Urban Railway Operation Rules
270675 · 2025-04-11
Chapter 1 General Provisions <Amended Aug. 9, 2010>
Article 1 (Purpose) The purpose of this Rule is to promote the safe operation of urban railways by establishing matters necessary for the operation of urban railways and the maintenance and preservation of vehicles and facilities in accordance with Article 18 of the Urban Railway Act. <Amended July 8, 2014>
[Wholly Revised 2010.8.9]
Article 2 (Scope of Application) Matters concerning the operation of urban railways not specified in this Rule or matters that differ by urban transportation zone may be determined separately by the urban railway operator within the scope of applicable laws and regulations.
[Wholly Revised 2010.8.9]
Article 3 (Definitions) The meanings of terms used in this Rule are as follows. <Amended Aug. 27, 2021>
1. The term "station" refers to a place for the boarding and alighting of passengers, the formation of trains, and the shunting of rolling stock.
2. The term "track" refers to the railway tracks and the artificial structures supporting them, and is classified into main lines commonly used for train operation and other sidings.
3. "Train" refers to a vehicle formed for the purpose of operation on the main line and assigned a train number.
4. The term "vehicle" refers to electric multiple units, track test vehicles, electric test vehicles, etc., other than trains operating on the tracks.
5. "Operational safety device" refers to a device for ensuring the safe operation of trains and vehicles (hereinafter referred to as "train lights"), including block devices, signaling devices, interlocking devices, track switching devices, alarm devices, automatic train stopping devices, automatic train control devices, automatic train driving devices, integrated train control devices, etc.
6. "Block" refers to the prohibition of operating two or more trains simultaneously on a certain section of a track.
7. "Overhead line" refers to the overhead line and the artificial structures supporting it.
8. "Operational accident" refers to an incident in which casualties occur or urban railway facilities are damaged due to the operation of a train, etc.
9. "Operational hindrance" refers to any impediment to the operation of a train, etc. caused by the operation of said train, etc., that does not constitute an operational accident.
10. "Tram" refers to a train that operates using tracks on a road surface.
11. "Unmanned operation" refers to a method in which a train operates automatically under remote control from a control room, without a person directly driving the train from inside.
12. "Visual driving" refers to driving while relying on the naked eye.
[Wholly Revised 2010.8.9]
Article 4 (Employee Training)
① Urban railway operators shall ensure that employees engaged in duties related to the safety of urban railways undergo aptitude tests and prescribed training to confirm that they have acquired the knowledge and skills of urban railway operation before they engage in such duties. However, persons possessing qualifications related to the relevant duties may be exempted from all or part of the aptitude test or training.
② The urban railway operator may conduct appropriate domestic or overseas training to improve the qualifications of its employees.
[Wholly Revised 2010.8.9]
Article 5 (Safety Measures and Maintenance, etc.)
① The urban railway operator shall take necessary measures to ensure the safe operation of trains, etc.
② Urban railway operators shall take safety measures, such as safety inspections of urban railway facilities, in accordance with the Special Act on the Safety and Maintenance of Facilities, in order to prevent disasters and ensure safety. <Amended Jan. 18, 2018>
[Wholly Revised 2010.8.9]
Article 6 (Maintenance of Equipment and Materials, etc. for Emergency Restoration) The Urban Railway Operator shall always store and maintain the equipment and materials necessary for emergency restoration in a suitable place in preparation for the occurrence of disasters, breakdowns, operational accidents, or operational disruptions in rolling stock, tracks, power facilities, operational safety devices, and other facilities for train operation.
[Wholly Revised 2010.8.9]
Delete Article 7 <June 21, 2006>
Article 8 (Establishment of Safe Operation Plan, etc.) The urban railway operator shall establish and implement long-term and short-term plans to ensure safe operation and enhance the convenience of passengers.
[Wholly Revised 2010.8.9]
Article 9 (Test Operation in Newly Constructed Sections, etc.) In the event that a city railway operator newly constructs, relocates, or modifies tracks, overhead lines, or operational safety devices, the operator shall conduct test operations for at least 60 days prior to normal operation to inspect the installation status or operation system and to ensure the proficiency of employees. However, in the case of expanding, relocating, or modifying a section already in operation, the test operation period may be reduced following a safety diagnosis by relevant experts.
