국가를 당사자로 하는 계약에 관한 법률 시행규칙

282607 · 2026-01-02

Ministry of Finance and Economy ( Contract Policy Division ), 044-215-5213, 5217, 5218 Public Procurement Service ( Office of Regulatory Reform and Legal Affairs ), 042-724-7277, 7249 Chapter 1 General Provisions Article 1 (Purpose) These Rules prescribe matters delegated by the Act on Contracts to Which the State Is a Party and its Enforcement Decree, as well as matters necessary for their enforcement. <Amended Sep. 8, 2005> Article 2 (Definitions) The definitions of terms used in this Rule are as follows. <Amended Dec. 12, 2003; Sep. 8, 2005; May 25, 2006> 1. The term “contracting officer” refers to a public official who has been delegated by the head of each central government agency affairs regarding contracts that are the cause of revenue; a finance officer pursuant to Article 22 of the National Treasury Management Act (including deputy finance officers, deputy finance officers, and deputy deputy finance officers; hereinafter the same applies); a contracting officer pursuant to Article 6, Paragraph 1 of the Act on Contracts to Which the State is a Party (hereinafter referred to as the “Act”) (including deputy contracting officers, deputy contracting officers, and deputy deputy contracting officers; hereinafter the same applies); and an office operating expense disbursement officer who can receive funds from an expenditure officer and perform acts causing payment pursuant to Article 24 of the National Treasury Management Act (including deputy office operating expense disbursement officers, deputy office operating expense disbursement officers, and deputy deputy office operating expense disbursement officers; hereinafter the same applies); and other public officials responsible for contracts that are the cause of the disbursement of funds or funds other than revenue and expenditure pursuant to laws and regulations. says. 2. The term “estimated amount” refers to the sum of the estimated price under Article 2, subparagraph 1 of the Enforcement Decree of the Act on Contracts to Which the State is a Party (hereinafter referred to as the “Decree”), the value-added tax under the Value-Added Tax Act, and the price of the portion to be supplied as government-supplied materials in the case of construction. Article 3 (Scope of Application) The head of each central government agency or the contracting officer shall handle matters concerning contracts in accordance with the provisions of this rule, except where there are special provisions in other laws and regulations. Chapter 2 Estimated Price Article 4 (Preparation of Estimated Price Statement) When the head of a central government agency or the contracting officer intends to determine an estimated price under Article 9 of the Enforcement Decree, the official shall prepare an estimated price statement in advance. Article 5 (Determination of Estimated Price Based on Actual Transaction Prices and Standard Market Unit Prices) ① In determining the estimated price based on the actual transaction price pursuant to Article 9, Paragraph 1, Subparagraph 1 of the Enforcement Decree, it shall be a price falling under any of the following subparagraphs; provided, however, that general administrative expenses and profit pursuant to Article 6, Paragraph 1, Subparagraphs 4 and 5 shall not be separately added to the said actual transaction price. <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> 1. The price investigated and notified by the Administrator of the Public Procurement Service 2. Prices investigated and published by an institution registered with the Minister of Finance and Economy as a professional price research agency that meets the standards set by the Minister of Finance and Economy. 3. The price confirmed by the head of each central government agency or the contracting officer through a direct investigation of actual transaction records of the relevant goods with respect to two or more business operators. ② When determining the estimated price based on standard market unit prices pursuant to Article 9, Paragraph 1, Subparagraph 3 of the Enforcement Decree, it shall be calculated in consideration of market conditions and construction conditions, based on contract unit prices, bid unit prices, and construction unit prices by type of work already performed; provided, however, that necessary matters in this regard shall be determined by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Mar. 5, 2009; Nov. 4, 2014; Jan. 2, 2026> [Title amended Nov. 4, 2014] Article 6 (Determination of Estimated Price by Cost Calculation) ① In determining the estimated price based on cost calculation in the case of construction, manufacturing, purchasing (excluding the purchase of imported goods), and services pursuant to Article 9, Paragraph 1, Subparagraph 2 of the Enforcement Decree, the following cost items shall be included in the estimated price. <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> 1. Material Cost: The amount calculated by multiplying the quantity of materials by specification required for the manufacture, construction, or services, etc., of the contract object by their unit price. 2. Labor costs: The amount calculated by multiplying the number of units of labor by type of work required for manufacture, construction, or services under the contract by the corresponding wage rate. 3. Expenses: The total amount of expenses by item required for the manufacture, construction, or services, etc. of the contract object. 4. General administrative expenses: The amount obtained by multiplying the sum of material costs, labor costs, and expenses by the general administrative expense ratio pursuant to the provisions of Article 8, Paragraph 1 (excluding Item 10). 5. Profit: An amount obtained by multiplying the sum of labor costs, expenses ( excluding items determined by the Minister of Finance and Economy ), and general administrative expenses by the profit rate under Article 8, Paragraph 2 (excluding Subparagraph 3). ② When purchasing imported goods, if the estimated price is determined based on cost calculation, the following items must be included in the estimated price. 1. Foreign currency-denominated cost of imported goods 2. Customs clearance fees 3. Bonded warehouse fees 4. Handling Fee 5. Domestic shipping costs 6. Letter of Credit Opening Fee 7. The amount obtained by multiplying the sum of general administrative expenses under Items 1 through 6 by the general administrative expense ratio pursuant to the provisions of Article 8, Paragraph 1, Item 10. 8. The amount obtained by multiplying the sum of the profits in Items 2 through 7 by the profit rate under Article 8, Paragraph 2, Item 3. ③ When determining the estimated price pursuant to the provisions of Paragraph 1 or 2, the head of each central government agency or the contracting officer shall clearly indicate the matters of each subparagraph of Paragraph 1 or Paragraph 2 in the estimated price statement. ④ The items for material costs, labor costs, and expenses shall be determined separately by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> Article 7 (Standard for Unit Price in Cost Calculation) ① When calculating costs pursuant to Article 6, Paragraph 1, the unit price refers to any of the prices falling under each of the following subparagraphs, and the order of application shall be in the order of the following subparagraphs. <Amended Feb. 23, 1998; Sep. 9, 1999; Sep. 8, 2005; Mar. 5, 2009; Jan. 2, 2026> 1. Actual transaction prices or prices investigated and published by an agency designated pursuant to Article 15 of the Statistics Act. However, if the Minister of Finance and Economy has separately determined a price per unit, or if the head of each central government agency has investigated and published a price per unit in consultation with the Minister of Finance and Economy, such price shall apply. 2. Prices pursuant to the provisions of Article 10, Subparagraphs 1 through 3-1 ② When applying the price under Paragraph 1, Subparagraph 1, the head of each central government agency or the contracting officer may add an amount not exceeding 15% of the relevant wage unit price to the applicable wage unit price in any of the following cases: <Amended Sep. 9, 1999; Sep. 8, 2005; Oct. 10, 2007; Mar. 5, 2009; Jul. 21, 2010> 1. Cases where there is a special intention to employ a person who has passed the national technical qualification examination pursuant to Article 10 of the National Technical Qualifications Act and has acquired a skilled technical qualification 2. In the case of construction work carried out in island areas (including Jeju Special Self-Governing Province) Article 8 (Ratio of General Administrative Expenses and Profit Margin in Determination of Estimated Price by Cost Calculation) ① In determining the estimated price based on cost calculation, the ratio of general administrative expenses shall not exceed the ratio specified in each of the following subparagraphs. <Amended Jun. 30, 2015; May 1, 2025> 1. Construction: 8/100 2. Manufacture and purchase of food and beverages: 14/100 3. Manufacture and purchase of textiles, clothing, and leather products: 8/100 4. Manufacture and purchase of wood and wood products: 9/100 5. Manufacture and purchase of paper, paper products, and printed publications: 14/100 6. Manufacture and purchase of chemical, petroleum, coal, rubber, and plastic products: 8/100 7. Manufacture and purchase of non-metallic mineral products: 12/100 8. Manufacture and purchase of primary metal products: 6/100 9. Manufacture and purchase of fabricated metal products, machinery, and equipment: 7/100 10. Purchase of imported goods: 8/100 11. Manufacture or purchase of other goods: 11/100 12. Waste Treatment & Recycling Services: 10/100 13. Facility management, security, and cleaning services: 9/100 14. Event management and other business support services: 8/100 15. Travel, accommodation, transportation, and insurance services: 5/100 16. Equipment maintenance and repair services: 10/100 17. Other services: 6/100 ② When determining the estimated price based on cost calculation, the profit margin shall not exceed any of the rates specified in the following subparagraphs. However, if there are special circumstances where it is recognized that achieving the purpose of the contract is difficult with the application of the profit margins specified in the following subparagraphs, the head of each central government agency may determine a rate exceeding said rate after consultation with the Minister of Finance and Economy. <Amended Sep. 9, 1999; Oct. 10, 2007; Mar. 5, 2009; Jan. 2, 2025; Jan. 2, 2026> 1. Construction: 15/100 2. Manufacturing/Purchasing ( including software development in accordance with the standards of Article 46, Paragraph 4 of the Software Promotion Act ): 25/100 3. Purchase of imported goods: 10/100 4. Services ( excluding software development in accordance with the standards of Article 46, Paragraph 4 of the Software Promotion Act ): 10/100 Article 9 (Preparation of Cost Calculation Statement, etc.) ① A cost calculation statement shall be prepared when determining the estimated price based on cost calculation. However, if the head of each central government agency or the contracting officer directly prepares the estimated price statement using the cost calculation method, a separate cost calculation statement may not be prepared. ② In cases where it is difficult for the head of each central government agency or the contracting officer to calculate costs themselves due to the special nature or content of the subject matter of the contract, they may request cost calculation from an agency falling under any of the following subparagraphs (hereinafter referred to as the “Cost Calculation Service Agency”). <Amended Sep. 9, 1999; Sep. 8, 2005; Mar. 5, 2009; Dec. 4, 2018> 1. Research institutions in which the government and public institutions under the Act on the Operation of Public Institutions have invested or contributed 50% or more of their assets 2. Research institutes of schools pursuant to the provisions of each subparagraph of Article 2 of the Higher Education Act 3. Industry- Academic Cooperation Foundation pursuant to Article 25 of the Act on the Promotion of Industrial Education and Industry-Academic-Research Cooperation 4. A corporation established by obtaining permission, etc. from the competent authority pursuant to the provisions of the Civil Act or other laws and regulations 5. An accounting firm established pursuant to the provisions of Article 23 of the Certified Public Accountants Act ③ A cost calculation service agency shall meet all of the requirements of each of the following subparagraphs. <Newly added Dec. 4, 2018> 1. Cost accounting services must be specified in the purpose of establishment of the articles of incorporation or school regulations. 2. Must employ at least 10 cost accounting specialists on a full-time basis. 3. Basic assets must be 200 million won or more (100 million won in the case of Paragraph 2, Subparagraphs 2 and 3). ④ The detailed requirements for cost calculation service agencies under Paragraph 3 shall be determined by the Minister of Finance and Economy. <Newly added Dec. 4, 2018; Jan. 2, 2026> ⑤ When the head of each central government agency or the contracting officer requests cost calculation pursuant to Paragraph 2, they shall have the cost calculation service agency prepare a cost calculation statement in accordance with this Rule and the provisions prescribed by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Mar. 5, 2009; Dec. 4, 2018; Jan. 2, 2026> Article 10 (Determination of Estimated Price Based on Appraisal Price, etc.) The appraisal price, actual transaction price, or estimated price pursuant to the provisions of Article 9, Paragraph 1, Subparagraph 4 of the Enforcement Decree refers to any of the prices in the following subparagraphs, and the order of application shall be in the order of the following subparagraphs. <Amended Sep. 8, 2005; Jun. 28, 2013> 1. Appraisal Value: The price assessed by an appraisal corporation or appraiser pursuant to the Act on Public Announcement of Real Estate Prices and Appraisal (limited to those who have been issued a business registration certificate for appraisal business pursuant to Article 8 of the Value Added Tax Act ). 