궤도운송법 시행규칙

289981 · 2026-09-18

Ministry of Land, Infrastructure and Transport (Railway Facilities Safety Division), 044-201-4889 Chapter 1 General Provisions Article 1 (Purpose) This Rule prescribes matters delegated by the Rail Transport Act and its Enforcement Decree and matters necessary for their implementation. Article 2 (Types of Tracks) In Article 2, Subparagraph 1 of the Rail Transport Act (hereinafter referred to as the “Act”), the term “transport systems prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as cable railways, trams, monorails, and magnetic levitation trains” refers to the transportation systems set forth in each of the following subparagraphs. <Amended Aug. 30, 2024> 1. Reciprocating Cableway: A cableway that transports people or cargo by suspending a rail vehicle from a wire rope installed in the air and traveling back and forth in opposite directions between stations. 2. Automatic Circulating Cableway: A cableway that transports people or cargo by suspending track vehicles from wire ropes installed in the air using an automatic coupling device and circulating them in one direction. 3. Fixed-circulation cableway: A cableway that carries people or freight by suspending track vehicles from aerial wire ropes with fixed connecting devices and circulating them in one direction 4. Traction Cableway: A cableway that tows or slides people or cargo using automatic or fixed coupling devices on a wire rope installed in the air. 5. Funicular: A system that transports people or cargo by using wire ropes to tow track vehicles moving along rails on slopes or similar terrains. 6. Tram: A system that transports people or goods by moving tracked vehicles along two rails installed on roads or other tracks. 7. Monorail: A system that transports people or goods by moving rail vehicles along a single track installed on an elevated structure. 8. Maglev Train: A system that transports people or cargo by using magnetic force within the tracks to levitate and move a rail vehicle above the tracks. 9. Steel-wheeled Light Rail: A system that transports people or cargo by moving rail vehicles equipped with steel wheels along two rails installed on a dedicated line, using electric power collected through the third rail (referring to a facility installed parallel to the rail that supplies electricity to the vehicle from the side or bottom of the vehicle; hereinafter the same applies in this Article). 10. Rubber-wheeled Light Rail: A system that transports people or cargo by moving rubber-wheeled railcars along an automatic guide track installed on a dedicated line, using electric power collected through the third rail of the track. 11. Linear Induction Motor Light Rail: A system that transports people or cargo by moving a rail vehicle along two rails installed on a dedicated line using electric power collected through the third rail of the track, while maintaining an air gap between the linear induction motor and the reaction plate. [Wholly revised Dec. 15, 2021] Article 2-2 (Scope of Operational Obstacles) The term “as prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 2, subparagraph 12-2 of the Act refers to the following: 1. An interruption of operation of 5 minutes or more occurring during rail transport (limited to cases involving the transport of people). 2. Anything that impedes the operation of the track due to any of the following reasons a. Defects or malfunctions of railway facilities under Article 2, Subparagraph 3, Items ( d) and (e ) of the Act B. Derailment of rail vehicles C. Damage to the tracks (d) Other reasons designated by the Minister of Land, Infrastructure and Transport as hindering the operation of the tracks [This Article was newly added on Aug. 30, 2024.] [Formerly Article 2-2 was moved to Article 2-3 <Aug. 30, 2024>] Article 2-3 (Requirements for Mountainous and Remote Area Tracks) ① In subparagraph 13 of Article 2 of the Act , the term “regions prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to Eup, Myeon, or Dong belonging to a city or county whose fiscal self-reliance is equal to or lower than the national average fiscal self-reliance of cities andcounties, and which meets all the requirements of each subparagraph of Article 2 of the Enforcement Decree of the Framework Act on Forests . <Amended Aug. 30, 2024> ② In subparagraph 13 of Article 2 of the Act , “requirements prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as the use of eco-friendly power sources and the utilization of existing roads” refers to satisfying all of the following subparagraphs. 1. Use eco-friendly power sources such as electricity and solar power. 2. At least two-thirds of the track shall be constructed using existing roads. 3. At least two-thirds of the railway line must be located in mountainous or remote areas pursuant to Article 2, Subparagraph 13 of the Act . [This Article was newly added on Mar. 24, 2017] [Moved from Article 2-2 on Aug. 30, 2024>] Chapter 2 Track Business and Dedicated Track Article 3 (Application for Permission for Track Business, etc.) ① A person seeking permission for a track business under Article 4 (1) and (2) of the Act shall submit an application for permission in attached Form No. 1 (including an electronic application) containing personal particulars such as the applicant's name and resident registration number, together with the documents specified in the following subparagraphs, to the competent special self-governing city mayor, special self-governing provincial governor, mayor, county head or autonomous district head (hereinafter referred to as a 'mayor, county head or district head'), or special metropolitan city mayor, consolidated special city mayor or metropolitan city mayor. <Amended June 23, 2016; Mar. 24, 2017; Sep. 15, 2026; Sep. 18, 2026> 1. Business Plan 2. Basic Design Documents 3. Construction Specifications 4. Review opinion on safety by a specialized safety inspection agency pursuant to Article 20 of the Act 5. In the case of a rail facility operating within an area requiring permission or approval from the competent administrative agency, etc., having jurisdiction over roads, rivers, farmland, forests, parks, cultural heritage protection zones, etc., documents proving such permission or approval from the competent administrative agency, etc. 6. In cases where an impact assessment regarding the environment, traffic, disasters, etc. has been conducted, the report on the results of such impact assessment 7. In the case of planned incorporation, a plan for incorporation ② If the applicant is a corporation, the public official in charge who receives an application under Paragraph 1 shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended Sep. 15, 2026> ③ The business plan referred to in Paragraph 1, Subparagraph 1 shall include the following matters. <Amended Sep. 18, 2026> 1. Name and location of principal office and business offices 2. Purpose of Rail Facility Operation 3. Types, Methods, and Characteristics of Track Facilities 4. Operation Plan 5. Details of Required Funds and Methods of Funding 6. Estimated annual transport volume and estimated statement of revenues and expenditures 7. In cases where a service for business feasibility has been conducted, the deliverables of said service 8. Plan for environmental conservation and promotion of public welfare, etc. ④ The basic design documents under Paragraph 1, Subparagraph 2 shall include the following items. 