[Wholly Revised 2010.8.9]
Chapter 2 Maintenance of Tracks and Facilities
Section 1 Tracks <Revised Aug. 9, 2010>
Article 10 (Maintenance of Tracks) Tracks shall be maintained in a condition that allows trains, etc. to operate safely at the speed determined by the urban railway operator (hereinafter referred to as "designated speed"). <Amended Apr. 11, 2025>
[Wholly Revised 2010.8.9]
Article 11 (Inspection and Maintenance of Tracks)
① Tracks shall be inspected by round-trip inspection at least once a day, and maintenance shall be performed if necessary.
② Tracks shall be maintained and repaired through regular safety inspections to ensure that safe operation is not hindered.
[Wholly Revised 2010.8.9]
Article 12 (Use of Tracks After Construction) In the event that a track is newly constructed, modified, or relocated, or that its use is temporarily suspended, it shall not be used until it has been inspected and a test run conducted. However, this shall not apply in the case of minor modifications.
[Wholly Revised 2010.8.9]
Section 2 Power Facilities
Article 13 (Maintenance of Electric Power Facilities) Electric power facilities shall be maintained in a condition that enables trains, etc. to operate safely at designated speeds.
[Wholly Revised 2010.8.9]
Article 14 (Inspection of Overhead Lines) Overhead lines shall be inspected by round-trip inspection at least once a day.
[Wholly Revised 2010.8.9]
Article 15 (Inspection of Power Facilities) Each part of the power facilities shall be inspected according to the cycle determined by the urban railway operator and maintained so as not to impede safe operation.
[Wholly Revised 2010.8.9]
Article 16 (Use of Electric Power Facilities After Construction) In the event that electric power facilities are newly installed, relocated, modified, or repaired, or that their use is temporarily suspended, they shall not be used until they have been inspected and test-operated. However, this shall not apply in the case of minor modifications or repairs.
[Wholly Revised 2010.8.9]
Section 3 Communication Equipment
Article 17 (Maintenance of Communication Facilities) Communication facilities shall be maintained in a state where they can communicate at all times.
[Wholly Revised 2010.8.9]
Article 18 (Inspection and Use of Communication Facilities)
① Each part of the telecommunications equipment shall be inspected at regular intervals and maintained to ensure safe operation is not hindered.
② Telecommunications facilities that have been newly installed, relocated, modified, or repaired shall not be used until their functions are inspected and verified.
[Wholly Revised 2010.8.9]
Section 4 Driving Safety Devices
Article 19 (Maintenance of Operational Safety Devices) Operational safety devices shall be maintained in a complete condition.
[Wholly Revised 2010.8.9]
Article 20 (Inspection and Use of Operation Safety Devices)
① Each part of the driving safety device shall be inspected at regular intervals and maintained to ensure safe operation is not hindered.
② Operational safety devices that have been newly installed, relocated, modified, or repaired shall not be used until their functions are inspected and verified.
[Wholly Revised 2010.8.9]
Section 5 Prohibition of Keeping Goods Within Building Limits
Article 21 (Prohibition on Holding of Goods) No objects other than trains, etc., shall be placed within the building limits established on the track so as not to interfere with vehicle operation. However, this shall not apply to work performed during hours when trains, etc. are not in operation.
[Wholly Revised 2010.8.9]
Article 22 (Preservation of Records Regarding Inspection of Lines, etc.) When an inspection of a line, power facility, communication facility, or operational safety device is conducted, the name of the inspector, the inspection status, and the date and time of the inspection, etc., shall be recorded and preserved for a certain period.
[Wholly Revised 2010.8.9]
Chapter 3 Maintenance of Trains, etc.
Article 23 (Maintenance of Trains, etc.) Trains, etc. shall be maintained in a condition suitable for safe operation.
[Wholly Revised 2010.8.9]
Article 24 (Vehicle Inspection and Test Drive)
① Vehicles that have been manufactured, modified, repaired, or undergone a disassembly inspection, or vehicles whose use has been temporarily suspended, shall not be used prior to inspection and test driving. However, this shall not apply in cases of minor modifications or repairs.
② Each part of the vehicle shall be inspected for its condition and function, and subjected to disassembly inspection, based on a certain period or mileage.
③ When conducting inspections pursuant to Paragraphs 1 and 2, insulation resistance tests and dielectric strength tests shall be performed on the electrical devices of the vehicle.