2. Similar Actual Transaction Prices: Actual transaction prices of goods with similar functions and uses 3. Estimated Price: The price received directly from the contractor or a third party. Article 11 (Aggregation of Taxes, etc. at the Time of Determination of Estimated Price) ① The estimated price shall include the taxes set forth in each of the following subparagraphs. <Amended Sep. 8, 2005; Mar. 5, 2009> 1. Value Added Tax under the Value Added Tax Act 2. Special consumption tax under the Special Consumption Tax Act 3. Education tax under the Education Tax Act 4. Customs duties under the Customs Act 5. Special tax for rural and fishing communities under the Special Tax Act for Rural and Fishing Communities ② In applying the provisions of Paragraph 1, if the estimated price is determined based on the cost calculation price, the estimated price shall be calculated by adding the tax amounts in each subparagraph of Paragraph 1 to the amount calculated pursuant to the provisions of Paragraph 1 or 2 of Article 6. In this case, the unit price of raw materials by cost item in the cost calculation shall be the supply price after deducting the tax amounts in each subparagraph of Paragraph 1, and the value-added tax in Paragraph 1, Subparagraph 1 shall be calculated by multiplying the supply price of the object of the contract by the value-added tax rate. ③ In applying the provisions of Paragraph 2, where an estimated price is determined to enter into a contract with a supplier of goods or services exempt from value-added tax pursuant to Article 26, Paragraph 1 of the Value-Added Tax Act or Article 106, Paragraph 1 of the Restriction of Special Taxation Act, the amount corresponding to the input value-added tax on raw materials by item to be borne by the relevant contract counterparty shall be added to the amount calculated pursuant to the provisions of Article 6, Paragraph 1. <Amended Sep. 9, 1999; Sep. 8, 2005; Jun. 28, 2013> Article 12 (Determination of Estimated Price in Quantity-Based Competitive Bidding) ① The estimated price in quantity-based competitive bidding pursuant to Article 17 of the Enforcement Decree shall be determined as the unit price of the goods concerned. ② In the case of Paragraph 1, if the bid concerns the manufacture or purchase of goods that constitute a burden on the national treasury, the unit price of the said goods shall be determined based on an estimated price statement derived from the total quantity of the goods to be put up for bid. Article 13 (Change of Estimated Price) In cases where there are no bidders or successful bidders even in a re-announced bid pursuant to Article 20, Paragraph 2 of the Enforcement Decree, and where a private contract pursuant to Article 27, Paragraph 1 of the Enforcement Decree cannot be concluded at the original estimated price, the head of each central government agency or the contracting officer may change the original estimated price and put the matter up for competitive bidding through a new procedure. Chapter 3 Methods of Contract Article 14 (Proof of Qualifications for Bidding) ①In Article 12, Paragraph 1, Subparagraph 4 of the Enforcement Decree, the term “requirements prescribed by the Ordinance of the Ministry of Finance and Economy” refers to cases where a business registration certificate for the relevant business has been issued or a unique identification number has been assigned pursuant to Article 168 of the Income Tax Act, Article 111 of the Corporate Tax Act, or Article 8 of the Value Added Tax Act. < Amended Sep. 9, 1999; Dec. 30, 2000; Sep. 8, 2005; May 25, 2006; Dec. 29, 2006; Oct. 10, 2007; Mar. 5, 2009; Jun. 28, 2013; Jan. 2, 2026> ② The head of each central government agency or the contracting officer shall require a person intending to participate in a competitive bidding to certify the requirements under Paragraph 1 by a copy of a business registration certificate or a document confirming a unique identification number, and the requirements under Article 12, Paragraph 1, Subparagraphs 2 and 3 of the Enforcement Decree by a document issued by a relevant agency (including organizations such as relevant associations established under relevant laws). <Amended Feb. 23, 1998; Sep. 9, 1999; May 25, 2006; Oct. 10, 2007> ③ A person who has registered for eligibility to participate in competitive bidding pursuant to the provisions of Article 15 may prove their qualification under the provisions of Paragraph 2 by means of the Certificate of Eligibility to Participate in Competitive Bidding issued to them, limited to the registered categories or items. <Amended Aug. 24, 2002> Article 15 (Registration of Qualifications for Bidding) ① The head of each central government agency or the contracting officer may require the registration of qualifications for competitive bidding in advance to efficiently execute competitive bidding affairs. The same shall apply when registered matters are changed. ② Any person who intends to register for eligibility to participate in competitive bidding pursuant to Paragraph 1 shall submit the documents classified according to each of the following subparagraphs. <Amended May 25, 2006; October 10, 2007; March 5, 2009; July 21, 2010; September 17, 2013; June 30, 2015; September 23, 2016; Jan. 2, 2025> 1. In the case of construction registration, the documents of each of the following items A. Registration Application b. Documents proving relevant permits, authorizations, licenses, registrations, notifications, etc. (only if necessary) C. Deleted <July 5, 2006> D. Deleted <July 5, 2006> e. A seal impression certificate or a certificate of confirmation of personal signature pursuant to Article 2, subparagraph 3 of the Act on Confirmation of Personal Signature, etc. (hereinafter referred to as “certificate of confirmation of personal signature”). However, cases registered using the National Comprehensive Electronic Procurement System pursuant to Article 2, subparagraph 4 of the Act on Promotion of the Use of Electronic Procurement (hereinafter referred to as the “electronic procurement system”) are excluded. 2. In the case of registration of product manufacturing or purchase, the following documents A. Registration Application b. Documents proving relevant permits, authorizations, licenses, registrations, notifications, etc. (only if necessary) C. Deleted <July 5, 2006> D. Deleted <July 5, 2006> E. In the case of manufacturing, a certified copy of the factory registration ledger pursuant to Article 12-3 of the Enforcement Rules of the Act on Promotion of Industrial Agglomeration and Factory Establishment, or documents proving direct production confirmed by the head of a public institution pursuant to Article 2, Item 8 of the Act on Promotion of Small and Medium Enterprises and Product Purchase (if the head of the public institution has not confirmed direct production, documents proving direct production confirmed by the Administrator of the Public Procurement Service). f. Certificate of seal impression or certificate of confirmation of personal signature. However, this shall not apply in cases where registration is made using the electronic procurement system. 3. In the case of service registration, the documents of each of the following items A. Registration Application b. Documents proving relevant permits, authorizations, licenses, registrations, notifications, etc. (only if necessary) C. Deleted <July 5, 2006> D. Deleted <July 5, 2006> E. Certificate of seal impression or certificate of verification of personal signature. However, this shall not apply in cases where registration is made using the electronic procurement system. ③ The head of each central government agency or the contracting officer who has received an application for registration of eligibility to participate in bidding pursuant to Paragraph 2 shall verify the Certificate of Corporate Registration, the Certificate of Factory Registration (applicable only in the case of manufacturing registration), and the documents set forth in each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. However, if a person intending to apply for registration of eligibility to participate in competitive bidding does not consent to the verification of the documents set forth in each of the following subparagraphs, they shall be required to attach such documents (in the case of a Business Registration Certificate, a copy thereof). <Newly added July 5, 2006; October 10, 2007; July 21, 2010; May 18, 2012> 1. Business registration certificate, document verifying unique identification number, or certificate of business registration 2. Certified copy of Resident Registration (applicable only to individuals) 3. Deleted <May 18, 2012> ④ The head of each central government agency or the contracting officer shall issue a Certificate of Registration for Qualification to Participate in Competitive Bidding in the form of Annex No. 1 to a person who has registered their qualification to participate in bidding pursuant to the provisions of Paragraph 1. <Amended July 5, 2006> ⑤ The head of each central government agency or the contracting officer shall post the registration received pursuant to Paragraph 1 on the Electronic Procurement System. In this case, the registered matters posted on the Electronic Procurement System shall be deemed to have been registered with other heads of central government agencies or contracting officers. <Amended May 25, 2006; July 5, 2006; October 10, 2007; September 17, 2013; June 30, 2015; January 2, 2025> ⑥ The head of each central government agency or the contracting officer may require registration of eligibility to participate in competitive bidding solely for use in the competitive bidding affairs of the relevant agency. In this case, Paragraph 5 shall not apply. <Amended July 5, 2006> ⑦ The head of each central government agency or the contracting officer shall post the matters set forth in each of the following subparagraphs regarding the registration of qualifications to participate in competitive bidding on the electronic procurement system. <Amended July 5, 2006; September 17, 2013> 1. Availability of advance registration of eligibility to participate in competitive bidding 2. Documents required for registration 3. This means that if there are any changes to the registration details regarding eligibility to participate in competitive bidding, the changes must be registered in advance prior to participating in the bid. ⑧ The Administrator of the Public Procurement Service may set a separate validity period for registered matters posted on the Electronic Procurement System pursuant to Paragraph 5. <Newly added Oct. 10, 2007; Sep. 17, 2013; Jun. 30, 2015> [Wholly Amended Aug. 24, 2002] Article 16 (Verification of documents regarding eligibility for bidding, etc.) ① The head of each central government agency or the contracting officer shall verify with respect to a bidder whether they are eligible to participate in the bidding and whether there are any restrictions on eligibility for bidding pursuant to Article 76 of the Enforcement Decree. ② If, as a result of verification pursuant to the provisions of Paragraph 1, the contents of the qualification documents differ from the facts, the head of each central government agency or the contracting officer shall notify the submitter of the relevant documents of such fact and take appropriate measures necessary for supplementing the documents, etc. Article 17 (Prohibition of Unjust Restrictions on Eligibility for Bidding) The head of each central government agency or the contracting officer shall not restrict participation in bidding by imposing conditions other than the eligibility requirements for competitive bidding under Article 12 of the Enforcement Decree, except where the Enforcement Decree, these Rules, or other laws and regulations provide otherwise. Article 18 (Exclusion from Registration and Related Requirements for Bidding Eligibility) Articles 14 through 16 shall not apply in any of the following cases; provided, however, that verification of whether bidding eligibility is restricted under Article 76 of the Enforcement Decree shall continue to apply. <Amended Mar. 5, 2009> 1. Cases where the State, a local government, or a public institution under the Act on the Operation of Public Institutions intends to participate in competitive bidding 2. When entering into a contract that gives rise to revenue Article 19 (Scope of Competitive Bidding by Desired Quantity) Cases in which competitive bidding by desired quantity may be used pursuant to the provisions of Article 17 of the Enforcement Decree are as follows: 1. In cases where a large quantity of identical goods is manufactured or purchased that is deemed impossible or difficult to supply with the capabilities or production facilities of a single person 2. In the case of selling a large quantity of identical goods that are deemed impossible or difficult to purchase by a single person 3. In cases where a large quantity of identical goods is manufactured, purchased, or sold in which entering into split contracts with multiple suppliers or buyers is recognized as being advantageous to the State in terms of price, quality, or other conditions Article 20 (Notice of Bid for Competitive Bidding by Desired Quantity) The notice of bid for competitive bidding by desired quantity shall specify the following matters: 1. Matter regarding general competitive bidding based on desired quantity 2. Matters under each subparagraph of Article 36 of the Enforcement Decree 3. Matters concerning the adjustment of bid quantity and successful bid quantity pursuant to the provisions of Article 47, Paragraph 2 4. Other matters necessary for competitive bidding based on desired quantity Article 21 (Competitive bidding for desired quantity of two or more types of goods) When the head of each central government agency or the contracting officer intends to put two or more types of goods up for competitive bidding for desired quantity, they shall have bids made for unit price and quantity for each type of goods. Article 22 (Auction) ① In an auction pursuant to Article 10, Paragraph 2 of the Enforcement Decree, the head of each central government agency or the contracting officer shall present an estimated price and allow bidding, and after announcing the highest bid amount, allow bidding again until there are no other bidders, and determine the bidder with the highest price as the successful bidder. ② In the case of a bid under the provisions of Paragraph 1, the bid security must be at least 5% of the estimated price. Article 23 (Factors Considered When Evaluating the Sincerity of Contract Performance) When the head of each central government agency or the contracting officer evaluates the sincerity of contract performance pursuant to Article 13, Paragraph 2 of the Enforcement Decree, they shall take into consideration the degree of compliance with integrity contracts pursuant to Article 5-2, Paragraph 1 of the Act, penalty points for substandard performance pursuant to Article 53 of the Construction Technology Promotion Act, evaluation results pursuant to Article 50 of the same Act, etc. <Amended June 19, 2013; Feb. 1, 2016> [Wholly Amended July 21, 2010] Article 23-2 (Procedure for Preliminary Examination of Bidding Qualification) ① The period for inspection and distribution pursuant to the main text of the part other than each subparagraph of Article 13, Paragraph 4 of the Enforcement Decree shall be from the date of the bid announcement until the deadline for applications for preliminary examination of bidding qualification. ② Applications for the pre-qualification screening for bidders under Paragraph 1 shall be made starting from the day at least 7 days after the date of the bid announcement, and the application period shall be at least 10 days, provided that the application period is specified in the bid announcement. ③ The head of each central government agency or the contracting officer may request supplementation within a period of three days if the contents of the application documents for the pre-qualification of bidders are unclear or if there are missing documents. ④ The head of each central government agency or the contracting officer shall pre-examine the qualifications of bidders within 10 days from the end of the application period under Paragraph 2 or the supplementary period under Paragraph 3, and post the results on the electronic procurement system. <Amended Sep. 17, 2013> ⑤ If a person who has applied for a preliminary screening of eligibility to participate in bidding has an objection to the results of the preliminary screening under Paragraph 4, they may request a re-examination from the head of each central government agency or the contracting officer no later than three days prior to the site briefing date under Article 14-2 of the Enforcement Decree. In this case, the results of the re-examination must be notified within three days from the date the request is received. [This Article was newly added on July 21, 2010.] [Formerly Article 23-2 was moved to Article 23-3 <July 21, 2010>] Article 23-3 (Services by Simple Labor) In Article 18, Paragraphs 1 and 3, Article 64, Paragraph 8, and Article 66, Paragraph 2 of the Enforcement Decree, the term “services prescribed by the Ordinance of the Ministry of Finance and Economy” refers to any of the services falling under any of the following subparagraphs. <Amended Mar. 5, 2009; Dec. 4, 2018; Jan. 2, 2026> 1. Cleaning services 2. Meter reading service 3. Simple security or management services not based on security systems, etc. 4. Manpower support services, such as event assistance 5. Other services similar to those in subparagraphs 1 through 4 as determined by the Minister of Finance and Economy [This Article was newly inserted on May 25, 2006.] [Title amended on December 4, 2018.] [Moved from Article 23-2 on July 21, 2010.] Article 24 (Subjects of Restricted