Rules for Handling Contract Affairs in the Defense Industry
282583 · 2026-01-02
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of these Rules is to prescribe matters concerning the conclusion of defense procurement contracts delegated by Article 46 of the Defense Procurement Act and Articles 60, 61, 61-3, 61-4, and 61-11 of the Enforcement Decree of the same Act, as well as matters necessary for their implementation. <Amended May 1, 2024; July 16, 2024>
[Wholly Revised 2011.5.9]
Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Sep. 12, 2014, May 1, 2024>
1. "Contract Amount" refers to the amount agreed upon by the contracting parties based on the estimated price at the time of concluding the contract in the case of a fixed-price contract, and refers to the amount determined based on actual incurred costs calculated during or after contract performance in the case of an estimated-price contract.
2. "Estimated price" refers to the price determined by the contracting officer pursuant to Article 4-3 to establish the standard for the contract amount.
3. "Estimated price" refers to the price determined based on estimated costs in order to conclude an estimated contract.
4. "Contract Price" refers to the amount paid to the Defense Acquisition Contractor as consideration for the performance of the contract.
5. "Target Cost" refers to the total cost of cost items or their components (hereinafter referred to as "cost items, etc. subject to incentive application") over which the Defense Acquisition Contractor can control the cost level, determined by agreement with the Defense Acquisition Contractor in the event of concluding a cost reduction incentive contract (hereinafter referred to as the "Cost Reduction Incentive Contract") pursuant to Article 61, Paragraph 1, Subparagraph 4 of the Enforcement Decree of the Defense Acquisition Act (hereinafter referred to as the "Decree").
6. "Target Profit" refers to the amount calculated by multiplying the target cost by a certain profit margin when entering into a cost-reduction incentive contract.
7. "Incentive Profit" refers to the amount obtained by subtracting the actual incurred costs of cost items, etc. subject to incentive application, from the target cost when entering into a cost reduction incentive contract.
8. Delete<2014.9.12>
9. "Actual incurred cost" refers to the total cost calculated in accordance with the "Rules on Cost Calculation of Defense Cost-Subject Materials" based on cost data acquired during or after the contract performance period.
10. "Standard Contract Amount" refers to an amount calculated by agreement between the contracting parties based on an estimated price or an estimated price for use as a standard for determining the contract amount of a performance-based contract pursuant to Article 61, Paragraph 1, Subparagraph 10 of the Enforcement Decree (hereinafter referred to as "Performance-Based Contract").
11. "Performance bonus" refers to an amount paid by adding to or subtracting from the base contract amount in exchange for performance resulting from contract execution, in the case of concluding a performance-based contract.
[Wholly Revised 2011.5.9]
Article 3 (Selection of Contract Method)
① The contracting officer shall select a contract method capable of providing the Defense Acquisition Contractor with appropriate risk bearing and incentives for efficient contract execution, taking into consideration the extent of the Defense Acquisition Contractor’s liability for costs incurred during contract execution, the timing of the determination of the contract amount, and the extent of incentive benefits provided to the Defense Acquisition Contractor, and shall clearly state the reasons for such selection. <Amended May 1, 2024>
② The Administrator of the Defense Acquisition Program Administration shall establish criteria for determining appropriate contract types for each project stage or project characteristic so that contracting officers can select appropriate contracting methods.
[Wholly Revised 2011.5.9]
Article 4 (Determination of Estimated Price, etc.)
① When determining the estimated price and provisional price (hereinafter referred to as "estimated price, etc.") necessary for the conclusion of a contract, the contracting officer shall prepare a statement of the estimated price, etc.
② When the contracting officer prepares the statement of estimated prices, etc. pursuant to Paragraph 1, he/she shall calculate the base amount of the estimated prices, etc., and if the base amount is calculated using the cost calculation method, it shall be in accordance with the “Rules on Cost Calculation of Defense Cost-Subject Materials.”
