액화석유가스의 안전관리 및 사업법 시행규칙

282369 · 2026-01-02

Ministry of Trade, Industry and Resources ( Gas Industry Division ), 044-203-5234 Ministry of Trade, Industry and Resources ( Resource Safety Team ), 044-203-5184 Chapter 1 General Provisions Article 1 (Purpose) The purpose of this rule is to prescribe matters delegated by the "Safety Control and Business of Liquefied Petroleum Gas Act" and the Enforcement Decree of the same Act , as well as matters necessary for the implementation thereof. Article 2 (Definitions) ① The definitions of terms used in this Rule are as follows. <Amended Dec. 30, 2015; Dec. 3, 2018; Mar. 18, 2020; Aug. 5, 2020; Oct. 1, 2025> 1. “Storage facility” refers to a facility for storing liquefied petroleum gas, including storage tanks, mound-type storage tanks, small storage tanks, and containers (including container assembly facilities and filling container storage rooms; hereinafter the same applies). 2. “Storage tank” means a tank fixedly installed above or below ground for the purpose of storing liquefied petroleum gas (including tanks fixedly installed on ships) with a storage capacity of 3 tons or more. 3. “Mound-type storage tank” refers to a tank installed on the ground to store liquefied petroleum gas, which is covered with soil and sand, and is a tank installed in a tank filling business facility fixed to a vehicle pursuant to Article 3, Paragraph 1, Item 1, Subparagraph ( e) of the Enforcement Decree of the Safety Control and Business of Liquefied Petroleum Gas Act ( hereinafter referred to as the “Decree”) . 4. “Small storage tank” means a tank fixedly installed above or below ground for the purpose of storing liquefied petroleum gas, and having a storage capacity of less than 3 tons. 5. “Container manifold facility” refers to a facility for storing liquefied petroleum gas by combining two or more containers, comprising containers, container manifold devices, automatic changeover switches (referring to devices that automatically supply gas from a spare container when the gas supply pressure of a container in use drops), pipes connecting the same, and auxiliary facilities. 6. “Tank fixed to a vehicle” means a tank fixedly installed in a vehicle for the transport and handling of liquefied petroleum gas. 7. “Filled container” refers to a container in which at least half of the filled mass of liquefied petroleum gas is filled. 8. “Residual gas container” refers to a container in which less than half of the liquefied petroleum gas filling mass is filled. 9. “Gas facility” means a facility other than a storage facility through which liquefied petroleum gas passes (excluding piping) and ancillary facilities. 10. “Filling equipment” refers to equipment for filling liquefied petroleum gas into a container or a tank fixed to a vehicle, and includes a filling machine and a pump and compressor attached to a storage tank. 11. “Container gas consumer” means a person who uses liquefied petroleum gas filled in a container as fuel. Provided, however, that the persons falling under each of the following subparagraphs are excluded. a. Persons using liquefied petroleum gas for automotive fuel, container-type gas heaters, portable butane burners, portable propane burners, industrial use, or marine use B. Persons who use liquefied petroleum gas while on the move 12. “Supply facilities” refers to facilities for supplying liquefied petroleum gas to container gas consumers, as specified in each of the following items. a. In cases where liquefied petroleum gas is supplied by a method of selling it by volume (hereinafter referred to as the “volume-based sales method”), the equipment from the container to the gas meter outlet b. In cases where liquefied petroleum gas is supplied by a method of selling it by weight (hereinafter referred to as the “weight-based sales method”), containers 13. “Consumption facilities” refers to facilities for container gas consumers to use liquefied petroleum gas, as specified in each of the following items. a. In the case of supplying liquefied petroleum gas by the volumetric sales method, the equipment from the gas meter outlet to the combustion device B. In the case of supplying liquefied petroleum gas by weight method, the equipment from the container outlet to the combustor 14. “Non-combustible material” means non-combustible material pursuant to Article 2, Item 10 of the Enforcement Decree of the Building Act . 15. “Protective wall” means a wall made of reinforced concrete with a height of 2 meters or more and a thickness of 12 centimeters or more, or a wall having a strength of the same level or higher. 16. “Protection facility” means Class 1 protection facilities and Class 2 protection facilities as specified in Annex 1 . 17. “Public use facility” means a facility that is entered and used by many people, as specified in Appendix 2 . 18. “Storage capacity” means the amount of liquefied petroleum gas that can be stored in a storage facility, calculated according to the storage capacity calculation criteria in Table 4 [in the case of a container , it refers to the maximum allowable filling amount of the Korean Industrial Standard (KS B 6211) pursuant to the Industrial Standardization Act ]. 19. The meanings of terms used in the liquefied petroleum gas pipeline network supply business are as follows, and for terms not specified in this subparagraph, the meanings of terms used in this rule shall apply. a. “Gas supply facility” refers to a facility for manufacturing or supplying liquefied petroleum gas, and includes the following facilities. 1) Gas manufacturing facilities: Liquefied petroleum gas storage facilities, unloading facilities, vaporization facilities, and their auxiliary facilities 2) Gas piping facilities: Piping and ancillary equipment extending from the boundary of the manufacturing plant to the boundary of the land owned or occupied by the gas user [in the case of multi-unit dwellings, officetels, condominiums, or other buildings designated by the Minister of Trade, Industry and Resources as necessary for safety management (hereinafter referred to as “multi-unit dwellings, etc.”) where the gas user separately owns or occupies a building and the meter is installed on the outer wall, this refers to the valve upstream of the meter; if the meter is installed inside the building, this refers to the outer wall of the building]. B. “Manufacturing facility” refers to a place where approval has been obtained for a construction plan for a gas supply facility pursuant to Article 34-2 of the “Safety Control and Business of Liquefied Petroleum Gas Act” (hereinafter referred to as the “Act”) . c. “Pipeline” means a pipe arranged to supply liquefied petroleum gas, including a main pipe, supply pipe, internal pipe, or other pipe. D. “Main pipe” refers to the piping extending from the boundary of the manufacturing plant to the pressure regulator. However, piping within the manufacturing plant is excluded. E. “Supply pipe” refers to any of the following: 1) In the case of supplying liquefied petroleum gas to multi-unit dwellings, etc., the piping extending from the boundary of the manufacturing facility (referring to the pressure regulator if it is installed outside the manufacturing facility) to the upstream valve of the meter installed on the outer wall of the building separately owned or occupied by the gas user (referring to the outer wall of the building if the meter is installed inside the building). 2) In cases where liquefied petroleum gas is supplied to buildings, etc., other than multi-unit dwellings, etc., the pipeline extending from the boundary of the manufacturing facility (or the pressure regulator if it is installed outside the manufacturing facility) to the boundary of the land owned or occupied by the gas user. f. “User supply pipe” refers to the piping among the supply pipes under subparagraph 1) extending from the boundary of the land owned or occupied by the gas user to the upstream valve of the meter installed on the outer wall of a building separately owned or occupied by the gas user (if the meter is installed inside the building, it refers to the outer wall of that building). d. “Internal pipe” refers to the piping extending from the boundary of the land owned or occupied by the gas user (in the case of multi-unit dwellings, etc., where the meter is installed on the outer wall of a building separately owned or occupied by the gas user, it refers to the valve upstream of the meter; in the case where the meter is installed inside the building, it refers to the outer wall of the building) to the combustion appliance. A. “Gas usage facilities” refers to facilities of gas users other than gas supply facilities, and includes the following facilities. 1) Inner tubes, combustion devices, and their auxiliary equipment 2) Gas meter installed on the exterior wall of multi-unit housing, etc. 20. “General collective supply facility” means piping and other supply facilities from a storage facility to the outer wall of a building owned or occupied by a gas user (in cases where a gas meter is installed on the outer wall, it refers to the valve upstream of the meter). ② In Article 2 , subparagraph 8 of the Act and Article 3, Paragraph 1, Subparagraph 4, Item (b ) 2) of the Enforcement Decree, “those that meet the standards prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to tanks with a storage capacity of 10 tons or less. <Amended Mar. 18, 2020; Oct. 1, 2025> ③ In Article 2 , subparagraph 8 of the Act and Article 3, Paragraph 1, Subparagraph 4, Item ( b ) 2) of the Enforcement Decree, the term “storage facilities of a scale or smaller than that prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to small storage tanks and storage tanks with a storage capacity of 10 tons or less, respectively. <Amended Mar. 18, 2020; Oct. 1, 2025> ④ In Article 2 , subparagraph 10 of the Act , and Article 5 , Paragraph 1 , subparagraph 3 , and Paragraphs 2 and 3 of the Enforcement Decree, the term “tank fixed to a vehicle prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a tank fixed to a vehicle equipped with a pump or compressor for supplying liquefied petroleum gas to a small storage tank (hereinafter referred to as a “bulk lorry”), and in Article 5 , Paragraph 2 of the Enforcement Decree, the term “small storage tank prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the small storage tank specified in Paragraph 1, subparagraph 4. <Amended Oct. 1, 2025> ⑤ In Article 2 , subparagraph 10 of the Act and Article 5, paragraphs 2 and 3 of the Enforcement Decree, the term “liquefied petroleum gas filling business operator or liquefied petroleum gas sales business operator prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a liquefied petroleum gas filling business operator or a liquefied petroleum gas sales business operator falling under each of the following subparagraphs. <Amended Oct. 1, 2025> 1. An liquefied petroleum gas (LPG) filling business operator falling under Article 3, Paragraph 1, Subparagraph 1, Item (a) or (e ) of the Enforcement Decree, who has secured an LPG filling business office licensed for bulk tankers in the name of the representative (in the case of a corporation, the name of the corporation). 2. An liquefied petroleum gas sales business operator falling under Article 3, Paragraph 1, Subparagraph 4, Item B of the Enforcement Decree , who has secured an liquefied petroleum gas sales office licensed for bulk tankers in the name of the representative (in the case of a corporation, the name of the corporation). ⑥ In Article 2, Subparagraph 14 of the Act , the term “certain amount prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the amounts specified in each of the following subparagraphs. <Amended July 11, 2017; October 1, 2025> 1. In the case of liquefied petroleum gas filled into a container with a capacity of less than 1 liter, 500 kilograms. However, among containers with a capacity of less than 1 liter, in the case of a portable butane burner container and a portable propane burner welding container equipped with a safety valve, it shall be 1 ton. 2. In the case of storage facilities other than those in Item 1 (excluding storage facilities in multi-unit housing with a management entity), a storage capacity of 5 tons Chapter 2 Liquefied Petroleum Gas Business, etc. Article 3 (Application for Permission and Registration of Liquefied Petroleum Gas Filling Business, etc.) ① Any person who intends to obtain a permit for a liquefied petroleum gas filling business, a liquefied petroleum gas collective supply business, a liquefied petroleum gas sales business, and the installation of a liquefied petroleum gas storage facility pursuant to Article 5 , Paragraphs 1 and 2 and Article 8, Paragraph 1 of the Act shall submit the following documents attached to the application for a permit for a liquefied petroleum gas filling business (collective supply business, sales business, and storage facility installation) in the form of Annex No. 1 (including applications submitted as electronic documents; hereinafter the same applies to all forms) to the Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, a County Head, or a District Head (the District Head refers to the head of a self-governing district; hereinafter referred to as “Mayor, County Head, or District Head”). <Amended Mar. 18, 2020> 1. Business Plan 2. Technical review report by the Korea Gas Safety Corporation (hereinafter referred to as the “Korea Gas Safety Corporation”) pursuant to Article 28 of the “High-Pressure Gas Safety Management Act” (excluding cases of liquefied petroleum gas pipeline network supply business permits) 3. In the case of a permit for a collective liquefied petroleum gas supply business, documents proving ownership or rights regarding the use and management of supply facilities pursuant to Article 6 , Paragraph 1, Subparagraph 5 of the Act or pipeline network supply facilities pursuant to Article 6, Paragraph 2, Subparagraph 4 of the Act ② Any person who intends to register a liquefied petroleum gas consignment transportation business pursuant to Article 9, Paragraph 1 of the Act shall submit to the Mayor, County Governor, or District Head an application for registration of a liquefied petroleum gas consignment transportation business in the form of Annex 2 , attaching the documents listed in each of the following subparagraphs. 1. Business Plan 2. Copy of General Cargo Trucking Business Permit 3. Copy of High-Pressure Gas Carrier Registration Certificate pursuant to the High-Pressure Gas Safety Management Act 4. Documents proving that all bulk tankers used for the liquefied petroleum gas consignment transportation business have been secured in the name of the representative (or the corporate name in the case of a corporation). ③ The mayor, county governor, or district head who receives an application pursuant to Paragraphs 1 and 2 shall verify the certificate of corporate registration (only applicable to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. ④ In Article 3, Paragraph 1, Subparagraph 1 , Items (a ) , (e) , and (f) of the Enforcement Decree, “tank prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” or “storage tank prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to storage tanks, mound-type storage tanks, and small storage tanks, respectively. <Amended Oct. 1, 2025> Article 4 (Application for Permission and Registration of Gas Appliance Manufacturing Business, etc.) ①person who intends to obtain a permit for a gas appliance manufacturing business pursuant to Article 5, Paragraph 1 of the Act shall submit to the Mayor, County Governor, or District Head an application for a permit for a gas appliance manufacturing business in the form of Annex 3, attaching the documents listed in each of the following subparagraphs. 1. Business Plan 2. Technical Review by the Korea Gas Safety Corporation ② Any person who intends to register the manufacture of foreign gas appliances pursuant to Article 10, Paragraph 1 of the Act or to re-register them pursuant to Article 10, Paragraph 3 of the Act shall submit to the Minister of Trade, Industry and Resources the Application for Registration (Re-registration) of the Manufacture of Foreign Gas Appliances in the Form of Annex 4, attaching the documents specified in each of the following subparagraphs. However, in the case of an application for re-registration, if there are no changes to the previously registered matters, the documents specified in subparagraphs 1 and 2 may be omitted. <Amended Oct. 1, 2025> 1. Business Plan 2. Technical Review by the Korea Gas Safety Corporation 3. Korea Gas Safety Agency Factory Inspection Report ③ The mayor, county governor, or district head who receives an application pursuant to Paragraph 1 shall verify the certificate of corporate registration (only applicable to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . ④ In Article 3, Paragraph 1, Subparagraph 2 of the Enforcement Decree and the main text of Article 6, Paragraph 2 of the Enforcement Decree , the term “gas appliances prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to those specified in Annex 3 , respectively . <Amended Oct. 1, 2025> Article 5 (Exclusions from Permit Requirement for Liquefied Petroleum Gas Collective Supply Business) The phrase “cases prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in the proviso to the part other than each item of Article 3 , Paragraph 1, Subparagraph 3 of the Enforcement Decree refers to any of the following cases: <Amended Oct. 1, 2025> 1. Cases where supply is provided to a multi-unit housing complex that the Mayor, County Governor, or District Head recognizes as difficult to supply through a collective supply project 2. Cases where an employer directly supplies employee housing, dormitories, etc. for the welfare of employees 3. Cases where the management entity of a self-managed multi-unit housing complex directly supplies to residents, etc. 4. Cases where a resort condominium business operator under the Tourism Promotion Act supplies directly to users through said facilities Article 6 (Permit Required for General Group Supply Business of Liquefied Petroleum Gas) In Article 3, Paragraph 1, Subparagraph 3, Item ( b ) 2) of the Enforcement Decree, the term “consumer prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a consumer who meets all of the requirements of each of the following subparagraphs. <Amended Mar. 18, 2020; Oct. 1, 2025> 1. Install a joint liquefied petroleum gas storage facility with a storage capacity exceeding 1 ton but less than 5 tons. 2. To receive liquefied petroleum gas from the joint storage facility referred to in Subparagraph 1 through a road (excluding roads within a multi-unit housing complex) or a pipeline buried on another person's land. [Title amended Mar. 18, 2020] Article 7 (Matters Requiring Permission for Change, Registration for Change, and Notification of Change) ①Matters requiring permission for change pursuant to the main clause of Article 5 , Paragraph 3 of the Act and the main clause of Article 8, Paragraph 2 of the Act shall be as follows: <Amended Dec. 30, 2015; Jul. 11, 2017; Mar. 18, 2020; Dec. 16, 2021; Oct. 1, 2025> 1. Relocation of business office 2. Expansion or reduction of the business site [Applicable only to liquefied petroleum gas filling business operators, liquefied petroleum gas general collective supply business operators pursuant to Article 3, Paragraph 1, Subparagraph 3, Item B, 1) of the Enforcement Decree, and liquefied petroleum gas storage operators] 3. Installation, abolition, or change in gross floor area of buildings or facilities corresponding to Item 5)b), c), f), g) and j) through m) of Subparagraph 2, Item (a) of Annex 4 4. In cases where gas is to be supplied to consumers outside the licensed business premises using storage facilities within the licensed business premises [applicable only to general collective supply facilities for liquefied petroleum gas pursuant to Article 3, Paragraph 1, Subparagraph 3, Item (b) 1) of the Enforcement Decree] 5. Change of location of pressure vessels, filling equipment, vaporizers, or loading arms among storage facilities or gas facilities ( excluding cases corresponding to minor changes of location determined and notified by the Minister of Trade, Industry and Resources) 6. Replacement and installation of storage facilities (excluding storage facilities of sales facilities and business offices) 7. Increase in the capacity of storage facilities. Provided, however, that the following cases are excluded. a. Cases where the storage facilities of sales establishments and business offices increase only in capacity without an increase in quantity B. Cases where capacity temporarily increases due to the installation of temporary storage facilities while re-inspecting or replacing storage tanks at facilities classified according to the following categories 1) Liquefied petroleum gas filling facilities, liquefied petroleum gas pipeline supply facilities, and liquefied petroleum gas general collective supply facilities (limited to cases where storage tanks are located underground) 2) Liquefied Petroleum Gas Storage Facilities 8. Increase in the quantity of pressure vessels, filling equipment, loading arms, or automatic gas injectors for automobiles among gas facilities (applicable only to liquefied petroleum gas filling business operators) 9. Increase in the quantity of vaporization devices (applicable only to general collective supply business operators and liquefied petroleum gas storage operators) 10. Increase in the quantity of bulk tankers (applicable only to liquefied petroleum gas filling business operators and liquefied petroleum gas sales business operators) 11. Addition or change of business under each item of Article 3, Paragraph 1, Subparagraph 1 of the Enforcement Decree (applicable only to liquefied petroleum gas filling business operators) 12. Change from the business under Article 3, Paragraph 1, Subparagraph 4, Item ( a) of the Enforcement Decree to the business under Subparagraph (b) of the same subparagraph (applicable only to liquefied petroleum gas sales business operators) 13. Change in type or specifications of gas appliances (applicable only to gas appliance manufacturers) 14. Any change falling under any of the following items (applicable only to liquefied petroleum gas pipeline network supply business operators). However, changes resulting from the installation of mobile supply facilities (hereinafter referred to as “emergency supply facilities”) to supply liquefied petroleum gas by temporarily connecting to gas supply facilities damaged by natural disasters or accidents shall be excluded, provided that if emergency supply facilities are installed, the mayor, county governor, or district head must be notified. A. Change of supply area B. Change of manufacturing plant location c. Change of one-tenth or more of the combined length of the main pipe and supply pipes (excluding user supply pipes) ② The matters requiring a report of change pursuant to the proviso to Article 5, Paragraph 3 and the proviso to Article 8, Paragraph 2 of the Act are as follows, respectively. Provided, however, that only Subparagraphs 1 and 2 apply to liquefied petroleum gas pipeline network supply business operators. <Amended Dec. 30, 2015; Jul. 11, 2017; Dec. 3, 2018; Mar. 18, 2020> 1. Change of company name 2. Change of representative (applicable only to corporations excluding the State, local governments, and public institutions under Article 4, Paragraph 1 of the Act on the Operation of Public Institutions ) 3. Reduction in the capacity of storage facilities (in the case of storage tanks or small storage tanks, this applies only when the quantity is reduced) 4. Installation or increase in capacity of storage facilities in sales facilities and business offices corresponding to any of the following 1) through 3) (only applicable if there is no increase in quantity) 1) Complete replacement of two or more of the four walls of the container storage room 2) Replacement of 50 percent or more of the total wall area of the container storage room 3) Modification of the foundation of the protective wall of the container storage room 5. Reduction in the quantity of pressure vessels, filling equipment, vaporizers, loading arms, or automatic gas injectors for automobiles among gas facilities 6. Replacement of bulk tankers or reduction in quantity (applicable only to liquefied petroleum gas filling business operators and liquefied petroleum gas sales business operators) 7. Expansion or reduction of the business site pursuant to Paragraph 1, Subparagraph 2 of this Article and alteration of buildings or facilities pursuant to Subparagraph 3 of the same Paragraph occurring prior to the completion inspection pursuant to Article 36, Paragraph 2 of the Act ( excluding alterations within the allowable margin of error pursuant to Article 26 of the Building Act ) 8. Expansion or reduction of the business office site [Applicable only to general collective liquefied petroleum gas supply business operators pursuant to Article 3, Paragraph 1, Subparagraph 3, Item (b) 2) of the Enforcement Decree] 9. Increase in the quantity of pressure vessels, pumps, compressors, or loading arms among gas facilities (applicable only to general collective supply business operators and liquefied petroleum gas storage operators) 10. Change from the business under Article 3, Paragraph 1, Subparagraph 4, Item (b) of the Enforcement Decree to the business under Subparagraph (a) of the same subparagraph (applicable only to liquefied petroleum gas sales business operators) ③ The matters requiring change registration pursuant to the main text of Article 9, Paragraph 2 of the Act are as follows: 1. Change of business office location 2. Increase in the quantity of bulk tankers ④ Matters requiring change registration pursuant to the main text of Article 10, Paragraph 2 of the Act are as follows: 1. Change of business office location 2. Changing the type of gas appliance 3. Change in manufacturing specifications of gas appliances ⑤ The matters requiring a change report pursuant to the proviso to Article 9, Paragraph 2 of the Act and the proviso to Article 10, Paragraph 2 of the Act are as follows: 1. Change of company name 2. Change of Representative (Applicable only to corporations for liquefied petroleum gas consignment transport business operators) 3. Replacement of bulk tankers or reduction in quantity (applicable only to liquefied petroleum gas consignment transport operators) Article 8 ( Applications for Permission, Registration, and Notification of Change of Liquefied Petroleum Gas Filling Business, etc.) ①Any person who intends to obtain a permission for change of a liquefied petroleum gas filling business, a collective supply business, a sales business, or the installation of a liquefied petroleum gas storage facility pursuant to the main clause of Article 5 , Paragraph 3 of the Act and the main clause of Article 8, Paragraph 2 of the Act shall submit to the Mayor, County Governor, or District Head the application for permission for change of liquefied petroleum gas filling business (collective supply business, sales business, storage facility installation) in the form of Annex 5, attaching the documents specified in each of the following subparagraphs. <Amended Mar. 18, 2020> 1. Documents proving the changes 2. Technical review report by the Korea Gas Safety Corporation ( excluding cases under Article 7, Paragraph 1 , Subparagraphs 2, 3, and 14) 3. Drawings and descriptions of facility and technical standards for the parts being changed ( applicable only to Article 7 , Paragraph 1 , Subparagraphs 2, 3, and 14) ② Any person who intends to report a change to an liquefied petroleum gas (LPG) filling business, LPG collective supply business, LPG sales business, or LPG storage facility installation pursuant to the proviso to Article 5, Paragraph 3 and the proviso to Article 8, Paragraph 2 of the Act shall submit the Report on Change of LPG Filling Business ( Collective Supply Business , Sales Business, Storage Facility Installation) in Form No. 6 of the Appendix ( in cases where a report on change of trade name is to be made together with a report on succession of status pursuant to Article 12, Paragraph 3 of the Act , it refers to the Report on Succession of Status of LPG Business Operator, etc. in Form No. 19 of the Appendix) to the Mayor, County Governor, or District Head by the time specified in each of the following subparagraphs. <Amended Dec. 30, 2015; July 11, 2017; Dec. 16, 2021> 1. Cases falling under Article 7, Paragraph 2, Subparagraphs 1 through 6 , 8, and 9: Within 30 days from the date the reported changes are completed. 