Competitive Bidding) ① In Article 21, Paragraph 1, Subparagraph 1 of the Enforcement Decree, the term “construction contract of an amount prescribed by the Ordinance of the Ministry of Finance and Economy” refers to a construction contract whose estimated price is equal to or greater than the amount specified in each of the following subparagraphs. <Amended Sep. 8, 2005; Mar. 5, 2009; Jan. 2, 2026> 1. Construction work under the Framework Act on the Construction Industry (excluding specialized works): 3 billion won 2. Specialized construction work under the Framework Act on the Construction Industry and other construction work under relevant laws: 300 million won ② In Article 21, Paragraph 1, Subparagraph 6 of the Enforcement Decree, the term “amount prescribed by the Ordinance of the Ministry of Finance and Economy” refers to the amounts set forth in each of the following subparagraphs. <Amended Dec. 31, 1996; Feb. 23, 1998; Sep. 9, 1999; Dec. 12, 2003; Sep. 8, 2005; Mar. 5, 2009; Dec. 4, 2018; Jan. 2, 2026> 1. In the case of construction, the amounts of each of the following items a. Construction work pursuant to the Framework Act on the Construction Industry (excluding specialized works): The amount notified pursuant to the main text of the part other than each subparagraph of Article 4, Paragraph 1 of the Act (hereinafter referred to as the “notified amount”) B. Specialized construction work under the Framework Act on the Construction Industry and other construction work under relevant laws and regulations: 1 billion won 2. The notified amount in the case of manufacturing or purchasing goods, services, or other cases Article 25 (Criteria for Restriction on Limited Competitive Bidding) ① When the head of each central government agency or the contracting officer restricts the qualifications of participants in limited competitive bidding pursuant to Article 21, Paragraph 1 of the Enforcement Decree, they shall appropriately consider the difficulty of performance, the scale of the project, and the supply and demand situation. <Amended Sep. 17, 2019> ② Where the head of each central government agency or the contracting officer restricts the qualifications of participants in restricted competitive bidding based on performance records or construction capabilities in construction, manufacturing, or services, etc., pursuant to Article 21, Paragraph 1, Subparagraphs 1 through 3 and 5 of the Enforcement Decree, such performance records and construction capabilities shall comply with the standards set forth in each of the following subparagraphs. <Amended Dec. 31, 1996; Feb. 23, 1998; Sep. 9, 1999; Sep. 8, 2005; May 25, 2006; Dec. 28, 2017; Sep. 17, 2019> 1. In the case of construction, manufacturing, or services, etc., the following performance records. However, except where it would hinder the achievement of the purpose of the contract, the performance record in subparagraph (a) shall be applied preferentially. a. In cases based on the scale or quantity of performance records for construction, manufacturing, or services, etc. (in the case of manufacturing or services, limited to contracts where the estimated price is equal to or greater than the notified amount), within 1 times the scale or quantity of the relevant contract object. B. In cases based on the amount of performance records for construction, manufacturing, or services, etc. (in the case of manufacturing or services, limited to contracts where the estimated price is equal to or greater than the notified amount), within 1 times the estimated price of the relevant contract object ( if the cost of government-supplied materials is included when applying construction capacity under other laws such as the Framework Act on the Construction Industry, it refers to the estimated amount; hereinafter the same applies in this paragraph). 2. In the case of construction capacity, within 1 times the applicable estimated price. ③ In cases where the qualification of a person to participate in a restricted competitive bidding is restricted based on the location of the head office as registered in the corporate registry pursuant to Article 21, Paragraph 1, Subparagraph 6 of the Enforcement Decree (in the case of a sole proprietorship, it refers to the location of the business place listed in the business registration certificate or documents related to permission, authorization, license, registration, notification, etc. under relevant laws and regulations; hereinafter the same applies), the restriction must be applied to persons whose head office as registered in the corporate registry is located within the jurisdiction of the Special City, Metropolitan City, Special Self-Governing City, Province, or Special Self-Governing Province (hereinafter referred to as “City/Province” in this paragraph) where the site of the construction, etc., or the delivery location, etc., is located ( in the case of a joint innovation city pursuant to Article 31 of the Special Act on the Construction and Support of Innovation Cities Following the Relocation of Public Institutions to Local Areas, it refers to the entire jurisdiction of the joint entity for the construction of the said joint innovation city; hereinafter the same applies in this paragraph). However, in any of the following cases, the restriction may include persons located within the jurisdictional area of a City or Province adjacent to the City or Province where the site of the relevant construction work, etc., or delivery place, etc., is located (hereinafter referred to as “adjacent City or Province” in this paragraph). <Amended Sep. 17, 2019> 1. Cases where the construction site, delivery location, etc., spans adjacent cities and provinces 2. In cases where there are fewer than 10 persons qualified for the execution of the project in the city or province where the construction site, delivery location, etc. is located ④ Where a Special City, Metropolitan City, or Special Self-Governing City is newly established (excluding cases of incorporation) within the jurisdictional area of a Metropolitan City, Special Self-Governing City, or Province, the jurisdictional area of the former Metropolitan City, Special Self-Governing City, or Province and the jurisdictional area of the newly established Special City, Metropolitan City, or Special Self-Governing City shall be deemed not to be separated, and the provisions of Paragraph 3 shall apply. <Amended May 18, 2012> ⑤ The head of each central government agency or the contracting officer shall not restrict the qualifications of persons to participate in restricted competitive bidding pursuant to Article 21, Paragraph 1 of the Enforcement Decree by overlapping with the matters in each subparagraph of the same Paragraph. However, in cases where a restriction is made pursuant to the matters in Subparagraph 6 of Article 21, Paragraph 1 of the Enforcement Decree, the restriction may overlap with the matters in Subparagraph 2 of the same Paragraph; and in cases where a restriction is made pursuant to the matters in Subparagraph 8 or 10 of Article 21, Paragraph 1 of the Enforcement Decree, the restriction may overlap with the matters in each subparagraph of the same Paragraph. <Amended Dec. 31, 1996; Mar. 5, 2009; Dec. 4, 2018> ⑥ In cases where the head of each central government agency or the contracting officer sets restriction standards by categorizing construction work by nature and scale pursuant to the provisions of Article 22 of the Enforcement Decree, they may not apply the restriction standards under the provisions of Paragraph 2. Article 26 (Notice of Qualification for Participation in Restricted Competitive Bidding) ① When the head of each central government agency or the contracting officernotifies a qualified bidder of participation in bidding pursuant to the provisions of Article 21, Paragraph 3 or Article 22, Paragraph 2 of the Enforcement Decree, they shall do so using the Notice of Participation in Competitive Bidding in Form No. 2 of the Appendix. ② The notice of participation in the bidding pursuant to the provisions of Paragraph 1 shall be given by 7 days prior to the date of the site briefing (or by 7 days prior to the deadline for submitting bids if no site briefing is held). However, in cases requiring urgency, notice may be given by 5 days prior to the deadline for submitting bids. <Amended Dec. 31, 1996> Article 27 (Criteria for Designation in Designated Competitive Bidding) When the head of each central government agency or the contracting officer designates participants for designated competitive bidding pursuant to Article 23, Paragraph 1, Subparagraphs 1 through 6 or 9 of the Enforcement Decree, they shall make the designation in accordance with the criteria set forth in each of the following subparagraphs, ensuring that the principles of competition are properly upheld. <Amended Feb. 23, 1998; Sep. 9, 1999; Sep. 8, 2005; May 25, 2006> 1. Construction a. In cases where designation is made based on construction capacity, the provisions of Article 25, Paragraph 2, Subparagraph 2 shall apply mutatis mutandis. B. Nominate a company based on credit, track record, and management status; however, if possession of specialized technology is required, nominate a person who possesses such technology. C. Deleted <September 9, 1999> 2. Where, in light of the nature or purpose of the contract, it is necessary to select a person with specialized technology, machinery, equipment, production facilities, etc. to perform manufacturing, purchasing, repair, or processing of goods, the person possessing the relevant technology, facilities, or equipment shall be designated. Article 28 Deleted <September 9, 1999> Article 29 (Reporting Documents, etc. for Designated Competitive Bidding Contracts) ① When a contracting officer intends to report a contract by designated competitive bidding (hereinafter referred to as “designated competitive bidding contract”) pursuant to Article 23, Paragraph 2 of the Enforcement Decree, he/she shall submit to the head of the central government agency to which he/she belongs a copy of the contract (including documents required to be attached to the said contract; hereinafter the same applies in this Article ) pursuant to Article 49, Paragraph 1 or 3, and documents clarifying the matters of each of the following subparagraphs. <Amended Feb. 23, 1998; May 25, 2006> 1. Purpose of the contract 2. Budget items 3. Applicable legal provisions and specific grounds for application 4. Deleted <May 25, 2006> 5. Deleted <May 25, 2006> 6. Other Notes ② When the head of each central government agency notifies the Board of Audit and Inspection of the details of a restricted competitive bidding contract pursuant to Article 23, Paragraph 2 of the Enforcement Decree, he or she shall submit a copy of the contract and documents pursuant to Paragraph 1 together. <Amended May 25, 2006> ③ The head of each central government agency or the contracting officer shall receive documents proving compliance with the nomination criteria under Article 27 from the person designated as a participant in the designated competitive bidding and keep them on file. [Title amended Feb. 23, 1998] Article 30 (Notice of Qualification for Participation in Designated Competitive Bidding) The provisions of Article 26 shall apply mutatis mutandis to the notice of participation in bidding for persons qualified to participate in designated competitive bidding. Article 31 Deleted <July 21, 2010> Article 32 (Determination of Contractor in Private Contracts by Re-announcement of Bidding, etc.) When the head of each central government agency or the contracting officer intends to conclude a private contract pursuant to the provisions of Article 27, Paragraph 1, Subparagraph 2 of the Enforcement Decree, they shall determine the party who offers the price most favorable to the State as the contractor. <Amended Feb. 23, 1998> Article 33 (Price Determination by Estimate, etc.) ① The phrase “cases where it is difficult to submit an estimate through an electronic procurement system, as prescribed by the Ordinance of the Ministry of Finance and Economy” in the proviso to Article 30, Paragraph 2 of the Enforcement Decree refers to any of the cases falling under any of the following subparagraphs. <Newly added Dec. 29, 2006; Mar. 5, 2009; Sep. 17, 2013; Jan. 2, 2026> 1. In the case of professional academic research services 2. Cases where freshness and quality must be given priority, such as the purchase of agricultural and fishery products and food (including their ingredients). 3. Other cases determined by the Minister of Finance and Economy where it is difficult to submit a quotation via the electronic procurement system due to the purpose or nature of the contract. ② Where the head of each central government agency or the contracting officer restricts the submission of quotations based on the registered head office address pursuant to Article 30, Paragraph 4 of the Enforcement Decree, the restriction shall be imposed on persons whose registered head office address is located within the jurisdictional area of the Special City, Metropolitan City, Special Self-Governing City, Province, or Special Self-Governing Province where the site of the relevant construction work, delivery location of goods, etc. is located. However, if there are five or more persons qualified for the performance of the relevant contract in the City (including administrative cities; hereinafter the same applies in this Paragraph) or County (referring to a county within the jurisdictional area of a Province; hereinafter the same applies in this Paragraph) where the site of the construction work, delivery location of goods, etc. is located, the restriction may be imposed on persons located within the jurisdictional area of that City or County. <Newly added Dec. 29, 2006; May 18, 2012; Sep. 23, 2016> ③ In Article 30, Paragraph 7 of the Enforcement Decree, the phrase “cases prescribed by the Ordinance of the Ministry of Finance and Economy” refers to any of the following cases: <Amended Sep. 9, 1999; Dec. 30, 2000; Sep. 8, 2005; Dec. 29, 2006; Mar. 5, 2009; May 1, 2025; Jan. 2, 2026> 1. Supply contract for electricity, gas, water, etc. 2. Manufacturing, purchasing, leasing, and service contracts for goods with an estimated price of less than 2 million won [Title amended Dec. 29, 2006] Article 34 (Competitive Bidding by Desired Quantity and Private Contract) In the event that there is a successful bidder among those who have not entered into a contract in a competitive bidding by desired quantity, the head of each central government agency or the contracting officer shall enter into a private contract pursuant to the provisions of Article 28 of the Enforcement Decree, and in the case of manufacturing or purchasing goods, at a price equal to or lower than the unit price of the successful bidder, and in the case of selling goods, at a price equal to or higher than the unit price of the successful bidder. Article 35 (Reporting Documents, etc. for Private Contracts) ① When a contracting officer intends to report a private contract pursuant to Article 26, Paragraph 5 of the Enforcement Decree, he/she shall submit to the head of the central government agency to which he/she belongs a copy of the contract (including documents required to be attached to the said contract; hereinafter the same applies in this Article) pursuant to Article 49, Paragraph 1 or 3, and documents clarifying the matters of each of the following subparagraphs. <Amended Feb. 23, 1998; May 25, 2006; July 21, 2010> 1. Purpose of the contract 2. Budget items 3. Applicable legal provisions and specific grounds for application 4. Deleted <May 25, 2006> 5. Deleted <May 25, 2006> 6. Deleted <May 25, 2006> 7. Other Notes ② When the head of each central government agency notifies the Board of Audit and Inspection of the details of a private contract pursuant to Article 26, Paragraph 5 of the Enforcement Decree, he or she shall submit a copy of the contract and documents pursuant to Paragraph 1 together. <Amended May 25, 2006; July 21, 2010> [Title amended Feb. 23, 1998] Article 36 (Documents for the grounds for application of private contract) When the head of each central government agency or the contracting officer intends to enter into a private contract pursuant to Article 26, Paragraph 1, Subparagraphs 1(a ) and 1(c), Subparagraph 2, Subparagraphs 3(a) through 3(e), Subparagraphs 4(a) through 4(d), or Subparagraphs 5(c) and 5(d) of the Enforcement Decree, they shall keep documents proving whether the grounds for application apply. [Wholly Amended July 21, 2010] Article 37 (Application of Provisions Concerning Competitive Contracts) Paragraphs 1 and 2 of Article 14 shall apply mutatis mutandis to private contracts. [Wholly Amended Mar. 5, 2009] Chapter 4 Bidding and Award Procedures Article 38 Deleted <Aug. 24, 2002> Article 39 (Notice of Participation in Bid, etc.) When the head of each central government agency or the contracting officernotifies a qualified bidder of participation in a bid pursuant to the provisions of Article 13 or Article 34 of the Enforcement Decree, they shall do so using the Notice of Participation in Competitive Bid in Form No. 2 of the Appendix. Article 40 (Application for Participation in Bid) ① When the head of each central government agency or the contracting officer intends to conduct a competitive bid, they shall require applicants for participation in the bid to submit the documents specified in each of the following subparagraphs. However, for persons who have registered their qualifications pursuant to the provisions of Article 15, the submission of the documents specified in each of the following subparagraphs may be substituted by the payment of a bid security deposit. 