1. Maps showing land use at a scale of 1:500 or 1:2000 (including administrative district boundaries, scale, orientation, and land boundaries) and railway layout maps 2. Actual plan drawing with a scale of 1:2,000 or larger (including names and locations of railway facilities such as stations and tracks, and buildings, hazardous material storage facilities, telegraph and telephone lines, power lines, etc. installed within 40 meters to the left and right of the track centerline) 3. Actual longitudinal profile with a scale of 1:2,000 or larger (including the ground elevation, track slope, and horizontal distance of the track centerline, the names and locations of stations, the names and locations of supports, and the locations and heights of features crossed by the track) ⑤ The construction specifications under Paragraph 1, Subparagraph 3 shall include the following items. 1. Rail facility construction plan (including scheduled commencement date, construction period, and construction schedule) 2. Descriptions, calculations, and drawings regarding the applicable items among the following subparagraphs a. Type, foundation, spacing, and strength calculation sheet of posts supporting the railway track B. Type, specifications, weight, installation method, installation height, slope, and strength calculation sheet for wire ropes, rails, etc. C. Maximum operating speed, number of vehicles, passenger capacity, and structure of tracked vehicles D. Calculation sheet for the type, method, capacity, and required output of prime movers of power equipment E. Calculation sheet for braking method, braking distance, and braking force f. Strength calculation sheet for drive pulleys and axles G. Details and Location of Protective Facilities Around the Track h. Details of safety communications facilities and lightning protection devices i. Details of electric lines, substations and distribution stations j. Details of machinery installed at stations K. Details regarding other related facilities, etc. 3. In the case of a cable car that transports people, in addition to the matters falling under subparagraph 2, the following matters must be additionally included. A. Method of moving rail vehicles B. Safety equipment for wire ropes and tracked vehicles, braking systems for machinery, installation locations and signaling methods for tracked vehicles and prime movers C. Structure, effective cross-sectional area, breaking force, average tensile strength, connection method, and tensioning method of the wire rope D. Structure and driving method of the main engine and backup engine E. Distance and height between the platform and the vehicle at the platform f. Method of constructing the surface of the ground or the surface of a structure replacing it ⑥ When a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor receives an application under Paragraph 1 and grants permission for a railway business pursuant to Article 4, Paragraph 1 or 2 of the Act , they shall present to the applicant the grounds and reasons for the validity period determined pursuant to Paragraph 7 of the same Article . <Newly added Sep. 18, 2026> [Title amended Sep. 18, 2026] Article 4 (Procedures for Permission for Change or Notification of Change of Railroad Business, etc.) ① When a railroad business operator intends to change matters for which permission has been granted pursuant to Article 4, Paragraph 6 of the Act ( including cases where it is applied mutatis mutandis under Article 4, Paragraph 8 of the Act ), the operator shall submit an application for permission for change or a notification of change in the form of Annex No. 2 (including applications and notifications in the form of electronic documents) to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City, attaching the documents set forth in each of the following subparagraphs. <Amended Sep. 18, 2026> 1. Business license (If the business license is lost, it may be replaced with a statement of reasons) 2. Statement of reasons for change (including documents proving the reasons for the change) 3. Documents containing the matters to be changed among the documents listed in each subparagraph of Article 3, Paragraph 1 (applicable only to applications for permission to change) ② A public official in charge who receives a report pursuant to Article 2, Paragraph 2 of the Enforcement Decree of the Rail Transport Act (hereinafter referred to as the “Decree”) shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act if the reporter is a corporation . <Amended June 23, 2016; September 15, 2026> Article 4-2 (Application for Renewal of Track Business Permission, etc.) ① A person seeking renewed permission for a track business under Article 4 (8) of the Act shall submit an application for renewal in attached Form No. 2-2 (including an electronic application), together with the documents specified in the following subparagraphs, to the competent mayor, county head, district head, special metropolitan city mayor, consolidated special city mayor or metropolitan city mayor during the period from two years before until one year before the expiration of the existing permission. 1. A business plan containing the contents of each subparagraph of Article 3, Paragraph 3 , and operational performance results pursuant to the originally approved business plan (in the case of re-approval, the business plan for the immediately preceding re-approval). 2. In the case of a rail facility operating within an area requiring permission or approval from the competent administrative agency, etc., having jurisdiction over roads, rivers, farmland, forests, parks, cultural heritage protection zones, etc., documents proving such permission or approval from the competent administrative agency, etc. 3. Results of safety inspection pursuant to Article 19 , Paragraph 1 of the Act 4. Safety management plan pursuant to Article 22-2 , Paragraph 1 of the Act ② If the applicant is a corporation, the public official in charge who receives the application under Paragraph 1 must verify the certificate of corporate registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . ③ The mayor, county governor, district head, or special mayor, integrated special mayor, or metropolitan mayor who receives an application under Paragraph 1 shall notify the applicant of whether or not to re-authorize the railway business within six months from the date of receipt of the application. In this case, the grounds and reasons for the validity period determined pursuant to Paragraph 7 of the same Article, which is applied mutatis mutandis in Paragraph 8 of Article 4 of the Act , must be presented together. [This Article was newly added on Sep. 18, 2026.] [Formerly Article 4-2 was moved to Article 4-3 <September 18, 2026>] Article 4-3 (Procedure for Approval of Track Business for Mountainous and Remote Area Tracks) ① In the part other than the subparagraphs of Article 2-3, Paragraph 1 of the Enforcement Decree, the term “application for approval prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport”refers to the application for approval or modification of a mountainous and remote area track business in Annex 2-2 . <Amended Sep. 18, 2026> ② The Minister of Land, Infrastructure and Transport shall decide whether to grant approval or approval for modification following deliberation by the Track Construction Deliberation Council under Article 15-2, in accordance with the first part of Article 2-3, Paragraph 3 of the Enforcement Decree. <Amended Sep. 18, 2026> [This Article was newly added on Mar. 24, 