Water Source Management Rules

289045 · 2026-09-18

Chapter 1 General Provisions Article 1 (Purpose) The purpose of this Rule is to prescribe matters delegated by the Water Supply Act and its Enforcement Decree, as well as matters necessary for its implementation, concerning the designation and management of water source protection zones and the water quality inspection of raw water. <Amended Oct. 20, 2021> Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Oct. 20, 2021> 1. "Downward distance" refers to the distance measured along the centerline of a river, lake, or similar body of water in the direction of water flow. 2. "Catchment area" refers to a region where rainwater flows into a water supply source, enclosed by a line connecting the surrounding ridges. 3. "Pollution load" refers to the amount of pollutants generated in a day converted into weight. 4. "Original Resident" refers to a resident living in a water source protection zone (hereinafter referred to as the "Protection Zone") who falls under any of the following subparagraphs. A. Persons who have continuously resided in the area prior to the designation of the protected area B. A person who resided in the protected area at the time of its designation and who has resided outside the area for a period of up to three years due to livelihood or other reasons. C. One person who was residing in the protected area at the time of its designation, and who succeeded to the family business of the person residing in the area through inheritance while residing outside the area for three years or more due to livelihood or other reasons. D. One person who was residing in the protected area at the time of its designation and who, while residing outside the area for three years or more due to livelihood or other reasons, succeeded to the family business of the resident through a gift. In this case, the period is limited to the time after the donor's death. Article 3 (Classification of Water Sources) Water used as a water source shall be classified as follows based on its flow characteristics and form of existence, etc. <Amended Feb. 16, 2011, Dec. 20, 2019> 1. River water: Water flowing in a river or valley that is not obstructed in flow by dams, embankments, etc. [Includes water whose flow is partially obstructed by weirs installed underwater] 2. Subsurface flow: Water flowing beneath the bottom or through layers of sand and gravel on the sides of rivers, lakes, or similar bodies of water 3. Lake water: Water flowing in rivers or valleys that has been impounded by constructing dams or embankments, etc., and which is the water in the full water level zone (including water in naturally formed lakes) 4. Groundwater: Refers to water flowing below the surface, excluding subsurface flow and riverbank filtered water, and is classified as follows. A. Surface groundwater: Water flowing through the soil above the underground bedrock layer B. Deep groundwater: Water flowing beneath the underground bedrock layer (including water naturally rising to the surface from beneath the underground bedrock layer) 5. Seawater: Seawater existing in ocean areas and water existing underground due to seawater infiltration 6. Riverbank filtered water: Water that has passed through a sand and gravel layer of a river, lake, or nearby area Chapter 2 Designation of Protected Areas, etc. Article 4 (Criteria for Designation of Protected Areas) ① A protection zone shall be designated in an area where water intake facilities are installed or are scheduled to be installed. However, such area may not be designated as a protection zone if it falls under any of the following subparagraphs. <Amended Feb. 5, 2008> 1. In the case of an area free from pollution sources such as livestock barns or factories, where it is recognized during the review for designation as a protected area that there is no risk of pollution or possibility of development within the next 10 years 2. In the case of an area surrounding a water intake facility for deep groundwater extraction where it is recognized that there is no concern regarding water quality pollution due to geology or stratigraphic structure 3. In the case of an area where intake facilities are installed solely for the supply of industrial water, and where it is recognized that there is no impediment to the use of the water for industrial purposes even without the designation of a protection zone 4. In the case of an area surrounding a water source in an urban area pursuant to the "Act on Planning and Utilization of National Land" where pollutants do not flow into the water source due to sewage system maintenance, etc. ② The designation criteria for protected areas by water source are as follows: <Amended Feb. 16, 2011, Dec. 20, 2019> 1. In the case of river water and groundwater: The standard distance shall be 4 kilometers downstream from the intake point; however, the standard distance may be adjusted according to the Standard Distance Adjustment Criteria Evaluation Table in Attached Table 1, taking into consideration the water pollution status, intake volume, intake ratio, and development potential of surrounding areas. In this case, the width of the protection zone shall be the catchment area; however, areas within the catchment area where rainwater, sewage, or wastewater does not flow directly into the water source due to embankments, etc., shall be excluded. 2. In the case of lake water: Designation shall be made in accordance with the same standards as for river water or groundwater; however, for dams exclusively for water sources, water sources with a daily intake of 100,000 tons or more, and other lakes deemed necessary due to regional characteristics, the starting point for calculating the standard distance shall be the lake's full water level line. In this case, if the downstream distance from the full water level zone exceeds 10 kilometers and the catchment area exceeds 150 square kilometers, the width may be determined separately for the area exceeding 10 kilometers downstream from the intake point, taking into consideration regional characteristics. 3. In the case of groundwater and riverbank filtered water: Starting from the intake point, the standard distance shall be a radius of 200 meters for groundwater (a radius of 20 meters in the case of deep groundwater) and a downstream distance of 2 kilometers for riverbank filtered water; however, the designation shall be made considering the subsurface depth, water quality, intake volume, land use status of adjacent areas, soil permeability coefficient, geological structure, groundwater veins, etc., starting from the intake point. Article 5 (Application for Designation of Protected Area) ① If the designation of a protected area is necessary, a Mayor, County Governor, or District Head (referring to the District Head of an autonomous district; hereinafter the same) shall apply for the designation of a protected area to the Special City Mayor, Integrated Special City Mayor, Metropolitan City Mayor, or Provincial Governor (hereinafter referred to as "City/Provincial Governor") by attaching the documents specified in each of the following subparagraphs to the application for designation in the form of Annex No. 1. <Amended Aug. 23, 2024; July 21, 2026> 1. A topographic map with a scale of 1:5,000 or greater and 1:25,000 or less, indicating water intake points, the scope of protected areas, and land use zones pursuant to the National Land Planning and Utilization Act 2. Application for Change of National Land Use Plan (referring to an application for change to a Natural Environment Conservation Area, and limited to cases where the protected area is a Management Area or Agricultural and Forestry Area under the National Land Planning and Utilization Act and is 10 square kilometers or more) 3. Current Status and Location Map of Major Facilities in the Area 4. Survey Report on Land Use Status by Land Category and Zoning, and Land Area by Administrative District in That Area 5. Calculation Sheet of Pollution Load for That Area 6. Geological survey report of the area (limited to cases where groundwater is used as a water source) 7. Review opinion statement by the head of the Basin Environmental Office or Regional Environmental Office (hereinafter referred to as the "Head of the Regional Environmental Office") ② If the mayor, county head, or district head who is the waterworks operator is different from the mayor, county head, or district head who has jurisdiction over the area requiring designation as a protection zone (hereinafter referred to as the "protection-needed zone"), the mayor, county head, or district head who is the waterworks operator shall request the mayor, county head, or district head who has jurisdiction over the protection-needed zone to apply for the designation of the protection zone. However, if the protection-needed zone spans the jurisdiction of two or more cities, counties, or districts (referring to autonomous districts; hereinafter the same applies) within the jurisdiction of the same special city, metropolitan city, or province (hereinafter referred to as "city/province"), and the mayor, county head, or district head who is the waterworks operator and the mayor, county head, or district head who has jurisdiction over the protection-needed zone belong to the same city/province, the mayor, county head, or district head who is the waterworks operator may apply for the designation of the protection zone collectively to the competent mayor/province governor after consultation with the mayor, county head, or district head who has jurisdiction over the protection-needed zone. ③ A waterworks operator other than a City/Provincial Governor or a Mayor/County Head/District Head [including a person who installs a private water supply pursuant to Article 3, Subparagraph 11 of the Water Supply Act (hereinafter referred to as the "Act"); hereinafter the same applies] may request the competent Mayor/County Head/District Head to apply for the designation of a protection zone if the designation of a protection zone is necessary. ④ Upon receiving a request pursuant to Paragraph 2 or 3, the Mayor, County Governor, or District Head shall apply to the competent City or Provincial Governor for the designation of a protected area after conducting necessary consultations with the waterworks operator regarding the designation, management, and cost burden of the protected area. Article 6 (Designation of Protected Areas, etc.) ① Upon receiving an application for the designation of a protected area pursuant to Article 5, the Mayor or Provincial Governor shall designate the protected area after reviewing its validity. In this case, the opinions of relevant experts may be heard. ② The Mayor or Provincial Governor may designate a protected area without an application for designation under Article 5 if the protected area spans the jurisdictional areas of two or more cities, counties, or districts within the same Mayor or Provincial jurisdiction, or if it is recognized that there are other special circumstances. ③ If a protected area spans the jurisdictional boundaries of two or more Cities or Provinces, the relevant City or Provincial Governors shall designate the protected area through consultation. ④ When a City or Provincial Governor designates a protection zone, they shall publish the matters specified in each subparagraph of Article 11, Paragraph 2 of the Enforcement Decree of the Water Supply Act (hereinafter referred to as the "Decree") in the Official Gazette, the City or Provincial Gazette, or a daily newspaper. ⑤ The Mayor, Provincial Governor, or Mayor, County Governor, or District Head (hereinafter referred to as the "Managing Authority") managing a protected area shall, upon the designation and public announcement of a protected area, prepare and maintain a Register of Designated Protected Areas in the form of Annex 2 without delay. Article 7 (Decision in Case of Failure to Reach Consultation) ① When conducting consultations pursuant to Article 5, Paragraph 4 or Article 6, Paragraph 3, if an agreement is not reached despite two or more consultations, a decision shall be made in accordance with the classifications in each of the following subparagraphs. However, decisions regarding consultations concerning the burden of costs shall be excluded. <Amended 2017.7.31, 2025.10.1> 1. In cases where the parties to the consultation are each mayors, county governors, or district heads belonging to the same city or province, the competent city or provincial governor shall make the decision. 