Urban Railway Construction Rules

273257 · 2025-08-08

Chapter 1 General Provisions <Amended 2010.10.8> Article 1 (Purpose) The purpose of this Rule is to prescribe necessary matters concerning construction standards, etc., for urban railways constructed in urban transportation zones pursuant to Article 18 of the Urban Railway Act. <Amended Jul. 8, 2014> [Wholly Revised 2010.10.8] Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Aug. 27, 2021> 1. "Gauge" refers to the distance between tracks according to the classifications in each of the following items. A. In the case of urban railway vehicles using steel wheels (hereinafter referred to as "vehicles"): The shortest distance between the inner sides of both rails located 14 millimeters below the top of the rail. B. For vehicles using rubber wheels: Distance between wheel centers C. For vehicles using a magnetic levitation propulsion system: Distance between the centers of the levitation rails 2. "Main line" refers to a track commonly used for the operation of trains (including passing tracks and loop tracks within a station). 3. "Siding" refers to a track other than the main line. 4. "Station" refers to a place used by passengers to board and alight from a train (referring to a train set configured for operation on the main line; hereinafter the same applies). 5. "Vehicle depot" refers to a facility established for the purpose of storing, inspecting, and maintaining vehicles. 6. "Light Rail" refers to an electric railway operating in the form of a monorail, tram, steel wheel, rubber wheel, linear induction motor, or magnetic levitation propulsion system, with a maximum design axle load of 13.5 tons or less [in the case of distributed load, 2.8 tons or less per meter]. 7. "Third Rail" refers to a type of overhead line installed parallel to the rail or running surface to supply electricity to the vehicle from the side or underside. 8. "Third-rail system" refers to a method of supplying electricity to a vehicle using a third rail. [Wholly Revised 2010.10.8] Article 3 (Type of Track) The main line shall be double-track. However, special sections specified in the Urban Railway Basic Plan by Line pursuant to Article 6 of the Urban Railway Act may be single-track. <Amended July 8, 2014> [Wholly Revised 2010.10.8] Article 4 Deleted <2004.12.4> Article 5 (Train Operation Route) In the case of a pair of tracks where upbound and downbound trains are operated separately, the train's operation route shall be to the right. However, in the case of a track directly connected to a state-owned railway, it may be to the left. [Wholly Revised 2010.10.8] Chapter 2 Tracks <Revised 2010.10.8> Section 1 Gauge <Revised 2010.10.8> Article 6 (Gauge) The gauge shall be 1,435 millimeters. Article 7 (Widened Gauge) ① Notwithstanding Article 6, an enlarged gauge shall be provided in the gauge of sections where the track is curved (hereinafter referred to as "curved sections"). ② The widened gauge pursuant to Paragraph 1 shall be placed on the inner rail of the curved section, and its dimensions shall be determined by the Special City Mayor, Metropolitan City Mayor, Provincial Governor, Special Self-Governing Provincial Governor, City Mayor, or County Head (hereinafter referred to as "City/Provincial Governor, etc.") in consideration of the radius of the relevant curve, etc., within a range not exceeding 25 millimeters. [Wholly Revised 2010.10.8] Article 8 (Reduction in gauge for widened tracks) ① The widened gauge pursuant to Article 7 shall be reduced at the distances specified in each of the following subparagraphs, except in the case of points where the tracks diverge (hereinafter referred to as "junctions"). 1. If there is a transition curve: the entire distance of the curve 2. Where there is no transition curve: It shall be equal to the decreasing distance of the cant pursuant to Article 12; provided, however, that in cases where no cant is provided, a distance of at least 5 meters from the start and end points of the original curve ② Where curves of the same direction with different radii connect, the difference in widened gauge within the curve with the larger radius shall be reduced in accordance with Paragraph 1, Subparagraphs 1 and 2. [Wholly Revised 2010.10.8] Article 9 (Tolerance of Gauge) ① The tolerances specified in each of the following subparagraphs shall be permitted for track gauges. 1. For crossings: Increase by 3 millimeters, decrease by 2 millimeters 2. In other cases: Increase by 10 millimeters, decrease by 2 millimeters ② The dimension obtained by adding the widened gauge to the allowable value under Paragraph 1 shall not exceed 30 millimeters. [Wholly Revised 2010.10.8] Section 2 Curves <Revised 2010.10.8> Article 10 (Curve Radius, etc. of Tracks) ① The curve radius of a track may be varied depending on the track section and function, etc. ② The size of the curve radius pursuant to Paragraph 1 shall be determined by the Mayor/Do Governor, etc. [Wholly Revised 2010.10.8] Article 11 (Cant) ① For the safe operation of trains, cant (referring to laying the outer rail higher than the inner rail to prevent derailment or overturning caused by centrifugal force; hereinafter the same) shall be provided on the outer rail of curved sections. However, this shall not apply to curves that are continuous at a turnout. ② The size of