeting, at least 6 and no more than 8 members from among those under Subparagraph 1 of Article 16-4, Paragraph 4 , and at least 5 and no more than 7 members from among those under Subparagraph 2 of the same paragraph, respectively, by random selection methods such as drawing lots. <Amended Sep. 20, 2017>
③ A meeting of the Actual Demand Verification Committee shall be opened with the attendance of at least two-thirds of the members pursuant to Paragraph 2, and decisions shall be made by the approval of a majority of the members present.
④ If the Minister of Land, Infrastructure and Transport or the Chairperson intends to convene a meeting of the Actual Demand Verification Committee, they must notify each member attending the meeting and the relevant business operator of the specific meeting schedule, including the date, time, place, and agenda items, at least 7 days prior to the meeting. However, this shall not apply in urgent or unavoidable cases.
⑤ When the Actual Demand Verification Committee deliberates and resolves regarding the verification of actual demand pursuant to Article 16-2, Paragraph 3, it shall comply with the evaluation criteria and evaluation methods for the verification of actual demand for logistics complexes set forth in Annex 2-3 . <Amended June 30, 2016; Sep. 20, 2017; Oct. 12, 2021; Aug. 24, 2022>
⑥ If deemed necessary in connection with the verification of actual demand for a logistics complex, the Chairperson of the Actual Demand Verification Committee may personally inspect the relevant location and may have the relevant business operator, etc. attend a meeting to hear their opinions or request the submission of opinions. <Amended Jun. 30, 2016; Oct. 12, 2021>
⑦ The secretary or clerk of the Actual Demand Verification Committee shall prepare and keep minutes of the meeting, including the date, time, place, content of remarks, and results of the meeting.
⑧ Except as otherwise provided in these rules, matters necessary for the operation of the Committee shall be determined by the Chairperson following a resolution by the Committee.
[This Article Newly Inserted June 10, 2016]
Article 17 (Simplified Structures) In Article 18, Paragraph 3, Subparagraph 1 of the Enforcement Decree , the term “simplified structures prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the structures set forth in each of the following subparagraphs. <Amended Mar. 14, 2008; Mar. 23, 2013; Jan. 2, 2019>
1. Vinyl greenhouse
2. Sericulture farm
3. Drying facilities for agricultural, forestry, and fishery products such as chili peppers, leaf tobacco, and seaweed
4. Mushroom cultivation house
5. Seedling nursery
6. Compost bin
7. Threshing ground
8. Other structures similar to those in subparagraphs 1 through 7, designated by the Minister of Land, Infrastructure and Transport and announced in the Official Gazette
Article 18 (Application for Designation of Implementing Authority, etc.) ①The application for designation of implementing authority pursuant to Article 20, Paragraph 3 of the Enforcement Decree shall be in accordance with Form No. 13 of the Attached Form .
② If the authority designating the logistics complex designates an implementer pursuant to Article 27, Paragraph 1 of the Act , it shall issue the Logistics Complex Development Project Implementer Designation Certificate in the form of Annex 14 to the applicant.
Article 19 (Application for Approval of Implementation Plan) The application for approval or modification of a logistics complex development implementation plan pursuant to Article 28, Paragraph 1 of the Act shall be in accordance with Form No. 15 of the Attached Form .
Article 20 (Support for Installation of Infrastructure) In Subparagraph 6 of Article 29 of the Enforcement Decree , “other public facilities particularly necessary for the development of logistics complexes as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to water retention basins and plazas. <Amended Mar. 14, 2008; Mar. 23, 2013>
Article 21 Deleted <April 7, 2026>
Article 22 Deleted <April 7, 2026>
Article 23 (Application for Completion Approval, etc.) ①The application for completion approval pursuant to Article 36, Paragraph 1 of the Enforcement Decree shall be in accordance with Form No. 17 of the Attached Form .
② The certificate of completion approval pursuant to Article 36 , Paragraph 3 of the Enforcement Decree shall be in accordance with Form No. 18 of the Attached Form .
③ The authority designating a logistics complex shall, in accordance with Article 46, Paragraph 3 of the Act , announce the matters specified in each subparagraph of Article 36, Paragraph 5 of the Enforcement Decree through the Official Gazette or public bulletin and the internet homepage of the Ministry of Land, Infrastructure and Transport or the relevant local government. <Amended Dec. 30, 2016>
Article 24 (Application for Permission for Use Prior to Completion) The application for permission for use prior to completion pursuant to Article 37, Paragraph 1 of the Enforcement Decree shall be in accordance with Form No. 19 of the Attached Form .
