Rules concerning the connection of roads and other facilities
235051 · 2021-08-27
Article 1 (Purpose) The purpose of this Rule is to ensure traffic safety and smooth flow and to preserve road structures by establishing permit standards, permit procedures, installation standards, and other necessary matters for cases where other roads, passages, or other facilities are to be connected to a road pursuant to Article 52 of the Road Act. <Amended July 15, 2014>
[Wholly Revised 2010.9.15]
Article 2 (Definitions) The meanings of terms used in this Rule are as follows: <Amended Dec. 29, 2014, Mar. 6, 2020>
1. "Transmission lane" refers to a lane installed for the purpose of accelerating or decelerating a vehicle.
2. "Taper" refers to a triangular section of roadway installed at sections where lanes separate or connect to facilitate smooth lane changes for moving vehicles.
3. The term "ancillary facilities" refers to guardrails, rockfall prevention facilities, private guide signs, road markings, median strips, etc., installed on a road for the safety of moving vehicles.
4. "Auxiliary lane" refers to a lane installed between project sites connected by a deceleration/acceleration lane.
5. "Intersection" refers to a space where two or more roads intersect or connect, such as a three-way intersection, a four-way intersection, a roundabout, or an overpass.
6. Delete<2014.12.29>
7. "Connecting road" refers to a road that connects intersecting roads at an overpass or connects roads with a difference in elevation.
8. "Side road" refers to a road installed parallel to the main roadway to allow vehicles to access the surrounding area of the road.
9. "Traffic island" refers to an island-shaped facility installed at intersections or roadway junctions, etc., to ensure the safe and smooth flow of vehicular traffic or the safety of pedestrians crossing the road.
10. "Shoulder" refers to a part of the road installed adjacent to a lane for the purpose of protecting the road and for use in emergencies or for maintenance.
11. "Curb" refers to a boundary stone installed adjacent to the boundary line between a sidewalk, etc. and a roadway.
[Wholly Revised 2010.9.15]
Article 3 (Scope of Application)
① This Rule applies to cases where another road, passage, or other facility (hereinafter referred to as "other facility") is connected to the right side of the vehicle direction of travel of a road (excluding connections by intersection) to enable entry or exit to the right side of the vehicle direction of travel of a general national road pursuant to Article 12, Paragraph 1 of the Road Act (hereinafter referred to as the "Act") (excluding general national roads to which Article 23, Paragraph 2 of the Act applies; hereinafter referred to as "general national road"). <Amended July 15, 2014, December 29, 2014>
② Except in cases of connection pursuant to Paragraph 1, the provisions of the “Rules on Standards for Structure and Facilities of Roads” shall apply. However, even in such cases, the application for a connection permit shall be in accordance with Paragraphs 1 and 2 of Article 4.
[Wholly Revised 2010.9.15]
Article 4 (Application for Connection Permission, etc.)
① In order to connect other facilities to a general national road pursuant to Article 52, Paragraph 1 of the Act, an application for permission to connect a road and other facilities in the form of Annex No. 1 must be submitted to the road management authority (hereinafter referred to as the "management authority"). <Amended July 15, 2014, December 29, 2014>
② The application for permission to connect a road and other facilities pursuant to Paragraph 1 shall be accompanied by the documents specified in each of the following subparagraphs. <Amended 2014.12.29>
1. Consolidation Plan
2. Design drawings of acceleration/deceleration lanes, auxiliary lanes, turning lanes (hereinafter referred to as "acceleration/deceleration lanes, etc.") and ancillary facilities, etc. (The area of the occupied space shall be indicated on a plan view of 1/1,200 or larger, showing the left and right distances and positions from the road centerline)
3. Statement of Opinion from the Manager of Major Underground Utilities (Applicable only when connection work is performed in an occupied area containing major underground utilities)
③ The consolidation plan pursuant to Paragraph 2, Subparagraph 1 shall include the following matters:
1. Project Overview (including purpose, scale, duration, and investment plan, and traffic demand analysis if necessary)
2. Installation Plan for Acceleration Lane Lights
3. Installation Plan for Ancillary Facilities
4. Safety Management Measures and Traffic Management Measures During Connection Construction
5. Statutory number of parking spaces for facilities intended for road connection (limited to cases where facilities exist)
④ The preparation of design drawings for acceleration/deceleration lanes, etc., pursuant to Paragraph 2, Subparagraph 2 shall comply with the preparation guidelines and installation methods prescribed in Annex 1 and Annex 2.