2017] [Moved from Article 4-2 on Sep. 18, 2026>] Article 5 (Application for Approval and Modification of Dedicated Track, etc.) ① Any person who intends to operate a dedicated track pursuant to the main clause of Article 5 , Paragraph 1 and Paragraph 2 of the Act shall submit an application for approval of a dedicated track in the form of Annex 3 (including an application in the form of an electronic document), containing the person's recorded information such as name and resident registration number, to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City, attaching the documents set forth in each of the following subparagraphs. <Amended June 23, 2016; September 18, 2026> 1. Facility operation plan including the following items A. Name and Location of Principal Office and Business Office B. Purpose of Operation of Dedicated Track Facilities C. Types and methods of dedicated track facilities D. Documents proving that the facility is an ancillary facility for a business, etc., subject to permission, registration, approval, or notification under other laws. 2. The applicable documents among the documents under Article 3, Paragraph 1 , Subparagraphs 2 through 6 ② When a dedicated railway operator intends to obtain approval for a change or report a change regarding matters for which approval has been obtained, they shall submit the Application for Approval of Change in Dedicated Railway Operation or the Report of Change (including applications and reports in the form of electronic documents) in Annex No. 4, attached with the documents specified in each of the following subparagraphs, to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended June 23, 2016; September 18, 2026> 1. Certificate of Approval for Dedicated Track Operation (If the Certificate of Approval for Dedicated Track Operation is lost, it may be replaced with a statement of reasons) 2. Statement of reasons for change (including documents proving the reasons for the change) 3. Documents containing the changed matters among the items in each subparagraph of Paragraph 1 (applicable only to applications for approval of change) ③ If the applicant or the reporter is a corporation, the public official in charge who receives an application or report pursuant to Paragraphs 1 and 2 shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended June 23, 2016; September 15, 2026> Article 6 (Reporting, etc. of Dedicated Tracks for Cargo Use) ①Any person who intends to report a dedicated track for cargo use (including temporary use; hereinafter the same applies) pursuant to the proviso to Article 5, Paragraph 1 of the Act shall submit to the Mayor, County Governor, or District Head a Dedicated Track Operation Report Form (including a report form in electronic document format) in Annex No. 5, which contains the personal information such as name and resident registration number , attached with the documents specified in each of the following subparagraphs. <Amended June 23, 2016> 1. Facility operation plan including the following items A. Purpose of operating the dedicated track B. Types, Methods, and Characteristics of Track Facilities C. Operating Period 2. Documents corresponding to Article 3, Paragraph 1 , Subparagraphs 2 and 3 ② When a person who has made a report pursuant to the proviso of Article 5, Paragraph 1 of the Act intends to report a change to a dedicated freight track, they must submit a report on the operation change of a dedicated freight track in Form No. 6 (including a report in electronic form) to the mayor, county governor, or district head, attaching documents containing the changed matters among the items of Paragraph 1. ③ When a public official in charge receives a report or a report of change pursuant to Paragraphs 1 and 2, if the reporting party is a corporation, the official shall verify the certificate of corporate registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Newly added Jun. 23, 2016; Sep. 15, 2026> Article 7 (Issuance of Permits/Approvals and Notification of Results, etc.) ① When a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor grants a permit or re-permit for a railway business or approves the operation of a dedicated railway, or receives a report on the operation of a dedicated railway, pursuant to Article 3, Paragraph 1 , Article 4-2, Paragraph 1 , Article 5 , Paragraph 1 , or Article 6, Paragraph 1 , they shall issue a permit, approval, or report confirmation certificate in the form of Annex 7 to the applicant. <Amended Sep. 18, 2026> ② When a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor receives an application for a permit or approval for a change pursuant to Article 4, Paragraph 1 and Article 5 , Paragraph 2 , they shall comprehensively review whether the relevant changes comply with the permit standards pursuant to Article 4, Paragraph 3 of the Act and issue a permit and approval certificate in the form of Annex 7. <Amended Sep. 18, 2026> ③ Upon receiving an application for a change notification pursuant to Article 6, Paragraph 2, the Mayor, County Governor, or District Head shall issue a Certificate of Notification in the form of Annex 7. <Amended June 23, 2016> Article 8 (Application for Extension of Commencement Period) ① If a railway operator wishes to extend the commencement period of construction pursuant to Article 7, Paragraph 2 of the Act , they shall submit an application for extension of the commencement period of construction (including applications submitted electronically) in the form of Annex 8, attached with documents stating the reasons for the extension, to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended Sep. 18, 2026> ② The Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City shall extend the commencement period of the construction without delay if they deem the grounds for an application for extension of the commencement period to be valid. <Amended Dec. 30, 2016; Sep. 18, 2026> Article 8-2 (Procedures and Methods for Test Operation, etc.) ① Before conducting test operations under Article 7-2 of the Act, a track business operator or dedicated track operator shall establish a test-operation plan including the matters specified in the following subparagraphs. 1. Test run schedule 2. Procedures and Methods for Test Run 3. Evaluation Items and Evaluation Criteria 4. Organization and Personnel for Test Run Implementation 5. Test equipment and devices used for test runs 6. Safety Management Plan and Implementation Organization 7. Emergency Response Plan 8. Other matters necessary for the efficient implementation of test runs and ensuring safety ② A railway operator or dedicated railway operator must conduct a test run for at least 40 hours. ③ When a railway operator or a dedicated railway operator conducts a test run, they shall designate a safety manager pursuant to Article 22, Paragraph 4 of the Act and have them perform the duties of each of the following subparagraphs. 