Article 25 (Rental Rate) In subparagraphs 1 and 2 of Article 40 of the Enforcement Decree , “rental rate prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to 3 percent. However, the implementing agency may calculate the rental rate within the range of adding or subtracting 1 percent from the rental rate, taking into consideration regional conditions and sales performance of the relevant logistics complex facility site, etc.
[Wholly revised Oct. 12, 2021]
Article 26 (Standards for Land Supply by Private Contract) The standards and area for supplying land by private contract pursuant to Article 41, Paragraph 4, Subparagraph 3 of the Enforcement Decree are as set forth in Table 4 .
Article 27 (Supply of Land to Complex Development Implementers) ① When selecting a person to be supplied with land by private contract pursuant to Article 41 , Paragraph 4, Subparagraph 6 of the Enforcement Decree (hereinafter referred to as “complex development implementer” in this Article), the procedures and methods set forth in each of the following subparagraphs shall be followed.
1. The public contest shall publish the matters of each of the following subparagraphs at least once in a daily newspaper distributed nationwide or in the relevant region, and the application period shall be at least 90 days.
A. Current Status of Land Subject to the Open Call
B. Eligibility and Competition Schedule
C. Other matters deemed necessary by the implementing agency
2. Select a complex development implementer through an evaluation by a selection review committee composed of experts in each field.
② In addition to the matters prescribed in Paragraph 1, detailed matters necessary for the composition of the Selection Deliberation Committee, evaluation criteria, selection methods, conclusion of agreements, etc. shall be determined by the Minister of Land, Infrastructure and Transport and announced by public notice . <Amended Mar. 14, 2008; Mar. 23, 2013>
Article 27-2 (Period for Commencement of Construction of Logistics Complex Facilities, etc.) ① In the main text of Article 50-2, Paragraph 1 of the Act , the term “period prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to four years. However, the period from November 1, 2012 to October 31, 2013 shall be three years. <Amended Nov. 1, 2012; Mar. 23, 2013; Nov. 25, 2015>
② In the proviso to Article 50-2, Paragraph 1 of the Act , “justifiable grounds prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to grounds falling under any of the following subparagraphs that have been recognized by the authority designating the logistics complex. <Amended Mar. 23, 2013>
1. Cases where the use of land for logistics complex facilities or support facilities is impossible
2. In cases where the commencement of construction is delayed due to reasons not attributable to the tenant company or supporting organization
[This Article Newly Inserted Aug. 4, 2010]
Article 27-3 (Period for Performance Prior to Imposition of Enforcement Penalty, etc.) ① In Article 50-3 , Paragraph 1 of the Act , the term “deadline prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the date six months after the end of the period for performance of obligations pursuant to the main clause of Article 50-2, Paragraph 1 of the Act . <Amended Mar. 23, 2013>
② The procedures for the imposition and collection of coercive fines pursuant to Article 50-3, Paragraph 6 of the Act shall be governed by the Enforcement Rules of the National Treasury Management Act . <Amended Aug. 24, 2022>
[This Article Newly Inserted Aug. 4, 2010]
Article 28 (Application for Disposition, etc.) ①Any person who intends to transfer land, facilities, etc. received through distribution pursuant to Article 42, Paragraph 1 of the Enforcement Decree shall submit an application for disposition in the form of Annex No. 20 , attached with the documents set forth in each of the following subparagraphs, to the implementing entity or the management agency of the logistics complex pursuant to Article 53 of the Act . <Amended Aug. 31, 2016; Jan. 21, 2022>
1. Statement of Grounds for Disposition
2. An appraisal report issued by an appraisal corporation, etc. pursuant to the Act on Appraisal and Appraisers within three months prior to the date of application for the disposition.
3. Copy of the resolution of the General Assembly or the Board of Directors (applicable only to corporations)
② In Article 42, Paragraph 2 of the Enforcement Decree, the term “period prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to 45 days. <Amended Mar. 14, 2008; Mar. 23, 2013>
Chapter 6 Logistics, Traffic, and Environmental Improvement Projects <Newly Inserted Aug. 24, 2022>
Article 29 (Designation of Logistics, Traffic, and Environment Improvement Districts) When a Mayor or Provincial Governor designates or changes a Logistics, Traffic, and Environment Improvement District (hereinafter referred to as the “Improvement District”),they shall report the following matters to the Minister of Land, Infrastructure and Transport in accordance with Article 59-5, Paragraph 4 of the Act .