1. Application for Participation in Bid (Form No. 3) 2. Documents proving eligibility to participate in the bid 3. Other documents required in the bid announcement or nomination notice ② When an applicant for participation in bidding submits the documents specified in each subparagraph of Paragraph 1, the head of each central government agency or the contracting officer may review the contents of such documents, accept them, and conduct a factual investigation regarding necessary matters. ③ The head of each central government agency or the contracting officer shall issue a Certificate of Application for Participation in Bid in the form of Annex 4 upon receipt of the application documents. However, this may be omitted in the case of postal bidding or other cases where it is deemed unnecessary. ④ The deadline for receiving application documents for participation in bidding submitted pursuant to the provisions of the main text of Paragraph 1 shall be the day before the deadline for submitting bids. <Amended Dec. 31, 1996> Article 41 (Preparation of Documents Concerning Bidding) ① The term “documents prescribed by the Ordinance of the Ministry of Finance and Economy” in Article 14, Paragraph 1, Subparagraph 3 of the Enforcement Decree refers to the documents set forth in each of the following subparagraphs. <Amended Sep. 9, 1999; May 25, 2006; Mar. 5, 2009; July 21, 2010; Jan. 2, 2026> 1. Bid announcement or notice of participation in bid 2. Instructions to Bidders 3. Application for Participation in Bid, Bid Proposal, and Contract Forms 4. General Conditions of Contract and Special Conditions of Contract 4-2. Deleted <July 21, 2010> 5. Evaluation criteria for determining the successful bidder pursuant to Article 42, Paragraphs 5 and 6 of the Enforcement Decree (including detailed evaluation criteria) 6. For construction projects subject to Chapters 6 and 8 of the Enforcement Decree, the bidding guidelines 7. Documents containing other notes ② In the main text of Article 16, Paragraph 1 of the Enforcement Decree, the term “documents relating to bidding prescribed by the Ordinance of the Ministry of Finance and Economy” refers to the documents listed in each of the following subparagraphs. <Amended July 21, 2010; Jan. 2, 2026> 1. The documents under Paragraph 1, Subparagraphs 1 through 4 2. Standards for concluding contracts pursuant to Article 43, Paragraph 7 of the Enforcement Decree (including detailed standards) 3. In the case of a service contract, the statement of work 4. Documents containing reference information in addition to the documents listed in Items 1 through 3 [Wholly Amended Dec. 31, 1996] [Title Amended Jul. 21, 2010] Article 41-2 Deleted <September 17, 2019> Article 42 (Bidding Method) ① The head of each central government agency or the contracting officer shall require any person who wishes to participate in competitive bidding to submit a bid in the form of Annex No. 5 ( or Annex No. 6 in cases where the bidding and determination of the successful bidder are to be conducted by computer processing). ② One bid per person shall be submitted in accordance with the provisions of Paragraph 1. ③ The head of each central government agency or the contracting officer may have a bidder participate in the bid if the bidder designates a bidder or changes a designated bidder from the time the bidder intending to participate submits the bid participation application form ( Form No. 3 ) until the time the bid commences. <Amended Sep. 9, 1999> ④ When the head of each central government agency or the contracting officer receives a bid, they shall affix a confirmation seal to the bid and keep it unopened until the bid opening. ⑤ The seal (including a signature; hereinafter the same applies in this paragraph) used on the bid submitted pursuant to Paragraph 1 shall be the same as the seal declared at the time of submitting the application for participation in the bid. <Amended Dec. 31, 1996; Sep. 23, 2016> ⑥ When the head of each central government agency or the contracting officer intends to conclude a contract for the manufacture or purchase of goods pursuant to the provisions of Article 44, Paragraph 1 of the Enforcement Decree, they shall require the bidder to submit, at the time of bidding, a document indicating the quality, performance, efficiency, etc., of the said goods (hereinafter referred to as the “Document indicating quality, etc.”) together with the bid proposal. <Amended Sep. 9, 1999; Dec. 30, 2000> Article 43 ( Payment of Bid Security ) ① The head of each central government agency or the contracting officer shall require bidders to pay a bid security pursuant to Article 37 of the Enforcement Decree in accordance with prescribed procedures, together with the application for participation in bidding in the form of Annex 3, by the deadline for bid applications. However, in the case of a guarantee certificate pursuant to Article 37, Paragraph 2, Subparagraph 4 of the Enforcement Decree that may be paid as a bid security for all bids within one fiscal year (limited to the case of construction), such certificate may be required to be submitted at the beginning of each fiscal year as determined by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> ② A document containing a commitment to pay an amount equivalent to the bid security pursuant to the provisions of Article 37, Paragraph 4 of the Enforcement Decree shall be submitted at the time of applying for participation in the bid or submitting a bid in accordance with the Application for Participation in the Bid Form No. 3. <Newly added Sep. 9, 1999; May 18, 2012> Article 44 (Invalidation of Bids) ① Bids deemed invalid pursuant to Article 39, Paragraph 4 of the Enforcement Decree are as follows: <Amended Dec. 31, 1996; Sep. 9, 1999; Mar. 25, 2002; Aug. 24, 2002; May 25, 2006; Dec. 29, 2006; Mar. 5, 2009; May 18, 2012; Sep. 17, 2013; Feb. 1, 2016; Sep. 23, 2016; Jul. 6, 2021; Jan. 2, 2026> 1. A bid submitted by a person ineligible to participate 1-2. Bidding through a representative who is within the period of restriction on bidding eligibility pursuant to Article 76, Paragraph 6 of the Enforcement Decree 2. A bid submitted without paying the prescribed bid security by the payment deadline. 3. Bids for which the bid document does not arrive at the designated bidding place by the arrival time. 4. A bid in which the same person (in cases where one person is the representative of multiple corporations, such multiple corporations shall be deemed the same person) submits two or more bid documents for the same matter. 5. Deleted <May 25, 2006> 6. Bids pursuant to Article 14, Paragraph 6 of the Enforcement Decree for which a detailed cost breakdown is not submitted together with the bid document, bids where the amount in the bid document does not match the amount in the detailed cost breakdown, and other bids falling under grounds for invalidation determined by the Minister of Finance and Economy. 6-2. Deleted <July 21, 2010> 6-3. A bid submitted without registering a change to any of the registration details falling under any of the following subparagraphs among the matters registered pursuant to Article 15, Paragraph 1. a. Trade name or corporate name B. Names of the representatives (or all representatives if there are multiple) C. Deleted <December 29, 2006> D. Deleted <December 29, 2006> 7. Deleted <March 5, 2009> 7-2. Bids submitted without following the method prescribed in the relevant regulations when submitting bids using an electronic procurement system or an information processing device designated and notified by the head of each central government agency pursuant to Article 39, Paragraph 1 of the Enforcement Decree. 7-3. Deleted <September 17, 2019> 8. A bid pursuant to the provisions of Article 44, Paragraph 1 of the Enforcement Decree that fails to submit the quality, etc. indication required to be submitted together with the bid document pursuant to the provisions of Article 42, Paragraph 6. 9. A bid that violates the method of joint contracting pursuant to Article 72, Paragraph 3 or 4 of the Enforcement Decree 10. In the case of alternative bidding pursuant to Article 79 of the Enforcement Decree, a bid in which the person who designed the original plan or the person who supervised the original plan participates jointly. 10-2. In the case of a technical proposal bidding for detailed design pursuant to Subparagraph 2 of Article 98 of the Enforcement Decree or a technical proposal bidding for basic design pursuant to Subparagraph 3 of the same Article, a bid in which the person who designed the original plan or the person who supervised the original plan participates jointly. 11. Bids that violate the bidding guidelines prescribed by the Minister of Finance and Economy, other than those specified in Items 1 through 10 ② Notwithstanding Paragraph 1, if a member other than the representative of a bidder who has formed a joint venture pursuant to Article 72 of the Enforcement Decree falls under any of the grounds set forth in the subparagraphs of Paragraph 1, the bid shall be invalidated only with respect to such member. <Newly added Sep. 23, 2016> Article 45 (Indication of Reasons for Invalidation of Bid) In cases where the head of each central government agency or the contracting officer invalidates a bid, unless there are unavoidable circumstances such as the time required to verify the invalidity, they shall specify the reasons and notify the bidders participating in the bid opening at the bid opening venue. However, in cases where bids are to be submitted using an electronic procurement system or an information processing device designated and notified by the head of each central government agency pursuant to Article 39, Paragraph 1 of the Enforcement Decree, the reasons for the invalidation of the bid shall be specified and notified to the bidders in accordance with the procedures and methods indicated in the bid announcement. <Amended Dec. 30, 2000; Aug. 24, 2002; May 18, 2012; Sep. 17, 2013> Article 46 (Determination of Successful Bidder Based on Quality, etc. in Manufacture or Purchase of Specified Goods) When determining the successful bidder under Article 44 (1) of the Enforcement Decree, the head of each central government agency or the contracting officer shall evaluate the statement of quality, etc. submitted with the bid under Article 42 (6) according to the evaluation criteria under Article 44 (2) of the Enforcement Decree and, unless there is a special reason, determine the successful bidder within 10 days from the date of bidding or bid opening. Article 47 (Determination of Successful Bidder in Quantity-based Competitive Bidding) ① In determining the successful bidder in quantity-based competitive bidding pursuant to Article 45 or Article 46 of the Enforcement Decree, the head of each central government agency or the contracting officer shall, when there are two or more bidders with the same bid price who are likely to be the successful bidder, designate the bidder with the larger bid quantity as the successful bidder of priority; and when the bid quantities are identical,the successful bidder shall be determined by drawing lots in accordance with the provisions of Article 47 of the Enforcement Decree. ② In determining the successful bidder pursuant to the provisions of Paragraph 1, if the quantity of the lowest-ranked successful bidder, when combined with the quantities of other successful bidders, exceeds the demanded quantity or the quantity to be sold, the excess quantity shall be deemed not to have been awarded. Article 48 (Opening of Bids and Declaration of Award) ① When the head of each central government agency or the contracting officer receives bids by the designated time, they shall declare the closing of bid reception and open the bids in the presence of the bidders. However, in cases where bids are to be submitted using an electronic procurement system or an information processing device designated and notified by the head of each central government agency pursuant to Article 39, Paragraph 1 of the Enforcement Decree, the reception of bids shall be closed and the bids opened in accordance with the procedures and methods indicated in the bid announcement. <Amended Dec. 30, 2000; Aug. 24, 2002; May 18, 2012; Sep. 17, 2013> ② In cases where the head of each central government agency or the contracting officer conducts bidding for specifications and price, or for technology and price, simultaneously pursuant to Article 18, Paragraph 3 of the Enforcement Decree, they may open the price bids even if, as a result of opening bids for a specification bid or a technology bid established by two or more valid bidders pursuant to the provisions of Article 11 of the Enforcement Decree, only one bidder is confirmed as qualified for specifications or technology. <Amended July 21, 2010> ③ Deleted <December 30, 2000> Chapter 5: Conclusion and Performance of Contracts Article 49 (Preparation of Contract) ① When the head of each central government agency or the contracting officer has determined a contractor, they shall enter into a contract without delay using the standard contract form in Annex No. 7, Annex No. 8, or Annex No. 9. ② The head of each central government agency or the contracting officer may enter into a contract by specifying special provisions necessary for the contract in addition to the general contract matters stated in the standard contract form pursuant to the provisions of Paragraph 1. ③ When the head of each central government agency or the contracting officer deems it difficult to use the form prescribed in Paragraph 1, they may enter into a contract using a different form. ④ In cases where the head of each central government agency or the contracting officer exempts the payment of all or part of the contract guarantee deposit pursuant to the provisions of Subparagraphs 1 through 3 and 5 of Paragraph 6 of Article 50 of the Enforcement Decree, they shall state the reason and the amount of exemption in the contract and require the submission of a promissory note for the payment of the contract guarantee deposit, attaching it to the contract. <Amended Dec. 31, 1996; Dec. 12, 2003> Article 50 (Cases Where the Preparation of a Contract is Omitted) Where the head of each central government agency or the contracting officer omits the preparation of a contract pursuant to Article 49 of the Enforcement Decree, they shall receive and keep on file documents that may serve as