1. Inspection and verification of safety measures, etc., prescribed by safety-related laws and regulations, such as the Occupational Safety and Health Act. 2. Supervision of safety management during test runs 3. Control of tracked vehicles used for test runs 4. Inspection and verification of test equipment, devices, and safety equipment used in test runs 5. Safety training for test run participants, including track vehicle drivers and testers ④ When a railway operator or dedicated railway operator conducts a test run, they must record the details of the test run, the results of the test run, and the measures taken. ⑤ The Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City may, in accordance with Article 30, Paragraph 1 of the Act , require a railway operator or a dedicated railway operator to submit the test operation plan under Paragraph 1 and the implementation results under Paragraph 4, and after reviewing the appropriateness of the test operation, recommend such improvement or supplementation if necessary. <Amended Sep. 18, 2026> ⑥ The Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City may request a specialized safety inspection agency under Article 20 of the Act to review the test operation plan under Paragraph 1 and the results of implementation under Paragraph 4. <Amended Sep. 18, 2026> [This Article Newly Inserted Feb. 7, 2019] Article 9 (Procedures for Application for Completion Inspection, etc.) ① In accordance with Article 4, Paragraph 1 of the Enforcement Decree, when a railway business operator or a dedicated railway operator intends to apply for a completion inspection of railway facilities, they shall submit an application for completion inspection in accordance with Form No. 9 (including an application in the form of an electronic document) to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended Sep. 18, 2026> ② In Article 4, Paragraph 2, Subparagraph 4 of the Enforcement Decree, “test report for major parts” refers to each of the following: 1. Cable cars and cable railways A. Motor System: Wire rope, reducer, and motor test reports B. Internal combustion engine type: Wire rope test report 2. In the case of track facilities other than cable cars and cable railways (excluding dedicated track facilities for freight transport), a track vehicle performance test report prepared by the construction company or track vehicle manufacturer, etc. ③ Deleted <September 18, 2026> ④ The completion inspection certificate under Article 4 , Paragraph 2 of the Enforcement Decree is in the form of Annex No. 10 . Article 10 (Reporting of Transfer and Assignment) ①When an assignee who has succeeded to the status of a railway operator pursuant to Article 9, Paragraph 1, Subparagraph 1 of the Act intends to report the transfer and assignment, he/she shall submit a report on transfer and assignment in the form of Annex No. 11 (including a report in electronic form) containing the personal records such as name and resident registration number, along with the documents specified in each of the following subparagraphs (including electronic documents), to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended June 23, 2016; September 18, 2026> 1. Copy of the Transfer and Assignment Agreement 2. In cases where the transferor or transferee is a corporation, documents proving the corporation's decision regarding the transfer or acquisition of the business ② If the assignee is a corporation, the public official in charge who receives the report under Paragraph 1 shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended June 23, 2016; September 15, 2026> Article 11 (Reporting of Inheritance) Any person who intends to report the inheritance of a railway business pursuant to Article 9, Paragraph 1, Subparagraph 2 of the Act shall submit an inheritance report in the form of Annex No. 12 (including a report in electronic form) containing the person's recorded details such as name and resident registration number, along with documents proving the fact of inheritance (including electronic documents), to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended June 23, 2016; September 18, 2026> Article 12 (Reporting Corporate Mergers) ① A corporation surviving after a merger or established through a merger that seeks to report the merger under Article 9 (1) 3 of the Act shall submit a corporate merger report in attached Form No. 13 (including an electronic report), together with the documents specified in the following subparagraphs (including electronic documents), to the competent mayor, county head, district head, special metropolitan city mayor, consolidated special city mayor or metropolitan city mayor. <Amended Sep. 15, 2026; Sep. 18, 2026> 1. Copy of Merger Agreement 2. In cases where a corporation is established through a merger, the list of founders, such as promoters, of the newly established corporation 3. Explanation of Method and Conditions of Merger 4. Documents proving the corporation's decision regarding the merger ② If the corporation continues to exist after the merger, the public official in charge who has received the report under Paragraph 1 shall verify the Certificate of Corporate Registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended June 23, 2016; September 15, 2026> Article 13 (Report on Entrustment or Acceptance of Management, etc.) ① Pursuant to Article 10, Paragraph 1 of the Act , when a railway business operator or a dedicated railway operator intends to entrust the management of a railway business or the operation of a dedicated railway, they shall submit a report on entrustment or acceptance in the form of Annex No. 14 (including a report in the form of an electronic document) containing the personal records such as name and resident registration number, along with the documents specified in each of the following subparagraphs (including electronic documents), to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Amended June 23, 2016; August 27, 2021; September 18, 2026> 1. Copy of Consignment/Entrustment Agreement 2. Where either the entrusting party or entrusted party is a corporation, documents proving the corporation's decision to entrust or accept the entrustment 3. In the case where the trustee is a corporation, the inventory of assets, balance sheet, and income statement for the most recent fiscal year 4. Drawings of the section to be entrusted or accepted ② If the trustee is a corporation, the public official in charge who receives a report under Paragraph 1 shall verify the certificate of corporate registration through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act . <Amended June 23, 2016; September 15, 2026> Article 14 (Report of Suspension, Closure or Change in Suspension Period) Where a track business operator or dedicated track operator wishes to report a suspension or closure of business or a change in the suspension period under Article 11 (1) of the Act, the operator shall submit the report in attached Form No. 15 (including an electronic report), or the report of change in suspension period, together with whichever of the documents specified in the following subparagraphs applies (including electronic documents), to the competent mayor, county head, district head, special metropolitan city mayor, consolidated special city mayor or metropolitan city mayor. <Amended Sep. 18, 2026> 1. If part of a line is to be suspended or closed: A drawing of that line 2. In the case of suspension, documents including the period, reason, and plan for resuming operations, etc. 3. In the case of a change in the suspension period, a statement of reasons for the change in the suspension period 4. Where a corporation seeks to close its operations: Documents proving the corporation's decision concerning the closure Chapter 3 Construction Article 15 (Application for Special Construction Approval, etc.) ① A person seeking permission for a track business or approval for a dedicated track that requires special construction approval under Article 16 (1) of the Act shall submit an application for special construction