the cant pursuant to Paragraph 1 shall be determined by the Mayor/Do Governor, etc., taking into consideration the radius of the relevant curve, the operating speed of the train, etc., provided that it shall not exceed a maximum of 160 millimeters. [Wholly Revised 2010.10.8] Article 12 (Decreasing distance of cant) The decreasing distance of cant is as follows: 1. If there is a transition curve: the entire distance of the curve 2. Where there is no transition curve: A distance of at least 600 times the cant under Article 11, Paragraph 2 (hereinafter referred to as "standard cant") 3. In the case of compound curves: A distance of 600 times or more of the cant difference on the curve with the larger radius 4. In the cases of Subparagraphs 1 through 3, unavoidable circumstances determined by the Mayor/Do Governor, etc.: A distance of 450 times or more of the standard cant [Wholly Revised 2010.10.8] Article 13 (Relaxation Curve) ① In the case of main lines, an appropriate transition curve shall be inserted where a straight line meets a curve with a radius of 800 meters or less. However, this shall not apply to curves that are continuous at a branching point. ② The length of the transition curve pursuant to Paragraph 1 shall be at least 600 times the standard cant. However, in unavoidable circumstances, it may be reduced to 450 times the standard cant. [Wholly Revised 2010.10.8] Article 14 (Insertion of Straight Lines, etc.) ① In the case of main lines, for tracks with two adjacent curves, a straight section of at least 20 meters must be inserted after the cant decreases. ② In the case of Paragraph 1, if two curved tracks in opposite directions are adjacent and it is unavoidable that a straight line cannot be inserted due to topography, a straight line may not be inserted; and if two curved tracks in the same direction are adjacent, a compound curve may be used within the scope determined by the Mayor/Do Governor, etc. ③ Notwithstanding Paragraphs 1 and 2, in cases where the section is continuous at a branching point or in the case of a survey line where safety is not compromised, the straight line insertion standards determined by the Mayor/Do Governor, etc., may be applied, or a compound curve different from the standards in Paragraph 2 may be used. <Amended Aug. 8, 2025> [Wholly Revised 2010.10.8] Section 3 Slope Article 15 (Inclination Limits Outside Stations) ① The gradient of the main line in areas outside the station shall not exceed 35/1000. ② In cases where a gradient is applied to a curved track, the limit shall be the gradient after applying an appropriate curve correction to the limit under Paragraph 1. [Wholly Revised 2010.10.8] Article 16 (Gradient Limits Within Stations) The gradient of the main line within a station shall not exceed the limits specified in each of the following subparagraphs. 1. Where the main line is used for separating, connecting, or parking vehicles: 3/1000 2. Except for Item 1: 8/1000 (10/1000 in unavoidable cases) [Wholly Revised 2010.10.8] Article 17 (Slope of Side Lines) The slope of a side line shall not exceed 3/1,000. However, in the case of a side line where vehicles are not parked, it may be up to 45/1,000. [Wholly Revised 2010.10.8] Article 18 (Vertical Curve) Where the gradient of a track changes and the change in adjacent gradients exceeds 5/1000, a vertical curve with a radius of at least 3,000 meters shall be inserted. [Wholly Revised 2010.10.8] Section 4 Architectural Limits Article 19 (Building Clearance) In urban railways, a space necessary for the safe operation of vehicles (hereinafter referred to as "building clearance") shall be provided in consideration of vehicle sway or track twisting, and buildings or other facilities shall not be installed therein. However, this shall not apply to temporary facilities necessary for overhead catenary lines and their suspension devices, or for track maintenance work, provided that such facilities do not impede the safe operation of trains. [Wholly Revised 2010.10.8] Article 20 (Building Clearances in Straight Sections) The building clearances for sections where the railway line is straight (hereinafter referred to as "straight sections") shall be determined by the Mayor/Do Governor, etc. [Wholly Revised 2010.10.8] Article 21 (Building Clearances in Curved Sections) ① The building clearances of curved sections shall be inclined according to the size of the cant pursuant to Article 11, Paragraph 2. ② The building clearance for curved sections pursuant to Paragraph 1 shall be the building clearance for straight sections expanded by a certain dimension or more on each side of the track center, provided that the scope thereof shall be determined by the Mayor/Do Governor, etc., taking into consideration the radius of the curve, etc. However, the building clearance above, excluding overhead catenary lines and their suspension devices, may not be subject to this. ③ The enlarged dimensions pursuant to Paragraph 2 shall decrease along the transition curve. However, if the length of the transition curve is 20 meters or less, or if there is no transition curve, the enlargement shall decrease at a distance of 20 meters or more from the end of the original curve; and if the original curve is a compound curve, the difference in enlarged dimensions shall decrease at a distance of 20 meters or