2. Where the parties to the consultation are mayors, county heads, or district heads belonging to different cities and provinces, or city and provincial governors, the Minister of Climate, Energy and Environment shall make the decision in consultation with the Minister of the Interior and Safety. 3. Where one of the parties to the consultation is a water utility operator other than a City/Provincial Governor or a Mayor, County Head, or District Head, if the other party is a Mayor, County Head, or District Head, the competent City/Provincial Governor shall make the decision in consultation with the Minister of the Interior and Safety; if the other party is a City/Provincial Governor, the Minister of Climate, Energy and Environment shall make the decision in consultation with the Minister of the Interior and Safety. ② A party to the consultation who intends to obtain a decision under Paragraph 1 shall submit the documents listed in each of the following subparagraphs to the Minister of Climate, Energy and Environment or the competent Mayor or Provincial Governor. <Amended 2025.10.1> 1. Documents under each subparagraph of Article 5, Paragraph 1 2. Report on the History of the Protected Area Designation 3. Statement of Reasons for Non-Consultation ③ The Mayor, County Governor, District Head, or City/Provincial Governor shall designate and manage protected areas in accordance with the decision made by the City/Provincial Governor or the Minister of Climate, Energy and Environment pursuant to Paragraph 1. <Amended 2025.10.1> Article 8 (Notice of Cadastral Survey, etc.) ① In order for a competent Mayor, County Governor, or District Head to publicly announce a cadastral register pursuant to Article 11, Paragraph 3 or Article 14, Paragraph 7 of the Enforcement Decree, they must prepare a cadastral map in advance and obtain approval from the competent City or Provincial Governor. However, this shall not apply if the City or Provincial Governor has used a topographic map with a scale of 1:5,000 or larger, specifying the cadastral register, when designating a protected area. <Amended Feb. 16, 2011> ② When a City or Provincial Governor intends to grant approval pursuant to Paragraph 1, they shall review whether the cadastral information is consistent with the matters subject to public notice under Article 11, Paragraph 2 or Article 14, Paragraph 6 of the Enforcement Decree, etc. <Amended Feb. 16, 2011> ③ If there is an application for confirmation, etc. regarding national land use plans and urban plans with respect to land within a protection zone, the competent Mayor, County Governor, or District Head shall indicate the fact that the land falls under a protection zone in the confirmation certificate. Article 9 (Change and Release of Protected Areas) ① A waterworks operator operating a water intake facility within a protected area, or the Mayor, County Governor, or District Head having jurisdiction over the protected area, may apply to the Governor of the City or Province having jurisdiction over the protected area for a change or解除 (removal) of the protected area if it is determined that such change or removal is necessary due to changes in the conditions of the water source, etc. ② Any person who intends to apply for the modification or解除 (removal) of a protected area pursuant to Paragraph 1 shall submit the application for modification or removal in the form of Annex No. 1, attached with the documents specified in each subparagraph of Article 5, Paragraph 1. However, if approval of a water supply maintenance plan pursuant to Article 5, Paragraph 3 of the Act has been obtained for the modification or removal of a protected area due to the closure of water intake facilities, the review opinion under Subparagraph 7 of Article 5, Paragraph 1 of these Rules shall not be attached; and if applying for the removal of a protected area, the application for modification of the national land use plan under Subparagraph 2 of the same Paragraph shall not be attached. ③ The Mayor or Provincial Governor who receives an application pursuant to Paragraph 2 shall consult with the persons listed in each of the following subparagraphs and, after reviewing the validity thereof, decide whether to change or lift the protection zone. In this case, if necessary, the opinions of relevant experts may be heard. 1. The Mayor, County Governor, or District Head having jurisdiction over the protected area 2. A water utility operator operating a water intake facility in a protected area (only applicable if the said water utility operator is different from the person in Item 1) 3. The Mayor or Governor having jurisdiction over the area receiving tap water from the relevant water source (including the Mayor of a Special Self-Governing City; applicable only if the relevant Mayor or Governor is different from the Mayor or Governor having jurisdiction over the protection zone or the person under Subparagraph 2) 4. Relevant Mayor/Provincial Governor regarding the Protected Area (referring to the Governor of that other Mayor/Provincial if the relevant Protected Area extends into the jurisdictional area of ​​another Mayor/Province) 4. If no agreement is reached despite two or more rounds of consultation pursuant to Paragraph 3, the matter shall be determined according to the classifications in each of the following subparagraphs. However, determinations regarding consultations concerning cost burdens shall be excluded. 1. Where a City or Provincial Governor (including a Special Self-Governing City Mayor) is included among the persons subject to consultation (referring to those listed in each subparagraph of Paragraph 3): The Minister of Climate, Energy and Environment shall decide in consultation with the Minister of the Interior and Safety 2. Cases other than Subparagraph 1: Decision made by the Mayor or Provincial Governor having jurisdiction over the protected area ⑤ Except for the matters prescribed in Paragraphs 1 through 4, Articles 6 Paragraphs 2, 4, and 5, Article 7 Paragraph 2, and Article 8 shall apply mutatis mutandis to the ex officio change or解除 of a protected area, the public notice of the change or解除 of a protected area, the preparation and maintenance of the register of designated protected areas (only applicable in the case of a change of protected area), documents submitted by a person seeking a decision pursuant to Paragraph 4 Subparagraph 1, and the public notice of cadastral surveys. [Wholly Revised 2026.7.21] Chapter 3 Procedures and Standards for Permission for Activities, etc. Article 10 (Application for Permission for Acts, etc.) ① Any person who intends to obtain permission for an act falling under any of the subparagraphs of Article 7, Paragraph 4 of the Act within a protected area shall submit an application for permission for an act in the form of Annex 3, along with the documents listed in each of the following subparagraphs, to the competent Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head. However, if the act for which permission is sought is an act subject to permission by the competent Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head under other laws, the application for permission for an act may be substituted by affixing the seal indicating the application for permission for an act as specified in Annex 2 to the application form under such laws. <Amended May 6, 2022> 1. Business Plan 2. Calculation Statement of Daily Water Usage and Pollutant Discharge ② Any person intending to perform an act pursuant to Article 14 of the Enforcement Decree in a protected area shall submit an act notification form in Annex 4, attached with a location map of the area of ​​the act, to the competent Mayor, County Governor, or District Head. Article 10-2 (Operation of Vessels in Protected Areas) The cases in which a vessel may be operated pursuant to Article 12, Paragraph 1, Subparagraph 2 of the Enforcement Decree are as follows: <Amended July 26, 2013> 1. When the managing authority of a protected area operates any of the following vessels A. Vessels for Protected Area Management for Water Quality Surveys, Monitoring and Control of Pollution Activities B. Disaster preparedness vessels such as fireboats, disaster relief vessels, and ambulances C. Educational vessel for ecological learning 2. In cases where the Water System Management Committee operates the vessels specified in each item of Subparagraph 1 pursuant to Article 24 of the Act on the Improvement of Water Quality of Water Sources in the Han River Basin and Support for Residents, etc., Article 37 of the Act on Water Management and Support for Residents, etc. in the Nakdong River Basin, Article 35 of the Act on Water Management and Support for Residents, etc. in the Geum River Basin, and Article 35 of the Act on Water Management and Support for Residents, etc. in the Yeongsan River and Seomjin River Basins 3. In cases where a person recognized by the managing authority temporarily operates a vessel for the purpose of repairing or renovating existing facilities within the protected area, removing floating debris, dredging, etc. [This Article Newly Established 2011.2.16] Article 11 (Fishing Activities in Protected Areas) ① In the proviso to Article 12, Paragraph 1, Subparagraph 4 of the Enforcement Decree, the term "person prescribed by the Ordinance of the Ministry of Climate, Energy and Environment" refers to any person falling under any of the following subparagraphs. <Amended 2025.10.1> 1. A person falling under any of the following subparagraphs who has obtained a permit for gillnet fishing or longline fishing pursuant to Article 9 of the Inland Fisheries Act as a means of livelihood A. Original Resident B. A person who engaged in fishing activities within a protected area after obtaining a license or permit for fishing under the Inland Fisheries Act or filing a report prior to the designation of the protected area. 2. The managing authority of the relevant protected area ② In the proviso to Subparagraph 4 of Article 12, Paragraph 1 of the Enforcement Decree, the term "fishing activities prescribed by the Ordinance of the Ministry of Climate, Energy and Environment" refers to fishing activities carried out when deemed unavoidable for the protection and management of water sources and the improvement of water quality (limited to the managing authority) and fishing activities using gill nets or longlines. In this case, the vessels used shall be limited to non-motorized vessels or electric-powered vessels. <Amended 2016.7.1, 2025.10.1> Article 12 (Types and Scale of Buildings, etc.) The types and scales of buildings or other structures that may be permitted pursuant to Article 13, Paragraph 1, Subparagraph 1 of the Enforcement Decree are as follows: <Amended Feb. 16, 2011; Jul. 26, 2013; Jul. 1, 2016; Dec. 20, 2019; Oct. 20, 2021; May 6, 2022; Aug. 23, 2024; Jul. 21, 2026; Aug. 27, 2026> 1. Buildings or other structures necessary for the public interest A. Restoration of National Heritage and Buildings for National Heritage Management B. Facilities for preventing pollution falling under any of the following categories. In this case, unless there are special circumstances, the discharge outlet shall be located downstream of the water intake. 