[Wholly Revised 2010.8.9]
Article 25 (Inspection of Train Formations) Each part of the vehicles formed into a train shall be inspected to ensure that there is no impediment to safe operation.
Article 26 Deleted <2004.12.4>
Article 27 (Records of Inspections and Tests) When an inspection or test is conducted pursuant to Articles 24 and 25, the type of inspection, the name of the inspector, the inspection status, and the inspection date, etc., shall be recorded and preserved for a certain period.
[Wholly Revised 2010.8.9]
Chapter 4 Operation <Revised Aug. 9, 2010>
Section 1 Train Formation
Article 28 (Train Formation) Trains shall be formed taking into consideration the characteristics of the rolling stock and the condition of facilities in the track sections, etc., so as not to impede safe operation.
[Wholly Revised 2010.8.9]
Article 29 (Emergency Braking Distance of Trains) The emergency braking distance of a train shall be 600 meters or less.
Article 30 (Braking System of a Train) Each vehicle in a train set shall be equipped with a braking system capable of applying braking force uniformly and stopping automatically upon separation.
[Wholly Revised 2010.8.9]
Article 31 (Testing of Train Braking Systems) When assembling a train or changing its composition, the function of the braking system shall be tested before operation.
[Wholly Revised 2010.8.9]
Section 2 Operation of Trains
Article 32 (Operation of Trains, etc.)
① The operation of trains, etc., shall be carried out by a person holding a driver's license pursuant to Article 10, Paragraph 1 of the Railway Safety Act, depending on the type of train, etc. However, this shall not apply in the case of unmanned operation pursuant to Article 32-2.
② Vehicles shall not be operated on the main line other than at stations before being assembled into a train. However, this shall not apply in cases where vehicles are being combined or disassembled, when changing lanes, or in other cases where there are special circumstances.
[Wholly Revised 2010.8.9]
Article 32-2 (Ensuring Safety, etc. During Unmanned Operation) If an urban railway operator intends to operate a train under unmanned operation, it shall comply with the matters in each of the following subparagraphs.
1. The control room shall be able to monitor and take action on the operational status of trains in real time.
2. A locking device shall be installed on the manual driver's cab inside the train to prevent passengers from handling it arbitrarily.
3. Obtain prior approval from the control room for opening the simplified control panel or changing the operating mode.
4. If you intend to perform manual operation by changing the operating mode, first verify that there are no abnormalities in communication with the control room.
5. If necessary to monitor passenger safety during boarding and alighting or to respond promptly to emergencies such as system failures, safety personnel shall be stationed on trains and at stations, etc., or shall be required to patrol.
6. Regulations shall be established to ensure the safe switching of driving modes in the boundary zone between sections where unmanned operation is applied and sections where it is not applied.
7. Regulations shall be established for measures to ensure passenger safety in the event that any of the following emergency situations occur during train operation.
A. In the event of a breakdown or fire on the train
B. In case a person or obstacle is found on the track
C. In other cases where a situation dangerous to passenger safety occurs
[This Article Newly Established 2010.8.9]
Article 33 (Operating Position of Train) A train shall be operated from the leading car. However, this shall not apply in cases of propulsion operation, reverse operation, or unmanned operation.
[Wholly Revised 2010.8.9]
Article 34 (Train Operation Schedule) Trains shall be operated in accordance with the train timetable determined by the urban railway operator. However, this shall not apply in cases of special circumstances, such as operational accidents or operational disruptions.
[Wholly Revised 2010.8.9]
Article 35 (Operation Management) When a train cannot be operated normally due to an operating accident, operational failure, etc., the Urban Railway Operator shall manage operations to ensure normal train operation, taking into consideration the type of train, destination, connections, etc.
[Wholly Revised 2010.8.9]
Article 36 (Route of Operation)
① On a pair of tracks where trains operate in distinct directions, the train's route shall be to the right. However, if the train is operated by direct connection to an existing track operating to the left, the route may be to the left.
② Notwithstanding Paragraph 1, a different driving lane may be used in any of the following cases:
1. In the event of reverse operation due to a malfunction on the track or train
2. When operating a rescue train or a construction train
3. When assembling or disassembling a vehicle, or changing lanes
4. In the case of driving within the premises
5. In case of test run
6. In the event of temporary single-line operation due to driving accidents, etc.
7. In other cases where there are special circumstances
[Wholly Revised 2010.8.9]
Article 37 (Block Sections)
① Main lines shall be divided into block sections. However, this shall not apply to main lines within stations.