more from the curve with the larger radius. [Wholly Revised 2010.10.8] Section 5 Orbit <Revised 2010.10.8> Article 22 (Center-to-Center Distance) ① In the case of main line tracks where trains operate in opposite directions, sufficient clearance must be maintained between the tracks to ensure the safety of trains and passengers. ② The standards for the track spacing pursuant to Paragraph 1 shall be determined by the Mayor/Do Governor, etc., taking into consideration the above-ground and underground sections of the relevant tracks, the number of parallel tracks, and vehicle body specifications. In this case, if overhead catenary posts or signal posts, etc., are installed between the tracks, the track spacing must be expanded by the corresponding amount. [Wholly Revised 2010.10.8] Article 23 (Center Spacing of Curved Tracks) The center spacing of curved tracks shall be expanded to at least twice the dimension specified in Article 21, Paragraph 2. [Wholly Revised 2010.10.8] Article 24 (Rail) The weight of rails shall be determined by the Mayor/Do Governor, etc., in accordance with the type of train, design load, and passing tonnage, etc. [Wholly Revised 2010.10.8] Article 25 (Thickness of Artwork, etc.) ① The standards for the thickness and width of the ballast [referring to concrete, gravel, etc. installed from the underside of the rail sleepers to the construction surface; hereinafter the same applies] shall be equal to or greater than the standards determined by the Mayor/Do Governor, etc. However, in cases where it is technically or topographically impossible and it is deemed that there is no impediment to safety, the thickness of the ballast may be varied or the ballast may not be installed. ② When establishing the standards under Paragraph 1, the Mayor/Do Governor, etc. shall consider the necessary space above or below ground and the characteristics of the ground, and may establish standards by distinguishing between cases where the relevant trackbed is made of gravel and cases where it is made of concrete. [Wholly Revised 2010.10.8] Section 6 Structures Article 26 (Endless Space Other than Building Setbacks) Between a structure and a building setback, necessary clearance space shall be provided for the installation of electrical, signal, communication, passageways, or other facilities, as determined by the Mayor/Do Governor, etc. [Wholly Revised 2010.10.8] Article 27 (Distance from Road Surface, etc.) ① Between the road surface and the upper surface of an underground structure, or between the road surface and the lower surface of an elevated structure, a depth or height exceeding a certain standard must be secured to ensure safety and to facilitate the installation of underground utilities, such as communications and piping, or temporary structures above ground. However, this shall not apply in cases where it is unavoidable due to topography, such as openings, and where it is deemed that there is no impediment to safety. ② The standards for depth or height pursuant to Paragraph 1 shall be determined by the Mayor/Do Governor, etc., in consideration of geology, etc. ③ Between the upper surface of a tunnel passing beneath a river and the planned dredging surface of the river, a depth exceeding the standard determined by the Mayor/Do Governor, etc., shall be secured for the maintenance and management of the river and the protection of urban railway facilities. [Wholly Revised 2010.10.8] Article 28 Deleted <2000.3.18> Section 7 Branch <Revised 2010.10.8> Article 29 (Branching) Branching of a track from the main line shall be made within a station or at a location where a signal box is present. However, this shall not apply if appropriate safety facilities are installed. [Wholly Revised 2010.10.8] Chapter 3 Station Article 30 (Facilities and Equipment of Stations) Stations shall be equipped with facilities necessary for passengers' use of the urban railway, such as platforms, waiting rooms, restrooms, and passageways, as well as electrical and telecommunications facilities. Detailed matters necessary for this shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Amended Mar. 23, 2013> [Wholly Revised 2010.10.8] Article 30-2 (Safety Facilities on Platforms) ① Safety facilities falling under any of the following subparagraphs shall be installed on platforms to prevent passenger safety accidents. <Amended Aug. 27, 2021> 1. Safety Fence 2. Boarding and alighting door equipment that opens and closes in conjunction with the train doors (hereinafter referred to as "screen door") ② Screen doors shall be installed in compliance with the standards of each of the following subparagraphs. 1. Minimize the distance from the platform edge to the screen door to prevent passengers from being trapped between the train and the screen door. 2. Notwithstanding the measures under Subparagraph 1, install an alarm device capable of detecting passenger entrapment and notifying crew members and station staff in order to prepare for cases where a passenger is trapped between the train and the screen door. 3. The material of the screen doors shall be non-combustible material pursuant to Article 10, Paragraph 1 of the "Rules on Safety Standards for Urban Railway Vehicles" or material pursuant to Paragraph 3 of the same article. 