evidence of the formation of a contract, such as invoices, memoranda, agreements, and matters of acceptance, from the contractor. However, this shall not apply in cases where the documents are prepared using forms for accounting and financial management separately prescribed by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> Article 51 (Payment of Contract Guarantee) ① When the head of each central government agency or the contracting officer intends to conclude a contract, they shall require the successful bidder or the contract counterparty to pay the contract guarantee in accordance with the prescribed procedures, together with the contract guarantee payment form in Annex 10, before concluding the contract. ② When the head of each central government agency or the contracting officer requests that the bid security paid by the contractor pursuant to the provisions of Article 43 be replaced with the contract security using the application for replacement of bid security with contract security in Annex 11, the head of each central government agency or the contracting officer shall replace it with the contract security. Article 52 (Payment of Defect Repair Guarantee Deposit) When the head of each central government agency or the contracting officer has completed the final inspection of a construction project, they shall require the payment of the defect repair guarantee deposit pursuant to Article 62 of the Enforcement Decree, together with the Defect Repair Guarantee Deposit Payment Form in Annex 12, by the time of the final disbursement of the construction price. Article 53 (Payment of Security Deposits in Cash) Where a bidder or contractor pays a security deposit in cash under Articles 43, 51, and 52, the head of each central government agency or the contracting officer shall have the public official responsible for receipt and disbursement of cash other than revenue and expenditures receive it in accordance with the Rules on the Handling of Government Deposits. Article 54 (Payment of Security Deposit in Securities) ① When a bidder or contractor pays a security deposit pursuant to Articles 43, 51, and 52 in the form of securities pursuant to Article 37, Paragraph 2, Subparagraph 2 of the Enforcement Decree, the head of each central government agency or the contracting officer shall have the securities handling officer receive it in accordance with the Government Securities Handling Regulations. <Amended Mar. 5, 2009> ② When a contractor pays the guarantee deposit under Articles 43, 51, and 52 in the form of registered government bonds, the head of each central government agency or the contracting officer shall have the contractor submit a consent form for the establishment of a pledge in the form of Annex 13 along with the notice of completion of government bond registration, and shall have the securities handling officer keep it in custody in accordance with the Government Securities Handling Regulations. ③ When a public official handling securities receives a notice of completion of registration of government bonds and a consent form for the establishment of a pledge pursuant to the provisions of Paragraph 2, he/she shall, unless there are unavoidable circumstances, take measures to establish a pledge with himself/herself as the pledgee without delay. [Title amended Mar. 5, 2009] Article 55 (Payment of Guarantee Deposit by Guarantee Insurance Certificate, etc.) ① When a bidder or contractor intends to pay the guarantee deposit pursuant to the provisions of Articles 43, 51, and 52 by means of a payment guarantee, guarantee insurance certificate, or guarantee certificate (hereinafter referred to as “guarantee insurance certificate, etc.”) pursuant to the provisions of Article 37, Paragraph 2, Subparagraphs 1, 3, or 4 of the Enforcement Decree, the head of each central government agency or the contracting officer shall require that such certificate be submitted to the securities handling officer as having satisfied the requirements of each of the following subparagraphs. <Amended Dec. 31, 1996; Sep. 8, 2005; Dec. 29, 2006> 1. The name of the principal party must be the Government of the Republic of Korea. 2. The security deposit amount must be equal to or greater than the security deposit amount payable. 3. The guarantee period shall fall under any one of the following items depending on the guarantee amount A. Bid Security (1) First day of the guarantee period: must be before the deadline for submitting bids (2) Expiration date of the guarantee period: 30 days after the day following the deadline for submitting bids. However, in the case of construction bids under Article 78 of the Enforcement Decree, it must be 90 days after the day following the deadline for submitting bids. B. Contract Deposit (1) Commencement date of the guarantee period: The commencement date of the contract period (2) Expiration date of the guarantee period: A date after the end of the contract period C. Defect repair guarantee deposit (1) Commencement date of the guarantee period: The earlier of the date of acceptance of the contract object and the date of completion of the final inspection (2) Expiration date of the guarantee period: A date after the expiry of the period of liability for defect repairs 4. The guarantee details specified in the guarantee insurance policy, etc. must guarantee the same content as the performance of obligations by the bidder or the contractor. 5. In the case of a guarantee insurance policy, there shall be a special clause guaranteeing the amount to be forfeited to the national treasury notwithstanding the grounds for exemption stipulated in the standard terms and conditions of the guarantee insurance. ② When a public official handling securities receives a guarantee insurance certificate, etc., he/she shall verify the matters under each subparagraph of Paragraph 1 and other necessary matters, and then keep it in custody in accordance with the Government Securities Handling Regulations. Article 56 (Payment of Guarantee in the Form of Certificates of Deposit, etc.) ① If a bidder or contractor intends to pay the guarantee pursuant to the provisions of Articles 43, 51, and 52 in the form of a certificate of deposit or beneficiary certificate (hereinafter referred to as “certificates of deposit, etc.”) pursuant to the provisions of Article 37, Paragraph 2, Subparagraphs 5 through 7 of the Enforcement Decree, the head of each central government agency or the contracting officer shall have the securities handling officer receive it in accordance with theGovernment Securities Handling Regulations. ② The provisions of Article 54, Paragraphs 2 and 3 concerning the submission of a consent form for the establishment of a pledge, the custody of registered government bonds, and the establishment of a pledge shall apply mutatis mutandis to cases where a guarantee is paid in the form of a certificate of deposit, etc., pursuant to the provisions of Paragraph 1. Article 57 (Payment of Security Deposit in Stocks) ① When a bidder or contractor intends to pay a security deposit in the form of stocks (in cases where it is substituted with a certificate of deposit pursuant to Article 171, Paragraph 4 of the Capital Market and Financial Investment Business Act, the contracting officer shall have the bidder or contractor pay the stocks in advance to a securities handling office (hereinafter referred to as “securities handling office”) pursuant to the “Rules on Government Securities Handling” and have the bidder submit to the securities handling officer a certificate of transfer for the relevant stocks and a memorandum in the form of Annex 14, along with a notice of confirmation of payment of government-held securities issued pursuant to the “Bank of Korea Rules on Government Securities Handling ”. <Amended Sep. 9, 1999; Sep. 8, 2005; Mar. 5, 2009; Feb. 1, 2016; Oct. 28, 2021> ② When a securities handling office receives a payment slip for government-custodial securities and shares pursuant to Paragraph 1, it shall verify the type, face value, symbol, number, quantity, etc., of the shares and whether they are listed securities; record the name of the owner of the relevant shares (or the last assignee in the case of registered shares) for each share in the remarks column of the Notice of Confirmation of Payment for Government-Custod Securities issued in accordance with the “Bank of Korea Rules on Handling Government-Custod Securities,” and deliver the relevant shares to the person who submitted them. <Amended Sep. 9, 1999; Sep. 8, 2005; Mar. 5, 2009; Feb. 1, 2016; Oct. 28, 2021> Article 58 (Certificate of Transfer of Shares) A certificate of transfer of shares submitted pursuant to Article 57 shall be prepared in accordance with the following requirements. 1. It must not state the name of the assignee or the date of transfer. 2. The transferor's seal shall bear the verification stamp of the company issuing the shares. 3. If an issuing company submits various different classes of shares, the share transfer certificates shall be separate from each issuing company. Article 59 (Confirmation of Payment of Security Deposit) When a cash disbursement officer or a securities handling officer receives a security deposit pursuant to the provisions of Articles 43, 51, and 52 in accordance with the prescribed procedures, he/she shall stamp a confirmation of payment on the security deposit payment slip and send it without delay to the head of the central government agency to which he/she belongs or the contracting officer. Article 60 (Obligations During the Guarantee Period) The head of each central government agency or the contracting officer shall faithfully perform the obligations set forth in each of the following subparagraphs imposed on the insured pursuant to the terms and conditions, special provisions, or the Commercial Act of the relevant guarantee insurance contract, etc., during the guarantee period. <Amended Sep. 8, 2005> 1. Duty to notify of change or increase in risk pursuant to the provisions of Article 652 of the Commercial Act 2. Duty to notify of the occurrence of an insured event pursuant to the provisions of Article 657 of the Commercial Act 3. Duty to prevent damage pursuant to the provisions of Article 680 of the Commercial Act 4. Obligation to consent to investigation pursuant to the provisions of the Terms and Conditions 5. Obligations stipulated in other terms and conditions or special agreements Article 61 (Extension of Guarantee Period of Guarantee Insurance Certificates, etc.) When the head of each central government agency or the contracting officer intends to postpone the date of conclusion of a contract or to extend the performance period of a contract or the defect liability period, they shall require the contractor to submit a guarantee insurance certificate, etc., to the securities handling officer in accordance with the provisions of Article 55, with the guarantee period being the period to be extended added to the original guarantee period. Article 62 (Adjustment of Guarantee Deposit and Additional Payment, etc., upon Change of Contract Amount) When the contract amount is adjusted pursuant to the provisions of Articles 64 through 66 of the Enforcement Decree, the head of each central government agency or the contracting officer shall require the contractor to pay an additional guarantee deposit of an amount corresponding to the adjustment, or return it upon the contractor's request. Article 63 (Return of Security Deposit) ① The head of each central government agency or the contracting officer shall ensure that when the purpose of the security deposit paid pursuant to Articles 37, 50, and 62 of the Enforcement Decree is achieved, it is returned immediately upon the request of the contractor. ② In the case of a construction project in which different types of work have different defect liability periods, the defect repair guarantee deposit for a type of work for which the purpose of the guarantee has been achieved and the defect liability period for each type of work pursuant to the provisions of Article 70 has expired shall be returned immediately upon the request of the contractor. Article 64 (Forfeiture of Security Deposits, etc. to the State Treasury) ① In the event that a cause arises requiring the forfeiture to the State Treasury of security deposits paid pursuant to the provisions of Articles 43, 51, and 52 pursuant to Article 38, Paragraph 1 of the Enforcement Decree, the head of each central government agency or the contracting officer shall handle the said security deposits in accordance with the methods set forth in each of the following subparagraphs. <Amended Dec. 12, 2003> 1. In the case of cash, the intention must be notified to the cashier of non-budgetary cash and the relevant revenue collection officer, and a request must be made to collect it as revenue. 2. In the case of securities, notice must be given to the public official in charge of securities handling, and a request must be made to process them as government-owned securities in accordance with the Government Securities Handling Regulations. In this case, for registered government bonds, notice must be given to the securities handling office and the public official in charge of securities handling. 3. In the case of guarantee insurance policies, etc., the relevant revenue collection officer, securities handling official, and relevant guarantee institution shall be notified of such fact and required to take necessary measures to collect the said guarantee amount as revenue. 4. In the case of time deposit certificates, etc., the relevant revenue collection officer, securities handling official, and the financial institution concerned shall be notified of this fact and required to take necessary measures to collect the said guarantee as revenue. ② Deleted <July 21, 2010> Article 65 (Forfeiture of Bid Security to the State Treasury in Quantity-Based Competitive Bidding) If the last-ranked successful bidder fails to perform the relevant obligation and the bid security is forfeited to the State Treasury, where Article 47 (2) applies to the quantity awarded to that bidder, only the bid security corresponding proportionately to the quantity awarded shall be forfeited. Article 66 (Performance Guarantee in Construction Contracts) ① Deleted <July 21, 2010> ② In cases where a construction performance bond has been submitted pursuant to the provisions of Article 52 of the Enforcement Decree and the contractor fails to perform their contractual obligations, the head of each central government agency or the contracting officer shall request the issuing agency of the construction performance bond to perform such obligations without delay. <Amended Dec. 31, 1996; July 21, 2010> ③ The head of each central government agency or the contracting officer shall take necessary measures in advance when concluding a contract so that, in the event that a company designated by the issuing agency of the construction performance guarantee (hereinafter referred to as the “guarantee fulfilling company”) has fulfilled its obligations pursuant to a claim under the provisions of Paragraph 2, an amount equivalent to the portion of the contract amount fulfilled by the guarantee fulfilling company may be paid to the issuing agency of the construction performance guarantee. <Amended Dec. 31, 1996; July 21, 2010> ④ If the head of each central government agency or the contracting officer deems that a person designated as the guarantee fulfillment company pursuant to the provisions of Paragraphs 1 and 3 is ineligible, they may request the contractor or the issuing agency of the construction performance guarantee to change the guarantee fulfillment company. <Amended Dec. 31, 1996; July 21, 2010> ⑤ The provisions of Paragraphs 1 through 4 may apply mutatis mutandis to service contracts. <Amended Dec. 31, 1996> ⑥ Deleted <December 31, 1996> [Title amended Dec. 31, 1996] Article 67 (Supervision and Inspection) If, as a result of the supervision or inspection, the content of the contract performance is not in accordance with the original contract, the person who has supervised or inspected the contract pursuant to the provisions of Articles 13 and 14 of the Act shall record the facts and opinions regarding the measures taken in the supervision report or inspection report and submit them to the head of the central government agency to which he/she belongs or the contracting officer. Article 68 (Detailed provisions regarding the implementation of supervision and inspection) The head of each central government agency may establish detailed guidelines regarding supervision or inspection when deemed necessary. Article 69 (Verification in Cases of Entrusted Supervision and Inspection) In cases where the head of each central government agency or the contracting officer has supervision or inspection performed by a specialized agency pursuant to the provisions of the proviso to Article 13, Paragraph 1 and the proviso to Article 14, Paragraph 1 of the Act, they shall receive notification of the results in writing and verify them. Article 70 (Period of Liability for Defects) ① When concluding a construction contract pursuant to the main clause of Article 60, Paragraph 1 of the Enforcement Decree, the head of each central government agency or the contracting officer shall determine the period of liability for defects in accordance with the classification of types of construction work as specified in each of the following subparagraphs. However, in the case of complex construction work where liability for defects cannot be distinguished between types of construction work excluding Subparagraph 7, the period of liability for defects shall be determined based on the type of the main construction work. <Amended Sep. 9, 1999; Nov. 4, 2014; Sep. 17, 2019> 1. Construction work pursuant to the Framework Act on the Construction Industry (excluding work under Subparagraph 2): Period pursuant to Article 30 and [Table 4] of the Enforcement Decree of the Framework Act on the Construction Industry. 