② Two or more trains may not be operated simultaneously in a block section. However, this shall not apply in any of the following cases:
1. When operating a rescue train in a block section with a broken-down train
2. When operating a construction train in a block section due to track obstruction
3. When driving to change lanes in accordance with the lane change instructions of another train
4. When operating a single train by splitting it
[Wholly Revised 2010.8.9]
Article 38 (Propulsion Operation and Reverse Operation)
① A train shall not operate in a forward motion or in reverse motion. However, this shall not apply in any of the following cases:
1. In the event of a breakdown on the track or train
2. When operating a construction train or rescue train
3. When assembling or disassembling a vehicle, or changing lanes
4. In case of driving within the premises
5. In the case of conducting a test run for the purpose of testing a facility or vehicle
6. In other cases where there are special circumstances
② When operating a tram in reverse, measures must be taken to ensure the safety of surrounding vehicles and pedestrians.
[Wholly Revised 2010.8.9]
Article 39 (Prohibition of Simultaneous Departure and Arrival of Trains) Two or more trains shall not be departed or arrived simultaneously. However, this shall not apply if signal or control facilities, etc., are fully equipped so as not to impede the safe operation of the trains.
[Wholly Revised 2010.8.9]
Article 40 (Prohibition on Boarding and Alighting Outside Stations) Trains shall not be stopped on the main line outside of stations to allow passengers to board or alight. However, this shall not apply in cases of special circumstances, such as a driving accident.
[Wholly Revised 2010.8.9]
Article 41 (Closure of Tracks) When it is necessary to close tracks due to construction or other reasons, the Urban Railway Operator shall establish a plan in advance and comply with said plan. However, in cases where urgent measures are required, the tracks may be closed upon the direction of the person in charge of overall operation (hereinafter referred to as the "Controller").
[Wholly Revised 2010.8.9]
Article 42 (Stopping of Trains, etc.)
① Train lights must be stopped immediately when a stop signal is given.
② Trains, etc. that have stopped in accordance with Paragraph 1 shall not proceed until a signal instructing them to proceed is given. However, if there are special circumstances, they may proceed in accordance with the speed limits and safety measures of the dispatcher.
[Wholly Revised 2010.8.9]
Article 43 (Slowing of Trains, etc.)
① Trains and lights shall operate at or below the designated speed when there is a slow-speed signal.
② After the train light passes the point where the slow speed release signal is present, it may operate at normal speed.
[Wholly Revised 2010.8.9]
Article 44 (Proceeding of Train Lights) When there is a signal indicating proceeding, train lights may proceed at the designated speed past the indicated point to the next signal.
Article 44-2 (Visual Operation of Trams) Trams operating on visual terms shall comply with the following matters:
1. Operate at an appropriate speed so that the train can be stopped within the driver's line of sight according to surrounding conditions, such as signals.
2. Maintain a sufficient safe distance from the train ahead
3. Do not follow the preceding train at intersections.
[This Article Newly Established 2010.8.9]
Section 3 Assembly and Disassembly of Vehicles, etc.
Article 45 (Assembly, Disassembly, etc. of Vehicles)
① Vehicles must be assembled or disassembled, or lanes must be changed, in accordance with signals.
② When combining or disassembling vehicles or changing the lane of trains, etc. using the main line, safety measures must be taken to prevent collision with other trains, etc.
[Wholly Revised 2010.8.9]
Article 46 (Places for Vehicle Combination, etc.) Vehicles shall not be combined or disassembled, or lanes changed, using the main line at places other than a station. However, this shall not apply when safety measures, such as collision prevention, have been taken.
[Wholly Revised 2010.8.9]
Section 4 Handling of Track Switches <Revised Aug. 9, 2010>
Article 47 (Locking and Maintaining of Track Switches in Correct Position)
① Track switches on the main line shall be locked in conjunction with related signaling devices (referring to installing a locking device to prevent electrical or mechanical operation; hereinafter the same applies). <Amended Apr. 11, 2025>
② After using the track switch, it must be returned to its predetermined position without delay.
③ In the case of trams, track switches installed on roads must operate when the train has sufficiently approached to ensure pedestrian safety, and the driver must be able to confirm the direction of opening of the switch.