1) Facilities to prevent air and water pollution occurring in protected areas 2) Facilities for preventing water pollution generated from wastewater discharge facilities temporarily installed in accordance with the execution of tunnel construction for the construction of roads or railways or the installation of electrical facilities pursuant to Article 2, Subparagraph 16 of the Electric Power Business Act C. Pumping facilities, water intake facilities, water purification facilities, and other similar facilities D. Among the infrastructure facilities under the National Land Planning and Utilization Act, the following facilities for which there are unavoidable circumstances requiring installation in a protection zone 1) Railway lines pursuant to the Framework Act on the Development of the Railway Industry (limited to cases where they do not pass over the water surface of a water source based on the maximum water level line) 2) Roads (limited to cases where they do not pass over the water surface of the water source based on the maximum water level line) 3) Telecommunications facilities, broadcasting facilities, etc., including relay towers installed as urban or rural planning facilities pursuant to the "Act on Planning and Utilization of National Land" (hereinafter referred to as "urban or rural planning facilities") 4) Gas pipeline facilities among gas supply facilities pursuant to the "City Gas Business Act" 5) Power line pursuant to Article 2, Subparagraph 16-2 of the Electric Power Business Act E. Facilities corresponding to museums and art galleries under Item 5, Subparagraph (d) of Annex 1 of the Enforcement Decree of the Building Act, educational centers under Item 10, Subparagraph (b) of the same Annex, libraries under Subparagraph (f) of the same Annex, or youth training centers under Item 12, Subparagraph (b) of the Youth Activities Promotion Act, which meet all of the following requirements 1) It must be a facility that is inevitably installed by the head of a central administrative agency, the governor of a city or province, or the mayor, county head, or district head on a site where urban or county planning facilities are already located. 2) The scale shall be 3 stories or less, and the gross floor area (in cases where two or more buildings are constructed on a single site, this refers to the sum of the gross floor areas; hereinafter the same applies) shall be 5,000 square meters or less 3) The Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head with jurisdiction over the area where the facility is located shall establish measures to prevent sewage or wastewater generated from the facility from flowing directly into the water supply source, consult with the head of the relevant local environmental agency, and devise plans to reduce water pollutants so that the water pollution load resulting from the construction of the facility does not increase. B. Facilities corresponding to a monorail under Article 2, Subparagraph 7 of the Enforcement Rules of the Rail Transport Act that meet all of the following requirements 1) It shall be a facility established for the purpose of guaranteeing the right to mobility of persons with disabilities pursuant to Article 2, Subparagraph 1 of the Act on Promotion of Mobility Convenience for Persons with Disabilities and the Promotion of Public Welfare, etc. 2) It must be a facility that the Mayor or Provincial Governor inevitably installs on a site where urban or county planning facilities are already located. 3) The Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head with jurisdiction over the area where the facility is located shall establish measures to prevent sewage or wastewater generated from the facility from flowing directly into the water supply source, consult with the head of the local environmental agency, and devise plans to reduce water pollutants so that the water pollution load resulting from the construction of the facility does not increase. d. Buildings or other structures that must be installed in the protection zone for other public purposes due to unavoidable circumstances 2. Living Infrastructure A. Construction of a farmhouse 1) In cases where an original resident or a resident who has actually resided in a protection zone for 6 months or more constructs a new building on land designated as 'Dae' (residential land), comprising a farmhouse with a gross floor area of ​​100 square meters or less (if the basement is an auxiliary warehouse for the farmhouse, it shall be 100 square meters or less, but shall not be included in the gross floor area) and ancillary buildings with a gross floor area of ​​66 square meters or less 2) In the case of a person who has been a non-homeowner continuously since the designation of the protection zone and has become the head of a household due to marriage, constructing a farmhouse on land designated as 'Dae' (residential land), the total floor area shall be 132 square meters or less (if the basement is an auxiliary warehouse for the farmhouse, the total floor area shall be 132 square meters or less, but shall not be included in the total floor area), and ancillary buildings with a total floor area of ​​66 square meters or less. In this case, the construction of a farmhouse without a basement shall be limited to a total floor area of ​​154 square meters or less. 3) A farmhouse to be newly constructed by an original resident or a resident pursuant to 1) and 2) must be located in the same protection zone or the same living area as the farmland owned by the said original resident or resident. B. Extension of a house 1) In the case of an extension by a resident living in a protected area, the total area including the existing house shall be 100 square meters or less (if the basement is an auxiliary warehouse for a farmhouse, the total area including the existing basement shall be 100 square meters or less, but shall not be included in the gross floor area) and the total area including the existing ancillary building shall be 66 square meters or less 2) In the case of an original resident expanding a dwelling, the total floor area including the area of ​​the existing dwelling shall be 132 square meters or less (if the basement is an auxiliary warehouse for a farmhouse, the total floor area including the existing basement shall be 132 square meters or less, but shall not be included in the total floor area), and the total floor area including the area of ​​existing ancillary buildings shall be 66 square meters or less. In this case, for the expansion of a dwelling without a basement, the total floor area including the existing area shall be 154 square meters or less. 3. Income-generating infrastructure: Buildings or other structures specified in each of the following subparagraphs constructed or installed by persons engaged in agriculture, forestry, or fisheries within a protected area. However, in the case of subparagraph (k), facilities installed by persons engaged in occupations other than agriculture, forestry, or fisheries are included. a. Silkworm rearing facility: 50/1,000 or less of the area of ​​the mulberry field, including the area of ​​the existing silkworm rearing facility B. Mushroom cultivation facility: 500 square meters or less per household, including the area of ​​the existing mushroom cultivation facility C. Product Storage Warehouse: Necessary for the storage of products produced on land within a protection zone or on land integral to it, and not exceeding 10/1000 of the relevant land area, including the existing warehouse area. However, in the case of a mushroom storage warehouse, it shall not exceed 1/10 of the land area, including the existing warehouse area, but shall not exceed 50 square meters. D. Tobacco drying room: 10/1000 or less of the leaf tobacco cultivation area, including the area of ​​existing tobacco drying rooms E. Compost storage facilities and fermentation composting sites: 50 square meters or less per household, including existing area B. Equipment Storage Warehouse: A building for the storage of equipment necessary for agriculture, forestry, or fisheries per household, with an area of ​​100 square meters or less. However, in cases where three or more households that have not installed an equipment storage warehouse individually install one jointly, the area shall be 200 square meters or less. d. Buildings for Management: Installed in orchards, fruit tree complexes, horticultural complexes, and mushroom cultivation facilities, provided that the area is not more than 10/1000 of the land area directly provided for production, and is not more than 66 square meters including the area of ​​existing buildings for management. However, in the case of mushroom cultivation facilities, it shall not exceed 1/10 of the land area, and shall not exceed 50 square meters including the area of ​​existing buildings for management. A. Greenhouse: A greenhouse installed using materials such as glass or plastic by a person who has continuously resided in a protected area for 3 years or more for the purpose of crop cultivation, such as hydroponics or facility horticulture, and limited to 3,000 square meters or less per household only when crops are cultivated using a recirculating hydroponic system. J. Rain shelters for cattle exercise areas: Within 3 times the area of ​​the existing livestock barn D. Insect rearing facilities: 300 square meters or less per household K. Solar energy facilities pursuant to Article 2, Subparagraph 4 of the Enforcement Rule of the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy (hereinafter referred to as "solar energy facilities") installed and operated by any of the following persons 1) Agricultural cooperatives and livestock cooperatives pursuant to the "Agricultural Cooperatives Act" 2) Forestry cooperative pursuant to the "Forestry Cooperatives Act" 3) Farming cooperative corporations and agricultural company corporations pursuant to Articles 16 and 19 of the Act on the Promotion and Support of Agricultural and Fisheries Management Entities 4) Cooperatives pursuant to the Framework Act on Cooperatives (limited to cases where only residents living in the protection zone participate as members) 5) Other corporations recognized by the Minister of Climate, Energy and Environment T. Other buildings or other structures designated by the ordinance of a local government (referring to Special Cities, Metropolitan Cities, and Provinces; hereinafter the same) as facilities (excluding livestock sheds) for engaging in agriculture, forestry, etc., by persons residing in or owning land within a protection zone. In this case, if the protection zone falls under any of the following, the opinion of the relevant local government must be heard. 1) Protection zone of a wide-area water source pursuant to Article 3, Subparagraph 3 of the Act 2) Protected areas spanning two or more cities, counties, or districts 3) A protected area where the protected area and the area receiving tap water from that water source are located in different cities, counties, or districts 4. Facilities for Joint Use by Residents: Facilities in each of the following subparagraphs that are jointly used or required by residents living in the protected area A. Facilities such as farm roads, embankments, and erosion control facilities constructed jointly by the village B. Kindergarten, Elementary School, Middle School C. Village hall, senior center, children's playground D. Rice milling plant and mill (limited to cases of expansion) E. Offices, joint marketplaces, storage yards, warehouses, agricultural machinery repair shops, and oil handling facilities installed by agricultural cooperatives and livestock cooperatives pursuant to the Agricultural Cooperatives Act, forestry cooperatives pursuant to the Forestry Cooperatives Act, farming cooperative corporations and agricultural corporations pursuant to Article 28 of the Framework Act on Agriculture, Rural Areas and Food Industry, or installed jointly by villages (limited to facilities of general sales outlets pursuant to the Enforcement Decree of the Petroleum and Petroleum Substitute Fuels Business Act that comply with the standards pursuant to the Enforcement Rule of the Dangerous Goods Safety Management Act) B. Religious Assembly Halls (excluding prayer centers): To expand an existing building, the total floor area, including the existing area, must be 300 square meters or less d. Monuments to filial piety and loyalty, shrines, and other similar facilities A. Public restrooms and簡易 restrooms managed and operated by the state or local governments as ancillary facilities of existing facilities J. Parking lots installed by the State or local governments as urban or county planning facilities for the convenience of residents D. Public Health Center, Health Clinic K. Police substations, police boxes, 119 branch offices pursuant to Article 8 of the "Regulations on the Establishment of Local Firefighting Agencies," 119 Safety Centers, etc. T. Other buildings or other structures designated by the ordinance of the local government among facilities jointly required by the residents of the relevant area. In this case, if the protection zone falls under any of the following, the opinion of the relevant local government must be heard. 