2. Cases falling under Article 7, Paragraph 2, Subparagraph 7 : Before receiving the completion inspection pursuant to Article 36, Paragraph 2 of the Act 3. Cases falling under Article 7, Paragraph 2, Item 10 : Before transferring or destroying the bulk tanker ③ Any person who intends to register a change regarding the consignment transportation business of liquefied petroleum gas pursuant to the main text of Article 9, Paragraph 2 of the Act shall submit to the Mayor, County Governor, or District Head, attaching the documents in each of the following subparagraphs to the application for registration of a change in the consignment transportation business of liquefied petroleum gas in Form No. 2 attached hereto, before conducting the consignment transportation business of liquefied petroleum gas at a business office with a changed location or with a bulk tanker with an increased quantity pursuant to Article 7, Paragraph 3 . 1. Documents proving the changes 2. Documents proving that the bulk tanker has been secured in the name of the representative (in the case of a corporation, the name of the corporation) (applicable only when the quantity of bulk tankers increases) ④ The report of change pursuant to Paragraph 2 shall be accompanied by the documents specified in each of the following subparagraphs. <Amended Dec. 30, 2015> 1. Documents proving the changes 2. A copy of the certificate of registration of a high-pressure gas carrier pursuant to Article 6, Paragraph 1, Subparagraph 4 of the Enforcement Rules of the High-Pressure Gas Safety Management Act ( applicable only to the replacement of a bulk tanker pursuant to Article 7, Paragraph 2, Subparagraph 6 ) 3. Documents proving that the bulk tanker has been secured in the name of the representative (in the case of a corporation, the name of the corporation) ( applicable only to the replacement of a bulk tanker pursuant to Article 7, Paragraph 2, Subparagraph 6 ) 4. Drawings and descriptions of facility and technical standards for the parts being changed ( applicable only to cases of expansion or reduction of the business office site or changes to buildings or facilities pursuant to Article 7, Paragraph 2 , Subparagraphs 7 and 8) ⑤ Any person who intends to report a change in the liquefied petroleum gas consignment transportation business pursuant to the proviso of Article 9, Paragraph 2 of the Act shall submit to the Mayor, County Governor, or District Head, within 30 days from the date the matters to be reported for change are completed, the liquefied petroleum gas consignment transportation business report form (Form No. 7) with the following documents attached. 1. Documents proving the changes 2. A copy of the certificate of registration of a high-pressure gas carrier pursuant to Article 6, Paragraph 1, Subparagraph 4 of the Enforcement Rules of the High-Pressure Gas Safety Management Act ( applicable only to the replacement of a bulk tanker pursuant to Article 7, Paragraph 5, Subparagraph 3 ) 3. Documents proving that the bulk tanker has been secured in the name of the representative (in the case of a corporation, the name of the corporation) ( applicable only to the replacement of a bulk tanker pursuant to Article 7, Paragraph 5, Subparagraph 3 ) ⑥ The mayor, county governor, or district head who receives an application pursuant to paragraphs 2, 4, and 5 shall verify whether the representative falls under the grounds for disqualification pursuant to Article 7 of the Act in the case of a change of representative. Article 9 (Application for Change Permit, Change Registration, and Change Notification of Gas Appliance Manufacturing Business, etc.) ①person who intends to obtain a change permit for a gas appliance manufacturing business pursuant to the main text of Article 5, Paragraph 3 of the Act shall submit to the Mayor, County Governor, or District Head anapplication for a change permit for a gas appliance manufacturing business in the form of Annex 3 , attaching the documents specified in each subparagraph of Article 8, Paragraph 1 . ② Any person who intends to report a change in the gas appliance manufacturing business pursuant to the proviso of Article 5, Paragraph 3 of the Act shall submit a report on the change in the gas appliance manufacturing business in Form No. 8 of the attached document, along with documents proving the details of the change, to the mayor, county governor, or district head within 30 days from the date the matters to be reported for change are completed. ③ Any person who intends to register a change of registration for the manufacture of foreign gas appliances pursuant to the main text of Article 10, Paragraph 2 of the Act shall submit to the Minister of Trade, Industry and Resources the Application for Registration of Change of Manufacturing of Foreign Gas Appliances in the Form of Annex 4 , attaching the documents specified in each subparagraph of Article 4, Paragraph 2. <Amended Oct. 1, 2025> ④ Any person who intends to report a change in the registration of manufacture of foreign gas appliances pursuant to the proviso to Article 10, Paragraph 2 of the Act shall submit to the Minister of Trade, Industry and Resources within 30 days from the date on which the matters to be reported as changed are completed, attaching documents proving the details of the change to the Report on Change in Registration of Manufacturer of Foreign Gas Appliances in Annex 9. <Amended Oct. 1, 2025> ⑤ The mayor, county governor, or district head who receives a report pursuant to Paragraph 2 shall verify whether the representative falls under the grounds for disqualification pursuant to Article 7 of the Act in the case of a change of representative. Article 10 (Permit, etc.) ①When a mayor, county governor, or district head (hereinafter referred to as the “licensing authority”) pursuant to Article 5 , Paragraphs 1 and 2 and Article 8 , Paragraph 1 of the Act grants a permit for a liquefied petroleum gas filling business, a gas appliance manufacturing business, a liquefied petroleum gas collective supply business, a liquefied petroleum gas sales business, or the installation of a liquefied petroleum gas storage facility pursuant to Article 5 , Paragraphs 1 and 2 or Article 8 , Paragraph 1 of the Act , they shall issue a permit in the form of Annex 10 to the applicant ② The Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head (hereinafter referred to as the “Registration Authority”) pursuant to Article 9, Paragraph 1 and Article 10, Paragraphs 1 and 3 of the Act shall issue a certificate of registration specified in each of the following subparagraphs when registration has been made pursuant to Article 9 , Paragraph 1 or Article 10 , Paragraphs 1 and 3 of the Act . <Amended Oct. 1, 2025> 1. Manufacturing registration or re-registration of foreign gas appliances: Certificate of Manufacturing Registration of Foreign Gas Appliances (Form No. 11) 2. Registration of Liquefied Petroleum Gas Consignment Transport Business Operator: Certificate of Registration of Liquefied Petroleum Gas Consignment Transport Business Operator ( Form No. 12) ③ In cases where a permit or registration authority has granted a permit for change, registered a change, or reported a change pursuant to Article 5, Paragraph 3 , Article 8 , Paragraph 2 , Article 9 , Paragraph 2 , and Article 10, Paragraph 2 of the Act , it shall write the details of the permit for change, registered a change, or reported a change on the back of the permit or registration certificate issued pursuant to Paragraph 1 or 2 and issue it to the applicant. ④ If a permit or certificate of registration issued pursuant to Paragraph 1 or 2 is lost or damaged beyond repair and is to be reissued, an application for reissuance in accordance with the classifications in each of the following subparagraphs must be submitted to the licensing authority or the registration authority. In this case, if the permit or certificate of registration is to be reissued because it has been damaged beyond repair, the said permit or certificate of registration must be attached. <Newly added Dec. 3, 2018> 1. Application for reissuance of permit pursuant to Paragraph 1: Form No. 10-2 2. Application for reissuance of registration certificate pursuant to Paragraph 2, Subparagraph 1: Form No. 11-2 3. Application for reissuance of registration certificate pursuant to Paragraph 2, Subparagraph 2: Form No. 12-2 ⑤ When the licensing authority or the registration authority receives an application for the reissuance of a license or a certificate of registration pursuant to Paragraph 4, it shall reissue the license or certificate of registration to the applicant without delay. <Newly added Dec. 3, 2018> Article 11 (Matters to be Confirmed by the Licensing Authority, etc.) ① An liquefied petroleum gas filling business operator, a general collective supply business operator, and an liquefied petroleum gas storage business operator who have obtained a permit for change pursuant to Article 7 , Paragraph 1, Subparagraph 2 shall submit boundary survey results and current status survey results to the licensing authority within 30 days from the date on which the expansion or reduction of the business site is completed. However, if it is possible to confirm whether the distance from the storage facilities, etc., to the boundary of the business site pursuant to Annex 4, Subparagraph 1, Item (a) 1) and Annex 5 , Subparagraph 1, Item (a) 1) has been secured solely through the current status survey results due to reasons such as obtaining a permit for change after the completion inspection, only the current status survey results may be submitted. <Amended Mar. 18, 2020> ② Notwithstanding Paragraph 1, if the storage facility is subject only to the distance to the protection facility in accordance with the facility standards under Article 12, the boundary survey results or the current status survey results may not be submitted. ③ The licensing authority that receives the boundary survey results and current status survey results pursuant to Paragraph 1 shall verify whether the distance from the storage facilities, etc. to the boundary of the business office is secured in accordance with Annex 4 Item 1 Subparagraph (a) 1) and Annex 5 Item 1 Subparagraph (a) 1). ④ The licensing authority shall notify the Korea Gas Safety Corporation of the details of the permit, the details of the permit for change, and the details of the report of change pursuant to Articles 5 and 8 of the Act , as well as copies of the boundary survey results, etc. pursuant to Paragraph 1. Article 12 (Facility and Technical Standards for Filling, etc. of Liquefied Petroleum Gas) ① The facility and technical standards for liquefied petroleum gas filling, collective supply of liquefied petroleum gas, sale of liquefied petroleum gas, manufacture of gas appliances, liquefied petroleum gas storage facilities, and manufacture of foreign gas appliances pursuant to Article 5 , Paragraph 5 , Article 8, Paragraph 4 , and Article 10 , Paragraph 7 of the Act shall be as follows: <Amended Mar. 18, 2020; May 27, 2022> 1. Facility and Technical Standards for Liquefied Petroleum Gas Filling: Appendix 4 1-2. Facility and Technical Standards for Liquefied Petroleum Gas Pipeline Supply: Appendix 4-2 2. Facility and Technical Standards for General Collective Supply and Storage of Liquefied Petroleum Gas: Appendix 5 3. Facility and Technical Standards for the Sale of Liquefied Petroleum Gas: Appendix 6 4. Facility and Technical Standards for the Manufacture of Gas Appliances: Appendix 7 5. Facility and Technical Standards for the Manufacture of Foreign Gas Appliances: Appendix 7 ② The facility standards for liquefied petroleum gas sales facilities installed under the previous regulations as of March 11, 1996, the effective date of the Enforcement Decree of the Act on Safety and Business Management of Liquefied Petroleum Gas ( Ministry of Trade, Industry and Energy Decree No. 34), shall be in accordance with the standards set forth in Table 6 . Article 13 (Facility Standards and Permits, etc. for Business Offices) ① The requirements for liquefied petroleum gas filling business operators who may establish business offices pursuant to the latter part of Article 5, Paragraph 6 of the Act , and the standards for facilities, etc., of business offices are as follows: <Amended May 27, 2022> 1. Equip facilities that comply with Item 1, Subparagraph (a), 3)e) and (f) of Attached Table 4 . 2. Equip a container storage facility that meets the facility and technical standards specified in Item 2 of Attached Table 6 . ② If a liquefied petroleum gas (LPG) filling business operator intends to obtain a permit for the installation of a business office pursuant to Article 5 , Paragraph 7 of the Act , they shall submit an application for a permit for the installation of an LPG filling business office ( Form No. 13) to the Mayor, County Governor, or District Head, attaching the documents pursuant to Article 3 , Paragraph 1 , Subparagraphs 1 and 2. In this case , Article 3, Paragraph 3 shall apply mutatis mutandis to the verification or submission of a certificate of corporate registration . <Amended May 27, 2022> ③ When a Mayor, County Governor, or District Head has granted permission for the installation of a business establishment pursuant to Article 5, Paragraph 7 of the Act , they shall issue to the applicant a Permit for the Installation of a Liquefied Petroleum Gas Filling Business Establishment in the form of Annex 14. <Amended May 27, 2022> ④ If a person who has obtained permission to install a business office intends to obtain permission to change the installation pursuant to the main text of Article 5 , Paragraph 3 of the Act , they must submit to the Mayor, County Governor, or District Head an application for permission to change the installation of a liquefied petroleum gas filling business office in Form No. 13 of the Appendix , attaching the documents pursuant to Article 8, Paragraph 1 , Subparagraphs 1 and 2. ⑤ If a person who has obtained permission to install a business office intends to report a change pursuant to the proviso of Article 5, Paragraph 3 of the Act , they must submit a report on the change of installation of a liquefied petroleum gas filling business office in Form No. 15 to the mayor, county governor, or district head within 30 days from the date the matters to be reported for change are completed, attaching documents proving the details of the change. ⑥ When a mayor, county governor, or district head has granted permission for the installation or change of a business establishment pursuant to paragraphs 4 and 5, or has received a report of change, they shall write the details of the permission for change or the report of change on the permit for the installation of a liquefied petroleum gas filling business establishment in the form of Annex 14 and issue it to the applicant. ⑦ If a permit issued pursuant to Paragraph 3 is lost or damaged beyond repair and a reissuance is desired, an application for reissuance in the form of Annex 14-2 must be submitted to the Mayor, County Governor, or District Head. In this case, if the permit is being reissued due to damage, the original permit must be attached. <Newly added Dec. 3, 2018> ⑧ When a Mayor, County Governor, or District Head receives an application for the reissuance of a permit pursuant to Paragraph 7, they shall reissue the permit to the applicant without delay. <Newly added Dec. 3, 2018> Article 14 (Supervision of Liquefied Petroleum Gas Sales Business Operators) ① Pursuant to Article 5, Paragraph 9 of the Act , the Mayor, County Governor, or District Head shall supervise the matters set forth in each of the following subparagraphs with respect to liquefied petroleum gas sales business operators who sell liquefied petroleum gas to general consumers within their jurisdictional areas. <Amended May 27, 2022> 1. Compliance with the sales territory pursuant to Article 5, Paragraph 2 of the Act 2. Compliance with sales methods pursuant to Article 24 of the Act 3. Compliance with the supplier's obligations under Article 30 of the Act 4. Compliance with transportation standards pursuant to Article 22, Paragraph 1 of the High-Pressure Gas Safety Management Act 5. Other matters concerning the safety management of liquefied petroleum gas pursuant to this Act ② The mayor, county governor, or district head shall order a liquefied petroleum gas sales business operator who has violated any of the subparagraphs of Paragraph 1 to correct the violation, and if the sales business operator is a person who has obtained permission from another mayor, county governor, or district head, the mayor, county governor, or district head shall notify the licensing authority of the violation. ③ The licensing authority that has been notified of a violation pursuant to Paragraph 2 shall verify the violation, take action in accordance with the violation, and notify the competent authority that notified the violation of the result of such action. Article 15 (Application for Technical Review, etc.) ① Any person who wishes to receive a technical review pursuant to Article 6 , Paragraph 1 , Subparagraph 4 of the Act, Article 4 , Paragraph 1 , Subparagraph 4 of the Enforcement Decree, Article 6, Paragraph 1, Subparagraph 2 of the Enforcement Decree, and Article 51, Paragraph 3, Subparagraph 1 of these Rules shall submit to the Korea Gas Safety Corporation an application for technical review in the form of Annex 16 , attaching the documents listed in each of the following subparagraphs. 1. Installation plan for the facility (in cases where permit or registered matters are to be changed, or where modification work is to be carried out pursuant to each item of Article 51, Paragraph 2, Subparagraph 2, it refers only to the modified part) 2. Drawings and descriptions regarding facility standards and technical standards (in cases where permitted or registered matters are to be changed, or where modification work is to be carried out pursuant to each item of Article 51 , Paragraph 2, Subparagraph 2 , this refers only to the modified part) 3. In the case of a gas appliance manufacturer or a registered manufacturer of foreign gas appliances, the gas appliance manufacturing process (if intending to change licensed or registered matters, only the changed part) ② Any person who intends to undergo a factory inspection pursuant to Article 6, Paragraph 1, Subparagraph 2 of the Enforcement Decree shall submit to the Korea Gas Safety Corporation an application for factory inspection of foreign gas appliances in Form No. 17 of the Appendix, attaching the documents specified in each subparagraph of Paragraph 1. Article 16 (Supply Facilities for Liquefied Petroleum Gas Collective Supply Business) In Article 6, Paragraph 1, Subparagraph 5, Item (a) of the Act , the term “supply facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to storage facilities. <Amended Oct. 1, 2025> Article 16-2 (Detailed Standards for Permission of Liquefied Petroleum Gas Pipeline Network Supply Business) The detailed standards for the permission of a liquefied petroleum gas pipeline network supply business pursuant to Article 6, Paragraph 4 of the Act are as follows. 1. The service area for supplying liquefied petroleum gas shall not overlap with the service area of other liquefied petroleum gas pipeline network suppliers. 2. A business plan shall be established to ensure that the equity ratio is at least 30 percent until the year of commencement of liquefied petroleum gas supply, and is continuously maintained at least 20 percent from the year following the commencement year, so that the liquefied petroleum gas pipeline network supply business can be properly carried out. 3. A business plan for the construction of storage facilities and pipeline networks must be established to ensure the stable supply of liquefied petroleum gas within the supply area. 4. The business plan must be suitable for receiving liquefied petroleum gas. [This Article Newly Inserted Mar. 18, 2020] Article 17 (Exemption from, etc., Registration of Manufacture of Foreign Gas Appliances) ① The term “gas appliances prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in the proviso to Article 6, Paragraph 2 of the Enforcement Decree refers to the gas appliances listed in each of the following subparagraphs. <Amended Oct. 1, 2025> 1. Gas appliances inspected by a foreign inspection agency recognized by the Minister of Trade, Industry and Resources in accordance with mutual recognition agreements between countries 2. Gas appliances imported for testing or research and development purposes 3. Gas appliances imported for export 4. Gas appliances imported for use by foreign institutions in Korea that have undergone inspection in the relevant foreign country 5. Gas appliances imported attached to industrial machinery and equipment, etc. 6. Gas appliances imported as samples by the manufacturer or importer of gas appliances 7. Other gas appliances that the Minister of Trade, Industry and Resources recognizes and notifies as difficult to register for manufacture under Article 10 of the Act ② In Article 10, Paragraph 3 of the Act , the term “period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” means three years. <Amended Oct. 1, 2025> ③ In Article 6 , Paragraph 1, Subparagraph 1 of the Enforcement Decree , “standards prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the standards in Annex 7. However, if foreign manufacturing-related facility standards and technical standards conform to the standards in Annex 7 , it refers to foreign standards. <Amended Oct. 1, 2025> Article 18 (Reporting of Commencement of Business, etc.) Pursuant to Article 11, Paragraph 1 of the Act , any person who intends to commence a business or the use of a storage facility, or to suspend, abolish, or resume such business or facility for a period of one month or longer, shall submit a report on commencement, suspension, abolition, or resumption in the form of Annex No. 18 to the licensing authority prior to the commencement, suspension, abolition, or resumption. In this case, if the business is to be abolished or the use of a storage facility is to be abolished, documents proving that the relevant liquefied petroleum gas has been disposed of must be attached. <Amended May 27, 2022; Oct 10, 2023> Article 19 (Reporting of Succession to Status of Business Operator, etc.) ① Any person who intends to succeed to the status of a liquefied petroleum gas business operator, etc. pursuant to Article 12 , Paragraphs 1 and 2 of the Act shall report the succession to the status of the liquefied petroleum gas business operator, etc. within 30 days from the date of transfer, merger, or acquisition. <Amended May 27, 2022> ② Any person who intends to file a report pursuant to Article 12, Paragraphs 1 through 3 of the Act shall submit the Report on Succession of Status of Liquefied Petroleum Gas Business Operator, etc. (Form No. 19) to the licensing authority or registration authority, attaching the documents specified in each of the following subparagraphs. <Amended May 27, 2022> 1. Permit or Registration 2. Documents proving the fact of succession, such as a copy of the contract or documents proving the sale of inherited, auctioned, liquidated, or seized property. ③ A Mayor, County Governor, or District Head who has received a report pursuant to Article 12, Paragraphs 1 through 3 of the Act shall verify the Certificate of Corporate Registration (in the case of a corporate merger, this applies only to the surviving corporation or the corporation newly established by the merger) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended May 27, 2022> Article 20 (Standards for Administrative Dispositions of Liquefied Petroleum Gas Business) The standards for administrative dispositions by violation pursuant to Article 13, Paragraph 1 of the Act are as set forth in Table 8 . Article 21 (Criteria for Imposing Surcharges) ① The amount of a surcharge pursuant to Article 14, Paragraph 1 of the Act shall be calculated according to the classifications in each of the following subparagraphs. However, for violations subject to the imposition of a surcharge for which a fine has already been imposed, the surcharge may be reduced by the amount of the fine imposed. 1. In the case of violations committed during the period from July 29, 2015 to December 31, 2018: Appendix 9 2. In the case of a violation committed on or after January 1, 2019: Appendix 10 ② The licensing authority or the registration authority may increase or decrease the amount of the administrative fine under Paragraph 1 within the range of one-fifth, taking into consideration the business operator's sales revenue, the degree and frequency of violations, etc. However, even in the case of increase, the total amount of the administrative fine shall not exceed 40 million won. Article 22 (Imposition and Payment of Surcharges) ① When a licensing authority or a registration authority imposes a surcharge pursuant to Article 14 , Paragraph 1 of the Act , it shall notify the payer in writing of the type of violation and the amount of the surcharge. ② A person who has received notice pursuant to Paragraph 1 shall pay the administrative surcharge to a receiving agency designated by the licensing authority or the registration authority within 20 days. <Amended Dec. 12, 2023> ③ The receiving agency that receives the penalty fee pursuant to Paragraph 2 shall issue a receipt to the payer. ④ The receiving agency of the penalty surcharge shall notify the licensing authority or the registration authority of the fact without delay upon receiving the penalty surcharge pursuant to Paragraph 2. ⑤ Deleted <December 12, 2023> Chapter 3 Liquefied Petroleum Gas Import and Export Business Article 23 (Application for Registration of Liquefied Petroleum Gas Import/Export Business) ①Any person who intends to register for the import/export business of liquefied petroleum gas pursuant to the main text of Article 17, Paragraph 1 of the Act shall submit to the Korea Petroleum Institute (hereinafter referred to as the “Korea Petroleum Institute”) pursuant to Article 25-2 of the Petroleum and Petroleum Substitute Fuels Business Act, 30 days prior to the scheduled date of the first import customs clearance of liquefied petroleum gas, an application for registration of the import/export business of liquefied petroleum gas in the form of Annex No. 20 (including an application in the form of an electronic document), with the following documents (including electronic documents) attached. 1. Business Plan 2. Import Agency Agreement (Attach only if acting as an agent for the import of liquefied petroleum gas) ② The Korea Petroleum Management Agency that receives an application pursuant to Paragraph 1 shall verify the certificate of corporate registration (only applicable to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . ③ The business plan referred to in Paragraph 1, Item 1 shall include the following items: 1. Current status data or construction and ownership plans for liquefied petroleum gas storage facilities (including location and storage capacity) 2. Liquefied petroleum gas supply and demand plan for the five years following the relevant year (including import, export, and sales plans) ④ The domestic sales volume of liquefied petroleum gas for the import and export business under Article 8 , Paragraph 3, Subparagraph 1 of the Enforcement Decree shall be the total import volume of liquefied petroleum gas brought into the country, after excluding the volumes specified in each of the following subparagraphs, and then adding or subtracting the volume of inventory changes. 