1. Logistics, traffic, and environment improvement plan pursuant to Article 59-4, Paragraph 2 of the Act (hereinafter referred to as the “improvement plan”)
2. Other matters requested by the Minister of Land, Infrastructure and Transport in relation to the improvement plan
[This Article Newly Inserted Dec. 10, 2020]
Article 29-2 (Revocation of Designation of Logistics, Traffic, and Environment Improvement District) When a Mayor or Provincial Governor revokes the designation of an improvement district, he or she shall report the following matters to the Minister of Land, Infrastructure and Transport in accordance with Article 59-6, Paragraph 4 of the Act .
1. Matters under each subparagraph of Article 46-7, Paragraph 3 of the Enforcement Decree
2. Other matters requested by the Minister of Land, Infrastructure and Transport in connection with the revocation of the designation of an improvement district
[This Article Newly Inserted Dec. 10, 2020]
Chapter 7 Supplementary Provisions <Newly Inserted Aug. 24, 2022>
Article 30 (Identification) The identification pursuant to Article 61, Paragraph 4 of the Act shall be in accordance with Form No. 21 of the Attached Form .
Article 31 (Fees) ①The fees pursuant to Article 63 of the Act shall be as set forth in Attached Table 5. In this case, the fees may be paid by means of revenue stamps of the relevant local government or by electronic money, electronic payment, etc. using an information and communications network. <Amended Apr. 7, 2011; Aug. 6, 2015>
② The Minister of Land, Infrastructure and Transport or the Mayor or Provincial Governor shall refund the fees under Paragraph 1 in accordance with the classifications in each of the following subparagraphs in any of the cases falling under any of the following subparagraphs. <Newly added Aug. 6, 2015>
1. In the case of overpayment of fees: The entire overpaid amount
2. In cases where the applicant withdraws the application for said registration, authorization, etc. before the registration, authorization, etc. is granted: the entire amount of the fees paid.
Article 32 Deleted <Aug. 4, 2010>
Article 33 (Calculation of Period for Capital Costs) In Annex 2 of the Enforcement Decree, “other unavoidable reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the reasons set forth in each of the following subparagraphs. <Amended Mar. 14, 2008; Mar. 23, 2013>
1. Decline in infrastructure projects, such as ports, roads, and water supply, implemented by the national or local government in conjunction with logistics complex development projects
2. Change in plans or policies of the State or local government
3. Occurrence of force majeure natural disasters such as typhoons, tsunamis, and floods
4. Reasons recognized by the authority approving the implementation plan under Article 28, Paragraph 1 of the Act as unavoidable for which an extension of the logistics complex development period is deemed inevitable, such as cultural heritage excavation, grave disposal, or delays in consultation with relevant agencies.
Article 34 (Review of Regulations) The Minister of Land, Infrastructure and Transport shall review the validity of the matters set forth in each of the following subparagraphs every three years, starting from January 1, 2017 (meaning before January 1 of the year marking every third year), and take measures such as improvements. <Amended July 10, 2023>
1. Deleted <March 12, 2026>
2. Deleted <July 10, 2023>
3. Deleted <July 10, 2023>
4. Deleted <March 12, 2026>
5. Deleted <April 7, 2026>
6. Deleted <July 10, 2023>
7. Deleted <July 10, 2023>
8. Rental rates pursuant to Article 25
9. Standards for land supply under private contract pursuant to Article 26
10. Supply of land to a complex development implementer pursuant to Article 27
11. Commencement period for construction of logistics complex facilities, etc. pursuant to Article 27-2
12. Period of compliance prior to the imposition of enforcement fines pursuant to Article 27-3 , etc.
13. Deleted <July 10, 2023>
[Wholly revised Dec. 30, 2016]
ADDENDA <Ministry of Construction and Transportation Decree No. 610, Feb. 29, 2008>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures Concerning Cancellation of Registration, etc.) Dispositions regarding the cancellation of registration, etc., for violations committed prior to the enforcement of this Rule shall be governed by the former provisions.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 4, Mar. 14, 2008> (Partial Amendment to the Rules on Appraisal, etc. pursuant to the Amendment of the Government Organization Act)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 122, Apr. 23, 2009>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures) ① The standards for administrative dispositions for violations committed prior to the enforcement of this Rule shall be in accordance with the standards for administrative dispositions for first-time violations among the amended provisions of Annex 2.