1) Protection zone of a wide-area water source pursuant to Article 3, Subparagraph 3 of the Act 2) Protected areas spanning two or more cities, counties, or districts 3) A protected area where the protected area and the area receiving tap water from that water source are located in different cities, counties, or districts 5. Renovation or reconstruction of buildings or other structures: Renovation or reconstruction within the scope of the use and scale of existing buildings or other structures 6. Relocation of buildings or other structures (including buildings or other structures that have already been demolished; hereinafter the same applies in this subparagraph): Cases where buildings or other structures are relocated due to the installation of facilities under each of the following subparagraphs, and cases where a resident who has actually resided for at least six months in an area adjacent to an environmental improvement zone pursuant to Article 14, Paragraph 5 (hereinafter referred to as the "Environmental Improvement Zone") demolishes a farmhouse, returns the relevant land to farmland or green space, and relocates to the Environmental Improvement Zone, provided that the relocation is within the scope of the previous use and scale. However, if the use of the building or other structure to be demolished is residential and its scale is less than or equal to the expansion scale under Subparagraph 2, the scale of relocation shall be limited to the expansion scale under the same subparagraph. A. Village Community Facilities 1) Facilities such as farm roads, embankments, and erosion control facilities constructed jointly by the village 2) Village Hall, Senior Citizens' Center 3) Shared workshop, shared warehouse B. Public Interest Facilities, Joint Facilities, and Public Facilities 1) Roads, railways, dams, embankments, etc. 2) Buildings necessary for the operation of public health centers, police stations, post offices (including special post offices), Eup/Myeon/Dong offices, health clinics, and the Reserve Forces 7. Solar energy equipment installed in any of the following items A. Rooftop of a building or other structure B. Sites for urban and county planning facilities (excluding cases involving changes in land characteristics) C. The site of the house D. The surface of a lake or reservoir, land corresponding to the planned flood level of a dam pursuant to Article 10, Paragraph 1, Subparagraph 4 of the River Act, and other similar places designated and notified by the Minister of Climate, Energy and Environment. In this case, solar energy facilities installed in the places referred to in the preceding paragraph shall be limited to those that meet all of the following requirements. 1) The following persons, or a special purpose corporation established by joint investment by the following persons for the purpose of a solar energy generation business (referring to a power generation business under Article 2, Subparagraph 3 of the Electric Power Business Act utilizing solar energy pursuant to Article 2, Subparagraph 2, Item A of the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy; hereinafter the same applies), shall formulate a plan for the installation and operation of the relevant facility and an environmental management plan during the installation, operation, and disposal processes after consultation with the head of the relevant local environmental agency, and shall directly install and operate the relevant facility. a) Local government b) Korea Water Resources Corporation pursuant to the "Korea Water Resources Corporation Act" c) Korea Hydro & Nuclear Power Co., Ltd. established pursuant to the former "Act on the Promotion of Restructuring of the Electric Power Industry" (referring to the act enacted as Act No. 6282) D) Korea Rural Community Corporation pursuant to the "Korea Rural Community Corporation and Farmland Management Fund Act" 2) Local residents shall participate in the relevant solar energy generation project in accordance with Article 27-2 of the “Act on Promotion of Development, Utilization and Dissemination of Renewable Energy” 8. A facility for charging electricity to electric vehicles pursuant to Article 58, Paragraph 3, Subparagraph 2, Item (b) of the Air Environment Preservation Act, or a facility for charging hydrogen gas to hydrogen electric vehicles pursuant to Subparagraph (c) of the same subparagraph (hereinafter referred to as "hydrogen fuel supply facility") that meets all of the requirements of each of the following items a. Installed on the site of a bus terminal (limited to cases where approval for use was obtained pursuant to Article 22, Paragraph 2 of the Building Act prior to the enforcement date of Partial Amendment to the Rules on Water Source Management, Ministry of Environment Decree No. 986), a parking lot, a park, a cultural facility, or a sports facility among urban or county planning facilities established by the State or a local government, or on an adjacent site within a straight-line distance of 50 meters from the boundary of said site. B. The area of ​​the site where the relevant facility is installed shall be 3,000 square meters or less. C. Wastewater discharge facilities pursuant to the Water Environment Preservation Act shall not be installed. D. In cases where facilities discharging wastewater, such as toilets, are installed, the total floor area of ​​said wastewater discharge facilities shall be within 50 square meters. E. Install and operate buffer storage facilities pursuant to Article 21-4, Paragraph 1 of the Water Environment Preservation Act and device-type non-point source pollution reduction facilities pursuant to Item 1, Subparagraph B of Annex 6 of the Enforcement Rule of the same Act, respectively (applicable only in cases where hydrogen fuel supply facilities are installed) F. The Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head with jurisdiction over the area where the facility is located shall establish measures to prevent sewage or wastewater generated from the facility from flowing directly into the water supply source and consult with the head of the relevant local environmental agency (applicable only in cases where a hydrogen fuel supply facility is installed). 9. Columbarium facilities or natural burial grounds established or created pursuant to the proviso of Article 17, Subparagraph 2 of the "Act on Funeral Services, etc." Article 13 (Change of Use of Buildings, etc.) The scope of changes of use of buildings or other structures for which permission for acts may be granted pursuant to Article 13, Paragraph 1, Subparagraph 2 of the Enforcement Decree is as follows: <Amended Feb. 16, 2011; Dec. 20, 2019; Oct. 20, 2021; Aug. 23, 2024> 1. Change of use of factories, accommodation facilities, and general restaurants: Limited to cases where the change is to a use where the level of pollutant generation is lower than before. 2. In the case of changing the use of a livestock barn or silkworm rearing facility to an agricultural product storage warehouse 3. In cases where an existing dwelling is converted to the use of a barbershop, beauty salon, pharmacy, butcher shop, facility for the elderly or children, or mill within 50 percent of the gross floor area 4. In cases where a building falling under Article 12, Subparagraph 1, Item (e) is changed to a rest area restaurant or general restaurant within 10 percent of the gross floor area, provided that all of the following requirements are satisfied a. The total floor area used for resturant or general restaurant purposes shall be 150 square meters or less. B. The total number of rest areas or general restaurants on the relevant site shall be one. c. Install a wastewater treatment facility (hereinafter referred to as "wastewater treatment facility") in accordance with Article 24, Paragraph 2, Subparagraph 1, Item (a) of the Enforcement Decree of the Sewerage Act in the relevant building. D. The effluent from the wastewater treatment facility shall be discharged into an area outside the protection zone (limited to cases where there is no water source in the downstream area) through a separate sewer system pursuant to Article 2, Subparagraph 8 of the Sewerage Act (hereinafter referred to as "separate sewer system"), and the water quality of the effluent shall satisfy the standards set forth in Annex 3 of the Enforcement Rule of the Sewerage Act. E. The Mayor or Provincial Governor shall directly operate the relevant resturant or general restaurant by establishing an operation plan (including scale, business type, etc.) and an environmental management plan (including the treatment of sewage and waste, etc.) after consultation with the head of the relevant local environmental agency. 5. In cases where the uses of Subparagraphs (a) through (g) and (j) of Article 12, Subparagraph 3 are changed from one another 6. In cases where national defense and military facilities pursuant to Item 23-2 of Annex 1 of the Enforcement Decree of the Building Act (limited to those whose use has been discontinued pursuant to Article 40, Paragraph 1 of the State Property Act) are changed to the use of a building corresponding to Subparagraph 1, Item (e) of Article 12 7. Change of use of other buildings and structures: In cases where the uses within each of the following items are swapped with one another, or where a use specified in any of Item (a) is changed to a use specified in any of Items (b) or (c), or where a use specified in any of Items (b) is changed to a use specified in any of Items (c) (excluding cases where a change of use has already been made pursuant to Items 1, 3, and 4) A. Rest areas, religious assembly halls, reading rooms, karaoke rooms B. Supermarkets, daily necessities retailers, barbershops, beauty salons, table tennis halls, billiard halls, martial arts studios, Go centers, offices, financial institutions, kindergartens, senior citizen centers, picture framing shops, funeral homes C. Village halls, senior citizen centers, village community marketplaces, warehouses (excluding warehouses storing liquid substances), shelters, parking lots Article 14 (Designation of Environmental Improvement Zones, etc.) ① The competent Mayor, County Governor, or District Head may formulate and implement a plan (hereinafter referred to as the "Environmental Improvement Plan") including the matters set forth in each of the following subparagraphs for certain areas within a protected area that are natural villages formed prior to the designation of the protected area and where the improvement of sewage systems and the installation of sewage treatment facilities are easy. In this case, prior approval must be obtained from the City/Provincial Governor regarding the Environmental Improvement Plan. <Amended Aug. 20, 2018; Oct. 20, 2021> 1. Matters concerning the maintenance of public sewage systems 2. Matters concerning the installation and maintenance of facilities for treating sewage and wastewater, such as public sewage treatment facilities 3. Other matters concerning pollution source management ② Matters concerning the maintenance of public sewers pursuant to Paragraph 1, Subparagraph 1 shall be in accordance with the provisions of the "Sewerage Act." ③ Facilities for treating sewage and wastewater, such as public sewage treatment facilities under Paragraph 1, Subparagraph 2, shall be facilities capable of treating water in accordance with the effluent water quality standards set forth in Annex 1 of the Enforcement Rules of the Sewerage Act. <Amended 2021.10.20> ④ When the competent Mayor, County Governor, or District Head completes the implementation of the environmental improvement plan under Paragraph 1, they shall report to the City/Provincial Governor, attaching relevant documents such as the cadastral survey report for the area where the plan has been implemented. ⑤ Upon receiving a report on the completion of the implementation of the environmental improvement plan under Paragraph 4, the Mayor or Provincial Governor may designate an area capable of treating sewage and wastewater by means of the facilities under Paragraph 1, Subparagraph 2 as an environmental improvement zone. 6. When a City or Provincial Governor designates an environmental improvement zone pursuant to Paragraph 5, they shall publicize the zone in the Official Gazette, the City or Provincial Gazette, or