4. Ensure that doors can be opened manually in the event of an emergency, such as a fire. 5. Install considering the structure of the platform and the strength of the platform floor structure ③ In areas where the gap between the vehicle and the platform edge exceeds 10 centimeters, facilities to prevent passenger falls, such as safety steps, must be installed. [Wholly Revised 2010.10.8] Article 30-3 (Distance Between Stations) The distance between stations of an urban railway shall be at least 1 kilometer; provided, however, that it may be adjusted by comprehensively considering traffic demand, economic feasibility, topographical conditions, and connectivity with other modes of transportation. [Wholly Revised 2010.10.8] Article 31 (Width of Platform, etc.) ① The width of a platform shall comply with the standards set forth in the following subparagraphs. However, the width of a platform may be narrower than the standards set forth in the following subparagraphs in cases designated by the Minister of Land, Infrastructure and Transport, taking into consideration areas at both ends of the platform with low passenger usage or the structure of the platform. <Amended 2021.11.3> 1. For platforms installed between main lines: 8 meters or more 2. For platforms installed on both sides of the main line: 4 meters or more ② Within a width of 1.5 meters and a height of 2 meters from the edge of the landing, only safety facilities, such as facilities to prevent passengers from slipping or falling and evacuation facilities, may be installed. However, if deemed unavoidable due to the conditions of the relevant landing, the Mayor/Do Governor, etc., may require the installation of columns, stairs, or elevators pursuant to Article 3 of the Enforcement Decree of the Elevator Safety Management Act. <Amended 2021.11.3> ③ Delete <2021.11.3> [Wholly Revised 2010.10.8] [Title Revised 2021.11.3] Article 32 (Height of Platform Edges) The platform edge shall be installed at a standard height of 1.135 meters from the upper surface of the rail. [Wholly Revised 2010.10.8] Article 33 (Separation between platform edge and vehicle clearance) ① The edge of the platform shall be installed at a distance of 50 millimeters from the vehicle clearance pursuant to Article 51. ② Platforms where the track is curved shall be installed by adding the dimensions under Article 21, Paragraph 2 to the spacing under Paragraph 1. [Wholly Revised 2010.10.8] Article 34 (Length of Platforms and Width of Passages) The effective length of platforms and the width of passages shall be determined in consideration of the transportation demand and operation plans of the relevant line, etc.; provided, however, that detailed matters necessary for this shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Amended Mar. 23, 2013> [Wholly Revised 2010.10.8] Article 35 (Roadside Entrances and Groundside Walkways) Where a roadside entrance is installed on a groundside sidewalk, the width of the groundside walkway, excluding the said entrance, shall be at least 2 meters. [Wholly Revised 2010.10.8] Article 35-2 (Special Evacuation Stairs) ① On platforms at the third basement level or lower, a separate emergency staircase (hereinafter referred to as "special evacuation staircase") directly connecting the platform to the ground level shall be installed to enable passengers to evacuate easily in an emergency; provided that at least one such staircase is installed on platforms located between main lines, and at least one is installed on each platform located on both sides of the main line. ② When installing special evacuation stairs pursuant to Paragraph 1, exit signs pursuant to Article 69 and emergency lighting pursuant to Article 70 shall be installed, respectively. [Wholly Revised 2010.10.8] Article 35-3 (Finishing materials for structures, etc. of stations) ① Finishing materials, etc. used for each structure, etc. of the station shall comply with the standards in each of the following subparagraphs. <Amended Aug. 8, 2025> 1. Finishing materials used for platforms and waiting rooms shall be non-combustible materials pursuant to Subparagraph 10 of Article 2 of the Enforcement Decree of the Building Act (hereinafter referred to as "non-combustible materials" in this Article). However, finishing materials used for floors in places where mechanical equipment, such as air conditioning units, is installed may not be non-combustible materials. 2. Finishing materials used in corridors, stairs, and passageways shall be non-combustible materials. 3. Finishing materials used on the exterior of prefabricated partitions shall be non-combustible materials, and materials used on the interior of prefabricated partitions shall be non-combustible materials or semi-non-combustible materials pursuant to Article 2, Subparagraph 11 of the Enforcement Decree of the Building Act (hereinafter referred to as "semi-non-combustible materials" in this Article). 4. Interior decorations shall use non-combustible materials, semi-non-combustible materials, or items pursuant to Article 20, Paragraph 1 of the Act on the Installation and Management of Firefighting Facilities. 