② When applying the standards for administrative dispositions based on the number of violations pursuant to the amended provisions of Annex 2, the first violation committed after the enforcement of this rule shall be deemed the first violation.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 269, Aug. 4, 2010>
Article 1 (Enforcement Date) This rule shall enter into force on August 5, 2010.
Article 2 (Applicability to Rental Rates) The amended provisions of Article 25 shall apply from the time the first public notice or notice of supply regarding land, facilities, etc. of a logistics complex is made after the enforcement of this Rule.
Article 3 (Transitional Measures Following Change of Bank Name) In the amended provisions of Article 25, “Bank” shall be deemed “Financial Institution” until November 17, 2010.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 349, Apr. 7, 2011> (Partial Amendment to the Enforcement Rules of the Construction Technology Management Act, etc. for Economic Revitalization and Relief of Public Inconveniences, etc.)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 443, Feb. 15, 2012>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 531, Nov. 1, 2012>
Article 1 (Enforcement Date) This rule shall enter into force on November 1, 2012.
Article 2 (Transitional Measures concerning the Commencement Period of Construction Works for Logistics Complex Facilities, etc.) Even if two years have not elapsed from the date on which an occupant company or support agency entered into a sales contract with the implementing agency at the time of enforcement of this rule (in cases where a sales contract was entered into before the completion of the logistics complex development project, it refers to the completion date; in cases where a permit for use was obtained before the approval of the completion of the logistics complex development project, it refers to the date of the permit for use), the amended provisions of the proviso to Article 27-2, Paragraph 1 shall apply.
ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 541, Nov. 29, 2012>
Article 1 (Enforcement Date) This rule shall enter into force on December 2, 2012.
Article 2 (Applicability to Attached Documents for Applications for Registration of Complex Logistics Terminals, etc.) The amended provisions of Article 4, Subparagraph 3 and Article 13-2, Paragraph 1, Subparagraph 3 shall apply from the time of application after the enforcement of this Rule.
Article 3 (Applicability to Disclosure of Facility Charge Exemption/Reduction Matters) The amended provisions of Article 21, Paragraph 3 shall apply from the time facility charges are exempted/reduced following the enforcement of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 5 omitted
Article 6 (Amendment of Other Laws) ① through <57> Omitted
<58> The Enforcement Rules of the Act on the Development and Management of Logistics Facilities are partially amended as follows.
Article 1-2, Article 13-2, Article 13-3, Article 13-4, Appendix 2-2, Form No. 8-2, Form No. 8-3, Form No. 8-4, and Form No. 8-5 are each deleted.
In the part other than the subparagraphs of Article 2, Paragraph 1; Paragraphs 2 and 3 of the same article; Article 3; Article 8, Paragraph 3; the part other than the subparagraphs of Article 13-5; Article 16; the part other than the subparagraphs of Article 17; Article 20; the main text of Article 25; the main text of Article 27-2, Paragraph 1; the part other than the subparagraphs of Paragraph 2 of the same article; Article 27-3, Paragraph 1; Article 28, Paragraph 2; and the part other than the subparagraphs of Article 33, “Ordinance of the Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ordinance of the Ministry of Land, Infrastructure and Transport”.
The first and second parts of the portion other than the numbered items of Article 4, Article 5, Article 6, the portion other than the numbered items of Article 10 Paragraph 1, the portion other than the numbered items of Paragraph 2 of the same Article, Article 11 Paragraph 1, the portion other than the numbered items of Paragraph 3 of the same Article, Article 12 Paragraph 1, Article 17 Item 8, Article 21 Paragraph 2, Article 27 Paragraph 2, Subparagraphs (a) through (c) of Item 2 of Annex 4, Form No. 1, Form No. 2, the front of Form No. 3, Form No. 4, the front of Form No. 5, Form No. 6, Form No. 7, Form No. 8, the front of Form No. 12 and the processing agency column on the back of the same forms, the front of Form No. 13 and the processing agency column on the back of the same forms, Form No. 14, and Form No. 21, “Minister of Land, Transport and Maritime Affairs” shall be replaced with “Minister of Land, Infrastructure and Transport”, respectively.
In the processing procedure section of Form No. 1, the front processing procedure section of Form No. 3, the processing procedure section of Form No. 4, the processing procedure section of Form No. 5, the processing procedure section of Form No. 6, the processing procedure section of Form No. 7, and the processing procedure section of Form No. 8, “Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ministry of Land, Infrastructure and Transport”.