1. Exported quantities (including cases where sold to organizations of the United Nations Forces in Korea or other foreign forces, cases where sold to vessels or aircraft traveling between Korea and foreign countries, and cases where exported to North Korea pursuant to the Act on Inter-Korean Exchange and Cooperation ) 2. Volume sold to other liquefied petroleum gas importers/exporters for the purpose of stockpiling the mandatory liquefied petroleum gas stockpile under Article 11 , Paragraph 1 of the Enforcement Decree (hereinafter referred to as the “mandatory liquefied petroleum gas stockpile”) ⑤ The Korea Petroleum Management Agency that receives an application pursuant to Paragraph 1 shall verify the contents of the application and notify the Minister of Trade, Industry and Resources of the results. <Amended Oct. 1, 2025> ⑥ Upon receiving the notice pursuant to Paragraph 5, the Minister of Trade, Industry and Resources shall, in the event that registration for the import and export business of liquefied petroleum gas has been completed , issue a Certificate of Registration for the Import and Export Business of Liquefied Petroleum Gas in the form of Annex 21 to the relevant applicant and notify the Korea Petroleum Management Agency of such fact. <Amended Oct. 1, 2025> ⑦ The Korea Petroleum Management Agency that has received the notice pursuant to Paragraph 6 shall record the fact in the liquefied petroleum gas import and export business registration ledger in the form of Annex 22 . Article 24 (Change Registration of Liquefied Petroleum Gas Import/Export Business) ①person who intends to change the registration of the liquefied petroleum gas import/export business pursuant to Article 17, Paragraph 2 of the Act shall submit to the Korea Petroleum Management Agency , within 30 days from the date on which the matters in each subparagraph of Article 7 of the Enforcement Decree are changed, an application for change registration of the liquefied petroleum gas import/export business in the form of Annex 23 , with documents proving the details of the change attached. ② The Korea Petroleum Management Agency that receives an application pursuant to Paragraph 1 shall verify the certificate of corporate registration (only applicable to the case of Article 7, Subparagraph 2 of the Enforcement Decree) through the joint use of administrative information pursuant to Article 36 , Paragraph 1 of the Electronic Government Act . ③ The Korea Petroleum Management Agency, upon receiving an application under Paragraph 1, shall verify the contents of the application and notify the Minister of Trade, Industry and Resources of the results. <Amended Oct. 1, 2025> ④ Upon receiving the notice pursuant to Paragraph 3, the Minister of Trade, Industry and Resources shall, in the event that a change registration of the liquefied petroleum gas import and export business has been made, reissue the liquefied petroleum gas import and export business registration certificate to the relevant applicant (only applicable if the details on the liquefied petroleum gas import and export business registration certificate have been changed) and notify the Korea Petroleum Management Agency of such fact. <Amended Oct. 1, 2025> ⑤ The Korea Petroleum Management Agency that has received the notice pursuant to Paragraph 4 shall record the fact in the liquefied petroleum gas import and export business registration ledger in the form of Annex 22 . Article 25 (Scope of Storage Facilities for Liquefied Petroleum Gas Import and Export Business) ① The storage facilities under Article 8, Paragraphs 1 and 3 of the Enforcement Decree refer to any of the facilities falling under any of the following subparagraphs, which are owned by or leased for a fixed period of one year or more by a person who intends to register or has registered the liquefied petroleum gas import and export business. In this case, cases where the storage facilities are used jointly by multiple liquefied petroleum gas import and export business operators are included, provided that the total capacity of the said storage facilities is greater than the sum of the usage capacities of each liquefied petroleum gas import and export business operator. 1. Facilities storing liquefied petroleum gas among storage tanks pursuant to Article 3 , Subparagraph 3 of the High-Pressure Gas Safety Management Act 2. Storage tanks and small storage tanks ② If a person registered for the import and export business of liquefied petroleum gas intends to make a change registration pursuant to Article 17, Paragraph 2 of the Act due to any of the reasons falling under any of the following subparagraphs , the liquefied petroleum gas storage facility to be changed or increased shall be a facility falling under any of the subparagraphs of Paragraph 1 that is owned or leased by the person registered for the import and export business of liquefied petroleum gas. 1. Change of location of registered liquefied petroleum gas storage facility 2. An increase of 20% or more in the size of registered liquefied petroleum gas storage facilities ③ When applying Paragraphs 1 and 2, if a person intending to register or who has registered for the liquefied petroleum gas import and export business entrusts the stockpiling of liquefied petroleum gas to an agent for the liquefied petroleum gas stockpiling obligation pursuant to Article 20, Paragraph 2 of the Act (hereinafter referred to as the “agent for the liquefied petroleum gas stockpiling obligation”), the liquefied petroleum gas storage facility corresponding to the amount of liquefied petroleum gas entrusted for stockpiling shall be deemed to be the storage facility of the person intending to register or who has registered for the liquefied petroleum gas import and export business. Article 26 (Application for Conditional Registration and Processing Period) ①Any person who intends to apply for conditional registration pursuant to Article 18, Paragraph 1 of the Act shall submit the documents specified in each subparagraph of Article 23 , Paragraph 1, the documents specified in each subparagraph of Paragraph 3 of the same Article , and a conditional registration application form in accordance with Form No. 20 attached hereto to the Korea Petroleum Management Agency. ② The Korea Petroleum Management Agency that receives the application under Paragraph 1 shall verify the certificate of corporate registration (only applicable to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . ③ In Article 18, Paragraph 2 of the Act , the term “period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to 14 days. <Amended Oct. 1, 2025> Article 27 (Reporting of Commencement, Suspension, and Closure of Business) ①Any person who intends to report the commencement, suspension, or closure of business pursuant to Article 19, Paragraph 2 of the Act shall submit a report on the commencement (suspension/closure) of the liquefied petroleum gas import and export business in the form of Annex 24 to the Korea Petroleum Management Agency within 30 days from the date the cause for reporting occurred. However, this shall not apply to a person who is exempt from registration of the liquefied petroleum gas import and export business pursuant to the proviso to Article 17, Paragraph 1 of the Act . ② The Korea Petroleum Management Agency that receives a report pursuant to Paragraph 1 shall verify the business registration certificate (only applicable in cases where business commences) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . However, if the reporting person does not consent to the verification of the business registration certificate, the reporting person shall be required to attach a copy thereof directly. ③ The Korea Petroleum Management Agency that receives the report pursuant to Paragraph 1 shall record the fact in the liquefied petroleum gas import and export business registration ledger in the form of Annex 22 . Article 28 (Notice of Correction) If the liquefied petroleum gas (LPG) stockpile held by an importer or exporter pursuant to Article 20, Paragraph 1 of the Act falls short of the mandatory LPG stockpile amount , the Minister of Trade, Industry and Resources may set a period of no more than one month and issue a notice to correct the situation. <Amended Oct. 1, 2025> Article 29 (Method for Calculating Domestic Sales Volume, etc. for Calculating Mandatory Stockpiling of Liquefied Petroleum Gas) ①The method for calculating the annual domestic sales volume pursuant to Article 11, Paragraph 2 of the Enforcement Decree is as set forth in Table 11 . ② Article 25, Paragraph 1 shall apply mutatis mutandis to the storage facilities of an agent of the liquefied petroleum gas stockpiling obligation . In this case, “ Article 8, Paragraphs 1 and 3 of the Enforcement Decree ” shall be deemed to be “ Article 13 , Paragraph 2 of the Enforcement Decree ,” and “a person who intends to register or has registered for the import and export business of liquefied petroleum gas” shall be deemed to be “an agent of the liquefied petroleum gas stockpiling obligation.” Article 30 (Standards for Administrative Dispositions against Liquefied Petroleum Gas Exporters and Importers) The standards for administrative dispositions pursuant to Article 21, Paragraph 2 of the Act are as set forth in Table 8 . Article 31 (Criteria for Imposing and Calculating Surcharges on Liquefied Petroleum Gas Exporters and Importers) ①The criteria for imposing and calculating surcharges imposed pursuant to the provisions of Article 22, Paragraphs 1 through 3 of the Act are as set forth in Table 12 . ② The Minister of Trade, Industry and Resources may increase or decrease the administrative surcharge under Paragraph 1 within the range of one-half of the amount, taking into consideration the scale of the business, the degree of violation, and the frequency of violations. However, even in the case of increase, the total amount of the administrative surcharge shall not exceed the amount prescribed in Paragraphs 1 through 3 of Article 22 of the Act . <Amended Oct. 1, 2025> Article 32 (Procedures for Imposition and Collection of Surcharges) ① If the Minister of Trade, Industry and Resources intends to impose a surcharge pursuant to the provisions of Article 22, paragraphs 1 through 3 of the Act , he/she shall notify the person concerned in writing that the surcharge be paid. In such cases, the written notice shall clearly state the type of violation and the amount of the surcharge. <Amended Oct. 1, 2025> ② Any person who has received notice pursuant to Paragraph 1 shall pay the administrative surcharge to the receiving agency designated by the Minister of Trade, Industry and Resources within 20 days from the date of receiving the notice. <Amended Dec. 12, 2023; Oct. 1, 2025> ③ The receiving agency that has received an administrative surcharge pursuant to Paragraph 2 shall issue a receipt to the payer and notify the Minister of Trade, Industry and Resources of such fact without delay. <Amended Oct. 1, 2025> ④ Deleted <December 12, 2023> Chapter 4 Supply and Quality Management Article 33 (Indication of Filling Amount, etc. and Allowable Tolerance) ① Containers required to display the filling amount and trade name pursuant to Article 23, Paragraph 1 of the Act shall be containers with a capacity of 25 liters or more and less than 125 liters (excluding containers attached to vehicles using liquefied petroleum gas as fuel). However, containers for gas heaters with built-in containers shall display only the filling amount. ② The filling amount and trade name indication pursuant to Paragraph 1 shall be displayed on the outer surface of the container in a manner easily recognizable by the general public; provided, the marking standards and other specific matters related to the marking shall be determined and announced by the Minister of Trade, Industry and Resources . <Amended Oct. 1, 2025> ③ In Article 23, Paragraph 2 of the Act , “allowable tolerance prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” means 1/100. <Amended Oct. 1, 2025> Article 33-2 (Inspection Methods, etc. for Violations of Quantitative Supply Obligations) ① In Article 23-2, Paragraph 1 of the Act , the term “allowable tolerance prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to 1.5 percent. <Amended Oct. 1, 2025> ② The inspection methods and procedures for determining whether there is a violation of the obligation to supply a fixed quantity, etc., pursuant to Article 23-2, Paragraph 4 of the Act are as set forth in Table 10-2 . [This Article Newly Inserted Mar. 18, 2020] Article 33-3 (Publication of Facts of Violation) ① Pursuant to Article 23-2, Paragraph 5 of the Act , the Minister of Trade , Industry and Energy or the Mayor, County Governor, or District Head may publish the matters set forth in each of the following subparagraphs by posting them on the internet homepage of the local government where the business operator's workplace is located, or by using the Official Gazette, newspapers pursuant to the Act on the Promotion of Newspapers, etc. , or broadcasts pursuant to the Broadcasting Act, in a manner easily accessible to the general public. In this case, publication may be substituted by posting them on the internet homepages of the Korea National Oil Corporation and the Korea Petroleum Management Agency. <Amended Oct. 1, 2025> 1. A title indicating that it is a public announcement of a legal violation 2. Types of licensed businesses 3. Business name, address, and representative's name of the violating business 4. Details of the violation 5. Details of administrative disposition for the violation 6. Date of administrative disposition (date the administrative disposition became final) 7. Period of administrative disposition (referring to the period of business suspension; in the case of a disposition imposing a penalty surcharge, it refers to the period corresponding to the penalty surcharge imposed in accordance with the penalty surcharge imposition standards. The same applies hereinafter in Paragraph 2) 8. Enforcement agency and date of enforcement or detection ② The publication pursuant to Paragraph 1 shall be made within 10 days from the date of the relevant administrative disposition. In this case, if the publication is made by posting on an internet homepage, the publication period shall be at least the period of the administrative disposition specified in Paragraph 1, Item 7 (in the case of a permit revocation disposition, at least 6 months). ③ Before making a public announcement pursuant to Article 23-2, Paragraph 5 of the Act , the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head shall notify the person subject to public announcement of the fact that they are subject to public announcement and provide them with an opportunity to submit explanatory materials or state their opinion. <Amended Oct. 1, 2025> ④ If the relevant administrative disposition under Paragraph 1, Subparagraph 5 is revoked, the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head shall publish the fact of revocation in the same manner as the original publication, correcting it for a period longer than that of the original publication. <Amended Oct. 1, 2025> [This Article Newly Inserted Mar. 18, 2020] Article 34 (Supply Method) In Article 24 of the Act , the term “supply method prescribed by the Ordinance of the Ministry of Trade, Industry and Resources”refers to Annex 13. <Amended Oct. 1, 2025> Article 35 (Matters to be Included in Supply Regulations, etc.) ① Supply regulations concerning liquefied petroleum gas pipeline network supply business pursuant to Article 25, Paragraph 1 of the Act shall include the following matters: 1. Supply zone to which supply regulations apply 2. Method of Calculating Gas Charges 3. Matters concerning the burden of costs required for the installation, maintenance, management, and replacement of gas supply facilities and gas usage facilities of gas users. In this case, the costs required for the installation, maintenance, management, and replacement of user supply pipes within the boundaries of multi-unit housing, etc. shall be borne by the gas user, and the costs associated with the installation, maintenance, management, and replacement of gas shut-off devices installed on the gas user's land in accordance with Item 3, Subparagraph (a) 4)c) of Table 4-2 and pressure regulators exceeding the total number of households specified in Item 3, Subparagraph (a) 1)a) (1) and (2) of Table 4-2 shall be borne by the facility owner or the liquefied petroleum gas pipeline network supplier. 4. If the gas user bears any burden other than the gas charges and the surcharges under Item 3, the details of the burden, the amount of the burden, and the basis for calculating the amount of the burden 5. Method of measuring gas consumption 6. Maximum and minimum gas pressure at the combustion cock inlet 7. Matters concerning safety responsibilities between the liquefied petroleum gas pipeline network supplier and the user regarding gas usage facilities 8. Matters concerning the suspension of gas supply or the cessation of use 9. In cases where a validity period is stipulated in the supply regulations, that period 10. Procedure for Applying for Gas Use 11. Matters concerning the keeping of supply regulations and the provision of copies 12. Effective Date 13. Other matters necessary regarding the conditions of gas supply ② The supply regulations concerning the general collective supply of liquefied petroleum gas pursuant to Article 25 , Paragraph 1 of the Act shall include the following matters: 1. Target of Supply 2. Method of Calculating Gas Charges 3. Ownership and Management Responsibilities of Facilities Between Liquefied Petroleum Gas General Group Supply Business Operators and Gas Users 4. Amount of Cost Sharing by Gas Users for Collective Supply Facilities and Gas Usage Facilities, Calculation Method, and Method of Bearing the Cost 5. Method of measuring gas usage, gas charges, and methods of collecting other amounts borne by the gas user 6. Matters concerning the suspension of gas supply or discontinuation of use 7. Matters concerning the rights and obligations between liquefied petroleum gas general collective supply business operators and gas users 8. Procedure for Applying for Gas Usage 9. Matters concerning the keeping of supply regulations and the provision of copies 10. Effective Date 11. Other matters necessary regarding the conditions of gas supply ③ Any person who intends to report supply regulations pursuant to the first part of Article 25, Paragraph 1 of the Act shall submit the supply regulations report form ( Form No. 25) to the licensing authority, attaching the documents of each of the following subparagraphs. 1. Draft Supply Regulations 2. Explanation of supply conditions, including gas charges ④ The Minister of Trade, Industry and Resources may establish and publish standard supply regulations concerning liquefied petroleum gas pipeline network supply businesses , and the licensing authority may recommend that liquefied petroleum gas pipeline network supply business operators prepare their plans in accordance with the standard supply regulations. <Amended Oct. 1, 2025> [Wholly Amended Mar. 18, 2020] Article 36 (Notification of Change in Supply Regulations) In the latter part of Article 25, Paragraph 1 of the Act , “important matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the matters under Article 35 , Paragraph 1 , Subparagraphs 1 through 9 and 13, and Article 35 , Paragraph 2, Subparagraphs 1 through 7 and 11. <Amended Mar. 18, 2020; Oct. 1, 2025> Article 37 (Notification of Change in Supply Regulations) ①Any person who intends to report a change in supply regulations pursuant to the latter part of Article 25 , Paragraph 1 of the Act shall submit a notification of change in supply regulations in the form of Annex 25 to the licensing authority. ② The change notification form under Paragraph 1 shall be accompanied by the following documents: 1. Statement of Reason for Change 2. Details of changes to supply regulations 3. In the event of an intention to change matters concerning supply conditions, such as gas charges, an explanatory statement regarding the basis for calculation or the method of determining the amount Article 38 (Methods and procedures for quality inspection and self-inspection, etc.) ①The methods and procedures for quality inspection and self-inspection pursuant to Article 27 , Paragraphs 1 and 2 of the Act are as set forth in Table 14 . ② The approval standards and procedures for self-inspectors pursuant to the proviso to Article 27, Paragraph 1 of the Act shall be governed by Article 30 of the Enforcement Rule of the Petroleum and Petroleum Substitute Fuels Business Act . Article 38-2 (Exclusions from Quality Inspection) The liquefied petroleum gas excluded from quality inspection pursuant to Article 27, Paragraph 3 of the Act is as follows: 1. Liquefied petroleum gas sold or delivered for export 2. Liquefied petroleum gas for use as raw materials in the petrochemical industry sold or delivered through pipelines [This Article Newly Inserted Mar. 18, 2020] Article 39 (Publication of Liquefied Petroleum Gas Violating Quality Standards) Article 33-3 shall applyto the publication of facts regarding violations of quality standards pursuant to Article 27, Paragraph 4 of the Act . In this case, “ Article 23-2, Paragraph 5 of the Act ” shall be deemed to be “ Article 27 , Paragraph 4 of the Act ,” and “violating business operator” in Article 33-3, Paragraph 1, Subparagraph 3 shall be deemed to be “violating business operator (including the supplier of the violating liquefied petroleum gas).” [Wholly Amended Mar. 18, 2020] Article 40 Deleted <Mar. 18, 2020> Article 41 (Exclusions from Restrictions on Refilling Activities) ① The cases in which a person intending to use liquefied petroleum gas as fuel for a vehicle may refill at a place other than an liquefied petroleum gas refilling business office pursuant to the proviso to Article 29, Paragraph 1 of the Act, and the methods of refilling said refilling, are as follows: <Amended Nov. 28, 2025> 1. In cases where fuel is depleted while the vehicle is in operation and refilling is performed using a container with a capacity of less than 1 liter, using a connecting device that has been inspected pursuant to Article 17 of the High-Pressure Gas Safety Management Act. 2. Cases where residual gas inside a container is temporarily recovered for vehicle repair, and the recovered gas is refilled for operation after the repair is completed. ② Pursuant to the proviso to Article 29, Paragraph 1 of the Act , the cases in which a person intending to use liquefied petroleum gas as fuel for a vehicle may directly fill liquefied petroleum gas at an liquefied petroleum gas filling business station shall be those in which liquefied petroleum gas is directly filled (hereinafter referred to as “self-filling”) using self-filling facilities specified in Subparagraph 2, Item (a) 10) of Annex 4 at an liquefied petroleum gas filling business station. <Newly added Nov. 28, 2025> Chapter 5 Safety Management Article 42 (Duties of Gas Suppliers) ① Liquefied petroleum gas filling business operators, Liquefied petroleum gas collective supply business operators, and Liquefied petroleum gas sales business operators (hereinafter referred to as “Gas Suppliers”) shall, pursuant to Article 30 of the Act , conduct safety inspections of the facilities of consumers to whom they supply in accordance with each of the following subparagraphs, and provide guidance to consumers on matters necessary for the prevention of hazards. <Amended Dec. 30, 2015; Aug. 5, 2020; Jan. 21, 2022; Oct. 10, 2023> 1. Prepare and distribute guidance materials on the safety management of gas-using facilities or gas-using facility inspection checklists containing gas safety usage guidelines at least once every six months. 2. Safety inspections shall be conducted at the time when liquefied petroleum gas is first supplied to the gas usage facilities of consumers (excluding those who directly purchase liquefied petroleum gas filled in containers for container-type gas heaters at the gas supplier's business premises and those who use liquefied petroleum gas filled in containers with a capacity of 15 liters or less) (in the case of container gas consumers, only consumption facilities) and thereafter at the times specified in the following subparagraphs. However, for gas usage facilities that use liquefied petroleum gas for automotive fuel, safety inspections must be conducted whenever requested by the consumer. a. In the case of supply by volumetric sales method, at least once a year B. In the case of supplying to facilities equipped with a multi-functional gas safety meter, at least once every three years C. In the case of gas-using facilities installed in housing pursuant to Article 2, Subparagraph 1 of the Housing Act, excluding Subparagraphs A and B , where the installation from the pressure regulator to the intermediate valve is made of steel pipe, copper pipe, or metal flexible hose, at least once a year (d) In cases where liquefied petroleum gas referred to in Article 2, Paragraph 1, Subparagraph 11, Item (b) is supplied to a person who uses it while on the move, each time the liquefied petroleum gas is supplied E. For gas-using facilities other than those specified in Subparagraphs A through D, at least once every six months 3. When supplying liquefied petroleum gas for the first time after the gas boiler and gas water heater have been installed (including replacement installation), verify the installation details of the gas boiler and gas water heater and confirm that there is no gas leakage at the connection points with the piping. ② Notwithstanding Paragraph 1, if the licensing authority deems it inappropriate to conduct a safety inspection at the relevant time due to natural disasters, calamities, or other unavoidable circumstances, the gas supplier may conduct the safety inspection at a time determined by the licensing authority after consultation with the licensing authority. <Newly added Dec. 16, 2021> ③ A gas supplier conducting safety inspections pursuant to Paragraphs 1 and 2 shall prepare documents classified according to the following subparagraphs and preserve them for two years. In this case, such documents may be prepared and preserved using a device with information processing capabilities, such as a computer. <Amended Dec. 16, 2021> 1. Facilities other than those in Nos. 2 and 3: Safety Management Implementation Register (Form No. 26) 2. Facilities of a gas cylinder consumer: Safety inspection checklist for consumption facilities in Form No. 27. In this case, a summary checklist for safety inspection of consumption facilities in Form No. 28 must be prepared, and a copy prepared in the relevant month must be submitted to the mayor, county governor, or district head of the area where the consumer lives by the 10th of the following month (including cases where it is submitted using a device with information processing capabilities such as a computer). 3. Facilities using liquefied petroleum gas for automotive fuel: Liquefied petroleum gas vehicle safety inspection checklist in Form No. 29. However, this checklist shall be completed only if there are abnormalities found during the safety inspection. ④ Any person who intends to report preventive measures against hazard, such as the interruption of the supply of liquefied petroleum gas, pursuant to Article 30, Paragraph 3 of the Act, shall submit the Report on Preventive Measures Against Hazardous Hazards in the form of Annex 30 to the Mayor, County Governor, or District Head of the area where the relevant user resides. <Amended Dec. 16, 2021> ⑤ The qualifications of inspectors, personnel, inspection equipment, inspection standards, and other necessary matters required for safety inspections pursuant to Article 30 , Paragraph 1 of the Act are as set forth in Attached Table 15. <Amended Dec. 16, 2021> Article 42-2 (Qualifications of Agents for Safety Management of Gas Usage Facilities) In Article 30-2, Paragraph 1 of the Act , the term “person possessing qualifications prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a person who meets all the requirements of each of the following subparagraphs. In this case, the person must respectively possess a safety management supervisor, a gas usage facility inspector, and a person holding the qualification for registration of Class 1 or Class 2 gas facility construction business pursuant to each of the following subparagraphs. <Amended Oct. 1, 2025> 1. There must be at least one safety management officer [ referring to a person who holds a technical qualification of Gas Craftsman or higher under the National Technical Qualifications Act or has completed the training specified in Subparagraph 4, Item C, Subparagraph 1) of Annex 19 ]. 