③ When determining the estimated price, etc. based on the base amount calculated pursuant to Paragraph 2, the contracting officer shall consider the contract quantity, prospects for contract performance, contract performance period, supply and demand status, contract conditions, and other relevant circumstances; and if the estimated price, etc. is determined differently from the base amount, the reason for such adjustment shall be clearly stated in the estimate price, etc. statement.
[Wholly Revised 2011.5.9]
Article 4-2 (Settlement of Estimated Contracts) In Article 61-4, Paragraph 3, Subparagraph 2 of the Enforcement Decree, the phrase "reasons beyond the control of the defense business partner as prescribed by the Ordinance of the Ministry of National Defense" refers to the reasons set forth in each of the following subparagraphs.
1. Change in Government Policy
2. Price fluctuations (limited to cases where the cost calculated based on actual incurred costs has increased to a level that does not meet the criteria set forth in the main text of Article 4-3, Paragraph 2, when compared to the estimated contract amount)
[Wholly Revised 2024.7.16]
Article 4-3 (Adjustment of Estimated Contract Amount)
① Where a contracting officer has concluded a long-term contract in the form of an estimated contract pursuant to Sections 3, 4, 4-2, 5, 6, 9, and 10 of Chapter 2, if it falls under any of the subparagraphs of Article 46-5 of the Act, the contracting officer may adjust the estimated contract amount (referring to an amount determined by agreement between the contracting parties based on the estimated price at the time of contract conclusion or during contract performance; hereinafter the same applies).
② Notwithstanding Paragraph 1, the adjustment of an estimated contract amount due to price fluctuations under Subparagraphs 1 and 3 of Article 46-5 of the Act shall be limited to cases where the cost calculated based on actual incurred costs up to the time of adjustment has increased or decreased by 3% or more compared to the estimated contract amount. However, in the case of an estimated contract concluded through competitive bidding, the item adjustment rate pursuant to the attached table must also have increased or decreased by 3% or more.
③ In cases where the estimated contract amount of an estimated contract concluded through competitive bidding is adjusted in accordance with Paragraph 2, the adjusted amount shall be calculated by multiplying the consideration for the portion of the estimated contract amount performed after the date on which the cause for adjustment occurred (hereinafter referred to as "consideration subject to price fluctuation") by the item adjustment rate specified in the attached table. In this case, the consideration subject to price fluctuation includes payments already made or progress payments made as an estimated payment, and advance payments and interim payments shall not be deducted.
④ The adjustment of the estimated contract amount pursuant to Paragraph 2 shall be made in a lump sum at the time of settlement by determining whether there are grounds for adjustment, except in special cases where it is recognized that failure to adjust the estimated contract amount during contract performance would cause significant impediment to the smooth execution of the contract.
[This Article Newly Established 2024.7.16]
Article 5 (Relationship with Other Laws) Matters related to contract affairs not specified in this Rule and the "Rules on Cost Calculation of Defense Industry Cost-Subject Materials" shall be governed by the laws and regulations concerning contracts to which the State is a party.
[Wholly Revised 2011.5.9]
Chapter 2 Contents and Scope of the Contract
Section 1 General Firm Agreement
Article 6 (Criteria for Concluding Contracts) When concluding a contract, if technical requirements such as specifications and performance have been determined and the contract amount can be determined using price analysis data or cost analysis data, the contracting officer shall conclude a general fixed-price contract pursuant to Article 61, Paragraph 1, Subparagraph 1 of the Enforcement Decree.
[Wholly Revised 2011.5.9]
Article 7 (Determination of Contract Amount) The contract amount shall be determined based on the estimated price prepared at the time of concluding the contract.