<59> through <126> omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 54, Dec. 30, 2013> (Partial Amendment to the Enforcement Rules of the Act on the Recapture of Development Profits, etc. for the Establishment of Regulatory Review Periods Pursuant to the Amendment of the Framework Act on Administrative Regulations)
This rule shall take effect on January 1, 2014.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 225, Aug. 6, 2015>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Reporting Business Succession) The amended provisions of Article 11, Paragraph 1 shall apply even in cases where a transfer, acquisition, or merger of corporations occurred prior to the enforcement of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 253, Nov. 25, 2015>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to the Commencement Period of Construction Work for Logistics Complex Facilities, etc.) The amended provisions of the main text of Article 27-2, Paragraph 1 shall apply even in cases where a sales contract was concluded prior to the enforcement of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 319, June 10, 2016>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 330, June 30, 2016>
Article 1 (Enforcement Date) This rule shall enter into force on June 30, 2016.
Article 2 (Amendment of Other Laws) Part of the Rules on the Determination, Structure, and Installation Standards of Urban and County Planning Facilities is amended as follows.
In Article 62, subparagraph 1, “logistics complex” shall be changed to “general logistics complex.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 357, Aug. 31, 2016> (Enforcement Rule of the Act on Appraisal and Appraisers)
Article 1 (Enforcement Date) This rule shall enter into force on September 1, 2016.
Article 2 (Amendment of Other Laws) ① through ⑧ Omitted
⑨ The Enforcement Rules of the Act on the Development and Management of Logistics Facilities are partially amended as follows.
In Article 28, Paragraph 1, Subparagraph 2, “the Act on Public Announcement of Real Estate Prices and Appraisal” shall be changed to “the Act on Appraisal and Appraisers”.
⑩ and ⑪ omitted
Article 3 Omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 382, Dec. 30, 2016> (Partial Amendment to the Enforcement Rules of the Act on Appraisal and Appraisers, etc. for the Establishment of Regulatory Review Periods, etc.)
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso Omitted>
Articles 2 through 4 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 448, Sep. 20, 2017>
Article 1 (Enforcement Date) This rule shall enter into force on January 1, 2018.
Article 2 (Transitional Measures concerning Evaluation Criteria for Verification of Actual Demand for General Logistics Complexes) If the verification procedure for actual demand for a general logistics complex is in progress at the time of enforcement of this Rule, the previous provisions shall apply notwithstanding the amended provisions of Annex 2-2.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 575, Jan. 2, 2019> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Six Laws for the Standardization of Japanese-style Terminology)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 602, Mar. 6, 2019>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Transitional Measures Concerning Land Supply Standards) Logistics complex development projects based on development plans and implementation plans established prior to the enforcement of this Rule shall be governed by the former regulations.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 785, Dec. 10, 2020>
This rule shall take effect on December 10, 2020.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 795, Dec. 23, 2020>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Decrees for the Reorganization of Difficult Legal Terms)
This rule shall take effect from the date of its promulgation. <Proviso omitted>
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 897, Oct. 12, 2021>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Rental Rates) The amended provisions of Article 25 shall apply from the time the implementing entity makes a public announcement or provides individual notice to supply land, facilities, etc. of a logistics complex after the enforcement of this rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1099, Jan. 21, 2022> (Enforcement Rule of the Act on Appraisal and Appraisers)
Article 1 (Enforcement Date) This rule shall enter into force on January 21, 2022.
Article 2 (Amendment of Other Laws) ① through ⑥ Omitted
⑦ The Enforcement Rules of the Act on the Development and Management of Logistics Facilities are partially amended as follows.
In Article 28, Paragraph 1, Subparagraph 2, “appraisal business operator” shall be changed to “appraisal corporation, etc.”
In Item 2 of the required documents section of Form No. 20, “an appraisal business operator pursuant to the Act on Public Announcement of Real Estate Prices and Appraisal” shall be changed to “an appraisal corporation, etc. pursuant to the Act on Appraisal and Appraisers.”
⑧ through ⑫ omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1118, Mar. 30, 2022> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 17 Laws for the Improvement of Forms to Enhance Public Convenience)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1147, Aug. 24, 2022>
This rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 21 shall enter into force on October 20, 2022.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1232, July 10, 2023> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 15 Laws, Including the Enforcement Rule of the Traffic Safety Act, for the Reorganization of Regulatory Review Periods)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1403, Nov. 13, 2024>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1472, Mar. 28, 2025>
This rule shall take effect one year after the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1473, Apr. 1, 2025>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Fee Reductions for Smart Logistics Center Certification, etc.) The amended provisions of the Note in Annex 5 shall apply from the time an application for Smart Logistics Center Certification, re-examination of Smart Logistics Center Certification pursuant to Article 13-3 (7), or preliminary certification is filed after this Rule enters into force.