⑤ If a person who has applied for a connection permit pursuant to Paragraph 1 wishes to extend the connection permit period or change the contents of the permit after receiving the permit, they shall submit an Application for Extension of Connection Permit Period (Form No. 2) or an Application for Change of Connection Permit (Form No. 3) (subject to attach documents related to the changes) to the administrative authority. <Amended Dec. 29, 2014; Aug. 3, 2021>
[Wholly Revised 2010.9.15]
Article 4-2 (Request for Prior Confirmation of Connection Permission)
① Any person who intends to connect another facility to a national road pursuant to Article 52, Paragraph 1 of the Act may request the administrative authority to confirm in advance whether the section of the road for which connection is sought falls under the section prohibited from connection permits pursuant to Article 6, prior to applying for a connection permit pursuant to Article 4, Paragraph 1.
② Any person who intends to request prior confirmation pursuant to Paragraph 1 shall submit to the administrative authority an Application for Prior Confirmation of Permission for Connection of Roads and Other Facilities (Form No. 1-2), attaching a drawing indicating the location of the facility to be connected and photographs of the site.
③ Upon receiving an application pursuant to Paragraph 2, the administrative authority shall verify whether the section of the road for which connection is requested falls under the section prohibited from connection permit pursuant to Article 6, and notify the applicant of the result.
[This Article Newly Established 2021.8.3]
Article 5 (Standards for Connection Permits in Urban Areas, etc.)
① In cases where the managing authority intends to connect other facilities to a national highway in an urban area pursuant to Article 6, Subparagraph 1 of the Act on Planning and Utilization of National Land (hereinafter referred to as "urban area"), and the national highway falls under any of the following subparagraphs, it shall grant permission in accordance with the relevant plan (including permission for extension and permission for modification pursuant to Article 4, Paragraph 6; hereinafter the same applies). <Amended Apr. 13, 2012; Dec. 29, 2014>
1. Where the relevant national road has been improved in accordance with the urban/county management plan pursuant to Article 2, Subparagraph 4 of the Act on Planning and Utilization of National Land (hereinafter referred to as the "urban/county management plan")
2. In cases where the first phase of the phased execution plan under Article 85 of the National Land Planning and Utilization Act has been established for the relevant national road on the date of application for permission to connect the road and other facilities
② If the managing authority intends to connect other facilities to a general national road currently under construction, it may grant permission to the extent that it does not impede the relevant road construction. In such cases, the managing authority shall prepare a "Survey of the Current Status of Road Facilities in the Section Applying for Permission to Connect Road and Other Facilities" in accordance with Form No. 4 (attaching supporting data for the calculation of road facility quantities and project costs, as well as photographs of construction quantities) for the permitted connection section, and take necessary measures such as modifying the design. <Amended Dec. 29, 2014>
[Wholly Revised 2010.9.15]
Article 6 (Sections Prohibited from Connection Permits) The managing authority shall not permit the connection of other facilities to any section of a general national road falling under any of the following subparagraphs. However, subparagraphs 1, 2, 5, and 6 shall not apply to general national roads located in urban areas that fall under any of the subparagraphs of Article 5, Paragraph 1. <Amended Apr. 13, 2012; Dec. 29, 2014; Mar. 6, 2020; Aug. 3, 2021>
1. Inner curve section where the distance from the centerline of the inner lane to an obstacle in a curve section with a radius of less than 280 meters (140 meters in the case of a two-lane road) is not equal to or greater than the minimum distance specified in Attached Table 3, and thus the sight distance cannot be secured
2. Sections where the longitudinal gradient exceeds 6 percent in flat areas or 9 percent in mountainous areas. However, if an uphill lane is installed, a connection may be permitted for the section outside the uphill lane.