[Title Revised 2008.12.31]
Section 2 Price Adjustment Unit Price Contract
Article 8 (Criteria for Concluding Contracts) For items for which a contract has been concluded within the last three years by determining the estimated price using the cost calculation method, the contracting officer may conclude a price adjustment unit price contract pursuant to Article 61, Paragraph 1, Subparagraph 2 of the Enforcement Decree, limited to cases where the amount is not exceeding the amount determined by the Administrator of the Defense Acquisition Program Administration in consultation with the Minister of Finance and Economy. <Amended Sep. 12, 2014; Jan. 2, 2026>
[Wholly Revised 2011.5.9]
Article 9 (Determination of Contract Amount)
① In Article 61, Paragraph 1, Subparagraph 2 of the Enforcement Decree, the term "rate of change of an index prescribed by the Ordinance of the Ministry of National Defense" refers to the rate of change of an index set forth in each of the following subparagraphs.
1. Rate of change in the Producer Price Index and Import Price Index surveyed and announced by the Bank of Korea
2. Wage growth rate surveyed and announced by the Ministry of Employment and Labor
3. Other rates of fluctuation in indices determined by the Administrator of the Defense Acquisition Program Administration as deemed necessary for determining the contract amount
② The contract amount shall be calculated by adjusting the actual contract unit prices by item of the immediately preceding contract, taking into account the rate of fluctuation of the index pursuant to Paragraph 1 for the period from the month in which the contract immediately preceding the contract was concluded to the month preceding the month in which the contract is concluded, and then multiplying the result by the contract quantity. In this case, the specific application and calculation methods for the rate of fluctuation of the index and the actual contract unit prices shall be determined by the Administrator of the Defense Acquisition Program Administration.
[Wholly Revised 2014.9.12]
Section 3 Cost Reduction Compensation Agreement
Article 10 (Criteria for Contract Conclusion)
① The contracting officer may determine the estimated price using the cost calculation method when concluding a contract, and may conclude a cost reduction compensation contract pursuant to Article 61, Paragraph 1, Subparagraph 3 of the Enforcement Decree if cost reductions are foreseen or occur during the performance of the contract.
② In cases where a contracting officer has concluded a contract other than a cost-saving compensation contract and falls under any of the following subparagraphs, the contracting officer may conclude a cost-saving compensation contract pursuant to Paragraph 1.
1. In the case where cost savings are foreseen or occur after entering into a general firm agreement
2. In cases where cost reductions are foreseen or occur after an interim fixed-price contract has been concluded and the contract amount has been finalized
3. Where cost reductions for cost items with a fixed contract amount are foreseen or occur after concluding a contract for specific cost items with an indeterminate contract amount
[Wholly Revised 2011.5.9]
Delete Article 11 <2006.11.1>
Article 12 (Proposal for Cost Reduction Measures) The contracting officer and the defense contractor may propose cost reduction measures when cost reduction is anticipated or occurs through any of the methods falling under the following subparagraphs. <Amended May 1, 2024>
1. Development of New Technologies and Methods
2. Localization Development
3. Thermal management
4. Specification and Process Improvement
5. Quality and Performance Improvement
6. Other methods to reduce costs
[Wholly Revised 2011.5.9]
Article 13 (Submission of Cost Reduction Proposals, etc.)
① When a defense contractor proposes cost reduction measures pursuant to Article 12, it shall prepare a cost reduction proposal containing all of the matters in each of the following subparagraphs and submit it to the contracting officer prior to concluding a cost reduction compensation contract. <Amended May 1, 2024>
1. Specific Details of Cost Reduction Activities and Their Impact on Product Performance
2. Cost Statement and Cost Reductions (in cases where cost reductions are anticipated, this refers to the Cost Estimation Statement and Estimated Cost Reductions)
3. Matters to be referenced for the cost reduction compensation agreement in addition to Items 1 and 2
② When a contracting officer proposes cost-saving measures and enters into a cost-saving compensation contract, said contracting officer shall reach an agreement with the defense procurement contractor regarding said cost-saving measures. <Amended May 1, 2024>
[Wholly Revised 2011.5.9]
Article 14 (Drafting of Contract)
① When concluding a cost reduction compensation contract, the contracting officer shall clearly specify in the contract the details of the cost reduction proposal, the method of evaluating the cost reduction amount, and other matters necessary in relation to cost reduction, and notify the Defense Acquisition and Quality Agency of such details.