Article 3 (Transitional Measures Concerning Smart Logistics Center Certification, etc.) In cases where an application for smart logistics center certification or preliminary certification was submitted prior to the enforcement of this Rule, the former provisions shall apply notwithstanding the amended provisions of Article 13-3, Paragraphs 3 through 8 and Article 13-5, Paragraph 7.
Article 4 (Transitional Measures Concerning the Certification Review Committee) ① The Certification Review Committee constituted pursuant to Article 13-7, Paragraph 1 of the former Rule at the time of enforcement of this Rule shall be deemed to be the Certification Operation Committee constituted pursuant to the amended provisions of Article 13-7, Paragraph 1.
② Any person who was designated or appointed as a member of the Certification Review Committee pursuant to Paragraphs 2 and 3 of the former Article 13-7 at the time of the enforcement of this Rule shall be deemed to have been designated or appointed as a member of the Certification Operation Committee pursuant to the amended provisions of Paragraphs 2 and 3 of Article 13-7.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1531, Oct. 31, 2025> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws to Reflect Government Organizational Reorganization)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1569, Mar. 12, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws for the Reorganization of Regulatory Review Periods)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1577, Apr. 7, 2026>
This rule shall take effect from the date of its promulgation.
[Attached Table 1] Structural and Facility Standards for Logistics Terminals (Related to Article 9)
[Appendix 2] Standards for Administrative Dispositions by Violation (Related to Article 13)
[Appendix 2-2] Criteria for Dispositions such as Revocation of Designation and Suspension of Business of Certification Bodies (Related to Article 13-9)
[Attached Table 2-3] Evaluation Criteria and Method for Verification of Actual Demand for Logistics Complexes (Related to Article 16-2, Paragraph 1 and Article 16-8, Paragraph 5)
[Appendix 4] Standards for Supply of Land and Area under Private Contract (Related to Article 26)
[Attachment 5] Fees (Related to Article 31)
[Attachment Form No. 1] Application for Registration of Complex Logistics Terminal Business
[Attachment Form No. 2] Complex Logistics Terminal Business Registration Certificate
[Attachment Form No. 3] Application for Change of Registration for Complex Logistics Terminal Business
[Attachment Form No. 4] Application for Approval of Logistics Terminal Construction
[Attachment Form No. 5] Application for Approval of Change in Logistics Terminal Construction Implementation
[Attachment Form No. 6] Report on Transfer and Acquisition of Complex Logistics Terminal Business
[Attachment Form No. 7] Report on Corporate Merger of Complex Logistics Terminal Business
[Attachment Form No. 8] Report on Complex Logistics Terminal Business (Suspension or Closure of Business, or Dissolution for Reasons Other than Merger)
[Attachment Form No. 8-6] Application for Smart Logistics Center Certification
[Attachment Form No. 8-7] Smart Logistics Center Certificate
[Form No. 8-8] Application for Preliminary Certification of Smart Logistics Center
[Attachment Form No. 8-9] Smart Logistics Center Preliminary Certification
[Form No. 8-10] Application for Designation as a Smart Logistics Center Certification Body
[Form No. 8-11] Designation Certificate for Smart Logistics Center Certification Bodies
[Attachment Form No. 9] Logistics Complex Designation Register
[Attachment Form No. 10] Register of Designated Logistics Complex Development Project Operators
[Attachment Form No. 11] Logistics Complex Development Project Implementation Register
[Attachment Form No. 12] Request for Designation of General Logistics Complex
[Attachment Form No. 12-2] Consent Form
[Attachment Form No. 12-3] Withdrawal of Consent
[Attachment Form No. 12-4] Consent Form for Designation of Representative
[Attachment Form No. 13] Application for Designation of Logistics Complex Development Project Operator
[Attachment Form No. 14] Designation of Logistics Complex Development Project Operator
[Attachment Form No. 15] Application for Approval (Amendment Approval) of Logistics Complex Development Implementation Plan
[Attachment Form No. 17] Application for Approval of Completion of Logistics Complex Development Project
[Attachment Form No. 18] Certificate of Approval for Completion of Logistics Complex Development Project
[Attachment Form No. 19] Application for Permit of Use Prior to Completion Approval
[Attachment Form No. 20] Application for Disposition
[Attachment Form No. 21] Inspector's ID Card