a daily newspaper. ⑦ Upon the designation and public notice pursuant to Paragraph 6, the competent Mayor, County Governor, or District Head shall allow the general public to inspect the land, and within three months from the date of such public notice, shall publish the cadastral records for the land within the relevant area and allow them for inspection. Article 14-2 (Hearing of Residents' Opinions) ① When a Mayor or Provincial Governor intends to designate an environmental improvement zone pursuant to Article 14, Paragraph 5, they shall hear the opinions of residents, and if such opinions are deemed valid, they shall reflect them in the designation of the environmental improvement zone. ② The provisions of Article 11-2, Paragraphs 3 through 6 of the Enforcement Decree shall apply mutatis mutandis to the hearing of opinions pursuant to Paragraph 1. In this case, among the provisions of Article 11-2, Paragraphs 3 through 6 of the Enforcement Decree, the Mayor, County Governor, and District Head shall be deemed to be the City/Provincial Governor, and the City, County, and District shall be deemed to be the City/Province. [This Article Newly Established 2011.2.16] Article 15 (Relaxation of Restrictions on Activities) In an environmental improvement zone designated and publicized pursuant to Article 14, the activities listed in each of the following subparagraphs may be permitted. <Amended Jul. 26, 2013; Aug. 20, 2018; Oct. 20, 2021; Aug. 23, 2024> 1. Construction, expansion, or change of use of living infrastructure: Construction of buildings specified in each of the following subparagraphs carried out by original residents or residents who have actually resided in the protection zone for 6 months or more, or expansion or change of use of buildings specified in each of the following subparagraphs carried out by residents residing in the protection zone A. New construction of housing with a gross floor area of ​​200 square meters or less and ancillary buildings with a gross floor area of ​​66 square meters or less B. Expansion of a dwelling with a gross floor area of ​​200 square meters or less, including the area of ​​the existing building, and an ancillary building with a gross floor area of ​​66 square meters or less, including the existing area. However, if a married child lives with their parents without moving out, the dwelling or ancillary building may be expanded within a gross floor area of ​​300 square meters, including the existing area of ​​the dwelling and ancillary building. C. Construction or expansion of a building with a gross floor area of ​​200 square meters or less used as a retail store for daily necessities such as food, miscellaneous goods, clothing, toys, books, building materials, and pharmaceuticals, or change of use of an existing factory or residence into a retail store for daily necessities. However, in the case of expansion, it shall be limited to cases where the gross floor area, including the area of ​​the existing building, is 200 square meters or less. D. Change of use to a residential building with a gross floor area of ​​200 square meters or less, used as a retail store for daily necessities such as food, miscellaneous goods, clothing, toys, books, building materials, and pharmaceuticals (limited to cases where the change of use is made by an original resident or a resident who has actually resided in the protection zone for at least 6 months). In this case, the use may not be changed again to another use within 5 years from the date of permission for the change of use to a residential building. E. Change of use of ancillary warehouses or ancillary buildings for farmhouses into residential housing. In this case, the sum of the area of ​​the changed use and the gross floor area of ​​the existing housing shall not exceed the gross floor area standards under Subparagraph A or B. 2. New construction, expansion, or change of use of other buildings or structures: New construction of buildings or other structures listed in each of the following subparagraphs carried out by original residents or residents who have actually resided in the protection zone for 6 months or more, or expansion or change of use of buildings or other structures listed in each of the following subparagraphs carried out by residents residing in the protection zone, local governments (only applicable in the case of new construction, expansion, or change of use pursuant to subparagraph (a)), or religious corporations (only applicable in the case of change of use pursuant to subparagraph (b) A. Construction or expansion of bathhouse facilities, or change of use of existing factories or residences into bathhouse facilities. In this case, the bathhouse facilities shall be limited to facilities for local residents. B. New construction or expansion of a religious assembly hall (excluding prayer centers), or change of use of an existing factory or residence into a religious assembly hall. However, in the case of a change of use, the total floor area, including the area of ​​the existing building, shall not exceed 300 square meters. C. Construction or expansion of a building with a gross floor area of ​​200 square meters or less used for the purposes of barbershops, beauty salons, table tennis halls, martial arts studios, Go clubs, offices, photo studios, framing shops, reading rooms, funeral homes, billiard halls, village halls, and warehouses (hereinafter referred to as "barbershops, etc." in this subparagraph), or change of use of an existing factory or residence into a barbershop, etc. However, in the case of expansion, it shall be limited to cases where the gross floor area, including the area of ​​the existing building, is 200 square meters or less. D. Expansion or change of use of resturant or general restaurant 1) Change of use of existing factories or residences by original residents in an environmental improvement zone to rest areas or general restaurants. In this case, the total number of rest areas and general restaurants in the relevant environmental improvement zone and the permissible range of the sum of floor areas used for such purposes shall be in accordance with Attached Table 3. 2) Expansion of a building used as a rest area restaurant or general restaurant (excluding cases where the use of a residential building has been changed) with a gross floor area of ​​100 square meters or less, including the existing area [150 square meters in the case of environmental improvement zones corresponding to Item 1 (excluding cases corresponding to the remarks in the same table) and Item 2 of Annex 3] E. In cases where an original resident expands a dwelling with a gross floor area of ​​200 square meters or less, including the area of ​​the existing building, and simultaneously changes the use of a part of the said building to a rest area restaurant or a general restaurant, said expansion and change of use. In this case, the permissible range of the total floor area used for the rest area restaurant or general restaurant purposes shall be in accordance with Attached Table 3. B. Change of use to an office or retail store of a building with a gross floor area of ​​200 square meters or less used as a mill Article 16 (Preparation of Permit Register) When the competent Mayor, County Governor, or District Head grants a permit for an act falling under any of the subparagraphs of Article 7, Paragraph 4 of the Act within a protected area, they shall prepare and maintain an Act Permit Register in the form of Annex 5. Chapter 4 Management of Protected Areas, etc. Article 17 (Standards for Securing Facilities, etc.) The standards for securing facilities, equipment, personnel, etc. pursuant to Article 15 of the Enforcement Decree are as set forth in Attached Table 4. Article 18 (Installation of Signs) ① Upon the designation and public announcement of a protected area, the managing authority shall install the information boards and marker posts specified in Attached Table 5 within three months from the date of public announcement. ② The installation locations and spacing of guide signs and marker posts pursuant to Paragraph 1 shall be as follows. 1. Information Board A. Roadsides within protection zones, settlement areas, and other places frequently accessed by the general public: Installed at intervals of 300 meters or more and 500 meters or less. B. Areas within the protected area where public access is infrequent: Installed at appropriate intervals within a range of 1,000 meters. However, in areas where public access is difficult due to the unique topographical characteristics of the region, installed at appropriate intervals within a range of 3,000 meters. 2. Pyoju A. Along the boundaries of the protection zone, they shall be installed at intervals of 150 meters to 200 meters in flat areas and at intervals of 300 meters to 500 meters in mountainous areas. However, in settlement areas, they shall be installed at intervals of 50 meters to 100 meters. B. If the boundary of a protected area crosses a major road, railway, river, etc., it shall be installed at the crossing points on both sides of the facility. ③ The managing authority shall prepare and maintain the register of information boards and marker posts in accordance with Form No. 6, and shall properly manage the information boards and marker posts so that they are not damaged or their installation locations are not changed. Article 19 (Register of Buildings and Structures) The administrative authority shall investigate the current status of buildings or other structures within a protection zone and prepare and maintain the Register of Buildings and Structures in the form of Annex 7. Article 20 (Patrol and Measures in Protected Areas) ① The managing authority shall patrol the protected area at least once a day and prepare and keep a patrol log in the form of Annex 8. ② If the administrative authority discovers an act violating Article 7, Paragraphs 3 and 4 of the Act within a protected area, it shall file a complaint or take necessary measures for restoration, etc., without delay, report the details of such measures to the Mayor/Do Governor, and notify the water utility operator. ③ If an accident occurs in which substances adversely affecting water quality flow into a protected area, the managing authority shall take necessary measures to prevent such pollutants from flowing into the water intake. Article 21 (Guidance and Inspection) The Mayor or Provincial Governor shall conduct guidance and inspection regarding the management status of protected areas under their jurisdiction at least once a year. Article 22 (Assessment of Management Status of Protected Areas) ① The head of a regional environmental office shall conduct an on-site investigation at least once a year to evaluate the management status of protected areas within their jurisdiction. <Amended Aug. 23, 2024> ② The head of a regional environmental office may request the administrative authority to provide necessary data in order to evaluate the management status of protected areas within their jurisdiction. In this case, the administrative authority shall comply with the request unless there are special circumstances. <Amended Aug. 23, 2024> ③ The competent Mayor, County Governor, or District Head shall prepare the matters specified in each of the following subparagraphs regarding protected areas by administrative district based on the end of each year and submit them to the head of the local environmental office by January 31 of the following year. <Amended Aug. 23, 2024> 1. Population Status 2. Status of Wastewater Discharge Facilities 3. Status of Livestock Wastewater Discharge Facilities 4. Status of facilities discharging sewage and wastewater other than the facilities in Items 2 and 3 5. Status of Land Use by Zoning and Land Category 6. Water Intake Status ④ The head of the regional environmental office shall, after conducting an on-site investigation pursuant to Paragraph 1, evaluate the management status of the protected area by referring to the data pursuant to Paragraphs 2 and 3, and notify the managing authority of the results. In this case, if it is deemed necessary to improve the management of the protected area, the head may request the managing authority to take necessary measures. <Amended Aug. 23, 2024> ⑤ Upon receiving a request pursuant to Paragraph 4, the