3. For intersections connecting a general national road and a road falling under any of the following subparagraphs, the section within the prohibited zone specified in the criteria for calculating the prohibited intersection connection section pursuant to Annex 4. However, in the case of a general national road falling under any of the subparagraphs of Article 5, Paragraph 1, or when installing access roads for houses with five or fewer households and small-scale rural facilities (referring to small-scale livestock sheds or warehouses, etc., that can be constructed solely through a building report pursuant to Article 14 of the Building Act), the restricted distances pursuant to Subparagraphs 2 and 3 of Annex 4 shall not be included in the prohibited zone.
A. Roads pursuant to Article 2, Subparagraph 1 of the Road Act
B. Among the Myeon roads established with two or more lanes pursuant to Article 4 of the "Rural Road Improvement Act"
c. A road with two or more lanes where the width of the roadway (excluding the width of the shoulder) is 6 meters or more
D. Roads recognized as causing significant impediment to traffic safety and flow due to road connection, as a result of consulting with traffic safety-related agencies, such as the head of the competent police station
4. Delete<2014.12.29>
5. Among facilities such as tunnels and underpasses, where lighting facilities, etc. are installed because the difference in light and shadow between the interior and exterior of the facility is large, making it difficult to recognize obstacles, and which falls under any of the following subparagraphs
A. General national roads with a design speed of 60 kilometers per hour or less: Section within 300 meters of the relevant facility
B. General national roads with a design speed exceeding 60 kilometers per hour: Section within 350 meters of the relevant facility
6. Sections where acceleration/deceleration lanes cannot be installed due to facilities such as bridges
7. Sections where resident convenience facilities, such as bus stops and sidewalks, are installed and cannot be relocated, or where relocation would pose a risk to resident traffic.
[Wholly Revised 2010.9.15]
Article 7 (Pavement of Speed Lanes, etc.)
① For deceleration lanes, etc., the section where the connecting road is vertically cut shall be paved with a thickness and material capable of maintaining the same strength as the pavement of that road.
② Acceleration lanes, etc., shall be paved with a transverse gradient that is equal to or gentler than that of the connecting road so as not to hinder drainage of the road surface.
[Wholly Revised 2010.9.15]
Article 8 (Transfer Lanes) Transfer lanes shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014, Aug. 27, 2021>
1. The length shall be greater than or equal to the standards specified in Attached Table 5
2. The width shall be at least 3.25 meters
3. Road markings shall be provided to facilitate the smooth entry and exit of vehicles.
4. The connection points of acceleration/deceleration lanes adjacent to the project site shall be treated as curves with a radius of 12 meters or more. However, if a curve radius specified in Attached Table 2 exists, it shall be followed.
5. The gradient of slopes, such as embankments (referring to the part where soil has been piled up) and cut sections (referring to the part where the ground has been cut), shall be installed to be equal to or gentler than that of the connecting road.
[Wholly Revised 2010.9.15]
Article 8-2 (Auxiliary Lanes) Auxiliary lanes shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014>
1. Unless there are special circumstances, the length shall be 500 meters or less
2. The width shall be at least 3 meters
3. The connection between the project site and the auxiliary lane shall be treated as a curve with a radius of 12 meters or more. However, if a curve radius specified in Attached Table 2 exists, it shall be followed.
[Wholly Revised 2010.9.15]
Article 9 (Drainage Facilities) Drainage facilities shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014>
1. Install curbs on the outer side of the shoulder to manage rainwater, etc. on the road surface.
2. Connect in a way that does not interfere with the existing drainage system
3. If the drainage facilities of the connecting road are buried due to the installation of acceleration/deceleration lanes, etc., drainage pipes of a larger size than the existing pipes shall be installed to ensure that drainage is not hindered; if drainage facilities such as U-shaped side ditches are already maintained, drainage pipes of the same cross-section may be installed to ensure that drainage is not hindered; and manholes with lids shall be installed at regular intervals of no more than 20 meters to easily remove sediment and other debris accumulated in the drainage facilities.