[Wholly Revised 2010.8.9]
[Title Revised 2025.4.11]
Section 5 Operating Speed
Article 48 (Operating Speed)
① The urban railway operator shall determine the operating speed of trains in consideration of the characteristics of trains, the structure and strength of tracks and overhead lines, etc.
② On downhill sections or curved tracks, the speed must be limited in consideration of braking distance and the safety of train lights.
③ In the case of trams, in sections where the track is shared with road traffic, the operating speed of the train shall be determined so as not to exceed the maximum speed pursuant to Article 17 of the Road Traffic Act.
[Wholly Revised 2010.8.9]
Article 49 (Speed Limit) An urban railway operator shall limit the operating speed in any of the following cases: <Amended Apr. 11, 2025>
1. When giving a slow-down signal
2. In case of forward operation or reverse operation
3. When assembling or disassembling a vehicle, or changing lanes
4. When proceeding toward an unlocked switch
5. When operating in substitute blockage mode
6. When proceeding past the point where the automatic block signal has a stop signal
7. When proceeding after an in-vehicle signal of "0"
8. When proceeding past a point with signals such as deceleration, caution, or warning
9. Other cases where a driving speed limit is necessary for safe driving
[Wholly Revised 2010.8.9]
Section 6. Detention of Vehicles
Article 50 (Prevention of Vehicle Rolling)
① When placing a vehicle on the track, necessary measures must be taken to prevent it from rolling on its own.
② When placing a powered vehicle on the track, measures must be taken to prevent it from moving by that power, and the vehicle's movement must be monitored while it is powered.
[Wholly Revised 2010.8.9]
Chapter 5 Blocking Methods
Section 1 General Provisions <Amended Aug. 9, 2010>
Article 51 (Classification of Blocking Methods)
① When operating a train, the block signaling system shall follow the block signaling system used routinely (hereinafter referred to as the "normal block signaling system") and the block signaling system used when the normal block signaling system cannot be followed due to a failure of the block signaling device or other reasons (hereinafter referred to as the "substitute block signaling system").
② When the blocking method under Paragraph 1 cannot be followed, the command method shall be followed or block-free operation shall be performed.
[Wholly Revised 2010.8.9]
Section 2 Commercial Blocking Method
Article 52 (Service Block System) The service block system shall follow the automatic block system or the in-vehicle signal block system.
[Wholly Revised 2010.8.9]
Article 53 (Automatic Block System) Station signals, start signals, and block signals in automatic block sections shall be equipped with devices capable of giving signals according to the classifications in each of the following subparagraphs.
1. When there is a train light in a block section: Stop signal
2. When a switch in a block section is not in the correct direction, or when other trains, etc. at branch lines and intersections obstruct the block section: Stop signal
3. When there is a fault in the blocking device: Stop signal
[Wholly Revised 2010.8.9]
Article 54 (In-car Signal Block System) In cases where the in-car signal block system is to be used, a device must be provided that enables the driver's cab of a train intending to enter a block section to know the operating status of trains, etc., within the block section.
[Wholly Revised 2010.8.9]
Section 3 Substitute Blockage Method
Article 55 (Substitute Blockage Method) The substitute blockage method shall be in accordance with the classifications in each of the following subparagraphs.
1. In the case of double-track operation: Command type or communication type
2. In case of single-line operation: Map communication type
[Wholly Revised 2010.8.9]
Article 56 (Command and Communication Types)
① When normal operation of a train is impossible due to a malfunction of the block signaling system or onboard signaling system, the dispatcher shall follow the command formula instructing the train to enter the block section.
② When it is not possible to follow the standard block system or the command system, the station master or station chief intending to have a train enter the block section shall consult with the opposing station master or station chief and the dispatcher and follow the communication system instructing the train's entry into the block section.
③ In cases where the command or communication system pursuant to Paragraph 1 or 2 is followed, the controller and the station masters or station chiefs on both sides of the block section shall install and operate a dedicated telephone. However, if a dedicated telephone cannot be installed due to unavoidable circumstances or if the dedicated telephone malfunctions, another telephone may be used.
[Wholly Revised 2010.8.9]
Article 57 (Map Communication Type)
① In cases following the map communication system, only trains issued a map ticket or map pass may operate in the relevant block section.