2. There shall be at least one gas usage facility inspector [ referring to a person who has completed the training specified in Subparagraph 4, Item 5) or Subparagraph 4) of Item 4 of Annex 19] for every 3,000 households or businesses requiring safety management of gas usage facilities. However, in any of the following cases, the household or business may be used as the standard. a. In the case of multi-unit dwellings, etc., 4,000 households or businesses subject to safety management of gas usage facilities B. In cases where a multi-functional gas safety meter (referring to a meter equipped with safety functions such as remote gas shut-off, remote carbon monoxide detection and shut-off, and earthquake detection and shut-off) is installed, 6,000 households or businesses subject to safety management of gas usage facilities 3. Must be a person registered as a Class 1 or Class 2 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry [This Article Newly Inserted Mar. 18, 2020] Article 43 (Guidelines for Drafting Safety Management Regulations, etc.) Guidelines for drafting safety management regulations pursuant to Article 31, Paragraph 1 of the Act and other necessary matters are as set forth in Attached Table 16 . Article 44 (Examination of Safety Management Regulations) ①Any person who wishes to hear the opinion of the Korea Gas Safety Corporation regarding safety management regulations pursuant to Article 31, Paragraph 1 of the Act shall submit to the Korea Gas Safety Corporation an application for examination of safety management regulations in the form of Annex 31 , attaching the safety management regulations. ② Upon receiving an application under Paragraph 1, the Korea Gas Safety Corporation shall send an opinion on the review to the applicant within 7 days ( 20 days in the case of a person subject to comprehensive safety management under Article 14 of the Enforcement Decree ). However, if it is necessary to supplement the content, the period may be extended. ③ The examination standards for safety management regulations and other matters necessary for the examination shall be determined and announced by the Minister of Trade, Industry and Resources . <Amended Oct. 1, 2025> Article 45 (Records of Implementation of Safety Management Regulations) Records of the implementation of safety management regulations pursuant to Article 31, Paragraph 5 of the Act shall be preserved for three years. Article 46 (Verification and Evaluation of Compliance with Safety Management Regulations) ①The verification and evaluation of compliance with safety management regulations pursuant to Article 31, Paragraph 6 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. However, for persons subject to comprehensive safety management pursuant to Article 14 of the Enforcement Decree , the evaluation cycle may be adjusted within a range of five years based on the results of the verification and evaluation, and liquefied petroleum gas sales business operators exempted from periodic inspection pursuant to Article 17 , Subparagraph 3 of the Enforcement Decree may be exempted from verification and evaluation during the period of exemption from periodic inspection. <Amended July 11, 2017; August 5, 2020; December 16, 2021> 1. Liquefied petroleum gas business operators, etc. (excluding liquefied petroleum gas consignment transport business operators and gas appliance manufacturing business operators; hereinafter the same applies in this subparagraph): to be carried out together with periodic inspections pursuant to the main text of Article 37 of the Act ( excluding periodic inspections pursuant to Article 52 , Paragraph 4, Subparagraph 2 ). However, in cases where the entire periodic inspection is exempted pursuant to the proviso of Article 37 , Paragraph 1 of the Act and Article 17, Subparagraphs 1 and 2 of the Enforcement Decree, the liquefied petroleum gas business operators, etc. and the Korea Gas Safety Corporation shall determine the timing of implementation through consultation, and shall be carried out once a year. 2. Gas appliance manufacturers: To be carried out together with the inspection under the main text of Article 39, Paragraph 1 of the Act . However, in cases where the entire inspection is omitted pursuant to the proviso of Article 39, Paragraph 1 of the Act , the gas appliance manufacturer and the Korea Gas Safety Agency shall determine the timing of implementation through consultation, and shall carry out once a year. ② When conducting the verification and evaluation pursuant to Paragraph 1, external relevant experts may be involved. ③ In addition to the matters prescribed in Paragraphs 1 and 2, the standards and frequency for the verification and evaluation of compliance with safety management regulations and other matters necessary for such verification and evaluation shall be determined by the Minister of Trade, Industry and Resources and announced by public notice . <Amended Oct. 1, 2025> Article 47 (Safety Inspection Standards for Containers, etc.) The safety inspection standards for containers that a liquefied petroleum gas filling business operator must inspect pursuant to Article 32, Paragraph 2 of the Act are as set forth in Table 17 . Article 48 (Suspension of Supply of Liquefied Petroleum Gas, etc.) ① Pursuant to Article 33, Paragraph 1 of the Act , the Mayor, County Governor, or District Head shall order necessary measures with respect to a user's liquefied petroleum gas usage facilities in accordance with the standards set forth in each of the following subparagraphs. <Amended July 11, 2017> 1. If a consumer's liquefied petroleum gas usage facility falls under any of the following subparagraphs, order the gas supplier to suspend or restrict supply, and order the consumer to repair or improve it. a. In case of gas leakage b. Where a container (excluding containers for built-in gas heaters and containers for portable butane burners) is installed indoors c. In cases where the installation of gas water heaters and gas boilers violates the combustion appliance standards specified in Item 1, Subparagraph (a) 5) of Annex 20 2. If a user's liquefied petroleum gas (LPG) usage facility does not comply with the facility standards and technical standards for LPG usage facilities pursuant to Annex 20 (hereinafter referred to as “facility standards, etc.” in this Article) (excluding the case under Subparagraph 1, Item (c)), the user shall be ordered to repair or improve said facility. ② When the mayor, county governor, or district head orders repairs or improvements pursuant to each subparagraph of Paragraph 1, they shall determine the period of implementation within the range of 30 days, taking into consideration the period required for such repairs or improvements, unless there is a special reason. ③ A user who has received an order for repair or improvement pursuant to each subparagraph of Paragraph 1 shall notify the gas supplier of the fact that said repair or improvement has been carried out upon completion of the repair or improvement of the liquefied petroleum gas usage facility. ④ A gas supplier who has received notification pursuant to Paragraph 3 shall, without delay, verify whether the liquefied petroleum gas usage facility has been repaired or improved, and if it meets the facility standards, etc., shall resume supplying liquefied petroleum gas. In this case, the gas supplier shall notify the Mayor, County Governor, or District Head of the fact that the repair or improvement of the liquefied petroleum gas usage facility has been verified. ⑤ The forms for suspension of supply of liquefied petroleum gas, etc. shall be in accordance with the classifications in each of the following subparagraphs. 1. Order to suspend or restrict the supply of liquefied petroleum gas to a gas supplier pursuant to Paragraph 1, Subparagraph 1: Form No. 32 2. Order for repair or improvement of liquefied petroleum gas usage facilities for users pursuant to Paragraph 1, Subparagraphs 1 and 2: Form No. 33 3. Verification of repair or improvement of liquefied petroleum gas usage facilities by the gas supplier pursuant to the latter part of Paragraph 4: Attached Form No. 34 Article 49 (Appointment of Safety Manager, etc.) ① The specific liquefied petroleum gas usage facilities for which a business operator supplying liquefied petroleum gas (excluding liquefied petroleum gas consignment transport business operators) must appoint a safety manager pursuant to the proviso to Article 34, Paragraph 1 of the Act are as follows: 1. Gas usage facilities in multi-unit dwellings. Provided, however, that the following cases are excluded. a. Cases under Article 5, Subparagraph 3, where the management entity of a self-managed multi-unit housing complex directly supplies to residents, etc. B. Cases where liquefied petroleum gas is supplied to a specific user of liquefied petroleum gas pursuant to Article 70, Paragraph 1, Subparagraph 4 2. Gas usage facilities other than those in multi-unit dwellings where two or more users jointly use liquefied petroleum gas. ② The report of appointment, dismissal, or resignation of a safety manager pursuant to Article 34, Paragraph 2 of the Act shall be made using the Safety Manager Appointment, Dismissal, or Resignation Report Form No. 35 . ③ In Note 19 of Annex 1 of the Enforcement Decree, “matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to manufacturing facilities for ball valves and globe valves pursuant to Item 6 of Annex 3 of these Rules. <Amended Oct. 1, 2025> Article 49-2 (Subjects of Approval for Construction Plans, etc.) ①Installation and modification works of gas supply facilities requiring approval or modification approval pursuant to Article 34-2, Paragraph 1 of the Act are as set forth in Table 15-2 . ② Installation and modification works of gas supply facilities for which a report or modification report must be submitted pursuant to Article 34-2, Paragraph 2 of the Act are as set forth in Table 15-3 . [This Article Newly Inserted Mar. 18, 2020] Article 49-3 (Application for Approval of Construction Plan, etc.) ①Any person who intends to obtain approval or approval for a change of construction plan pursuant to Article 34-2 , Paragraphs 1 and 3 of the Act shall submit an application in the form of Annex 35-2 to the Mayor, County Governor, or District Head, and any person who intends to report or report a change of construction plan pursuant to Article 34-2, Paragraphs 2 and 3 of the Act shall submit a report in the form of Annex 35-3 to the Mayor, County Governor, or District Headby three days prior to the start of the construction ② The mayor, county governor, or district head who receives an application pursuant to Paragraph 1 shall verify the construction business registration certificate pursuant to Article 9-2, Paragraph 1 of the Framework Act on Construction Industry through the joint use of administrative information pursuant to Article 36 , Paragraph 1 of the Electronic Government Act. However, if the applicant does not consent to the verification by the public official in charge, a copy of the document shall be attached. ③ The application or report pursuant to Paragraph 1 must be accompanied by the following documents: 1. Construction Plan 2. Construction Schedule 3. In case of changing the construction plan, a statement of reasons for the change 4. Technical review document pursuant to Paragraph 7 5. A copy of documents proving the qualifications of the construction manager ( referring to a construction engineer pursuant to Article 40 of the Framework Act on the Construction Industry ; hereinafter the same applies). 6. Copies of documents proving the estimated cost of the relevant construction project, such as the detailed statement of estimated costs. ④ When a mayor, county governor, or district head grants approval or approval for a construction plan pursuant to Article 34-2, Paragraph 1 of the Act , or receives a report or report for a construction plan pursuant to Paragraph 2 of the same Article, they shall record it in the Gas Supply Facility Construction Plan (Change) Approval/Report Register in Form No. 35-4 , issue a Construction Plan (Change) Approval Certificate or Construction Plan (Change) Report Certificate in Form No. 35-5 , and notify the Korea Gas Safety Corporation of this. ⑤ In Article 34-2, Paragraph 4, Subparagraph 3 of the Act , “installation or modification work of gas supply facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the work set forth in each of the following subparagraphs. <Amended Oct. 1, 2025> 1. Works for installing or altering user supply pipes of 50 meters or more with a maximum operating pressure of less than 0.01 megapascals. However, works falling under any of the following subparagraphs shall be excluded. a. Installation or modification work for user supply pipes connected to supply pipes with a maximum operating pressure of less than 0.01 megapascals and a nominal diameter of 50 millimeters (in the case of polyethylene pipes for gas according to KS M 3514, this refers to a nominal outer diameter of 63 millimeters; hereinafter the same applies) or less. B. Work that changes the scope of construction for which a technical review report has been obtained from the Korea Gas Safety Agency pursuant to Paragraph 7, involving reducing the length of the pipeline or increasing the length of the pipeline by no more than one-tenth or less than 50 meters. 2. Work on pressure regulators falling under any of the following items a. Work to change the type of safety valve B. Work to change the capacity or model of the pressure regulator C. Installation or modification work of metering equipment ⑥ Any person who wishes to receive a technical review from the Korea Gas Safety Corporation pursuant to Article 34-2, Paragraph 4 of the Act shall submit to the Korea Gas Safety Corporation an application for technical review in Form No. 16 of the Attached Form, attaching the documents listed in each of the following subparagraphs. 1. Installation plan for facilities (in the case of facility changes, only the changed part applies) 2. Explanatory statement regarding facility standards and technical standards (in the case of facility changes, only the changed part applies) 3. Drawings [In the case of piping, they must be prepared in accordance with Item 3, Subparagraph (a), 2)a) of Annex 4-2 ; in the case of facility changes, only the changed portion applies] ⑦ When the Korea Gas Safety Corporation receives an application for technical review pursuant to Paragraph 6, it shall prepare a technical review report and issue it to the applicant within the period specified in each of the following subparagraphs. 1. For manufacturing facilities: 10 days 2. For piping and pressure regulators: 5 days [This Article Newly Inserted Mar. 18, 2020] Article 49-4 (Criteria for Approval of Construction Plan) When a mayor, county governor, or district head receives an application for approval or modification of a construction plan pursuant to Article 34-2, Paragraph 1 of the Act, approval shall be granted only if the plan for the installation or modification of a gas supply facility conforms to any of the following subparagraphs. 1. It must be consistent with the contents of the permit pursuant to Article 5 of the Act 2. The gas supply facilities shall comply with the facility standards and technical standards pursuant to Annex 4-2. 3. The process of installation or modification work shall be suitable for the smooth supply of liquefied petroleum gas. 4. The contractor must be a person registered as a Class 1 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry. 5. The construction plan shall conform to the technical review report pursuant to Article 49-3 , Paragraph 7. [This Article Newly Inserted Mar. 18, 2020] Article 49-5 (Notification of Construction Details, etc.) ① The installation or modification work of gas supply facilities or gas usage facilities for which a gas facility construction business operator must notify the relevant liquefied petroleum gas pipeline network supplier of the details of the construction in advance pursuant to Article 35, Paragraph 2 of the Act shall be the installation or modification work of each of the following subparagraphs in an area not included in the supply zone of the liquefied petroleum gas pipeline network supplier. 1. Installation or modification work for gas supply facilities or gas usage facilities with 10 or more users 2. Installation or alteration work for specific use facilities pursuant to Article 70 , Paragraph 1 (excluding Subparagraphs 6 through 8 and Subparagraph 8-2) ② Pursuant to Article 35, Paragraph 2 of the Act , a gas facility construction business operator shall notify the relevant liquefied petroleum gas pipeline network supplier of the matters in each of the following subparagraphs 15 days prior to the commencement of construction, and the relevant liquefied petroleum gas pipeline network supplier shall notify the gas facility construction business operator and the person intending to use liquefied petroleum gas of the results of the review of the installation plan of gas supply facilities and the impact on supply capacity, etc., within 7 days from the date of receiving notification from the gas facility construction business operator. 1. Construction Period 2. Details of Facility Construction 3. Number of users and estimated usage 4. Scheduled timing of liquefied petroleum gas usage 5. Address, name, and telephone number of the user 6. Name and Qualifications of Construction Manager [This Article Newly Inserted Mar. 18, 2020] Article 49-6 (Facility Standards, etc. Related to Liquefied Petroleum Gas Pipeline Network Supply Business) The facility standards and technical standards for gas supply facilities and gas usage facilities pursuant to Article 35, Paragraph 3 of the Act are as follows: 1. Facility Standards and Technical Standards for Gas Supply Facilities in Liquefied Petroleum Gas Pipeline Network Supply Businesses: Appendix 4-2 2. Facility and technical standards for gas-using facilities receiving liquefied petroleum gas from liquefied petroleum gas pipeline network operators: Appendix 20 [This Article Newly Inserted Mar. 18, 2020] Article 50 (Method of Preservation of Construction Records and Completed Drawings, etc.) ①A person registered as a gas facility construction business pursuant to Article 35, Paragraph 1 of the Act (hereinafter referred to as “gas facility construction business operator” in this Article) shall prepare the construction records and completed drawings specified in each of the following subparagraphs pursuant to Article 35, Paragraph 5 of the Act and preserve them for five years. <Amended Mar. 18, 2020> 1. Construction records: All records of each of the following items a. Records and test reports of non-destructive testing [fusion welding in the case of polyethylene tubes] B. Drawings of non-destructive testing (fusion bonding in the case of polyethylene tubes) c. Film of non-destructive testing (if entered into a computer auxiliary storage device, the entered data may be used) D. Report on the results of the potential measurement of the electro-corrosion prevention facility E. Photos of construction work at locations requiring special management, such as obstacles and bedrock 2. Completed drawings ② In the case of a person registered as a gas facility construction business (Class 3) pursuant to Article 7 of the Enforcement Decree of the Framework Act on Construction Industry and Annex 1 of the same Enforcement Decree, the construction record under Paragraph 1, Item 1 may be substituted with the gas boiler installation construction confirmation certificate and insurance subscription confirmation certificate pursuant to Item 1, Subparagraph (a) 5)b)(6) of Annex 20 of this Rule. ③ In the case of installation or modification work for hot water boilers, water heaters, and their ancillary facilities among liquefied petroleum gas facilities, photographs verifying the construction details may be substituted for the completed drawings referred to in Paragraph 1, Subparagraph 2. ④ A gas facility construction business operator shall, in accordance with Article 35, Paragraph 6 of the Act , provide for or submit copies of the records or drawings specified in each of the following subparagraphs to the persons classified under each of the following subparagraphs within 7 days from the date of completion of the installation or modification work of a liquefied petroleum gas facility. <Amended Mar. 18, 2020> 1. Person who commissioned the installation or modification work of liquefied petroleum gas facilities: Copies of the records or drawings in each of the following items a. Construction records pursuant to Paragraph 1, Subparagraph 1 B. Completed drawings pursuant to Paragraph 1, Subparagraph 2 2. Korea Gas Safety Corporation: A copy of the completed drawings of the specific liquefied petroleum gas use facility ( excluding cases where a copy of the completed drawings was submitted at the time of the completion inspection pursuant to Articles 51 and 71 ) ⑤ Gas suppliers and liquefied petroleum gas storage operators who have received copies of construction records, etc., pursuant to Paragraph 4 shall permanently preserve copies of the completion drawings (or the data entered into a computer auxiliary storage device if applicable) in accordance with Article 35, Paragraph 7 of the Act. < Amended Mar. 18, 2020> Article 51 (Safety Verification and Completion Inspection) ①Construction work subject to safety verification pursuant to Article 36, Paragraph 1 of the Act shall be construction work belonging to the processes of each of the following subparagraphs. 1. The process immediately before burying the storage tank underground 2. In cases where piping is installed underground, the process immediately before burying the portion designated by the Korea Gas Safety Agency. 3. Process for conducting non-destructive testing on parts designated by the Korea Gas Safety Agency 4. Foundation installation process for protective walls or above-ground storage tanks and wall installation process for protective walls (applicable only to reinforced concrete or concrete block protective walls) ② Modification works on facilities subject to a completion inspection pursuant to Article 36, Paragraph 2 of the Act shall be as follows: <Amended Dec. 30, 2015; Jul. 11, 2017; Mar. 18, 2020; Jan. 21, 2022; Nov. 28, 2025> 1. Change construction subject to a change permit under Article 7, Paragraph 1 ( excluding Article 7, Paragraph 1 , Subparagraphs 2 and 3 ). 2. Among the modification works excluded from the scope of modification permits under Article 7 , Paragraph 1, any of the following works a. Work to increase the capacity of storage facilities in sales facilities and business offices, corresponding to any of the following 1) through 3) 1) Construction to completely replace at least two of the four walls of the container storage room 2) Construction to replace 50 percent or more of the total wall surface area of the container storage room 3) Work to alter the foundation of the protective wall of the container storage room B. Construction work to increase the capacity of pressure vessels or filling facilities among gas facilities without increasing the quantity (applicable only to liquefied petroleum gas filling business operators) C. Construction work to change the charging facility to a self-service charging facility in accordance with Item 2, Subparagraph A, Subparagraph 10) of Annex 4 (d) Works to increase the quantity or capacity of pressure vessels, pumps, compressors, and loading arms among gas facilities, or works to increase the capacity of vaporization devices without increasing the quantity (applicable only to general collective supply business operators of liquefied petroleum gas and liquefied petroleum gas storage operators) E. Construction work to install or expand solar power generation facilities in accordance with Annex 4, Item 1, Subparagraph (a) 10)f), Item 2, Subparagraph (a) 5)h), and Item 3, Subparagraph (a) 8)a) and (b). f. Construction work to install or expand fuel cell power generation facilities in accordance with Annex 4, Item 1, Subparagraph (a) 10)g), Item 2, Subparagraph (a) 5)g), and Item 3, Subparagraph (a) 8)a) and b) of the same Table. d. Works to replace or install pipes with a length of 20 meters or more, or to change their nominal diameter, and works to extend the pipe length by 20 meters or more. However, in the case of general collective supply facilities, this shall be limited to works to replace or install pipes with a length of 50 meters or more, or to change their diameter, and works to extend the pipe length by 50 meters or more. A. Construction work in which the capacity of the storage facility is changed by changing the type of gas. However, if the person changing the type of gas falls under the category of a person subject to comprehensive safety management pursuant to Article 14 of the Enforcement Decree and the Korea Gas Safety Agency recognizes that there is no risk of harm, it shall be excluded from the completion inspection. ③ Any person who intends to undergo a completion inspection pursuant to Article 36, Paragraph 2 of the Act shall submit an application for completion or periodic inspection in the form of Annex 36 to the Korea Gas Safety Corporation, attaching the completion drawings and construction status determined by the President of the Korea Gas Safety Corporation. In this case, if any of the following subparagraphs apply, the requirements of the corresponding subparagraph must be met. 1. In cases corresponding to modification work under Paragraph 2, Subparagraph 2: A technical review must be obtained prior to the modification work. 2. In cases falling under Article 7, Paragraph 2, Subparagraph 7 : Submit a copy of the permit containing the details of the change notification pursuant to Article 10, Paragraph 3. ④ The inspection standards for each facility subject to inspection for safety verification or completion inspection pursuant to Article 36 of the Act are as follows: <Amended Mar. 18, 2020> 1. Standards for Safety Verification or Completion Inspection of Liquefied Petroleum Gas Filling Facilities: Appendix 4 2. Standards for Safety Verification or Completion Inspection of Liquefied Petroleum Gas General Collective Supply Facilities and Storage Facilities: Appendix 5 3. Standards for safety verification or completion inspection of container storage facilities installed at business offices of liquefied petroleum gas sales facilities and liquefied petroleum gas filling business operators: Appendix 6 4. Completion Inspection Standards for Gas Appliance Manufacturing Facilities: Appendix 7 ⑤ The President of the Korea Gas Safety Corporation shall issue a Certificate of Completion and Periodic Inspection in the form of Annex No. 37 (including a certificate in the form of an electronic document if the person who passed consents) to a person who has passed the completion inspection pursuant to Article 36, Paragraph 2 of the Act . <Amended Dec. 16, 2021> Article 51-2 (Subjects of Construction Supervision and Application, etc.) ①Installation or modification works of gas supply facilities subject to construction supervision pursuant to Article 36-2, Paragraph 1 of the Act shall be the works listed in each of the following subparagraphs. 1. Construction projects subject to approval of construction plans under Attached Table 15-2 2. Installation or modification work of gas supply facilities falling under any of the following items that are excluded from the scope of construction plan approval under Annex 15-2 A. Main building B. Supply pipes with a maximum operating pressure of 0.01 megapascals or higher 3. Construction subject to the construction plan notification under Attached Table 15-3 4. Installation or alteration work of supply pipes excluded from the scope of construction plan reporting under Annex 15-3 . However, this shall not apply in any of the following cases: a. Supply pipes with a nominal diameter exceeding 50 millimeters and a maximum operating pressure of less than 0.01 megapascals, and a length of less than 20 meters B. Supply pipes with a nominal diameter of 50 millimeters or less and a maximum operating pressure of less than 0.01 megapascals C. User supply pipes connected to supply pipes with a nominal diameter of 50 millimeters or less and a maximum operating pressure of less than 0.01 megapascals D. User supply pipes less than 50 meters in length 5. Construction work for which approval of the construction plan has been obtained or a report has been filed, wherein the pipe length within the construction section is changed by increasing or decreasing by no more than one-tenth or less than 20 meters. 6. Construction pursuant to Article 49-3, Paragraph 5 , Subparagraphs 1 and 2 ② Any person who intends to receive construction supervision pursuant to Article 36-2, Paragraph 1 of the Act shall apply by attaching a construction schedule to Form No. 37-2 . However, in any of the following cases, a gas facility construction business operator may apply for construction supervision on behalf of a liquefied petroleum gas pipeline network supply business operator, and in this case, the liquefied petroleum gas pipeline network supply business operator shall be notified of such fact. 1. Where a gas facility construction business operator has obtained approval or approval for a change of construction plan, or has filed a report or a report for a change, in accordance with Article 34-2, Paragraph 3 of the Act 2. When a gas facility construction contractor performs user supply pipe construction ③ Construction supervision pursuant to Article 36-2, Paragraph 1 of the Act shall be in accordance with the standards of each of the following subparagraphs. 1. It must conform to the construction plan approved or reported pursuant to Article 34-2 of the Act . However, among the gas supply facilities subject to construction supervision under Paragraph 1, those excluded from approval or reporting must conform to the technical review report pursuant to Paragraph 7 of Article 49-3 . 2. The work must have been constructed and managed by a person registered as a Class 1 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry and a construction manager. 