도시가스사업법 시행규칙

289257 · 2026-09-18

Ministry of Trade, Industry and Resources (Gas Industry Division), 044-203-5237 Ministry of Trade, Industry and Resources (Resource Safety Team), 044-203-5183 Article 1 (Purpose) The purpose of this Rule is to prescribe matters delegated by the Urban Gas Business Act and its Enforcement Decree and matters necessary for their implementation. [Wholly Amended July 11, 2008] Article 2 (Definitions) ① The definitions of terms used in this Rule are as follows. <Amended Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Jul. 25, 2013; Aug. 8, 2014; Oct. 1, 2025> 1. “Pipeline” means a pipe installed to supply city gas, including a main pipeline, supply pipeline, internal pipeline or other pipeline. 2. “Main pipeline” means any of the following pipelines: a. For a gas wholesale business, pipelines extending from the site boundary of a city gas manufacturing plant (including a liquefied natural gas receiving terminal; hereinafter the same applies) to the boundary of a pressure-regulating station, excluding pipelines within a valve station. b. For a general city gas business, pipelines extending from the site boundary of a city gas manufacturing plant or the boundary of the gas facilities of a gas wholesaler to a pressure regulator c. For a naphtha by-product gas or biogas manufacturing business, pipelines extending from the site boundary of the relevant manufacturing plant to the boundary of gas facilities or business premises of a gas wholesaler or general city gas business operator d. For a synthetic natural gas manufacturing business, pipelines extending from the site boundary of the relevant manufacturing plant to the boundary of gas facilities or business premises of a gas wholesaler 3. “Supply pipeline” means any of the following pipelines: a. In cases where city gas is supplied to multi-unit dwellings, officetels, condominiums, and other buildings designated by the Minister of Trade, Industry and Energy as necessary for safety management (hereinafter referred to as “multi-unit dwellings, etc.”), the piping extending from the pressure regulator to the upstream valve of the meter installed on the outer wall of the building separately owned or occupied by the gas user (or the outer wall of the building if the meter is installed inside the building) B. In cases where city gas is supplied to buildings, etc., other than multi-unit dwellings, etc., the pipeline extending from the pressure regulator to the boundary of the land owned or occupied by the gas user. C. In the case of the gas wholesale business, the pipeline extending from the pressure regulating station to the gas supply facilities of general city gas business operators or the gas usage facilities of large-scale consumers D. In the case of naphtha byproduct gas/biogas manufacturing businesses and synthetic natural gas manufacturing businesses, pipelines extending from the main building or site boundary of the relevant business facility to the boundary of the land owned or occupied by the gas user. 4. “User supply pipe” refers to the piping among the supply pipes under subparagraph 3(a) that extends from the boundary of the land owned or occupied by the gas user to the upstream valve of the meter installed on the outer wall of the building separately owned or occupied by the gas user (or the outer wall of the building if the meter is installed inside the building). 5. “Internal pipe” refers to the piping extending from the boundary of the land owned or occupied by the gas user (in the case of multi-unit dwellings, etc., where the gas user owns or occupies a separate building, the valve upstream of the meter in the case of the gas user installing the meter on the outer wall of the building, or in the case of the gas user installing the meter inside the building, the outer wall of the building) to the combustion device. 6. “High pressure” means a pressure of 1 megapascal or more (referring to gauge pressure; hereinafter the same applies). However, liquefied gas in a liquid state shall be deemed high pressure. 7. “Medium pressure” means a pressure of 0.1 megapascal or more and less than 1 megapascal. However, if the liquefied gas is vaporized and not mixed with other substances, it means a pressure of 0.01 megapascal or more and less than 0.2 megapascals. 8. “Low pressure” means a pressure of less than 0.1 megapascal. However, if the liquefied gas is vaporized and not mixed with other substances, it means a pressure of less than 0.01 megapascal. 9. “Liquefied gas” means a substance that has a pressure of 0.2 megapascals or more at normal operating temperature or at a temperature of 35 degrees Celsius. 10. “Protection facility” means a Class 1 protection facility and a Class 2 protection facility as specified in Annex 1. 11. “Storage facility” refers to a facility for storing city gas, including a storage tank and a storage room for filled containers. 12. “Treatment facility” means a facility capable of treating city gas by compression, liquefaction, or other methods, and includes a compressor, vaporizer, and pump necessary for filling city gas. 13. “Compressed gas facility” refers to a pressure vessel as a facility for storing gas compressed through a compressor. 14. “Filling facility” refers to a facility for filling city gas into a container, a wheeled vehicle loaded with a high-pressure gas container (hereinafter referred to as a “mobile filling vehicle”), or a tank fixed to a vehicle, and includes a filling unit and its auxiliary facilities. 15. “Processing capacity” means the amount of city gas that can be processed per day by compression, liquefaction, or other methods according to a processing facility or a pressure reduction facility (based on a temperature of 0 degrees Celsius and a gauge pressure of 0 Pascals). 16. “Pressure-regulating station” means a facility for regulating the pressure of city gas in which pressure-regulating equipment, metering equipment, heating equipment, impurity-removal equipment, a gas vent stack, pipelines or auxiliary equipment are installed. 17. “Valve station” means a facility for shutting off the flow of city gas in which a gas shut-off device, gas vent stack, pipelines or auxiliary equipment are installed. 18. “Pretreatment facility” means a treatment facility (excluding the capture facility) for the primary desulfurization and dehydration of captured gas as an upstream facility of the gas quality improvement facility among biogas production facilities. 19. “Gas quality improvement facility” means a purification facility, pressure regulating facility, calorific value regulating facility, quality monitoring facility, compression facility, metering facility and odorant injection facility among naphtha byproduct gas, biogas production facility and synthetic natural gas production facility for improving the quality of city gas. ② In Article 2, Subparagraph 3 of the Urban Gas Business Act (hereinafter referred to as the “Act”), the term “bulk consumer prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to any person falling under any of the following subparagraphs. <Amended Sep. 25, 2009; Nov. 4, 2011; Mar. 23, 2013; Feb. 21, 2014; Oct. 7, 2014; Apr. 27, 2021; Mar. 10, 2022; Oct. 1, 2025; Aug. 31, 2026> 1. Among those who receive and use 100,000 cubic meters or more of natural gas per month through pipelines, any of the following persons a. Persons using natural gas in areas outside the supply zone of a general city gas business operator b. Natural gas users within the supply area of a general city gas business operator who, for legitimate reasons, are unable to receive natural gas from that operator 2. Persons using natural gas for any of the following purposes a. For power generation: For the purpose of producing electricity (applicable only to cases where the facility capacity is 100 megawatts or more) B. For Cogeneration: Uses for producing electricity and heat together (applicable only to cases where the facility capacity is 100 megawatts or more) and uses for producing heat using dedicated heat equipment attached to cogeneration facilities. C. For hydrogen production: Use for producing hydrogen to supply to fuel cells installed in vehicles, facilities, etc., as specified in each subparagraph of Article 2, Paragraph 3 of the Enforcement Rule of the Act on the Promotion of the Hydrogen Economy and Hydrogen Safety Management (applicable only to cases where a person who has obtained a general high-pressure gas manufacturing permit pursuant to Article 3, Paragraph 1, Subparagraph 2 of the Enforcement Decree of the High-Pressure Gas Safety Management Act produces hydrogen by receiving natural gas at a high pressure of 1 megapascal or more) 3. Persons who install liquefied natural gas storage tanks (including containers used for testing or research purposes) and use natural gas 4. Deleted <Aug. 5, 2020> ③ In Article 2, Subparagraph 4-2 of the Act, the term “business prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the businesses listed in each of the following subparagraphs. <Newly added July 28, 2010; November 4, 2011; March 23, 2013; October 7, 2014; August 5, 2020; August 25, 2020; October 31, 2024; October 1, 2025> 1. Stationary Compressed City Gas Vehicle Refueling Business: A business that compresses city gas supplied through pipelines or storage tanks and refuels vehicles. 2. Mobile Compressed City Gas Vehicle Refueling Business: A business that refuels vehicles with compressed city gas supplied via mobile refueling vehicles. 3. Stationary Compressed City Gas Mobile Refueling Vehicle Business: A business that compresses city gas supplied through pipelines or storage tanks and refuels mobile refueling vehicles. 4. Stationary Liquefied City Gas Vehicle Refueling Business: A business that refuels vehicles [ including yard tractors pursuant to Item 8 of Annex 5 of the Enforcement Decree of the Port Act (hereinafter referred to as “yard tractors”)] with liquefied city gas supplied through pipelines or storage tanks. 5. Mobile Liquefied City Gas Vehicle Refueling Business: A business of refueling vehicles (including yard tractors) with liquefied city gas using tanks fixed to the vehicles. ④ “Facilities prescribed by Ordinance of the Ministry of Trade, Industry and Resources” in Article 2, subparagraph 4-3 of the Act means facilities licensed to specifically manufacture high-pressure gas under Article 3 (1) 1 of the Enforcement Decree of the High-Pressure Gas Safety Control Act. <Newly inserted June 2, 2017; Oct. 1, 2025> ⑤ In Article 2, Subparagraph 5 of the Act, the term “gas manufacturing facilities, gas pipeline facilities, gas filling facilities, naphtha byproduct gas and biogas manufacturing facilities and synthetic natural gas manufacturing facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the facilities listed in each of the following subparagraphs. <Amended Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Aug. 8, 2014; Jun. 2, 2017; Oct. 1, 2025> 1. Gas Manufacturing Facilities: Facilities for the loading, unloading, storage, vaporization, and transmission of city gas, and their ancillary equipment 2. Gas Piping Facilities: Piping and supply facilities and their ancillary facilities extending from the city gas manufacturing plant to the boundary of the land owned or occupied by the gas user (in the case of multi-unit dwellings, etc., where the gas user separately owns or occupies a building, the valve upstream of the meter in the case where the meter is installed on the outer wall of such a building; in the case where the meter is installed inside the building, the outer wall of the building). 3. Gas Filling Facilities: Storage facilities, processing facilities, compressed gas facilities, filling facilities, and ancillary facilities installed within a city gas filling business office for the purpose of filling city gas. 4. Naphtha By-product Gas Manufacturing Facility: Gas quality improvement equipment, storage facilities, vaporization facilities, transmission facilities, and their auxiliary facilities installed within the naphtha by-product gas manufacturing plant to manufacture naphtha by-product gas. 5. Biogas Production Facilities: Pretreatment facilities, gas quality improvement facilities, storage facilities, vaporization facilities, transmission facilities, and their auxiliary facilities installed within a biogas production plant to produce biogas. 6. Synthetic Natural Gas Manufacturing Facility: Manufacturing equipment, gas quality improvement equipment, storage equipment, vaporization equipment, transmission equipment, and ancillary equipment installed within a synthetic natural gas manufacturing plant to produce synthetic natural gas. ⑥ In Article 2, Subparagraph 6 of the Act, “facilities of gas users other than gas supply facilities as prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” shall be as follows: <Amended Nov. 4, 2011; Mar. 23, 2013; Oct. 7, 2014; Jun. 2, 2017; Aug. 5, 2020; Oct. 31, 2024; Oct. 1, 2025> 1. Internal pipes, combustion devices, and their auxiliary equipment. However, those installed on a vessel (referring to a vessel as defined in Article 2, subparagraph 1 of the Ship Safety Act; hereinafter the same applies) are excluded. 2. Gas meter installed on the exterior wall of multi-unit housing, etc. 3. Vehicles using city gas as fuel (including yard tractors) 4. Slow refueling equipment for automobiles ⑦ In Article 1-4, Subparagraph 2 of the Enforcement Decree of the Urban Gas Business Act (hereinafter referred to as the “Decree”), the term “manufacturing prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to manufacturing as defined in the Korean Standard Industrial Classification notified by the Commissioner of Statistics Korea pursuant to Article 22 of the Statistics Act. <Newly added Feb. 21, 2014; Jun. 2, 2017; Mar. 24, 2020; Oct. 1, 2025> [Wholly Amended July 11, 2008] Article 3 (Application for Permit, etc.) ① An application for a permit or a permit for change of permit for a city gas business pursuant to Article 3 of the Act shall be in accordance with the classifications in each of the following subparagraphs. <Amended Oct. 5, 2012; Aug. 8, 2014> 1. Application for permission for gas wholesale business pursuant to the first part of Article 3, Paragraph 1 of the Act and for general city gas business pursuant to the first part of Paragraph 2 of the same Act : Attached Form No. 1 2. Application for Permission to Change Gas Wholesale Business Pursuant to the latter part of Article 3, Paragraph 1 of the Act and General City Gas Business Pursuant to the latter part of Paragraph 2 of the same Act : Form No. 2, Form No. 2-2, Form No. 3, and Form No. 4 3. Application for Permission for City Gas Filling Business Pursuant to the first part of Article 3, Paragraph 3 of the Act : Form No. 4-2 4. Application for Permission to Change City Gas Filling Business Pursuant to the latter part of Article 3, Paragraph 3 of the Act : Form No. 4-2 5. Application for Permission for Naphtha By-product Gas and Biogas Manufacturing Business Pursuant to the first part of Article 3, Paragraph 4 of the Act : Form No. 4-3 6. Application for Permit for Change of Naphtha By-product Gas and Biogas Manufacturing Business Pursuant to the latter part of Article 3, Paragraph 4 of the Act : Form No. 4-3 7. Application for Permission for Synthetic Natural Gas Manufacturing Business Pursuant to the first part of Article 3, Paragraph 5 of the Act : Form No. 4-4 8. Application for Permission to Change Synthetic Natural Gas Manufacturing Business Pursuant to the latter part of Article 3, Paragraph 5 of the Act : Form No. 4-4 ② The application for permission under Paragraph 1, Subparagraph 1 shall be accompanied by the documents set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> 1. Business Plan 2. In the case of a corporation, the articles of incorporation. However, if the articles of incorporation have been submitted to the Minister of Trade, Industry and Energy or the Mayor of a Special City, Metropolitan City, Special Self-Governing City, Governor of a Province, or Governor of a Special Self-Governing Province (hereinafter referred to as “Mayor/Governor”) in accordance with other laws and regulations, they may not be attached if they can be verified. ③ The application for permission under Paragraph 1, Subparagraphs 3, 5, and 7 shall be accompanied by the following documents (including electronic documents). <Amended Aug. 8, 2014> 1. Business Plan 2. In the case of a corporation, the articles of incorporation. However, if the articles of incorporation have been submitted to the mayor of a special self-governing city, the governor of a special self-governing province, the mayor, the county head, or the district head (referring to the head of a self-governing district, hereinafter referred to as “mayor, county head, or district head”) in accordance with other laws and regulations and can be verified, they may not be attached. 3. Technical review by the Korea Gas Safety Corporation (hereinafter referred to as the “Korea Gas Safety Corporation”) pursuant to Article 28 of the “High-Pressure Gas Safety Management Act” ④ The Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Governor, or District Head who has received an application under Paragraph 1 shall verify the Certificate of Corporate Registration (applicable only to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Mar. 23, 2013; Oct. 1, 2025> ⑤ An application for permission to change pursuant to Paragraph 1, Subparagraphs 2, 4, 6, and 8 shall be accompanied by a document stating the details of the change. <Amended Aug. 8, 2014> ⑥ Paragraphs 6 and 7 of Article 12 shall apply mutatis mutandis to the technical review pursuant to Paragraph 3, Subparagraph 3. [Wholly Amended July 28, 2010] Article 4 (Matters Requiring Permission for Change, etc.) ① Matters requiring permission for change pursuant to the latter part of Article 3, Paragraph 1 or Paragraph 2 of the Act are as follows. However, changes resulting from the installation of mobile supply facilities (hereinafter referred to as “emergency supply facilities”) for the purpose of supplying city gas by temporarily connecting to gas supply facilities damaged by natural disasters or accidents shall be excluded. <Amended Sep. 25, 2009; Jul. 28, 2010; Aug. 8, 2014> 1. Change in the type or calorific value of city gas 2. Change in supply area or supply capacity 3. Change in the type, installation location, or number of gas generating equipment, liquefied gas storage tanks, or gas holders among gas supply facilities 4. Change of Company Name 5. Change of representative (applicable only to corporations excluding the State, local governments, and public institutions under Article 4, Paragraph 1 of the Act on the Operation of Public Institutions) ② Matters requiring a permit for change pursuant to the latter part of Article 3, Paragraph 3 of the Act are as follows: <Newly added July 28, 2010; July 25, 2013> 1. Change of business office location 2. Change of type of city gas. However, cases where the Korea Gas Safety Agency recognizes that there is no risk of harm are excluded. 3. Changing City Gas Pressure 4. Replacement of storage facilities, change in location or storage capacity of storage facilities 5. Change in the location or processing capacity of the treatment facility 5-2. Change of location or charging capacity of charging facilities 6. When refueling a mobile compressed city gas refueling vehicle at a fixed compressed city gas vehicle refueling facility, or when intending to refuel a compressed city gas vehicle at a fixed compressed city gas mobile refueling vehicle refueling facility 7. Change in pipe inner diameter (only applicable when processing capacity changes) 8. Change of piping installation location (applicable only if the total length of the piping at the section to be changed is 20 meters or more) 9. Change of Company Name 10. Change of representative (applicable only to corporations excluding the State, local governments, and public institutions under Article 4, Paragraph 1 of the Act on the Operation of Public Institutions) ③ Matters requiring a permit for change pursuant to the latter part of Article 3, Paragraph 4 and the latter part of Paragraph 5 of the Act are as follows: <Newly added Aug. 8, 2014> 1. Change of business office location 2. Change in city gas type or calorific value 3. Change in city gas supply pressure 4. Changes to manufacturing facilities, pretreatment facilities, gas quality improvement facilities, and storage facilities in each of the following items a. Replacement of equipment B. Change of location c. Change in manufacturing, processing, or storage capacity 5. Changes involving the installation, expansion, relocation, or replacement of piping (only applicable to those with a nominal diameter of 150 millimeters or more) of 20 meters or more 6. Change of Company Name 7. Change of representative (applicable only to corporations excluding the State, local governments, and public institutions under Article 4, Paragraph 1 of the Act on the Operation of Public Institutions) ④ For changes falling under Paragraph 1, Subparagraphs 4 and 5; Paragraph 2, Subparagraphs 9 and 10; and Paragraph 3, Subparagraphs 6 and 7, the forms prescribed in each of the following subparagraphs must be submitted to the relevant licensing authority within 30 days from the date of such change. <Amended Aug. 8, 2014> 1. Change of Paragraph 1, Subparagraph 4 or 5: Form No. 2-2 2. Change of Paragraph 2, Subparagraph 9 or 10: Form No. 4-2 3. Change of Paragraph 3, Subparagraph 6 or 7: Form No. 4-3 or Form No. 4-4 [Wholly Amended July 11, 2008] Article 5 (Detailed Standards for Permits for City Gas Businesses) The detailed standards for permits for city gas businesses (excluding city gas filling businesses, naphtha byproduct gas and biogas manufacturing businesses, and synthetic natural gas manufacturing businesses) pursuant to Article 3, Paragraph 10 of the Act are as follows. However, Subparagraphs 4 through 6 shall apply only to permits for general city gas businesses. <Amended Sep. 25, 2009; Jul. 28, 2010; Aug. 8, 2014> 1. The service area for which city gas is to be supplied shall not overlap with the service area of another city gas business operator. 2. A business plan shall be established to ensure that the equity ratio is at least 30 percent until the year of commencement of city gas supply, and is continuously maintained at least 20 percent from the year following the commencement year, so that the city gas business can be properly conducted. 3. A business plan regarding the procurement of raw materials and the construction of a trunk pipeline network must be established to ensure the stable supply of city gas within the supply area. 4. City gas supply shall not be concentrated in specific areas. 5. Equip yourself with the reserve facilities specified in Item 1, Subparagraph (a) 10) of Annex 6 for the stable supply of city gas (applicable only to general city gas business operators that do not receive natural gas from the pipelines of gas wholesale business operators). 6. If there is a plan to use natural gas as a raw material for city gas, the business plan must be suitable for receiving the natural gas supply. [Wholly Amended July 11, 2008] Article 6 (Permits, etc.) ① The Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Governor, or District Head shall issue permits in accordance with the classifications in each of the following subparagraphs. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> 1. When a permit for a gas wholesale business or a general city gas business has been granted pursuant to the first part of Article 3, Paragraph 1 or the first part of Paragraph 2 of the Act : Permit in the form of Annex 5 2. When a permit for a city gas filling business has been granted pursuant to the first part of Article 3, Paragraph 3 of the Act : Permit in the form of Annex 5-2 3. When a permit for a naphtha byproduct gas/biogas manufacturing business or a synthetic natural gas manufacturing business has been granted pursuant to the first part of Article 3, Paragraph 4 or the first part of Paragraph 5 of the Act : Permit in the form of Annex 6 ② When the Minister of Trade, Industry and Resources, the relevant metropolitan or provincial governor, or a mayor, county head or district head permits a change in the permitted matters under the latter sentence of Article 3 (1), (2), (3), (4) or (5) of the Act, the authority shall enter the details of the change on the reverse of the permit issued under paragraph (1) and issue it to the applicant. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> [Wholly Amended July 28, 2010] Article 7 Deleted <July 1, 1999> Article 8 Deleted <July 1, 1999> Article 9 (Report of Succession to the Status of a City Gas Business Operator) ① A person intending to succeed to the status of a city gas business operator under Article 7 (1) or (2) of the Act shall report that succession to the Minister of Trade, Industry and Resources, the relevant metropolitan or provincial governor, or a mayor, county head or district head within 30 days after the date of transfer, merger or acquisition, using attached Form No. 9 and including the documents specified in the following subparagraphs. <Amended Mar. 23, 2013; May 23, 2022; Oct. 1, 2025> 1. Permit pursuant to Article 6 2. Documents proving the cause of succession to status ② An heir who intends to succeed to the status of a city gas business operator pursuant to Article 7, Paragraph 3 of the Act shall report to the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Head, or District Head by attaching the documents specified in each subparagraph of Paragraph 1 to the Report on Succession to Status in Annex 9. <Newly added May 23, 2022; October 1, 2025> ③ Upon receiving a report pursuant to Paragraph 1, the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Governor, or District Head shall verify the certificate of corporate registration (applicable only to corporations) of the person who has succeeded to the status through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Mar. 23, 2013; May 23, 2022; Oct. 1, 2025> [Wholly Amended July 28, 2010] Article 10 (Reporting of Commencement, etc. of Business) Any person who intends to report the commencement, suspension (only applicable if the suspension is for one month or more), or closure of a city gas business pursuant to Article 8, Paragraph 1 of the Act shall submit the Report on Commencement, Suspension, or Closure of City Gas Business in the form of Annex 9-2 to the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Head, or District Head at the time specified in each of the following subparagraphs. <Amended Mar. 23, 2013; May 23, 2022; Oct. 1, 2025> 1. Notification of Commencement: Before starting the city gas business 2. Notification of Suspension or Closure: 30 days prior to the scheduled date of suspension or closure [Wholly Amended July 28, 2010] Article 10-2 (Restrictions on Disposition by Naphtha By-product Gas and Biogas Manufacturers) In Article 8-3, Paragraph 1, Subparagraph 5 of the Act, the term “scale prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the scale classified according to each of the following subparagraphs. <Amended Sep. 2, 2024; Oct. 1, 2025> 1. Naphtha byproduct gas manufacturer: 10,000 cubic meters 2. Biogas Manufacturer: 300,000 cubic meters [This Article was newly added on Aug. 8, 2014.] [Formerly Article 10-2 was moved to Article 10-3 <Aug. 8, 2014>] Article 10-3 (Standards for Administrative Dispositions in City Gas Businesses) The standards for administrative dispositions by type of violation under Article 9 (2) of the Act shall be as specified in Annex 1-2. [Wholly Amended Jul. 11, 2008] [Moved from Article 10-2; former Article 10-3 moved to Article 10-4 <Aug. 8, 2014>] Article 10-4 (Standards for Imposing Administrative Surcharges) ① The standards for imposing administrative surcharges under Article 10 (2) of the Act shall be as specified in Annex 1-3. ② The Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Head, or District Head may increase or decrease the administrative surcharge under Annex 1-3 within the range of one-fifth, taking into consideration the scale of the city gas business operator's business, the severity and frequency of violations, etc. However, even in the case of increase, the total amount of the administrative surcharge shall not exceed 30 million won. <Amended July 28, 2010; March 23, 2013; October 1, 2025> [Wholly Amended Jul. 11, 2008] [Moved from Article 10-3; former Article 10-4 moved to Article 10-5 <Aug. 8, 2014>] Article 10-5 (Imposition and Payment of Surcharges) ① When the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Head, or District Head imposes a surcharge pursuant to Article 10, Paragraph 1 of the Act, they shall notify the person concerned in writing to pay the surcharge, specifying the type of violation and the amount of the surcharge. <Amended July 28, 2010; March 23, 2013; October 1, 2025> ② Any person who has received notice pursuant to Paragraph 1 shall pay the administrative surcharge to a collection agency designated by the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Head, or District Head within 20 days. <Amended July 28, 2010; March 23, 2013; December 12, 2023; October 1, 2025> ③ A collecting institution that receives an administrative surcharge under paragraph (2) shall issue a receipt to the payer. ④ Upon receiving an administrative surcharge pursuant to Paragraph 2, the receiving agency shall notify the Minister of Trade, Industry and Energy, the Governor of a City or Province, or the Mayor, County Governor, or District Head of such fact without delay. <Amended July 28, 2010; March 23, 2013; October 1, 2025> ⑤ Deleted <December 12, 2023> [Wholly Amended Jul. 11, 2008] [Moved from Article 10-4; former Article 10-5 moved to Article 10-6 <Aug. 8, 2014>] Article 10-6 (Application for Registration of Natural Gas Import/Export Business, etc.) ① Any person who intends to register a natural gas import/export business pursuant to Article 10-2, Paragraph 1 of the Act shall submit to the Minister of Trade, Industry and Energy an application for registration of a natural gas import/export business in the form of Annex No. 10 (including an application in the form of an electronic document; hereinafter the same applies), with a business plan attached, at least 30 days prior to the scheduled date of the first import customs clearance of natural gas. <Amended Mar. 23, 2013; Oct. 1, 2025> ② A person who intends to report a business of bringing natural gas into or out of the country under the former sentence of Article 10-2 (3) of the Act shall submit a report of the natural gas inward/outward movement business in attached Form No. 10-2 (including an electronic application), together with a business plan, to the Minister of Trade, Industry and Resources at least 30 days before the initial planned date of bringing natural gas in or taking it out. <Newly inserted Aug. 8, 2014; Amended Oct. 1, 2025> ③ The Minister of Trade, Industry and Energy who receives an application pursuant to Paragraphs 1 and 2 shall verify the Certificate of Corporate Registration (applicable only to corporations) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> ④ The business plan referred to in Paragraph 1 shall include the following matters: <Amended Aug. 8, 2014> 1. Current status, construction or ownership plans for natural gas storage facilities (including location and storage capacity) 2. Natural gas supply and demand plan for the five years following the year of natural gas import (including plans for import/export and sales/use) ⑤ The business plan referred to in Paragraph 2 shall include the following matters. <Newly added Aug. 8, 2014> 1. Current status of bonded areas (including names and locations) 2. Current status, construction or lease plans for natural gas storage facilities (including location and storage capacity) 3. Disposal plan for evaporated gas [This Article newly inserted July 11, 2008] [Title amended August 8, 2014] [Moved from Article 10-5; former Article 10-6 moved to Article 10-7 <August 8, 2014>] Article 10-7 (Change Registration, etc. of Natural Gas Import/Export Business) ① Any person who intends to register a change in the natural gas import/export business or report a change in the natural gas export/import business pursuant to the latter part of Paragraph 1 and Paragraph 3 of Article 10-2 of the Act shall submit to the Minister of Trade, Industry and Energy, within 30 days from the date of such change, an application for registration of a change in the natural gas import/export business or a report on a change in the natural gas export/import business in the form of Annex 10-3, attaching documents proving the details of the change. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> ② The Minister of Trade, Industry and Energy who has received an application under Paragraph 1 shall verify the Certificate of Corporate Registration [applicable only to corporations in cases where the representative is changed pursuant to Article 2, Subparagraph 2 of the Enforcement Decree] through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. < Amended Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Feb. 21, 2014; Oct. 1, 2025> [This Article newly inserted July 11, 2008] [Title amended August 8, 2014] [Moved from Article 10-6; former Article 10-7 moved to Article 10-8 <August 8, 2014>] Article 10-8 (Application for Conditional Registration and Processing Period) ① A person who intends to obtain conditional registration under Article 10-3 (1) of the Act shall submit an application for registration of a natural gas import/export business in attached Form No. 10, together with the business plan specified in Article 10-6 (1), to the Minister of Trade, Industry and Resources. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> ② Paragraphs 2 and 3 of Article 10-6 shall apply mutatis mutandis to the conditional registration under Paragraph 1. <Amended Aug. 8, 2014> ③ In Article 10-3, Paragraph 2 of the Act, the term “period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to 14 days. <Amended Mar. 23, 2013; Oct. 1, 2025> [This Article was newly added on July 11, 2008.] [Moved from Article 10-7; former Article 10-8 moved to Article 10-9 <Aug. 8, 2014>] Article 10-9 (Reporting of Commencement, Suspension, and Closure of Business) Any person who intends to report the commencement, suspension, or closure of business pursuant to Article 10-4, Paragraph 1 of the Act shall submit a Report on the Commencement (Suspension/Closure) of Natural Gas Import/Export Business or Natural Gas Export/Import Business in accordance with Form No. 10-4 of the Attached Form to the Minister of Trade, Industry and Energy within 30 days from the date the cause for reporting occurred. <Amended Mar. 23, 2013; Aug. 8, 2014; Mar. 24, 2020; May 23, 2022; Oct. 1, 2025> [This Article was newly added on July 11, 2008.] [Moved from Article 10-8; former Article 10-9 moved to Article 10-10 <Aug. 8, 2014>] Article 10-10 (Application for Approval of Natural Gas Import/Export Contracts, etc.) ① If a natural gas import/export business operator who is a city gas business operatorwishes to obtain approval or approval for modification regarding the conclusion of import, export, and transportation contracts for natural gas pursuant to Article 10-5, Paragraph 1 of the Act, they shall submit an application for approval of natural gas contracts in the form of Annex 11, attached with the documents set forth in each of the following subparagraphs, to the Minister of Trade, Industry and Energy. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Two copies of the import, export, or transport contract for natural gas (if the contract is written in a foreign language, one copy of the Korean translation must be attached) 2. One copy of the natural gas sales plan for the planned usage period of the purchased natural gas 3. Documents proving the changes (applicable only to changes approved) ② If a natural gas import/export business operator who is a city gas business operator intends to report the conclusion or amendment of a natural gas import, export, or transportation contract pursuant to Article 10-5, Paragraph 2 of the Act, they shall submit a Natural Gas Contract (Amendment) Report in the form of Annex 11-2, attached with the documents specified in each of the following subparagraphs, to the Minister of Trade, Industry and Energy within 7 days from the date of conclusion or amendment of the contract. <Newly added July 1, 2015; October 1, 2025> 1. Two copies of the import, export, or transport contract for natural gas (if the contract is written in a foreign language, one copy of the Korean translation must be attached) 2. One copy of the natural gas sales plan 3. One copy of documents explaining the necessity of city gas supply and demand and the appropriateness of the price 4. One copy of documents proving the changes (to be submitted only in the case of a change notification). ③ If a direct importer for self-consumption intends to report the conclusion or amendment of an import, export, or transportation contract for natural gas pursuant to Article 10-5, Paragraph 3 of the Act, they shall submit a Natural Gas Contract (Amendment) Report in the form of Annex 11-2, attached with the documents specified in each of the following subparagraphs, to the Minister of Trade, Industry and Energy within 30 days from the date of conclusion or amendment of the contract. <Amended Mar. 23, 2013; Aug. 8, 2014; Jul. 1, 2015; Oct. 1, 2025> 1. Two copies of the import, export, or transport contract for natural gas (if the contract is written in a foreign language, one copy of the Korean translation must be attached) 2. One copy of the natural gas usage plan. 3. Documents proving the changes (applicable only to reports of changes) ④ A natural gas inward/outward movement business operator wishing to report the conclusion or amendment of a natural gas inward/outward movement or transportation contract under Article 10-5 (5) of the Act shall, within 30 days after concluding or amending the contract, submit a natural gas contract report or change report in attached Form No. 11-3, accompanied by the documents specified in the following subparagraphs, to the Minister of Trade, Industry and Resources. <Newly added Aug. 8, 2014; Jul. 1, 2015; Oct. 1, 2025> 1. Two copies of the contract for bringing natural gas in or taking it out, or the transportation contract; where the contract is written in a foreign language, one Korean translation shall also be attached. 2. Documents proving the changes (applicable only to notifications of changes) [This Article was newly inserted on July 11, 2008.] [Moved from Article 10-9; former Article 10-10 was moved to Article 10-11 <Aug. 8, 2014>] Article 10-11 (Matters to be Notified Regarding Natural Gas Import/Export Plans) Pursuant to Article 10-5, Paragraph 4 of the Act, a direct importer for self-consumption shall notify the Minister of Trade, Industry and Energy of the matters set forth in each of the following subparagraphs at least 30 days prior to the scheduled date of conclusion of an import or export contract. However, if the period of the natural gas import or export contract is one year or less, notification shall be given at least 3 days prior (10 days prior when used for power generation). <Amended Sep. 25, 2009; Mar. 23, 2013; Aug. 8, 2014; Jul. 1, 2015; Oct. 1, 2025> 1. Annual Natural Gas Import and Export Plan 2. Natural Gas Usage Plan 3. Contractor and Natural Gas Quality [This Article newly inserted July 11, 2008] [Title amended August 8, 2014] [Moved from Article 10-10; former Article 10-11 moved to Article 10-12 <August 8, 2014>] Article 10-12 (Standards for Administrative Dispositions against Natural Gas Importers and Exporters) The standards for administrative dispositions pursuant to Article 10-7, Paragraph 3 of the Act are as set forth in Table 1-4. [This Article was newly added on July 11, 2008.] [Moved from Article 10-11; former Article 10-12 moved to Article 10-13 <Aug. 8, 2014>] Article 10-13 (Standards for Imposing and Calculating Administrative Surcharges) ① The standards for imposing and calculating administrative surcharges under Article 10-8 (2) of the Act shall be as specified in Annex 1-5. ② The Minister of Trade, Industry and Energy may increase or decrease the administrative surcharge within the range of one-half of the amount set forth in Annex 1-5, taking into consideration the scale of the business, the severity of the violation, and the frequency of violations. However, even if the administrative surcharge is increased, the total amount of the administrative surcharge shall not exceed the amount prescribed in Article 10-8, Paragraph 1 of the Act. <Amended July 28, 2010; March 23, 2013; October 1, 2025> [This Article was newly added on July 11, 2008.] [Moved from Article 10-12; former Article 10-13 moved to Article 10-14 <Aug. 8, 2014>] Article 10-14 (Procedures for Imposition and Collection of Surcharges) ① When the Minister of Trade, Industry and Energy imposes a surcharge pursuant to Article 10-8, Paragraph 1 of the Act, he/she shall notify the person concerned in writing to pay the surcharge, specifying the type of the violation and the amount of the surcharge. <Amended Mar. 23, 2013; Oct. 1, 2025> ② Any person who has received notice pursuant to Paragraph 1 shall pay the administrative surcharge to the receiving agency designated by the Minister of Trade, Industry and Energy within 20 days. <Amended Mar. 23, 2013; Dec. 12, 2023; Oct. 1, 2025> ③ The receiving agency that has received the administrative surcharge pursuant to Paragraph 2 shall issue a receipt to the payer and notify the Minister of Trade, Industry and Energy of that fact without delay. <Amended Mar. 23, 2013; Oct. 1, 2025> ④ Deleted <December 12, 2023> ⑤ In the proviso to Article 10-8, Paragraph 3 of the Act, “unavoidable reasons prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” means any of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. In the event that an impediment occurs to the operation of gas production facilities, such as damage or breakdown of the natural gas storage facilities of a natural gas importer/exporter. 2. Cases where a natural gas importer/exporter is unable to conduct normal business operations due to bankruptcy, etc. [This Article was newly added on July 11, 2008.] [Moved from Article 10-13; former Article 10-14 moved to Article 10-15 <Aug. 8, 2014>] Article 10-15 (Request for Cooperation from Relevant Administrative Agencies) If necessary to issue an administrative disposition pursuant to Article 10-7 or Article 10-8 of the Act, the Minister of Trade, Industry and Energymay request relevant administrative agencies to provide cooperation necessary for the investigation of said violations. <Amended Mar. 23, 2013; Oct. 1, 2025> [This Article Newly Inserted July 11, 2008] [Moved from Article 10-14 <Aug. 8, 2014>] Article 10-16 (Application for Registration, etc. of a Marine Natural Gas Business) ① A person who intends to register a marine natural gas business under the first sentence of Article 10-11 (1) of the Act shall submit an application for registration or amended registration in attached Form No. 11-4 (including an electronic application; hereinafter the same applies), accompanied by the documents specified in the following subparagraphs, to the Minister of Trade, Industry and Resources. <Amended Oct. 1, 2025> 1. Business Plan 2. In the case of a corporation, the articles of incorporation. However, if the articles of incorporation have been submitted to the Minister of Trade, Industry and Energy or the Mayor/Do Governor in accordance with other laws and regulations and can be verified, they may not be attached. 3. Documents proving ownership or lease of storage facilities ② Any person who intends to register a change of registration for a marine natural gas business pursuant to the latter part of Paragraph 1 of Article 10-11 of the Act shall submit to the Minister of Trade, Industry and Energy, within 30 days from the date of the change, an application for registration (change of registration) of a marine natural gas business in the form of Annex 11-4, attached with documents proving the details of the change. <Amended Oct. 1, 2025> ③ Upon receiving an application pursuant to Paragraph 2, the Minister of Trade, Industry and Energy shall verify the Certificate of Corporate Registration (applicable only to corporations in cases of changing the representative pursuant to Subparagraph 2 of Article 6-7 of the Enforcement Decree) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. <Amended Oct. 1, 2025> [This Article Newly Inserted Aug. 5, 2020] Article 10-17 (Notification of Commencement, Suspension, and Closure of Business) Any person who intends to report the commencement, suspension, or closure of business pursuant to Article 10-12 of the Act shall submit a Notification of Commencement (Suspension/Closure) of Marine Natural Gas Business in the form of Annex 11-5 to the Minister of Trade, Industry and Energy within 30 days from the date the cause for reporting occurred. <Amended Oct. 1, 2025> [This Article Newly Inserted Aug. 5, 2020] Article 10-18 (Reporting of Imports and Exports of Natural Gas for Ships, etc.) ① A marine natural gas business operator who wishes to report the conclusion or amendment of a natural gas import, export or transportation contract under Article 10-13 (1) of the Act shall, within seven days after concluding or amending the contract, submit a natural gas contract report or change report using attached Form No. 11-6, accompanied by the documents specified in the following subparagraphs, to the Minister of Trade, Industry and Resources. <Amended Oct. 1, 2025> 1. Two copies of the natural gas import, export, or transport contract (if the contract is written in a foreign language, one copy of the Korean translation must be attached) 2. One copy of the natural gas sales plan 3. One copy of documents proving the changes (applicable only to notification of changes) ② Pursuant to Article 10-13, Paragraph 2 of the Act, a marine natural gas business operator shall notify the Minister of Trade, Industry and Energy of the matters set forth in each of the following subparagraphs at least 30 days prior to the scheduled date of conclusion of a natural gas import or export contract. However, if the term of the natural gas import or export contract is one year or less, notification shall be given at least 3 days prior. <Amended Oct. 1, 2025> 1. Annual Natural Gas Import and Export Plan 2. Natural Gas Sales Plan 3. Contracting party and quality of natural gas [This Article Newly Inserted Aug. 5, 2020] Article 10-19 (Standards for Administrative Dispositions against Shipboard Natural Gas Business Operators) The standards for dispositions by violation pursuant to Article 10-15, Paragraph 3 of the Act are as set forth in Table 1-6. [This Article Newly Inserted Aug. 5, 2020] Article 11 (Subjects of Approval for Construction Plans, etc.) ① Installation and modification works of gas supply facilities requiring approval or modification approval pursuant to Article 11, Paragraph 1 of the Act are as set forth in Attached Table 2. ② Installation and modification works of gas supply facilities for which a report or modification report must be submitted pursuant to Article 11, Paragraph 2 of the Act are as set forth in Attached Table 3. [Wholly Amended July 11, 2008] Article 12 (Application for Approval of Construction Plan, etc.) ① Any person who intends to obtain approval or approval for modification of a construction plan pursuant to Article 11, Paragraphs 1 and 4 of the Act shall submit an application in the form of Annex 13 to the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head; andany person who intends to report or report modification of a construction plan pursuant to Article 11, Paragraphs 2 and 4 of the Act shall submit a report in the form of Annex 14 to the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head no later than three days prior to the commencement of the construction. <Amended July 28, 2010; March 23, 2013; May 23, 2022; October 1, 2025> ② The Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head who receives an application under Paragraph 1 shall verify the Construction Business Registration Certificate pursuant to Article 9-2, Paragraph 1 of the Framework Act on the Construction Industry through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. However, if the applicant does not consent to the verification by the public official in charge, a copy thereof shall be required to be attached. <Newly added Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Oct. 1, 2025> ③ The application or report under Paragraph 1 shall be accompanied by the documents specified in each of the following subparagraphs. <Amended Sep. 25, 2009> 1. Construction Plan 2. Construction Schedule 3. In case of changing the construction plan, a statement of reasons for the change 4. Technical review document pursuant to Paragraph 7 5. Deleted <September 25, 2009> 6. A copy proving the qualifications of the construction manager (referring to a construction technician pursuant to Article 40 of the Framework Act on the Construction Industry ; hereinafter the same applies). 7. Copies of documents proving the estimated cost of the relevant construction project, such as the detailed statement of estimated costs. ④ When the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head grants approval or approval for modification of a construction plan pursuant to Article 11, Paragraph 1 of the Act, or receives a report or report for modification of a construction plan pursuant to Article 11, Paragraph 2 of the Act, they shall record it in the Register of Approvals and Reports of Construction Plans (Modifications) for Gas Supply Facilities in accordance with Form No. 41, issue a Certificate of Approval (Modification) for Construction Plans or a Certificate of Reporting (Modification) for Construction Plans in accordance with Form No. 42, and notify the Korea Gas Safety Corporation thereof. <Amended July 28, 2010; March 23, 2013; October 1, 2025> ⑤ In Article 11, Paragraph 5, Subparagraph 3 of the Act, “installation or modification works of gas supply facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the works set forth in each of the following subparagraphs. <Newly added Sep. 25, 2009; Mar. 23, 2013; Oct. 7, 2014; Aug. 25, 2020; May 23, 2022; Oct. 1, 2025> 1. Work involving the installation or modification of at least 50 meters of a user supply pipeline whose maximum operating pressure is low pressure, excluding work falling under any of the following items. a. Work to install or modify a user supply pipeline connected to a low-pressure supply pipeline with a nominal diameter not exceeding 50 millimeters (or a nominal outside diameter of 63 millimeters for polyethylene gas pipes under KS M 3514; hereinafter the same applies) b. A change to the scope of work for which a technical review report was issued by the Korea Gas Safety Corporation under paragraph (7), where the pipeline length is reduced or increased by no more than one-tenth of its length or by less than 50 meters 2. Construction work on pressure regulating stations or pressure regulators that falls under any of the following subparagraphs a. Work to change the type of safety valve B. Work to change the capacity or model of the pressure regulator c. Installation or modification work on metering equipment (only applicable to work on changing flow rate or model) D. Installation or modification work for heating equipment ⑥ Any person who wishes to hear the opinion of the Korea Gas Safety Corporation pursuant to Article 11, Paragraph 5 of the Act shall submit an application for technical review in the form of Annex 15 to the Korea Gas Safety Corporation, attaching the documents specified in each of the following subparagraphs. <Amended Sep. 25, 2009; May 23, 2022> 1. Installation plan for facilities (in the case of facility changes, only the changed part applies) 2. Explanatory statement regarding facility standards and technical standards (in the case of facility changes, only the changed part applies) 3. Drawings (in the case of piping, they must be prepared in accordance with Item 3, Subparagraph (a) 1)a) of Attached Table 5 ; in the case of facility changes, only the changed portion applies) ⑦ When the Korea Gas Safety Corporation receives an application for technical review pursuant to Paragraph 6, it shall prepare a technical review report and issue it to the applicant within the period specified in each of the following subparagraphs. <Amended Sep. 25, 2009; Jul. 25, 2013> 1. In the case of city gas manufacturing plants: 15 days 2. In the case of supply stations, pressure regulating stations, valve stations, and city gas filling stations: 7 days 3. In the case of piping, pressure regulators, and specific gas-using facilities: 5 days [Wholly Amended July 11, 2008] Article 13 (Criteria for Approval of Construction Plans) When the Minister of Trade, Industry and Energy or a Mayor, County Governor, or District Head receives an application for approval or approval of modification of a construction plan pursuant to Article 11, Paragraph 1 of the Act, approval shall be granted only if the plan for the installation or modification of gas supply facilities conforms to any of the following subparagraphs. <Amended Sep. 25, 2009; Nov. 4, 2011; Mar. 23, 2013; Oct. 1, 2025> 1. It must be consistent with the contents of the permit pursuant to Article 3 of the Act 2. It shall comply with the facility standards and technical standards for gas supply facilities pursuant to Article 17. 3. The process of installation or modification work shall be suitable for the smooth supply of city gas. 4. The contractor must be a person registered as a Class 1 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry. 5. The construction plan shall conform to the technical review report pursuant to Article 12, Paragraph 7. [Wholly Amended July 11, 2008] Article 13-2 (Notification of Installation of Emergency Supply Facilities) Any person who has installed emergency supply facilities pursuant to Article 11-2, Paragraph 1 of the Act shall, without delay, submit a Notification of Installation of Emergency Supply Facilities in the form of Annex 12, attached with the documents specified in each of the following subparagraphs, to the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head. <Amended Mar. 23, 2013; May 23, 2022; Oct. 1, 2025> 1. Statement of Justification for Installation of Emergency Supply Facilities 2. Drawing specifying the supply area by emergency supply facilities 3. Installation Location and Surrounding Context 4. Status of Safety Manager Deployment [Wholly Amended July 11, 2008] Article 14 Deleted <September 12, 1997> Article 15 (Notification of Construction Details, etc.) ① The installation or modification works of gas supply facilities or gas usage facilities for which a contractor must notify the relevant city gas business operator of the details of construction in advance pursuant to Article 12, Paragraph 1 of the Act shall be the installation or modification works specified in each of the following subparagraphs in areas not included in the regional gas supply facility construction plan announced by the Mayor or Provincial Governor pursuant to Article 18-3, Paragraph 1 of the Act. <Amended Nov. 4, 2011> 1. Installation or modification work for gas supply facilities or gas usage facilities with 10 or more users 2. Installation or modification work of specific gas usage facilities pursuant to Article 20-2, Paragraph 1 (excluding Subparagraph 3) ② Pursuant to Article 12, Paragraph 1 of the Act, the contractor shall notify the relevant city gas business operator of the matters set forth in each of the following subparagraphs at least 15 days prior to the commencement date of construction, and the relevant city gas business operator shall notify the contractor and any person intending to use city gas of the results of the review regarding the installation plan of gas supply facilities and the impact on supply capacity, etc., within 7 days from the date of receiving notification from the contractor. <Amended Sep. 25, 2009> 1. Construction Period 2. Details of Facility Construction 3. Number of users and estimated usage 4. Expected timing of city gas usage 5. Address, name, and telephone number of the user 6. Name and Qualifications of Construction Manager [Wholly Amended July 11, 2008] Article 16 Deleted <July 1, 1999> Article 17 (Facility Standards and Technical Standards) The facility standards and technical standards for gas supply facilities and gas usage facilities pursuant to Article 12, Paragraph 2 of the Act are as follows. <Amended Jul. 28, 2010; Aug. 8, 2014; Aug. 5, 2020> 1. Facility and Technical Standards for Gas Supply Facilities in the Gas Wholesale Business: Appendix 5 2. Facility Standards and Technical Standards for Gas Supply Facilities in General City Gas Businesses: Appendix 6 3. Facility and Technical Standards for Gas Filling Facilities in City Gas Filling Businesses: Appendix 6-2 4. Facility and Technical Standards for Gas Supply Facilities in Naphtha By-product Gas Manufacturing Businesses: Appendix 6-3 5. Facility and Technical Standards for Gas Supply Facilities in Biogas Manufacturing Businesses: Appendix 6-4 6. Facility and Technical Standards for Gas Supply Facilities in Synthetic Natural Gas Manufacturing Businesses: Appendix 6-5 6-2. Facility and Technical Standards for Gas Supply Facilities in Marine Natural Gas Business: Appendix 6-6 7. Facility Standards and Technical Standards for Gas Usage Facilities: Appendix 7 [Wholly Amended July 11, 2008] Article 18 Deleted <September 12, 1997> Article 19 Deleted <July 1, 1999> Article 20 (Preservation of Construction Records and As-Built Drawings, etc.) ① Under Article 14 (1) of the Act, the constructor shall prepare and preserve the construction records specified in the following subparagraphs (for a person registered for Class 3 gas facility construction under Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry, a confirmation of gas boiler installation, construction and insurance may be substituted) and as-built drawings (for hot-water boilers, water heaters and auxiliary facilities, photographs verifying the construction may be substituted). The constructor shall provide copies to the city gas business operator and the user of a specified gas-using facility under Article 20-2 (1) (excluding subparagraph 2 (a)) within seven days after completing the construction. <Amended July 25, 2013> 1. Records and reports regarding non-destructive testing (in the case of polyethylene tubes, records and reports regarding fusion bonding) 2. Drawings based on non-destructive testing (fusion joining) 3. Non-destructive testing film 4. Report on Potential Measurement of Electrocorrosion Prevention Facilities 5. Photos of construction work at locations requiring special management, such as obstacles and bedrock ② The contractor shall preserve the completed drawings pursuant to Paragraph 1 and the non-destructive inspection films pursuant to Subparagraph 3 of the same Paragraph (or the data entered into a computer auxiliary storage device if applicable) for five years, and the city gas business operator and the user of a specific gas usage facility shall preserve copies of the completed drawings (or the data entered into a computer auxiliary storage device if applicable) permanently. <Amended Sep. 25, 2009> ③ Pursuant to Article 14, Paragraph 3 of the Act, a city gas business operator shall submit the completed drawings of the facility (or the data entered into a computer auxiliary storage device if applicable) to the Korea Gas Safety Corporation by the time specified in each of the following subparagraphs, starting from the date of receipt of copies of construction records, etc., from the contractor. However, this shall not apply if the completed drawings were submitted to the Korea Gas Safety Corporation during construction supervision or completion inspection pursuant to Article 21, Paragraphs 1 and 4. <Amended July 28, 2010; July 25, 2013; October 7, 2014; August 25, 2020> 1. Supply Facilities: When applying for a periodic inspection in the year of the first periodic inspection. 