5. Finishing materials used for convenience facilities such as kiosks, information booths, and public telephone booths shall be non-combustible materials. ② The finishing materials pursuant to Paragraph 1 shall be installed in accordance with appropriate methods so that cracks, leakage, or deterioration of the station structures can be easily inspected. [Wholly Revised 2010.10.8] Chapter 4 Facilities <Revised 2010.10.8> Section 1 Electrical Installations Article 36 (Electrical System) The voltage and electrical system supplied to the line shall be in accordance with the provisions of each of the following subparagraphs; provided, in principle, that power shall be supplied from the urban railway substation having jurisdiction over the relevant urban railway. 1. Overhead line: DC 1,500-volt overhead line type 2. High-voltage distribution lines: AC 3-phase 6,600 volts, 22,000 volts, or 22,900 volts 3. Lighting and power facilities within the tracks: AC single-phase 220 volts or 3-phase 380 volts 4. Signal distribution lines: AC 100 volts or more and 400 volts or less [Wholly Revised 2010.10.8] Article 37 (Power Lines) ① High-voltage distribution lines for lighting and power shall consist of two or more circuits. ② For above-ground overhead lines, a separate feeder line shall be installed to supply electricity by section, and for underground overhead lines, a rigid overhead line or catenary messenger wire shall serve as the feeder line. However, in the case of the third rail system, the third rail shall serve as the feeder line. [Wholly Revised 2010.10.8] Article 38 (Measures to Prevent Electrolytic Corrosion) When using running rails as a return line, appropriate facilities shall be installed to prevent damage to cables, metal underground conduits, track structures, etc. caused by leakage current. [Wholly Revised 2010.10.8] Article 39 Deleted <2004.12.4> Article 40 (Disconnection of Feeder Lines) Automatic disconnection equipment installed on feeder lines shall be capable of rapidly detecting fault current and disconnecting the power supply in the event of an emergency, such as an accident. [Wholly Revised 2010.10.8] Article 41 (Backup Power Facilities) Backup power facilities or supply lines with two or more redundancies shall be installed in underground lines. [Wholly Revised 2010.10.8] Article 42 (Overhead Line) ① Matters concerning the overhead line installation method, height from the upper surface of the rail, and deviation shall be determined by the Mayor/Do Governor, etc., taking into consideration the type of train, the installation location of the overhead line, and regional conditions. ② The overhead line shall be equipped with emergency power cutoff facilities so that the electricity supply can be automatically cut off at locations necessary for safety and operation, such as the boundary between the main line and the siding, and near substations. ③ In cases where the overhead line is of the third rail type, appropriate facilities must be provided at platforms, tracks, vehicle depots, etc., to minimize the risk of electric shock from high voltage to passengers, crew members, station staff, maintenance personnel, etc. [Wholly Revised 2010.10.8] Article 43 (Inclination of Overhead Lines) The inclination of overhead overhead lines with respect to the rail surface shall be no more than 3/1,000 for main lines and no more than 10/1,000 for sidings. However, if unavoidable due to topography, it may be no more than 5/1,000 for main lines and no more than 15/1,000 for sidings. [Wholly Revised 2010.10.8] Section 2 Ventilation, Drainage, and Communication Facilities Article 44 (Ventilation Facilities) Underground tracks shall be equipped with appropriate ventilation facilities, taking into consideration the size of the underground space, the urban railway operation plan, and the convenience of users. [Wholly Revised 2010.10.8] Article 45 (Drainage Facilities) Appropriate drainage facilities shall be provided on the railway line. Article 46 (Installation of Communication Facilities, etc.) ① Communication facilities shall be installed in such a manner that they do not interfere with the operation of trains or the operation, maintenance, and management of facilities. ② Wireless communication facilities shall be installed to enable two-way communication between persons engaged in urban railway-related duties, such as crew members, station staff, maintenance personnel, and control center personnel, and to enable two-way communication between persons engaged in urban railway-related duties and external disaster-related agencies, such as police stations, fire stations, and medical institutions. ③ Control rooms and station offices shall be equipped with facilities capable of monitoring the conditions of safety-vulnerable areas, such as platforms and waiting rooms, in real time via video. 4. Equipment capable of displaying an image of the area where a fire alarm has been detected shall be installed in the station office. ⑤ The driver's cab shall be equipped with facilities capable of monitoring the platform conditions in real time via video from the time the vehicle enters the platform and stops until it departs. However, this shall not apply if screen doors are installed throughout the entire station or if unmanned operation pursuant to Article 3, Item 11 of the "Rules for the Operation of Urban Railways" is applied. 