approval or approval of a change in attached Form No. 16 (including an electronic application), together with a special construction plan containing the matters specified in the following subparagraphs (or documents indicating the changes in the case of an amendment, including electronic documents), to the competent mayor, county head, district head, special metropolitan city mayor, consolidated special city mayor or metropolitan city mayor. <Amended Sep. 18, 2026> 1. Reasons and Details of the Application for Special Construction Approval 2. Specifications of the Facility and Specific Characteristics of the System 3. Domestic and international installation examples and related photos or drawings 4. Review opinion on safety by a specialized safety inspection agency pursuant to Article 20 of the Act 5. Equipment standards for the track facility to be constructed 6. Safety inspection standards including the following items A. Safety standards for each detailed item requiring safety inspection B. Inspection Content and Method by Inspection Item C. Test result record sheet, etc. 7. Internal safety management regulations including the following items A. Matters concerning driving B. Matters concerning self-inspection and maintenance C. Method of rescuing passengers in the event of an emergency stop due to fire, power outage, breakdown, etc. D. Matters concerning the training of safety-related personnel E. Other matters necessary in relation to safety, etc. ② Upon receiving an application for approval of special construction, the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City shall submit the documents set forth in each of the following subparagraphs to the Minister of Land, Infrastructure and Transport. <Amended Mar. 23, 2013; Sep. 18, 2026> 1. Special construction plan under Paragraph 1 2. Review opinion of the Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor ③ The Minister of Land, Infrastructure and Transport shall decide whether to grant approval following deliberation by the Track Construction Deliberation Council pursuant to Article 15-2 , and shall notify the Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor. <Amended Mar. 23, 2013; June 23, 2016; Sep. 18, 2026> ④ Any person seeking special construction approval under Article 16 , Paragraph 1 of the Act shall satisfy all of the requirements of each of the following subparagraphs. <Newly added June 23, 2016> 1. The relevant rail facility must be functionally suitable for the safe transportation of people or cargo. 2. The internal safety management regulations submitted by the applicant for special construction approval shall be suitable for the safe management of the relevant track facility. [Title amended June 23, 2016] Article 15-2 (Establishment of the Track Construction Deliberation Council, etc.) ① A Track Construction Deliberation Council (hereinafter referred to as the “Council”) shall be established under the Minister of Land, Infrastructure and Transport to deliberate on the matters set forth in each of the following subparagraphs. <Amended Mar. 24, 2017> 1. Matters concerning the approval or modification approval of a track business for mountainous and remote area type tracks pursuant to Article 4-2, Paragraph 1 of the Act 2. Matters concerning the enactment and amendment of construction and facility standards pursuant to Article 15, Paragraph 1 of the Act 3. Matters concerning special construction approval pursuant to Article 16 , Paragraph 1 of the Act 4. Other matters concerning the construction of railway facilities that the Minister of Land, Infrastructure and Transport deems necessary. ② The council shall be composed of no more than 20 members, including one chairperson. ③ Members of the deliberation council shall be appointed or commissioned by the Minister of Land, Infrastructure and Transport from among persons falling under any of the following subparagraphs. 1. Public officials of Grade 4 or higher in charge of track-related duties, or general civil servants belonging to the Senior Civil Service 2. Executives of public organizations and research institutions related to track transportation 3. A person with extensive professional knowledge and experience in civil engineering, architecture, machinery, electricity, etc., related to the track. ④ The chairperson of the deliberation council shall be appointed by the Minister of Land, Infrastructure and Transport from among the members of the deliberation council. ⑤ The term of office for a member appointed pursuant to Paragraph 3, Subparagraph 2 or 3 shall be two years. ⑥ The Minister of Land, Infrastructure and Transport may dismiss a member appointed pursuant to subparagraph 2 or subparagraph 3 of paragraph 3 if the member falls under any of the following subparagraphs. 1. Cases where duties cannot be performed due to mental or physical disability 2. In the case of misconduct related to official duties 3. Cases where a member is deemed unsuitable due to negligence of duty, damage to reputation, or other reasons 4. Cases where a member expresses that it is difficult to perform their duties. [This Article Newly Inserted June 23, 2016] Article 15-3 (Operation of the Track Construction Deliberation Council, etc.) ① The Chairperson represents the Council and oversees the Council's affairs. ② If the Chairperson is unable to perform their duties due to unavoidable circumstances, a member designated in advance by the Chairperson shall perform the duties on their behalf. ③ The chairperson convenes the meeting of the deliberation council and presides over it. ④ A meeting of the Council shall be opened with the attendance of a majority of the registered members and decisions shall be made by the approval of a majority of the members present. ⑤ The Council shall have one secretary to handle the Council’s affairs, and the secretary shall be designated by the Minister of Land, Infrastructure and Transport from among the officials under his/her jurisdiction. ⑥ Matters necessary for the operation of the Council, other than those stipulated in these rules, shall be determined by the Chairperson following a resolution by the Council. [This Article Newly Inserted June 23, 2016] Chapter 4 Safety Management Article 16 (Application for Safety Inspection) ① Any person who intends to undergo a safety inspection pursuant to Article 13, Paragraph 2 of the Enforcement Decree shall submit an application for safety inspection in the form of Annex No. 17 (including a report in the form of an electronic document) to the Mayor, County Governor, District Head, or the Special Mayor, Integrated Special Mayor, or Metropolitan Mayor (in cases where the Mayor, County Governor, District Head, or the Special Mayor, Integrated Special Mayor, or Metropolitan Mayor has entrusted safety inspection duties, this refers to the person to whom the entrustment has been made; hereinafter the same applies in this Article). <Amended Aug. 30, 2024; Sep. 18, 2026> 1. Copy of the most recent safety inspection certificate 2. Notification of Safety Inspection ( Applicable only in cases where an application for said inspection is made after receiving notification to undergo an unscheduled inspection under Article 19, Paragraph 1, Subparagraph 2 of the Act or a detailed safety inspection under Subparagraph 3 of the same Paragraph pursuant to Article 13, Paragraph 1 of the Enforcement Decree) ② When a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor conducts a safety inspection under each