② The guidance slip and guidance ticket shall be issued by the station master or station chief intending to direct a train into a block section, in consultation with the opposing station master or station chief and the dispatcher.
③ When a station master or station manager intends to direct only one train into a block section in the same direction, they shall issue a guidance ticket; when intending to direct two or more trains consecutively into a block section in the same direction, they shall issue a guidance ticket for the last train and guidance tickets for the remaining trains.
④ The names of the stations or offices on both sides of the block section, the controller, the order number, the train number, and the date and time of issue must be written on the map sheet and map ticket.
⑤ The train engineer shall return the map ticket or map ticket issued pursuant to Paragraph 3 to the station master or station manager of the destination after passing through the block section.
[Wholly Revised 2010.8.9]
Section 4 The Messenger Method
Article 58 (Enforcement of the Messenger Act)
① When operating another train in a block section equipped with train lights, the messenger method shall be applied to that train.
② When implementing the messenger method pursuant to Paragraph 1, trains, etc. already in the block section shall not be moved from their position.
[Wholly Revised 2010.8.9]
Article 59 (Selection of Messengers, etc.)
① One messenger must be selected for the section where the Messenger Act is implemented.
② The messenger under Paragraph 1 shall wear a white armband.
③ In sections where the Messenger Act is enforced, a train may be operated only if the messenger for that section is on board. However, if the operation is handled by a dispatcher, a messenger may not be required to board.
[Wholly Revised 2010.8.9]
Chapter 6 Signals <Revised Aug. 9, 2010>
Section 1 General Provisions <Amended Aug. 9, 2010>
Article 60 (Types of Signals) The types of signals for urban railways are as follows:
1. Signal: A device that indicates operating conditions to trains, etc., using form, color, sound, etc.
2. Telegram: The expression of intent between employees through form, color, sound, etc.
3. Sign: Something that indicates the location, direction, or condition of an object using shape, color, etc.
[Wholly Revised 2010.8.9]
Article 61 (Day or Night Signals)
① In cases where signaling methods differ between daytime and nighttime, the daytime method shall be followed from sunrise to sunset, and the nighttime method shall be followed from sunset to sunrise of the following day. However, if it is difficult to confirm a signal according to the daytime method from a considerable distance due to weather conditions between sunrise and sunset, the nighttime method shall be followed.
② The in-vehicle signaling system and the signaling system in underground sections shall follow the night system.
[Wholly Revised 2010.8.9]
Article 62 (Presumption of Limitation Signal)
① Where there is no signal at a place where a signal is required, or where the signal is unclear, it shall be deemed that a stop signal is present.
② When the signal of a permanent signal or a temporary signal differs from the hand signal, the signal with the most restrictions attached to the train light shall be followed. However, if prior notice has been given, the notified signal shall be followed.
[Wholly Revised 2010.8.9]
Article 63 (Prohibition of Combined Use of Signals) A single signal shall be used for a single purpose on a single line. However, this shall not apply to a signal equipped with a route indicator.
Section 2 Permanent Signals
Article 64 (Permanent Signal) A permanent signal refers to a signal that indicates operating conditions for trains, etc., by means of colored lights or rows of lights at a designated location.
Article 65 (Types of Permanent Signals) The types and functions of permanent signals are as follows:
1. Main Signal
A. Onboard signal: A signal installed in the driver's cab at the very front of the train to indicate operating conditions
B. Station signal: A signal indicating whether entry is permitted in the direction behind the signal for trains, etc., intending to enter a station
C. Departure Signal: A signal indicating whether entry is permitted in the direction behind the signal for trains, etc., intending to depart from a station
D. Block Signal: A signal indicating operating conditions to trains, etc., intending to enter a block section
E. Shunting Signal: A signal indicating whether entry is permitted in the direction behind the signal for vehicles intending to assemble or disassemble vehicles or change lanes.
2. Dependent Signal
A. Distant Signal: A signal subordinate to an internal signal and a block signal that indicates their signal status
B. Relay Signal: A signal device subordinate to a main signal that relays its signal status
3. Signal Accessories
A. Route Indicator: A device attached to a station signal, departure signal, route opening indicator, or shunting signal that indicates the route to trains, etc.
B. Route Opening Indicator: Installed at the branching point of a main line using onboard signals to indicate the route opening status
[Wholly Revised 2010.8.9]
Article 66 (Types of Permanent Signals and Signaling Methods) Permanent signals shall signal using instruments, color lights, or arrays of lights in the manner of each of the following subparagraphs.