3. The construction details shall comply with the facility standards and technical standards for liquefied petroleum gas pipeline network supply pursuant to Attached Table 4-2. ④ The construction supervision standards pursuant to Paragraph 3 are as set forth in Attached Table 4-2 . ⑤ The construction supervision referred to in Paragraph 3 shall be divided into construction supervision of major processes carried out in accordance with Subparagraph 3 of Annex 4-2 by a person qualified as an inspector pursuant to Article 61 of the Enforcement Rule of the High-Pressure Gas Safety Management Act (hereinafter referred to as “supervisor”) during the construction period, and construction supervision of partial processes carried out at the construction site for each of the processes listed in the following subparagraphs. 1. A process in a state where a storage tank is installed to allow for pressure resistance or airtightness tests. 2. Process of conducting non-destructive testing on parts designated by the supervisor 3. In the case of installing piping underground, the process immediately before burying the section designated by the supervisor. 4. In the case of installing storage tanks underground, the process immediately before burying 5. Other processes determined by the supervisor ⑥ The subjects of construction supervision for major processes and construction supervision for partial processes pursuant to Paragraph 5 shall be classified as follows: 1. Subjects of Construction Supervision for Major Processes: Gas pipeline facilities (including ancillary facilities) of liquefied petroleum gas pipeline network suppliers 2. Subject to Construction Supervision for Partial Processes a. Gas supply facilities of liquefied petroleum gas pipeline network suppliers, excluding the facilities under Item 1 b. User supply pipes (including their ancillary facilities) subject to construction supervision pursuant to Paragraph 1 ⑦ A supervisor pursuant to Article 36-2, Paragraph 2 of the Act shall issue a Certificate of Construction Supervision in the form of Annex 37-3 (including a certificate in the form of an electronic document if the successful party consents) to a gas supply facility that has received a judgment of suitability for use as a result of such supervision. <Amended Dec. 16, 2021> [This Article Newly Inserted Mar. 18, 2020] Article 52 (Periodic Inspection) ①An application for a periodic inspection pursuant to the main text of Article 37, Paragraph 1 of the Act shall be made using the Application for Completion and Periodic Inspection Form No. 36 . ② The inspection standards for each subject of periodic inspection pursuant to the main text of Article 37, Paragraph 1 of the Act are as follows: <Amended Mar. 18, 2020> 1. Periodic Inspection Standards for Liquefied Petroleum Gas Filling Facilities: Appendix 4 1-2. Periodic Inspection Standards for Liquefied Petroleum Gas Pipeline Supply Facilities: Appendix 4-2 2. Periodic Inspection Standards for Liquefied Petroleum Gas General Collective Supply Facilities and Storage Facilities: Appendix 5 3. Periodic Inspection Standards for Container Storage Facilities Installed at Liquefied Petroleum Gas Sales Facilities and Business Offices of Liquefied Petroleum Gas Filling Operators: Attached Table 6 ③ The periodic inspection pursuant to the main text of Article 37, Paragraph 1 of the Act shall be received within 30 days before or after the date marking every one year from the date classified in each of the following subparagraphs. <Amended Mar. 18, 2020; Dec. 16, 2021> 1. Liquefied petroleum gas filling facilities, general collective supply facilities, storage facilities, sales facilities, and container storage facilities installed at the business offices of liquefied petroleum gas filling business operators: The date on which the certificate of completion inspection for the installation of the relevant facility was first issued. 2. Liquefied petroleum gas pipeline network supply facilities: The date on which the construction supervision certificate for the installation of the relevant facility was first issued. However, for gas supply facilities not subject to construction supervision that fall under any of the following subparagraphs, the date on which the installation of the facility was completed shall be the date. a. Supply pipes with a nominal diameter of 50 millimeters or less and a maximum operating pressure of less than 0.01 megapascals b. User supply pipes with a length of less than 50 meters (excluding user supply pipes connected to supply pipes with a nominal diameter of 50 millimeters or less and a maximum operating pressure of less than 0.01 megapascals) c. Supply pipes with a nominal diameter exceeding 50 millimeters and a maximum operating pressure of less than 0.01 megapascals, and a length of less than 20 meters ④ Notwithstanding Paragraph 3, in cases falling under any of the following subparagraphs, a periodic inspection must be undergone at the time specified in each subparagraph. <Newly added Dec. 16, 2021> 1. In cases where the liquefied petroleum gas collective supply business operator and the Korea Gas Safety Agency have separately determined the date for the periodic inspection of a liquefied petroleum gas collective supply facility through consultation: the date determined by consultation 2. In the case of facilities on hiatus: Before starting business 3. In cases where the President of the Korea Gas Safety Agency deems it inappropriate to conduct periodic inspections at the times specified in each subparagraph of Paragraph 3 and subparagraphs 1 and 2 of this Paragraph due to natural disasters, calamities, or other unavoidable circumstances: at a time determined by the President of the Korea Gas Safety Agency in consultation with the liquefied petroleum gas business operator, etc. ⑤ Where there are two or more facilities subject to periodic inspection at the same business site ( including liquefied petroleum gas usage facilities subject to periodic inspection under Article 71 ) and the timings for their periodic inspections differ, the periodic inspections of the other facilities may be conducted together during the periodic inspection period of the facility subject to the inspection first. <Amended Dec. 16, 2021> ⑥ The President of the Korea Gas Safety Corporation shall issue a Certificate of Completion or Periodic Inspection in the form of Annex No. 37 (including a certificate in the form of an electronic document if the person who passed consents) to a person who has passed the inspection pursuant to the main clause of Article 37, Paragraph 1 of the Act . <Amended Dec. 16, 2021> Article 53 (Periodic Inspections) ① Periodic inspections pursuant to the main text of Article 37, Paragraph 1 of the Act shall be conducted when the Korea Gas Safety Corporation deems it necessary for the prevention of accidents caused by gas or for other gas safety purposes. ② The Korea Gas Safety Corporation shall notify the subject of an inspection in advance if it intends to conduct an unscheduled inspection. However, this shall not apply if notification in advance would prevent the achievement of the purpose of the inspection or if notification is impossible due to other urgent reasons. ③ The inspection standards for unscheduled inspections are as follows: <Amended Mar. 18, 2020> 1. Standards for Periodic Inspections of Liquefied Petroleum Gas Filling Facilities: Appendix 4 1-2. Standards for Periodic Inspections of Liquefied Petroleum Gas Pipeline Supply Facilities: Appendix 4-2 2. Standards for Periodic Inspections of Liquefied Petroleum Gas General Collective Supply and Storage Facilities: Appendix 5 3. Standards for Periodic Inspections of Container Storage Facilities Installed at Liquefied Petroleum Gas Sales Facilities and Business Offices of Liquefied Petroleum Gas Filling Operators: Attached Table 6 Article 54 (Exemption from Periodic Inspection) ①A person who intends to receive an exemption from all or part of a periodic inspection pursuant to the proviso to Article 37, Paragraph 1 of the Act ( referring to a person falling under Article 17, Subparagraph 1 of the Enforcement Decree) shall submit to the licensing authority an application for partial or full exemption from periodic inspection in the form of Annex 38 , attaching the documents listed in each of the following subparagraphs. 1. Records of implementation of safety management regulations for the past two years 2. Examination records for regular and unscheduled inspections over the past two years 3. Review Opinion of the Korea Gas Safety Agency regarding Safety ② The Korea Gas Safety Corporation shall notify the relevant licensing authority of the list of liquefied petroleum gas sales business operators exempt from periodic inspections pursuant to Article 17, subparagraph 3 of the Enforcement Decree . Article 55 (Subjects of Detailed Safety Diagnosis and Safety Assessment) ① Liquefied petroleum gas filling business operators, liquefied petroleum gas storage operators, or liquefied petroleum gas pipeline network supply business operatorsshall undergo a detailed safety diagnosis for facilities classified according to each of the following subparagraphs pursuant to Article 38, Paragraph 1 of the Act . <Amended Mar. 18, 2020> 1. Facilities installed at business offices, storage facilities, or manufacturing plants with a total storage capacity of 1,000 tons or more (excluding underground rock cave-type storage tanks), for which 15 years have passed since the date of receiving the initial completion inspection certificate or construction supervision certificate. 2. Among the pipelines installed outside the manufacturing facility of a liquefied petroleum gas pipeline network supplier, main pipes and supply pipes ( excluding user supply pipes) with a maximum operating pressure of 0.01 megapascals or higher installed in urban areas pursuant to Article 6 , Subparagraph 1 of the National Land Planning and Utilization Act, for which 20 years have passed since the date the construction supervision certificate was first received. ② Liquefied petroleum gas filling business operators, Liquefied petroleum gas storage operators, or Liquefied petroleum gas pipeline network supply business operators shall undergo a safety assessment for business offices, storage facilities, or manufacturing facilities where the total storage capacity of storage facilities (excluding underground rock cave-type storage tanks) is 1,000 tons or more, in accordance with Article 38, Paragraph 1 of the Act. <Amended Mar. 18, 2020> Article 56 (Timing and Standards, etc., for Detailed Safety Diagnosis and Safety Assessment) ① A detailed safety diagnosis pursuant to Article 38, Paragraph 1 of the Act (hereinafter referred to as “detailed safety diagnosis”) shall be received at the time specified in each of the following subparagraphs. <Amended Mar. 18, 2020> 1. Facilities under Article 55, Paragraph 1, Subparagraph 1 : The year in which 15 years have elapsed from the date the certificate of completion inspection or certificate of construction supervision was first received, and the year in which every 5 years thereafter elapse. 2. Piping pursuant to Article 55, Paragraph 1, Subparagraph 2 : The year in which 20 years have elapsed from the date the construction supervision certificate was first received, and the year in which every 5 years thereafter elapse. ② The safety assessment pursuant to Article 38 , Paragraph 1 of the Act (hereinafter referred to as the “safety assessment”) shall be received at the respective times specified in each of the following subparagraphs. However, in cases falling under subparagraph 3, notwithstanding subparagraphs 1 and 2, the assessment shall be received at the time specified in subparagraph 3. <Amended Dec. 3, 2018; Mar. 18, 2020> 1. Before submitting an application for technical review to the Korea Gas Safety Corporation pursuant to Article 15 , Paragraph 1 or Article 49-3, Paragraph 6 2. The year in which every five years have elapsed from the date of receipt of the Certificate of Completion Inspection or Certificate of Construction Supervision for business offices, storage facilities, or manufacturing plants 3. In cases where a storage tank for liquefied petroleum gas (excluding underground rock cave-type storage tanks) is installed at a business office, storage facility, or manufacturing facility pursuant to Article 55, Paragraph 2, each of the following times a. Before submitting an application for technical review to the Korea Gas Safety Corporation pursuant to Article 15, Paragraph 1 or Article 49-3, Paragraph 6 B. The year in which every five years have elapsed from the date of receipt of the certificate of completion inspection or the certificate of construction supervision of the facility ③ If the timing for a safety assessment coincides with the timing for a detailed safety diagnosis or periodic inspection, the safety assessment and the detailed safety diagnosis or periodic inspection may be conducted at the same time. ④ The standards for precise safety diagnosis and safety assessment are as follows: <Amended Mar. 18, 2020> 1. Standards for Detailed Safety Diagnosis and Safety Assessment of Liquefied Petroleum Gas Filling Stations: Appendix 4 1-2. Standards for Detailed Safety Diagnosis and Safety Assessment of Gas Supply Facilities in Liquefied Petroleum Gas Pipeline Network Supply Businesses: Appendix 4-2 2. Standards for Detailed Safety Diagnosis and Safety Assessment of Liquefied Petroleum Gas Storage Facilities: Appendix 5 ⑤ Any person who intends to undergo a precise safety diagnosis or safety assessment shall submit the application for precise safety diagnosis in Form No. 39 or the application for safety assessment in Form No. 40 to the Korea Gas Safety Corporation at least 60 days prior to the date of the precise safety diagnosis or safety assessment. ⑥ The Korea Gas Safety Corporation shall submit the results to the licensing authority of the relevant business office or storage facility within 30 days from the date the detailed safety diagnosis or safety assessment is completed, and notify the person who received the detailed safety diagnosis or safety assessment. Article 57 (Application for Gas Appliance Inspection) Any person who intends to undergo an inspection of gas appliances pursuant to Article 39, Paragraph 1 of the Act shall submit an application for gas appliance inspection in the form of Annex 41 to the Korea Gas Safety Corporation. In this case, any person who intends to import gas appliances requiring confirmation by the head of the customs office pursuant to Article 226 of the Customs Act shall submit the application before clearing the relevant gas appliances through customs. <Amended July 11, 2017> Article 58 (Omission of Entire Gas Appliance Inspection) ①Where the entire inspection of gas appliances is omitted pursuant to Article 18, Paragraph 1, Subparagraph 1 of the Enforcement Decree, a person who has manufactured or imported gas appliances (including a foreign manufacturer of gas appliances) shall notify the Korea Gas Safety Corporation that the gas appliances are of the relevant type that have undergone certification examination pursuant to Article 17 of the Industrial Standardization Act . <Amended Dec. 3, 2018> ② Any person who intends to manufacture or import gas appliances for which the entire inspection of gas appliances is omitted pursuant to Article 18, Paragraph 1 of the Enforcement Decree may submit an application for omission of gas appliance inspection in the form of Annex 42 to the Korea Gas Safety Corporation and receive confirmation thereof. ③ The application form under Paragraph 2 must be accompanied by materials proving that the gas appliance is exempt from inspection. Article 59 (Inspection of Gas Appliances and Partial Omission of Inspection) ①For gas appliances under Article 18, Paragraph 2, Subparagraph 1 of the Enforcement Decree, the production stage inspection pursuant to Subparagraph 3, Item (b) 2) of Annex 7 may be omitted. In this case, for a combustion appliance that has undergone type approval inspection in accordance with the Korean Industrial Standards pursuant to Article 12 of the Industrial Standardization Act, the design stage inspection may be omitted if the inspection report is submitted. ② Cases in which part of the inspection of gas appliances imported pursuant to Article 18, Paragraph 2, Subparagraph 2 of the Enforcement Decree may be omitted are as follows: <Amended Oct. 1, 2025> 1. If there is a risk that conducting an inspection will degrade the performance of the gas appliance 2. If there is a risk of damage to the gas appliance by conducting the inspection 3. Cases where it is proven that an inspection has been received from a foreign inspection agency recognized by the Minister of Trade, Industry and Resources 4. In cases where gas appliances are imported in quantities less than or equal to the amount determined and notified by the Minister of Trade, Industry and Resources ③ Pursuant to Article 18 (3) of the Decree, the gas appliances specified in the following subparagraphs shall undergo all or part of the inspections as provided in the respective subparagraphs. 1. General-purpose liquefied petroleum gas pressure regulators, fuse cocks, gas heaters with built-in containers, portable butane burners, portable propane burners, and other piping valves under item 4 (f) 3) of Attached Table 7: Design-stage and production-stage inspections under item 3 (b) of Attached Table 7. 2. Gas appliances whose performance has been changed (excluding minor changes determined by the President of the Korea Gas Safety Corporation): Design-stage inspection under item 3 (b) 1) of Attached Table 7. ④ Pursuant to Article 18 (4) of the Decree, general-purpose liquefied petroleum gas pressure regulators, fuse cocks, gas heaters with built-in containers, portable butane burners, portable propane burners, and other piping valves under item 4 (f) 3) of Attached Table 7 shall undergo design-stage and production-stage inspections under item 3 (b) of Attached Table 7. Article 60 (Inspection Standards, etc. for Gas Appliances) The standards and methods for inspecting gas appliances under Article 39 (1) of the Act and other necessary matters shall be as prescribed in Attached Table 7. Article 61 (Marks Indicating Passage of Inspection for Gas Appliances) Stamping or marking of gas appliances that have passed an inspection under Article 39 (2) of the Act shall be as prescribed in Attached Table 18: Provided, That where compliance with Attached Table 18 is deemed difficult due to the size, shape, etc. of a gas appliance, the appliance may be marked in accordance with the detailed standards under Article 45 of the Act. Article 62 (Collection and Inspection of Gas Appliances in Distribution, etc.) ① Gas appliances that may be collected and inspected under Article 40 (2) of the Act shall be those for which one year has not elapsed since the date of passing an inspection under Article 39 (1) of the Act (or, where the manufacturer has established a warranty period, the applicable warranty period): Provided, That where particularly necessary for the safety control of gas appliances, appliances for which such period has elapsed may also be collected and inspected. ② Inspections of gas appliances collected under paragraph (1) shall determine whether they comply with the technical standards and inspection standards under items 2 and 3 of Attached Table 7. Article 63 (Orders for Recall, Replacement, Refund, and Public Announcement of Gas Appliances) ① An order for recall, replacement, and refund (hereinafter referred to as 'recall, etc.') under Article 40 (2) of the Act shall include the following matters: 1. Name and manufacturing serial number of the product. 2. Date of manufacture or import. 3. Name of the manufacturer or importer. 4. Grounds for the recall, etc. 5. Time, place, and method of the recall, etc. ② A person who has received an order under paragraph (1) shall, without delay, suspend or cause the suspension of distribution and sale of gas appliances subject to recall, etc., formulate a plan for the recall, etc., and submit the plan to the Minister of Trade, Industry and Resources or the head of a Si/Gun/Gu. <Amended Oct. 1, 2025> ③ A person who has received an order under paragraph (1) shall report the results of the recall, etc. to the Minister of Trade, Industry and Resources or the head of a Si/Gun/Gu. <Amended Oct. 1, 2025> ④ A person ordered to make a public announcement under Article 40 (2) of the Act shall, without delay, publish an advertisement concerning the recall, etc. containing the following matters in at least two nationwide daily newspapers: 1. A headline stating that the gas appliances are subject to recall, etc. 2. Name and manufacturing serial number of the product. 3. Year and month of manufacture or import of the gas appliances subject to recall, etc. 4. Grounds for the recall, etc. 5. Method of the recall, etc. 6. Name of the manufacturer or importer conducting the recall, etc. 7. Other matters necessary for the recall, etc. ⑤ Before ordering a public announcement under Article 40 (2) of the Act, the Minister of Trade, Industry and Resources or the head of a Si/Gun/Gu shall give the person subject to the order an opportunity to submit explanatory materials or state opinions. <Amended Oct. 1, 2025> ⑥ The Minister of Trade, Industry and Resources or the head of a Si/Gun/Gu may determine and publicly notify detailed matters concerning recall, etc. <Amended Oct. 1, 2025> Article 64 (Marking of Intended Uses of Gas Appliances, etc.) The method of marking the manufacturer, date of manufacture, intended use, method of use, warranty period, manufacturing serial number, and other particulars on gas appliances manufactured or imported by a person (including a foreign gas appliance manufacturer) under Article 40 (4) of the Act shall comply with the technical standards under item 2 of Attached Table 7. <Amended Dec. 3, 2018> Article 65 (Minor Modifications) 'Minor cases prescribed by Ordinance of the Ministry of Trade, Industry and Resources' under Article 40 (5) of the Act means cases falling under any of the following subparagraphs as determined by the President of the Korea Gas Safety Corporation. <Amended Oct. 10, 2023; Oct. 1, 2025> 1. Where a manufacturer of combustion appliances, forced-mixing gas burners, or multifunctional boilers changes the performance of a gas appliance. 2. Where the heat output of combustion appliances, forced-mixing gas burners, or multifunctional boilers is changed as a result of changing the type of gas used. 3. Where modifications are made to prevent accidents involving combustion appliances, forced-mixing gas burners, or multifunctional boilers, such as measures to block gas when the ignition rod of a large commercial combustion appliance becomes detached. Article 66 (Safety Education) ① The scope of persons subject to safety education under Article 41 of the Act, the training period, curricula, and other matters necessary for education shall be as prescribed in Attached Table 19. ② A person who intends to receive education under paragraph (1) shall submit an application for safety education in Form No. 43 to the Korea Gas Safety Corporation. Article 67 Deleted. <Mar. 18, 2020> Article 68 Deleted. <Mar. 18, 2020> Article 69 (Facility and Technical Standards for Liquefied Petroleum Gas-Using Facilities) The facility standards and technical standards for liquefied petroleum gas-using facilities under Article 44 (1) of the Act shall be as prescribed in Attached Table 20. Article 70 (Specified Users of Liquefied Petroleum Gas, etc.) ① 'Persons prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 44 (2) of the Act means persons falling under any of the following subparagraphs (hereinafter referred to as 'specified users of liquefied petroleum gas'). <Amended Jul. 11, 2017; Dec. 3, 2018; Mar. 18, 2020; Dec. 16, 2021; Oct. 1, 2025> 1. Persons intending to use liquefied petroleum gas in Class I protected facilities or basements (excluding use of liquefied petroleum gas for residential purposes). 2. Persons other than those under subparagraph 1 who fall under any of the following items: (a) Persons operating institutional food service facilities under Article 2, subparagraph 12 of the Food Sanitation Act. (b) Persons engaged in food service business under Article 36 (1) 3 of the Food Sanitation Act. (c) A management entity of multi-unit housing that jointly has storage facilities with a capacity of at least 250 kilograms (500 kilograms where containers are connected using an automatic changeover device; hereinafter the same applies in this item) and uses liquefied petroleum gas: Provided, That where there is no management entity, this means the representative of the users of multi-unit housing jointly equipped with storage facilities with a capacity of at least 250 kilograms but less than five tons who use liquefied petroleum gas. (d) Persons using storage facilities with a capacity of at least 250 kilograms but less than five tons (excluding facilities attached to vehicles used for road maintenance or repair): Provided, That where containers are connected using an automatic changeover device, this means persons using storage facilities with a capacity of at least 500 kilograms but less than five tons. 3. Persons, other than those under subparagraphs 1 and 2, who use liquefied petroleum gas with small storage tanks. 4. Owners of detached houses, multi-unit housing, or officetels (limited to residential use) using liquefied petroleum gas that require approval for use of the building under Article 22 of the Building Act, other than persons under subparagraphs 1 through 3. 5. Persons, other than those under subparagraphs 1 through 4, who use liquefied petroleum gas in buildings falling under items 3 through 28 of Attached Table 1 of the Enforcement Decree of the Building Act that are subject to permission or reporting under Articles 11 or 14 or Article 20 (1) of the Building Act. 6. Persons intending to use liquefied petroleum gas as fuel for automobiles. 7. Persons using liquefied petroleum gas for purposes other than automobile fuel in small or light-duty trucks for mobile food sales under items 1 and 2 and note 1 (a) of Attached Table 1 of the Enforcement Rule of the Motor Vehicle Management Act, or in special-purpose vehicles for mobile food sales under item 2 of that Table (hereinafter referred to as 'mobile food sales vehicles'). 8. Persons using liquefied petroleum gas for cooking or camping inside camping vehicles under Article 29 (3) of the Motor Vehicle Management Act. 8-2. Persons, other than those under subparagraphs 1 through 8, who use liquefied petroleum gas by connecting a liquefied petroleum gas storage facility to piping. 9. Persons similar to those under subparagraphs 1 and 2 who are designated by the head of a Si/Gun/Gu as necessary for safety control. ② Notwithstanding paragraph (1), persons falling under any of the following subparagraphs shall be excluded from specified users of liquefied petroleum gas. <Newly inserted Dec. 16, 2021> 1. Persons using liquefied petroleum gas for gas heaters with built-in containers, portable butane burners, or portable propane burners. 2. Persons who use liquefied petroleum gas while moving. ③ A person falling under paragraph (1) 2 (c) or (d) who intends to obtain a prior review of whether a facility installation plan complies with facility and technical standards shall submit an application for technical review in Form No. 16 to the Korea Gas Safety Corporation, accompanied by the following documents. <Amended Dec. 16, 2021> 1. A facility installation plan. 2. Drawings and explanatory documents concerning facility and technical standards. Article 71 (Inspection of Facilities for Specified Use of Liquefied Petroleum Gas) ① Alteration works for facilities that must undergo a completion inspection under Article 44 (2) of the Act shall be as follows: 1. Works involving relocation of storage facilities (limited to container manifold facilities with a capacity of at least 500 kilograms, small storage tanks, and storage tanks) or an increase in capacity accompanied by an increase in the number of facilities installed. 2. Works for replacement and installation of storage tanks or small storage tanks. 3. Works for changing the type of storage facilities (limited to containers, small storage tanks, and storage tanks). 4. Works for increasing the number or capacity of gas facilities (limited to vaporizers, pumps, and compressors). 