② When a contracting officer enters into a new contract within five years for an item for which a cost-saving compensation contract has been concluded, the details of the compensation amount determined in the initial cost-saving compensation contract must be clearly stated in the contract.
[Wholly Revised 2011.5.9]
Article 15 (Assessment of Cost Reduction Status, etc.)
① If a contracting officer requires a technical judgment regarding the details of cost reduction measures, the contracting officer may have the Defense Acquisition Contractor determine whether the details of cost reductions for the relevant contract are appropriate, and the Defense Acquisition Contractor may request the submission of necessary data from the Defense Acquisition Contractor. In this case, the Defense Acquisition Contractor shall comply faithfully. <Amended May 1, 2024>
② The Defense Technology and Quality Agency shall notify the contracting officer of cost reduction data, etc., for which appropriateness has been determined pursuant to Paragraph 1.
[Wholly Revised 2011.5.9]
Article 15-2 (Evaluation of Cost Reduction Performance, etc.)
① The contracting officer shall require the defense contractor to obtain a final evaluation opinion from the Defense Acquisition Quality Agency regarding cost reduction performance during the contract execution period, and to submit the final evaluation opinion and final cost data within 30 days from the date of completion of contract execution. <Amended May 1, 2024>
② When the Defense Acquisition Quality Agency receives a request from a defense contractor to evaluate cost reduction performance, it shall review the quality assurance and technical feasibility of the results of contract execution, prepare an evaluation opinion thereon, and send it to the defense acquisition contractor within 20 days from the date the request was received. <Amended May 1, 2024>
[Wholly Revised 2011.5.9]
Article 16 (Determination of Cost Reduction Compensation Amount, etc.)
① The cost reduction compensation amount shall be the full amount of cost reduction.
② The cost reduction amount under Paragraph 1 shall be the amount obtained by subtracting the actual manufacturing cost incurred from the original manufacturing cost of the cost element for which cost reduction is proposed.
③ The contract price of a cost reduction compensation contract shall be the sum of the amount obtained by subtracting the cost reduction amount from the contract amount at the time of concluding the cost reduction compensation contract, and the cost reduction compensation amount pursuant to Paragraph 1.
④ For items for which a cost reduction compensation contract has been concluded, if a new contract is concluded within five years from the date of conclusion of the previous contract, the cost reduction compensation amount pursuant to Paragraph 1 shall be paid. In this case, the contract amount shall be determined by adding the amount determined based on the estimated price according to cost calculation and the amount obtained by multiplying the cost reduction compensation amount per item unit by the contract quantity.
⑤ In the case of Paragraph 4, the manufacturing cost of the cost element for which cost reduction is proposed shall be determined within the range of the amount obtained by multiplying the manufacturing cost with recent cost reduction performance by the rate of change in the index by basic classification of the Producer Price Index for the relevant item.
[Wholly Revised 2011.5.9]
Section 4 Cost Reduction Incentive Contracts <Revised Sep. 12, 2014>
Article 17 (Criteria for Contract Conclusion)
① A contracting officer may enter into a cost-reduction incentive contract when entering into a contract if cost reduction can be expected due to the nature of the contract or if there is a need to induce cost reduction.
② The contracting officer shall, by agreement with the defense procurement contractor, designate items, etc. for which cost reduction is possible due to the nature of the relevant contract as subjects for incentive application. <Amended May 1, 2024>
[Wholly Revised 2014.9.12]
Article 18 (Determination of Contract Amount) The contract amount shall be determined by agreement between the contracting parties based on the sum of all prices classified according to the following subparagraphs.