6. Emergency communication devices enabling passengers to make two-way calls with the station office must be installed on the platform at a height of 1.5 meters from the platform floor and distributed across at least three locations. ⑦ The contents of voice calls using wireless communication facilities pursuant to Paragraph 2 shall be recorded on a recording device and stored for at least one month, and video records pursuant to Paragraph 3 shall be recorded on a video recording device and stored for at least one week. [Wholly Revised 2010.10.8] Section 3 Signal and Security Facilities, etc. <Amended Oct. 8, 2010> Article 47 (Signaling System for Main Line Trains) ① In principle, the onboard signaling system shall be used for trains operating on the main line. However, in special cases such as tracks equipped with ground signals, departure stations, and train depots, the ground signaling system may be used. ② Even when the signaling system is adopted as an onboard signaling system pursuant to Paragraph 1, signal signs may be installed in necessary areas, such as the departure area of ​​a station or the block section between stations. [Wholly Revised 2010.10.8] Article 48 (Installation of Signaling Devices, etc.) Signaling devices and route markers necessary for the shunting of vehicles shall be installed at stations or vehicle depots, etc., where turnouts are installed. [Wholly Revised 2010.10.8] Article 49 (Interlocking of Track Switches and Signaling Devices) Track switches that change the course of the tracks and signaling devices that guide the direction of travel of trains shall be installed to be interlocked with one another. [Wholly Revised 2010.10.8] Article 50 (Safety Devices) Safety devices capable of automatically controlling or stopping trains in conjunction with signaling devices shall be installed on the tracks. However, such devices may not be installed in the case of sidings. [Wholly Revised 2010.10.8] Article 50-2 (Automated Fare Collection Facilities) When installing automated fare collection facilities, fare collection tasks such as ticket sales, ticket verification, accounting, and statistics for electronic transportation cards and tickets shall be processed through computerization, and the facilities shall be installed to enable the settlement of related fares upon transfer to connected modes of transportation. [This Article Newly Established 2010.10.8] Chapter 5 Deleted <2000.3.18> Delete Section 1 <2000.3.18> Article 51 Deleted <2000.3.18> Article 52 Deleted <2000.3.18> Article 53 Deleted <2000.3.18> Delete Section 2 <2000.3.18> Article 54 Deleted <2000.3.18> Delete Article 55 <2000.3.18> Article 56 Deleted <2000.3.18> Delete Section 3 <2000.3.18> Article 57 Deleted <2000.3.18> Article 58 Deleted <2000.3.18> Article 59 Deleted <2000.3.18> Article 60 Deleted <2000.3.18> Chapter 6 Safety Equipment such as Track Markers Article 61 (Route Markings) The following markers shall be installed on the railway. 1. Signs indicating the distance every 100 meters 2. Signs indicating the slope at places where the slope changes 3. Signs indicating the vehicle connection limits at the branching section 4. Radius of the curve and marks indicating the start and end points of the transition curve 5. Signs indicating places where train speed is restricted or where special caution is required regarding the operation of electricity and trains 6. Sign indicating the center of the station [Wholly Revised 2010.10.8] Article 62 (Blocking Facilities) Blocking facilities shall be installed at the terminus of the track. Article 63 (Evacuation Facilities) The following evacuation facilities shall be installed on railway lines. 1. Circular walkways and handrail facilities on both sides of the bridge and elevated section 2. Installation of intermediate column handrails in the underground section with intermediate columns 3. Passageways and handrail facilities on both walls of the underground branch 4. Circulation passages and handrail facilities in necessary places such as inside tunnels or vehicle depots 5. Ground-level entrance facilities on the underground main line [Wholly Revised 2010.10.8] Article 64 (Flood Prevention Facilities) Flood prevention facilities shall be installed in openings of structures as necessary. Article 65 (Fire Protection and Disaster Prevention Facilities) Structures shall be equipped with fire protection and disaster prevention facilities. [Wholly Revised 2010.10.8] Article 66 (Equipment Inside Ventilation Openings) Devices such as stairs or ladders shall be installed inside ventilation openings to facilitate access, and fences necessary for safety shall be installed. [Wholly Revised 2010.10.8] Article 67 (Smoke Control System) ① Smoke control equipment capable of controlling the direction of toxic gas exhaust by considering the location of the fire shall be installed inside stations and tunnels to enable passengers to evacuate easily in the event of a fire. ② Among the smoke control systems, electric motors, exhaust fans, exhaust ducts, and exhaust membranes (referring to the membrane connecting the exhaust fan and the exhaust duct) shall be capable of maintaining normal function for at least one hour at 250 degrees Celsius. However, this shall not apply to electric motors that are installed separately from the exhaust fan and are not affected by exhaust gases. ③ Smoke control systems installed inside tunnels shall be equipped with the capability to control the direction of smoke discharge so that smoke is expelled in the opposite direction of passenger evacuation, and the