5. Works for extending piping by at least 20 meters at facilities using storage facilities with a capacity of at least 500 kilograms. ② A gas facility constructor intending to undergo a completion inspection of facilities for specified use of liquefied petroleum gas under Article 44 (2) of the Act shall submit an application for completion inspection of such facilities in Form No. 44 to the Korea Gas Safety Corporation no later than seven days before the start of use, accompanied by as-built drawings and construction status documents concerning the facilities as determined by the President of the Korea Gas Safety Corporation. ③ A specified user of liquefied petroleum gas under Article 70 (1) 4 shall pass a completion inspection under Article 44 (2) of the Act before applying for approval for use of the relevant building under Article 22 of the Building Act: Provided, That this shall not apply to a building in an island area under Article 2 (1) of the Enforcement Decree of the Islands Development Promotion Act that is not connected to the mainland by a bridge, where a copy of the completion inspection application is attached when applying for approval for use of the building. ④ A specified user of liquefied petroleum gas shall undergo a periodic inspection under the main clause of Article 44 (4) of the Act within 30 days before or after each anniversary of the date on which the certificate of completion inspection was issued under Article 44 (2) of the Act. <Amended Dec. 16, 2021; Jun. 30, 2023> 1. Deleted. <Jun. 30, 2023> 2. Deleted. <Jun. 30, 2023> ⑤ Notwithstanding paragraph (4), in any of the following cases a periodic inspection shall be conducted at the time specified in the relevant subparagraph. <Newly inserted Dec. 16, 2021; Jun. 30, 2023> 1. Where deemed necessary by the President of the Korea Gas Safety Corporation: At the time determined for each Eup/Myeon/Dong. 2. Where requested by a specified user of liquefied petroleum gas: At the time determined by agreement between the Korea Gas Safety Corporation and that user. 3. Where the President of the Korea Gas Safety Corporation determines that conducting a periodic inspection at the time under paragraph (4) or subparagraph 1 or 2 of this paragraph is inappropriate due to a natural disaster, calamity, or other unavoidable circumstances: At the time determined by the President of the Korea Gas Safety Corporation in consultation with the specified user of liquefied petroleum gas. ⑥ A person intending to undergo a periodic inspection of facilities for specified use of liquefied petroleum gas under the main clause of Article 44 (4) of the Act shall submit an application for periodic inspection of those facilities in Form No. 45 to the Korea Gas Safety Corporation. <Amended Dec. 16, 2021> ⑦ Any specified user of liquefied petroleum gas falling under any of the following subparagraphs shall be exempted from periodic inspection pursuant to the proviso to Article 44 (4) of the Act. <Amended Dec. 16, 2021; Jun. 30, 2023> 1. Persons using liquefied petroleum gas in senior citizens' centers under the Welfare of Senior Citizens Act whose liquefied petroleum gas storage facilities have a capacity of no more than 100 kilograms. 2. Persons falling under any of the following items whose storage capacity is less than 250 kilograms (or less than 500 kilograms where containers are connected using an automatic changeover device): (a) Persons intending to use liquefied petroleum gas in basements under Article 70 (1) 1. (b) Persons engaged in food service business under Article 70 (1) 2 (b). (c) Persons falling under Article 70 (1) 3 through 5. 3. Deleted. <Jun. 30, 2023> ⑧ The Korea Gas Safety Corporation may inform a specified user of liquefied petroleum gas of the periodic inspection date, inspection fee, and other matters necessary for periodic inspection one month before the inspection date. <Amended Dec. 16, 2021> ⑨ A specified user of liquefied petroleum gas under Article 70 (1) 6 through 8 shall be deemed to have undergone a completion inspection or periodic inspection under Articles 44 (2) and the main clause of Article 44 (4) of the Act according to the following classifications. <Amended Jul. 11, 2017; Dec. 16, 2021> 1. Cases deemed to have undergone a completion inspection: Where a specified user of liquefied petroleum gas under Article 70 (1) 6 falls under either of the following items: (a) Where self-certification has been completed under Article 30 of the Motor Vehicle Management Act. (b) Where a tuning inspection has been conducted under Article 43 (1) 3 of the Motor Vehicle Management Act. 2. Cases deemed to have undergone a periodic inspection: Where a specified user of liquefied petroleum gas under Article 70 (1) 6 through 8 has undergone a periodic inspection under Article 43 (1) 2 of the Motor Vehicle Management Act. ⑩ Inspection standards for completion inspections and periodic inspections under Articles 44 (2) and (4) of the Act shall be as prescribed in Attached Table 20. <Amended Dec. 16, 2021> ⑪ The President of the Korea Gas Safety Corporation shall issue to a person who has passed a completion or periodic inspection a certificate according to the following classifications (including an electronic certificate if the successful applicant consents): Provided, That where a specified user of liquefied petroleum gas requests a completion inspection certificate, a confirmation of passage of the completion inspection as determined by the President of the Korea Gas Safety Corporation shall be issued. <Amended Dec. 16, 2021> 1. Gas facility constructor who has passed a completion inspection: Certificate of completion inspection in Form No. 46. 2. Specified user of liquefied petroleum gas who has passed a periodic inspection: Certificate of periodic inspection in Form No. 47. ⑫ The particulars that the head of a Si/Gun/Gu shall notify to the head of the competent fire station under Article 44 (5) of the Act shall be the name and location of the facilities for specified use of liquefied petroleum gas and the name of their representative. <Amended Dec. 16, 2021> ⑬ The subjects, scope, methods, and timing for disclosure of inspection results under Article 44 (9) of the Act shall be as set forth in the following subparagraphs. <Newly inserted Dec. 16, 2021> 1. Subjects of disclosure: (a) Among specified users of liquefied petroleum gas under Article 70 (1) 1, persons using liquefied petroleum gas in Class I protected facilities. (b) Persons operating institutional food service facilities under Article 70 (1) 2 (a). (c) Persons engaged in food service business under Article 70 (1) 2 (b). (d) Persons using liquefied petroleum gas in facilities used by many persons. 2. Scope of disclosure: (a) Name and location (address) of the facility using liquefied petroleum gas. (b) Date, type, and result of inspection of the facility. 3. Method and timing of disclosure: (a) Method of disclosure: Disclosure through the following methods: 1) Posting on the website of the Korea Gas Safety Corporation. 2) Posting on the integrated safety information management system under Article 66-9 (2) of the Framework Act on the Management of Disasters and Safety. (b) Timing of disclosure: Within 10 days from the last day of the quarter in which the inspection date falls. Article 71-2 (Types of Safety Devices, etc.) ① 'Persons prescribed by Ordinance of the Ministry of Trade, Industry and Resources, such as persons operating lodging businesses under the Public Health Control Act' in Article 44-2 (2) of the Act means persons operating lodging businesses under Article 2 (1) 2 of the Public Health Control Act. <Amended Oct. 1, 2025> ② The scope of gas appliances, types of safety devices, and installation standards under Articles 44-2 (1) and (2) of the Act shall be as follows. <Amended Oct. 10, 2023> 1. Scope of gas appliances: Hot-water boilers under item 4 (j) of Attached Table 7 and multifunctional boilers under item 4 (h) of the same Table: Provided, That hot-water boilers and multifunctional boilers sold to users (including building owners) with separately installed safety devices under subparagraph 2 (including those already installed) or with more safety devices than the number required by the installation standards under subparagraph 3 shall be excluded. 2. Types of safety devices: Carbon monoxide gas leak alarms (hereinafter referred to as 'carbon monoxide alarms') that have passed product inspection under Article 37 (3) of the Act on Installation and Management of Firefighting Systems. 3. Installation standards for safety devices: Item 1 (a) 5) (b) (3) of Attached Table 20. [This Article Newly Inserted on Aug. 5, 2020] Article 72 (Procedures for Establishing or Amending Detailed Standards) ① A person applying for the establishment or amendment of detailed standards under Article 45 (1) of the Act shall submit the following documents to the Gas Technical Standards Committee under Article 33-2 of the High-Pressure Gas Safety Control Act (hereinafter referred to as the 'Standards Committee'). 1. A proposed detailed standard or proposed amendment thereto. 2. Grounds for the proposed establishment or amendment and supporting materials. ② Upon receiving an application under paragraph (1), the Standards Committee shall, within 15 days, review whether to place the matter on the agenda of its meeting; if it decides to do so, it shall place the matter on the agenda, and if it decides not to do so, it shall notify the applicant of its reasons. ③ Where the Standards Committee decides under paragraph (2) to place a matter on the agenda, it shall inform the public of the name, number (only in the case of amendment), main contents, reasons, period for submission of opinions, and other particulars of the detailed standards through the Committee's website or other means. ④ An applicant notified under paragraph (2) that a matter will not be placed on the agenda may file an objection within 10 days from the date of receiving the notice of the reasons. ⑤ Details necessary for establishing or amending detailed standards, other than those prescribed in paragraphs (1) through (5), shall be determined by the Standards Committee. Article 72-2 (Support for Establishing Safety Management Systems) 'Establishment of safety management systems prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 47 (1) of the Act means the following. <Amended Oct. 1, 2025> 1. Operation and monitoring of a centralized safety management monitoring system capable of monitoring the safety of gas supply and gas use facilities through information and communications networks. 2. Maintenance and management of gas supply facilities of liquefied petroleum gas pipeline network supply businesses. 3. Other matters deemed necessary for safety control by the Minister of Trade, Industry and Resources or the head of a Si/Gun/Gu. [This Article Newly Inserted on Mar. 18, 2020] Article 72-3 (Business Subject to Confirmation of Buried Liquefied Petroleum Gas Pipelines, etc.) 'A business prescribed by Ordinance of the Ministry of Trade, Industry and Resources among liquefied petroleum gas filling businesses' in the main clauses of Articles 49-3 (1) and 49-5 (1), the former part of Article 49-4 (1), and Article 49-7 (1) of the Act means a liquefied petroleum gas filling business under Article 3 (1) 1 (e) or (f) of the Decree that has pipelines extending beyond its business premises. <Amended Oct. 1, 2025> [This Article Newly Inserted on Mar. 18, 2020] Article 72-4 (Confirmation of Buried Liquefied Petroleum Gas Pipelines, etc.) ① When an excavation contractor requests confirmation of whether liquefied petroleum gas pipelines are buried under Article 49-3 (1) of the Act from the Excavation Information Support Center entrusted under Article 21-2 of the Decree (hereinafter referred to as the 'Information Support Center'), the contractor shall notify the Center of an excavation plan including the following: 1. Name of the company ordering the excavation work. 2. Name of the excavation contractor and personal details of the person in charge of the work. 3. Type, location, and scheduled date of the excavation work. ② Where a person intending to notify an excavation plan under paragraph (1) has obtained permission to occupy and use a road under Article 61 of the Road Act and the permitting authority provides the Information Support Center with the excavation plan information no later than 24 hours before excavation work begins, the excavation contractor shall be deemed to have notified the plan. <Amended Oct. 10, 2023> ③ Upon receiving an excavation plan under paragraph (1), the Information Support Center shall issue a receipt number to the excavation contractor: Provided, That where the permitting authority provides the Center with the excavation plan information under paragraph (2), the Center may assign a receipt number through an information and communications network and enable the contractor to check it through that network. ④ Upon receiving notice of an excavation plan from an excavation contractor under paragraph (1), the Information Support Center shall immediately notify, through an information and communications network, the relevant liquefied petroleum gas filling business operator (limited to an operator under Article 72-3; hereinafter the same applies in this Article, Article 72-5, Articles 72-8 through 72-13, and Attached Table 20-2) or liquefied petroleum gas collective supply business operator (limited to a liquefied petroleum gas pipeline network supply business operator and a general collective supply business operator who supplies gas through pipelines buried in a road or another person's land; hereinafter the same applies in the same provisions). ⑤ A liquefied petroleum gas filling business operator or collective supply business operator shall confirm whether pipelines are buried and notify the Information Support Center of the result within 24 hours after receiving the excavation plan notice from the Center under paragraph (4). Saturdays and public holidays under Article 2 of the Regulations on Public Holidays of Government Offices shall not be counted in the notification period. ⑥ An excavation plan notified under paragraph (1) shall be valid for 15 days. If the location of the excavation site and the buried liquefied petroleum gas pipelines have not been marked under Article 72-5 by 15 days after the date of notification to the Information Support Center or the scheduled excavation date, the excavation contractor shall notify the excavation plan again. ⑦ 'Place prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 21-3 (2) 5 of the Decree means a manufacturing facility. <Amended Oct. 1, 2025> [This Article Newly Inserted on Mar. 18, 2020] Article 72-5 (Measures to Be Taken by Excavation Contractors and Liquefied Petroleum Gas Filling and Collective Supply Business Operators) Matters that excavation contractors, liquefied petroleum gas filling business operators, and liquefied petroleum gas collective supply business operators shall undertake to prevent accidents due to excavation works under Article 49-3 (4) of the Act, including how to mark excavation sites and buried pipeline locations, notification of marking, installation of pipeline protection facilities, and provision of drawings, shall be as prescribed in item 1 of Attached Table 20-2. [This Article Newly Inserted on Mar. 18, 2020] Article 72-6 (Commencement of Excavation Works) The Information Support Center shall notify an excavation contractor that excavation works may commence within either of the following periods: 1. Within 24 hours after receiving notice under Article 72-4 (5) that no pipelines are buried. 2. Within one hour after receiving notice under Article 72-5 that the buried liquefied petroleum gas pipelines have been marked. [This Article Newly Inserted on Mar. 18, 2020] Article 72-7 (Points Through Which Liquefied Petroleum Gas Pipelines Pass) 'Points through which liquefied petroleum gas pipelines pass prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 21-4 of the Decree means the following points. <Amended Jan. 21, 2022; Oct. 1, 2025> 1. Points where liquefied petroleum gas pipelines are expected to be exposed due to excavation related to the construction works. 2. Points where liquefied petroleum gas pipelines are buried within a horizontal distance of 0.6 times the excavation depth from either end of the excavated bottom surface of the construction works. 3. Points of construction works where a liquefied petroleum gas pipeline with a maximum operating pressure of at least 0.01 megapascals passes directly beneath the bottom of an underground facility to be built. 4. In tunnel excavation works, points where liquefied petroleum gas pipelines are buried within 0.6 times the maximum diameter of the tunnel excavation cross section from the tunnel excavation face. [This Article Newly Inserted on Mar. 18, 2020] Article 72-8 (Preparation of Gas Safety Impact Assessment, etc.) ① Documents concerning a gas safety impact assessment under Article 49-4 (1) of the Act (hereinafter referred to as the 'assessment report') shall include the following. <Amended Jan. 21, 2022> 1. Scope of liquefied petroleum gas pipelines affected by the construction works. 2. Whether the construction plan needs to be changed. 3. Necessity, methods, and timing of safety measures, such as relocation of liquefied petroleum gas pipelines, temporary suspension of use, installation of temporary pipelines, changes in pipeline types, and protective works, and matters concerning the contractor undertaking those safety measures. 4. Safety management system during construction and timing and methods of attendance at construction works. 5. Matters concerning the cost of safety measures to be borne. 6. Other matters prescribed in item 3 of Attached Table 20-2. ② A person intending to obtain the opinion of the Korea Gas Safety Corporation on an assessment report under the latter part of Article 49-4 (1) of the Act shall submit the report to the Korea Gas Safety Corporation, accompanied by opinions from the liquefied petroleum gas filling and collective supply business operators responsible for the relevant pipelines. ③ A person responsible for preparing an assessment report under Article 49-4 (1) of the Act shall submit the report, accompanied by the opinion of the Korea Gas Safety Corporation, to the head of a Si/Gun/Gu before commencement of the construction works subject to gas safety impact assessment. [This Article Newly Inserted on Mar. 18, 2020] Article 72-9 (Preparation of Agreements on Excavation Works) ① Persons required to consult on the safety of liquefied petroleum gas pipelines under Article 49-5 (1) of the Act shall be persons intending to undertake excavation works falling under either of the following subparagraphs: 1. Excavation works in which the total length of liquefied petroleum gas pipelines buried within the planned excavation area is at least 100 meters. 2. Excavation works expected to expose at least 10 meters of pipeline with a maximum operating pressure of at least 0.01 megapascals. ② A person intending to undertake excavation works under paragraph (1) shall, before commencing the works, prepare an excavation works consultation document in Form No. 47-2 with the relevant liquefied petroleum gas filling and collective supply business operators under Article 49-5 (2) of the Act. [This Article Newly Inserted on Mar. 18, 2020] Article 72-10 (Emergency Excavation Works, etc.) Where an excavation contractor undertakes excavation works for emergency restoration due to a natural disaster or unexpected accident (hereinafter referred to as 'emergency excavation works'), or excavation works for water supply no longer than 10 meters and no wider than three meters (hereinafter referred to as 'small-scale water supply works'), the contractor may, notwithstanding Articles 72-4 (3) and (5), 72-5, 72-6, and 72-9, jointly consult with the relevant liquefied petroleum gas filling and collective supply business operators at the excavation site about buried liquefied petroleum gas pipelines and commence works in the presence of a safety inspector. <Amended Jan. 21, 2022; Oct. 10, 2023> [This Article Newly Inserted on Mar. 18, 2020] Article 72-11 (Joint Monitoring System and Patrol Inspections) ① 'Other works prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 49-5 (3) of the Act means the following works. <Amended Oct. 1, 2025> 1. Underground shopping center construction works. 2. Construction works expected to expose at least 10 meters of pipelines with a maximum operating pressure of at least 0.01 megapascals. ② Pursuant to Article 49-5 (3) of the Act, the relevant liquefied petroleum gas filling and collective supply business operators and the construction contractor shall determine matters concerning joint on-site attendance or patrol inspections through mutual consultation and carry them out. <Amended Jan. 21, 2022> ③ Where joint on-site attendance or patrol inspections under paragraph (2) are conducted, the parties shall mutually confirm the results. <Amended Jan. 21, 2022> ④ The period of joint patrol inspections under paragraph (2) shall run from commencement until completion of the construction works. [This Article Newly Inserted on Mar. 18, 2020] Article 72-12 (Standards for Prevention of Damage to Liquefied Petroleum Gas Pipelines, etc.) ① 'Businesses prescribed by Ordinance of the Ministry of Trade, Industry and Resources among liquefied petroleum gas filling and collective supply businesses' in Article 49-6 of the Act means filling businesses under Article 3 (1) 1 (e) or (f) of the Decree that have pipelines extending beyond their business premises and liquefied petroleum gas collective supply businesses (excluding general collective supply businesses that supply gas through pipelines other than those buried in a road or another person's land). <Amended Oct. 1, 2025> ② Standards for preventing damage to liquefied petroleum gas pipelines under Article 49-6 of the Act shall be as prescribed in Attached Table 20-2. [This Article Newly Inserted on Mar. 18, 2020] Article 72-13 (Safety Measures for Liquefied Petroleum Gas Pipelines, etc.) ① Safety measures that liquefied petroleum gas filling and collective supply business operators may take under Article 49-7 (1) of the Act shall be as follows: 1. Designation and operation of persons dedicated to safety management at each excavation site. 2. Provision to excavation contractors of drawings showing buried pipeline locations, etc. 3. Guidance and consultation on systems for protection of liquefied petroleum gas pipelines, including confirmation of buried pipeline locations, gas safety impact assessments, consultation on excavation works, and patrol inspections. 4. Other matters prescribed in item 2 of Attached Table 20-2. ② Drawings of liquefied petroleum gas pipelines under Article 49-7 (2) of the Act shall include the following. <Amended Oct. 1, 2025> 1. Buried locations of pipelines and their ancillary facilities. 2. Pressure, nominal diameter, and material of liquefied petroleum gas pipelines. 3. Constructor and year, month, and day of construction. 4. Other matters deemed necessary and determined by the Minister of Trade, Industry and Resources. [This Article Newly Inserted on Mar. 18, 2020] CHAPTER VI SUPERVISION Article 73 (Procedures for Reporting and Investigation, etc.) ① Where the Minister of Trade, Industry and Resources, the Mayor/Do Governor, or the head of a Si/Gun/Gu (excluding the Special Self-Governing City Mayor and Special Self-Governing Province Governor) orders an association of business operators, an importer or exporter of liquefied petroleum gas, a liquefied petroleum gas business operator, etc., a specified user of liquefied petroleum gas, or a constructor to report on its affairs under the former part of Article 55 (1) of the Act, the authority shall specify the matters to be reported and the reporting deadline and give notice at least 10 days before that deadline: Provided, That the matters and deadlines for periodic reports by liquefied petroleum gas filling business operators (including their business offices) and sales business operators shall be as prescribed in Attached Table 21. <Amended Oct. 1, 2025> ② Where the Minister of Trade, Industry and Resources, the Mayor/Do Governor, or the head of a Si/Gun/Gu (excluding the Special Self-Governing City Mayor and Special Self-Governing Province Governor) has an affiliated public official or a person entrusted with authority conduct an investigation under the former part of Article 55 (1) of the Act, the person subject to investigation shall be notified in advance of the investigation's purpose, date and time, place, and investigators' personal details: Provided, That this shall not apply where advance notice would prevent attainment of the investigation's purpose or where urgent circumstances exist. <Amended Oct. 1, 2025> Article 74 (Notification of Accidents) ① Persons required to notify the Korea Gas Safety Corporation of an accident under Article 56 (1) of the Act shall be as follows: 1. Liquefied petroleum gas filling business operators (including their business offices), collective supply business operators, gas appliance manufacturers, and sales business operators licensed under Article 5 of the Act, and consignment transport business operators registered under Article 9 of the Act. 2. Persons licensed to install liquefied petroleum gas storage facilities under Article 8 (1) of the Act. 3. Specified users of liquefied petroleum gas under Article 44 (2) of the Act (limited to those whose liquefied petroleum gas storage capacity exceeds 250 kilograms). ② Notification under paragraph (1) shall be made as prescribed in Attached Table 22. ③ 'Accidents prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 56 (1) 5 of the Act means accidents involving gas leakage from storage tanks or small storage tanks of liquefied petroleum gas business operators, etc. <Amended Oct. 1, 2025> CHAPTER VII SUPPLEMENTARY PROVISIONS Article 75 (Insurance Coverage, etc.) ① The scope of insurance coverage under each subparagraph of Article 30 (1) of the Decree shall be as follows: 1. Gas accident liability insurance: The amount of loss caused by a gas accident resulting from negligence of a person falling under Article 57 (1) of the Act. 2. Consumer protection liability insurance: The amount of loss caused by gas accidents falling under any of the following items: (a) Gas accidents caused by negligence of a person supplying liquefied petroleum gas. (b) Gas accidents occurring at liquefied petroleum gas-using facilities of persons using liquefied petroleum gas with small storage tanks or of container gas consumers, excluding the following accidents: 1) Accidents intentionally caused by persons using liquefied petroleum gas with small storage tanks, container gas consumers, etc.: Provided, That compensation shall be paid if so specified in the insurance terms and conditions. 2) Accidents caused by arbitrarily removing or modifying equipment owned by a gas supplier without prior consultation with the supplier. 3) Accidents caused by failing to comply with a recommendation for improvement under Article 30 (2) of the Act. 4) Accidents caused by natural disasters. ② 'Liquefied petroleum gas-using facilities prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 30 (1) 1 (a) of the Decree means facilities used by container gas consumers. <Amended Oct. 1, 2025> ③ 'Persons prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 30 (1) 2 (a) of the Decree means the following. <Amended Oct. 1, 2025> 1. Persons who import liquefied petroleum gas for any of the purposes specified in Article 18 (1) 2 through 7 of the Decree. 2. Persons who import liquefied petroleum gas for purposes other than sale. ④ 'Persons prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 30 (1) 2 (d) of the Decree means the following. <Amended Jul. 11, 2017; Oct. 1, 2025> 1. Among constructors of liquefied petroleum gas facilities under Article 35 of the Act, those undertaking installation or alteration works of hot-water boilers fueled by liquefied petroleum gas (excluding hot-water boilers constituting equipment subject to inspection under Article 39 (1) of the Energy Use Rationalization Act), gas water heaters, or their auxiliary facilities. 