1. Cost items, etc. for which cost calculation is possible at the time of signing the contract: Estimated price
2. Items, etc., for which cost calculation is difficult at the time of signing the contract: Estimated price
[Wholly Revised 2014.9.12]
Article 19 (Contractual Elements, etc.)
① When concluding a cost-saving incentive contract, the contracting officer shall clearly state the matters of each of the following subparagraphs in the contract.
1. Contract Amount. In this case, it is classified into cost items, etc. for which cost calculation is possible and cost items, etc. for which it is difficult at the time of concluding the contract.
2. Items subject to inducement application, etc.
3. Target Cost
4. Target Profit
5. Settlement Method and Criteria
② If a contracting officer has a track record of concluding a cost-saving incentive contract, and subsequently enters into a contract under each subparagraph of Article 61, Paragraph 1 of the Enforcement Decree within five years from the date of concluding such contract, the officer shall pay a cost-saving compensation amount based on the incentive profit determined in the previous contract. In this case, the contract amount shall be calculated by adding the amount determined based on the estimated price derived from cost calculation and the cost-saving compensation amount.
[Wholly Revised 2014.9.12]
Article 20 (Determination of Contract Price, etc.)
① After the performance of the contract, the contracting officer shall pay the determined contract price by adding up all amounts according to the classifications in each of the following subparagraphs.
1. Items, etc. Subject to Incentive Application: The sum of actual incurred costs, target profit, and incentive profit. However, this shall not exceed the contract amount corresponding to the items, etc. subject to incentive application at the time of concluding the relevant contract.
2. Items, etc. not falling under the categories subject to incentive application: The contract amount determined pursuant to Article 18. However, in the case of items, etc. under Article 18, subparagraph 2, a settlement shall be made.
② Specific matters necessary for the determination, payment, settlement, and cost items, etc. of the contract price pursuant to Paragraph 1 shall be determined by the Administrator of the Defense Acquisition Program Administration.
[Wholly Revised 2014.9.12]
Section 4-2 Limit Contract <Newly Inserted 2008.12.31>
Article 20-2 (Criteria for Concluding Contracts) The contracting officer may conclude a ceiling contract (hereinafter referred to as "Census Contract") pursuant to Article 61, Paragraph 1, Subparagraph 5 of the Enforcement Decree in order to secure spare parts and maintenance support for major equipment required for the operation of weapon systems.
[This Article Newly Established 2008.12.31]
Article 20-3 (Determination of Contract Price)
① The contract amount shall be determined by agreement between the contracting parties based on the sum of the amounts calculated by multiplying the prices according to the classifications in each of the following subparagraphs by the respective estimated quantities. In this case, the contract amount shall not exceed the limit amount requested by the requesting agency.
1. Items with confirmed prices: Estimated price
2. Items where price determination is difficult: Estimated price
② The contracting officer shall determine the quantity, delivery date, delivery location, etc., for the items under the relevant contract upon the request for use by the requesting agency and issue an order.
③ The contracting officer may order additional items other than those specified in the contract upon a request from the requesting agency, after consultation with the contractor. In this case, the price of the additional items shall be determined by applying the prices specified in Paragraph 1, Subparagraphs 1 and 2, provided that the ratio of the estimated price, etc. to the base amount calculated pursuant to Article 4 and the ratio of the successful bid amount of other contracts to the estimated price, etc. shall be taken into consideration.
④ The contracting officer shall conduct a settlement when the total amount of items ordered pursuant to the relevant contract reaches 90 percent of the contract amount or 30 days prior to the expiration date of the relevant contract period. However, if the prices of all contract items can be determined, the settlement shall be conducted when the total amount of ordered items reaches the contract amount.
⑤ The contracting officer shall perform a settlement pursuant to Paragraph 4 based on the cost data obtained from the date the relevant contract was concluded until the settlement date.