2. Ballast railway construction (limited to the track construction portion) among construction works under the Framework Act on the Construction Industry: 1 year 3. Construction of multi-unit housing pursuant to the Multi-unit Housing Management Act: Period pursuant to Article 36, Paragraph 1 and Annex 4 of the Enforcement Decree of the Multi-unit Housing Management Act 4. Electric construction work pursuant to the Electric Construction Business Act: Period pursuant to Article 11-2 and [Appendix 3-2] of the Enforcement Decree of the Electric Construction Business Act 5. Information and communications construction work pursuant to the Information and Communications Construction Business Act: Period pursuant to Article 37 of the Enforcement Decree of the Information and Communications Construction Business Act 6. Firefighting facility construction pursuant to the Firefighting Facilities Construction Business Act: Period pursuant to Article 6 of the Enforcement Decree of the Firefighting Facilities Construction Business Act 7. Cultural property repair work pursuant to the Act on the Repair, etc. of Cultural Property: Period pursuant to Article 19 and [Appendix 9] of the Enforcement Decree of the Act on the Repair, etc. of Cultural Property 8. Construction of groundwater development and utilization facilities under the Groundwater Act or other construction work pursuant to relevant laws: 1 year ② Where the warranty period for defects is not determined pursuant to the provisions of the proviso to Article 60, Paragraph 1 of the Enforcement Decree, it shall be the works specified in each subparagraph of Article 72, Paragraph 2. <Amended Sep. 9, 1999> Article 71 (Defect Inspection) A person conducting a defect inspection under Article 61 of the Enforcement Decree shall inspect for defects periodically at least twice a year during the defect liability period under Article 70 and conduct a separate inspection without delay upon expiry of that period. ② When the head of each central government agency or the contracting officer requests a defect inspection from a specialized agency pursuant to the provisions of Article 61, Paragraph 2 of the Enforcement Decree, they shall receive the results in writing and verify them. ③ The head of each central government agency or the contracting officer shall take necessary measures without delay when defects are discovered as a result of the defect inspection pursuant to the provisions of Paragraphs 1 and 2. ④ When the head of each central government agency or the contracting officer conducts a defect inspection, they shall keep a defect repair management register for the relevant construction work and record and maintain the following matters. 1. Project Name and Contract Amount 2. Contracting Party 3. Date of Completion 4. Details of Defect Occurrence and Handling 5. Other Notes Article 72 (Defect Repair Guarantee Deposit Rate) ① When concluding a construction contract, the head of each central government agency or the contracting officer shall determine the defect repair guarantee deposit rate for the contract amount in accordance with the classification of the construction types in each of the following subparagraphs (in the case of complex construction where liability for defects between construction types cannot be distinguished, it refers to the main construction type) pursuant to the provisions of the main text of Article 62, Paragraph 1 of the Enforcement Decree. 1. Construction of major structures such as railways, dams, tunnels, steel bridge installations, power generation facilities, bridges, and water and sewage structures, and landscaping works: 5/100 2. Construction work including airports, ports, cable car installations, breakwaters, erosion control, land reclamation, etc.: 4/100 3. Works for irrigation canals, roads (including paving), landfills, water and sewage pipelines, rivers, general construction, etc.: 3/100 4. Works other than those in Nos. 1 through 3: 2/100 ② Cases where the payment of a defect repair guarantee deposit may be waived pursuant to the proviso to Article 62, Paragraph 1 of the Enforcement Decree shall be any of the construction works listed in the following subparagraphs. < Amended Feb. 23, 1998; Sep. 8, 2005; Jun. 19, 2013; Nov. 4, 2014> 1. Demolition work for structures, etc., among the scope of work for construction business categories pursuant to Annex 1 of the Enforcement Decree of the Framework Act on the Construction Industry 2. Works such as simple rock excavation and sand and gravel extraction that objectively do not require defect repair due to the nature of the work 3. Construction work with a contract amount not exceeding 30 million won (excluding landscaping work) Article 73 (Direct Use of Defect Repair Guarantee Deposit) ① When the head of each central government agency or the contracting officer intends to directly use the defect repair guarantee deposit pursuant to the provisions of Article 63 of the Enforcement Decree, they shall notify the cash disbursement officer for non-revenue and expenditure or the securities handling officer of such intent and take necessary measures for the repair of the defect. ② When the defect repair guarantee deposit is submitted in the form of a guarantee insurance certificate, etc. pursuant to the provisions of Article 37, Paragraph 2 of the Enforcement Decree, notice must be given to the relevant guarantee institution to pay the guaranteed amount simultaneously with the notice pursuant to the provisions of Paragraph 1. ③ A public official handling securities who has received notice pursuant to Paragraph 1 shall take the following measures with respect to securities, etc. held in his/her custody. <Amended Sep. 9, 1999; Mar. 5, 2009> 1. If the defect repair guarantee deposit is held in the form of a guarantee insurance certificate, etc. pursuant to the provisions of Article 37, Paragraph 2 of the Enforcement Decree, the performance of the guarantee obligation must be requested immediately from the relevant guarantee institution. 2. If a defect repair guarantee deposit is held in the form of listed securities, it must be sold in accordance with the laws and regulations concerning state-owned property, and the sale commission shall be paid from the proceeds of the sale. However, if it is determined that the proceeds from the sale of the said listed securities will be less than the amount of the defect repair guarantee deposit, it may not be sold. 3. If a defect repair guarantee deposit is held in the form of listed securities such as government bonds, local government bonds, bonds guaranteed by the state, or corporate bonds with a fixed repayment date for principal and interest, such securities shall be sold in accordance with the laws and regulations concerning state-owned property, and the sale commission shall be paid from the proceeds of the sale. However, such securities may not be sold if it is determined that the proceeds from the sale of the relevant listed securities will be less than the amount of the defect repair guarantee deposit, or if the final repayment date for principal and interest of the relevant listed securities falls within 30 days from the date of sale. 4. If the defect repair guarantee deposit is held in the form of a time deposit certificate pursuant to the provisions of Article 37, Paragraph 2, Item 5 of the Enforcement Decree, a claim for cash payment must be made immediately to the relevant financial institution. ④ When a public official handling securities sells securities, etc. held in custody pursuant to the provisions of Paragraph 3 or receives the fulfillment of the relevant guarantee obligation, the public official shall have the guarantee institution, etc. pay the proceeds directly to the public official disbursing cash for non-revenue and expenditure. ⑤ When the head of each central government agency or the contracting officer has performed an act of causing expenditure for the direct use of the defect repair guarantee deposit, they shall send the relevant documents of such act of causing expenditure to the cashier of non-revenue and non-expenditure cash; however, if the listed securities submitted as the defect repair guarantee deposit have not been sold by the method prescribed in subparagraph 2 or 3 of Paragraph 3, they may not perform an act of causing expenditure. ⑥ When a cash disbursement officer for non-revenue and expenditure receives documents related to the cause of expenditure pursuant to the provisions of Paragraph 5, he/she shall pay the cost of the repair of the defect from the said defect repair guarantee deposit. ⑦ If there is a balance remaining after paying the consideration under Paragraph 6 during the warranty period for defects under Article 70, Paragraph 1, the head of each central government agency or the contracting officer shall handle it in accordance with the provisions of Article 64, Paragraph 1. <Amended Dec. 30, 2000> Article 74 (Adjustment of Contract Amount Due to Price Fluctuations) ① The item adjustment rate pursuant to Article 64, Paragraph 1, Subparagraph 1 of the Enforcement Decree, and the calculation of the related fluctuation range and rate, shall be in accordance with the formulas set forth in the following subparagraphs. In this case, the items or cost categories and the contract amount, etc. shall apply to the portion to be performed after the adjustment reference date; “contract unit price” refers to the contract unit price of each item or cost category specified in Article 65, Paragraph 3, Subparagraph 1 of the Enforcement Decree; “price at the time of price fluctuation” refers to the price of each item or cost category calculated at the time of the price fluctuation; and “price at the time of bidding” refers to the price of each item or cost category calculated at the deadline for submitting bids. <Amended Sep. 8, 2005> ② In the case of a contract based on the estimated price under Article 9, Paragraph 1, Item 2 of the Enforcement Decree, the total amount calculated by multiplying the quantity of each item or cost category by the fluctuation range in the formula of Paragraph 1, Item 1 shall include general administrative expenses and profit, etc., that increase or decrease in proportion to said total amount. ③ In calculating the fluctuation range under Paragraph 1, Subparagraph 1, the following standards shall apply. <Amended Sep. 8, 2005> 1. In the event that the price at the time of price fluctuation is higher than the contract unit price and the contract unit price is higher than the price at the time of bidding, the fluctuation amount shall be the price at the time of price fluctuation minus the contract unit price. 2. If the price at the time of price fluctuation is higher than the price at the time of bidding but lower than the contract unit price, the fluctuation range shall be zero. ④ The index adjustment rate pursuant to Article 64, Paragraph 1, Subparagraph 2 of the Enforcement Decree shall be calculated based on the fluctuation rates of the index, etc., of the index set forth in each of the following subparagraphs and the cost item groups constituting the calculation details of the contract amount (covering the portion to be performed after the adjustment reference date). <Amended Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> 1. The Basic Producer Price Classification Index or the Import Price Index surveyed and published by the Bank of Korea 2. An average index of wages, prices, or fees determined, permitted, or authorized by the government, local governments, or public institutions pursuant to the Act on the Operation of Public Institutions 3. Average index of prices investigated and published pursuant to the provisions of Article 7, Paragraph 1, Subparagraph 1 4. Other indices similar to those in Subparagraphs 1 through 3 as determined by the Minister of Finance and Economy ⑤ In adjusting the contract amount pursuant to the provisions of Article 64, Paragraph 1 of the Enforcement Decree, the adjusted amount shall be calculated by multiplying the consideration for the portion of the contract amount performed after the adjustment reference date (hereinafter referred to as the “consideration subject to price fluctuation”) by the item adjustment rate or the index adjustment rate; provided, however, that the portion of the contract that is required to be completed prior to the adjustment reference date shall be excluded from the consideration subject to price fluctuation. Provided, however, that if performance is delayed due to reasons attributable to the government or force majeure such as natural disasters, it shall be included in the consideration subject to price fluctuation. ⑥ In cases where an advance payment has been made pursuant to the provisions of Article 64, Paragraph 3 of the Enforcement Decree, the calculation of the deductible amount shall be based on the following formula. In this case, the consideration subject to price fluctuation adjustments in long-term continuous construction contracts, long-term goods manufacturing contracts, or contracts under a continuing expenditure budget, etc., pursuant to the provisions of Article 69, Paragraphs 2, 3, or 5 of the Enforcement Decree, shall be based on the contract concluded or the amount performed in the relevant year. Deductible Amount = Consideration Subject to Price Fluctuation Adjustment × (Item Adjustment Rate or Index Adjustment Rate) × Advance Payment Rate ⑦ When calculating the price at the time of price fluctuation pursuant to Paragraph 1, the same standards and methods applied when calculating the price at the time of bidding shall be applied. However, in cases of unavoidable circumstances such as natural disasters or a sudden surge in raw material prices, the method applied when calculating the price at the time of bidding may be different. <Amended Sep. 9, 1999; Sep. 8, 2005; Mar. 5, 2009> ⑧ In calculating the rate of change pursuant to Paragraph 1, the rate of change in labor costs for service contracts under each subparagraph of Article 23-3 (limited to contracts concluded after the bid notice was issued prior to May 25, 2006) shall be calculated by applying the minimum wage under the Minimum