4. Separate drainage facilities shall be installed to prevent sewage or rainwater from facilities connected to acceleration/deceleration lanes, etc., from flowing onto the connecting road. In this case, the drainage facility shall be a U-shaped concrete side ditch with an effective width of at least 30 centimeters and an effective depth of at least 60 centimeters, equipped with a grid-type steel cover.
[Wholly Revised 2010.9.15]
Article 10 (Separators) Separators shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014>
1. In front of the project site, excluding the entrances and exits of the acceleration/deceleration lanes, a median barrier shall be installed on the outer shoulder of the connecting road to prevent disorderly entry and exit of vehicles.
2. Median strips shall be installed as flowerbeds, guardrails, traffic islands (limited to cases where deceleration lanes, etc. are installed pursuant to Subparagraphs 3(a) and 4(a) of Annex 2), or other similar structures; provided, however, that impact absorption facilities shall be installed at the entrance of deceleration lanes if necessary to prevent safety accidents.
3. Median strips shall be installed at a height of at least 0.3 meters (0.12 meters for traffic islands), ensuring that there is no obstruction to visibility.
4. When installing median strips as flowerbeds, their width shall be at least 1 meter, and measures shall be taken to prevent rainwater, etc. from accumulating on the surface of the median strip; provided that, if necessary, a U-shaped concrete side ditch with a grid-type steel lid at least 30 centimeters wide shall be installed separately from the drainage facilities of acceleration/deceleration lanes, etc.
5. Attach reflective sheets capable of strongly reflecting light to the dividers or install visual guidance lights so that drivers can recognize the dividers at night.
6. When installing an additional deceleration lane for another facility in connection with an existing deceleration lane, the connected facility shall be regarded as a single integrated facility, and a continuous divider suitable for it shall be installed.
[Wholly Revised 2010.9.15]
Article 11 (Shoulders of Acceleration/Deceleration Lanes, etc.) Shoulders shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014, Aug. 27, 2021>
1. The shoulder of the acceleration/deceleration lane shall be installed with a width of at least 1 meter and a structure equivalent to the shoulder of the connecting road. However, if the shoulder is also used as a sidewalk, measures must be taken to ensure the width of the sidewalk.
2. If there is a risk that the road surface of a deceleration lane, etc., will be encroached upon by the parking space of a facility connected to the deceleration lane, etc., install curbs, guardrails, etc., on the outer side of the shoulder.
3. A side strip (referring to a section installed on a median strip or shoulder that connects to the roadway with the same transverse slope and structure as the roadway to guide the driver's line of sight and secure lateral clearance) with a width of at least 0.25 meters shall be installed on the shoulder of the acceleration/deceleration lane.
4. Secure a protective shoulder on the outer side of the shoulder of the acceleration/deceleration lane where guardrails, etc. can be installed.
[Wholly Revised 2010.9.15]
Article 12 (Ancillary Facilities) Ancillary facilities for deceleration lanes, etc., shall be installed in accordance with the standards of each of the following subparagraphs. <Amended Dec. 29, 2014>
1. Safety facilities such as guardrails and rockfall prevention facilities shall be installed in accordance with local conditions or the topographical conditions of the slope.
2. Road markings such as acceleration/deceleration lanes shall be of the same specifications as the connecting road, and safety zone markings shall be provided in areas where median barriers are not installed.
[Wholly Revised 2010.9.15]
Article 13 (Execution of Construction) Where there are no vehicle entry or exit routes except for the relevant acceleration/deceleration lanes, etc., construction of acceleration/deceleration lanes, etc. shall be carried out first among all facility constructions to enhance the efficiency of construction execution and ensure the safe entry and exit of construction vehicles.