⑥ Specific matters necessary for the determination of the contract amount pursuant to Paragraph 1 and the settlement method, etc. pursuant to Paragraph 4 shall be determined by the Administrator of the Defense Acquisition Program Administration.
[Wholly Revised 2014.9.12]
Section 5 Intermediate Fixed Contract
Article 21 (Criteria for Concluding Contracts) When concluding a contract for items following research and development or the production of prototypes, the contracting officer may conclude an interim fixed-price contract pursuant to Article 61, Paragraph 1, Subparagraph 6 of the Enforcement Decree in cases where it is difficult to obtain cost data or significant cost fluctuations are expected during contract execution, but the necessary cost data can be obtained during the contract execution period.
[Wholly Revised 2011.5.9]
Article 22 (Determination of Contract Amount)
① The contract shall be concluded based on estimated prices, and the contract amount shall be determined by analyzing cost data acquired up to the interim confirmation period.
② The "interim fixed time" under Paragraph 1 refers to a time when cost calculation is possible, either when a certain quantity is produced within 50% of the contract volume during contract performance or after a certain period has passed within 50% of the contract period; this must be clearly stated in the contract by mutual agreement between the contracting parties at the time of signing.
[Wholly Revised 2011.5.9]
Section 6 Contract for Specific Expenses (Indeterminate)
Article 23 (Criteria for Concluding Contracts) If it is difficult to determine the cost of some cost items among the cost items constituting the contract amount, the contracting officer may conclude a contract for indeterminate specific cost items pursuant to Article 61, Paragraph 1, Subparagraph 8 of the Enforcement Decree.
[Wholly Revised 2011.5.9]
Article 24 (Determination of Contract Amount) The contract amount shall be the sum of the estimated prices for cost items for which cost calculation is possible at the time of concluding the contract, and the estimated prices for cost items for which cost calculation is difficult. In this case, the amount determined as the estimated price within the contract amount shall be finalized based on cost data obtained from the date of contract conclusion to the date of completion of contract performance.
[Wholly Revised 2011.5.9]
Delete Section 7 <2014.9.12>
Delete Article 25 <2014.9.12>
Delete Article 26 <2014.9.12>
Delete Article 27 <2014.9.12>
Delete Section 8 <2006.4.24>
Delete Article 28 <2006.4.24>
Delete Article 29 <2006.4.24>
Delete Article 30 <2006.4.24>
Section 9 General Estimated Contract
Article 31 (Criteria for Concluding Contracts) When concluding a contract for research or prototype production (including research services related thereto), the contracting officer may conclude a general estimated contract pursuant to Article 61, Paragraph 1, Subparagraph 9 of the Enforcement Decree only when it is difficult to obtain cost data and other contracting methods cannot be applied.
[Wholly Revised 2011.5.9]
Article 32 (Determination of Contract Amount) The contract shall be concluded based on the estimated price, and the contract amount shall be determined after contract performance based on the actual incurred costs calculated in accordance with the "Rules on Cost Calculation of Defense Industry Cost-Subject Materials."
[Wholly Revised 2011.5.9]
Section 10 Performance-Based Contracts <Newly Added Sep. 12, 2014>
Article 33 (Criteria for Concluding Contracts) The contracting officer may conclude a performance-based contract if the achievement of specific outcomes is required and differential payment is to be made based on such outcomes after contract execution.
[This Article Newly Established 2014.9.12]
Article 34 (Determination of Contract Amount)
① The contract amount shall be the sum of the standard contract amount and the performance bonus. In this case, specific details regarding the scope of the performance bonus shall be determined by the Minister of National Defense.
② With regard to contract guarantee deposits, liquidated damages for delay, and adjustments to the contract amount due to price fluctuations, etc., under performance-based contracts, the provisions of the Act on Contracts to Which the State is a Party shall apply mutatis mutandis. In this case, the "contract amount" shall be deemed the "standard contract amount."