subparagraph of Article 19, Paragraph 1 of the Act and the inspection results are deemed satisfactory , they shall issue a Safety Inspection Certificate in the form of Annex 10 to the applicant. <Amended Aug. 30, 2024; Sep. 18, 2026> Article 17 (Application for Extension of Inspection Validity Period) Pursuant to Article 14, Paragraph 3 of the Enforcement Decree , if a railway operator or a dedicated railway operator wishes to extend the validity period of an inspection, they shall submit an Application for Extension of Inspection Validity Period ( Form No. 8 of the Appendix ) (including a report in the form of an electronic document) to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City, attaching the documents specified in each of the following subparagraphs (including electronic documents). <Amended Sep. 18, 2026> 1. A copy of the safety inspection certificate issued pursuant to Article 16, Paragraph 2 2. Documents proving the reason for extension Article 18 (Entrustment of Safety Inspection Duties, etc.) ① The technical personnel and facility standards required to be entrusted with safety inspection duties pursuant to Article 16, subparagraph 3 of the Enforcement Decree are as set forth in Table 1 . ② In cases where a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor entrusts safety inspection duties pursuant to Article 20 of the Act , they shall publicly announce in advance the entrusted party and the period of entrustment, etc. <Amended Sep. 18, 2026> Article 19 (Safety Rules, etc.) The safety rules pursuant to Article 21 of the Act are as set forth in Attached Table 2 . Article 20 (Safety Manager) In cases where a Safety Manager is appointed, dismissed, or retires pursuant to Article 18 of the Enforcement Decree, a Report on Appointment, Dismissal, or Retirement of a Safety Manager ( Form No. 18 of the Annex) (including a report in electronic form) shall be submitted to the Mayor, County Governor, District Head, or the Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor, attaching the documents corresponding to any of the following subparagraphs (including electronic documents). <Amended Sep. 18, 2026> 1. Report of Appointment: Certificate of Qualification (including supporting documents) 2. Report of Dismissal: Statement of Reasons for Dismissal Article 20-2 (Establishment of Safety Management Plan, etc.) ①The standards for establishing a safety management plan for railway facilities pursuant to Article 22-2, Paragraph 1 of the Act are as set forth in Table 2-2 . ② A railway operator or dedicated railway operator must submit a railway facility safety management plan to the mayor, county governor, district head, or special mayor, integrated special mayor, or metropolitan mayor within 30 days from the date of establishment, change, or supplementation. ③ The Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor may review the appropriateness of the railway facility safety management plan submitted pursuant to Paragraph 2, and if improvement or supplementation is necessary, notify the submitter and have them make improvements or supplements. ④ The mayor, county governor, district head, or special mayor, integrated special mayor, or metropolitan mayor may request a safety inspection agency pursuant to Article 20 of the Act to review the appropriateness of the safety management plan under Paragraph 3. ⑤ If, as a result of reviewing whether the safety management plan has been implemented pursuant to Article 22-2, Paragraph 2 of the Act , it is determined that it may impede the safe operation of the rail facility , the mayor, county governor, district head , or special mayor, integrated special mayor, or metropolitan mayor may order corrective measures by specifying the details and the deadline for such measures. ⑥ A railway operator or dedicated railway operator who has received a corrective action order pursuant to Paragraph 5 shall submit a corrective action plan to the mayor, county head, district head, or special mayor, integrated special mayor, or metropolitan mayor within 30 days from the date of receiving the corrective action order, and if the corrective action is completed, shall report the details of the correction to the mayor, county head, district head, or special mayor, integrated special mayor, or metropolitan mayor without delay. [This Article Newly Inserted Sep. 18, 2026] Article 21 (Measures in Case of Accidents) ① Under Article 24 of the Act, a track business operator or dedicated track operator shall immediately notify passengers by public address announcement of any operational disruption or track transport accident. <Amended Aug. 30, 2024> ② A railway operator or dedicated railway operator shall safely transport passengers to their destination or departure point and have them disembark after the announcement made pursuant to Paragraph 1, and shall conduct at least one test run before resuming operation. ③ If a railway operator or dedicated railway operator determines immediately after the occurrence of an operational disruption or railway transport accident that it is difficult to safely transport passengers to their destination or departure point due to a defect in the facility as set forth in Paragraph 2, they shall take measures to enable passengers to promptly escape from the railway vehicle in accordance with the safety management plan under Article 4, Paragraph 2 , Subparagraph 5 of the Enforcement Decree and the internal safety management regulations under Article 15, Paragraph 1, Subparagraph 7. <Amended Aug. 30, 2024> Article 22 (Reporting and Investigation of Serious Rail Transport Accidents) ① The term “serious rail transport accidents and operational disruptions prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 25, Paragraph 1 of the Act refers to any accident falling under any of the following subparagraphs. <Amended Apr. 14, 2014; Aug. 30, 2024; Sep. 18, 2026> 1. Accidents resulting in fatalities 1-2. Accidents resulting in injured persons requiring hospitalization for one week or more, or treatment for three weeks or more, based on a doctor's diagnosis. 2. Accidents of falling, collision, or fire involving tracked vehicles 3. An accident in which the operation of the track carrying passengers is suspended for 30 minutes or more due to reasons such as mechanical defects, breakdowns, or natural disasters during transportation. ② In accordance with Article 25, Paragraph 1 of the Act , a railway operator or a dedicated railway operator shall immediately report an overview of the railway transportation accident, including the matters in each of the following subparagraphs, to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City, in the event that a railway transportation accident falling under any of the subparagraphs of Paragraph 1 of this Article occurs (in cases where an injured person corresponding to Subparagraph 1-2 of the same Paragraph occurs due to an accident other than Subparagraphs 2 and 3 of Paragraph 1, this refers to the time when the railway operator or dedicated railway operator becomes aware of the results of a doctor's diagnosis). <Newly added Aug. 30, 2024; Sep. 18, 2026> 1. Date and time of occurrence and location 2. Circumstances of Occurrence 3. General damage details ③ A railway operator or a dedicated railway operator shall submit a report on serious railway transport accidents in the form of Annex 18-2 to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City within three days from the date of reporting