Wage Act. <Newly added Dec. 29, 2006; July 21, 2010> ⑨ If the head of each central government agency or the contracting officer intends to adjust the contract amount by increasing it pursuant to the provisions of Paragraphs 1 through 7, they shall adjust the contract amount within 30 days from the date of receiving a request for adjustment from the contractor. In this case, if there are unavoidable reasons such as a delay in budget allocation, the adjustment period may be extended in consultation with the contractor; and if there is no budget available to increase the contract amount, the consideration may be paid by adjusting the quantity of work or manufacturing, etc. <Newly added Sep. 9, 1999; Sep. 8, 2005> 10. The Minister of Finance and Economy may prescribe necessary detailed matters concerning the adjustment of contract amounts due to price fluctuations, such as guidelines for calculating the index adjustment rate pursuant to Paragraph 4. <Newly added Sep. 9, 1999; Mar. 5, 2009; Jan. 2, 2026> Article 74-2 (Adjustment of Contract Amount Due to Design Change) ① Design changes pursuant to Article 65 of the Enforcement Decree shall be completed prior to construction of the part requiring such design change. However, if the head of each central government agency or the contracting officer deems it necessary to urgently carry out construction, such as when there is a concern that quality deterioration may occur due to a delay in the execution of the construction schedule, they may consult with the contractor to clearly determine the timing of the design change, etc., and allow construction to proceed first before the design change is completed. ② The provisions of Paragraphs 9 and 10 of Article 74 shall apply mutatis mutandis to the adjustment of the contract amount pursuant to the provisions of Paragraph 1. [This Article was newly established on Sep. 9, 1999.] Article 74-3 (Adjustment of Contract Amount Due to Changes in Other Contract Details) ① Changes to contract details, such as changes in the construction period or transportation distance pursuant to Article 66 of the Enforcement Decree, shall be completed before commencement of the performance of the contract. However, if the head of each central government agency or the contracting officer deems it necessary to urgently perform the contract, such as when there is a concern that quality may deteriorate due to a delay in contract performance, they may consult with the contractor to clearly determine the timing of the change in contract details and allow the contract to be performed first before the contract details are changed. ② The provisions of Paragraphs 9 and 10 of Article 74 shall apply mutatis mutandis to the adjustment of the contract amount pursuant to the provisions of Paragraph 1. [This Article was newly established on Sep. 9, 1999.] Article 75 (Rates of Liquidated Damages for Delay) The liquidated damages rates for delay under Article 74 (1) of the Enforcement Decree shall be as follows: <Amended Dec. 31, 1996; Sep. 8, 2005; Jul. 21, 2010; Nov. 4, 2014; Dec. 28, 2017> 1. Construction: 0.5 per thousand 2. Manufacture or purchase of goods ( including cases where goods and services are put up for bidding collectively in the case of a software business pursuant to Article 16, Paragraph 3 of the Enforcement Decree; hereinafter the same applies in this subparagraph): 0.75 per mille. However, in the case of the manufacture or purchase of goods where design and manufacturing are carried out collectively after the contract, and approval by the head of the ordering central government agency is required for the design, the rate shall be 0.5 per mille. 3. Repair, processing, or rental of goods; services ( excluding services where goods and services are put up for bidding together in a software business pursuant to Article 16, Paragraph 3 of the Enforcement Decree); and other: 1.25 per thousand 4. Manufacture and purchase of military food and beverages: 1.5 per thousand 5. Transportation, storage, and grain processing: 2.5 per thousand Article 75-2 (Restriction on Eligibility of Unfair Business Operators to Participate in Bidding) In the proviso to Article 76, Paragraph 2, Subparagraph 1, Item (b) of the Enforcement Decree, the phrase “bids falling under grounds for invalidation of bid prescribed by the Ordinance of the Ministry of Finance and Economy, such as bids where the amount specified in the bid document does not match the amount specified in the bill of quantities” refers to bids pursuant to Article 44, Paragraph 1, Subparagraphs 6 and 6-3. <Amended July 6, 2021; Jan. 2, 2026> [This Article Newly Inserted Sep. 17, 2019] Article 76 (Criteria for Restricting Bidding Eligibility of Unfair Business Operators, etc.) The detailed criteria for restricting the bidding eligibility of unfair business operators pursuant to Article 76, Paragraph 4 of the Enforcement Decree are as set forth in Attached Table 2. <Amended July 6, 2021> [Wholly Amended Sep. 23, 2016] Article 77 (Publication of Restrictions on Eligibility for Bidding, etc.) ① When a contracting officer determines that there is a person who falls under the category of a dishonest contractor pursuant to Article 27, Paragraph 1 of the Act, the officer shall report this to the head of the central government agency to which such person belongs without delay. <Amended Sep. 23, 2016> ② Deleted <September 9, 1999> ③ The posting pursuant to Article 76, Paragraph 11 of the Enforcement Decree shall be carried out by posting the Confirmation of Sanctions against Unfair Business Operators in the form of Annex 15 on the Electronic Procurement System. <Amended May 25, 2006; Sep. 17, 2013; Sep. 23, 2016; Jul. 6, 2021; Jan. 2, 2025> ④ The head of each central government agency shall use the electronic procurement system to verify whether a bidder's eligibility to participate in the bidding process is restricted. <Amended Aug. 24, 2002; Sep. 17, 2013> ⑤ Disclosure pursuant to Article 76, Paragraph 12 of the Enforcement Decree shall be made by disclosing the Confirmation of Sanctions against Unfair Business Operators ( Form No. 15 ) (only the matters specified in each subparagraph of Article 76, Paragraph 12 of the Enforcement Decree shall be entered) on the Electronic Procurement System during the period of restriction on eligibility to participate in bidding. <Newly added Sep. 23, 2016; Jul. 6, 2021; Jan. 2, 2025> [Title amended Sep. 9, 1999; May 25, 2006] Article 77-2 (Detailed Subjects and Criteria for Imposing Surcharges) ①The types of violations and the rates of surcharges imposed pursuant to Article 27-2, Paragraph 1 of the Act and Article 76-2 of the Enforcement Decree, as well as the degree of violation, are as set forth in Annex 3 and Annex 4, according to the classifications in each of the following subparagraphs. 1. Criteria for Imposing Penalty Surcharges on Unfair Business Operators Whose Liability Is Minor under Article 27-2 (1) 1 of the Act and Article 76-2 (1) of the Enforcement Decree: Attached Table 3 2. Criteria for Imposing Surcharges in Cases Where Valid Competitive Bidding Is Clearly Not Established Due to Restrictions on Bidding Eligibility Pursuant to Article 27-2, Paragraph 1, Subparagraph 2 of the Act and Article 76-2, Paragraph 2 of the Enforcement Decree: Attached Table 4 ② The head of each central government agency may reduce the amount of the penalty surcharge under paragraph (1) by up to one-half, taking into consideration the motive, details, and frequency of the violation. [This Article was newly established on June 19, 2013.] Chapter 6 Large-scale Construction Contracts Article 78 (Submission of Basic Execution Plan for Large-Scale and Specific Construction Projects) ① The head of each central government agency shall, for large-scale and specific construction projects, prepare a basic execution plan containing the matters set forth in each of the following subparagraphs annually pursuant to Article 80, Paragraph 2 of the Enforcement Decree, and submit it to the Minister of Land, Infrastructure and Transport by January 15 of the relevant year. However, if there are special circumstances preventing submission within the deadline, such as the project not being finalized, the basic execution plan shall be prepared and submitted to the Minister of Land, Infrastructure and Transport without delay once such circumstances have ceased to exist. <Amended Dec. 31, 1996; Feb. 23, 1998; May 25, 2006; Oct. 10, 2007; Mar. 5, 2009; Mar. 23, 2013> 1. Project Name 2. Overview of the Project 3. Estimated construction cost 4. Construction Period 5. Location of the construction site 6. Scheduled bidding period 7. Bidding Method (in the case of alternative bidding, matters or scope to be submitted for alternative bidding) and Reason for Proposal 8. Deleted <May 25, 2006> 9. Project Effects 10. Other Notes ② The head of each central government agency shall, prior to preparing the basic design documents pursuant to Article 80, Paragraph 2, Subparagraph 1 of the Enforcement Decree, prepare a basic execution plan by classifying works to be awarded through lump-sum bidding and works not to be awarded through lump-sum bidding (hereinafter referred to as “other works”); and for works among those reviewed as other works pursuant to Article 80, Paragraph 3 of the Enforcement Decree for which it is recognized that awarding through alternative bidding is necessary after the detailed design documents have been prepared, a basic execution plan shall be prepared for the purpose of requesting a review pursuant to Paragraph 1. <Amended Oct. 10, 2007> ③ Notwithstanding Paragraph 1, the Minister of National Defense may not submit the Basic Implementation Plan to the Minister of Land, Infrastructure and Transport if a Special Construction Technology Deliberation Committee is established within the Ministry of National Defense pursuant to Article 5, Paragraph 2 of the Construction Technology Promotion Act. <Newly added May 25, 2006; October 10, 2007; March 5, 2009; March 23, 2013; February 1, 2016> [Title amended Dec. 31, 1996; Oct. 10, 2007] Article 79 (Deliberation by the Central Construction Technology Deliberation Committee) ① When the Minister of Land, Infrastructure and Transport receives a basic execution plan pursuant to Article 78, Paragraph 1, he/she shall have the Central Construction Technology Deliberation Committee pursuant to Article 5, Paragraph 2 of the Construction Technology Promotion Act deliberate on the bidding methods for construction works included in the basic execution plan. However, in the case of other construction works, deliberation may be omitted. <Amended Oct. 10, 2007; Mar. 5, 2009; Mar. 23, 2013; Feb. 1, 2016> ② When the deliberation by the Central Construction Technology Deliberation Committee has been completed, the Minister of Land, Infrastructure and Transport shall notify the head of the relevant central government agency of the deliberation results for each construction project in accordance with the classifications in each of the following subparagraphs. <Amended Oct. 10, 2007; Mar. 5, 2009; Mar. 23, 2013> 1. For Basic Implementation Plans submitted by January 15 of each year: By February 20 of each year 2. For Basic Implementation Plans submitted on or after January 16 of each year: Within 10 days after the completion of deliberation ③ Unless there are special circumstances, the head of each central government agency shall adjust the basic implementation plan in accordance with the results of the deliberation notified pursuant to Paragraph 2. <Amended Oct. 10, 2007> [Wholly Amended May 25, 2006] Article 79-2 (Deliberation by the Special Construction Technology Deliberation Committee) Notwithstanding Article 79, Paragraph 1, if a Special Construction Technology Deliberation Committee is established within the Ministry of National Defense pursuant to Article 5, Paragraph 2 of the Construction Technology Promotion Act, the Minister of National Defense shall have the Special Construction Technology Deliberation Committee deliberate on the bidding methods for all construction projects specified in the Basic Implementation Plan. <Amended Oct. 10, 2007; Feb. 1, 2016> [This Article Newly Inserted May 25, 2006] Article 80 Deleted <May 25, 2006> Article 81 (Public Notice of Construction Works Subject to Alternative Bidding and Lump-sum Bidding) When the Minister of Land, Infrastructure and Transport or the Minister of National Defense has completed the deliberation of the Central Construction Technology Deliberation Committee or the Special Construction Technology Deliberation Committee pursuant to Article 79, Paragraph 1 or Article 79-2, they shall publish a public notice in a newspaper or on the electronic procurement system regarding construction works to be executed by alternative bidding and lump-sum bidding methods. <Amended Mar. 5, 2009; Mar. 23, 2013; Sep. 17, 2013> [Wholly Amended May 25, 2006] Article 81-2 (Deliberation on Bidding Methods for Technical Proposal Bidding for Detailed Design, etc.) Articles 78, 79, 79-2, and 81 shall apply mutatis mutandis to the deliberation on bidding methods for technical proposal bidding for detailed design, etc. pursuant to Article 99, Paragraph 1 of the Enforcement Decree. [Wholly Amended July 21, 2010] Chapter 7 Disclosure of Contract Information, etc. <Amended Sep. 8, 2005> Article 82 (Disclosure of Contract Information) In the main text of Article 92-2, Paragraph 1 of the Enforcement Decree, the term “matters prescribed by the Ordinance of the Ministry of Finance and Economy” refers to the matters in each of the following subparagraphs. <Amended Mar. 5, 2009; July 21, 2010; Feb. 1, 2016; Sep. 23, 2016; Jan. 2, 2026> 1. Quarterly procurement plan for goods, construction, services, etc. to be contracted through competitive bidding or private contracting in the current year A. Purpose of the Contract B. Contract volume or scale C. Budget Amount 2. Matters concerning the specifications of the contract object to be put up for bidding a. Goods Manufacturing and Purchase Contracts: Conditions required of the subject matter of the contract, such as performance, material, and specifications B. Service Contract: Details of the services to be performed by the contractor, such as the scope of work 3. Matters concerning the conclusion of a contract A. Purpose of the Contract B. Bid Date and Contract Signing Date C. Estimated price or planned price D. Method of concluding a contract (general competition, limited competition, designated competition, private contract; presence of regional restrictions; applicability of Article 72, Paragraph 3 of the Enforcement Decree) E. Name of the counterparty (in the case of a corporation, the name of the corporation) f. Contract volume or scale g. Contract amount (in the case of long-term continuous construction, the total amount of construction; the same shall apply hereinafter) h. For designated competitive bidding or private contracting, the reasons therefor i. For a construction project whose successful bidder is determined under Article 42 (4) of the Enforcement Decree, the bid amount submitted by each bidder 4. Matters concerning contract amendment A. Purpose of the Contract B. Contract details prior to the contract change (contract volume or scale, contract amount) C. Details of Contract Amendments D. Reasons for contract modification 5. Matters concerning contract performance A. Inspection and Acceptance Results B. Date of completion of contract performance [This Article Newly Inserted Sep. 8, 2005] Article 82-2 (Reporting of Contract Performance) In the main text of Article 93 of the Enforcement Decree, the term “matters prescribed by the Ordinance of the Ministry of Finance and Economy” refers to the matters under subparagraphs 2 and 3 of Article 82. <Amended Mar. 5, 2009; Jan. 2, 2026> [This Article Newly Inserted Sep. 8, 2005] Article 83 (Government Supply of Materials for Construction Works) ① The head of each central government agency may directly supply materials necessary for a construction project when ordering the work, provided that it is easy to distinguish liability for defects