③ The provisions of the “Rules on Payment of Advance Payments and Intermediate Payments in the Defense Industry” shall apply mutatis mutandis to advance payments and interim payments of performance-based contracts. In this case, the “contract amount” shall be deemed the “standard contract amount.”
[This Article Newly Established 2014.9.12]
Article 35 (Contract Elements) When concluding a performance-based contract, the contracting officer shall clearly state the matters in each of the following subparagraphs in the contract.
1. Contract Amount
2. Contract Period
3. Performance bonus
4. Standard Contract Amount
5. Performance Evaluation Criteria
[This Article Newly Established 2014.9.12]
Article 36 (Determination of Contract Price)
① The contracting officer shall pay the settled contract amount by adding to or subtracting the performance bonus based on the evaluation results of contract execution performance from the standard contract amount.
② Specific matters necessary for the settlement and determination methods, etc. of the contract price pursuant to Paragraph 1 shall be determined by the Administrator of the Defense Acquisition Program Administration.
[This Article Newly Established 2014.9.12]
Section 11 Long-term Option Contracts <Newly Inserted 2014.9.12>
Article 37 (Criteria for Concluding Contracts) When concluding a contract, the contracting officer shall determine the contract period within a range not exceeding five years and establish conditions for modification regarding price, period, and contract termination, etc., for the projected required volume; however, if the officer intends to conclude a separate contract for the volume purchased by exercising these modification conditions, the officer may conclude a long-term option contract pursuant to Article 61, Paragraph 1, Subparagraph 11 of the Enforcement Decree (hereinafter referred to as the "long-term option contract").
[This Article Newly Established 2014.9.12]
Article 38 (Drafting of Contract)
① When concluding a long-term option contract, the contracting officer shall clearly state the matters corresponding to each of the following subparagraphs in the contract. <Amended May 1, 2024>
1. Item, Quantity, and Contract Period of Long-term Option Contract
2. Method for Determining the Contract Amount of Long-Term Option Contracts
3. Obligations of the Defense Contractor under Long-term Option Contracts
4. Measures regarding contractual disadvantages, collection of damages, disclosure of information on non-performance of long-term option contracts, etc., in the event of non-performance of a long-term option contract due to reasons attributable to the defense contractor
② When the contracting officer exercises the modification conditions pursuant to the contents of a long-term option contract, the officer shall enter into a separate contract with the relevant defense procurement contractor regarding the required quantity. <Amended May 1, 2024>
③ When concluding a contract pursuant to Paragraph 2, the contracting officer may calculate the price for the required quantity based on the criteria for applying the rate of fluctuation of the Producer Price Index agreed upon by the contracting parties. In this case, the rate of fluctuation of the Producer Price Index investigated and published by the state agencies or public institutions of the country to which the contracting parties belong shall be the basis.
[This Article Newly Established 2014.9.12]
Section 12 Long-term Contracts <Newly Inserted 2024.5.1>
Article 39 (Criteria for Concluding Contracts) The contracting officer may conclude a long-term contract within the scope of the total project cost in cases where, considering the characteristics of the contract object and the efficiency of contract performance, it is determined that contract performance requires several years, or where, considering long-term procurement plans, long-term anticipated recurring requirements, or economic conditions, concluding a contract that terminates within the relevant fiscal year is inefficient or difficult.
[This Article Newly Established 2024.5.1]
Article 40 (Procedure for Return of Contract Guarantee Deposit) When the contracting officer returns the contract guarantee deposit to the defense procurement contractor pursuant to Article 60, Paragraph 4 of the Enforcement Decree and Article 50, Paragraph 3 of the Enforcement Decree of the Act on Contracts to Which the State is a Party, in the case of a long-term contract specifying annual performance portions, the contracting officer shall return the portion of the contract guarantee deposit corresponding to the completed part (including parts already performed or delivered) among the annual performance portions specified in the contract.