[Wholly Revised 2010.9.15]
Article 14 Deleted <2002.4.27>
[Attachment Form No. 1] <Revised 2014.12.29.>
Application for Permission to Connect Roads and Other Facilities
──────────┬─────────────────────────┬───────────────────────
Receipt No. Receipt Date Processing Period 21 days
──────────┴─────────────────────────┴───────────────────────
─────┬─────────────────────┬────────────────────────────────
Applicant's Name (In the case of a corporation, its name and the name of the representative) Date of Birth (Corporate Registration Number or Alien Registration Number)
├─────────────────────┴────────────────────────────────
Address (Location of the principal office for corporations)
├───┬──────────┬──────────────┬────────────────────────
Contact Phone Mobile Phone Email
─────┴───┴──────────┴──────────────┴────────────────────────
─────┬─────────────────────┬────────────────────────────────
Application ① Purpose of Connection ② Period of Occupancy
Content
Occupied Location·Occupied Area
│ ( ㎡)
├─────────────────────┬────────────────────────────────
Construction Implementation Method Construction Period
Year Month Day ~ Year Month Day
├─────────────────────┴────────────────────────────────
Road Repair Method
├──────────────────────────────────────────────────────
③ Road Type and Route Name
├──────────────────────────────────────────────────────
Types and names of other facilities connecting to the road
─────┴──────────────────────────────────────────────────────
Pursuant to Articles 52 and 61 of the "Road Act" and Article 4 of the "Rules on the Connection of Roads and Other Facilities," regarding a road, another road,
.
Year Month Day
Applicant (Signature or Seal)
To the Road Administration
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬─────────────────────────────────────────────┬──────
Applicant 1. Consolidation Plan Fee:
Submission Documents 2. Design Drawings (referring to design drawings for acceleration/deceleration lanes, auxiliary lanes, turning lanes, and ancillary facilities, etc., and 1,000 won of the occupied area
Area indicates the left and right distances and positions from the road centerline on a plan of 1/1,200 or larger)
3. Statement of Opinion from the Manager of Major Underground Utilities (Regarding connection work being carried out in an occupied area where major underground utilities are located
Applies only in this case.)
───────┼─────────────────────────────────────────────┴──────
Note 1. Connecting another road, passageway, or other facility to a road without permission is punishable by imprisonment for up to 2 years or a fine of up to 20 million won.
Subject to a fine (Article 114, Subparagraph 5 of the Road Act).
2. Occupying a road without permission is punishable by imprisonment for up to two years or a fine of up to 20 million won, and compensation fees may be imposed.
is (Article 72 and Article 114, Subparagraph 6 of the Road Act).
3. The permit holder shall pay an occupancy fee in accordance with relevant regulations, and if the occupancy exceeds the permitted area, a fee of not more than 3 million won
An administrative fine will be imposed (Article 66 and Article 117, Paragraph 2, Subparagraph 1 of the Road Act).
4. To extend the permit period, you must obtain an extension permit before the permit period expires.
───────┼────────────────────────────────────────────────────
Instructions: In Section ①, state the purpose of the connection, such as a rest area, gas station, factory, apartment, or access road.
Column ② refers to cases where the object is an occupied object pursuant to Article 55, Paragraph 5, Subparagraphs 1 through 5, 7, 9, and 10 of the Enforcement Decree of the Road Act
Write within 10 years, and for other occupied objects, write within 3 years.
In column ③, enter the national highway route number. (e.g., National Highway No. ○○, etc.)
───────┴────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing procedure
────────────────────────────────────────────────────────────
┌───┐ ┌───┐ ┌────┐ ┌───┐ ┌───┐ ┌───┐ ┌───┐
Application ? Receipt ? On-site Inspection ? Review ? Approval ? Permit ? Issuance
Write
└───┘ └───┘ └────┘ └───┘ └───┘ └───┘ └───┘
Applicant Processing Agency Processing Agency Processing Agency Processing Agency
────────────────────────────────────────────────────────────
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
Original file: /LSW/flDownload.do?flSeq=107004957
Original file: /LSW/flDownload.do?flSeq=107004959
Original file: /LSW/flDownload.do?flSeq=107004961
[Attachment Form No. 1-2] <Newly Inserted Aug. 3, 2021>
Application for Preliminary Confirmation of Permission for Connection of Roads and Other Facilities
───────────┬───────────────────┬────────────
Receipt No. Receipt Date Processing Period 7 days
───────────┴───────────────────┴────────────
─────┬─────────────────────┬────────────────
Applicant's Name (In the case of a corporation, its name and the name of the representative) Date of Birth (Corporate Registration Number)
├─────────────────────┴────────────────
Address (Location of the principal office for corporations)
├───┬───────┬────────────────┬─────────
Contact Phone Mobile Phone Email
─────┴───┴───────┴────────────────┴─────────
─────┬──────────────────────────────────────
Application ① Purpose of Connection
Content
② Type of Road and Route Name
│
├──────────────────────────────────────
Connection Request Location
│
├──────────────────────────────────────
③ Project Site Location
│
├──────────────────────────────────────
Project Site Area (Building Area, Statutory Parking Capacity, etc.)