2. Among specified users of liquefied petroleum gas, persons falling under any of the following items: (a) Persons operating food service establishments under the Food Sanitation Act with business premises of at least 100 square meters in Class I protected facilities or basements. (b) Persons operating institutional food service facilities under the Food Sanitation Act capable of accommodating at least 50 persons per meal on a regular basis in Class I protected facilities or basements. (c) Persons equipped with storage facilities for liquefied petroleum gas with a storage capacity exceeding 100 kilograms (in the case of common storage facilities, total storage capacity divided by the number of users) in traditional markets under Article 2, subparagraph 1 of the Special Act on the Development of Traditional Markets and Shopping Districts. (d) Persons, other than those under items (a) through (c), equipped with storage facilities with a capacity of at least 250 kilograms (500 kilograms where containers are connected using an automatic changeover device or where small storage tanks are used): Provided, That persons using liquefied petroleum gas for residential purposes shall be excluded. ⑤ The insured amounts under Article 30 (3) of the Decree shall be as prescribed in Attached Table 23. Article 76 (Reporting and Disclosure of Sales Prices, etc.) ① 'Liquefied petroleum gas sales business operators prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in Article 31 (1) 4 of the Decree means sales business operators falling under either of the following subparagraphs. <Amended Oct. 1, 2025> 1. Liquefied petroleum gas sales business operators whose annual domestic sales of liquefied petroleum gas in the previous year were at least 120 tons. 2. Liquefied petroleum gas sales business operators designated by the Minister of Trade, Industry and Resources as requiring a price survey. ② Reporting of liquefied petroleum gas sales prices under Article 31 (2) of the Decree shall be made using sales price reports in Forms No. 48 and 49. ③ 'At least the quantity prescribed by Ordinance of the Ministry of Trade, Industry and Resources' in the proviso to Article 31 (3) 1 of the Decree means cases where annual domestic sales of liquefied petroleum gas in the previous year were at least 1.5 million kiloliters. <Amended Oct. 1, 2025> ④ Detailed instructions for completing Forms No. 48 and 49 and other particulars necessary for reporting and disclosing sales prices shall be determined and publicly notified by the Minister of Trade, Industry and Resources. <Amended Oct. 1, 2025> Article 77 (Fees, etc.) ① Fees under Article 60 (1) of the Act shall be as prescribed in Attached Table 24. ② Fees under paragraph (1) shall be paid in revenue stamps of the relevant local government: Provided, That the Mayor/Do Governor or head of a Si/Gun/Gu (excluding the Special Self-Governing City Mayor and Special Self-Governing Province Governor) may permit payment by electronic money, electronic settlement, or similar means using an information and communications network. Article 78 (Special Exceptions to Facility and Technical Standards, etc.) Where deemed necessary due to changes in technology concerning liquefied petroleum gas or for improvement of safety management or distribution order, the Minister of Trade, Industry and Resources or the Minister of Climate, Energy and Environment may establish special exceptions or separately determine and publicly notify matters necessary for implementing facility and technical standards, etc. <Amended Oct. 1, 2025> Article 79 (Standards for Handling Entrusted Affairs) The Minister of Trade, Industry and Resources may determine detailed matters, including procedures necessary for the Korea Gas Safety Corporation to handle affairs entrusted to it under Article 32 (3) and Article 32 (4) 2 and 3 of the Decree. <Amended Oct. 1, 2025> Article 80 Deleted. <Jul. 11, 2017> Article 81 (Review of Regulations) ① The Minister of Trade, Industry and Resources shall review the appropriateness of the following matters every three years, based on January 1, 2017 (meaning before January 1 of every third year), and take measures such as making improvements. <Amended Jul. 11, 2017; Oct. 1, 2025> 1. Deleted. <Aug. 5, 2020> 2. Deleted. <Aug. 5, 2020> 3. Deleted. <Mar. 18, 2020> 4. Deleted. <Aug. 5, 2020> 5. Deleted. <Aug. 5, 2020> 6. Persons subject to mandatory insurance coverage under Article 75 (3) and (4). ② The Minister of Trade, Industry and Resources shall review the appropriateness of the following matters every two years based on the reference dates specified in the respective subparagraphs (meaning before the same date as each reference date in every second year), and take measures such as making improvements. <Amended Jul. 11, 2017; Mar. 18, 2020; Dec. 16, 2021; Oct. 1, 2025> 1. Deleted. <Jul. 11, 2017> 2. Deleted. <Jul. 11, 2017> 3. Matters subject to permission for change, change registration, and change reporting under Article 7: January 1, 2015. 4. Facility and technical standards for liquefied petroleum gas pipeline network supply under Article 12 (1) 1-2 and Attached Table 4-2: January 1, 2020. 5. Facility and technical standards for general collective supply and storage facilities of liquefied petroleum gas under Article 12 (1) 2 and Attached Table 5: January 1, 2015. 6. Gas appliances exempt from manufacturing registration under Article 17 (1): January 1, 2015. 7. Standards for imposition and calculation of penalty surcharges under Articles 21 (1) and 31 (1) and Attached Tables 9, 10, and 12: January 1, 2015. 8. Deleted. <Jul. 11, 2017> 9. Matters to be publicly announced concerning liquefied petroleum gas that violates quality standards under Article 39 (1): January 1, 2015. 10. Mandatory retention period for safety management implementation registers, etc. under Article 42 (3): January 1, 2015. 11. Deleted. <Jul. 11, 2017> 12. Retention period for records of implementation of safety management regulations under Article 45: January 1, 2015. 13. Deleted. <Feb. 28, 2023> 14. Scope of facilities for specified use of liquefied petroleum gas subject to appointment of safety managers under Article 49 (1): January 1, 2015. 15. Scope of works subject to confirmation of safety under Article 51 (1): January 1, 2015. 16. Periodic inspection cycles under Article 52 (3): January 1, 2015. 17. Documents required for an application for exemption from periodic inspection under Article 54 (1): January 1, 2015. 18. Facilities subject to precision safety diagnosis and safety assessment under Article 55: January 1, 2015. 19. Timing of precision safety diagnosis and safety assessment under Article 56: January 1, 2015. 20. Deleted. <Jul. 11, 2017> 21. Deleted. <Jul. 11, 2017> 22. Deleted. <Jul. 11, 2017> 23. Liquefied petroleum gas sales business operators subject to mandatory sales-price reporting under Article 76 (1): January 1, 2015. 24. Fees under Article 77 (1) and Attached Table 24: January 1, 2015. Article 82 (Deadline for Replacement of Piping of Liquefied Petroleum Gas-Using Facilities Installed in Housing) 'Deadline prescribed by Ordinance of the Ministry of Trade, Industry and Resources' among the violations under item 2 (ch) 1) of Attached Table 4 of the Decree means December 31, 2030. <Amended Mar. 18, 2020; Aug. 5, 2020; Oct. 1, 2025> [This Article Newly Inserted on Dec. 30, 2015] ADDENDA <Ministry of Trade, Industry and Energy Decree No. 146, Jul. 29, 2015> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability) ① The amended provisions of Article 50 (1) of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 19, shall apply to facilities first altered on or after July 18, 2008, the date that amendment entered into force. ② The amended provisions of item 2 (d) of Attached Table 20 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 19, shall apply to container gas consumers who requested termination of their contracts on or after July 18, 2008, the date that amendment entered into force. ③ The amended provisions of item 1 (a) 9) (f) of Attached Table 15 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 94, shall apply to liquefied petroleum gas-using facilities first installed on or after September 25, 2009, the date that amendment entered into force. ④ The amended provisions of item 2 (d) 4) of Attached Table 20 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 94, shall apply to safety supply contracts for liquefied petroleum gas first concluded on or after September 25, 2009, the date that amendment entered into force. ⑤ The amended provisions of Attached Table 1 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 212, shall apply to protected facilities first installed on or after November 25, 2011, the date that amendment entered into force: Provided, That where business operators, etc. install facilities or equipment related to filling or sales, the amended provisions shall apply to protected facilities existing when this Rule enters into force. ⑥ The amended provisions of item 1 (a) 8) (g) (4) of Attached Table 3 and item 1 (a) 5) (e) (4) of Attached Table 6 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 212, shall apply to bulk tankers first added on or after November 25, 2011, the date that amendment entered into force. ⑦ The amended provisions of item 2 (a) 2) and item 3 (a) 2) (e) of Attached Table 5 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 212, shall apply to storage facilities first installed on or after November 25, 2011, the date that amendment entered into force. ⑧ The amended provisions of item 11 of Attached Table 14 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Trade, Industry and Energy Decree No. 22, shall apply to safety inspections of containers conducted on or after February 7, 2014, the date that amendment entered into force. ⑨ The amended provisions of item 1 (d) of Attached Table 20 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Trade, Industry and Energy Decree No. 22, shall apply to supplies of liquefied petroleum gas made on or after February 7, 2014, the date that amendment entered into force. ⑩ The amended provisions of Article 48 (1) 3 and 5 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 72, shall apply to installation works for liquefied petroleum gas-using facilities or alteration works falling under Article 50 (1) completed on or after October 1, 2014, the date that amendment entered into force. ⑪ The amended provisions of Article 42 (1) of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 83, shall apply to containers filled on or after September 11, 2014, the date that amendment entered into force. ⑫ The amended provisions of item 7 of Attached Table 4 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 83, shall apply to nozzle cocks for large commercial combustion appliances manufactured on or after March 12, 2015, the date that amendment entered into force. ⑬ The amended provisions of item 3 (c) 3) of Attached Table 20 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 83, shall apply to contracts concerning the entrustment of container safety management concluded on or after September 11, 2014, the date that amendment entered into force. ⑭ The amended provisions of item 3 (e) 1) of Attached Table 20 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 83, shall apply to supplies of liquefied petroleum gas made on or after September 11, 2014, the date that amendment entered into force. Article 3 (Special Provisions Concerning Existing Liquefied Petroleum Gas-Using Facilities) Notwithstanding Article 2 (11) of these Addenda, liquefied petroleum gas-using facilities of persons who were using liquefied petroleum gas in buildings under the amended provisions of Article 48 (1) 5 of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 72, before that amendment entered into force shall undergo a completion inspection when any of the following works are completed after its enforcement: 1. Works for relocating storage facilities or increasing their capacity accompanied by an increase in the number of facilities installed. 2. Works for replacing hoses between storage facilities and intermediate valves with piping such as steel pipes or copper pipes. 3. Works for burying aboveground piping underground or embedding it in a building. Article 4 (Transitional Measures Concerning Notices of Correction) A notice of correction issued by the Minister of Trade, Industry and Energy to a person obligated to stockpile petroleum under Article 21 of the Enforcement Rule of the Petroleum and Petroleum Substitute Fuel Business Act before this Rule enters into force shall be deemed a notice of correction under the amended Article 28. Article 5 (Transitional Measures Concerning Public Notices of Facility Standards) Facility standards for liquefied petroleum gas filling and sales businesses publicly notified by the Mayor/Do Governor or head of a Si/Gun/Gu under the former provisions of item 1 (a) 10) (b) of Attached Table 3 and items 1 (a) 7) and 2 (a) 3) of Attached Table 6 as at March 2, 2011, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 173, shall continue to be governed by the former provisions until the relevant local government establishes and implements such standards by ordinance under the corresponding amended provisions. Article 6 (Transitional Measures Concerning Aggregation of Storage Capacity) Storage facilities installed under the former provisions as at November 25, 2011, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 212, shall be governed by the former provisions notwithstanding the amended provisions of items 2 (a) 2) and 3 (a) 2) (e) of Attached Table 5 of that Rule. Article 7 (Transitional Measures Concerning Facility and Technical Standards) ① Liquefied petroleum gas filling, gas appliance manufacturing, collective supply, sales, storage, business-office, and use facilities installed before July 18, 2008, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 19, in conformity with the former facility and technical standards shall be deemed installed in conformity with the amended provisions of Attached Tables 3, 5, 6, 7, and 15 of that Rule. ② Filling facilities installed by persons who, as at November 25, 2011, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 212, were licensed under Article 3 (1) of the Act to fill storage tanks through piping shall be deemed to comply with the facility and technical standards for filling storage tanks through piping under item 3 of Attached Table 3 of that Rule. Article 8 (Transitional Measures Concerning Facility Standards) ① The former provisions shall apply, notwithstanding the amended provisions of item 1 (a) (1) of Attached Table 3; items 1 (a), (c) (1), (c) (2) (c), (c) (2) (f), (c) (6), and (e) of Attached Table 4; item 1 (b) (2) of Attached Table 5; item 1 (a) (3) of Attached Table 7; and item 5 (a) and item 9 of Attached Table 18 of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Trade and Industry Decree No. 34, to safety distances of filling facilities, safety distances, piping and safety valves of collective supply facilities, container storage room areas of sales facilities, safety distances of storage facilities, and piping installations of use facilities installed under the former provisions as at March 11, 1996: Provided, That piping from the pressure regulator to the intermediate valve in liquefied petroleum gas-using facilities classified in the following subparagraphs shall be installed in compliance with the applicable subparagraph. <Amended Dec. 30, 2015; Aug. 5, 2020> 1. Liquefied petroleum gas-using facilities installed in facilities other than housing under Article 2, subparagraph 1 of the Housing Act (hereinafter referred to as 'housing' in this paragraph): Piping conforming to the amended provisions of the wholly amended Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 9, shall be installed by December 31, 2012. 2. Liquefied petroleum gas-using facilities installed in housing: Piping shall be installed with steel pipes, copper pipes, or metallic flexible hoses by December 31, 2030 (or with piping conforming to standards determined and publicly notified by the Minister of Trade, Industry and Energy for housing in which installation with such pipes or hoses is determined to be difficult). ② The former provisions shall apply to unloading equipment of filling facilities installed under the former provisions as at February 14, 1997, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Trade and Industry Decree No. 52, notwithstanding item 1 (a) (14) (g) of Attached Table 3 of that Rule. ③ The former provisions shall apply to the floor height of container storage rooms at business offices of liquefied petroleum gas sales and filling business operators installed under the former provisions as at February 14, 1997, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Trade and Industry Decree No. 52, notwithstanding item 1 (b) (2) of Attached Table 5 of that Rule. ④ Liquefied petroleum gas filling, collective supply, storage, or use facilities installed under the former provisions as at April 4, 1998, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 7, shall be deemed to conform to the seismic design standards under amended item 1 (a) (6) (d) of Attached Table 3 of that Rule. ⑤ The former facility and technical standards shall apply to container filling facilities (including small-container filling facilities and gas-heater container filling facilities; hereinafter the same applies in this paragraph) and vehicle-container filling facilities installed under the former provisions as at April 1, 1999, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 37, notwithstanding amended items 1 (a) (1), 1 (a) (16) (b), and 1 (b) (1) of Attached Table 3 of that Rule: Provided, That this shall not apply in either of the following cases: 1. Where permission for change is obtained under Article 7 (1) 1. 2. Where permission for change is obtained under Article 7 (1) 5: Provided, That where safety assessment standards publicly notified by the Minister of Commerce, Industry and Energy under the provisos to Article 5 (5) 2 and 3 of the Addenda to the wholly amended Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Knowledge Economy Decree No. 9 (hereinafter referred to as 'safety assessment standards' in this Article) are met, the former provisions shall apply notwithstanding amended items 1 (a) (1) and 1 (b) (1) of Attached Table 3 of Ministry of Commerce, Industry and Energy Decree No. 37 (limited to provisions strengthening facility standards). 3. Where permission for change is obtained under Article 7 (1) 7: Provided, That where there is no increase in the number of filling machines and the safety assessment standards are met, the former provisions shall apply notwithstanding amended items 1 (a) (1) and 1 (b) (1) of Attached Table 3 of Ministry of Commerce, Industry and Energy Decree No. 37 (limited to provisions strengthening facility standards). ⑥ The former provisions shall apply to protected facilities subject to safety-distance requirements for liquefied petroleum gas filling, collective supply, storage, and use facilities installed under the former provisions as at April 12, 2002, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business Management of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 162, notwithstanding amended item 1 (a) of Attached Table 1 of that Rule. ⑦ The former provisions shall apply to buildings or facilities installed within filling stations under the former provisions as at April 12, 2002, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 162, notwithstanding amended item 1 (b) (6) (d) and (e) of Attached Table 3 of that Rule. ⑧ The former provisions shall apply to liquefied petroleum gas sales businesses installed under the former provisions as at April 12, 2002, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 162, notwithstanding amended item 1 (b) (1) of Attached Table 5 of that Rule. ⑨ The former provisions shall apply to liquefied petroleum gas filling, collective supply, storage, and use facilities installed under the former provisions as at April 20, 2004, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 230, notwithstanding amended item 1 (a) (6) (b) of Attached Table 3 of that Rule. ⑩ The former provisions shall apply to liquefied petroleum gas collective supply facilities installed under the former provisions as at April 20, 2004, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 230, notwithstanding amended items 1 (c) (2) (b), (h), and (i), and 1 (c) (3) of Attached Table 4 of that Rule. ⑪ The former provisions shall apply to facilities of liquefied petroleum gas sales business offices installed under the former provisions as at April 20, 2004, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 230, notwithstanding amended item 1 (h) (1) of Attached Table 5 of that Rule. ⑫ The former provisions shall apply to liquefied petroleum gas filling facilities installed under the former provisions as at May 3, 2006, the enforcement date of the partial amendment to the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, Ministry of Commerce, Industry and Energy Decree No. 338, notwithstanding amended items 1 (a) (16) (f) and (g) and 1 (c) (2) of Attached Table 3 of that Rule. ⑬ The former provisions shall apply to safety valves installed in liquefied petroleum gas filling, collective supply, and storage facilities under the former provisions as at May 3, 2006, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 338, notwithstanding amended item 2 (h) of Attached Table 3 of that Rule. ⑭ The former provisions shall apply to liquefied petroleum gas collective supply facilities installed under the former provisions as at May 3, 2006, the enforcement date of Ministry of Commerce, Industry and Energy Decree No. 338, notwithstanding amended item 1 (c) (2) (b) of Attached Table 4 of that Rule. ⑮ The former provisions shall apply to liquefied petroleum gas sales business and business office container storage facilities installed under the former provisions as at May 3, 2006, the enforcement date of Decree No. 338 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, notwithstanding amended items 1 (h) (1), (l), and (m) of Attached Table 5 of that Rule. ⑯ The former provisions shall apply to buildings or facilities installed under the former provisions as at September 26, 2009, the enforcement date of Decree No. 94 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, notwithstanding amended item 2 (a) 7) of Attached Table 3 of that Rule. ⑰ The former provisions shall apply to liquefied petroleum gas filling facilities installed under the former provisions as at November 25, 2011, the enforcement date of Decree No. 212 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, notwithstanding amended items 1 (a) 8) (b) and 2 (a) 4) of Attached Table 3 of that Rule (excluding the parts concerning fire-resistant structures or noncombustible materials in item 2 (a) 4). ⑱ Where storage facilities of liquefied petroleum gas collective supply, storage, business-office, or use facilities licensed or installed under the former provisions as at January 1, 2012, the enforcement date of Decree No. 212 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, fall under either of the following subparagraphs, the former provisions shall apply notwithstanding amended items 1 (a) 1) (a) of Attached Table 5, 2 (a) 1) of Attached Table 6, and 3 (a) 1) of Attached Table 15 of that Rule: 1. Storage facilities licensed or installed under the former provisions when Ministry of Knowledge Economy Decree No. 212 entered into force. 2. Where storage facilities licensed or installed under the former provisions when Ministry of Knowledge Economy Decree No. 212 entered into force are replaced or relocated (limited to cases where storage capacity does not exceed that of the original facilities). ⑲ The former provisions shall apply to liquefied petroleum gas-using facilities installed under the former provisions as at November 25, 2011, the enforcement date of Decree No. 212 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, notwithstanding amended items 1 (a) 5) (b) and 3 (a) 18) of Attached Table 15 of that Rule. Open-type water heaters manufactured or imported by October 5, 2011, in accordance with the detailed standards under Article 27-2 (1) of the Safety Control and Business of Liquefied Petroleum Gas Act (before its wholly amendment by Act No. 13089 on January 28, 2015), may be installed under the former provisions notwithstanding amended item 1 (a) 5) (b) of that Table. ⑳ The former provisions shall apply to liquefied petroleum gas filling facilities licensed under the former provisions as at February 7, 2014, the enforcement date of Decree No. 22 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, notwithstanding amended items 1 (a) 1) (d) and (e) and 2 (a) 2) (a) of Attached Table 3 of that Rule. ㉑ The former provisions shall apply to gas meters installed under the former provisions as at February 7, 2014, the enforcement date of Decree No. 22 amending the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act, and to gas meters installed in housing or officetels for which a building permit was obtained or a building report filed under Article 11 or 14 of the Building Act, notwithstanding amended item 1 (a) 1) (b) of Attached Table 15 of that Rule. Article 9 (Transitional Measures Concerning Forms) Forms under the former provisions at the time this Rule enters into force may be used together with the forms under this Rule for six months from the enforcement date. Article 10 (Relationship with Other Statutes and Regulations) Where another statute or regulation cites the former Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act when this Rule enters into force, and this Rule contains a corresponding provision, the citation shall be deemed to refer to the corresponding provision of this Rule in place of the former provision. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 176, Dec. 30, 2015> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That the following amended provisions shall enter into force on the dates specified in the respective subparagraphs. 1. Amended items 2 (d) of Article 51 (2), 1 (a) 10) (f) and 2 (a) 5) (l) of Attached Table 4, and 1 (a) 9) (i) of Attached Table 20: Four months after promulgation. 2. Amended items 1 (a) 1) (a) of Attached Table 4 and 1 (a) 6) (f) of Attached Table 20: Six months after promulgation. Article 2 (Applicability to Reports of Changes by Small-Scale Liquefied Petroleum Gas Collective Supply Business Operators) Amended subparagraphs 8 and 9 of Article 7 (2) shall also apply to persons who applied for permission for changes under the former Article 7 (1) 2 or 7 before this Rule entered into force. Article 3 (Applicability to Installation Standards for Solar Power Generating Facilities) Amended item 2 (d) of Article 51 (2) and items 1 (a) 10) (f) and 2 (a) 5) (l) of Attached Table 4 shall apply to solar power generating facilities installed after this Rule enters into force. Article 4 (Applicability to Attachment of Construction Signboards in Works on Liquefied Petroleum Gas-Using Facilities) Amended item 1 (a) 9) (i) of Attached Table 20 shall apply to installation or alteration works for facilities of specified users of liquefied petroleum gas completed after this Rule enters into force. Article 5 (Applicability to Late Fees on Unpaid Gas Charges) Amended subparagraph 3 of the gas metering methods and charges section on the front of Form No. 50 shall apply to safety supply contracts for liquefied petroleum gas concluded after this Rule enters into force (including extension of contract terms under the latter part of item 3 (a) 2) of Attached Table 13). Article 6 (Transitional Measures Concerning Layout Standards for Liquefied Petroleum Gas Filling Facilities) Notwithstanding amended item 1 (a) 1) (a) of Attached Table 4, the former provisions shall apply to liquefied petroleum gas filling facilities licensed under the former provisions before this Rule entered into force. Article 7 (Transitional Measures Concerning Facility Standards for Filling Facilities with Tanks Fixed to Vehicles) Notwithstanding amended item 3 (a) 7) of Attached Table 4, liquefied petroleum gas filling business operators licensed before this Rule entered into force who do not meet the amended facility standards shall bring their facilities into compliance with those standards by December 31, 2016. Article 8 (Transitional Measures Concerning Accident Prevention Equipment Standards for Liquefied Petroleum Gas-Using Facilities) Notwithstanding amended item 1 (a) 6) (f) of Attached Table 20, the former provisions shall apply to liquefied petroleum gas-using facilities installed under the former provisions before this Rule entered into force. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 264, Jul. 11, 2017> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That amended item 1 (a) 1) (a) of Attached Table 5 shall enter into force six months after promulgation. Article 2 (Applicability to Safety Inspection Standards for Gas Suppliers) Amended item 3 (a) 10) of Attached Table 15 shall apply to safety inspections conducted after this Rule enters into force. Article 3 (Transitional Measures Concerning Permission for Liquefied Petroleum Gas Filling Businesses, etc.) Where permission for change has been obtained under the former Article 7 (1) 12, or an application for permission for change has been submitted and the permission process is pending, at the time this Rule enters into force, a report of change shall be deemed to have been filed under amended Article 7 (2) 10. Article 4 (Transitional Measures Concerning Facility Standards for Liquefied Petroleum Gas Filling Facilities) The former provisions shall apply to liquefied petroleum gas filling facilities for which installation permission was obtained before this Rule entered into force, notwithstanding amended item 1 (a) 1) (e) (2) of Attached Table 4. Article 5 (Transitional Measures Concerning Facility Standards for Liquefied Petroleum Gas Collective Supply and Storage Facilities) The former provisions shall apply to liquefied petroleum gas collective supply and storage facilities for which installation permission was obtained before the enforcement date under the proviso to Article 1 of these Addenda, notwithstanding amended item 1 (a) 1) (a) of Attached Table 5. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 317, Dec. 3, 2018> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That amended item 2 (a) 5) (k) of Attached Table 4 shall enter into force three months after promulgation. Article 2 (Applicability to Administrative Dispositions) Amended item 2 (a) 22) of Attached Table 8 shall apply to violations committed after this Rule enters into force. Article 3 (Transitional Measures Concerning Timing of Safety Assessments) The former provisions shall apply to the timing of safety assessments of liquefied petroleum gas filling business operators and storage operators who received technical reviews before this Rule entered into force, notwithstanding amended subparagraphs 1 and 3 (a) of Article 56 (2). Article 4 (Transitional Measures Concerning Buildings or Facilities Installed at Vehicle-Container Filling Stations) Retail stores and exhibition halls installed under former item 2 (a) 5) (k) of Attached Table 4 when this Rule enters into force shall be deemed to meet the detailed standards under Article 45 of the Act pursuant to amended item 2 (a) 5) (k) of Attached Table 4. Article 5 (Transitional Measures Concerning Standards for Administrative Dispositions) ① In applying standards for administrative dispositions to violations committed before this Rule entered into force, the former provisions shall apply notwithstanding amended item 2 of Attached Table 8. ② Where a person who received an administrative disposition for a violation committed before this Rule entered into force under former item 2 (p) or (s) of Attached Table 8 commits the same violation again after enforcement, the number of violations shall be calculated as follows: 1. Where a person who received an administrative disposition for a first violation commits the same violation: It shall be deemed a first violation under amended item 2 (a) 20) or 25) of Attached Table 8. 2. Where a person who received an administrative disposition for a second violation commits the same violation: It shall be deemed a second violation under amended item 2 (a) 20) or 25) of Attached Table 8. 3. Where a person who received an administrative disposition for a third violation commits the same violation: It shall be deemed a third violation under amended item 2 (a) 20) or 25) of Attached Table 8. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 367, Mar. 18, 2020> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That amended items 1 (b) 1) (r) of Attached Table 4, 1 (b) 1) (h) of Attached Table 6, 5 (g) of Attached Table 13, and 2 (a) 1) (d) and 2 (a) 8) of Attached Table 20 shall enter into force three months after promulgation. Article 2 (Applicability to Methods of Preserving Construction Records and As-Built Drawings) Amended Article 50 (1) shall apply to installation or alteration works of liquefied petroleum gas facilities commenced after this Rule enters into force. Article 3 (Applicability to Confirmation of Buried Liquefied Petroleum Gas Pipelines, etc.) Amended Articles 72-4, 72-8, 72-9, and 72-11 shall apply to excavation works commenced after this Rule enters into force. Article 4 (Transitional Measures Concerning Supply Regulations) ① A liquefied petroleum gas collective supply business operator who reported supply regulations under the former provisions when this Rule enters into force and is deemed licensed for a liquefied petroleum gas pipeline network supply business under Article 2 (1) of the Addenda to Act No. 16477, partially amending the Safety Control and Business of Liquefied Petroleum Gas Act (hereinafter referred to as the 'amended Act'), shall revise the supply regulations to conform to amended Article 35 (1) and report them to the licensing authority within six months from the enforcement date. ② A liquefied petroleum gas general collective supply business operator who reported supply regulations under the former provisions when this Rule enters into force shall revise the supply regulations to conform to amended Article 35 (2) and report them to the licensing authority within three months from the enforcement date. Article 5 (Transitional Measures Concerning Approval of Construction Plans, etc.) Installation or alteration works for gas supply facilities deemed licensed as liquefied petroleum gas pipeline network supply facilities under Article 2 (1) of the Addenda to the amended Act when this Rule enters into force, and for which the Korea Gas Safety Corporation completed a technical review of the construction plan, shall be deemed to have obtained approval of or filed a report on the construction plan notwithstanding amended Article 49-2. Article 6 (Transitional Measures Concerning Applications for Construction Supervision) Where a liquefied petroleum gas pipeline network supply business operator required to obtain confirmation of safety under the former provisions at the time this Rule enters into force has applied for safety confirmation or completion inspection of gas supply facilities, the operator shall be deemed to have applied for construction supervision under amended Article 51-2 (2). Article 7 (Transitional Measures Concerning Timing of Precision Safety Diagnosis and Safety Assessment) Where a person deemed licensed for a liquefied petroleum gas pipeline network supply business among collective supply businesses under Article 2 (1) of the Addenda to the amended Act has received a completion inspection certificate for gas supply facilities when this Rule enters into force, the person shall be deemed to have received a construction supervision certificate under amended Article 56 (1) and (2). Article 8 (Transitional Measures Concerning Facility and Technical Standards) ① The former provisions shall apply to facility and technical standards for liquefied petroleum gas pipeline network supply facilities deemed licensed as such under Article 2 (1) of the Addenda to the amended Act when this Rule enters into force, notwithstanding amended Attached Table 4-2. ② The former provisions shall apply to facility and technical standards for general collective liquefied petroleum gas supply facilities licensed under the former provisions when this Rule enters into force that supply gas through pipelines buried in roads or another person's land, notwithstanding amended items 1 (a) 7) (c), 1 (a) 8) (c), and 1 (b) 1) (n) of Attached Table 5. ③ The former provisions shall apply to facility and technical standards for liquefied petroleum gas-using facilities with small storage tanks installed under the former provisions when this Rule enters into force (including replacement without changes to capacity or location), notwithstanding amended items 2 (a) 1) (d) and 2 (a) 8) of Attached Table 20. <Amended Nov. 28, 2025> Article 9 (Transitional Measures Concerning Enrollment in Gas Accident Liability Insurance) A person deemed licensed for a liquefied petroleum gas pipeline network supply business among collective supply businesses under Article 2 (1) of the Addenda to the amended Act when this Rule enters into force shall obtain gas accident liability insurance in conformity with amended item 1 (b) 3) (b) of Attached Table 23 within three months from the enforcement date. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 386, Aug. 5, 2020> Article 1 (Enforcement Date) This Rule shall enter into force on August 5, 2020: Provided, That amended items 1 (c) 3), 2 (c) 3), and 3 (c) 3) of Attached Table 20 shall enter into force three months after promulgation. Article 2 (Applicability to Facility Standards) Amended item 1 (a) 5) (b) (3) of Attached Table 20 shall apply to installations (including replacements) of gas boilers manufactured or imported after this Rule enters into force. Article 3 (Transitional Measures Concerning Facility Standards) The former provisions shall apply to facility standards for facilities where gas boilers were installed under the former provisions when this Rule enters into force (excluding lodging facilities under Article 71-2 (1)), notwithstanding amended item 1 (a) 5) (b) (3) of Attached Table 20. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 415, Apr. 1, 2021> (Enforcement Rule of the Electrical Safety Management Act) Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. <Proviso omitted> Articles 2 through 6 Omitted. Article 7 (Amendment of Other Statutes and Regulations) ① and ② Omitted. ③ Part of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act shall be amended as follows: In item 1 (a) 10) (f) (1) of Attached Table 4, 'Article 63 of the Electric Utility Act' shall be replaced with 'Article 9 of the Electrical Safety Management Act'. ④ Omitted. Article 8 Omitted. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 445, Dec. 16, 2021> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That amended Article 71 (13) shall enter into force on December 16, 2021. Article 2 (Applicability to Facility Standards for Liquefied Petroleum Gas Filling Facilities) Amended item 2 (a) 6) of Attached Table 4 shall apply to liquefied petroleum gas filling facilities licensed for business after this Rule enters into force (including only those granted permission for change under Article 7 (1) 3). Article 3 (Transitional Measures Concerning Amendment of Forms) Former Forms No. 18, 30, 37, 45, 46, and 47 in use at the time this Rule enters into force may be used together with the forms under this Rule for three months from the enforcement date. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 448, Jan. 21, 2022> (Partial Amendments to 36 Ministry of Trade, Industry and Energy Decrees, including the Enforcement Rule of the High-Pressure Gas Safety Control Act) This Rule shall enter into force on the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 454, Mar. 30, 2022> (Partial Amendments to Seven Statutes and Regulations to Improve Forms for Public Convenience) This Rule shall enter into force on the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 467, May 27, 2022> This Rule shall enter into force on the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 502, Feb. 28, 2023> (Partial Amendments to Seven Statutes and Regulations to Reorganize Sunset Regulations under the Framework Act on Administrative Regulations) This Rule shall enter into force on the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 512, Jun. 30, 2023> Article 1 (Enforcement Date) This Rule shall enter into force on July 1, 2023. Article 2 (Applicability to Periodic Inspections of Facilities Used by Many Persons) Amended Article 71 (4) shall also apply to specified users of liquefied petroleum gas at facilities used by many persons where less than six months have elapsed since the latest periodic inspection of liquefied petroleum gas facilities conducted under the former provisions at the time this Rule enters into force. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 524, Oct. 10, 2023> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Reports on Discontinuance of Business, etc.) Amended latter part of Article 18 shall apply to reports of discontinuance of business or discontinuance of use of storage facilities filed after this Rule enters into force. Article 3 (Transitional Measures Concerning Confirmation of Buried Liquefied Petroleum Gas Pipelines, etc.) Where the permitting authority provided excavation plan information to the Information Support Center under the former provisions when this Rule enters into force, the excavation plan shall be deemed notified under amended Article 72-4 (2). Article 4 (Transitional Measures Concerning Amended Forms) Former Forms No. 26 and 27 in use when this Rule enters into force may be used together with the forms under this Rule for three months from the enforcement date. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 533, Dec. 12, 2023> (Partial Amendments to Seven Statutes and Regulations, including the Enforcement Rule of the Measurement Act, for Reorganization of Penalty Surcharge Provisions, etc.) This Rule shall enter into force on the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Resources Decree No. 1, Oct. 1, 2025> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Resources and Its Affiliated Agencies) Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That provisions amending, pursuant to Article 5 of these Addenda, ministerial decrees promulgated before the enforcement date of this Rule but not yet effective shall enter into force on the enforcement dates of those respective decrees. Articles 2 through 4 Omitted. Article 5 (Amendment of Other Statutes and Regulations) ① through ㉛ Omitted. ㉜ Part of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act shall be amended as follows: In Article 2 (1) 19 (a) 2), the main text of Article 4 (2) excluding its subparagraphs, Article 7 (1) 5, Article 9 (3) and (4), Article 10 (2) excluding its subparagraphs, Article 17 (1) 1 and 7, Article 23 (5) and (6), Article 24 (3) and (4), Article 28, the main text of Article 31 (2), the former part of Article 32 (1), Article 32 (2) and (3), Article 33 (2), the former part of Article 33-3 (1) excluding its subparagraphs, Article 33-3 (3) and (4), Article 35 (4), Article 44 (3), Article 46 (3), Article 59 (2) 3 and 4, Article 63 (2), (3), (5), and (6), Article 72-2 3, Article 72-13 (2) 4, the main text of Article 73 (1) and (2), Article 76 (1) 2 and (4), Article 79, Article 81 (1) excluding its subparagraphs, and Article 81 (2) excluding its subparagraphs, the term 'Minister of Trade, Industry and Energy' shall be replaced with 'Minister of Trade, Industry and Resources', respectively. In Article 2 (2) through (4), Article 2 (5) and (6) excluding their subparagraphs, Article 3 (4), Article 4 (4), Articles 5 and 6 excluding their subparagraphs, Article 16, Article 17 (1) excluding its subparagraphs, Article 17 (2) and the main text of Article 17 (3), Article 26 (3), Article 33 (3), Article 33-2 (1), Article 34, the former part of Article 36, Article 42-2 excluding its subparagraphs, Article 49 (3), Article 49-3 (5) excluding its subparagraphs, Article 65 excluding its subparagraphs, Article 70 (1) excluding its subparagraphs, Article 71-2 (1), Article 72-2 excluding its subparagraphs, Article 72-3, Article 72-4 (7), Article 72-7 excluding its subparagraphs, Article 72-11 (1) excluding its subparagraphs, Article 72-12 (1), Article 74 (3), Article 75 (2), Article 75 (3) and (4) excluding their subparagraphs, Article 76 (1) excluding its subparagraphs, Article 76 (3), and Article 82, the term 'Ordinance of the Ministry of Trade, Industry and Energy' shall be replaced with 'Ordinance of the Ministry of Trade, Industry and Resources', respectively. In Article 78, 'Minister of Trade, Industry and Energy' shall be replaced with 'Minister of Trade, Industry and Resources or Minister of Climate, Energy and Environment'. In the front of Form No. 4, Forms No. 9, 11, 11-2, 21, 36, 37-2, 39 through 41, and 43 through 45, 'Minister of Trade, Industry and Energy' shall be replaced with 'Minister of Trade, Industry and Resources', respectively. In the processing procedures sections of the back of Form No. 4 and Forms No. 9, 11-2, 20, and 23, 'Ministry of Trade, Industry and Energy' shall be replaced with 'Ministry of Trade, Industry and Resources', respectively. On the front of Form No. 4, 'Minister of Trade, Industry & Energy' shall be replaced with 'Minister of Trade, Industry & Resources'; on the back of that Form, 'Ministry of Trade, Industry & Energy' shall be replaced with 'Ministry of Trade, Industry & Resources'. On the front of Form No. 9, 'Minister of Trade, Industry & Energy' shall be replaced with 'Minister of Trade, Industry & Resources', and 'Ministry of Trade, Industry & Energy' with 'Ministry of Trade, Industry & Resources'. On the front of Form No. 11, 'Korea’s Minister of Trade, Industry & Energy' shall be replaced with 'Korea’s Minister of Trade, Industry & Resources'. ㉝ through 54 Omitted. ADDENDA <Ministry of Trade, Industry and Resources Decree No. 2, Nov. 28, 2025> Article 1 (Enforcement Date) This Rule shall enter into force on November 28, 2025. Article 2 (Special Provisions Concerning Filling Equipment for Self-Service Filling) Notwithstanding amended Article 51 (2) 2 (c), a liquefied petroleum gas filling business operator who installed or altered filling equipment before this Rule entered into force so that users could operate it themselves to fill liquefied petroleum gas shall undergo a completion inspection of the relevant works within the period specified in the following subparagraphs: 1. Where the equipment was installed or altered under a regulatory special exemption for demonstration under Article 10-3 of the Industrial Convergence Promotion Act (hereinafter referred to as a 'regulatory special exemption'): Within six months after this Rule enters into force. 2. In cases other than subparagraph 1: Before users first conduct self-service filling after this Rule enters into force. Article 3 (Special Provisions Concerning Fuel Cell Power Generation Facilities) Notwithstanding amended Article 51 (2) 2 (f), a liquefied petroleum gas filling business operator who installed or expanded fuel cell power generation facilities before this Rule entered into force pursuant to a regulatory special exemption shall undergo a completion inspection of the relevant works within six months after the enforcement date. ADDENDA <Ministry of Trade, Industry and Resources Decree No. 4, Dec. 30, 2025> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Resources and Its Affiliated Agencies) Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation: Provided, That Article 3 of these Addenda shall enter into force on January 2, 2026. Article 2 Omitted. Article 3 (Amendment of Other Statutes and Regulations) Part of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act shall be amended as follows: In item 5 (b) of the contract termination section on the front of Form No. 50, 'Minister of Economy and Finance' shall be replaced with 'Minister of Finance and Economy', respectively. [Attached Table 1] Protected Facilities (Related to Article 2 (1) 16) [Attached Table 2] Facilities Used by Many Persons (Related to Article 2 (1) 17) [Attached Table 3] Scope of Gas Appliances Subject to Permission (Related to Article 4 (4)) [Attached Table 4] Facility, Technical, Inspection, Precision Safety Diagnosis, and Safety Assessment Standards for Liquefied Petroleum Gas Filling (Related to Articles 12 (1) 1, 51 (4) 1, 52 (2) 1, 53 (3) 1, and 56 (4) 1) [Attached Table 4-2] Facility, Technical, Construction Supervision, Inspection, Precision Safety Diagnosis, and Safety Assessment Standards for Liquefied Petroleum Gas Pipeline Network Supply (Related to Articles 12 (1) 1-2, 49-6 1, 51-2 (4), 52 (2) 1-2, 53 (3) 1-2, and 56 (4) 1-2) [Attached Table 5] Facility, Technical, Inspection, Precision Safety Diagnosis, and Safety Assessment Standards for Liquefied Petroleum Gas General Collective Supply and Storage Facilities (Related to Articles 12 (1) 2, 51 (4) 2, 52 (2) 2, 53 (3) 2, and 56 (4) 2) [Attached Table 6] Facility, Technical, and Inspection Standards for Liquefied Petroleum Gas Sales and Container Storage Facilities Installed at Business Offices of Liquefied Petroleum Gas Filling Business Operators (Related to Articles 12 (1) 3 and (2), 13 (1) 2, 51 (4) 3, 52 (2) 3, and 53 (3) 3) [Attached Table 7] Facility, Technical, and Inspection Standards for Manufacturing Gas Appliances and Foreign Gas Appliances (Related to Articles 12 (1) 4 and 5, the main text of 17 (3), 51 (4) 4, and 60) [Attached Table 8] Standards for Administrative Dispositions (Related to Articles 20 and 30) [Attached Table 9] Standards for Imposition and Calculation of Penalty Surcharges (Related to Article 21 (1) 1) [Attached Table 10] Standards for Imposition and Calculation of Penalty Surcharges (Related to Article 21 (1) 2) [Attached Table 10-2] Methods and Procedures for Inspecting Whether the Quantity Supplied Falls Short of the Specified Amount (Related to Article 33-2) [Attached Table 11] Method of Calculating Annual Domestic Sales Volume (Related to Article 29 (1)) [Attached Table 12] Standards for Imposition and Calculation of Penalty Surcharges (Related to Article 31 (1)) [Attached Table 13] Methods of Supplying Liquefied Petroleum Gas (Related to Article 34) [Attached Table 14] Methods and Procedures for Quality Inspections and Self-Inspections (Related to Article 38 (1)) [Attached Table 15] Standards for Safety Inspections by Gas Suppliers, etc. (Related to Article 42 (5)) [Attached Table 15-2] Construction Plans Subject to Approval (Related to Article 49-2 (1)) [Attached Table 15-3] Construction Plans Subject to Reporting (Related to Article 49-2 (2)) [Attached Table 16] Guidelines for Preparation of Safety Management Regulations (Related to Article 43) [Attached Table 17] Container Safety Inspection Standards (Related to Article 47) [Attached Table 18] Marks Indicating Passage of Gas Appliance Inspections (Related to Article 61) [Attached Table 19] Methods of Conducting Safety Education (Related to Article 66 (1)) [Attached Table 20] Facility, Technical, and Inspection Standards for Liquefied Petroleum Gas-Using Facilities (Related to Articles 49-6 2, 69, 71 (10), and 71-2 (2) 3) [Attached Table 20-2] Safety Measures and Damage Prevention Standards for Liquefied Petroleum Gas Pipelines (Related to Articles 72-5, 72-8 (1) 6, 72-12 (2), and 72-13 (1) 4) [Attached Table 21] Matters to Be Reported and Reporting Deadlines, etc. (Related to Article 73 (1)) [Attached Table 22] Methods of Reporting Accidents, etc. (Related to Article 74 (2)) [Attached Table 23] Insured Amounts for Gas Accident Liability Insurance and Consumer Protection Liability Insurance (Related to Article 75 (5)) [Attached Table 24] Fees for Permissions, etc. (Related to Article 77 (1)) [Attachment Form No. 1] Application for Permission for Liquefied Petroleum Gas (Filling Business, Collective Supply Business, Sales Business, Storage Facility Installation) [Attachment Form No. 2] Application for Registration (Change Registration) of Liquefied Petroleum Gas Consignment Transport Business [Attachment Form No. 3] Application for Permission (Permission for Change) for Gas Appliance Manufacturing Business [Attachment Form No. 4] Application for Registration (Change Registration or Re-Registration) of Foreign Gas Appliance Manufacturing Business [Attachment Form No. 5] Application for Permission for Change of Liquefied Petroleum Gas (Filling Business, Collective Supply Business, Sales Business, Storage Facility Installation) [Attachment Form No. 6] Report of Change in Liquefied Petroleum Gas (Filling Business, Collective Supply Business, Sales Business, Storage Facility Installation) [Attachment Form No. 7] Report of Change in Liquefied Petroleum Gas Consignment Transport Business [Attachment Form No. 8] Report of Change in Gas Appliance Manufacturing Business [Attachment Form No. 9] Report of Change in Foreign Gas Appliance Manufacturing Registration [Attachment Form No. 10] Permit [Attachment Form No. 10-2] Application for Reissuance of Permit for Liquefied Petroleum Gas (Filling Business, Collective Supply Business, Sales Business, Storage Facility Installation, Gas Appliance Manufacturing Business) [Attachment Form No. 11] Certificate of Registration of Foreign Gas Appliance Manufacturing Business [Attachment Form No. 11-2] Application for Reissuance of Certificate of Registration of Foreign Gas Appliance Manufacturing Business [Attachment Form No. 12] Certificate of Registration of Liquefied Petroleum Gas Consignment Transport Business [Attachment Form No. 12-2] Application for Reissuance of Certificate of Registration of Liquefied Petroleum Gas Consignment Transport Business [Attachment Form No. 13] Application for Permission (Permission for Change) for Establishment of a Business Office of a Liquefied Petroleum Gas Filling Business [Attachment Form No. 14] Permit for Establishment of a Business Office of a Liquefied Petroleum Gas Filling Business [Attachment Form No. 14-2] Application for Reissuance of Permit for Establishment of a Business Office of a Liquefied Petroleum Gas Filling Business [Attachment Form No. 15] Report of Change in the Establishment of a Business Office of a Liquefied Petroleum Gas Filling Business [Attachment Form No. 16] Application for Technical Review [Attachment Form No. 17] Application for Factory Audit of Foreign Gas Appliances [Attachment Form No. 18] Report on Commencement, Suspension, Discontinuance, or Resumption of Business or Use of Storage Facilities [Attachment Form No. 19] Report on Succession to the Status of a Liquefied Petroleum Gas Business Operator, etc. [Attachment Form No. 20] Application for Registration (Conditional Registration) of Liquefied Petroleum Gas Import and Export Business [Attachment Form No. 21] Certificate of Registration of Liquefied Petroleum Gas Import and Export Business [Attachment Form No. 22] Register of Liquefied Petroleum Gas Import and Export Businesses [Attachment Form No. 23] Application for Change Registration of Liquefied Petroleum Gas Import and Export Business [Attachment Form No. 24] Report on Commencement, Suspension, or Closure of Liquefied Petroleum Gas Import and Export Business [Attachment Form No. 25] Report (Report of Change) on Supply Regulations [Attachment Form No. 26] Register of Implementation of Safety Management [Attachment Form No. 27] Safety Inspection Checklist for Gas Consumption Facilities [Attachment Form No. 28] Summary of Safety Inspections of Gas Consumption Facilities [Attachment Form No. 29] Liquefied Petroleum Gas Vehicle Safety Inspection Checklist [Attachment Form No. 30] Report on Measures to Prevent Hazards [Attachment Form No. 31] Application for Review of Safety Management Regulations [Attachment Form No. 32] Order to Suspend or Restrict Liquefied Petroleum Gas Supply [Attachment Form No. 33] Order to Repair or Improve Liquefied Petroleum Gas-Using Facilities [Attachment Form No. 34] Confirmation of Repair and Improvement of Liquefied Petroleum Gas-Using Facilities [Attachment Form No. 35] Report on Appointment, Dismissal, or Retirement of a Safety Management Officer [Attachment Form No. 35-2] Application for Approval (Amended Approval) of Construction Plan [Attachment Form No. 35-3] Report (Amended Report) on Construction Plan [Attachment Form No. 35-4] Register of Approvals and Reports on Construction Plans (Changes) for Gas Supply Facilities [Attachment Form No. 35-5] Approval of Construction Plan (Amendment) or Certificate of Report [Attachment Form No. 36] Application for Completion or Periodic Inspection [Attachment Form No. 37] Certificate of Completion or Periodic Inspection [Attachment Form No. 37-2] Application for Construction Supervision [Attachment Form No. 37-3] Certificate of Construction Supervision [Attachment Form No. 38] Application for Partial or Full Exemption from Periodic Inspection [Attachment Form No. 39] Application for Precision Safety Diagnosis [Attachment Form No. 40] Application for Safety Assessment [Attachment Form No. 41] Application for Gas Appliance Inspection [Attachment Form No. 42] Application for Waiver of Gas Appliance Inspection [Attachment Form No. 43] Application for Safety Education [Attachment Form No. 44] Application for Completion Inspection of Facilities for Specified Use of Liquefied Petroleum Gas [Attachment Form No. 45] Application for Periodic Inspection of Facilities for Specified Use of Liquefied Petroleum Gas [Attachment Form No. 46] Certificate of Completion Inspection [Attachment Form No. 47] Certificate of Periodic Inspection [Attachment Form No. 47-2] Consultation Document on Excavation Works [Attachment Form No. 48] Sales Price Report [Attachment Form No. 49] Monthly Sales Price Report (Liquefied Petroleum Gas Import and Export Business Operator) [Attachment Form No. 50] Safety Supply Contract for Liquefied Petroleum Gas [Attachment Form No. 51] Register of Quality Inspections [Attachment Form No. 52] Performance Report on Quality Inspections (Inspections under Article 27 (1) of the Safety Control and Business of Liquefied Petroleum Gas Act) [Attachment Form No. 53] Performance Report on Quality Inspections (Inspections under Article 27 (2) of the Safety Control and Business of Liquefied Petroleum Gas Act) [Attachment Form No. 54] Register of Transaction Status (Liquefied Petroleum Gas Filling) [Attachment Form No. 55] Register of Safety Management Status (Liquefied Petroleum Gas Filling) [Attachment Form No. 56] Register of Transaction Status (Liquefied Petroleum Gas Sales and Business Offices) [Attachment Form No. 57] Facility Improvement Status Record (Liquefied Petroleum Gas Sales & Business Offices)