[This Article Newly Established 2024.5.1]
Revision
⊙Ministry of National Defense Decree No. 1200 (Jan. 2, 2026)
Partial Amendment to the Enforcement Rules on the Organizational Structure of the Ministry of National Defense and Its Affiliated Agencies
[Body omitted]
Supplementary Provisions
Article 1 (Enforcement Date) This Rule shall enter into force on January 2, 2026.
Article 2 (Amendment of Other Laws) ① through ③ Omitted
④ The Rules on the Processing of Contract Affairs Concerning the Defense Industry are partially amended as follows.
In Article 8, "Minister of Strategy and Finance" shall be changed to "Minister of Finance and Economy".
⑤ Omitted
Reason for Enactment/Amendment
[Partial revision]
◇ Reasons for Amendment and Key Contents
To support the establishment of a system for the development and utilization of artificial intelligence and advanced technologies in the defense sector within the Ministry of National Defense, one Assistant Minister position is newly created and appointed from among general civil servants belonging to the Senior Civil Service; for the efficient operation of the organization, the Information Technology and Resource Management Offices within the Ministry of National Defense's Planning and Coordination Office are reorganized into the Defense Information Technology Bureau, the Logistics Management Bureau, and the Military Facilities Bureau, with their assigned duties adjusted; to strengthen institutional and democratic control for a military that serves the people, the Military Advisor, who was previously appointed as a general officer, will henceforth be appointed from among general civil servants belonging to the Senior Civil Service and the title will be changed to Defense Advisor, with the necessary staffing level increased by one (one member of the Senior Civil Service); and to continuously perform tasks related to advanced military power, such as the overall management and coordination of AI-based manned and unmanned combined combat systems, the Director of Advanced Military Power Planning, which was established as a temporary organization under the Director of the Power Policy Bureau of the Ministry of National Defense, is being made into a permanent organization The "Organizational Structure of the Ministry of National Defense and Its Affiliated Agencies" is amended to convert one temporary position (one Senior Civil Service member) into a permanent position upon reorganization into the Defense AI Planning Bureau; to establish one Division within the Defense AI Planning Bureau as an organization subject to evaluation to strengthen the functions of formulating and coordinating AI policies in the defense sector, thereby increasing the necessary personnel by seven (1 Grade 4, 3 Grade 5, 2 Grade 6, and 1 Grade 7); to convert three temporary positions (1 Grade 4 and 2 Grade 5) into permanent positions upon converting the Manned-Unmanned Combined System Division, which was established as a temporary organization within the Power Policy Bureau, into a permanent organization to ensure the smooth execution of the transition to manned-unmanned combined combat systems; and to convert two temporary positions (1 Grade 4 or 5 and 1 Grade 7) increased for the performance of civilian employee recruitment duties into permanent positions (Presidential Decree). While reflecting matters changed pursuant to Act No. 36012 (promulgated and effective January 2, 2026),
The purpose is to adjust the names and division of duties of some subordinate organizations of the Ministry of National Defense, such as appointing the position of Policy Management Officer—previously assigned to field-grade officers—to a deputy director, science and technology secretary, secretary, or a special civil servant equivalent to Grade 4, and appointing the position of Protocol Officer—previously assigned to a secretary or a special civil servant equivalent to Grade 4—to a field-grade officer, converting two positions (two Grade 5 positions) of the Ministry of National Defense's authorized quota to multiple job series for efficient personnel management, changing the names of the Military Structure Innovation Officer, etc. placed under the Director of National Defense Innovation Planning to Military Structure Reform Officer, etc., and transferring them to the Planning and Coordination Office, changing the name of the Data Policy Officer of the Planning and Coordination Office to National Defense Data Policy Division and transferring it to the National Defense Artificial Intelligence Planning Bureau, and transferring the Cyber Electromagnetic Policy Division of the National Defense Policy Office to the National Defense Informatization Bureau.
<Provided by the Ministry of National Defense>