Management Authority shall take necessary measures to properly manage the protected area. Article 23 (Comprehensive Plan for Protected Area Management) ① The managing authority shall formulate and implement a plan (hereinafter referred to as the "Comprehensive Plan") including the matters set forth in each of the following subparagraphs for protected areas that the head of a local environmental agency recognizes as requiring special management for the preservation of water quality of water sources as a result of the assessment of the management status of protected areas pursuant to Article 22. In this case, a managing authority other than a Mayor or Provincial Governor shall obtain prior approval for the Comprehensive Plan from the Mayor or Provincial Governor. <Amended Aug. 23, 2024> 1. Domestic Wastewater Management Plan 2. Industrial Facility Management Plan 3. Livestock Facility Management Plan 4. Cage Aquaculture Farm Maintenance Plan 5. Other pollution source management plans 6. Financing Plan ② If a Mayor or Provincial Governor intends to formulate or approve a comprehensive plan pursuant to Paragraph 1, they shall consult with the head of the relevant local environmental office in advance; and if the plan includes matters requiring action by a central administrative agency, they shall consult with the head of the relevant central administrative agency regarding such matters. <Amended Aug. 23, 2024> Article 24 (Water Quality Standards for Raw Water) ① The water quality standards for raw water pursuant to Article 29 of the Act shall comply with the standards classified in each of the following subparagraphs. <Amended Feb. 16, 2011> 1. River water and lake water: Environmental standards regarding water quality and aquatic ecosystems in Annex 1 of the Enforcement Decree of the Framework Act on Environment Policy 2. Groundwater and riverbank filtered water: Environmental standards for river water among the environmental standards for water quality and aquatic ecosystems in Annex 1 of the Enforcement Decree of the Framework Act on Environment Policy 3. Seawater: Environmental standards for marine areas among the environmental standards regarding water quality and aquatic ecosystems in Annex 1 of the Enforcement Decree of the Framework Act on Environment Policy 4. Groundwater: Drinking water quality standards in Annex 1 of the "Rules on Drinking Water Quality Standards and Inspection, etc." ② Delete <2021.10.20> [Title Revised 2021.10.20] Article 25 (Method for Testing Raw Water Quality) ① Pursuant to Article 29, Paragraph 1, Article 53, and Article 55, Paragraph 1 of the Act, the mayor, county governor, or district head having jurisdiction over general waterworks business operators, installers of private water supply systems, and small-scale water supply facilities shall inspect the quality of raw water in accordance with the methods set forth in Annex 6. <Amended 2021.10.20> ② The mayor, county governor, or district head having jurisdiction over general waterworks operators, installers of private water supply systems, and small-scale water supply facilities shall, upon inspecting water quality pursuant to Paragraph 1, prepare a water quality inspection record book in the form of Annex 9 and preserve it for five years. [Title Revised 2021.10.20] Chapter 5 Supplementary Provisions Article 26 Deleted <2024.8.23> Article 27 (Types of Water Pollution Prevention Facilities) The term "facilities prescribed by the Ordinance of the Ministry of Climate, Energy and Environment" in Subparagraph 3 of Article 22 of the Enforcement Decree refers to the facilities listed in each of the following subparagraphs. <Amended Aug. 20, 2018, Oct. 1, 2025> 1. Facilities installed to treat wastewater at the natural village level 2. Facilities installed to treat livestock wastewater in areas densely populated with small-scale livestock farms Article 28 (Management Costs of Protected Areas) In Article 23, Paragraph 1, Subparagraph 4 of the Enforcement Decree, the term "costs prescribed by the Ordinance of the Ministry of Climate, Energy and Environment" refers to the costs set forth in each of the following subparagraphs. <Amended 2025.10.1> 1. Costs incurred for the water source forest creation project to conserve water sources 2. Costs incurred for river purification projects, such as dredging river sediments for the protection of water sources 3. Costs incurred for the installation of road safety facilities in protected areas (excluding structures associated with road projects) 4. Other costs necessary for the management of protected areas, determined by the Minister of Climate, Energy and Environment in consultation with the heads of relevant central administrative agencies Article 29 (Reporting) ① When a Mayor or Provincial Governor designates or changes a protected area, they shall report to the Minister of Climate, Energy and Environment through the head of the local environmental office within one month, attaching the documents specified in each of the following subparagraphs. <Amended Aug. 23, 2024; Oct. 1, 2025> 1. Statement of Reasons for Designation or Change of Protected Area 2. Copy of the Protected Area Designation Register with an attached topographic map at a scale of 1:25,000 or less 3. Copy of Notice ② When a Mayor or Provincial Governor designates an environmental improvement zone pursuant to Article 14, they shall report to the Minister of Climate, Energy and Environment through the head of the local environmental agency within one month, attaching a topographic map with a scale of at least 1:25,000 showing the zone. <Amended Aug. 23, 2024, Oct. 1, 2025> ③ The head of a regional environmental agency shall report the results of the assessment of the management status of protected areas pursuant to Article 22 to the Minister of Climate, Energy and Environment by June 30 of the following year. <Amended Aug. 23, 2024, Oct. 1, 2025> 4. General waterworks operators managing wide-area and local water supply systems shall report the results of water quality inspections conducted pursuant to Article 25, Paragraph 1, to the Minister of Climate, Energy and Environment through the head of the local environmental office within 15 days after the end of each quarter, in accordance with Form No. 9 attached hereto. However, the results of groundwater quality inspections shall be reported within 15 days after the end of each half-year. <Amended Aug. 23, 2024, Oct. 1, 2025> ⑤ The installer of a private water supply system shall submit the results of the water quality inspection conducted pursuant to Article 25, Paragraph 1, to the competent Mayor, County Governor, or District Head by January 10 of the following year of each year, in accordance with Form No. 9. ⑥ The Mayor, County Governor, or District Head shall report the water quality inspection results received pursuant to Paragraph 5 to the City/Provincial Governor by January 20 of the year in which they were received, in accordance with Form No. 10 of the Attached Annex; and the City/Provincial Governor shall report to the Minister of Climate, Energy and Environment by March 10, in accordance with Form No. 10 of the Attached Annex. <Amended 2025.10.1> 7. General waterworks operators managing village water supply systems and the mayors, county governors, or district heads having jurisdiction over small-scale water supply facilities shall report the results of water quality inspections pursuant to Article 25, Paragraph 1 to the Mayor or Provincial Governor by January 20 of the following year of each year, in accordance with Form No. 9. In this case, the Mayor or Provincial Governor shall report to the Minister of Climate, Energy and Environment by March 10 of the year in which the report was received, in accordance with Form No. 10. <Amended 2025.10.1> Article 30 (Cooperation) The managing authority shall provide necessary cooperation to the head of a regional environmental office regarding the assessment of the management status of protected areas, and the head of a regional environmental office shall provide necessary cooperation to the managing authority, such as the provision of information and data, for the efficient management of protected areas. <Amended Aug. 23, 2024> Article 31 (Review of Regulations) The Minister of Climate, Energy and Environment shall review the validity of the types and scales of buildings, etc. pursuant to Article 12 every three years, starting from January 1, 2014 (meaning before January 1 of every third year), and take measures such as improvements. <Amended 2025.10.1> [This Article Newly Established 2014.4.30] Application for Water Source Protection Area (Designation, Change, Removal) ■ Rules on Water Source Management [Attachment Form No. 1] <Amended July 21, 2026> Application for Designation of Water Source Protection Area [ ] [ ] Change [ ] Release ────────────────┬──────────────────────────────────────────── Receipt No. Receipt Date & Time ────────────────┴──────────────────────────────────────────── ───────┬─────────────┬─────────────────────────────────────── Applicant Company Name and Name (Representative) Date of Birth ├─────────────┼─────────────────────────────────────── Address Phone Number ───────┴─────────────┴─────────────────────────────────────── ───────┬───────────────────────────────────────────────────── Application Details Name of Protected Area ├───────────────────────────────────────────────────── Name and Address of Water Supply Operator ├───────────────────────────────────────────────────── Location of Water Intake (Old) ├───────────────────────────────────────────────────── Types of water sources ├───────────────────────────────────────────────────── Purpose of water intake and supplier ├───────────────────────────────────────────────────── Water intake capacity ├───────────────────────────────────────────────────── Zone Area (㎡) ├───────────────────────────────────────────────────── Administrative Agency ├───────────────────────────────────────────────────── Reason for Application ├───────────────────────────────────────────────────── Reason for determining zone designation (Do not fill in for解除 requests) ───────┴───────────────────────────────────────────────────── Pursuant to Article 7, Paragraph 1 of the Water Supply Act, Article 11, Paragraph 4 of the Enforcement Decree of the same Act, and Article 5, Paragraph 1 of the [ ] Rules on Water Source Management, [ ] Article 9, Paragraph 2 I hereby apply as above. Year Month Day Applicant (Signature or Seal) To the Mayor of a Special City, Integrated Special City, Metropolitan City, or Governor of a Province ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬─────────────────────────────────────────────────────── Attachment 1. Scale in 5,000 indicating the water intake point, the scope of the protected area, and the land use zone pursuant to the National Land Planning and Utilization Act Topographic maps of scale 1 or greater and 1:25,000 or less 2. Application for Change of National Land Use Plan (Do not attach if applying for the解除 of a Protection Zone) 3. Status and Location Map of Major Facilities in the Relevant Area 4. Survey Report on Land Use Status by Land Category and Zoning, and Land Area by Administrative District in the Relevant Area 5. Calculation Sheet of Pollution Load for the Relevant Area 6. Geological Survey Report for the Relevant Area (Attach only if groundwater is used as the water source) 7. Review opinion statement by the head of the regional environmental office (regarding the change or解除 of the protected area due to the closure of the water intake facility, Article 5 of the Water Supply Act (Do not attach if approval of the water supply maintenance plan pursuant to Paragraph 3 has been obtained) ─────┴─────────────────────────────────────────────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ───────────────────────────────────────────────────────────── ┌───┐ ┌──┐ ┌───────┐ ┌────┐ ┌──┐ ┌─────────┐ Application ? Receipt ? Consultation with Relevant Agencies ? On-site Verification ? Approval ? Designation/Change/Removal Prepare and review (if necessary) Decide │ │ │ │ │ │ │ │ │ │ │ │ └───┘ └──┘ └───────┘ └────┘ └──┘ └─────────┘ Applicant Mayor of Special City · Integrated Special City · Metropolitan City Mayor · Provincial Governor ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 210㎜×297㎜[white paper 