│
─────┴──────────────────────────────────────
Pursuant to Articles 52 and 61 of the Road Act and Article 4-2 of the Rules on the Connection of Roads with Other Roads, etc., roads and other
I am applying for preliminary confirmation of the facility connection permit.
Year Month Day
Applicant (Signature or Seal)
To the Road Administration
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬────────────────────────────┬────────
Applicant 1. Drawing showing the location of the facility to be connected Fee: None
Submission Documents 2. Site photos including the facility to be connected
──────┼────────────────────────────┴────────
Note 1. To save the applicant's cost and time, the application for prior confirmation of a permit to connect a road and other facilities requires a location map and site photos.
.
2. Even if notified that it is possible during the preliminary verification, the review of the facility structure, etc. and the results of the on-site investigation in the actual permit application
You may receive a denial depending on the department.
──────┼─────────────────────────────────────
Instructions: In Section ①, state the purpose of the connection, such as access roads to rest areas, gas stations, factories, or apartment complexes.
In column ②, enter the national highway route number. (e.g., National Highway No. ○○, etc.)
In column ③, write the location of other facilities connected to the road.
──────┴─────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing procedure
────────────────────────────────────────────
┌────┐ ┌───┐ ┌───┐ ┌───┐ ┌─────┐
Application ? Receipt ? Review ? Approval ? Notification of Result
Write
└────┘ └───┘ └───┘ └───┘ └─────┘
Applicant Processing Agency Processing Agency Processing Agency
────────────────────────────────────────────
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
Original file: /LSW/flDownload.do?flSeq=107004963
Original file: /LSW/flDownload.do?flSeq=107004965
Original file: /LSW/flDownload.do?flSeq=107004967
[Attachment Form No. 2] <Revised 2014.12.29.>
Application for Extension of Permit Period for Connection of Roads and Other Facilities
──────────┬─────────────────────────┬─────────────
Receipt No. Receipt Date Processing Period 7 days
──────────┴─────────────────────────┴─────────────
─────┬─────────────────────┬──────────────────────
Applicant's Name (In the case of a corporation, its name and the name of the representative) Date of Birth (Corporate Registration Number or Alien Registration Number)
├─────────────────────┴──────────────────────
Address (Location of the principal office for corporations)
├───┬──────────┬──────────────┬──────────────
Contact Phone Mobile Phone Email
─────┴───┴──────────┴──────────────┴──────────────
─────┬─────────────────────┬──────────────────────
Application ① Permit Number Original Permit Period
Content
② Connection Purpose
├────────────────────────────────────────────
Occupied Location·Occupied Area
│ ( ㎡)
├────────────────────────────────────────────
③ Road Type and Route Name
├────────────────────────────────────────────
Types and names of other facilities connecting to the road
├────────────────────────────────────────────
Reason for extension
─────┴────────────────────────────────────────────
Pursuant to Articles 52 and 61 of the "Road Act" and Article 4, Paragraph 6 of the "Rules on the Connection of Roads and Other Facilities," other roads on a road
.
Year Month Day
Applicant (Signature or Seal)
To the Road Administration
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬──────────────────────────────────┬───────
No applicant Fee:
Submission Documents 1,000 KRW
───────┼──────────────────────────────────┴───────
Note 1. Connecting another road, passage, or other facility to a road without permission is punishable by imprisonment for up to 2 years or a fine of up to 20 million won.
Subject to a fine (Article 114, Subparagraph 5 of the Road Act).