2. Gas-using facilities [referring only to specific gas-using facilities pursuant to Article 20-2, Paragraph 1 (excluding Subparagraph 2, Item (a))]: Within 7 days [Wholly Amended July 11, 2008] Article 20-2 (Specific Gas Usage Facilities) ① In Article 14, Paragraph 2 of the Act, the term “gas usage facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to any gas usage facility falling under any of the following subparagraphs (hereinafter referred to as “specific gas usage facilities”). <Amended Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Jul. 25, 2013; Mar. 24, 2020; Oct. 31, 2024; Oct. 1, 2025> 1. Gas usage facilities with a projected monthly usage of 2,000 cubic meters or more (1,000 cubic meters in the case of being located within a Class 1 protection facility). However, gas usage facilities located within power generation facilities that generate electricity using city gas among electrical facilities under Article 2, Item 16 of the Electric Power Business Act (only facilities after the gas shut-off valve installed in front of a gas turbine, gas engine, gas boiler, or fuel cell) and gas usage facilities corresponding to equipment subject to inspection under Article 39, Paragraph 1 of the Energy Use Rationalization Act (hereinafter referred to as “equipment subject to inspection” in this Article and Article 64, Paragraph 2) shall be excluded. 2. Gas-using facilities with an estimated monthly usage of less than 2,000 cubic meters (1,000 cubic meters in the case of being located within a Class 1 protected facility) that fall under any of the following subparagraphs a. Gas usage facilities in which internal pipes and ancillary facilities are installed by being embedded or buried in floors, walls, etc. (excluding household gas usage facilities) B. Gas-using facilities used by a large number of people that are designated by the Mayor or Provincial Governor as necessary for safety management 3. Gas usage facilities of vehicles (including yard tractors) that use city gas as fuel 4. A gas-using facility equipped with a slow-charging compressed natural gas (CNG) refueling facility for automobiles pursuant to Article 2, Paragraph 5, Subparagraph 8 of the Enforcement Rule of the High-Pressure Gas Safety Management Act (hereinafter referred to as “slow-charging facility for automobiles”) and refueling city gas into automobiles. 5. Gas usage facilities that install liquefied natural gas storage tanks and use natural gas (excluding parts through which high-pressure gas flows; hereinafter referred to as “liquefied natural gas storage tank installation and usage facilities”) ② The criteria for calculating the estimated monthly usage amount pursuant to Paragraph 1, Subparagraphs 1 and 2 shall be in accordance with Subparagraph 6, Item (a) of Annex 7 ; provided, however, that when calculating the estimated monthly usage amount for gas-using facilities that include equipment subject to inspection under the proviso of Paragraph 1, Subparagraph 1, the estimated monthly usage amount of the equipment subject to inspection shall also be included. <Amended Nov. 4, 2011> [Wholly Amended July 11, 2008] Article 21 (Scope of Construction Supervision, Intermediate Inspection, and Final Inspection, etc.) ① Installation or modification works of gas supply facilities subject to construction supervision pursuant to Article 15, Paragraph 1 of the Act shall be the works listed in each of the following subparagraphs. <Amended Sep. 25, 2009; Jul. 28, 2010; Feb. 21, 2014> 1. Construction projects subject to approval of construction plans as specified in Attached Table 2 2. Construction subject to the construction plan notification requirements in Attached Table 3 3. Installation or modification work of gas supply facilities falling under any of the following items that are excluded from the scope of construction plan approval under Attached Table 2 a. Main pipelines b. Supply pipelines with a maximum operating pressure at or above medium pressure c. Pipelines inside a pressure-regulating station d. Pipelines inside a valve station 4. Installation or alteration work of supply pipes excluded from the scope of construction plan reporting under Attached Table 3. However, this shall not apply in any of the following cases: a. Low-pressure supply pipes with a nominal diameter exceeding 50 millimeters and a length of less than 20 meters B. Low-pressure supply pipes with a nominal diameter of 50 millimeters or less C. User supply pipe connected to a low-pressure supply pipe with a nominal diameter of 50 millimeters or less d. User supply pipelines less than 50 meters in length 5. Construction work for which approval of the construction plan has been obtained or a report has been filed, wherein the pipe length within the construction section is changed by increasing or decreasing by no more than one-tenth or less than 20 meters. 6. Construction pursuant to the first part of Article 12, Paragraph 5, Subparagraph 1 and Subparagraph 2 of the same paragraph ② In the proviso to Article 15, Paragraph 4 of the Act, “person prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a person using city gas at a specific gas-using facility under Article 20-2, Paragraph 1, Subparagraphs 3 and 4. <Newly added July 28, 2010; March 23, 2013; October 1, 2025> ③ The intermediate inspection processes for city gas filling facilities subject to intermediate inspection under Article 15, Paragraph 5 of the Act are as follows: <Newly added July 28, 2010> 1. A process in which the installation of gas facilities or piping is completed and a leak test or pressure test can be performed. 2. Process immediately before burying the storage tank underground 3. In the case of installing pipelines underground, the process immediately prior to burying the portion designated by the Korea Gas Safety Agency 4. Process for conducting non-destructive testing on parts designated by the Korea Gas Safety Agency 5. Foundation installation process for protective walls or storage tanks 6. Foundation Installation Process for Equipment Subject to Seismic Design ④ Installation or modification works for gas filling facilities and specific gas usage facilities subject to completion inspection pursuant to Article 15, Paragraph 6 of the Act shall be as follows: <Amended Sep. 25, 2009; Jul. 28, 2010> 1. Installation work for gas filling facilities 2. Installation work for specific gas usage facilities 3. Construction work resulting from the modification of gas filling facilities falling under the provisions of Article 4, Paragraph 2, Subparagraphs 1 through 8 4. Modification work on specific gas-using facilities falling under any of the following subparagraphs a. Modification work on gas usage facilities converted to specific gas usage facilities due to an increase in city gas consumption B. Modification work involving the expansion, replacement, or relocation of piping with a nominal diameter of 50 millimeters or more at specific gas-using facilities, with a total length of 20 meters or more C. Construction work involving the alteration of piping for specific gas-using facilities, wherein the planned monthly usage is increased by 500 cubic meters or more, or modification work involves the relocation of facilities with a planned monthly usage of 500 cubic meters or more. D. Modification work for the expansion, replacement (excluding cases where replacement is made with the same flow rate), or relocation of pressure regulators or pressure adjusters of specific gas-using facilities ⑤ Any person intending to carry out installation or modification work on a specific gas-using facility pursuant to Paragraph 4 (excluding installation or modification work on facilities with an estimated monthly usage of less than 500 cubic meters among specific gas-using facilities excluding those under Article 20-2, Paragraph 1, Subparagraph 2, Item (a)) shall obtain a technical review from the Korea Gas Safety Agency in advance regarding the construction plan. In this case, if the contractor receives the technical review on behalf of the user of the specific gas-using facility, they shall notify the user of such fact and the results of the review. <Amended Oct. 31, 2024> ⑥ Paragraphs 6 and 7 of Article 12 shall apply mutatis mutandis to the technical review pursuant to Paragraph 5. <Amended Sep. 25, 2009; Jul. 28, 2010> ⑦ When the Korea Gas Safety Agency receives notification of matters concerning construction project management pursuant to Article 15, Paragraph 3 of the Act, it shall verify whether the installation or modification work of gas supply facilities is being managed under the Construction Technology Promotion Act. <Amended July 28, 2010; March 24, 2020> ⑧ If a user of a specific gas-using facility pursuant to Article 20-2, Paragraph 1, Subparagraph 3 has undergone an inspection for the installation of a pressure vessel pursuant to Article 35-7 of the Automobile Management Act, an inspection pursuant to Article 13, Paragraph 1 of the Construction Machinery Management Act, or reported facility equipment pursuant to Article 31, Paragraph 1 of the Ports Act, such user shall be deemed to have received the completion inspection pursuant to Article 15, Paragraph 6 of the Act. <Newly added July 25, 2013; August 25, 2020; October 31, 2024> [Wholly Amended Jul. 11, 2008] [Title Amended Jul. 28, 2010] Article 22 (Applications for Construction Supervision, Intermediate Inspection and Completion Inspection, etc.) ① An application for construction supervision under Article 15 (1) of the Act shall be submitted using attached Form No. 19 with the construction schedule. However, in any of the cases specified in the following subparagraphs, the constructor may apply for construction supervision on behalf of the city gas business operator, and shall notify the operator thereof. <Amended July 25, 2013; May 23, 2022> 1. Where the contractor has obtained approval or approval for a change of construction plan, or has filed a report or a report for a change, in accordance with Article 11, Paragraph 4 of the Act 2. When the contractor performs user supply pipe construction ② A supervisor pursuant to Article 15, Paragraph 2 of the Act shall issue a construction supervision certificate in the form of Annex 21 to a gas supply facility that has been judged to be suitable for use as a result of the supervision. ③ The application for an interim inspection pursuant to Article 15, Paragraph 5 of the Act shall be in accordance with Form No. 19-2 of the Attached Form. ④ An application for a completion inspection pursuant to Article 15, Paragraph 6 of the Act shall be submitted using Form No. 20 of the Attached Form, with the completion drawings attached (excluding gas filling facilities). However, in the case of specific gas usage facilities, the contractor of the installation or modification work or the automobile manufacturer may apply for the completion inspection on behalf of the user of the specific gas usage facility and shall notify the user of such fact and the inspection results. <Amended July 25, 2013; October 31, 2024> ⑤ The completion inspection agency pursuant to Article 15, Paragraph 6 of the Act shall issue a Certificate of Completion Inspection in the form of Annex 21-2 to gas filling facilities and specific gas usage facilities that have passed the completion inspection for installation work under Article 21, Paragraph 4, Subparagraphs 1 and 2, or modification work under Subparagraphs 3 and 4(a) of the same Paragraph, and shall issue a Certificate of Completion Inspection with the inspection details written on the back for specific gas usage facilities that have passed the completion inspection for modification work under Article 21, Paragraph 4, Subparagraphs 4(b) through 4(d). In this case, the city gas business operator supplying city gas to the specific gas usage facility shall be notified of such fact. [Wholly Amended July 28, 2010] Article 23 (Standards, etc. for Construction Supervision, Intermediate Inspection, and Final Inspection) ① Construction supervision, intermediate inspection, and final inspection pursuant to Article 15, Paragraphs 1, 5, and 6 of the Act shall comply with the standards set forth in each of the following subparagraphs. <Amended July 28, 2010; November 4, 2011; August 8, 2014> 1. It must conform to the construction plan approved or reported pursuant to Article 11 of the Act. However, among the gas supply facilities subject to construction supervision pursuant to Article 21, Paragraph 1, gas supply facilities excluded from approval or reporting must conform to the technical review report pursuant to Article 12, Paragraph 7. 2. The work must have been constructed and managed by a person registered as a Class 1 through Class 3 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry and a construction manager. 3. The construction details shall comply with the facility standards and technical standards for gas supply facilities or gas usage facilities pursuant to Annexes 5, 6, 6-2, 6-3, 6-4, 6-5, and 7. ② The inspection standards for each type of facility subject to construction supervision, intermediate inspection, and final inspection pursuant to Paragraph 1 are as follows: <Amended Jul. 28, 2010; Aug. 8, 2014> 1. Construction Supervision Standards for Gas Supply Facilities in Gas Wholesale Business: Appendix 5 2. Construction Supervision Standards for Gas Supply Facilities in General City Gas Businesses: Appendix 6 3. Standards for Intermediate and Final Inspections of Gas Filling Facilities in City Gas Filling Businesses: Attached Table 6-2 4. Construction Supervision Standards for Gas Supply Facilities in Naphtha By-product Gas Manufacturing Businesses: Appendix 6-3 5. Construction Supervision Standards for Gas Supply Facilities in Biogas Manufacturing Businesses: Appendix 6-4 6. Construction Supervision Standards for Gas Supply Facilities in Synthetic Natural Gas Manufacturing Businesses: Attached Table 6-5 7. Standards for Completion Inspection of Gas Usage Facilities: Appendix 7 ③ The construction supervision referred to in Paragraph 1 shall be classified into construction supervision of major processes performed during the construction period by a person qualified as an inspector pursuant to Article 61 of the Enforcement Rules of the High-Pressure Gas Safety Management Act (hereinafter referred to as “Supervisor”) in accordance with Annex 6, Item 3, Subparagraph (c), Item 3; Annex 6-3, Item 3 ; Annex 6-4, Item 3; and construction supervision of partial processes performed at the construction site for each of the processes listed in the following subparagraphs. <Amended Feb. 21, 2014; Aug. 8, 2014> 1. A process equipped with gas generation facilities (excluding biogas capture facilities), gas purification facilities, calorific value adjustment facilities, odorant injection facilities, gas holders, storage tanks, or refrigeration facilities, in a state where pressure resistance tests or airtightness tests can be performed. 2. Process of conducting non-destructive testing on parts designated by the supervisor 3. In the case of installing piping underground, the process immediately before burying the section designated by the supervisor. 4. In the case of installing storage tanks underground, the process immediately before burying 5. Other processes determined by the supervisor ④ The subjects of construction supervision for major processes and construction supervision for partial processes pursuant to Paragraph 3 are classified as follows. <Amended Sep. 25, 2009; Feb. 21, 2014; Aug. 8, 2014> 1. Subjects of Construction Supervision for Major Processes a. Piping (including ancillary facilities) of general city gas business operators and gas supply facility installers other than city gas business operators B. Pipelines (including ancillary facilities) of naphtha byproduct gas and biogas manufacturers and synthetic natural gas manufacturers 2. Subject to Construction Supervision for Partial Processes A. Gas supply facilities of gas wholesalers B. Gas supply facilities of general city gas business operators, naphtha byproduct gas and biogas manufacturers, synthetic natural gas manufacturers, and gas supply facility installers other than city gas business operators, excluding the facilities under Item 1. C. User supply pipes (including their ancillary facilities) subject to construction supervision pursuant to Article 21, Paragraph 1 [Wholly Amended Jul. 11, 2008] [Title Amended Jul. 28, 2010] Article 24 (Temporary Use of Gas Supply Facilities) ① A person who wishes to use gas supply facilities temporarily under Article 16 (1) of the Act shall submit an application for temporary use in attached Form No. 23, accompanied by a temporary-use plan, to the Minister of Trade, Industry and Resources or the mayor, county head or district head. <Amended Mar. 23, 2013; Oct. 1, 2025> ② Upon receiving an application under Paragraph 1, the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head shall review the suitability of temporary use and notify the results within 2 days. <Amended July 28, 2010; March 23, 2013; October 1, 2025> [Wholly Amended July 11, 2008] Article 25 (Periodic Inspections) ① An application for periodic inspection under Article 17 of the Act shall be submitted using attached Form No. 20. ② The inspection standards for each subject of periodic inspection pursuant to Article 17 of the Act are as follows: <Amended July 28, 2010; August 8, 2014> 1. Standards for Periodic Inspection of Gas Supply Facilities in Gas Wholesale Business: Appendix 5 2. Standards for Periodic Inspection of Gas Supply Facilities in General City Gas Businesses: Appendix 6 3. Standards for Periodic Inspection of Gas Filling Facilities in City Gas Filling Businesses: Attached Table 6-2 4. Standards for Periodic Inspection of Gas Supply Facilities for Naphtha By-product Gas Manufacturing Businesses: Appendix 6-3 5. Standards for Periodic Inspection of Gas Supply Facilities for Biogas Manufacturing Businesses: Appendix 6-4 6. Periodic Inspection Standards for Gas Supply Facilities in Synthetic Natural Gas Manufacturing Businesses: Appendix 6-5 7. Standards for Periodic Inspection of Gas Usage Facilities: Appendix 7 ③ Periodic inspections pursuant to Article 17 of the Act shall be received within 30 days before or after the date marking one year from each of the following dates (ten years for senior citizen centers pursuant to Article 36, Paragraph 1, Subparagraph 2 of the Senior Welfare Act and home childcare centers pursuant to Article 10, Subparagraph 5 of the Infant Care Act among gas usage facilities pursuant to Article 20-2, Paragraph 1, Subparagraph 2, Items A and B). However, the date for periodic inspection of gas supply facilities (excluding gas filling facilities; hereinafter the same applies in this paragraph) may be determined separately by the Korea Gas Safety Corporation in consultation with the city gas business operator, and the date for periodic inspection of specific gas usage facilities may be determined separately by Eup, Myeon, and Dong if the President of the Korea Gas Safety Corporation deems it necessary. <Amended Sep. 25, 2009; Jul. 28, 2010; Jul. 25, 2013; Oct. 31, 2024> 1. For gas supply facilities subject to construction supervision pursuant to Article 21, Paragraph 1, the date on which the construction supervision certificate was first received 2. Among gas supply facilities not subject to construction supervision under Article 21, Paragraph 1, for any of the following gas supply facilities, the date on which the installation of such facility is completed a. Low-pressure supply pipes with a nominal diameter of 50 millimeters or less b. User supply pipes with a length of less than 50 meters (excluding user supply pipes connected to low-pressure supply pipes with a nominal diameter of 50 millimeters or less) c. Low-pressure supply pipes with a nominal diameter exceeding 50 millimeters and a length of less than 20 meters 3. For gas filling facilities and specific gas usage facilities subject to completion inspection pursuant to Article 21, Paragraph 4, the date on which the certificate of completion inspection was first received. ④ In cases where there are interconnected facilities among gas supply facilities or specific gas usage facilities and the timing for periodic inspections differs, the periodic inspection of other facilities may be conducted together during the periodic inspection period of the facility that must be inspected first. ⑤ If a person who has received a completion inspection of a specific gas-using facility pursuant to Article 20-2, Paragraph 1, Subparagraph 3 has received a periodic inspection or structural modification inspection pursuant to Article 43, Paragraph 1 of the Automobile Management Act, Article 13, Paragraph 1 of the Construction Machinery Management Act, or Article 33, Paragraph 1, Subparagraph 3 of the Ports Act, he/she shall be deemed to have received the periodic inspection pursuant to Article 17, Paragraph 1 of the Act. <Newly added July 28, 2010; August 25, 2020; October 31, 2024> ⑥ The President of the Korea Gas Safety Corporation shall issue a Certificate of Periodic Inspection in the form of Annex 22 to any person who has passed the initial periodic inspection of gas supply facilities pursuant to Article 17 of the Act. <Amended Oct. 31, 2024> ⑦ The President of the Korea Gas Safety Corporation (or the head of the relevant inspection agency in cases where the periodic inspection duties for specific gas-using facilities have been entrusted to an inspection agency pursuant to Article 35 of the High -Pressure Gas Safety Management Act pursuant to Article 26, Paragraph 3 of the Enforcement Decree) shall issue a Certificate of Periodic Inspection in the form of Annex 22-2 to any person who has passed the initial periodic inspection of a specific gas-using facility pursuant to Article 17 of the Act. In this case, the city gas business operator supplying city gas to said specific gas-using facility (excluding specific gas-using facilities falling under Article 20-2, Paragraph 1, Subparagraph 3) shall be notified of such fact. <Amended Sep. 25, 2009; Jul. 28, 2010; Oct. 31, 2024> [Wholly Amended July 11, 2008] Article 26 (Ad Hoc Inspections) ① The Korea Gas Safety Corporation shall conduct an ad hoc inspection under Article 17 of the Act when it considers such an inspection necessary to prevent city gas accidents or otherwise ensure gas safety. <Amended Sep. 25, 2009> ② The Korea Gas Safety Corporation shall notify the person subject to an ad hoc inspection in advance, except where prior notice would prevent the inspection from achieving its purpose or cannot be given for another urgent reason. ③ The standards for ad hoc inspection under Article 17 of the Act for each type of facility shall be as follows. <Amended July 28, 2010; Aug. 8, 2014> 1. Standards for ad hoc inspection of gas supply facilities in a gas wholesale business: Annex 5 2. Standards for ad hoc inspection of gas supply facilities in a general city gas business: Annex 6 3. Standards for ad hoc inspection of gas filling facilities in a city gas filling business: Annex 6-2 4. Standards for ad hoc inspection of gas supply facilities in a naphtha by-product gas manufacturing business: Annex 6-3 5. Standards for ad hoc inspection of gas supply facilities in a biogas manufacturing business: Annex 6-4 6. Standards for ad hoc inspection of gas supply facilities in a synthetic natural gas manufacturing business: Annex 6-5 7. Standards for ad hoc inspection of gas-using facilities: Annex 7 [Wholly Amended July 11, 2008] Article 27 (Exemption from Periodic Inspection) Any person who wishes to be exempted in whole or in part from periodic inspection pursuant to the proviso to Article 17, Paragraph 1 of the Act shall submit an application for exemption from periodic inspection in the form of Annex 24, attached with the documents set forth in each of the following subparagraphs, to the Minister of Trade, Industry and Energy or the Mayor, County Governor, or District Head. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Records of implementation of safety management regulations for the past two years 2. Performance of periodic inspections over the past 2 years 3. Review Opinion of the Korea Gas Safety Agency regarding Safety [Wholly Amended July 11, 2008] Article 27-2 (Subjects of Detailed Safety Diagnosis and Safety Assessment) In Article 17-2, Paragraph 1 of the Act, the term “gas supply facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to facilities classified according to each of the following subparagraphs. <Amended Mar. 23, 2013; July 25, 2013; Feb. 21, 2014; Jan. 5, 2018; Dec. 22, 2023; Oct. 1, 2025> 1. Detailed Safety Diagnosis: Gas supply facilities classified according to the following items a. A liquefied natural gas receiving terminal (excluding LNG storage tanks under item (d)) for which 15 years have passed since the date its construction supervision certificate was first issued (for a date before November 4, 1995, the date of receipt of the completion inspection certificate under Article 15 (2) of the former Urban Gas Business Act and Article 16 (5) of its Enforcement Rule; hereinafter the same applies in this Article and Articles 27-3 and 27-5) B. Main and supply pipes with a maximum operating pressure of 1 megapascal or higher that have been in operation for more than 15 years since the date the initial construction supervision certificate was received. C. Main and supply pipes (excluding user supply pipes) with a maximum operating pressure of 0.1 megapascals or more and less than 1 megapascal, for which 20 years have passed since the date the initial construction supervision certificate was received. d. An LNG storage tank at an LNG receiving terminal for which five years have passed since the date a certificate of successful inspection was issued under Article 17 (6) of the High-Pressure Gas Safety Control Act (for an LNG storage tank manufactured before August 31, 1998, the date of completion of that tank; hereinafter the same applies in Article 27-3) 2. Safety Assessment: Liquefied Natural Gas Receiving Terminal [Wholly Amended July 11, 2008] Article 27-3 (Timing and Standards, etc., for Detailed Safety Diagnosis and Safety Assessment) ① A detailed safety diagnosis pursuant to the main clause and proviso of Article 17-2, Paragraph 2, Subparagraph 1 of the Act (hereinafter referred to as “detailed safety diagnosis”) shall be received at the time specified in the classifications of each of the following subparagraphs. <Amended Feb. 21, 2014> 1. Facilities pursuant to Article 27-2, Subparagraph 1, Items (a) and (b) : Seas classified according to the following items a. The year in which 15 years have passed since the date the construction supervision certificate was first received B. Every fifth year from the year specified in Item A 2. Facilities under Article 27-2, subparagraph 1 (c): The years specified in the following items a. The year marking the 20th anniversary of the date the construction supervision certificate was first received B. Every fifth year from the year specified in Item A 3. Facilities under Article 27-2, subparagraph 1 (d): The years specified in the following items a. The year in which five years have elapsed since the date of receiving the certificate of conformity pursuant to Article 17, Paragraph 6 of the High-Pressure Gas Safety Management Act for the first time B. The year in which 15 years have elapsed since the date of the first receipt of the Certificate of Conformity pursuant to Article 17, Paragraph 6 of the High-Pressure Gas Safety Management Act c. Every fifth year from the year of item b ② The safety assessment pursuant to Article 17-2, Paragraph 2, Subparagraph 2 of the Act (hereinafter referred to as the “safety assessment”) shall be received at the time specified in each of the following subparagraphs. However, in cases falling under Subparagraph 2, notwithstanding Subparagraph 1, it shall be received at the time specified in Subparagraph 2. <Amended Sep. 25, 2009; Feb. 21, 2014> 1. Where an LNG receiving terminal is constructed: before submitting an application for technical review to the Korea Gas Safety Corporation under Article 12 (6), and every five years from the year in which a construction supervision certificate was received for the facility 2. Where an LNG storage tank is installed at an LNG receiving terminal: before submitting an application for technical review to the Korea Gas Safety Corporation under Article 12 (6), and every five years from the year in which a construction supervision certificate was received for the facility ③ If the timing for a safety assessment coincides with the timing for a detailed safety diagnosis or periodic inspection, the safety assessment and the detailed safety diagnosis or periodic inspection may be conducted at the same time. ④ Any person who intends to undergo a precise safety diagnosis or safety assessment shall submit an application for precise safety diagnosis or safety assessment in the form of Annex 24-2 to the Korea Gas Safety Corporation at least 60 days prior to the date on which the precise safety diagnosis or safety assessment is to be received. In this case, if the person intends to undergo a precise safety diagnosis, a precise safety diagnosis plan must be submitted together. <Amended Jul. 28, 2010; Feb. 21, 2014> ⑤ Pursuant to Article 17-2, Paragraph 3 of the Act, the Korea Gas Safety Corporation shall report the results to the Minister of Trade, Industry and Energy within 30 days from the date the precise safety diagnosis or safety assessment is completed, and notify the person who received the precise safety diagnosis or safety assessment. However, in the case of facilities under Article 27-2, Subparagraph 1, Item (c), notification shall also be given to the Mayor or Provincial Governor. <Newly added Feb. 21, 2014; Oct. 1, 2025> ⑥ Pursuant to Article 17-2, Paragraph 4 of the Act, if the Minister of Trade, Industry and Energy determines that measures such as repair or reinforcement of gas supply facilities are necessary as a result of a precise safety diagnosis or safety assessment, the Minister may order urban gas business operators and installers of gas supply facilities other than urban gas business operators under Article 39-2, Paragraph 1 of the Act to take such repair or reinforcement measures. <Amended Feb. 21, 2014; Oct. 1, 2025> ⑦ City gas business operators and gas supply facility installers other than city gas business operators under Article 39-2, Paragraph 1 of the Act shall prepare a plan for measures and submit it to the Minister of Trade, Industry and Energy within 30 days from the date of receiving the order for measures under Paragraph 6, and after completing the measures, prepare a report on the results of the measures and submit it to the Korea Gas Safety Corporation and the Minister of Trade, Industry and Energy. <Newly added Feb. 21, 2014; Oct. 1, 2025> ⑧ The specific standards and methods, etc. for precise safety diagnosis and safety assessment pursuant to Article 17-2, Paragraph 5 of the Act are as set forth in Annex 5, Item 1 (d) and Item 3 (d), Annex 6, Item 3 (d), Annex 6-3, Item 3, Annex 6-4, Item 3, and Annex 6-5, Item 3. <Newly added Feb. 21, 2014; Aug. 8, 2014> [Wholly Amended July 11, 2008] Article 27-4 (Safety Management Level Evaluation) ① Any city gas business operator who intends to undergo a quantitative evaluation of management and operation performance conducted by the Korea Gas Safety Corporation pursuant to Article 17-3, Paragraph 1 of the Act (hereinafter referred to as “Safety Management Level Evaluation”) shall submit an application for the Safety Management Level Evaluation in the form of Annex 24-3 to the Korea Gas Safety Corporation by December 1 of the year preceding the year in which the Safety Management Level Evaluation is to be conducted. ② The Korea Gas Safety Corporation shall prepare an implementation plan for the safety management level assessment applied for pursuant to Paragraph 1 and submit it to the Minister of Trade, Industry and Energy by the end of December of the same year. <Amended Oct. 1, 2025> ③ The Korea Gas Safety Corporation shall report the results to the Minister of Trade, Industry and Energy and the Mayor, County Governor, or District Head within 30 days from the date on which all safety management level assessments applied for pursuant to Paragraph 1 are completed, and shall notify the relevant city gas business operator. <Amended Oct. 1, 2025> ④ Matters concerning the standards and methods, etc. for safety management level evaluation are as set forth in Appendix 7-2. ⑤ The period until the next time when periodic inspection under Article 17, Paragraph 1 of the Act and verification and evaluation of compliance with safety management regulations under Article 26, Paragraph 5 of the Act must be received in consideration of the results of the safety management level assessment under Article 17-3, Paragraph 3 of the Act is as set forth in Table 7-3. [This Article Newly Inserted Feb. 21, 2014] Article 27-5 (City Gas Business Operators Required to Submit Gas Pipeline Integrity Management Plans) ① The “city gas business operator prescribed by Ordinance of the Ministry of Trade, Industry and Resources” in Article 17-4 (1) of the Act means a gas wholesaler licensed to operate a city gas business under Article 3 (1) of the Act. <Amended Oct. 1, 2025> ② In Article 17-4, Paragraph 1 of the Act, “gas piping facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to main pipes and supply pipes with a maximum operating pressure of 1 megapascal or more, for which 15 years have passed since the date the first construction supervision certificate was received. <Amended Dec. 22, 2023; Oct. 1, 2025> [This Article was newly added on Jan. 5, 2018.] [Formerly Article 27-5 was moved to Article 27-7 <Jan. 5, 2018>] Article 27-6 (Timing and Standards for Submitting Gas Pipeline Integrity Management Plans, etc.) ① Integrity management plans under Article 17-4 (1) of the Act shall consist of a basic implementation plan and detailed implementation plans (each prepared for a city gas pipeline section or region in accordance with the basic plan), and shall be submitted at the times specified in the following subparagraphs. 1. Basic implementation plan: In the years specified in the following items A. 2018 B. Every fifth year from the year specified in Item A 2. Detailed implementation plan: In the years specified in the following items a. The year marking the 15th anniversary of the year in which a gas pipeline under Article 27-5 (2) first received a construction supervision certificate B. The year of Subparagraph 1(b) ② Any person who wishes to hear the opinion of the Korea Gas Safety Corporation pursuant to the latter part of Article 17-4, Paragraph 1 of the Act shall submit an application in Form No. 24-4 of the Appendix to the Korea Gas Safety Corporation, attaching a basic implementation plan. ③ The Korea Gas Safety Corporation, upon receiving an application pursuant to Paragraph 2, may request the applicant to supplement the basic implementation plan if supplementation is necessary, and shall prepare an opinion statement and notify the applicant within 60 days from the date of application (excluding the supplementation period). However, if there are unavoidable circumstances, the period may be extended within the range of 30 days. ④ An urban gas business operator pursuant to Article 27-5, Paragraph 1 shall report the results of such implementation to the Minister of Trade, Industry and Energy in the year marking every fifth year from the year specified in Paragraph 1, Subparagraph 2, Item (a), in accordance with Article 17-4, Paragraph 4 of the Act. < Amended Oct. 1, 2025> ⑤ A city gas business operator pursuant to Article 27-5, Paragraph 1 shall receive confirmation of the results of implementation pursuant to Article 17-4, Paragraph 5 of the Act in the year that is five years from the year specified in Paragraph 1, Subparagraph 2, Item (a). ⑥ Any person who wishes to receive confirmation of the results of implementation pursuant to Paragraph 5 shall submit to the Korea Gas Safety Corporation by January 31 of the year in which they wish to receive confirmation, by attaching a detailed implementation plan to the application for confirmation of the results of implementation in Form No. 24-5. ⑦ The Korea Gas Safety Corporation shall, in accordance with Article 17-4, Paragraph 5 of the Act, report the results to the Minister of Trade, Industry and Energy within 30 days from the date the verification of the implementation results is completed, and notify the person who received the verification of the implementation results. <Amended Oct. 1, 2025> ⑧ The standards for preparing the basic performance plan and detailed performance plan pursuant to the provisions of Paragraphs 1 through 7, the standards for reviewing the basic performance plan, and the standards for verifying the results of implementing the detailed performance plan are as set forth in Appendix 7-4. [This Article Newly Inserted Jan. 5, 2018] Article 27-7 (Procedures for Enactment and Amendment of Detailed Standards) ① Any person who intends to apply for the enactment or amendment of detailed standards pursuant to Article 17-5, Paragraph 1 of the Act shall submit the documents set forth in each of the following subparagraphs to the Gas Technical Standards Committee pursuant to Article 33-2 of the High-Pressure Gas Safety Management Act (hereinafter referred to as the “Standards Committee”). <Amended Jan. 5, 2018> 1. Proposed enactment or amendment of detailed standards 2. Reasons for the necessity of enactment or amendment and supporting materials ② Upon receiving an application pursuant to Paragraph 1, the Standards Committee shall review within 15 days whether to refer the matter to a meeting of the Standards Committee; if it decides to refer the matter to a meeting, it shall do so, and if it decides not to refer it to a meeting, it shall notify the applicant of the reasons therefor. <Amended Oct. 31, 2024> ③ If the Standards Committee decides to submit the relevant agenda item to a meeting pursuant to Paragraph 2, it shall notify the general public of the name, number (only in the case of amendment), main contents, reasons, and period for submitting opinions of the detailed standard using the internet homepage, etc. ④ If it is decided not to submit a matter to a meeting pursuant to Paragraph 2, the applicant who received such notification may file an objection within 10 days from the date of receiving the notification of the reason. ⑤ In addition to the matters prescribed in paragraphs 1 through 4, detailed matters necessary for the enactment or amendment of detailed standards shall be determined by the Standards Committee. [This Article was newly added on Feb. 21, 2014] [Moved from Article 27-5 on Jan. 5, 2018>] Article 28 (Gas Supply Plan, etc.) The gas supply plan required to be prepared by general city gas business operators, gas wholesale business operators, synthetic natural gas manufacturing business operators, and naphtha byproduct gas and biogas manufacturing business operators pursuant to Article 18 of the Act shall include the matters in each of the following subparagraphs. <Amended Aug. 8, 2014> 1. Annual and administrative district gas supply plans for the supply area (in the case of synthetic natural gas manufacturers or naphtha byproduct gas/biogas manufacturers, this refers to the annual gas production and supply plans) 2. Current Status and Expansion Plan for Gas Supply Facilities 3. If the gas supply plan differs from the one submitted in the previous year, a statement of reasons must be submitted. 4. Facility Investment Plan 5. Other matters necessary for gas supply [Wholly Amended July 11, 2008] Article 29 (Gas Supply and Demand Plan) ① The gas supply and demand plan that a Mayor or Do Governor is required to submit to the Minister of Trade, Industry and Energy pursuant to Article 18-2, Paragraph 1 of the Act shall include the matters in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Demand and Supply Plans by Region, Year, and Operator 2. Expansion of Gas Supply Facilities and Facility Investment Plan 3. General Business Status and Matters Concerning Development by Business Operator 4. Matters concerning the construction and support of large-scale gas usage facilities 5. Support for promoting the supply of city gas ② The five-year gas supply and demand plan established by the Minister of Trade, Industry and Energy pursuant to Article 18-2, Paragraph 2 of the Act shall include the following matters applicable to the entire nation. <Amended Sep. 25, 2009; Mar. 23, 2013; Oct. 1, 2025> 1. City gas supply and demand plan (including regional supply and demand plans) 2. Expansion of Gas Supply Facilities and Facility Investment Plan 3. City Gas Import and Emergency Stockpiling Plan 4. Current status and development plan for the city gas business (including plans for securing funding) 5. Measures to promote the supply of city gas 6. Matters concerning the demand management of city gas ③ The long-term natural gas supply and demand plan established by the Minister of Trade, Industry and Energy pursuant to Article 18-2, Paragraph 3 of the Act shall include the matters of each of the following subparagraphs. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> 1. Long-term Outlook on Natural Gas Supply and Demand 2. Natural Gas Supply Facility Planning 3. Natural Gas Investment Plan [Wholly Amended July 11, 2008] Article 30 (Public Notice of Construction Plan for Gas Supply Facilities) ① The construction plan for regional gas supply facilities established by the Mayor or Provincial Governor pursuant to Article 18-3 of the Act shall include the following matters: 1. Piping and Pressure Regulator Installation Plan 2. Construction Implementation Plan 3. Gas supply timing and number of eligible customers by region ② Pursuant to the proviso to Article 18-3, Paragraph 2 of the Act, cases in which a general city gas business operator may not install gas supply facilities in accordance with the construction plan for regional gas supply facilities shall be cases falling under any of the following subparagraphs and in which approval has been obtained from the Mayor or Provincial Governor. 1. Cases where road excavation permit has not been obtained 2. In cases where the road expansion and paving are planned to be carried out within one year from the scheduled date of installation of the gas supply facility 3. In cases where regional redevelopment is planned to be promoted 4. In cases where it is determined that the supply of city gas is impossible due to other unforeseen circumstances. [Wholly Amended July 11, 2008] Article 30-2 (Bulk Consumers Subject to Supply Obligations of Gas Wholesale Business Operators) In Article 19, Paragraph 1 of the Act, the term “bulk consumer prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to any person falling under any of the subparagraphs of Article 2, Paragraph 2. <Amended Oct. 1, 2025> [This Article Newly Inserted Feb. 21, 2014] Article 31 (Detailed Calculation Standards for Share of Gas Supply Facility Installation Costs, etc.) ① The detailed standards for calculating the share of gas supply facility installation costs pursuant to Article 19-2, Paragraph 4 of the Act and the method of sharing are as set forth in Attached Table 8. ② A person who has been allocated the cost of installing gas supply facilities shall pay the allocated amount calculated in accordance with Paragraph 1 by the time of the supply of city gas or the contract regarding the supply. ③ The Mayor or Provincial Governor shall determine and announce specific standards regarding the method of calculation and payment of contributions for the installation costs of gas supply facilities, reflecting regional characteristics within the scope of the detailed calculation standards under Paragraph 1. [This Article Newly Inserted July 28, 2010] Article 31-2 (Qualifications, etc. of Safety Inspectors of City Gas Charging Business Operators) ① Pursuant to Article 19-4, Paragraph 1 of the Act, a city gas charging business operator shall prepare and distribute guidance materials for the prevention of hazards, such as methods of use and handling of city gas, to its consumers at least once a year (these materialsshall include the content that drivers of vehicles using city gas as fuel must receive special education pursuant to Article 50). <Amended Jan. 26, 2012> ② Where a city gas filling business operator has conducted a safety inspection under Article 19-4 (1) of the Act, the operator shall complete the safety inspection checklist for city gas consumers' facilities in attached Form No. 25 and preserve it for two years. <Newly added Feb. 21, 2014> ③ The qualifications of inspectors, inspection personnel, inspection equipment, inspection standards, and other necessary matters required for safety inspections pursuant to Article 19-4, Paragraph 1 of the Act are as set forth in Annex 8-2. <Amended Jan. 26, 2012; Feb. 21, 2014> [This Article Newly Inserted July 28, 2010] Article 32 (Application for Approval of Supply Regulations) ① Any person who intends to obtain approval for supply regulations pursuant to Article 20, Paragraphs 1 and 2 of the Act shall submit an application for approval of supply regulations in the form of Annex 26 to the Minister of Trade, Industry and Energy or the Governor of a City or Province. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> ② The application for approval under Paragraph 1 shall be accompanied by the documents listed in each of the following subparagraphs. <Amended Sep. 25, 2009> 1. Draft Supply Regulations 2. Estimated statement of income and expenditure by fiscal year for the three years following the enforcement of the supply regulations 3. Explanation of supply conditions, including city gas rates ③ The matters to be included in the supply regulations pursuant to Paragraph 2, Item 1 are as set forth in Attached Table 9. [Wholly Amended July 11, 2008] Article 33 (Application for Approval of Change to Supply Regulations) ① Any person who intends to obtain approval for a change to supply regulations pursuant to the latter part of Paragraph 1 and the latter part of Paragraph 2 of Article 20 of the Act shall submit an application for approval of a change to supply regulations in the form of Annex 26 to the Minister of Trade, Industry and Energy or the Governor of a City or Province. <Amended Mar. 23, 2013; Aug. 8, 2014; Oct. 1, 2025> ② The application for approval of change under Paragraph 1 shall be accompanied by the documents set forth in each of the following subparagraphs. <Amended Sep. 25, 2009> 1. Statement of Reason for Change 2. Details of changes to supply regulations 3. To change matters concerning supply conditions, such as city gas rates, an explanatory statement regarding the basis for calculation or the method of determining the amount, and projected revenue and expenditure statements for each fiscal year for three years following the enforcement of the changed supply regulations. [Wholly Amended July 11, 2008] Article 33-2 (Detailed Approval Criteria for Supply Regulations) Pursuant to Article 20, Paragraph 5 of the Act, supply regulations shall adequately and clearly stipulate matters concerning each of the following subparagraphs. <Amended Sep. 25, 2009; Jul. 28, 2010; Jan. 26, 2012; Aug. 8, 2014> 1. Measurement Method of City Gas Supply Volume and Calculation of Rates by Consumption Type 2. Payment and Settlement Methods 3. Gas Supplier's Supply Obligations and Gas User's Contract Compliance Obligations 4. Grounds for suspension of city gas supply, restriction on use and its lifting, and termination of contract 5. Institutional Mechanisms for Supply Stabilization 6. Composition, calorific value, and pressure of city gas 7. Standards for the Expansion and Establishment of Gas Supply Branches [Wholly Amended July 11, 2008] Article 34 (Persons Eligible for Reduction of City Gas Charges and Other Support) ① Persons eligible for support such as reductions in city gas charges under Article 20-3 (1) of the Act (hereinafter referred to as “reduction support”; such persons hereinafter referred to as “eligible recipients of reduction support”) shall be as specified in Annex 9-2. ② Persons on whose behalf a gas wholesale business operator, a metropolitan or provincial governor, or a mayor, county head or district head may apply for reduction support under Article 20-3 (2) of the Act (hereinafter referred to as “proxy applications for reductions”) shall be eligible recipients of reduction support under subparagraph 1 of Annex 9-2. [This Article Newly Inserted Mar. 21, 2025] Article 34-2 (Amount of Reduction Support) ① The amounts of reduction support for eligible recipients shall be determined by gas wholesalers and general city gas business operators, taking into account the matters specified in the following subparagraphs. In doing so, the Minister of Trade, Industry and Resources may prepare guidelines for calculating reduction support amounts and provide them to gas wholesalers and general city gas business operators. <Amended Oct. 1, 2025> 1. Beneficiaries of reduction support pursuant to Subparagraphs 1 and 2 of Annex 9-2 : City gas usage, income level of the beneficiary, and necessity of reduction support 2. Persons eligible for reduction support under subparagraph 3 of Annex 9-2: Difference between the rate per unit applicable to the facility's consumption category and the rate per unit applicable to other consumption categories 3. Persons eligible for reduction support under subparagraph 4 of Annex 9-2: Extent of damage to the relevant dwelling ② Gas wholesale business operators shall reflect the amount of wholesale rate reduction for persons eligible for reduction support and the costs incurred from acting as agents for reduction applications in the wholesale rate supply costs prescribed in the Supply Regulations pursuant to Article 20 of the Act (hereinafter referred to as the “Supply Regulations”), subject to the approval of the Minister of Trade, Industry and Energy. <Amended Oct. 1, 2025> ③ General city gas business operators shall reflect the amount of retail rate reduction for eligible recipients in the retail rate supply costs determined in the supply regulations, upon obtaining approval from the Mayor or Provincial Governor. [This Article Newly Inserted Mar. 21, 2025] Article 34-3 (Procedure for Reduction Support) ① A person eligible for reduction support may apply for reduction support by any of the following methods. In this case, the head of the relevant administrative agency may provide information regarding the eligibility of a person who has applied for reduction support to the information system operated by the gas wholesaler for reduction support (hereinafter referred to as the “ Gas Rate Reduction Management System”) through the joint use of administrative information pursuant to Article 36 of the Electronic Government Act. 1. Application to general city gas business operators 2. Application through the Mayor, County Governor, or District Head 3. Application through the e-government portal pursuant to Article 20 of the Electronic Government Act 4. Application through the public portal pursuant to Article 25 of the Act on the Use and Provision of Social Security Benefits and the Identification of Beneficiaries ② Where a gas wholesale business operator, metropolitan or provincial governor, or mayor, county head or district head applies for reduction support on behalf of an eligible recipient, the applicant shall verify the recipient's eligibility and apply using the gas rate reduction management system in a single batch. ③ If a reason for change, such as the loss of eligibility of a person eligible for reduction support, occurs, the head of a local government may provide the relevant information to the gas rate reduction management system through the joint use of administrative information pursuant to Article 36 of the Electronic Government Act. ④ General city gas business operators must use the gas rate reduction management system to check for changes in the eligibility of eligible recipients for reduction support every month and reflect the changes in the city gas rates of the eligible recipients. [This Article Newly Inserted Mar. 21, 2025] Article 35 (City Gas Quality Inspections, etc.) ① Methods and procedures for quality inspections under Article 25-2 (3) of the Act shall be as specified in Annex 10. ② A quality inspection agency pursuant to Article 12-2 of the Enforcement Decree (hereinafter referred to as the “quality inspection agency”) shall record the results of quality inspections conducted pursuant to Article 25-2, Paragraph 1 of the Act in the quality inspection record ledger in the form of Annex 28. ③ A quality inspection agency shall report its monthly or quarterly quality inspection results to the Minister of Trade, Industry and Resources by the 15th day of the month following the relevant month or quarter, using the quality inspection results report in attached Form No. 29. <Amended Mar. 23, 2013; Oct. 1, 2025> ④ The quality inspection agency shall preserve the quality inspection record ledger pursuant to Paragraph 2 for three years. [Wholly Amended Jan. 26, 2012] Article 36 (Guidelines for Drafting Safety Management Regulations, etc.) Guidelines for drafting safety management regulations pursuant to Article 26 of the Act and other necessary matters are as set forth in Attached Table 11. [Wholly Amended July 11, 2008] Article 37 (Review of Safety Management Regulations) ① A person who wishes to obtain the opinion of the Korea Gas Safety Corporation on safety management regulations under Article 26 (1) of the Act shall submit an application for review in attached Form No. 31, accompanied by the safety management regulations. ② When the Korea Gas Safety Corporation receives an application for review of safety management regulations pursuant to Paragraph 1, it shall send a written opinion to the applicant within 14 days. However, if supplementation of the content is necessary, such period may be extended. <Amended Sep. 25, 2009> ③ The examination standards for safety management regulations and other matters necessary for the examination shall be determined and announced by the Minister of Trade, Industry and Energy. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 11, 2008] Article 38 Deleted <July 1, 1999> Article 39 Deleted <July 1, 1999> Article 40 (Records of Implementation of Safety Management Regulations) Records of implementation of safety management regulations under Article 26 (4) of the Act shall be retained for three years. <Amended Sep. 25, 2009> [Wholly Amended July 11, 2008] Article 41 (Verification and Evaluation of Compliance with Safety Management Regulations) ① Verification and evaluation of compliance with safety management regulations pursuant to Article 26, Paragraph 5 of the Act shall be carried out together with the periodic inspection or occasional inspection of gas supply facilities pursuant to Article 17 of the Act. ② When conducting the verification and evaluation pursuant to Paragraph 1, external relevant experts may be involved. ③ The criteria for verifying and evaluating compliance with safety management regulations pursuant to Article 26, Paragraph 5 of the Act, and other matters necessary for such verification and evaluation, shall be determined by the Minister of Trade, Industry and Energy and announced by public notice. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 11, 2008] Article 42 Deleted <July 1, 1999> Article 43 Deleted <July 1, 1999> Article 44 Deleted <July 1, 1999> Article 45 Deleted <July 1, 1999> Article 46 Deleted <July 1, 1999> Article 47 (Qualifications of Agents for Safety Management of Gas Usage Facilities) In Article 28, Paragraph 1 of the Act, the term “person possessing qualifications prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a person who meets all the requirements of each of the following subparagraphs. In this case, the person must respectively possess a safety management supervisor, a gas usage facility inspector, and a person holding the qualification for registration of Class 1 or Class 2 gas facility construction business as stipulated in each of the following subparagraphs. <Amended July 28, 2010; March 23, 2013; October 1, 2025> 1. There must be at least one safety management officer (referring to a person who holds a technical qualification of Gas Craftsman or higher under the National Technical Qualifications Act or has completed the training specified in Item 4, Subparagraph c, Subparagraph 1) of Annex 14). 2. At least one gas-using facility inspector (meaning a person who has completed the training under Annex 14, subparagraph 4 (b) 2 or (c) 2) for every 3,000 households or businesses requiring safety management of gas-using facilities, subject to the exceptions in the following items. a. In the case of multi-unit dwellings, etc., 4,000 households or businesses subject to safety management of gas usage facilities B. In cases where a multi-functional gas safety meter (referring to a meter equipped with safety functions such as remote gas shut-off, remote carbon monoxide detection and shut-off, and earthquake detection and shut-off) is installed, 6,000 households or businesses subject to safety management of gas usage facilities 3. Must be a person registered as a Class 1 or Class 2 gas facility construction business pursuant to Article 13 of the Enforcement Decree of the Framework Act on the Construction Industry. [Wholly Amended July 11, 2008] Article 48 (Safety Measures Following Changes to Gas Usage Facilities) In Article 28-2 of the Act, “safety measures prescribed by the Ordinance of the Ministry of Trade, Industry and Resources, such as the removal of liquefied petroleum gas containers and ancillary facilities” shall be as follows: <Amended Mar. 23, 2013; July 1, 2015; Aug. 25, 2020; Oct. 1, 2025> 1. Before installing city gas facilities, a general city gas business operator or a contractor shall remove liquefied petroleum gas containers and ancillary facilities (hereinafter referred to as “containers, etc.”) after confirming that the safety supply contract for liquefied petroleum gas pursuant to Subparagraph 4 has been terminated. However, if the containers, etc. are owned by a liquefied petroleum gas supplier (hereinafter referred to as “supplier” in this Article), the contractor shall request the supplier to remove the containers, etc. by the scheduled date of city gas supply. 2. If the supplier refuses to comply with the request for removal pursuant to the proviso of Subparagraph 1, the contractor shall take safety measures corresponding to each of the following items under the supervision of the general city gas business operator. a. After disconnecting the liquefied petroleum gas container from the pressure regulator, seal the valve filling port of the container, store it in a safe place, and notify the supplier. B. Take measures to seal both ends of the liquefied petroleum gas pipeline and remove the hose to distinguish it from the city gas pipeline to be installed. 3. General city gas business operators shall verify any change in the calorific value of the combustion appliance before supplying city gas. 4. Before switching fuel to city gas, the gas user shall terminate the liquefied petroleum gas safety supply contract pursuant to Item 3, Subparagraph (a) of Annex 13 of the Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas, and use city gas after confirming that the containers, etc., pursuant to Items 1 and 2 have been removed and safety measures have been taken. [This Article Newly Inserted Sep. 25, 2009] Article 48-2 (Safety Measures, etc. for Construction of Buildings) ① The person carrying out construction for the expansion, alteration, major repair, or demolition of a building on which city gas pipelines are installedshall notify the city gas business operator supplying city gas of the construction plan including the following items in accordance with Article 28-3, Paragraph 1 of the Act. 1. Personal details of the building construction client 2. Company name of the building construction contractor and personal details of the person in charge of the construction 3. Matters concerning the type, details, location, and scheduled date of construction work 4. Matters concerning the safety measure plan pursuant to Paragraph 2 ② In Article 28-3, Paragraph 2 of the Act, “safety measures prescribed by the Ordinance of the Ministry of Trade, Industry and Resources, such as locking gas shut-off valves and removing residual gas within piping” shall be as follows: <Amended Jan. 21, 2022; Oct. 1, 2025> 1. Consultation on safety measures a. The building construction contractor and the city gas business operator shall prepare a Safety Measures Agreement in accordance with Form No. 34 (hereinafter referred to as the “Safety Measures Agreement”), including whether the city gas business operator will observe the construction site, in order to prevent damage to surrounding city gas pipelines, etc., and gas accidents. B. Two copies of the Safety Measures Agreement shall be prepared, with the building construction contractor and the city gas business operator each retaining one copy. 2. Safety measures by the construction contractor a. Implement safety measures in accordance with the contents of the safety measures agreement. B. Commence construction after confirming that safety measures in accordance with the safety measures agreement have been completed. 3. Safety measures by city gas operators a. Take measures to lock (shut off) or block the gas shut-off valve of the city gas pipeline supplying the building. B. Take measures such as removing residual gas from gas piping facilities and gas usage facilities within the building site. C. Implement the contents of the safety measures agreement [This Article Newly Inserted July 1, 2015] Article 49 (Reporting of Appointment, etc. of Safety Manager) The report of appointment, dismissal, or retirement of a safety manager pursuant to Article 29, Paragraph 2 of the Act shall be made using the Safety Manager Appointment, Dismissal, or Retirement Report Form No. 35. [Wholly Amended Aug. 25, 2020] Article 50 (Safety Education) ① The scope of persons subject to safety education pursuant to Article 30 of the Act, the education period and curriculum, and other matters necessary for educationare as set forth in Table 14. ② Any person who wishes to receive education pursuant to Paragraph 1 shall submit the application for safety education in the form of Annex 36 to the Korea Gas Safety Corporation. [Wholly Amended July 11, 2008] Article 51 Deleted <July 1, 1999> Article 52 (Confirmation of Burial Status of City Gas Pipelines, etc.) ① Under Article 30-3 (1) of the Act, an excavation contractor shall request confirmation from the Excavation Work Information Support Center under Article 30-2 of the Act (hereinafter referred to as the “Information Support Center”) as to whether city gas pipelines are buried at the work site no later than 24 hours before commencing excavation; for excavation required for emergency restoration following a natural disaster or sudden accident (hereinafter referred to as “emergency excavation work”), the request shall be made immediately. Saturdays and public holidays under Article 2 of the Regulations on Public Holidays for Government Offices shall not be included in the request period. <Newly added Aug. 25, 2020; Oct. 31, 2024> ② When requesting confirmation pursuant to Paragraph 1, the excavation contractor shall notify the Information Support Center of an excavation plan including the matters in each of the following subparagraphs. <Amended Aug. 25, 2020; Oct. 31, 2024> 1. Company name of the excavation client 2. Company name of the excavation contractor and personal details of the person in charge of the work 3. Type, location, length, and scheduled date of excavation work 4. In cases where excavation work is carried out on land owned or occupied by a gas user, the personal details and facility name of the gas user (in the case of multi-unit housing, the management entity pursuant to Article 2, Paragraph 1, Item 10 of the "Act on the Management of Multi-unit Housing," and in the case of condominiums, the manager pursuant to Article 24, Paragraph 1 of the "Act on the Ownership and Management of Condominiums") ③ Where a person intending to notify an excavation plan pursuant to Paragraph 2 has obtained a road occupancy permit under Article 61 of the Road Act, and the permitting authority has provided information regarding the excavation plan to the Information Support Center at least 24 hours prior to the commencement of the excavation work, the excavator shall be deemed to have notified the excavation plan. <Amended July 1, 2015; August 25, 2020; October 31, 2024> ④ Upon receiving notification of an excavation plan pursuant to Paragraph 2, the Information Support Center shall issue a receipt number to the excavation contractor. However, if the licensing authority has provided information regarding the excavation plan to the Information Support Center pursuant to Paragraph 3, the receipt number may be assigned to an information and communications network so that the excavation contractor may verify it through the information and communications network. <Amended Aug. 25, 2020> ⑤ Upon receiving notification of an excavation plan from an excavation contractor pursuant to Article 30-3, Paragraph 2 of the Act, the Information Support Center shall immediately notify the relevant city gas business operator of the contents of such notification through an information and communications network. <Amended Aug. 25, 2020> ⑥ When a city gas business operator receives notification of the contents of an excavation plan from the Information Support Center pursuant to Article 30-3, Paragraph 3 of the Act, it shall verify whether there are buried pipelines within 24 hours from that time and notify the Information Support Center of the results. In this case, Saturdays and public holidays pursuant to Article 2 of the Regulations on Public Holidays for Government Offices shall not be included in the notification time. <Amended Aug. 25, 2020> ⑦ The validity period of an excavation plan notified pursuant to Paragraph 2 shall be 15 days; and if the location of the excavation site and the location of the buried city gas pipeline are not indicated pursuant to Article 52-2 by the date the excavation plan was notified to the Information Support Center or by the day 15 days have elapsed from the scheduled date of the excavation work, the excavation contractor shall re-notify the excavation plan. <Amended Sep. 25, 2009; Aug. 25, 2020> [Wholly Amended July 11, 2008] Article 52-2 (Measures to Be Taken by Excavation Contractors and City Gas Business Operators) Measures to be taken by excavation contractors and city gas business operators to prevent accidents arising from excavation under Article 30-3 (4) of the Act, including marking the excavation site and buried pipeline locations, notifying that the markings have been made, installing pipeline protection facilities and providing drawings, shall be as specified in subparagraph 1 of Annex 16. <Amended Sep. 25, 2009> [This Article Newly Inserted July 11, 2008] Article 52-3 (Commencement of Excavation) The Information Support Center shall notify an excavation contractor that excavation may begin within any of the following time limits. <Amended Sep. 25, 2009; Aug. 25, 2020> 1. 24 hours from the time of receiving notification that there are no buried pipes pursuant to Article 52, Paragraph 6 2. 1 hour from the time of receiving notification of the marking of the city gas pipeline burial location pursuant to Article 52-2 [This Article Newly Inserted July 11, 2008] Article 53 (Points through which city gas pipelines pass) In Article 18 of the Enforcement Decree, the term “points through which city gas pipelines pass as prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the points listed in each of the following subparagraphs. <Amended Sep. 25, 2009; Mar. 23, 2013; July 25, 2013; Jan. 21, 2022; Oct. 1, 2025> 1. Areas where city gas pipelines are expected to be exposed due to excavation work related to the construction project 2. A portion where city gas pipelines are buried at a horizontal distance within 0.6 times the excavation depth from both ends of the excavation bottom surface resulting from the construction work. 3. The part corresponding to the construction work in cases where a city gas pipeline with a maximum operating pressure of medium pressure or higher passes directly beneath the floor of the underground facility to be constructed by the said work. 4. In cases where the relevant construction work is excavated as a tunnel, the part where a city gas pipeline is buried at a distance of within 0.6 times the maximum tunnel excavation cross-section diameter from the tunnel excavation face. [Wholly Amended Jul. 11, 2008] [Title Amended Sep. 25, 2009] Article 54 (Guidelines for Preparing Gas Safety Impact Assessment Reports, etc.) ① The gas safety impact assessment report under Article 30-4, Paragraph 1 of the Act shall include the matters in each of the following subparagraphs. <Amended Sep. 25, 2009; Jan. 21, 2022> 1. Scope of city gas pipelines affected by construction 2. Whether a change to the construction plan is necessary 3. Matters concerning the necessity, method, and timing of safety measures, such as the relocation of city gas pipelines, temporary suspension of use, installation of temporary pipelines, change of pipeline type, and protective works, and the contractor for such safety measures 4. Safety management system during construction, timing and method of observation 5. Matters concerning the costs of safety measures to be borne 6. Other matters specified in Item 3 of Annex 16 ② A person who wishes to obtain the Korea Gas Safety Corporation's opinion on a gas safety impact assessment report under the latter part of Article 30-4 (1) of the Act shall submit that report, together with the opinion of the relevant city gas business operator, to the Korea Gas Safety Corporation. [Wholly Amended July 11, 2008] Article 55 (Preparation of Consultation on Excavation Work) ① Persons required to consult regarding the safety of city gas pipelines pursuant to Article 30-5, Paragraph 1 of the Act shall be persons intending to carry out excavation work falling under any of the following subparagraphs. <Amended Sep. 25, 2009> 1. Excavation work where the length of the city gas pipeline buried within the planned excavation area is 100 meters or more 2. Excavation work in which piping with a maximum operating pressure of medium pressure or higher is expected to be exposed for a length of 10 meters or more ② Any person who intends to carry out excavation work pursuant to Paragraph 1 shall prepare an excavation work consultation agreement with a city gas business operator in accordance with Form No. 39 of the attached document before commencing excavation work pursuant to Paragraph 1 of Article 30-5 of the Act. [Wholly Amended July 11, 2008] Article 56 (Emergency Excavation Work) Notwithstanding the provisions of Article 52 Paragraphs 4 and 6, Article 52-2, Article 52-3, and Article 55, in cases where an excavation contractor carries out emergency excavation work, the contractormay consult jointly with the city gas business operator regarding the buried status of city gas pipelines at the excavation site and commence excavation work under the observation of a safety inspector. <Amended Aug. 25, 2020; Jan. 21, 2022; Oct. 31, 2024> [Wholly Amended Sep. 25, 2009] [Title Amended Aug. 25, 2020] Article 57 (Joint Monitoring System and Patrol Inspections) ① “Other construction work prescribed by Ordinance of the Ministry of Trade, Industry and Resources” in Article 30-5 (3) of the Act means the work specified in the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Underground shopping mall construction 2. Construction work where piping with a maximum operating pressure of medium pressure or higher is expected to be exposed for a length of 10 meters or more ② Pursuant to Article 30-5, Paragraph 3 of the Act, the city gas business operator and the construction implementer shall consult with each other to determine matters concerning joint observation orpatrol inspection and carry them out. <Amended Jan. 21, 2022> ③ Where a joint observation or patrol inspection is conducted under paragraph (2), both parties shall verify its results. <Amended Jan. 21, 2022> ④ The period of joint patrol inspections under paragraph (2) shall extend from commencement to completion of the construction. <Amended Oct. 7, 2014> [Wholly Amended July 11, 2008] Article 58 (Standards for Preventing Damage to City Gas Pipelines) The standards for preventing damage to city gas pipelines pursuant to Article 30-6 of the Act are as set forth in Attached Table 16. <Amended Sep. 25, 2009> [Wholly Amended Jul. 11, 2008] [Title Amended Sep. 25, 2009] Article 58-2 (Safety Measures, etc. for City Gas Pipelines) ① The safety measures that a city gas business operator may take pursuant to Article 30-7, Paragraph 1 of the Act are as follows: <Amended Sep. 25, 2009> 1. Designation and Operation of Safety Managers for Each Excavation Site 2. Provision of drawings indicating pipe burial locations, etc. to the excavation contractor 3. Guidance and consultation on systems for the protection of city gas pipelines, including verification of buried pipeline status, gas safety impact assessment, consultation on excavation work, andpatrol inspections. 4. Other matters specified in Item 2 of Annex 16 ② Drawings relating to city gas pipelines pursuant to Article 30-7, Paragraph 2 of the Act shall include the matters in each of the following subparagraphs. <Amended Sep. 25, 2009; Mar. 23, 2013; Oct. 1, 2025> 1. Burial location of piping and ancillary facilities 2. Pressure, Nominal Diameter, and Material of City Gas Pipelines 3. Contractor and Date of Construction 4. Other matters determined by the Minister of Trade, Industry and Energy as necessary [Wholly Amended Jul. 11, 2008] [Title Amended Sep. 25, 2009] Article 59 Deleted <July 1, 1999> Article 60 Deleted <July 1, 1999> Article 61 Deleted <July 1, 1999> Article 62 Deleted <July 1, 1999> Article 62-2 (Construction Plans Subject to Approval and Reporting and Related Procedures) ① For installers of gas supply facilities other than city gas business operators, installation or modification work requiring approval or approval of changes under Article 39-2 (1) of the Act shall be as specified in Annex 2. ② The installation and modification works of gas supply facilities for which a gas supply facility installer other than a city gas business operator must report or report a change pursuant to Article 39-2, Paragraph 2 of the Act are as set forth in Table 3. ③ Any person who intends to obtain approval or approval for a change of construction plan pursuant to Paragraph 1 shall submit an application in the form of Annex 13 to the Minister of Trade, Industry and Energy or the Governor of a City or Province by three days prior to the commencement of construction. Similarly, any person who intends to report a construction plan or a change of construction plan pursuant to Paragraph 2 shall submit a report in the form of Annex 14 to the Minister of Trade, Industry and Energy or the Governor of a City or Province by three days prior to the commencement of construction. <Amended Mar. 23, 2013; Feb. 21, 2014; Oct. 1, 2025> ④ The Minister of Trade, Industry and Energy or the Governor of a City or Province who receives an application under Paragraph 1 shall verify the construction business registration certificate pursuant to Article 9-2, Paragraph 1 of the Framework Act on the Construction Industry through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. However, if the applicant does not consent to the verification by the public official in charge, a copy thereof shall be attached. <Newly added Sep. 25, 2009; Jul. 28, 2010; Mar. 23, 2013; Feb. 21, 2014; Oct. 1, 2025> ⑤ The application or report under Paragraph 3 shall be accompanied by the documents specified in each of the following subparagraphs. <Amended Sep. 25, 2009; Jul. 28, 2010> 1. Construction Plan 2. Construction Schedule 3. Statement of Reasons for Change (Attach only if the construction plan is changed) 4. Technical review document pursuant to Article 62-4, Paragraph 2 5. Copy of Construction Business Registration Certificate pursuant to Article 9-2, Paragraph 1 of the Framework Act on the Construction Industry 6. Documents proving the qualifications of the construction manager 7. Documents proving the estimated construction cost of the relevant project, such as a detailed statement of estimated construction costs ⑥ Pursuant to Article 39-2, Paragraph 5 of the Act, when the Minister of Trade, Industry and Energy or the Governor of a City or Province intends to approve or approve a change to a construction plan, they shall send copies of the documents corresponding to Subparagraphs 1 through 4 of Paragraph 5 and other necessary materials to the city gas business operator possessing the gas pipeline facilities, and request the submission of opinions regarding the construction plan. <Amended Sep. 25, 2009; Mar. 23, 2013; Feb. 21, 2014; May 23, 2022; Oct. 1, 2025> ⑦ Any city gas business operator who has been requested to submit an opinion pursuant to Paragraph 6 shall submit such opinion to the Minister of Trade, Industry and Energy or the Mayor/Do Governor within 15 days from the date of receiving the request. <Amended Sep. 25, 2009; Mar. 23, 2013; Feb. 21, 2014; Oct. 1, 2025> ⑧ When the Minister of Trade, Industry and Energy or the Mayor or Provincial Governor grants approval or approval for modification of a construction plan pursuant to Article 39-2, Paragraph 1 of the Act, or receives a report or report for modification of a construction plan pursuant to Article 39-2, Paragraph 2 of the Act, they shall take the measures set forth in each of the following subparagraphs. <Amended July 1, 2015; October 1, 2025> 1. Record in the Gas Supply Facility Construction Plan (Change) Approval/Notification Register (Form No. 41). 2. Issue the Construction Plan (Change) Approval Certificate or Construction Plan (Change) Notification Certificate in accordance with Form No. 42. 3. Notify the head of the competent fire station, the Korea Gas Safety Corporation, and the relevant city gas business operator owning the gas pipeline facilities of the details of the approval or report. [Wholly Amended July 11, 2008] Article 62-3 (Criteria for Approval of Construction Plans) When the Minister of Trade, Industry and Energy or the Governor of a City or Province receives an application for approval or approval of modification of a construction plan pursuant to Article 39-2, Paragraph 1 of the Act, they shall grant approval only if the plan for the installation or modification of gas supply facilities meets the criteria set forth in each of the following subparagraphs. <Amended Sep. 25, 2009; Mar. 23, 2013; Feb. 21, 2014; May 23, 2022; Oct. 1, 2025> 1. It shall comply with the facility standards and technical standards for gas supply facilities of the gas wholesale business pursuant to Article 17. 2. The contractor must be a person registered as a Class 1 gas facility construction business pursuant to Article 7 of the Enforcement Decree of the Framework Act on the Construction Industry. 3. The construction plan must conform to the results of the technical review pursuant to Article 39-2, Paragraph 4 of the Act. 4. The installation or modification work of gas supply facilities shall comply with the gas supply and demand plan pursuant to Article 39-4 of the Act. 5. Installation or modification work on gas supply facilities shall not interfere with the operation of the city gas system, such as the flow of city gas. 6. The installation of the relevant gas pipeline facility shall not cause duplicate investment. [Wholly Amended July 11, 2008] Article 62-4 (Technical Review) ① A person who wishes to obtain the opinion of the Korea Gas Safety Corporation under Article 39-2 (4) of the Act shall submit an application for technical review in attached Form No. 15, together with the documents specified in the following subparagraphs, to the Korea Gas Safety Corporation. <Amended May 23, 2022> 1. Plan for the Installation or Modification of Gas Supply Facilities 2. Explanatory Notes on Facility Standards and Technical Standards 3. Drawings (in the case of piping, they must be prepared in accordance with Item 3, Subparagraph 1)a) of Annex 5, and in the case of facility changes, only the changed parts are applicable) ② When the Korea Gas Safety Corporation receives an application for technical review pursuant to Paragraph 1, it shall prepare a technical review report within 5 days and provide it to the applicant. [Wholly Amended July 11, 2008] Article 62-5 (Gas Supply and Demand Plan) The gas supply and demand plan pursuant to Article 39-4 of the Act shall include the matters in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Natural Gas Supply and Demand Plan by Year and Workplace 2. Expansion of Gas Supply Facilities and Facility Investment Plan 3. Other matters deemed necessary by the Minister of Trade, Industry and Energy [Wholly Amended July 11, 2008] Article 62-6 (Provisions Applied Mutatis Mutandis) Articles 21 (1) and (7), 22 (1) and (2), 23, 25 through 27, 27-2, 27-3, 36, 37, 40, 41, 49, 50, 52, 52-2, 55 through 57, 58-2, 63 (2), and 64 (3) shall apply mutatis mutandis to persons installing gas supply facilities other than city gas business operators. <Amended July 28 , 2010 ; Feb. 21, 2014> [Wholly Amended July 11, 2008] Article 62-7 (Plan for Joint Use of Gas Supply Facilities) The plan for the joint use of gas supply facilities, which must be included in the construction plan under Article 39-2 of the Act by a naphtha byproduct gas/biogas manufacturer, synthetic natural gas manufacturer, direct importer for self-consumption, or marine natural gas business operator who intends to jointly use gas supply facilities pursuant to Article 39-6, Paragraph 3 of the Act, shall include the matters of each of the following subparagraphs. <Amended Aug. 8, 2014; Aug. 5, 2020> 1. Volume of gas supply facility usage 2. Targets and Scope of Use of Gas Supply Facilities 3. Joint Usage Period [This Article Newly Inserted July 11, 2008] Article 62-8 (Application for Approval of Regulations on the Use of Pipeline Facilities) ① A gas wholesale business operator who intends to obtain approval for regulations on the use of pipeline facilities pursuant to Article 39-8, Paragraph 1 of the Act shall submit to the Minister of Trade, Industry and Energy an application for approval of regulations on the use of pipeline facilities in the form of Annex 43, attaching the documents set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Draft Regulations on the Use of Piping Facilities 2. Explanation of Terms and Conditions of Use, Including Piping Facility Usage Fees ② The draft regulations on the use of piping facilities under Paragraph 1, Subparagraph 1 shall include the following matters. <Amended Sep. 25, 2009> 1. Scope of Application 2. Facility Usage Fees 3. Matters concerning facility usage requirements, such as city gas quality conditions 4. Matters concerning the weighing and settlement of facility usage volume 5. Other matters concerning the use of piping facilities [This Article Newly Inserted July 11, 2008] Article 62-9 (Application for Approval of Amendment to Regulations on the Use of Pipeline Facilities) ① A gas wholesale business operator who intends to obtain approval for an amendment to regulations on the use of pipeline facilities pursuant to the latter part of Article 39-8, Paragraph 1 of the Act shall submit to the Minister of Trade, Industry and Energy an application for approval of an amendment to regulations on the use of pipeline facilities in the form of Annex 43, attaching the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Statement of Reason for Change 2. Details of changes to the Piping Facility Usage Regulations ② A gas wholesale business operator who has received an order to change the regulations on the use of pipeline facilities pursuant to Article 39-8, Paragraph 2 of the Act shall change the regulations on the use of pipeline facilities within 30 days from the date of receiving the order and then apply for approval of the change. [This Article Newly Inserted July 11, 2008] Article 62-10 (Reporting of Piping Facility Usage Guidelines) ① A general city gas business operator who intends to report piping facility usage guidelines pursuant to Article 39-8, Paragraph 3 of the Act shall submit to the Mayor/Do Governor a report on piping facility usage guidelines in Form No. 44 of the Appendix, attaching the documents listed in each of the following subparagraphs. 