80g/㎡] Original file: /LSW/flDownload.do?flSeq=168603573 Original file: /LSW/flDownload.do?flSeq=168603577 Original file: /LSW/flDownload.do?flSeq=168603575 [Attachment Form No. 2] <Revised Feb. 16, 2011> Water Source Protection Area Designation Register (front) ┌───────────┬────────────────────────┐ Name of Water Source Protection Area ├────┬──────┼─────┬─┬────┬───────────┤ Designating Authority Designation Date Announcement No. ├────┼──────┼─────┼─┴────┴───────────┤ Designated Area ㎡ Water Supply Operator ├────┴──────┼─────┴──────────────────┤ National Land Use Planning (Zoning) ├────┬──────┼────────────────────────┤ Location of Water Intake Facility │ ├──────┼──────┬──┬──────────────┤ Water intake volume m³/day Water source ├────┴──────┴──────┴──┴──────────────┤ Scope of Water Source Protection Area ├───┬───────┬─────┬─────┬────┬───────┤ City/Province City/County/District Eup/Myeon Detailed Address Area (㎡) Remarks ├───┼───────┼─────┼─────┼────┼───────┤ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ │ └───┴───────┴─────┴─────┴────┴───────┘ ※ If an environmental improvement zone is included, indicate its administrative district and area. 257mm×364mm(Printing Paper (Express) 120g/㎡) (Back) ┌──────────────────┐ │ │ Location Map │ │ Scale: └──────────────────┘ Original file: /LSW/flDownload.do?flSeq=168603579 Original file: /LSW/flDownload.do?flSeq=168603583 Original file: /LSW/flDownload.do?flSeq=168603585 Original file: /LSW/flDownload.do?flSeq=168603581 [Attachment Form No. 3] <Revised May 6, 2022> Application for Permit for Activities in Water Source Protection Zone ───────────┬───────────────────┬──────────── Receipt No. Receipt Date Processing Period 20 days ───────────┴───────────────────┴──────────── ─────┬────────────────────────────────────── Applicant's Business Name (Business Name) ├─────────────────────────┬──────────── Name (Representative) Date of Birth ├─────────────────────────┴──────────── Address (Phone Number) ─────┴────────────────────────────────────── ─────┬────────────────────────────────────── Application Details Purpose of Action ├────────────────────────────────────── Action Details ├────────────────────────────────────── Activity Area ├────────────────────────────────────── Start Date ├───────────────┬─────────┬──────────── Type of pollutant Emission Amount Treatment method ─────┴───────────────┴─────────┴──────────── I hereby apply for a permit to conduct activities in a water source protection zone pursuant to Article 7, Paragraph 4 of the Water Supply Act. Year Month Day Applicant (Signature or Seal) To the Mayor of a Special Self-Governing City, Governor of a Special Self-Governing Province, Mayor, County Head, or District Head ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬────────────────────────────────┬───── Attachment 1. Business Plan (1 copy) Fee 2. Calculation Statement of Daily Water Usage and Pollutant Discharge Amount (1 copy) None ─────┴────────────────────────────────┴───── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ──────────────────────────────────────────── ┌──────┐ ┌──────┐ ┌───────┐ ┌─────┐ ┌───┐ Application Form Completion ? Submission ? Verification of Required Documents ? Approval ? Notification and Review └──────┘ └──────┘ └───────┘ └─────┘ └───┘ Applicant Processing Authority (Special Self-Governing City·Special Self-Governing Province·City·County·District) ──────────────────────────────────────────── 210mm×297mm[Standard Paper 60g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=168603587 Original file: /LSW/flDownload.do?flSeq=168603591 Original file: /LSW/flDownload.do?flSeq=168603589 [Attachment Form No. 4] <Revised Feb. 16, 2011> Water Source Protection Zone Activity Report ───────────┬────────────────────┬─────────── Receipt No. Receipt Date Processing Period 20 days ───────────┴────────────────────┴─────────── ─────┬────────────────────────────────────── Applicant's Business Name (Business Name) ├──────────────────────────┬─────────── Name (Representative) Date of Birth ├──────────────────────────┴─────────── Address (Phone Number) ─────┴────────────────────────────────────── ─────┬────────────────────────────────────── Application Details Purpose of Action ├────────────────────────────────────── Behavior Region ├────────────────────────────────────── Action Details ├────────────────────────────────────── Activity Area ├────────────────────────────────────── Start Date ├────────────────┬────────┬──────────── Type of pollutant Emission Amount Treatment method ─────┴────────────────┴────────┴──────────── Pursuant to Article 7, Paragraph 4 of the Water Supply Act, Article 14 of the Enforcement Decree of the same Act, and Article 10, Paragraph 2 of the Water Source Management Rules I hereby report my intention to perform the above act in a water source protection zone. Year Month Day Declarant (Signature or Seal) To the Governor of a Special Self-Governing Province, Mayor, County Head, or District Head ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬────────────────────────────────┬───── Attached Documents Location Map of the Area of ​​Activity Fee None ─────┴────────────────────────────────┴───── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing procedure ──────────────────────────────────────────── ┌──────┐ ┌──────┐ ┌───────┐ ┌───┐ ┌───┐ Form Completion ? Receipt ? Verification of Required Documents ? Approval ? Notification and Review └──────┘ └──────┘ └───────┘ └───┘ └───┘ Reporter Processing Agency (Special Self-Governing Province·City·County·District) ──────────────────────────────────────────── 210mm×297mm[Standard Paper 60g/㎡ (Recycled)] Original file: /LSW/flDownload.do?flSeq=168603593 Original file: /LSW/flDownload.do?flSeq=168603597 Original file: /LSW/flDownload.do?flSeq=168603595 [Attachment Form No. 5] <Revised Feb. 16, 2011> Water Source Protection Zone Activity Permit Register ┏━━━━━━━┯━━━━━┓ License No. ┠───────┼─────╄━━━━━━┯━━━━┯━━━━━━┯━━━━━━━━━━━━┓ Date of Permit Related to Approvals Date of Commencement of Construction Document Number Date of Completion ┠───────┼─────┼──────┴────┼──────┼────────────┨ Authorized Name Date of Birth Person Address ┠───────┼─────┴─────────┬─────┬───────────────┨ Water Source Site Location Protected Area Name ┠───────┼─────┬─────────┴─────┼─────┬─────────┨ Buildings and Uses Structures of the workpiece Overview of Construction by Type (Installation, Removal, etc.) Previous · Change · Remove ┃ ├─────┼──────┬──┬─────┼─────┼─────────┨ Site Area Land Category Facilities Size/Area ┠───────┼─────┼──────┴──┴─────┴─────┴─────────┨ Business Purpose of Land Characteristics change, bamboo and trees' Project Overview by Planting and Logging Work Type ┃ ├─────┼───────────────┼─────┼─────────┨ Land Characterization Land Category Quantity Area ┠───────┼─────┼─────┬─────────┼─────┼─────────┨ Change of Use Building Structure·Number of Floors Building Area Status Gross Floor Area ┃ ├─────┼─────┼─────────┼─────┼─────────┨ Change of Use Area Before Change Content Area after change ┠───────┼─────┴─────┴─────────┴─────┴─────────┨ Special Notes (Permission Conditions) ┣━━━━━━━┿━━━━━━┯━━━━━━━━━┯━━━━━━━━━━┯━━━━━━━━━┫ Approval Officer Section Chief Section Chief Mayor/County Governor/District Head ┃ ├──────┼─────────┼──────────┼─────────┨ (Signature) (Signature) (Signature) (Signature) ┗━━━━━━━┷━━━━━━┷━━━━━━━━━┷━━━━━━━━━━┷━━━━━━━━━┛ 210mm×297mm(Printing Paper (Express) 70g/㎡) Original file: /LSW/flDownload.do?flSeq=168603599 Original file: /LSW/flDownload.do?flSeq=168603603 Original file: /LSW/flDownload.do?flSeq=168603601 [Attachment Form No. 6] <Revised Feb. 16, 2011> Water Source Protection Area Information Signs & Marker Register ┌───┬──────────────────────────────────────┐ Administrative Agency ├───┼──┬────┬───────────────────┬──────────┤ Type Serial Point Distance Installation Location Landowner Number City/County/District Eup/Myeon/Dong Detailed Address Land Category Name Address ├───┼──┼────┼─────┼─────┼────┼──┼──┼───────┤ │ │ │ │ │ │ │ │ │ │ └───┴──┴────┴─────┴─────┴────┴──┴──┴───────┘ <How to fill out> 1. The types are recorded by classifying them into information boards and marker posts. 2. Serial numbers are entered starting from the point in time, by city, county, and district, and by water source protection area. 3. The point distance is recorded as the distance from the neighboring sign along the boundary of the water source protection area. 297mm×210mm(Printing Paper (Express) 70g/㎡ Original file: /LSW/flDownload.do?flSeq=168603605 Original file: /LSW/flDownload.do?flSeq=168603609 Original file: /LSW/flDownload.do?flSeq=168603607 [Attachment Form No. 7] <Revised Feb. 16, 2011> Summary Table of Management Registers for Buildings and Structures in Water Source Protection Zones Name of Water Source Protection Area: ┌────┬────────────────┬───┬──┬──┬───┬───┬──┐ Serial No. Location Owner Structure Number of Buildings Quantity Construction Remarks (Area) Year Month Day City/County/District Eup/Myeon/Dong Detailed Address ├────┼─────┼─────┼────┼───┼──┼──┼───┼───┼──┤ │ │ │ │ │ │ │ │ │ │ │ └────┴─────┴─────┴────┴───┴──┴──┴───┴───┴──┘ ※ This summary table is bound together with the management register for buildings and structures within the water source protection zone. 297mm×210mm(Printing Paper (Express) 70g/㎡ Original file: /LSW/flDownload.do?flSeq=168603611 Original file: /LSW/flDownload.do?flSeq=168603615 Original file: /LSW/flDownload.do?flSeq=168603613 [Attachment Form No. 8] ┏━━┯┯━┯━━━━┯━━┓ Water Source Protection Area Patrol Log Approval ┠──┼┼─┼────┤ ┃ ┃ ││ │ │ ┃ ┗━━┷┷━┷━━━━┷━━┛ ┏━━━━━━━━━━━━━━━┯━┯━━┯━━┯━━━━┯━━━┓ Date Day of the week Weather ┠───────────────┼─┴──┴──┼────┼───┨ Workplace Working Hours ┠────┬──────────┼───────┴────┴───┨ Job Description Enforcement of Prohibited Acts ┃ ├──────────┼────────────────┨ Detection of illegal activities ┃ ├──────────┼────────────────┨ Inspection of facilities such as signs ┃ ├──────────┼────────────────┨ Other ┠────┴──────────┼────────────────┨ Action Plan and Results ┠───────────────┼────────────────┨ Remarks (Special Notes) ┗━━━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━┛ Year Month Day Employee Job Title Name (Name or Seal) 51318-26411 days 210mm×297mm Approved 92.11.18 (Newspaper paper 54g/㎡) Original file: /LSW/flDownload.do?flSeq=168603617 Original file: /LSW/flDownload.do?flSeq=168603621 Original file: /LSW/flDownload.do?flSeq=168603619 Raw Water (Intake, Settlement Well) Water Quality Inspection Record (General) [Attachment Form No. 9 (1)] <Revised 2013.7.26> Raw Water (□ Intake □ Settlement Well) Water Quality Inspection Record (General) ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ┏━━━━━┯┯━━━━━┯━━━━━┯━━━┯━━━┯━━━┯━━━━━┯━━━┯┓ Waterworks Operator Water Intake Facility Water Volume m³/day Water Source Water Source Name Type Name ┠─────┼┴─────┴─────┴───┴───┴───┼─────┼───┴┨ Protected Area ①Name: ②Area: ㎢ ③Administrating Authority: Inspection Agency ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━━┷━━━━┛ ┏━━━━━━━━━━━┯━━━━━┯━━━━━┯━━━┯━━━━━━┯━━┯━━━┓ Item Unit Previous Year Average Annual Average High Low Remarks ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Hydrogen ion concentration ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Biochemical Oxygen Demand mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Chemical Oxygen Demand mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Suspended solids mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Dissolved Oxygen mg/L ┠──┬────────┼─────┼─────┼───┼──────┼──┼───┨ Total coliform colonies in E. coli/100mL Flora Fecal coliform count/100mL ┠──┴────────┼─────┼─────┼───┼──────┼──┼───┨ Cadmium mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Arsenic mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Cyanide mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Mercury mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Lead mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Chromium mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Organic phosphorus mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Diazinon mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Parathion mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Fenitrothion mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Polychlorinated biphenyl mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Anionic surfactant mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Fluorine mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Selenium mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Ammoniacal Nitrogen mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Nitrate nitrogen mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Carbaryl mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ 1,1,1-Trichloroethane mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Tetrachloroethylene mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Trichloroethylene mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Phenol mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Boron mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Normal hexane extractable substance mg/L (Animal and vegetable oils) content ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Carbon tetrachloride mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ 1,2-Dichloroethane mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Dichloromethane mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Benzene mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Chloroform mg/L ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Diethylhexyl phthalate mg/L ┃(DEHP) │ │ │ │ │ │ ┃ ┠───────────┼─────┼─────┼───┼──────┼──┼───┨ Antimony mg/L ┠───────────┴─────┴─────┴───┴─────┬┴──┴───┨ Remarks: 1. Write the protected area name only if designated as a protected area. Author 2. The type of water source is river water? lake water? subsurface flow? groundwater? seawater, etc. (Signature or Seal) . 