2. Occupying a road without permission is punishable by imprisonment for up to two years or a fine of up to 20 million won, and compensation fees may be imposed.
is (Article 72 and Article 114, Subparagraph 6 of the Road Act).
3. The permit holder shall pay an occupancy fee in accordance with relevant regulations, and if the occupancy exceeds the permitted area, a fee of not more than 3 million won
An administrative fine will be imposed (Article 66 and Article 117, Paragraph 2, Subparagraph 1 of the Road Act).
4. To extend the permit period, you must obtain an extension permit before the permit period expires.
───────┼──────────────────────────────────────────
Instructions: In Section ①, write the previously approved permit number.
In column ②, write the purpose of the connection, such as a rest area, gas station, factory, apartment, or access road.
In column ③, enter the national highway route number. (e.g., National Highway No. ○○, etc.)
───────┴──────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing procedure
──────────────────────────────────────────────────
┌───┐ ┌───┐ ┌────┐ ┌───┐ ┌───┐ ┌───┐ ┌───┐
Application ? Receipt ? On-site Inspection ? Review ? Approval ? Permit ? Issuance
Write
└───┘ └───┘ └────┘ └───┘ └───┘ └───┘ └───┘
Applicant Processing Agency Processing Agency Processing Agency Processing Agency
──────────────────────────────────────────────────
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
Original file: /LSW/flDownload.do?flSeq=107004969
Original file: /LSW/flDownload.do?flSeq=107004971
Original file: /LSW/flDownload.do?flSeq=107004973
[Attachment Form No. 3] <Revised 2014.12.29.>
Application for Change of Permit for Connection of Roads and Other Facilities
──────────┬─────────────────────────┬─────────────
Receipt No. Receipt Date Processing Period 10 days
──────────┴─────────────────────────┴─────────────
─────┬─────────────────────┬──────────────────────
Applicant's Name (In the case of a corporation, its name and the name of the representative) Date of Birth (Corporate Registration Number or Alien Registration Number)
├─────────────────────┴──────────────────────
Address (Location of the principal office for corporations)
├───┬──────────┬──────────────┬──────────────
Contact Phone Mobile Phone Email
─────┴───┴──────────┴──────────────┴──────────────
─────┬─────────────────────┬──────────────────────
Application ① Permit Number Permit Period
Content
② Connection Purpose
├────────────────────────────────────────────
Occupied Location·Occupied Area
│ ( ㎡)
├────────────────────────────────────────────
③ Road Type and Route Name
├────────────────────────────────────────────
Types and names of other facilities connecting to the road
├────────────────────────────────────────────
Changes
─────┴────────────────────────────────────────────
Pursuant to Articles 52 and 61 of the "Road Act" and Article 4, Paragraph 6 of the "Rules on the Connection of Roads and Other Facilities," other roads on a road
.
Year Month Day
Applicant (Signature or Seal)
To the Road Administration
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────┬──────────────────────────────────┬───────
Applicant Changes Related Books Fee:
Submission Documents 1,000 KRW
───────┼──────────────────────────────────┴───────
Note 1. Connecting another road, passage, or other facility to a road without permission is punishable by imprisonment for up to 2 years or a fine of up to 20 million won.
Subject to a fine (Article 114, Subparagraph 5 of the Road Act).
2. Occupying a road without permission is punishable by imprisonment for up to two years or a fine of up to 20 million won, and compensation fees may be imposed.
is (Article 72 and Article 114, Subparagraph 6 of the Road Act).
3. The permit holder shall pay an occupancy fee in accordance with relevant regulations, and if the occupancy exceeds the permitted area, a fee of not more than 3 million won
An administrative fine will be imposed (Article 66 and Article 117, Paragraph 2, Subparagraph 1 of the Road Act).
4. To extend the permit period, you must obtain an extension permit before the permit period expires.
───────┼──────────────────────────────────────────
Instructions: In Section ①, write the previously approved permit number.
In column ②, write the purpose of the connection, such as a rest area, gas station, factory, apartment, or access road.
In column ③, enter the national highway route number. (e.g., National Highway No. ○○, etc.)