airflow velocity of the smoke discharged in an emergency shall be at least 2.5 meters per second. ④ Equipment that delays or prevents the spread of toxic gases, such as smoke barrier walls, shall be installed at the landing-side entrance of special evacuation staircases and at the entrance of stairs or escalators leading from the landing to the waiting room. [Wholly Revised 2010.10.8] Article 68 (Water-based Firefighting Equipment) Water-based firefighting equipment, such as indoor fire hydrants and sprinklers installed at stations, shall be connected to the municipal water supply firefighting facilities so that they can operate even when the electricity supply is interrupted. [Wholly Revised 2010.10.8] Article 69 (Exit Lights) ① Guide lights must be installed on station platforms, waiting rooms, passageways, stairs, etc., that are normally always on and can remain on for at least 60 minutes in the event of a power outage. ② In major evacuation routes within the station, flashing guide lights must be installed or visual alarms installed near the guide lights to enable hearing-impaired persons to evacuate easily in an emergency. [Wholly Revised 2010.10.8] Article 70 (Emergency Lighting) ① Emergency lighting capable of remaining on for at least 60 minutes in the event of a power outage must be installed in stations or tunnels. ② Emergency lighting installed in major evacuation routes within the station shall ensure that the average floor illumination is at least 5 lux. ③ Emergency lighting inside tunnels shall be installed at a height of 1 meter to 1.5 meters above the floor, and the average illumination level of the floor shall be at least 1 lux. [Wholly Revised 2010.10.8] Article 71 (Connecting water transmission pipe facilities, etc. inside tunnels) ① Connected water supply facilities shall be installed inside the tunnel to be utilized for firefighting in emergencies, and water outlets shall be installed at intervals of no more than 50 meters in the same direction of track connection within the tunnel. ② The connected water supply system pursuant to Paragraph 1 may be utilized for watering inside the tunnel under normal circumstances. [Wholly Revised 2010.10.8] Article 72 (Access Route to Tunnel) The access route from the platform to the tunnel shall be at least 90 centimeters wide, and safety facilities such as stairs shall be installed to allow passengers to evacuate easily in case of emergency. [Wholly Revised 2010.10.8] Article 73 (Seismic Design Standards) The seismic design standards for urban railways pursuant to Article 14, Paragraph 1, Subparagraph 10 of the Earthquake and Volcanic Disaster Countermeasures Act shall be determined and publicly notified by the Minister of Land, Infrastructure and Transport. <Amended Mar. 23, 2013, Aug. 8, 2025> [Wholly Revised 2010.10.8] Chapter 7 Special Provisions Concerning Light Rail <Newly Inserted Oct. 8, 2010> Article 74 (Special Provisions Concerning Gauge) ① Notwithstanding Article 6, in the case of light rail using steel wheels, the standard gauge shall be 1,435 millimeters; and in the case of using rubber wheels, the standard gauge shall be 1,700 millimeters, and the standard distance between guide surfaces (referring to the shortest distance between the inner guide rails that prevent the vehicle from derailing) shall be 2,900 millimeters. For other types, the gauge shall be determined by the Mayor/Do Governor, etc., taking into consideration the characteristics of the vehicle structure, track, etc. ② Notwithstanding Article 9, the allowance for light rail track gauge shall be determined by the Mayor/Do Governor, etc., taking into consideration the vehicle type and track characteristics. [This Article Newly Established 2010.10.8] Article 75 (Special Provisions Concerning Widened Gauge) ① Notwithstanding Articles 7 and 8, the dimensions and reduction distance of widened gauges for light rail transit shall be determined by the Mayor/Do Governor, etc., taking into consideration the radius of the relevant curve, etc. ② In the case of magnetic levitation propulsion types, widened gauge shall not be provided. [This Article Newly Established 2010.10.8] Article 76 (Special Provisions Concerning Cant, Transition Curves, etc.) Notwithstanding Articles 11 through 18 and Article 21, Paragraph 3, in the case of light rail, the Mayor/Do Governor, etc. may determine differently the size and reduction distance of cant (referring to lateral inclination in the case of rubber-wheeled types), the insertion standards and length of transition curves, the insertion length of straight lines, the gradient limit of main lines, the gradient limit of sidings, the insertion standards and length of vertical curves, the clearance of curved sections, etc., taking into consideration the vehicle type and track characteristics. [This Article Newly Established 2010.10.8] Article 77 (Special Provisions Concerning Center-to-Center Spacing of Curved Tracks) Notwithstanding Article 23, in the case of magnetic levitation propulsion types, the center-to-center spacing of curved tracks shall be expanded to a value greater than or equal to the sum of the inner enlargement dimension and the outer enlargement dimension of the construction limit. [This Article Newly Established 2010.10.8] Article 78 (Special Provisions Concerning Facilities, etc. at