3. For the name of the water source, please indicate the river name, lake name, parcel name, island name, etc. Phone number: ┃습니다. │ ┃ 4. This record book is bound together with the monthly record book. ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━━━━┛ 210㎜×297㎜ or 257㎜×364㎜[Preservation Paper (Type 1) 70g/㎡] [Attachment Form No. 9 (2)] <Revised 2013.7.26> Raw Water (□ Intake Port □ Settlement Well) Water Quality Inspection Record ━━━━━━━━━━━━━━━━━━━━━━━━━━━ ┏━━━━━┯━━━━━━━┯━━━┯━━━━━┯━━━┯━━━━┯━━━┯━━━━┯━━━━━┯━━━━┓ Waterworks Operator Water Intake Facility Water Volume m³/day Water Source Water Source Name Type Name ┠─────┼───────┴───┴─────┴───┴────┴───┼────┼─────┴────┨ Protected Area ①Name: ②Area: ㎢ ③Administrating Authority: Inspection Agency ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━┷━━━━━━━━━━┛ ┏━━━━━━━━━━━━┯━━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┯━━┓ Item Annual Average January February March April May June July August September October November December ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Hydrogen ion concentration ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Biochemical Oxygen Demand ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Chemical Oxygen Demand ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Amount of suspended solids ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Dissolved Oxygen ┠──┬─────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Total coliforms Flora Fecal coliforms ┠──┴─────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Cadmium ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Arsenic ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Design ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Mercury ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Lead ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Chrome ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Organophosphorus ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Diazinon ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Parathion ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Fenitrothion ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Polychlorinated Biphenyl ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Anionic surfactant ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Fluorine ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Selenium ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Ammoniacal Nitrogen ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Nitrate Nitrogen ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Cavaril ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ 1,1,1-Trichloroethane ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Tetrachloroethylene ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Trichloroethylene ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ phenol ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Boron ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Normal hexane extractant (Animal and vegetable oils) content ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Carbon tetrachloride ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ 1,2-Dichloroethane ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Dichloromethane ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Benzene ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Chloroform ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Diethylhexylphthale DEHP ┠────────────┼───┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┼──┨ Antimony ┠────────────┴───┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┨ Remark: The unit for coliform bacteria is count/100mL, and all items except hydrogen ion concentration are in mg/L. ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 257㎜×364㎜[Preservation Paper (Type 1) 70g/㎡)] Remarks: 1. Write the protected area name only if designated as a protected area. 2. For the type of water source, list river water, lake water, subsurface flow, groundwater, seawater, etc. 3. For the name of the water source, write the name of the river, lake, parcel, island, etc. Original file: /LSW/flDownload.do?flSeq=168603623 Original file: /LSW/flDownload.do?flSeq=168603627 Original file: /LSW/flDownload.do?flSeq=168603629 Original file: /LSW/flDownload.do?flSeq=168603625 [Village Water Supply · Private Water Supply · Small-scale Water Supply Facilities] Report on Water Quality Inspection Results [Attachment Form No. 10] <Revised 2007.11.12> (Front) Sender Name Recipient (Diesel) Subject: Report on Water Quality Inspection Results (□Village Water Supply □Private Water Supply □Small-scale Water Supply Facility) ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ 1. Status of (□Village Water Supply □Private Water Supply □Small-scale Water Supply Facilities) (Unit: m³/day) ┏━━━━━┯━━━━━┯━━━━┯━━━━━┯━━━━━━━┯━━━┯━━━━━┓ Classification Total River water Subsurface flow Lake water Groundwater Others ┠─────┼─────┼────┼─────┼───────┼───┼─────┨ Number of water intake facilities ┠─────┼─────┼────┼─────┼───────┼───┼─────┨ Water intake capacity ┗━━━━━┷━━━━━┷━━━━┷━━━━━┷━━━━━━━┷━━━┷━━━━━┛ 2. (□Village Water Supply □Private Water Supply □Small-scale Water Supply Facility) Water Quality Inspection Results A. River water, groundwater, lake water, and others 1) General Management ┏━━━━━━┯━━━┯━━━━┯━━━┯━━━┯━━━━┯━━━┳━━━┳━━━┓ Classification Total Grade Ia Grade Ib Grade II Grade III Grade IV Grade V Grade VI ┠──────┼───┼────┼───┼───┼────┼───╂───╂───┨ Branch Point Count ┠──────┼───┼────┼───┼───┼────┼───╂───╂───┨ Composition Ratio(%) ┗━━━━━━┷━━━┷━━━━┷━━━┷━━━┷━━━━┷━━━┻━━━┻━━━┛ 2) Status of Water Sources Exceeding Grade III (Unit: m³/day) ┏━━━━━━━━┯━━━━━┯━━━━━━┯━━━━━━━━━━━━━┯━━━━┓ Water Supply Operator Water Intake Station Name Water Intake Volume Exceeding Standards Details Remarks ┠────────┼─────┼──────┼─────────────┼────┨ ┃ │ │ │ │ ┃ ┗━━━━━━━━┷━━━━━┷━━━━━━┷━━━━━━━━━━━━━┷━━━━┛ B. Groundwater (Unit: m³/day) ┏━━━━━━━━┯━━━━━┯━━━━━━┯━━━━━━━━━━━━━┯━━━━┓ Water Supply Operator Water Intake Station Name Water Intake Volume Exceeding Standards Details Remarks ┠────────┼─────┼──────┼─────────────┼────┨ ┃ │ │ │ │ ┃ ┗━━━━━━━━┷━━━━━┷━━━━━━┷━━━━━━━━━━━━━┷━━━━┛ Sender's (Signature) Proposer (Position/Rank) Signature / Reviewer (Position/Rank) Signature / Approver (Position/Rank) Signature Collaborator (Position/Rank) Signature Implementing Department - Serial Number (Implementation Date) Receiving Department Name - Serial Number (Receipt Date) Right Address / Homepage Address Phone number ( ) Fax ( ) / Email address / Privacy setting 210mm×297mm[Newspaper paper 54g/㎡ (recycled) or Standard paper 60g/㎡ (recycled)] (Back) <How to fill out> 1. Prepare village water supply, private water supply, and small-scale water supply facilities separately, and mark "V" in the □ on the form mark. 2. The 'Others' column in Paragraph 1 refers to surface water, such as valley water, other than national rivers, local Class I rivers, and local Class II rivers. Write this only if using Won. 3. The classification of grades under Paragraph 2, Subparagraph (a) 1) shall be in accordance with the environmental standards in Annex 1 of the Enforcement Decree of the Framework Act on Environment Policy . 4. The details regarding the exceedance of the standards in Paragraph 2, Subparagraph (a) 2) pertain to biochemical oxygen demand and hazardous substances such as heavy metals and specifically list the details of the excess by item, and the details of the standard excess in Subparagraph B are drinking water Specifically, regarding substances with health hazards among the quality standard items, the details of the exceedances by item writes. 5. If the contents of Paragraph 2, Subparagraph (a) 2) and Subparagraph (b) are extensive, they may be prepared separately on an attached sheet. . Original file: /LSW/flDownload.do?flSeq=168603631 Original file: /LSW/flDownload.do?flSeq=168603635 Original file: /LSW/flDownload.do?flSeq=168603637 Original file: /LSW/flDownload.do?flSeq=168603633 Revision ⊙Ministry of Climate, Energy and Environment Decree No. 54 (Aug. 27, 2026) Partial Amendment to the Enforcement Rules of the Act on Promotion of Development, Utilization, and Dissemination of New and Renewable Energy Part of the Enforcement Rule of the Act on Promotion of Development, Utilization, and Dissemination of New and Renewable Energy is amended as follows. The title "Enforcement Rules of the Act on Promotion of Development, Utilization, and Dissemination of New and Renewable Energy" shall be changed to "Enforcement Rules of the Act on Promotion of Development, Utilization, and Dissemination of Renewable Energy". [Body omitted] Supplementary Provisions Article 1 (Enforcement Date) This Rule shall enter into force on September 18, 2026. Articles 2 and 3 Omitted Article 4 (Amendment of Other Laws) ① through ③ Omitted ④ The Water Source Management Rules are partially amended as follows. In the part of Article 12, Subparagraph 3, Item (k) excluding items 1) through 5), "「Enforcement Rules of the Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy」" shall be changed to "「Enforcement Rules of the Act on Promotion of Development, Utilization and Dissemination of Renewable Energy」", and in the part of Subparagraph 7, Item (d) excluding items 1)a) through d) and Item 2) of the same Article, "「Act on Promotion of Development, Utilization and Dissemination of New and Renewable Energy」" shall be changed to "「Act on Promotion of Development, Utilization and Dissemination of Renewable Energy」" respectively. Omit ⑤ through ⑦ Article 5 Omitted Reason for Enactment/Amendment [Partial revision] ◇ Reasons for Amendment and Key Contents In order to support the smooth expansion of renewable energy supply, the "Act on the Promotion of Development, Use, and Supply of New and Renewable Energy" (Act No. 21462, promulgated on March 17, 2026; effective September 18) and the Enforcement Decree of the same Act (Presidential Decree No. 36586, promulgated on August 18, 2026; effective September 18) were amended with provisions such as transferring matters concerning new energy, including hydrogen energy, to the "Act on the Promotion of Hydrogen Economy and Hydrogen Safety Management" and changing the title of the Act to the "Act on the Promotion of Development, Use, and Supply of Renewable Energy." Accordingly, this is intended to change the title of this Rule to the "Enforcement Rule of the Act on the Promotion of Development, Use, and Supply of Renewable Energy" and to revise the relevant regulations in accordance with the amendments to the Act and the Presidential Decree, such as excluding facilities related to new energy, including hydrogen energy facilities and fuel cell facilities, from renewable energy facilities. <Provided by the Ministry of Climate, Energy and Environment>