1. Guidelines for Using Piping Facilities 2. Description of Conditions for Use of Piping Facilities ② The guidelines for the use of piping facilities under Paragraph 1, Item 1 shall include the matters specified in each item of Paragraph 2 of Article 62-8. [This Article Newly Inserted July 11, 2008] Article 62-11 (Notification of Change in Piping Facility Usage Guidelines) A general city gas business operator who intends to report a change in piping facility usage guidelines pursuant to the latter part of Paragraph 3 of Article 39-8 of the Act shall submit to the Mayor/Do Governor a report on the change in piping facility usage guidelines in Form No. 44 attached thereto, with the following documents attached. 1. Statement of Reason for Change 2. Changes to the Guidelines for Using Piping Facilities [This Article Newly Inserted July 11, 2008] Article 62-12 (Reporting of Guidelines for Use of Manufacturing Facilities) ① A gas wholesale business operator who intends to report guidelines for use of manufacturing facilities pursuant to Article 39-8, Paragraph 4 of the Act shall submit a report on guidelines for use of manufacturing facilities in the form of Annex 45 to the Minister of Trade, Industry and Energy, attaching the documents set forth in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Guidelines for Using Manufacturing Facilities 2. Description of Conditions for Use of Manufacturing Facilities ② The guidelines for the use of manufacturing facilities under Paragraph 1, Item 1 shall include the following matters: 1. Scope of Application 2. Facility Usage Fees 3. Matters concerning facility usage requirements 4. Other matters concerning the use of manufacturing facilities [This Article Newly Inserted July 11, 2008] Article 62-13 (Notification of Change in Guidelines for Use of Manufacturing Facilities) A gas wholesale business operator who intends to report a change in the guidelines for use of manufacturing facilities pursuant to the latter part of Paragraph 4 of Article 39-8 of the Act shall submit to the Minister of Trade, Industry and Energy the Notification of Change in Guidelines for Use of Manufacturing Facilities in the Form of Annex 45, attaching the documents specified in each of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Statement of Reason for Change 2. Changes to the Guidelines for Using Manufacturing Facilities [This Article Newly Inserted July 11, 2008] Article 63 (Reporting, etc.) ① Matters that a metropolitan or provincial governor or a mayor, county head or district head may require a general city gas business operator or naphtha by-product gas or biogas manufacturer to report under Article 41 (2) of the Act shall be as follows. <Amended Aug. 8, 2014> 1. Matters concerning the operation of gas supply business 2. Matters concerning safety in the construction, maintenance, and operation of gas supply facilities 3. Matters concerning finance and accounting 4. Matters concerning the operation of safety measures for gas-using facilities ② Notification of the occurrence of an accident pursuant to Article 41, Paragraph 3 of the Act shall be in accordance with Annex 17. ③ In Article 41, Paragraph 3, Subparagraph 5 of the Act, the term “accident prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to an accident in which a city gas leak occurs in a liquefied natural gas storage tank of a city gas manufacturing business facility, corresponding to the standards prescribed and notified by the Minister of Trade, Industry and Energy regarding the scope of city gas leakage and methods for determining whether city gas leakage has occurred. <Amended Sep. 25, 2009; Mar. 23, 2013; Oct. 1, 2025> ④ The “matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources, such as relevant plans and performance results” pursuant to Article 23, Paragraph 2, Subparagraph 2 of the Enforcement Decree refers to the matters in each of the following subparagraphs. <Newly added July 30, 2013; October 1, 2025> 1. Scope of Support and Eligibility 2. Previous Year's Support Performance by Region 3. Support Plan by Region for the Relevant Year [Wholly Amended July 11, 2008] Article 63-2 (Application for Permission to Use Land for Installation of Gas Pipeline Facilities, etc.) ① A person seeking permission to use land to install gas pipeline facilities under Article 42-2 (2) of the Act and Article 26 (1) of the Enforcement Decree shall submit an application in attached Form No. 46, together with the documents prescribed in the following subparagraphs, to the mayor, county head or district head. 1. Statement of reasons for the application for land use permission for the installation of gas pipeline facilities (including documents proving that the requirements of Article 42-2, Paragraph 2 of the Act have been satisfied) 2. Drawings specifying the supply area by gas piping facilities 3. Map of Gas Piping Installation Location and Surrounding Conditions ② When a mayor, county governor, or district head permits the use of land pursuant to Article 42-2, Paragraph 2 of the Act and Article 26, Paragraph 1 of the Enforcement Decree, they shall issue a permit in the form of Annex 47. [This Article Newly Inserted Feb. 21, 2014] Article 64 (Insurance for Compensation for Damages Caused by City Gas Accidents) ① Gas users of specific gas usage facilities required to subscribe to insurance pursuant to Article 43, Paragraph 1, Subparagraph 2 of the Act shall be persons with an estimated monthly usage of 3,000 cubic meters or more. However,users of residential specific gas usage facilities under the supply regulations pursuant to Article 20 of the Act, and users of specific gas usage facilities pursuant to Article 20-2, Paragraph 1, Subparagraph 2, Item (a) and Subparagraphs 3 and 4 of the same Paragraph shall be excluded. <Amended July 28, 2010; July 25, 2013> ② A contractor required to subscribe to insurance pursuant to Article 43, Paragraph 1, Subparagraph 3 of the Act shall be a person performing installation or modification work on a hot water boiler using city gas as fuel (referring to a boiler that generates hot water, excluding hot water boilers subject to inspection) and its ancillary facilities. <Amended Sep. 25, 2009; Jul. 28, 2010> ③ The insurance benefits pursuant to Article 24, Paragraph 2 of the Enforcement Decree shall be as follows: 1. In the case of death or injury, the amount pursuant to Article 53, Paragraph 2 of the Enforcement Rule of the High-Pressure Gas Safety Management Act (excluding Subparagraph 4). 2. In the case of property damage, the amount specified in Table 17-2 per accident. However, the insurance amount paid shall not exceed the actual amount of loss. [Wholly Amended July 11, 2008] Article 65 (Fees, etc.) ① The fees pursuant to Article 44, Paragraph 1 of the Act are as set forth in Attached Table 18. ② Among the fees under Paragraph 1, fees payable to the Minister of Trade, Industry and Energy shall be paid with revenue stamps, and fees payable to the Mayor or Provincial Governor shall be paid with revenue certificates of the relevant local government. However, the Minister of Trade, Industry and Energy or the Mayor or Provincial Governor may allow fees to be paid by means of electronic money, electronic payment, etc., using an information and communications network. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 11, 2008] Article 65-2 (Accounting of Information Support Center) The operating funds of the Information Support Center pursuant to Article 44, Paragraph 3 of the Act shall be accounted for separately from other funds of the Korea Gas Safety Corporation. [Wholly Amended July 11, 2008] Article 66 (Special Provisions on Facility Standards, etc.) Where the Minister of Trade, Industry and Energy deems it necessary for changes in technology regarding city gas or for other reasons related to the safety management of city gas, he/she may establish special provisions on facility standards, etc., or separately prescribe and announce matters necessary for implementation. <Amended Sep. 25, 2009; Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 11, 2008] Article 67 (Delegation of Authority, etc.) ① In Article 26, Paragraphs 2 and 3 of the Enforcement Decree, the term “specific gas-using facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the specific gas-using facilities under Article 20-2, Paragraph 1, Subparagraphs 1 and 2. <Newly added July 28, 2010; March 23, 2013; October 1, 2025> ② The Minister of Trade, Industry and Energy may prescribe detailed matters concerning processing procedures, etc. necessary when the Korea Gas Safety Corporation or inspection agencies handle tasks entrusted pursuant to Article 26, Paragraphs 2 and 3 of the Enforcement Decree. <Amended July 28, 2010; March 23, 2013; October 1, 2025> [Wholly Amended Jul. 11, 2008] [Title Amended Jul. 28, 2010] Article 68 Deleted <September 3, 2015> Article 69 (Review of Regulations) ① The Minister of Trade, Industry and Energy shall review the validity of the matters set forth in each of the following subparagraphs every three years based on the reference dates specified in each of the following subparagraphs (meaning the period prior to the same date as the reference date of the year marking every third year) and take measures such as improvements. <Amended Dec. 31, 2014; Feb. 28, 2023; Oct. 1, 2025> 1. Detailed standards for city gas business permits pursuant to Article 5 : January 1, 2014 2. Methods and procedures, etc. for city gas quality inspection pursuant to Article 35, Paragraph 1 and Annex 10 : January 1, 2014 3. Notification of construction plan and safety measures pursuant to Article 48-2 : January 1, 2023 ② The Minister of Trade, Industry and Energy shall review the validity of the matters set forth in each of the following subparagraphs every two years based on the reference dates specified in each of the following subparagraphs (meaning until the day before the same date as the reference date of the year marking every second year) and take measures such as improvements. <Newly added Dec. 31, 2014; Aug. 25, 2020; Oct. 1, 2025> 1. Deadline for reporting succession of status of city gas business operator pursuant to Article 9, Paragraph 1 : January 1, 2015 2. Deadline for reporting the commencement, suspension, and closure of city gas business pursuant to Article 10 : January 1, 2015 3. Standards for administrative dispositions by violation pursuant to Article 10-3 and Annex 1-2 : January 1, 2015 4. Documents to be submitted upon notification by natural gas import/export business operators, etc. pursuant to Article 10-10 : January 1, 2015 5. Scope of installation and modification works subject to approval or modification approval pursuant to Article 11, Paragraph 1 and Annex 2 : January 1, 2015 6. Documents to be submitted for the notification of installation of emergency supply facilities pursuant to Article 13-2 : January 1, 2015 7. Standards for installation or modification works requiring prior notification of construction details to the relevant city gas business operator pursuant to Article 15, Paragraph 1 : January 1, 2015 8. Deadline for submission and retention of copies of the contractor's construction records and completed drawings pursuant to Article 20, Paragraphs 1 and 2 : January 1, 2015 9. Standards for specific gas usage facilities pursuant to Article 20-2, Paragraph 1 : January 1, 2015 10. Subjects of construction supervision, intermediate inspection, and final inspection pursuant to Article 21, Paragraphs 1, 3, and 4: January 1, 2015 11. Standards for construction supervision of gas supply facilities and standards for completion inspection of gas usage facilities for general city gas businesses pursuant to Article 23, Paragraph 2, Subparagraphs 2 and 7, and Annex 6 and Annex 7 : January 1, 2015 12. Periodic inspection cycle pursuant to Article 25, Paragraph 3 : January 1, 2015 13. Standards for ad hoc inspection by facility under Article 26 (3) 1 through 4, 6 and 7, Annexes 5, 6, 6-2, 6-3, 6-5 and 7: January 1, 2015 14. Items included in the gas supply plan pursuant to Article 28 : January 1, 2015 15. Items exempt from the installation of gas supply facilities by general city gas business operators pursuant to Article 30, Paragraph 2 : January 1, 2015 16. Qualifications of the agent for safety management of gas-using facilities pursuant to Article 47 : January 1, 2015 17. Obligation of the excavator to notify the excavation plan pursuant to Article 52, Paragraph 2 : January 1, 2015 18. Items to be included in the Gas Safety Impact Assessment Report pursuant to Article 54, Paragraph 1 : January 1, 2015 19. City gas pipeline damage prevention standards pursuant to Article 58 and Annex 16 : January 1, 2015 20. Fees pursuant to Article 65, Paragraph 1 and Annex 18 : January 1, 2015 [This Article Newly Inserted Feb. 4, 2014] ADDENDA <Ordinance of the Ministry of Trade and Industry No. 35, Mar. 11, 1996> Article 1 (Enforcement Date)  This rule shall enter into force on the date of its promulgation. However, the provisions of Item 8, Subparagraph (a)(2)(b) of Annex 6 and Item 1, Subparagraph (b)(2) of Annex 7 shall enter into force three months after the date of promulgation. Article 2 (Applicability to the Expansion of the Scope of Specific Gas Usage Facilities)  ① Matters concerning completion inspections for items newly included in specific gas usage facilities pursuant to the provisions of Article 21, Paragraph 2, Subparagraph 1 shall apply to those installed after the enforcement of this Rule. ② Notwithstanding the provisions of Article 25, Paragraph 3, specific gas-using facilities falling under the provisions of Paragraph 1 shall undergo a periodic inspection pursuant to Article 25 within 6 months after the enforcement of this rule, and subsequent periodic inspections shall be carried out within 30 days before or after the date marking one year from the date of the first periodic inspection. Article 3 (Applicability to Technical Review of Modification Works for Specific Gas Usage Facilities)  Matters concerning modification works for specific gas usage facilities that newly become subject to technical review by the Korea Gas Safety Agency pursuant to the provisions of Article 21, Paragraph 3 shall apply to works commenced after the enforcement of this Rule. Article 4 (Transitional Measures concerning Safety Management Regulations)  The initial verification and evaluation of compliance with safety management regulations for city gas business operators who submitted safety management regulations to the licensing authority in accordance with the previous regulations at the time of the enforcement of this rule shall be carried out during the period up to December 31, 1996. Article 5 (Transitional Measures Concerning Construction Supervision and Inspection)  For installation or modification works of gas supply facilities that are in progress at the time of the enforcement of this Rule and for which an application for an intermediate inspection or final inspection has already been submitted, the intermediate inspection or final inspection shall be conducted in accordance with the previous regulations. Article 6 (Transitional Measures Concerning Self-Inspection)  For city gas supply facilities that received a completion inspection prior to the enforcement of this Rule (excluding those for which the first periodic inspection period had not yet arrived at the time of enforcement of this Rule), the self-inspection period shall be calculated by deeming the date on which the certificate of completion for the most recent periodic inspection was issued as the date on which the certificate of completion for construction supervision pursuant to the latter part of Article 42, Paragraph 1 was issued. Article 7 (Applicability to Investigation of Gas Pipeline Burial Status, etc.)  Matters concerning the investigation of gas pipeline burial status, gas safety impact assessment, and consultation on gas pipeline safety pursuant to the provisions of Articles 52 through 55 shall apply starting from excavation work commenced after the enforcement of this Rule. Article 8 (Applicability to Operation of the Joint Monitoring System) Operators of subway construction, underground road construction and other construction work under Article 57 (1) that is ongoing when this Rule enters into force shall establish a joint monitoring system and conduct patrol inspections under Article 57 (2) through (4) within 20 days after the Rule enters into force. Article 9 (Special Cases Concerning Submission of Annual Plans for Work on Facilities Related to Electric Corrosion) Notwithstanding Article 58 (3), the operator of underground facilities shall submit the annual plan for 1996 to the Electric Corrosion Prevention Measures Committee within the period specified in the transitional provisions. Article 10 (Transitional Measures concerning Changes to Facility Standards)  ① City gas facilities installed under the previous regulations prior to the enforcement of this rule shall be deemed to have been installed in accordance with the provisions of Annex 6, Item 8, Subparagraph (2)(b), (3)(a), (3)(c), (4)(c), (14)(b), Annex 7, Item 1, Subparagraph (2), Subparagraph (c)(3), Item 3, Subparagraph (a), and Item 4, Subparagraph (1). ② Any facilities installed or facilities for which a technical review was requested prior to the enforcement of this rule that do not comply with the provisions of Annex 5, Item 2, Subparagraph (2), Item 4, Subparagraph (4), (5), (7), Subparagraph (1), Subparagraph (2), Subparagraph (f), Subparagraph (j), Annex 6, Item 1, Subparagraph (2), Subparagraphs (h) through (j) must be made compliant with these provisions within 6 months from the enforcement date of this rule. Article 11 (Transitional Measures Concerning Forms)  Forms under the former regulations at the time of the enforcement of this Rule may be used together with the forms under this Rule for three months from the date of enforcement of this Rule. In this case, any provisions of the Act, Decree, or Rule cited in the forms under the former regulations shall be deemed to be cited in the forms under this Rule. ADDENDA <Ordinance of the Ministry of Trade and Industry No. 70, Sep. 12, 1997> Article 1 (Enforcement Date)  This rule shall enter into force on the date of its promulgation. However, the amended provision of Item 7, Subparagraph (3) of Annex 6 shall enter into force six months after the date of promulgation, and the amended provision of Item 4, Subparagraph (2) and (4) of Annex 14 shall enter into force three months after the date of promulgation. Article 2 (Applicability to Changes in Facility Standards)  The amended provisions of Annex 5 No. 3, Annex 6 Nos. 6 through 8, and Annex 7 Nos. 1 and 3-2 shall apply to facilities for which a technical review is applied for the first time after the enforcement of this rule pursuant to the provisions of Article 12 Paragraph 5 or Article 21 Paragraph 3. Article 3 (Applicability to Subjects of Gas Safety Impact Assessment)  The amended provisions of Article 53, Subparagraph 2 shall apply to the buried portions of gas pipelines for which excavation work commences for the first time after the enforcement of this Rule. Article 4 (Transitional Measures Concerning Construction Supervision)  Construction supervision for installation or modification works of gas supply facilities for which construction supervision has already been applied at the time of the enforcement of this rule shall be governed by the previous regulations. Article 5 (Transitional measures regarding changes to facility standards)  ① City gas facilities installed under the previous regulations at the time of enforcement of this rule shall be deemed to have been installed in accordance with the amended regulations of subparagraphs (a) and (b) (2) of subparagraph 7 of Annex 6. ② Any facilities installed under the previous regulations or facilities for which a technical review was requested at the time of enforcement of this rule that have become non-compliant with the amended regulations of Annex 5, Item 3, Subparagraph (2) and Annex 6, Item 8, Subparagraph (6) must be made compliant with these regulations within 6 months from the date of enforcement of this rule, any facilities that have become non-compliant with the amended regulations of Annex 6, Item 6, Subparagraph (3), Item 7, Subparagraph (7), Subparagraph (2), Subparagraph (3), or Subparagraph (2) and (3) must be made compliant with these regulations within 1 year from the date of enforcement of this rule, and any facilities that have become non-compliant with the amended regulations of Annex 7, Item 3-2 must be made compliant with said regulations within 1 year and 6 months from the date of enforcement of this rule. Article 6 (Transitional Measures Concerning Safety Education)  ① Persons who have completed regular education for safety managers and safety officers of city gas business operators under the previous regulations at the time of enforcement of this rule shall be deemed to have completed regular education under the amended regulations of Item 4, Subparagraph (2) of Annex 14. ② Persons who have completed regular training for construction managers under the previous regulations at the time of enforcement of this rule shall be deemed to have completed regular training under the revised regulations of Item 4, Subparagraph (4) of Table 14. Article 7 (Transitional Measures Concerning Forms) Forms prescribed under the former provisions at the time this Rule enters into force may continue to be used together with the forms under this Rule for six months from its enforcement date. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 16, Dec. 10, 1998> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 16, Paragraph 1 shall enter into force on March 28, 1999. Article 2 (Special Provisions Concerning the Placement of Construction Managers)  In applying the amended provisions of Article 16, Paragraphs 1 and 2, until March 27, 1999, “Gas Industrial Engineer or higher” in Subparagraph 1 of Paragraph 1 of the same Article shall be deemed to be “Gas Engineer Grade 2 or higher and High-Pressure Gas Craftsman Grade 1 or higher”; “Gas Craftsman or higher” in Subparagraph (a) of Subparagraph 2 of Paragraph 1 of the same Article shall be deemed to be “High-Pressure Gas Craftsman Grade 2 or higher and High-Pressure Gas Handling Craftsman Grade 1 or higher”; “Gas Craftsman or higher” in Subparagraph (a) of Subparagraph 3 of Paragraph 1 of the same Article shall be deemed to be “High-Pressure Gas Craftsman Grade 2 or higher”; and “Gas Craftsman or higher” in Subparagraph (a) of Paragraph 2 of the same Article shall be deemed to be “High-Pressure Gas Craftsman Grade 2 or higher”. Article 3 (Applicability to Participation in Self-Inspection)  The amended provisions of Article 19, Paragraph 2 shall apply to installation or modification works of gas facilities commenced after the enforcement of this Rule. Article 4 (Applicability to Submission of Documents, etc.)  The amended provisions of Article 19, Paragraph 5, Article 20, Paragraph 1, and Article 22, Paragraph 1 shall apply to installation or modification work of gas facilities commenced after the enforcement of this Rule. Article 5 (Applicability to Construction Supervision)  The amended provisions of Article 21, Paragraph 1 shall apply to installation or modification works of gas supply facilities for which construction supervision is applied for after the enforcement of this Rule. Article 6 (Transitional Measures Concerning Periodic Inspections)  In applying the amended provisions of Article 25, Paragraph 3, low-pressure supply pipes with a diameter of 50 millimeters or less that branch off to supply gas to single-family homes or multi-family homes that have already been installed at the time of enforcement of this Rule shall be deemed to have been installed on the date of enforcement of this Rule. Article 7 (Transitional Measures concerning Changes in Facility Standards)  ① Pipes, hose cocks, and pipe valves installed in accordance with the previous regulations prior to the enforcement of this rule shall be deemed to have been installed in accordance with the revised regulations of Annex 6 Item 8 Subparagraph (3)(d) and (e), Annex 6 Item 8 Subparagraph (4)(a)④, and Annex 7 Item 4 Subparagraph (1). ② Any facilities installed or for which a technical review was applied for under the previous regulations prior to the enforcement of this rule that do not comply with the revised regulations of Annex 6 No. 7, Item (2) and Annex 6 No. 7, Item (1) and (2) must be made compliant with the revised regulations of Annex 6 No. 7, Item (2) and Annex 6 No. 7, Item (1) and (2) within 6 months from the enforcement date of this rule. Article 8 (Transitional Measures Concerning Forms)  Forms used under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule for six months from the date of enforcement of this rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 35, Mar. 12, 1999> ① (Enforcement Date) This rule shall take effect on April 1, 1999. ② (Transitional measures concerning insured persons) Notwithstanding the amended provisions of Article 64, Paragraph 2 and Annex 17-2, the former provisions shall apply to the amount of insurance for persons who have subscribed to insurance pursuant to the provisions of Article 43 of the Act at the time of the enforcement of this Rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 75, July 1, 1999> ① (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 41, Paragraph 1 shall enter into force on July 1, 2000. ② (Transitional measures concerning safety management regulations) City gas business operators at the time of enforcement of this rule shall amend their safety management regulations to conform to the amended regulations of Annex 11 within six months from the enforcement date of this rule and submit them to the Minister of Trade, Industry and Energy or the Mayor/Do Governor. ③ (Applicability to technical review due to changes in facility standards, etc.) The amended provisions of Annex 6, Item 8, Subparagraph (4)(b) and (13)(b) and Annex 7, Item 7 shall apply to facilities that apply for technical review to the Corporation after the enforcement of this rule. ④ (Transitional measures regarding changes to facility standards) Facilities installed under the previous regulations or facilities for which technical review was applied for or received prior to the enforcement of this rule that are no longer in compliance with the revised regulations of Annex 6, Item 8, Subparagraph (14)(c) and Annex 7, Item 1, Subparagraph (3) must be installed in compliance with the said revised regulations by December 31, 1999. ⑤ (Transitional measures regarding forms) Forms used under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule until December 31, 1999. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 139, July 14, 2001> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the Expansion of the Scope of Protected Facilities)  ① Matters concerning the completion inspection and technical review of facilities newly classified as specific gas usage facilities pursuant to the amended provisions of Item 1, Subparagraph (a) of Annex 1 shall apply to facilities for which construction begins for the first time after the enforcement of this rule. ② Notwithstanding the provisions of Article 25, Paragraph 3, specific gas-using facilities falling under the provisions of Paragraph 1 shall undergo a periodic inspection pursuant to Article 25 within 6 months after the enforcement of this rule, and subsequent periodic inspections shall be undergone within 30 days before or after the date marking one year from the date of the first periodic inspection. Article 3 (Applicability to Completion Inspection)  Matters concerning the completion inspection and technical review of construction projects newly subject to completion inspection pursuant to the amended provisions of Article 21, Paragraph 2, Subparagraph 5 shall apply to construction projects that commence for the first time after the enforcement of this Rule. Article 4 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 205, June 13, 2003> Article 1 (Enforcement Date)  This rule shall enter into force three months after the date of its promulgation. Article 2 (Transitional measures regarding changes to facility standards)  ① Gas supply facilities installed under the previous regulations at the time of enforcement of this rule shall be deemed to have been installed in accordance with the revised regulations of Annex 5 No. 2, Item (a) (9), No. 4, Item (c) (9) and (10), Annex 6 No. 1, Item (e) (5), No. 7, Item (b) (8) and (9), and No. 8, Item (a) (3) and (f). ② Gas supply facilities installed under the previous regulations prior to the enforcement of this rule that do not comply with the amended provisions of Annex 5 No. 3, Item (g) and No. 4, Item (t) (2) and Annex 6 No. 11 must be made compliant with the amended provisions of Annex 5 No. 3, Item (g) and No. 4, Item (t) (2) and Annex 6 No. 11 by June 30, 2005. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 210, Sep. 30, 2003> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Special Cases Concerning Detailed Safety Diagnoses) Notwithstanding the amended provisions of Article 27-3 (1), main pipelines or supply pipelines already installed at the time this Rule enters into force and newly subject to their first detailed safety diagnosis under those amended provisions shall undergo that diagnosis in the years specified in the following subparagraphs. 