Stations) Notwithstanding the provisions of Articles 30, 30-2, 30-3, and 31 through 35, the Minister of Land, Infrastructure and Transport shall prescribe and publicly announce detailed standards for facilities necessary for passengers' use of the urban railway, such as platforms, passageways, and entrances, as well as electrical and telecommunications facilities, installed at light rail stations. <Amended Mar. 23, 2013> [This Article Newly Established 2010.10.8] Article 79 (Special Provisions Concerning Electrical Systems) Notwithstanding Article 36, subparagraph 1, in the case of light rail, the voltage supplied to the overhead line and the electrical system shall, in principle, be a DC 750-volt or 1,500-volt third-rail system; however, they may be varied depending on the vehicle type or track characteristics. [This Article Newly Established 2010.10.8] Article 80 (Special Provisions Concerning Transmission Lines) Notwithstanding Article 37, Paragraph 1, in the case of light rail, if the power supply for lighting and operation is redundant, the configuration of the transmission lines may be different. [This Article Newly Established 2010.10.8] Article 81 (Special Provisions Concerning the Inclination of Overhead Lines) Notwithstanding Article 43, the inclination limit for light rail overhead lines relative to the rail surface shall be determined by the Mayor/Do Governor, etc., taking into consideration the operating conditions of the vehicles, etc. [This Article Newly Established 2010.10.8] Article 82 (Special Provisions Concerning the Installation of Emergency Communication Devices) Notwithstanding Article 46, Paragraph 6, emergency communication devices shall be installed at the platforms of light rail transit at a height of 1.5 meters from the floor to enable passengers to communicate two-way with the control room. In this case, the installation locations and positions, etc., shall be determined by the Mayor/Do Governor, etc., taking into consideration the scale of the station. [This Article Newly Established 2010.10.8] Article 83 (Special Provisions Concerning Track Markings) Notwithstanding Article 61, markings may be installed selectively as necessary on tracks to which unmanned operation of light rail is applied. [This Article Newly Established 2010.10.8] Article 84 (Special Provisions Concerning Evacuation Facilities on Railway Tracks) Notwithstanding Article 63, evacuation facilities may not be installed on railway tracks if measures have been taken to ensure the safe evacuation of passengers in an emergency, such as equipping light rail vehicles with disaster prevention functions or emergency escape facilities. [This Article Newly Established 2010.10.8] Article 85 (Safety Equipment for Unmanned Operation) In cases where unmanned operation is to be applied to a light rail transit, appropriate safety equipment must be provided in accordance with the safety requirements for Automated Urban Rail Transport (AUGT) of the Korean Industrial Standard KS C IEC PAS62267, notified pursuant to Article 11 of the Industrial Standardization Act. [This Article Newly Established 2010.10.8] Article 86 (Special Provisions Concerning Tram Types) In the case of light rail of the tram type, the Mayor/Do Governor, etc. may determine provisions differently from the contents of this Rule, taking into consideration the characteristic of running together with other road traffic. [This Article Newly Established 2010.10.8] Revision ⊙Ministry of Land, Infrastructure and Transport Decree No. 1516 The Partial Amendment to the Rules on Urban Railway Construction is hereby promulgated as follows. August 8, 2025 Minister of Land, Infrastructure and Transport (Seal) Partial Amendment to the Urban Railway Construction Rules The Urban Railway Construction Rules are partially amended as follows. In Article 14, Paragraph 3, "not inserting a straight line or" shall be changed to "applying the straight line insertion standards determined by the Mayor/Do Governor, etc." In Article 35-3, Paragraph 1, Subparagraph 4, "Article 12, Paragraph 1 of the Act on Installation, Maintenance and Safety Management of Firefighting Facilities" shall be changed to "Article 20, Paragraph 1 of the Act on Installation and Management of Firefighting Facilities". In Article 73, "Article 14, Item 10 of the Earthquake Disaster Countermeasures Act" shall be changed to "Article 14, Paragraph 1, Item 10 of the Earthquake and Volcanic Disaster Countermeasures Act". Supplementary Provisions Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Standards for Insertion of Straight Lines) Regarding the insertion of straight lines, until the Mayor/Do Governor, etc. establishes standards for insertion of straight lines in accordance with the amended provisions of Article 14, Paragraph 3, the former provisions shall apply notwithstanding the said amended provisions. Reason for Enactment/Amendment [Partial revision] ◇ Reasons for Amendment and Key Contents This is intended to allow Mayor/Do Governors, etc., to separately establish standards for inserting straight lines in cases where curves are continuous at track switches and in the case of sidings, provided that safety is not compromised, in order to expand the autonomy of urban railway construction and ensure operational safety. <Provided by the Ministry of Land, Infrastructure and Transport>