───────┴──────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing procedure
──────────────────────────────────────────────────
┌───┐ ┌───┐ ┌────┐ ┌───┐ ┌───┐ ┌───┐ ┌───┐
Application ? Receipt ? On-site Inspection ? Review ? Approval ? Permit ? Issuance
Write
└───┘ └───┘ └────┘ └───┘ └───┘ └───┘ └───┘
Applicant Processing Agency Processing Agency Processing Agency Processing Agency
──────────────────────────────────────────────────
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
Original file: /LSW/flDownload.do?flSeq=107004975
Original file: /LSW/flDownload.do?flSeq=107004977
Original file: /LSW/flDownload.do?flSeq=107004979
[Attachment Form No. 4] <Revised 2014.12.29.>
Current Status Survey of Road Facilities for the Section for which Permission to Connect Roads and Other Facilities is Applied
─────┬───────────────────────────────────────────────
Applicant's Name (In the case of a corporation, its name and the name of its representative)
├───────────────────────────────────────────────
Address (Location of the principal office for corporations)
─────┴───────────────────────────────────────────────
─────┬───────────────────────────────────────────────
Connecting Road Type and Route Name
Overview
Types and names of other facilities connecting to the road
├───────────────────────────────────────────────
Road connection point
├───────────────────────────────────────────────
Purpose of Use
─────┴───────────────────────────────────────────────
─────┬─────────────┬─────────────────────────────────
Road Construction Volume Unconstructed Volume
Facilities
Construction Facility Name Unit Quantity Project Cost Facility Name Unit Quantity Project Cost
Status
│ │ │ │ │ │ │ │
─────┴───┴──┴──┴───┴───┴──┴──┴───────────────────────
Year Month Day
Author (Signature or Seal)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬──────────────────────────────────────────────
Note: Attach supporting data for the calculation of road facility quantities and project costs, as well as photographs of construction quantities, to the status report.
──────┴──────────────────────────────────────────────
210㎜×297㎜[White Paper 80g/㎡ (Recycled)]
Original file: /LSW/flDownload.do?flSeq=107004981
Original file: /LSW/flDownload.do?flSeq=107004983
Original file: /LSW/flDownload.do?flSeq=107004985
Revision
⊙Ministry of Land, Infrastructure and Transport Decree No. 882 (Aug. 27, 2021)
Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Ordinances for the Reorganization of Difficult Legal Terms
Articles 1 through 28 Omitted
Article 29 (Amendment to the Rules on the Connection of Roads and Other Facilities) Parts of the Rules on the Connection of Roads and Other Facilities are amended as follows.
In the part other than the subparagraphs of Article 8, "shall be installed" shall be changed to "must be installed," and in Subparagraph 5 of the same article, "embankment section, cut section" shall be changed to "embankment section (referring to the part where soil has been piled up), cut section (referring to the part where the ground has been cut)."
In the part other than the subparagraphs of Article 11, "shall be installed" shall be changed to "must be installed," and in Subparagraph 3 of the same Article, "side strip" shall be changed to "side strip (referring to a part installed on a median strip or shoulder that is connected to the roadway with the same transverse slope and structure as the roadway to guide the driver's gaze and secure lateral clearance)."
Articles 30 through 80 omitted
Supplementary Provisions
This rule shall take effect from the date of promulgation. <Proviso omitted>
Reason for Enactment/Amendment
[Batch Revision]
◇ Reasons for Amendment and Key Contents
The purpose is to establish substantive rule of law and enhance the convenience of public use of the law by amending 80 ordinances of the Ministry of Land, Infrastructure and Transport, including the "Enforcement Rules of the Special Act on the Construction and Operation of Bus Rapid Transit Systems," to make them easier for the public to understand. This is achieved by replacing difficult and Japanese-style terms found in current laws—such as technical jargon and rarely used Sino-Korean words (e.g., changing "gulsak" to "gulchak" and "gongran" to "binkan")—with simple and natural Korean words, or by including accompanying explanations for the terms.
<Provided by the Ministry of Land, Infrastructure and Transport>