1. Main pipes or supply pipes installed prior to December 31, 1986: 2004 2. Main pipes or supply pipes installed from January 1, 1987 to December 31, 1987: 2005 3. Main pipes or supply pipes installed from January 1, 1988 to December 31, 1988: 2006 4. Main pipes or supply pipes installed from January 1, 1989, to December 31, 1991: 2007 ③ (Exclusion from Application of Regulations on Subscription to Insurance for Compensation for Damages Caused by Gas Accidents) The amended provisions of Article 64, Paragraph 2 shall not apply to contractors performing installation or modification work on ancillary facilities of hot water boilers installed prior to the enforcement of this Rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 230, Apr. 20, 2004> (Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through 11 Omitted Article 12 (Amendment of Other Statutes) ① Omitted ② The Enforcement Rules of the City Gas Business Act are amended as follows: In Item 5 of Annex 5, “Liquefied Petroleum Gas Safety and Business Management Act” shall be changed to “Liquefied Petroleum Gas Safety Management and Business Act”. In Item 9 of Annex 6, “Liquefied Petroleum Gas Safety and Business Management Act” shall be changed to “Liquefied Petroleum Gas Safety Management and Business Act”. In Item 10 of Annex 7, “Liquefied Petroleum Gas Safety and Business Management Act” shall be changed to “Liquefied Petroleum Gas Safety Management and Business Act”. In Note 4 of Table No. 4 of Annex 14, “Enforcement Rules of the Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas”. In the signature section of Form No. 35, “Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Act on Safety Management and Business of Liquefied Petroleum Gas”. ③ through ⑥ Omitted Article 13  Omitted ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 254, Feb. 2, 2005> (Partial Amendment to the Enforcement Rules of the Act on Measurement, etc. for the Processing of Electronic Civil Petitions) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 274, Mar. 31, 2005> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Transitional measures concerning safety management regulations) Any general city gas business operator who delegates the safety management duties for gas usage facilities shall amend the safety management regulations to conform to the revised regulations of Annex 11 and submit them to the mayor or provincial governor by December 31, 2005. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 369, Oct. 4, 2006> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for the Joint Use of Administrative Information and Document Reduction) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 377, Dec. 4, 2006> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the matters set forth in each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. The amended provisions of Article 23, Paragraph 3, Article 25, Paragraph 7, Annex 6, Item 8, Subparagraph (4)(c), and Annex 7, Item 1, Subparagraph (1) shall be effective three months after the date of promulgation. 2. The amended provisions of Subparagraph 3 of Attached Table 9 are effective July 1, 2007 3. The amended provisions of Item 1 of Attached Table 14 are effective January 1, 2007 Article 2 (Application)  ① The amended provisions of Article 25, Paragraph 3 shall apply to persons for whom the periodic inspection period under the previous provisions has not elapsed at the time of the enforcement of this Rule. ② The amended provisions of Article 25, Paragraph 7 shall apply starting from the first application for a periodic inspection of a specific gas-using facility after the enforcement of this Rule. Article 3 (Transitional measures regarding the installation of indoor piping for gas-using facilities)  Notwithstanding the amended provisions of Item 1, Subparagraph (1) and Subparagraph (2) of Annex 7 regarding indoor piping for gas-using facilities installed under the previous regulations at the time of enforcement of this rule, the previous regulations shall apply. Article 4 (Transitional Measures Concerning Supply Regulations)  General city gas business operators shall change the supply regulations pursuant to Article 20, Paragraph 1 of the Act to conform to the amended regulations of Item 3 of Annex 9 and obtain approval from the mayor or provincial governor by June 30, 2007. Article 5 (Transitional Measures Concerning Forms) Forms used under the former provisions at the time this Rule enters into force may continue to be used alongside the forms under this Rule for two months from its enforcement date. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 419, Sep. 14, 2007> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Special provisions regarding the implementation of detailed safety inspections)  ① Notwithstanding the amended provisions of Article 27-3, Paragraph 1, for city gas manufacturing business offices that are required to undergo a detailed safety inspection pursuant to the amended provisions of Article 27-2, Subparagraph 1, Item (a) at the time of enforcement of this rule, a detailed safety inspection may be conducted until December 31, 2008. ② If a detailed safety diagnosis is received pursuant to Paragraph 1, it shall be deemed that the detailed safety diagnosis was received in the year in which 15 years have elapsed from the date of the first receipt of the construction supervision certificate pursuant to the amended provisions of Article 27-3, Paragraph 1. Article 3 (Special Provisions Concerning the Implementation of Safety Assessment)  ① Notwithstanding the amended provisions of Article 27-3, Paragraph 2, city gas manufacturing facilities required to undergo a safety assessment pursuant to the amended provisions of Article 27-2, Subparagraph 2 at the time of enforcement of this Rule may undergo a safety assessment at the time specified in each of the following subparagraphs. 1. City gas manufacturing plants installed prior to December 31, 1996: Until December 31, 2008 2. City gas manufacturing plants established from January 1, 1997, until the effective date of this rule: Until December 31, 2009 ② If a safety assessment is received pursuant to Paragraph 1, it shall be deemed that the safety assessment was received prior to receiving the construction supervision certificate for the installation work in accordance with the amended provisions of Article 27-3, Paragraph 2, Subparagraph 1. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 442, Feb. 13, 2008> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 1, Mar. 3, 2008> (Enforcement Rule of the Organizational Structure of the Ministry of Knowledge Economy and Its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Articles 2 through 4  omitted Article 5 (Amendment of Other Laws)  ① through ⑨ Omitted ⑩ Part of the Enforcement Rule of the Urban Gas Business Act shall be amended as follows: Article 2, Paragraph 1, Subparagraph 3, Item (a); Article 3, Paragraph 2, Subparagraph 2, proviso; Article 5, Subparagraph 6; Article 6, Paragraphs 1 and 2; Article 9, Paragraph 1; Article 10; Article 10-3, Paragraph 2, main text; Article 10-4, Paragraphs 1 and 2, main text and Paragraph 4; Article 12, Paragraphs 1 and 4 and Paragraph 5, Subparagraph 3; Article 13, excluding the numbered items; Article 13-2, excluding the numbered items; Article 20-2, Paragraph 2; Article 23, Paragraphs 3 and 5; Article 24, Paragraphs 1 and 2; Article 25, Paragraph 5; Article 27, excluding the numbered items; Article 27-3, Paragraph 6; Article 29, excluding the numbered items of Paragraph 1, excluding the numbered items of Paragraph 2, and excluding the numbered items of Paragraph 3; Article 31, excluding the numbered items; Article 32, Paragraph 1; Article 33, Paragraph 1 Article 37, Paragraph 3; Article 41, Paragraph 3; Article 49, Paragraph 2; Article 54, Paragraph 1, Subparagraph 6; Article 58-2, Paragraph 2, Subparagraph 4; Article 62-2, Paragraphs 3 and 5; Article 62-3, excluding the subparagraphs; Article 62-4, Paragraph 1, Subparagraph 3; Article 62-5, Subparagraph 3; Article 63, Paragraph 3; Article 65, Paragraph 2, main text and proviso; Article 66; Article 67; Annex 5, Subparagraph 1, Item (a)(1) and (2), proviso; Annex 5, Subparagraph 2, Item (a)(9) and Item (b)(4), proviso; Annex 5, Subparagraph 3, Item (a)(1), (3), and (4); Annex 5, Subparagraph 3, Item (c)(2)(d)① and (5)(b), remarks column of the table, (8)(d)① and Subparagraphs (g) and (h) of the same subparagraph; Annex 5 Item 4 (c)(2), (8), (10) and Item 4 (e)(4) and Item 4 (j)(2); Annex 6 Item 1 (e)(2) and Item 4 (f)(1) proviso and (2) proviso; Annex 6 Item 6 (a)(4) proviso and Item 6 (b)(3)(b); Annex 6 Item 7 (b)(6) main text, (7) main text, (8) main text, (9) main text and Item 7 (j)(2) main text; Annex 6 Item 8 (a)(1)(a), (2)(c), (d) and Item 8 (4)(b) main text and proviso, Item 8 (c) proviso and (d) and Item 8 (12)(a), (14)(a), (15)(a) and part other than (b), (16)(a), (17); Annex 6 Item 11 (a); Annex 7 Item 1 (a)(1) and (3) and Item 8 In the proviso of item (1), item 3(b) of Annex 7, item 7(a) of Annex 7, item 3 of Annex 8-2, item 4(b) of Annex 10, item 1(d) and item 3 of Annex 11, item 4 of Annex 14, the education period column of Annex 16 (4) and Annex 17 (1(e)), “Minister of Industry and Resources” shall be changed to “Minister of Knowledge Economy”. In Article 2, Paragraph 2 (excluding the numbered items), Paragraphs 3 and 4; Article 20-2, Paragraph 1 (excluding the numbered items); Article 27-2 (excluding the numbered items); Article 47 (excluding the numbered items); Article 53 (excluding the numbered items); Article 57, Paragraph 1 (excluding the numbered items); and Article 63, Paragraph 3, “Ordinance of the Ministry of Commerce, Industry and Energy” shall be changed to “Ordinance of the Ministry of Knowledge Economy.” ⑪ through <64> Omitted ADDENDA <Ministry of Knowledge Economy Decree No. 4, Mar. 11, 2008> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 17, July 11, 2008> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 5, subparagraph 5; Article 12, paragraph 5, subparagraphs 2 and 3; Article 13, subparagraph 2; Article 17; Article 20-2, paragraph 2; Article 23, paragraph 1, subparagraph 3, paragraphs 2 and 3; Article 25, paragraph 2; Article 26, paragraph 3; Article 27-3, paragraph 4; Article 54, paragraph 1, subparagraph 6; Article 58-2, paragraph 1, subparagraph 4; Article 62-3, subparagraph 1; Article 62-4, paragraph 1, subparagraphs 2 and 3; Annex 5; Annex 6 (excluding subparagraph 3, item a, subparagraph 2) a) and g) ① ㉰ and ㉳); Annex 7 (excluding subparagraph 4, item b); and Annex 16, subparagraphs 2 and 3 shall enter into force on January 1, 2009. Article 2 (Application)  Gas wholesale business operators shall establish regulations on the use of pipeline facilities pursuant to Article 62-8 and guidelines for the use of manufacturing facilities pursuant to Article 62-12 and obtain approval or report within 6 months from the effective date of this rule, and general city gas business operators shall establish guidelines for the use of pipeline facilities pursuant to Article 62-10 and report within 2 years from the effective date of this rule. Article 3 (Transitional Measures concerning Facility Standards and Technical Standards)  Gas supply facilities for gas wholesale businesses, gas supply facilities for general city gas businesses, and gas usage facilities installed prior to the enforcement of this Rule, which have undergone inspection, construction supervision, and technical review in accordance with the former regulations (including facilities in progress), shall be deemed to have been installed in compliance with the amended regulations of Annex 5, Annex 6, and Annex 7. Article 4 (Transitional Measures Concerning Standards for Administrative Dispositions)  Administrative dispositions for violations under Article 10-2 prior to the enforcement of this Rule shall be governed by the former provisions. Article 5 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Knowledge Economy Decree No. 95, Sep. 25, 2009> Article 1 (Enforcement Date)  This Rule shall enter into force on September 26, 2009. However, the amended provision of Article 23, Paragraph 4, Subparagraph 2, Item (c) shall enter into force on January 1, 2010. Article 2 (Application)  ① The amended provisions of the main text of the part other than the subparagraphs of Article 25, Paragraph 3 shall apply to facilities that have undergone periodic inspections in accordance with the previous regulations at the time of the enforcement of this Rule. However, for facilities where the periodic inspection period has elapsed in accordance with the previous regulations at the time of the enforcement of this Rule, the provisions shall apply from the date of the periodic inspection in accordance with the previous regulations. ② The amended provisions of Subparagraph 2, Item (b) of Annex 7 shall apply to facilities that have undergone disassembly inspection of pressure regulators and filters in accordance with the previous regulations at the time of enforcement of this rule. However, for facilities where the inspection period has expired in accordance with the previous regulations at the time of enforcement of this rule, the provisions shall apply from the date the inspection was received in accordance with the previous regulations. Article 3 (Applicability to the subjects of approval and notification of construction plans)  The amended provisions of Item 1, Subparagraph (a) of Annex 2 and Items 3, Subparagraphs (a) and (b) of Annex 3 shall apply from the first time an application for approval of a construction plan (including approval of change) or a notification of a construction plan (including notification of change) is made after the enforcement of this rule. Article 4 (Transitional Measures Concerning Construction Supervision Subjects)  Facilities for which applications were received prior to the enforcement date of this Rule and for which construction supervision is in progress shall be governed by the former regulations, notwithstanding the amended provisions of Article 21, Paragraph 1, Subparagraph 4. Article 5 (Transitional Measures Concerning Installation Locations of Gas Meters)  Gas meters installed prior to the enforcement date of this Rule shall be deemed to comply with the amended provisions of Item 1, Subparagraph (a) of Annex 7. Article 6 (Transitional Measures Concerning Installation Standards for High-Pressure Piping in Gas Usage Facilities)  High-pressure piping in gas usage facilities installed prior to the enforcement date of this Rule shall be deemed to comply with the amended provisions of Subparagraph 3) (c) of Item 1 (a) of Annex 7. Article 7 (Transitional Measures concerning Safety Management Regulations)  General city gas business operators at the time of enforcement of this rule shall amend their safety management regulations to conform to the amended regulations of Annex 11 and submit them to the mayor or provincial governor by March 31, 2010. Article 8 (Transitional Measures Concerning Specialized Training)  Persons who, at the time of the enforcement of this Rule, have received regular training or specialized training for the first time upon new employment in accordance with the previous regulations shall receive specialized training in accordance with the classifications in each of the following subparagraphs, notwithstanding the amended provisions of Subparagraph 4, Item (a) of Annex 14. 1. Those who received regular or specialized training before December 31, 2003: From January 1, 2010 to December 31, 2010 2. Persons who received specialized training between January 1, 2004, and December 31, 2006: From January 1, 2011, to December 31, 2011 3. Persons who received specialized training between January 1, 2007, and December 31, 2009: From January 1, 2012, to December 31, 2012 Article 9 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Knowledge Economy Decree No. 142, July 28, 2010> Article 1 (Enforcement Date)  This rule shall enter into force on July 28, 2010. Article 2 (Transitional Measures Concerning Safety Management Regulations)  A person who, at the time of the enforcement of this Rule, is deemed to have obtained a permit for a city gas filling business pursuant to Paragraph 2 of the Addenda to Act No. 9983, the Partial Amendment to the City Gas Business Act, and who has established safety management regulations in accordance with Annex 15 of the Enforcement Rule of the High-Pressure Gas Safety Management Act and submitted them to the Mayor, County Governor, or District Head, shall be deemed to have submitted safety management regulations in accordance with the amended provisions of Annex 11. Article 3 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Knowledge Economy Decree No. 207, Oct. 19, 2011> (Partial Amendment to the Enforcement Rules of the Special Act on the Designation and Operation of Free Economic Zones, etc., for the Comprehensive Revision of Legal Basis for the Processing of Personal Information, Including Resident Registration Numbers) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning the Revision of Forms)  Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used. ADDENDA <Ministry of Knowledge Economy Decree No. 210, Nov. 4, 2011> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Subparagraph 1, Item (a), Subparagraph 9) (a) of Annex 6-2 shall enter into force six months after the date of promulgation. Article 2 (Transitional Measures Concerning Changes to Facility Standards)  ① Facilities installed pursuant to the former regulations at the time of the enforcement of this Rule that do not comply with the amended provisions of Annex 5, Subparagraph 2, Item (a), Subparagraph 6) and Annex 6, Subparagraph 2, Item (a), Subparagraph 6)a) shall be made compliant with the amended provisions of Annex 5, Subparagraph 2, Item (a), Subparagraph 6)c) within one year from the date of enforcement of this Rule. <Amended July 25, 2013> ② Gas filling facilities installed in accordance with the previous regulations at the time of enforcement of this rule shall be deemed to have been installed in accordance with the amended provisions of Item 1, Subparagraph (a) 9)a) of Annex 6-2. ADDENDA <Ministry of Knowledge Economy Decree No. 238, Jan. 26, 2012> This rule shall take effect on January 26, 2012. ADDENDA <Ministry of Knowledge Economy Decree No. 271, Oct. 5, 2012> (Partial Amendment to the Enforcement Rules of the Act on Weights and Measures, etc. for the Improvement of Legal Forms) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning the Revision of Forms)  Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Energy and its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through 6  omitted Article 7 (Amendment of Other Laws)  ① through ⑩ Omitted ⑪ Part of the Enforcement Rule of the Urban Gas Business Act shall be amended as follows: Article 2, Paragraph 1, Subparagraph 3, Item (a); Article 3, Paragraph 2, Subparagraph 2, proviso; Paragraph 4 of the same article; Article 6, Paragraph 1, excluding the numbered items; Paragraph 2 of the same article; Article 9, Paragraph 1, excluding the numbered items; Paragraph 2 of the same article; Article 10, excluding the numbered items; Article 10-3, Paragraph 2, main text; Article 10-4, Paragraph 1; Paragraph 2, main text; Paragraph 4 of the same article; Article 10-5, Paragraphs 1 and 2; Article 10-6, Paragraphs 1 and 2; Article 10-7, Paragraph 1; Article 10-8; Article 10-9, Paragraph 1, excluding the numbered items; Paragraph 2, excluding the numbered items; Article 10-10, main text, excluding the numbered items; Article 10-12, Paragraph 2, main text; Article 10-13, Paragraph 1; Paragraph 2, main text; Paragraph 3 of the same article; Article 10-14; Article 12, Paragraph 1; and the same Article 2, Paragraph 2, main text; Article 13, Paragraph 4; Article 13, excluding the numbered clauses; Article 13-2, excluding the numbered clauses; Article 24, Paragraphs 1 and 2; Article 27, excluding the numbered clauses; Article 27-3, Paragraph 6; Article 29, Paragraph 1, excluding the numbered clauses; Paragraph 2, excluding the numbered clauses; Paragraph 3, excluding the numbered clauses; Article 32, Paragraph 1; Article 33, Paragraph 1; Article 35, Paragraph 3; Article 37, Paragraph 3; Article 41, Paragraph 3; Article 49, Paragraph 2, main text; Article 58-2, Paragraph 2, Subparagraph 4; Article 62-2, Paragraph 3; Article 62-2, Paragraph 4, main text; Paragraphs 6 through 8; Article 62-3, excluding the numbered clauses; Article 62-5, Subparagraph 3; Article 62-8, Paragraph 1, excluding the numbered clauses; Article 62-9, Paragraph 1, excluding the numbered clauses In the part other than the subparagraphs of Article 62-12, Paragraph 1; the part other than the subparagraphs of Article 62-13; Article 63, Paragraph 3; the main text and proviso of Article 65, Paragraph 2; Article 66; Article 67, Paragraph 2; and the part other than the subparagraphs of Article 68, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Article 2, Paragraph 2 (excluding the numbered items), Paragraph 3 (excluding the numbered items), Paragraph 4 (excluding the numbered items), Paragraph 5 (excluding the numbered items), Article 10-7, Paragraph 3; Article 10-13, Paragraph 5 (excluding the numbered items); Article 12, Paragraph 5 (excluding the numbered items); Article 20-2, Paragraph 1 (excluding the numbered items); Article 21, Paragraph 2; Article 27-2 (excluding the numbered items); the first part of Article 47 (excluding the numbered items); Article 48 (excluding the numbered items); Article 53 (excluding the numbered items); Article 57, Paragraph 1 (excluding the numbered items); Article 63, Paragraph 3; and Article 67, Paragraph 1, the term “Ordinance of the Ministry of Knowledge Economy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Energy”. In subparagraph (d) of Item 1 of Table 1-5, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In the proviso of Item 1, Subparagraph (a) of Annex 5 and Item 3, Subparagraph (a) of the same table, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Item 6 of Annex 6-2, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Annex 10, Subparagraph 2, Item (b) 2) and 3) and Subparagraph 4 of the same table, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Item 1(d) of Annex 11 and Item 3 of the same table, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraph 1(e) of Annex 17, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In the front of attached Form No. 1, attached Forms No. 2 through No. 4, the front of attached Form No. 5, attached Forms No. 9, 9-2, 10, 10-2, 10-3, 11, 11-2, 12 through 14, 19, 19-2, 20, 23, 24, 24-2, 26, 31, 35, 36, 42, 43 and 45, each occurrence of “Minister of Knowledge Economy” shall be replaced with “Minister of Trade, Industry and Energy”. In the back of Form No. 1, Forms No. 2 through No. 4, Form No. 4-2, Form No. 9, Form No. 10, Form No. 10-2, Form No. 11, Form No. 13, Form No. 23, Form No. 24, Form No. 26, Form No. 43, and Form No. 45, “Ministry of Knowledge Economy” shall be changed to “Ministry of Trade, Industry and Energy”. In the processing procedure section of Form No. 11-2, “Minister of Knowledge Economy” shall be changed to “Ministry of Trade, Industry and Energy.” Sections 12 through <63> omitted ADDENDA <Ministry of Trade, Industry and Energy Decree No. 20, July 25, 2013> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the Deadline for Issuance of Technical Review Reports)  The amended provisions of Article 12, Paragraph 7 shall apply from the time an application for technical review is submitted after the enforcement of this Rule. Article 3 (Applicability to the Subject of Gas Safety Impact Assessment)  The amended provisions of Article 53, Subparagraph 4 shall apply to construction work commenced after the enforcement of this Rule. Article 4 (Applicability to the Subjects of Approval for Construction Plans)  The amended provisions of Subparagraph 2)b) of Item 3, Subparagraph (a) of Annex 2 shall apply to construction plans for which an application for approval of change is submitted after the enforcement of this rule. Article 5 (Special Cases Concerning the Timing of Detailed Safety Diagnoses) Main pipelines or supply pipelines already installed at the time this Rule enters into force that fall under item (c) of subparagraph 1 of Article 27-2 as amended and are specified in the following subparagraphs shall undergo detailed safety diagnoses at the respective times specified therein, notwithstanding amended Article 27-3 (1). 1. Main pipes or supply pipes installed prior to December 31, 1986: By December 31, 2014 2. Main pipes or supply pipes installed from January 1, 1987, to December 31, 1988: Until December 31, 2015 3. Main pipes or supply pipes installed from January 1, 1989, to December 31, 1990: Until December 31, 2016 4. Main pipes or supply pipes installed from January 1, 1991, to December 31, 1992: Until December 31, 2017 5. Main pipes or supply pipes installed from January 1, 1993, to December 31, 1993: Until December 31, 2018 Article 6 (Transitional Measures Concerning Specific Gas Usage Facilities)  Notwithstanding the amended provisions of Article 20-2, Paragraph 1, Subparagraph 2, Item (a), internal pipes installed or in the process of being installed in accordance with the former regulations at the time of the enforcement of this Rule shall be governed by the former regulations. Article 7 (Transitional Measures Concerning Installation Locations of Gas Meters)  Notwithstanding the amended provisions of Item 1, Subparagraph (a) 1)a)② of Annex 7, gas meters installed in accordance with the former regulations at the time of enforcement of this rule and gas meters installed in houses or officetels for which a building permit or building report has been filed pursuant to Article 11 or Article 14 of the Building Act shall be governed by the former regulations. Article 8 (Transitional Measures concerning Open-type Gas Water Heaters)  Open-type gas water heaters installed in accordance with the previous regulations at the time of enforcement of this rule and open-type gas water heaters manufactured or imported by October 5, 2011, in accordance with the detailed standards under Article 27-2, Paragraph 1 of the Act on Safety Management and Business of Liquefied Petroleum Gas may be installed in accordance with the previous regulations, notwithstanding the amended provisions of Subparagraph 2) and 4) of Item 3, Subparagraph (a) of Annex 7. Article 9 (Transitional Measures, etc., concerning Changes to Facility Standards)  ① Facilities installed or in progress under the previous regulations at the time of enforcement of this Rule shall be deemed to have been installed in accordance with the amended provisions of Annex 6 and Annex 7 (excluding the amended provisions of Subparagraph 1, Item (a) 1) ② and Subparagraph 3, Item (a) 2) and 4). ② Any facility that was installed or is being installed in accordance with the previous regulations at the time of enforcement of this rule and has become non-compliant with the amended provisions of Item 6, Subparagraph (c) of Annex 7 shall be made compliant with the amended provisions of Item 6, Subparagraph (c) of Annex 7 within three months from the date of enforcement of this rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 21, July 30, 2013> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 48, Feb. 4, 2014> (Partial Amendment to the Enforcement Rules of the Act on Measurement, etc. for the Provision of Review Periods Pursuant to the Amendment of the Framework Act on Administrative Regulations) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 50, Feb. 21, 2014> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Special provisions regarding the timing of precision safety inspections of liquefied natural gas storage tanks) Among the  liquefied natural gas storage tanks required to undergo a precision safety inspection by December 31, 2013, pursuant to the amended provisions of Article 27-2, subparagraph 1, item (d), those liquefied natural gas storage tanks that received a certificate of conformity pursuant to Article 17, paragraph 6 of the “High Pressure Gas Safety Management Act” from January 1, 2008, to December 31, 2008, must undergo a precision safety inspection by December 31, 2014, notwithstanding the amended provisions of Article 27-3, paragraph 1, item 3. Article 3 (Special provisions regarding safety management level evaluation)  City gas business operators who intend to undergo a safety management level evaluation in 2014 pursuant to the amended provisions of Article 27-4, Paragraph 1 shall submit an application for a safety management level evaluation to the Korea Gas Safety Corporation by the date three months after the enforcement of this rule. Article 4 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for three months from the date of enforcement of this Rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 77, Aug. 8, 2014> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Special Provisions Concerning Previously Installed Gas Supply Facilities, etc.)  ① Gas supply facilities of naphtha byproduct gas and biogas manufacturers installed prior to the enforcement of this Rule in accordance with the standards established by the Minister of Trade, Industry and Energy regarding such gas supply facilities (hereinafter referred to as “Gas Manufacturing Facility Standards”) shall be deemed to have been installed in compliance with the amended provisions of Annex 6-3 and Annex 6-4. ② Notwithstanding the amended provisions of Annex 6-3 and Annex 6-4, the Gas Manufacturing Facility Standards shall apply to gas supply facilities of naphtha byproduct gas and biogas manufacturers who applied for technical review or construction supervision in accordance with the Gas Manufacturing Facility Standards prior to the enforcement of this rule. ③ Notwithstanding the amended provisions of Annex 6-5 of this Rule, for gas supply facilities of synthetic natural gas manufacturing businesses for which technical review, intermediate inspection, final inspection, or construction supervision was applied for pursuant to Annex 4, Item 1 of the Enforcement Rule of the High-Pressure Gas Safety Management Act prior to the enforcement of this Rule, Annex 4, Item 1 of the Enforcement Rule of the High-Pressure Gas Safety Management Act shall apply. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 86, Oct. 7, 2014> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 106, Dec. 31, 2014> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for Regulatory Reform, Including Setting Regulatory Review Periods) This rule shall take effect on January 1, 2015. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 134, July 1, 2015> This rule shall take effect on July 1, 2015. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 155, Sep. 3, 2015> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 261, June 2, 2017> This rule shall take effect on June 3, 2017. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 285, Jan. 5, 2018> Article 1 (Enforcement Date)  This rule shall enter into force on January 7, 2018. Article 2 (Special Cases Concerning the Time for Submitting Integrity Management Implementation Plans) Notwithstanding Article 27-6 (1) 2 (a), where the year marking 15 years after the year in which gas pipeline facilities under Article 27-5 (2) first received a construction supervision certificate would be before 2018, that fifteenth year shall be deemed to be 2018. Article 3 (Special Cases Concerning Verification of Implementation Results of Integrity Management Plans) Where an urban gas business operator under Article 27-5 (1) first submitted a detailed implementation plan in 2018 for a gas pipeline facility under Article 2 of these Addenda, the operator may, notwithstanding Article 27-6 (5), consult the Korea Gas Safety Corporation and obtain verification of implementation results at a time determined within five years after the year specified in Article 27-6 (1) 2 (a). ADDENDA <Ministry of Trade, Industry and Energy Decree No. 320, Dec. 13, 2018> This rule will take effect on December 13, 2018. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 370, Mar. 24, 2020> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 388, Aug. 5, 2020> Article 1 (Enforcement Date) This rule shall enter into force on August 5, 2020. Article 2 (Special provisions regarding the supply of natural gas for ships by gas wholesalers) Notwithstanding the amended provisions of Article 2, Paragraph 2, Subparagraph 4, a gas wholesaler may supply city gas to ships that are unable to receive natural gas for ships (including natural gas supplied when undergoing construction inspection or ship inspection) from a natural gas for ships business operator for justifiable reasons for five months from the effective date of this rule. Article 3 (Special provisions regarding the reporting of export and import of natural gas for ships and the notification of natural gas export and import plans)  Notwithstanding the amended provisions of Article 10-18, any person applying for registration of a natural gas business for ships pursuant to Article 10-16 within 30 days from the enforcement date of this rule may report the conclusion of export, import, or transport contracts for natural gas for ships or provide an annual natural gas export and import plan, etc., when applying for registration of the natural gas business for ships. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 390, Aug. 25, 2020> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 2, Paragraph 3, Subparagraph 5; Article 52, Paragraphs 1 and 2; Article 56; Annex 5, Subparagraph 3, Item (a) 1)g) and Subparagraph (b) 4) of the same subparagraph; Annex 6, Subparagraph 3, Item (a) 2)h) and Subparagraph (b) 3) of the same subparagraph; and Annex 6-2, Subparagraph 5 shall enter into force three months after the date of its promulgation. Article 2 (Applicability of Technical Standards for Gas Supply Facilities) Where a general city gas business operator underwent a detailed safety diagnosis under Article 27-3 before the enforcement date specified in the proviso to Article 1 of these Addenda and thereby investigated the burial depth of pipelines in a river, the operator shall maintain and manage the pipelines under the amended provisions of Annex 6, subparagraph 3 (b) 3 (c), within one year after this Rule enters into force. Article 3 (Applicability of Facility Standards for Gas-Using Facilities) The amended provisions of Annex 7, subparagraph 3 (a) 2 (d) shall apply to gas boilers manufactured or imported after August 5, 2020 and installed, including replacements, after this Rule enters into force. Article 4 (Transitional Measures Concerning Facility Standards for Gas-Using Facilities)  Notwithstanding the amended provisions of Subparagraph 3, Item (a), Subparagraph 2)d) of Annex 7, the facility standards for gas-using facilities for which gas boilers were installed in accordance with the former regulations at the time of enforcement of this Rule shall be in accordance with the former regulations. However, persons who use city gas by installing gas boilers in accommodation facilities pursuant to Article 2, Paragraph 1, Subparagraph 2 of the Public Health Management Act shall install carbon monoxide alarms in accordance with the amended provisions of Subparagraph 3, Item (a), Subparagraph 2)d) of Annex 7 by August 4, 2021. Article 5 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for three months from the date of enforcement of this Rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 418, Apr. 27, 2021> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 448, Jan. 21, 2022> (Partial Amendment to 36 Ministry of Trade, Industry and Energy Decrees, including the Enforcement Rule of the High-Pressure Gas Safety Management Act) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 453, Mar. 10, 2022> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Large-Scale Consumers)  The amended provisions of Article 2, Paragraph 2, Subparagraph 2, Item (b) shall apply from the time a heat-only facility attached to a combined heat and power facility is installed or the fuel of an existing heat-only facility is replaced with natural gas after the enforcement of this Rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 466, May 23, 2022> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 502, Feb. 28, 2023> (Ministry of Trade, Industry and Energy Decree on the Partial Amendment of Seven Acts for the Rectification of Sunset Regulations Pursuant to the Framework Act on Administrative Regulations) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 533, Dec. 12, 2023> (Ministry of Trade, Industry and Energy Decree on the Partial Amendment of 7 Laws, Including the Enforcement Rule of the Weights and Measures Act, for the Revision of Regulations on Administrative Surcharges, etc.) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 541, Dec. 22, 2023> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. [Wholly Amended Oct. 31, 2024] Article 2 (Special Cases Concerning the Timing of Detailed Safety Diagnoses) Notwithstanding Article 27-3 (1) 1 and 2, main pipelines or supply pipelines already installed outside urban areas under Article 6, subparagraph 1 of the National Land Planning and Utilization Act when this Rule enters into force, and subject to a detailed safety diagnosis under amended Article 27-2, subparagraph 1 (b) or (c), shall undergo the diagnosis at a time determined by the city gas business operator in consultation with the Korea Gas Safety Corporation within five years after this Rule enters into force. [This Article Newly Inserted Oct. 31, 2024] Article 3 (Special Cases Concerning the Timing of Submission of Detailed Integrity Management Implementation Plans) Notwithstanding Article 27-6 (1) 2 (a), where a main pipeline or supply pipeline installed outside an urban area under Article 6, subparagraph 1 of the National Land Planning and Utilization Act, and subject to amended Article 27-5 (2), first received a construction supervision certificate in a year whose fifteenth anniversary falls before 2023, that anniversary year shall be deemed to be 2023. [This Article Newly Inserted Oct. 31, 2024] Article 4 (Special Cases Concerning the Timing of Verification of Results of Detailed Integrity Management Implementation Plans) Notwithstanding Article 27-6 (5), a gas wholesale business operator under Article 27-5 (1) that first submitted a detailed implementation plan in 2023 under Article 3 of these Addenda for a main pipeline or supply pipeline outside an urban area under Article 6, subparagraph 1 of the National Land Planning and Utilization Act may, within five years after this Rule enters into force, determine the timing of verification in consultation with the Korea Gas Safety Corporation and obtain verification of the implementation results. [This Article Newly Inserted Oct. 31, 2024] ADDENDA <Ministry of Trade, Industry and Energy Decree No. 572, Sep. 2, 2024> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 578, Oct. 31, 2024> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 2, Paragraph 3, Subparagraph 5 and Annex 6-2, Subparagraph 5 shall enter into force six months after the date of promulgation. Article 2 (Applicability to Changes in Facility Standards) The  amended provisions of Subparagraph 1)g)⑥ and Subparagraph 1)g)⑦ of Item 3(a) of Annex 5 shall apply from the time a technical review is requested after the enforcement of this rule. Article 3 (Transitional Measures Concerning Changes to Facility Standards)  Facilities installed or in progress under the previous regulations at the time of the enforcement of this Rule shall be deemed to have been installed in accordance with the amended provisions of Annex 5, Item 3, Subparagraph (a), Item 1)(g)⑥ and Item 1)(g)⑦, and Annex 6-2, Item 5. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 603, Mar. 21, 2025> This rule shall enter into force on March 21, 2025. <Amended Mar. 31, 2026> ADDENDA <Ordinance of the Ministry of Trade, Industry and Resources No. 1, Oct. 1, 2025> (Enforcement Rule on the Organization of the Ministry of Trade, Industry and Resources and Its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, among the Ministerial Ordinances amended pursuant to Article 5 of the Addenda, the parts amending Ministerial Ordinances that were promulgated prior to the enforcement of this Rule but whose effective date has not yet arrived shall enter into force on the effective date of said Ministerial Ordinance. Articles 2 through 4  omitted Article 5 (Amendment of Other Laws)  ① through ⑪ Omitted ⑫ Part of the Enforcement Rule of the Urban Gas Business Act shall be amended as follows: Article 2, Paragraph 1, Subparagraph 3, Item (a); Article 3, Paragraph 2, Subparagraph 2, proviso; Paragraph 4 of the same article; Article 6, Paragraph 1, excluding the numbered items; Paragraph 2 of the same article; Article 9, Paragraph 1, excluding the numbered items; Paragraphs 2 and 3 of the same article; Article 10, excluding the numbered items; Article 10-4, Paragraph 2, main text; Article 10-5, Paragraphs 1, 2, and 4; Article 10-6, Paragraphs 1 through 3; Article 10-7, Paragraphs 1 and 2; Article 10-8, Paragraph 1; Article 10-9; Article 10-10, Paragraph 1, excluding the numbered items; Paragraph 2, excluding the numbered items; Paragraph 3, excluding the numbered items; Paragraph 4, excluding the numbered items; Article 10-11, main text excluding the numbered items; Article 10-13, Paragraph 2, main text; Article 10-14, Paragraphs 1 through 3. Article 10-15, Article 10-16 Paragraph 1 (excluding the numbered clauses), proviso to Subparagraph 2 of the same paragraph, Paragraphs 2 and 3 of the same article, Article 10-17, Article 10-18 Paragraph 1 (excluding the numbered clauses), main text of Paragraph 2 of the same article, Article 12 Paragraph 1, main text of Paragraph 2 of the same article, Paragraph 4 of the same article, Article 13 (excluding the numbered clauses), Article 13-2 (excluding the numbered clauses), Article 24 Paragraphs 1 and 2, Article 27 (excluding the numbered clauses), Article 27-3 Paragraph 5 (main text), Paragraphs 6 and 7 of the same article, Article 27-4 Paragraphs 2 and 3, Article 27-6 Paragraphs 4 and 7, Article 29 Paragraph 1 (excluding the numbered clauses), Paragraph 2 of the same article (excluding the numbered clauses), Paragraph 3 of the same article (excluding the numbered clauses), Article 32 Paragraph 1, Article 33 Paragraph 1 The latter part of the introductory subparagraph of Article 34-2, Paragraph 1; Paragraph 2 of the same Article; Article 35, Paragraph 3; Article 37, Paragraph 3; Article 41, Paragraph 3; Article 58-2, Paragraph 2, Subparagraph 4; Article 62-2, Paragraph 3; the main text of Paragraph 4 of the same Article; Paragraphs 6 and 7 of the same Article; the introductory subparagraph of Paragraph 8 of the same Article; the introductory subparagraph of Article 62-3; Subparagraph 3 of Article 62-5; the introductory subparagraph of Paragraph 1 of Article 62-8; the introductory subparagraph of Paragraph 1 of Article 62-9; the introductory subparagraph of Paragraph 1 of Article 62-12; the introductory subparagraph of Article 62-13; Paragraph 3 of Article 63; the main text and proviso of Paragraph 2 of Article 65; Article 66; Article 67, Paragraph 2; the introductory subparagraph of Paragraph 1 of Article 69; and the introductory subparagraph of Paragraph 2 of the same Article, respectively, “Minister of Trade, Industry and Energy” shall be replaced with “Minister of Trade, Industry and Resources”. Article 2, Paragraph 2 (excluding the numbered items), Article 2, Paragraph 3 (excluding the numbered items), Article 2, Paragraph 4, Article 2, Paragraph 5 (excluding the numbered items), Article 2, Paragraph 6 (excluding the numbered items), Article 2, Paragraph 7, Article 10-2 (excluding the numbered items), Article 10-8, Paragraph 3, Article 10-14, Paragraph 5 (excluding the numbered items), Article 12, Paragraph 5 (excluding the numbered items), Article 20-2, Paragraph 1 (excluding the numbered items), Article 21, Paragraph 2, Article 27-2 (excluding the numbered items), Article 27-5, Paragraphs 1 and 2, Article 30-2, the first part of Article 47 (excluding the numbered items), Article 48 (excluding the numbered items), Article 48-2, Paragraph 2 (excluding the numbered items), Article 53 (excluding the numbered items), Article 57, Paragraph 1 (excluding the numbered items), Article 63, Paragraph 3, Article 63, Paragraph 4 (excluding the numbered items), and In Article 67, Paragraph 1, “Ordinance of the Ministry of Trade, Industry and Energy” shall be replaced with “Ordinance of the Ministry of Trade, Industry and Resources”. In the columns for types of accidents in Annex 1-5 Item 1 (d), Annex 5 Item 1 (a) 1) (a) proviso, Item 4) of the same item, Item 3 (a) 1) (g) ② (a) of the same table, Annex 6 Item 3 (d) 4), Annex 6-2 Item 6, Annex 7-3 Item 1 (excluding the table), Annex 10 Item 2 (b) 2) and 3), Annex 10 Item 4, Annex 11 Item 1 (d), Annex 11 Item 3, and Annex 17 Item 1 (e), “Minister of Trade, Industry and Energy” shall be replaced with “Minister of Trade, Industry and Resources” in each case. Front of Attached Form No. 1, Attached Form No. 2, Attached Form No. 2-2, Attached Form No. 3, Attached Form No. 4, Attached Form No. 4-3, Front and back of Attached Form No. 4-4, Front of Attached Form No. 5, Front of Attached Form No. 6, Front of Attached Form No. 9, Attached Form No. 9-2, Attached Form No. 10, Attached Form No. 10-2, Attached Form No. 10-3, Attached Form No. 10-4, Attached Form No. 11, Attached Form No. 11-2, Attached Form No. 11-3, Attached Form No. 11-4, Attached Form No. 11-5, Attached Form No. 11-6, Attached Form No. 12, Attached Form No. 13, Attached Form No. 14, Attached Form No. 19, In Forms No. 19-2, No. 23, No. 24, No. 24-2, No. 24-3, No. 24-4, No. 24-5, No. 26, No. 31, No. 35, No. 36, No. 42, No. 43, and No. 45, “Minister of Trade, Industry and Energy” shall be replaced with “Minister of Trade, Industry and Resources”. The processing procedure section on the back of Form No. 1, the processing procedure section of Form No. 2, the processing procedure section of Form No. 2-2, the processing procedure section of Form No. 3, the processing procedure section of Form No. 4, the processing procedure section of Form No. 4-2, the processing procedure section on the back of Form No. 9, the processing procedure section of Form No. 10, the processing procedure section of Form No. 10-2, the processing procedure section of Form No. 10-3, the processing procedure section of Form No. 11, Form No. 11-2, the processing procedure section of Form No. 11-3, the processing procedure section of Form No. 11-4, the processing procedure section of Form No. 13, the processing procedure section of Form No. 23, the processing procedure section of Form No. 24, the processing procedure section of Form No. 26, Form No. 43 In the processing procedure section and the processing procedure section of Form No. 45, “Ministry of Trade, Industry and Energy” shall be replaced with “Ministry of Trade, Industry and Resources”. In the front of attached Form No. 4-4, “Minister of Trade, Industry and Energy” shall be replaced with “Minister of Trade, Industry and Resources”. ⑬ through <54> Omitted ADDENDA <Ordinance of the Ministry of Trade, Industry and Resources No. 10, Mar. 31, 2026> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Climate, Energy and Environment Decree No. 56, Aug. 31, 2026> (Enforcement Rule of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management) Article 1 (Enforcement Date)  This rule shall enter into force on September 18, 2026. Article 2 (Amendment of Other Laws)  ① through ④ Omitted ⑤ Part of the Enforcement Rule of the Urban Gas Business Act shall be amended as follows. In Article 2, Paragraph 2, Subparagraph 2, Item (c), “Article 2, Paragraph 2” shall be changed to “Article 2, Paragraph 3”. ⑥ through ⑬ Omitted Article 3 Omitted [Attached Table 1] Protection Facilities (Related to Article 2, Paragraph 1, Item 10) [Attached Table 1-2] Standards for Administrative Dispositions by Violation (Related to Article 10-3) [Attached Table 1-3] Criteria for Imposing Surcharges (Related to Article 10-4, Paragraph 1) [Annex 1-4] Standards for Administrative Dispositions (Related to Article 10-12) [Attached Table 1-5] Criteria for Imposing and Calculating Surcharges (Related to Article 10-13, Paragraph 1) [Annex 1-6] Standards for Dispositions by Type of Violation (Related to Article 10-19) [Attached Table 2] Subjects of Approval for Construction Plans (Related to Article 11, Paragraph 1 and Article 62-2, Paragraph 1) [Attached Table 3] Subjects of Reporting for Construction Plans (Related to Article 11, Paragraph 2 and Article 62-2, Paragraph 2) [Appendix 5] Standards for Facilities, Technology, Inspection, Detailed Safety Diagnosis, and Safety Assessment of Gas Supply Facilities in Gas Wholesale Business (Related to Article 12, Paragraph 6, Subparagraph 3; Article 17, Subparagraph 1; Article 23, Paragraph 2, Subparagraph 1; Article 25, Paragraph 2, Subparagraph 1; Article 26, Paragraph 3, Subparagraph 1; and Article 27-3, Paragraph 8) [Appendix 6] Standards for Facilities, Technology, Inspection, and Detailed Safety Diagnosis of Gas Supply Facilities in General City Gas Businesses (Related to Article 5, Item 5; Article 17, Item 2; Article 23, Paragraph 2, Item 2; Article 23, Paragraph 3; Article 25, Paragraph 2, Item 1; Article 26, Paragraph 3, Item 2; and Article 27-3, Paragraph 8) [Appendix 6-2] Standards for Facilities, Technology, and Inspection of Gas Filling Facilities in City Gas Filling Businesses (Related to Article 17, Subparagraph 3; Article 23, Paragraph 2, Subparagraph 3; Article 25, Paragraph 2, Subparagraph 3; and Article 26, Paragraph 3, Subparagraph 3) [Appendix 6-3] Standards for Facilities, Technology, Inspection, and Detailed Safety Diagnosis of Gas Supply Facilities for Naphtha By-product Gas Manufacturing Businesses (Related to Article 17, Subparagraph 4; Article 23, Paragraph 2, Subparagraph 4; Article 23, Paragraph 3; Article 25, Paragraph 2, Subparagraph 4; Article 26, Paragraph 3, Subparagraph 4; and Article 27-3, Paragraph 8) [Appendix 6-4] Standards for Facilities, Technology, Inspection, and Detailed Safety Diagnosis of Gas Supply Facilities for Biogas Manufacturing Businesses (Related to Article 17, Item 5; Article 23, Paragraph 2, Item 5; Article 23, Paragraph 3; Article 25, Paragraph 2, Item 5; Article 26, Paragraph 3, Item 5; and Article 27-3, Paragraph 8) [Appendix 6-5] Standards for Facilities, Technology, Inspection, and Detailed Safety Diagnosis of Gas Supply Facilities for Synthetic Natural Gas Manufacturing Businesses (Related to Article 17, Item 6; Article 23, Paragraph 2, Item 6; Article 23, Paragraph 3; Article 25, Paragraph 2, Item 6; Article 26, Paragraph 3, Item 6; and Article 27-3, Paragraph 8) [Annex 6-6] Facility and Technical Standards for Gas Supply Facilities in Marine Natural Gas Businesses (Related to Article 17, subparagraph 6-2) [Appendix 7] Facility, Technical, and Inspection Standards for Gas Usage Facilities (Related to Article 17, Item 7; Article 20-2, Paragraph 2; Article 23, Paragraph 2, Item 7; Article 25, Paragraph 2, Item 7; and Article 26, Paragraph 3, Item 7) [Appendix 7-2] Standards and Methods for Safety Management Level Assessment, etc. (Related to Article 27-4, Paragraph 4) [Appendix 7-3] Cycle of Periodic Inspections and Verification/Evaluation of Compliance with Safety Management Regulations Based on Safety Management Level Assessment (Related to Article 27-4, Paragraph 5) [Attached Table 7-4] Standards for Preparation, Review, and Verification of Implementation Results of Gas Pipeline Integrity Management Plans (Related to Article 27-6, Paragraph 8) [Attached Table 8] Detailed Calculation Standards and Method of Sharing for Gas Supply Facility Installation Costs (Related to Article 31, Paragraph 1) [Appendix 8-2] Qualifications, etc. of Safety Inspectors for City Gas Filling Business Operators (Related to Article 31-2, Paragraph 3) [Annex 9] Matters to Be Included in Gas Supply Regulations (Related to Article 32 (3)) [Attached Table 9-2] Eligibility for Support for Reduction of City Gas Charges, etc. (Related to Article 34, Paragraph 1) [Appendix 10] Methods and Procedures for City Gas Quality Inspection, etc. (Related to Article 35, Paragraph 1) [Appendix 11] Guidelines for Drafting Safety Management Regulations (Related to Article 36) [Appendix 14] Method of Conducting Safety Education (Related to Article 50, Paragraph 1) [Appendix 16] Safety Measures and Damage Prevention Standards for City Gas Pipelines (Related to Article 52-2, Article 54 Paragraph 1 Subparagraph 6, Article 58, and Article 58-2 Paragraph 1 Subparagraph 4) [Appendix 17] Method of Notification of Accidents, etc. (Related to Article 63, Paragraph 2) [Attached Table 17-2] Insurance Amount (Related to Article 64, Paragraph 3, Subparagraph 2) [Appendix 18] Fees for Permits, etc. (Related to Article 65, Paragraph 1) [Attached Form No. 1] Application for City Gas Business Permit (Gas Wholesale or General City Gas) [Attachment Form No. 2] Application for Permission to Change City Gas Type, etc. [Attached Form No. 2-2] Application for Permission to Change Business Name or Representative [Attachment Form No. 3] Application for Permission to Change Gas Supply Facilities [Attachment Form No. 4] Application for Permission to Change Supply Area, etc. [Attached Form No. 4-2] Application for City Gas Filling Business Permit or Amendment Permit [Attachment Form No. 4-3] Application for [Naphtha Byproduct Gas Manufacturing, Biogas Manufacturing (Permit, Amendment Permit)] [Attachment Form No. 4-4] Application for Synthetic Natural Gas Manufacturing Business (Permit, Amendment Permit) [Attachment Form No. 5] City Gas Business Permit [Attachment Form No. 5-2] City Gas Filling Business Permit [Attachment Form No. 6] City Gas Manufacturing Business Permit [Attached Form No. 9] Report on Succession to the Status of a City Gas Business Operator, Natural Gas Import/Export Business Operator or Natural Gas Inward/Outward Movement Business Operator [Attachment Form No. 9-2] City Gas Business (Commencement, Suspension, Closure) Report [Attachment Form No. 10] Application for Natural Gas Import/Export Business (Registration, Conditional Registration) [Attached Form No. 10-2] Report on Natural Gas Inward/Outward Movement Business [Attached Form No. 10-3] Application for Amendment to Natural Gas Import/Export Business Registration or Report on Change in Natural Gas Inward/Outward Movement Business [Attached Form No. 10-4] Report on Commencement, Suspension or Closure of Natural Gas Import/Export Business or Natural Gas Inward/Outward Movement Business [Attachment Form No. 11] Application for Natural Gas [Import Contract, Export Contract, Transport Contract (Approval, Change Approval)] [Attached Form No. 11-2] Natural Gas Import, Export or Transportation Contract Report or Amendment Report [Attached Form No. 11-3] Report or Amendment Report on a Contract for Bringing Natural Gas In, Taking Natural Gas Out or Transporting Natural Gas [Attached Form No. 11-4] Application for Registration or Amendment of Registration of a Marine Natural Gas Business [Attachment Form No. 11-5] Notification of Marine Natural Gas Business (Commencement, Suspension, Closure) [Attached Form No. 11-6] Natural Gas Import, Export or Transportation Contract Report or Amendment Report [Attachment Form No. 12] Notification of Installation of Emergency Supply Facilities [Attachment Form No. 13] Application for Construction Plan (Approval, Change Approval) [Attached Form No. 14] Construction Plan Report or Report of Amendment [Attached Form No. 15] Application for Technical Review [Attachment Form No. 19] Application for Construction Supervision [Attached Form No. 19-2] Application for Intermediate Inspection [Attachment Form No. 20] Application for (Completion Inspection, Periodic Inspection) [Attachment Form No. 21] Construction Supervision Certificate [Attached Form No. 21-2] Certificate of Completion Inspection [Attachment Form No. 22] Periodic Inspection Certificate [Attached Form No. 22-2] Periodic Inspection Certificate [Attached Form No. 23] Application for Temporary Use [Attachment Form No. 24] Application for Exemption from Periodic Inspection (All or Partial) [Attached Form No. 24-2] Application for Detailed Safety Diagnosis or Safety Assessment [Attached Form No. 24-3] Application for Safety Management Level Assessment [Attached Form No. 24-4] Application for Review of a Basic Implementation Plan [Attached Form No. 24-5] Application for Verification of Implementation Results [Attachment Form No. 25] City Gas Consumer Facility Safety Inspection Checklist [Attachment Form No. 26] Application for Supply Regulations (Approval, Change Approval) [Attachment Form No. 28] Quality Inspection Record Book [Attachment Form No. 29] Quality Inspection Performance Report [Attachment Form No. 31] Application for Review of Safety Management Regulations (Amendment) [Attachment Form No. 34] Consultation on Safety Measures for City Gas Pipelines, etc. [Attachment Form No. 35] Safety Manager (Appointment, Dismissal, Retirement) Report [Attachment Form No. 36] Safety Training Application Form [Attachment Form No. 39] Excavation Work Consultation [Attachment Form No. 41] Register of Approvals and Notifications for Gas Supply Facility Construction Plans (Changes) [Attachment Form No. 42] Construction [Plan, Plan Change (Approval, Report Certificate)] [Attachment Form No. 43] Application for Piping Facility Usage Regulations (Approval, Change Approval) [Attachment Form No. 44] Guidelines for the Use of Piping Facilities (Notification Form, Change Notification Form) [Attachment Form No. 45] Guidelines for the Use of Manufacturing Facilities (Notification Form, Change Notification Form) [Attached Form No. 46] Application for Permission to Use Land [Attachment Form No. 47] Land Use Permit