1. Main Signal
A. Onboard Signal
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110776" alt="img33110776" >
┌──────┬───────┬────────┐
Type of signal Stop signal Go signal
By Day/Night
├──────┼───────┼────────┤
Displays "0" speed for day and night Displays command speed
└──────┴───────┴────────┘
</img>
B. Station signals, departure signals, and block signals
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110778" alt="img33110778" >
┌───┬──────┬────┬────┬────┬────┬────┐
Type of signal Stop signal Warning signal Caution signal Deceleration signal Proceed signal
By Day/Night
├───┼──────┼────┼────┼────┼────┼────┤
Color light type: Day and night, red light; upper and lower lights: yellow light; upper light: green light
Orange light Orange light
sub is
green light
└───┴──────┴────┴────┴────┴────┴────┘
</img>
C. Shunting signal
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110781" alt="img33110781" >
┌───┬──────┬────┬────┐
Method Signal Type Stop Signal Proceed Signal
By Day/Night
├───┼──────┼────┼────┤
Color light type Day and night red light Yellow light
└───┴──────┴────┴────┘
</img>
2. Dependent Signal
A. Remote Signal
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110785" alt="img33110785" >
┌───┬──────┬───────────┬──────────────┐
Type of signal for the START method, the main signal giving a stop signal, and the main signal instructing to proceed
When signaling by day/night
├───┼──────┼───────────┼──────────────┤
Colored light type day and night lights yellow light green light
└───┴──────┴───────────┴──────────────┘
</img>
B. Repeater Signal
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110787" alt="img33110787" >
┌───┬──────┬───────────┬──────────────┐
Type of signal for the START method, the main signal giving a stop signal, and the main signal instructing to proceed
When signaling by day/night
├───┼──────┼───────────┼──────────────┤
Color light type daytime and nighttime red main signal for one proceed
Indicating color light
└───┴──────┴───────────┴──────────────┘
</img>
3. Signal Accessories
A. Route Indicator
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110788" alt="img33110788" >
┌───┬──────┬──────┬──────┬──────┐
Method Opening Direction Left Lane Center Lane Right Lane
By Day/Night
├───┼──────┼──────┼──────┼──────┤
Color light type day and night on black background on black background on black background
Left direction Vertical direction Right direction
White arrow White arrow White arrow
│ │ │← │↑ │→ │
├───┼──────┼──────┴──────┴──────┤
Character style Day and Night Square characters on black background ?? ??
└───┴──────┴────────────────────┘
</img>
B. Route Opening Indicator
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110790" alt="img33110790" >
┌───┬──────┬───────────┬──────────────┐
Method Opening Direction If the route is open If the route is not open
By Day/Night
├───┼──────┼─┬─────────┼─┬────────────┤
Colored Day and Night Lights ● Red ?
Yellow
Color ? etc. ●
, etc.
└───┴──────┴─┴─────────┴─┴────────────┘
</img>
[Wholly Revised 2010.8.9]
Section 3 Temporary Signal
Article 67 (Installation of Temporary Signals) When a track is temporarily unable to operate normally, temporary signals shall be installed ahead of that section.
Article 68 (Types of Temporary Signals) The types of temporary signals are as follows:
1. Slow-down signal
A signal instructing trains, etc. entering an area requiring slow speed operation to proceed slowly in that section
2. Slow-down Warning Signal
Signal signal announcing the presence of a slow-down signal
3. Slow-down release signal
Signal instructing the release of slow speed for trains, etc., operating through a slow speed zone
[Wholly Revised 2010.8.9]
Article 69 (Signaling Method of Temporary Signals)
① The form, color, and signaling method of the temporary signal are as follows.
<img src="http://www.law.go.kr/flDownload.do?flSeq=33110791" alt="img33110791" >
┌──────┬──────────┬────────────┬──────────┐
Types of Signals Slow Speed Signal Slow Speed Warning Signal Slow Speed Release Signal
By Day/Night
├──────┼──────────┼────────────┼──────────┤
Daytime yellow and black triangle patterns with white borders, 3 of which are green with white borders
Green disc triangular disc disc
├──────┼──────────┼────────────┼──────────┤
Night light yellow light black green light with three triangular patterns
Green White Light
└──────┴──────────┴────────────┴──────────┘
</img>
② The back and back light of temporary signal signs shall be white, and the designated speed shall be displayed on slow-speed signals.