pursuant to Paragraph 2. <Newly added Aug. 30, 2024; Sep. 18, 2026> ④ If a railway operator or a dedicated railway operator has entered information required to be included in the serious railway transport accident report in the Form No. 18-2 of the Attached Form into the Comprehensive Information Management System for Railway Facilities pursuant to Article 26-2, Paragraph 1 of the Act, it shall be deemed that the report pursuant to Paragraph 3 has been submitted to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City. <Newly added Aug. 30, 2024; Sep. 18, 2026> ⑤ When a Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor receives a report pursuant to Paragraph 2 or receives a report submitted pursuant to Paragraph 3 (excluding cases where a report is deemed to have been received pursuant to Paragraph 4), they shall immediately notify the Minister of Land, Infrastructure and Transport of the contents thereof. <Newly added Aug. 30, 2024; Sep. 18, 2026> ⑥ A Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor who has received a report pursuant to Paragraph 2, or the Minister of Land, Infrastructure and Transport who has received notification pursuant to Paragraph 5, may form an accident investigation team together with a specialized safety inspection agency pursuant to Article 16 of the Enforcement Decree and conduct an investigation. <Amended Aug. 30, 2024; Sep. 18, 2026> [Title amended Aug. 30, 2024] Chapter 5 Supplementary Provisions Article 23 (Types of Insurance, etc.) ① The types of insurance under Article 26 of the Act shall be rail transport accident liability insurance or insurance containing the same contents as said insurance. ② The insurance under Paragraph 1 must have an insured amount that meets the criteria of each of the following subparagraphs. 1. The compensation limit per rail transport accident must be 200 million won or more. 2. The compensation limit per person must be 200 million won or more. 3. The annual compensation limit must be 400 million won or more. ③ The insurance under Paragraph 1 must be purchased before operating the rail facility. Article 23-2 (Operation of Rail Infrastructure Comprehensive Information Management System) The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 26-2, Paragraph 1, Item 10 of the Act refers to the following matters: 1. Matters concerning the safety management plan for railway facilities pursuant to Article 8, Paragraph 3 of the Act and Article 4, Paragraph 2, Subparagraph 5 of the Enforcement Decree 2. Matters concerning safety education pursuant to Article 27 , Paragraph 2 of the Act 3. Matters concerning the driver of a tracked vehicle 4. Matters concerning operational information, such as operating hours and usage status of rail vehicles 5. Matters concerning rail transport accidents and operational disruptions [This Article was newly inserted on Aug. 30, 2024.] [Formerly Article 23-2 was moved to Article 23-3 <Aug. 30, 2024>] Article 23-3 (Subjects and Contents of Safety Education, etc.) ① The subjects of safety education pursuant to Article 27, Paragraph 2 of the Act (hereinafter referred to as “safety education”) are as follows: 1. Among rail transport workers, rail vehicle drivers, passenger boarding assistants, and safety managers and inspection and maintenance personnel 2. Safety manager appointed pursuant to Article 22, Paragraph 3 of the Act ② The educational content and methods of safety education, etc. are as set forth in Attached Table 3 . ③ A railway operator or a dedicated railway operator may entrust safety training to an institution specified in each subparagraph of Article 16 of the Enforcement Decree in accordance with Article 27, Paragraph 4 of the Act . [This Article newly inserted Feb. 7, 2019] [Title amended Aug. 30, 2024] [Moved from Article 23-2 <Aug. 30, 2024>] Article 24 (Identification card indicating the authority of an inspection official) The identification card of an inspection official pursuant to Article 30, Paragraph 4 of the Act shall be in the form of Annex 19 . Article 25 (Fees) ① Any person who intends to apply for a permit or permit for modification of a railway business, or for approval or notification, etc., of a dedicated railway, pursuant to Article 31 of the Act, shall pay a fee of 20,000 won to the Mayor, County Governor, District Head, or the Mayor of a Special City, Integrated Special City, or Metropolitan City for each such application. <Amended Sep. 18, 2026> ② Any person who intends to apply for a completion inspection or safety inspection of a railway facility shall pay a fee determined by the Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor (or the person to whom the Mayor, County Governor, District Head, or Special City Mayor, Integrated Special City Mayor, or Metropolitan City Mayor has entrusted safety inspection duties) in accordance with the standards for appropriate remuneration for engineering projects pursuant to Article 31, Paragraph 2 of the Engineering Industry Promotion Act. <Amended June 23, 2016; September 18, 2026> Article 26 Deleted <Mar. 12, 2026> ADDENDA <Ministry of Land, Transport and Maritime Affairs Decree No. 208, Jan. 11, 2010> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures for Rail Facilities)  Any person who has installed and is operating rail facilities under subparagraphs 5 through 11 of Article 2 at the time of enforcement of this Rule shall obtain permission for a rail business or approval for a dedicated rail pursuant to Article 4 or 5 of the Act, or report a dedicated rail within six months after enforcement of this Rule. Article 3 (Amendment of Other Laws)  ① The Enforcement Rules of the Traffic Safety Act are partially amended as follows. In Article 4, subparagraph 2, “a person who has obtained permission for a cable car business pursuant to the Cable Car and Rail Act” shall be changed to “a person who has obtained permission for a rail business pursuant to the Rail Transport Act and a person who has obtained approval for a dedicated rail.” ② The Enforcement Rules for the Organization of the Ministry of Land, Transport and Maritime Affairs and its affiliated agencies are partially amended as follows. In Article 9, Paragraph 19, Subparagraph 15, “cable car and rail” shall be changed to “rail”. ③ The Rules on the Determination, Structure, and Installation Standards of Urban Planning Facilities are partially amended as follows. In Article 34, “Article 3, Paragraph 2 of the Cableway and Rail Act” shall be changed to “Article 2, Paragraph 7 of the Rail Transport Act”. In Article 36, “「Cableway and Rail Act」” shall be changed to “「Railway Transport Act」”. In Article 37, “Article 3, Paragraph 1 of the Cable Car and Rail Act” shall be changed to “Article 2, Paragraph 7 of the Rail Transport Act”. In Article 39, “「Cableway and Rail Act」” shall be changed to “「Railway Transport Act」”. ④ Part of the Enforcement Rules of the Act on Urban Parks and Green Spaces, etc. is amended as follows. In column 3 of Appendix 1, “monorail/cable car” shall be changed to “railway”. Article 4 (Relationship with Other Laws and Regulations)  Where, at the time of the enforcement of this Rule, other laws and regulations refer to the former "Enforcement Rules of the Cable Car and Rail Road Act" or its provisions, and there are corresponding provisions in this Rule, it shall be deemed that this Rule or the relevant provisions of this Rule have been referred to in place of the former provisions. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through 5  omitted Article 6 (Amendment of Other Laws)  ① through ㉞ Omitted Part of the Enforcement Rules of the Rail Transport Act is amended as follows. In the part other than the subparagraphs of Article 15, Paragraph 2, and Paragraph 3 of the same article, “Minister of Land, Transport and Maritime Affairs” shall be changed to “Minister of Land, Infrastructure and Transport”. In the part other than the subparagraphs of Article 22, Paragraph 1, “Ordinance of the Ministry of Land, Transport and Maritime Affairs” shall be changed to “Ordinance of the Ministry of Land, Infrastructure and Transport”. Omitted from 34 to <126> ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 54, Dec. 30, 2013> (Partial Amendment to the Enforcement Rules of the Act on the Recapture of Development Profits, etc. for the Establishment of Regulatory Review Periods Pursuant to the Amendment of the Framework Act on Administrative Regulations) This rule shall take effect on January 1, 2014. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 87, Apr. 14, 2014> This rule shall take effect on April 15, 2014. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 120, Aug. 7, 2014> (Partial Amendment to the Enforcement Rules of the Framework Act on the Construction Industry, etc. for the Protection of Personal Information) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Forms)  Forms in use under the previous regulations at the time of the enforcement of this Rule shall continue to be used; however, parts where the Resident Registration Number has been deleted or revised to the Date of Birth pursuant to this Rule shall be deleted or modified for use. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 169, Dec. 31, 2014> (Partial Amendment to the Enforcement Rules of the Act on the Sale of Buildings, etc. for the Establishment of Regulatory Review Periods, etc.) This rule shall take effect on January 1, 2015. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 320, June 23, 2016> Article 1 (Enforcement Date)  This rule shall enter into force on June 23, 2016. Article 2 (Transitional Measures Concerning the Change of Name of the Track Construction Deliberation Committee)  ① The Track Construction Deliberation Committee under Article 17, Paragraph 1 of the former Act at the time of the enforcement of this Rule shall be deemed to be the Deliberation Committee under the amended provisions of Article 15-2, Paragraph 1. ② Members of the Track Construction Deliberation Committee appointed or commissioned pursuant to Article 17, Paragraph 3 of the former Act at the time of the enforcement of this Rule shall be deemed to have been appointed or commissioned as members of the Deliberation Committee pursuant to the amended provisions of Article 15-2, Paragraph 2. In this case, the term of office of the commissioned members shall be the remaining period. Article 3 (Amendment of Other Laws)  Part of the Enforcement Rules for the Organization of the Ministry of Land, Infrastructure and Transport and its Affiliated Agencies is amended as follows. In Article 14, Paragraph 11, Subparagraph 14, “Track Construction Deliberation Committee” shall be changed to “Track Construction Deliberation Council”. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 382, ​​Dec. 30, 2016> (Partial Amendment to the Enforcement Rules of the Act on Appraisal and Appraisers, etc. for the Establishment of Regulatory Review Periods, etc.) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through 4  omitted ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 408, Mar. 24, 2017> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 591, Feb. 7, 2019> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Decrees for the Reorganization of Difficult Legal Terms) This rule shall take effect from the date of its promulgation. <Proviso omitted> ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 923, Dec. 15, 2021> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1232, July 10, 2023> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 15 Laws, Including the Enforcement Rule of the Traffic Safety Act, for the Reorganization of Regulatory Review Periods) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1385, Aug. 30, 2024> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1569, Mar. 12, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws for the Reorganization of Regulatory Review Periods) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1621, Sep. 15, 2026> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 19 Laws to Enhance Consistency in the Legal System) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1628, Sep. 18, 2026> Article 1 (Enforcement Date)  This rule shall enter into force on September 18, 2026. Article 2 (Transitional Measures Concerning the Establishment of Safety Management Plans)  A railway operator or dedicated railway operator who established a safety management plan and received a completion inspection pursuant to Article 9, Paragraph 3 of the former Rule prior to the enforcement of this Rule shall be deemed to have established a safety management plan for railway facilities pursuant to the amended provisions of Article 20-2, Paragraph 1. [Attachment 1] Standards for Technical Personnel and Facilities of Specialized Safety Inspection Agencies (Related to Article 18) [Appendix 2] Safety Rules (Related to Article 19) [Appendix 2-2] Standards for Establishing Safety Management Plans (Related to Article 20-2, Paragraph 1) [Attached Table 3] Contents of Safety Education by Target Group, etc. (Related to Article 23-3, Paragraph 2) [Attached Form No. 1] Application for Track Business Permission [Attachment Form No. 2] Railroad Business (Application for Permit Change, Notification of Change) [Attached Form No. 2-2] Application for Renewal of Track Business Permission [Attached Form No. 2-3] Application for Approval or Amendment Approval of a Track Business for Mountainous and Remote Areas [Attachment Form No. 3] Application for Approval of Dedicated Track Operation [Attachment Form No. 4] Operation of Dedicated Track (Application for Approval of Change, Notification of Change) [Attachment Form No. 5] Dedicated Freight Track Operation Report [Attachment Form No. 6] Notification of Change in Operation of Dedicated Freight Track [Attachment Form No. 7] Permit/Re-permit Certificate, Approval Certificate, Report Confirmation Certificate [Attachment Form No. 8] Application for Extension of (Construction Commencement Period, Inspection Validity Period) [Attachment Form No. 9] Application for Completion Inspection (Track Business, Dedicated Track) [Attachment Form No. 10] (Completion, Safety) Inspection Certificate [Attachment Form No. 11] Report of Transfer and Assignment [Attachment Form No. 12] Inheritance Declaration [Attachment Form No. 13] Corporate Merger Report [Attachment Form No. 14] Report on Management Entrustment/Consignment (Track Business, Dedicated Track) [Attachment Form No. 15] [Notification of Railway Business Management, Dedicated Railway Operation (Suspension, Change of Suspension Period, Abolition)] [Attachment Form No. 16] Special Construction (Application for Approval, Application for Approval of Change) [Attachment Form No. 17] Application for Safety Inspection (Track Facilities, Dedicated Track Facilities) [Attachment Form No. 18] Report on Safety Manager (Appointment, Dismissal, Retirement) [Form No. 18-2] Report on Serious Rail Transport Accident [Attachment Form No. 19] Inspection Official ID Card