[Wholly Revised 2010.8.9]
Section 4 Hand Signals
Article 70 (Hand Signaling Method) Where signal devices are not installed or cannot be used, hand signals shall be given in the manner of each of the following subparagraphs.
1. Stop signal
A. Daytime: Red flag. However, in unavoidable circumstances, raising both arms high or vigorously waving an object other than a green flag may be substituted.
B. Nighttime: Red light. However, in unavoidable circumstances, rapidly waving a light other than the green light may be substituted.
2. Proceed signal
A. Daytime: Green flag. However, in unavoidable circumstances, raising one arm high may be substituted.
B. Night: Green light
3. Slow signal
A. Daytime: Cross the red and green flags high above the head. However, if unavoidable, this may be substituted by crossing both arms high above the head.
B. Night: Flashing green light
[Wholly Revised 2010.8.9]
Article 71 (Protective Signals in Case of Track Obstruction) In cases where trains, etc. are to be stopped or slowed down due to a track obstruction, and temporary signals cannot be followed, a stop signal must be given at a point at least 200 meters ahead of the obstruction.
[Wholly Revised 2010.8.9]
Section 5 Previous Subparagraph <Revised Aug. 9, 2010>
Article 72 (Signal for Departure) A signal for departure shall be given when intending to depart a train. However, this shall not apply if the train is equipped with passenger safety facilities and a conductor is not on board.
[Wholly Revised 2010.8.9]
Article 73 (Transfer of Authority) A transfer of authority shall be made in any of the following cases:
1. In case of an emergency
2. If warning of danger
[Wholly Revised 2010.8.9]
Article 74 (Shunting Signals) The shunting signaling method is as follows.
1. Approach signal
A. Daytime: Wave the green flag from side to side. However, if unavoidable, moving one arm from side to side may be substituted.
B. Night: Shake the green light left and right.
2. Move out
A. Daytime: Wave the green flag up and down. However, if unavoidable, moving one arm up and down may be substituted.
B. Night: Shake the green light up and down.
3. Stop signal
A. Daytime: Wave the red flag. However, in unavoidable circumstances, raising both arms high may be substituted.
B. Night: Wave the red light.
[Wholly Revised 2010.8.9]
Section 6 Cover Page <Revised Aug. 9, 2010>
Article 75 (Installation of Signs) The urban railway operator shall install operational signs so as not to impede the safe operation of trains, etc.
[Wholly Revised 2010.8.9]
Section 7 Tram Signals <Newly Added 2010.8.9>
Article 76 (Design of Tram Signals) Tram signals shall be designed in accordance with the requirements of each of the following subparagraphs.
1. Do not confuse with road traffic signals
2. Size and shape shall be clearly and distinctly perceived so as to be visible to the eye
[This Article Newly Established 2010.8.9]
Revision
⊙Ministry of Land, Infrastructure and Transport Decree No. 1477
The Partial Amendment to the Urban Railway Operation Rules is hereby promulgated as follows.
April 11, 2025
Minister of Land, Infrastructure and Transport (Seal)
Partial Amendment to the Urban Railway Operation Rules
Part of the Urban Railway Operation Rules is amended as follows.
Article 10, Paragraph 1 shall be changed to the part other than the title, and in the same article, "shall preserve" shall be changed to "must preserve."
In the title of Article 47, "locking" shall be changed to "locking," and Paragraph 1 of the same article shall be amended as follows.
① The switches on the main line shall be locked in conjunction with the related signaling devices (referring to installing a locking device to prevent electrical or mechanical operation; hereinafter the same applies).
In the part other than the subparagraphs of Article 49, "shall restrict" shall be changed to "must restrict," and in Subparagraph 4 of the same article, "not locked" shall be changed to "not locked."
Supplementary Provisions
This rule shall take effect from the date of its promulgation.
Reason for Enactment/Amendment
[Partial revision]
◇ Reasons for Amendment and Key Contents
The purpose is to replace the difficult Sino-Korean term "swaejeong (鎖錠)" with "jamgeum" to revise the language into Korean that is easy for the public to understand.
<Provided by the Ministry of Land, Infrastructure and Transport>