from other parts of the work and there is no impediment to project management, and the project falls under any of the following subparagraphs. <Amended Sep. 8, 2005; Jan. 2, 2025> 1. When deemed efficient after comprehensively considering the quality of materials, supply situation, scale of construction, and construction site, etc. 2. In the case of a new technology certified product recognized or designated by the Minister in charge (including those delegated by the Minister in charge). ② Matters necessary for the operation and management of materials directly supplied by the head of each central government agency pursuant to Paragraph 1 shall be determined by the Minister of Finance and Economy. <Amended Sep. 9, 1999; Aug. 24, 2002; Mar. 5, 2009; Jan. 2, 2026> [Title amended Aug. 24, 2002] Article 84 (Government Supply of Software for Software Projects) ① When the head of each central government agency or the contracting officer orders a software project pursuant to Article 2, Subparagraph 3 of the Software Promotion Act, they shall directly purchase and supply software products designated by the Minister in charge. <Amended Jan. 2, 2025> ② Notwithstanding Paragraph 1, the head of each central government agency or the contracting officer may not directly purchase and supply software products in any of the following cases: 1. Cases where integration of the software product with existing or newly constructed information systems is impossible or results in a significant increase in costs 2. In cases where directly supplying software products poses a risk of significant delays to the extent that the project cannot be completed within the project period 3. Other cases where it is determined that directly purchasing and supplying software products is significantly inefficient, aside from the increase in administrative work resulting from separate ordering. ③ If software is not directly purchased and supplied in accordance with Paragraph 2, the reason for such non-purchase must be specified in the procurement plan and the bid announcement. [Wholly Amended Mar. 5, 2009] Chapter 8 Objections and the State Contract Dispute Mediation Committee <Newly Inserted Jun. 19, 2013> Article 85 Deleted <September 23, 2016> Article 86 (Scope of Cost Burden and Settlement Related to Examination and Adjustment) ① The scope of costs to be borne by the claimant for examination and adjustment pursuant to Article 115 of the Enforcement Decree shall be as follows: 1. Costs for appraisal, diagnosis, and testing 2. Costs of admitting witnesses and evidence 3. Costs incurred for inspection and investigation 4. Costs incurred for recording, stenographic records, interpretation, and other examination and mediation services ② If the Committee deems it necessary, it may require the claimant to pay in advance the costs related to the examination and adjustment pursuant to Paragraph 1. ③ If the Committee has received expenses related to the examination and adjustment in advance pursuant to Paragraph 2, it shall notify the claimant of a settlement statement regarding the amount and expenses received in advance within 30 days from the date the examination and adjustment proposal is presented to the parties. However, if there is an agreement between the claimant and the head of the relevant central government agency, the settlement statement shall be notified in accordance with such agreement. [This Article was newly established on June 19, 2013.] Article 87 (Operation of the Committee, etc.) Except as otherwise prescribed by these Rules, necessary matters concerning the operation of the Committee and mediation procedures shall be determined by the Chairperson after a resolution of the Committee. [This Article was newly established on June 19, 2013.] ADDENDA <Prime Minister's Decree No. 511, July 6, 1995> Article 1 (Enforcement Date) This rule shall enter into force on July 6, 1995. Article 2 (Transitional Measures Concerning Contract Conclusion, etc.) For bids, determination of successful bidders, and contract conclusions conducted after the enforcement of this Rule where a bid notice was issued prior to the enforcement of this Rule, and for contracts concluded after the enforcement of this Rule where a bid was awarded prior to the enforcement of this Rule, the former provisions shall apply. Article 3 (Repeal and Amendment of Other Laws) ① The Rules on Contract Management and the Rules on Public Notices for Large-Scale Construction Projects are hereby repealed. ② The Regulations on Qualifications for Participation in General Competitive Bidding for Foreign Procurement are amended as follows: In Article 2, subparagraph 2, and the main text and subparagraph 2 of Article 3, “Administrator of the Public Procurement Service” shall be changed to “Minister of National Defense or Administrator of the Public Procurement Service”. ③ The Rules on Special Procedures for Contract Management Regarding the Procurement of Specific Goods, etc. are amended as follows: In Article 4, Paragraphs 1 and 2, “Article 16 of the Rules on the Handling of Contract Affairs” shall be changed to “Article 15 of the Enforcement Rules of the Act on Contracts to Which the State is a Party”. ④ The Rules on Cost Calculation of Defense Materials are amended as follows. In the main text and proviso of Article 10, Paragraph 2, Article 18, Paragraph 3, Subparagraph 1, and Article 33, Paragraphs 2 and 3, “Rules for the Handling of Contract Affairs” shall be changed to “Enforcement Rules of the Act on Contracts to Which the State is a Party”. ⑤ The Enforcement Rules of the Act on Procurement Business are amended as follows. In the main text of Article 11, Paragraph 2, “Rules for the Processing of Contract Affairs” shall be changed to “Enforcement Rules of the Act on Contracts to Which the State is a Party”. ⑥ The Enforcement Rules of the Forest Act are amended as follows. In Article 34, Paragraph 6, “Article 74 of the Rules on the Handling of Contract Affairs” shall be changed to “Article 73 of the Enforcement Rules of the Act on Contracts to Which the State is a Party”. ⑦ The Enforcement Rules of the Automobile Management Act are amended as follows. In Article 36, Paragraph 4, “Rules for the Processing of Contract Affairs” shall be changed to “Enforcement Rules of the Act on Contracts to Which the State is a Party”. Article 4 (Relationship with Other Laws and Regulations) Where other laws and regulations at the time of the enforcement of these Rules cite provisions of the Rules on the Processing of Contract Affairs, such citation shall be deemed to be for the corresponding provisions of these Rules. ADDENDA <Prime Minister's Decree No. 602, Dec. 31, 1996> ① (Enforcement Date) This rule shall take effect on January 1, 1997. ② (Transitional measures regarding the conclusion of contracts, etc.) For bids, determination of successful bidders, and conclusion of contracts conducted after the enforcement of this rule where a bid notice was issued before the enforcement of this rule, and for contracts concluded after the enforcement of this rule where a bid was awarded before the enforcement of this rule, the former regulations shall apply. ADDENDA <Prime Minister's Decree No. 682, Feb. 23, 1998> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Transitional Measures) In cases where a bid notice was issued prior to the enforcement of this rule, the previous regulations shall apply to the bidding, the determination of the successful bidder, and the conclusion of the contract. ADDENDA <Ministry of Finance and Economy Decree No. 104, Sep. 9, 1999> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 23, Paragraph 2 and Article 44, Item 7 shall enter into force on January 1, 2001. Article 2 (Applicability to the Warranty Period for Defects) The amended provisions of Annex 1 regarding the warranty period for defects shall apply to contracts concluded after the enforcement of this rule. Article 3 (Applicability to the Period of Restriction on Bidding Eligibility of Unfair Business Operators) The amended provisions of Annex 2 regarding the period of restriction on bidding eligibility of unfair business operators shall apply from the time the cause for restriction occurs after the enforcement of this rule. Article 4 (Special Provisions for Adjustment of Contract Amount Due to Price Fluctuations) ① In calculating the fluctuation range for each item or cost category pursuant to the amended provisions of Article 74, Paragraph 4 (in the case of index adjustment rates, this refers to the index fluctuation rate by cost category group; hereinafter the same applies), in cases where bidding was conducted before November 21, 1997, and a contract was concluded on or after that date, or where bidding was conducted and a contract was concluded during the period from November 21, 1997, to April 1, 1998, and a reason for reduction has occurred upon the arrival of the adjustment reference date, the fluctuation range shall be calculated as follows: Provided, however, that this shall not apply if there is a special agreement between the contracting parties. 1. If the price at the time of price fluctuation (in the case of an index fluctuation rate, the index; hereinafter the same applies in this Article) is lower than the price at the time of contract conclusion and higher than the price at the time of bidding, the fluctuation range shall be zero (index fluctuation rate is 1). 2. If the price at the time of price fluctuation is lower than the price at the time of contract signing and the price at the time of bidding, and the price at the time of bidding is lower than the price at the time of contract signing, the fluctuation range is calculated by comparing the price at the time of bidding and the price at the time of price fluctuation. ② Even if the contract amount has already been adjusted due to price fluctuations prior to the enforcement of this rule, the provisions of Paragraph 1 may apply if the performance of the contract is in progress as of the enforcement date of this rule. Article 5 (Transitional Measures Concerning Contract Conclusion, etc.) In cases where a bid notice was issued prior to the enforcement of this Rule, the bid, determination of the successful bidder, and conclusion of a contract conducted after the enforcement of this Rule, and in cases where a contract is concluded after the enforcement of this Rule following a successful bid in a bid conducted prior to the enforcement of this Rule, the former provisions shall apply. ADDENDA <Ministry of Finance and Economy Decree No. 174, Dec. 30, 2000> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Applicability of the criteria for restricting the eligibility of dishonest contractors to participate in bidding) The amended provisions of Annex 2 shall apply to cases where the grounds for restriction occur after the enforcement of this rule. ADDENDA <Ministry of Finance and Economy Decree No. 251, Mar. 25, 2002> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Effective Date) The amended provisions of Article 23, Paragraph 2 and Article 44, Subparagraph 7 shall remain in effect until December 31, 2003. ③ (Transitional measures regarding contract conclusion, etc.) Bids, determination of successful bidders, and contract conclusions that are conducted after the enforcement of this rule following a bid notice issued before the enforcement of this rule, and contracts concluded after the enforcement of this rule following a successful bid in a bid conducted before the enforcement of this rule, shall be governed by the previous regulations. ADDENDA <Ministry of Finance and Economy Decree No. 274, Aug. 24, 2002> ① (Enforcement Date) This Rule shall enter into force on September 30, 2002. However, the amended provisions of Article 14, Paragraph 3 and Article 83 shall enter into force on the date of promulgation. ② (Transitional measures concerning designated information processing devices) If it is difficult for the head of each central government agency or the contracting officer to use a designated information processing device due to unavoidable circumstances, they may apply the former provisions notwithstanding the amended provisions of Articles 15, 38, 44 (subparagraphs 6-2 and 7-2), 45, 48, and 77 until December 31, 2002. ③ (Transitional measures regarding contract conclusion, etc.) Bids, determination of successful bidders, and contract conclusions that are conducted after the enforcement of this rule following a bid notice issued before the enforcement of this rule, and contracts concluded after the enforcement of this rule following a successful bid in a bid conducted before the enforcement of this rule, shall be governed by the previous regulations. ADDENDA <Ministry of Finance and Economy Decree No. 335, Dec. 12, 2003> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Applicability to the Defect Liability Period) The amended provisions of Item 2 of Annex 1 regarding the defect liability period shall apply to contracts concluded after the enforcement of this rule. ③ (Applicability to the criteria for restricting the eligibility of dishonest contractors to participate in bidding) The amended provisions of Item 1 (g), Item 2 (f), and Item 3 (k) of Annex 2 regarding the criteria for restricting the eligibility of dishonest contractors to participate in bidding shall apply from the time the cause for restriction occurs after the enforcement of this rule. ④ (Transitional measures regarding contract conclusion, etc.) Bidding, determination of successful bidder, and contract conclusion for bids announced before the enforcement of this rule and conducted after the enforcement of this rule, as well as contracts concluded after the enforcement of this rule following a successful bid in a bid conducted before the enforcement of this rule, shall be governed by the previous regulations. ADDENDA <Ministry of Finance and Economy Decree No. 460, Sep. 8, 2005> ① (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 27 and Subparagraph 2, Item (c) of Annex 2 shall enter into force on January 1, 2006. ② (Applicability to Liquidated Damages Rates) The amended provisions of Article 75, Subparagraphs 2 and 3 shall also apply to contracts concluded prior to the enforcement of this Rule. ③ (Applicability to the Defect Liability Period) The amended provisions of Annex 1 regarding the defect liability period shall apply to contracts concluded after the enforcement of this rule. ④ (Transitional measures regarding restrictions on bidding eligibility of dishonest contractors) Notwithstanding the amended provisions of Subparagraph 2, Item C of Annex 2, the previous provisions shall apply to restrictions on bidding eligibility for violations that occurred before the enforcement of this rule. ADDENDA <Ministry of Finance and Economy Decree No. 508, May 25, 2006> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Applicability to Report Documents, etc. for Designated Competitive Bidding and Private Contracts) The amended provisions of Article 29, Paragraphs 1 and 2, or Article 35 shall apply to reports or notifications made after the enforcement of this Rule. ③ (Transitional measures regarding restrictions on bidding eligibility of dishonest contractors) Notwithstanding the amended provisions of Article 76 and Annex 2, the previous provisions shall apply to restrictions on bidding eligibility for violations that occurred before the enforcement of this rule. ④ (Transitional measures regarding contract conclusion, etc.) For bids, determination of successful bidders, and contract conclusions that are conducted after the enforcement of this rule where a bid notice was issued before the enforcement of this rule, and for contracts concluded after the enforcement of this rule where a bid was awarded before the enforcement of this rule, the former regulations shall apply. ADDENDA <Ministry of Finance and Economy Decree No. 512, July 5, 2006> (Partial Amendment to the Enforcement Rules of the Act on Contracts to Which the State is a Party, etc. for the Joint Use of Administrative Information and Document Reduction) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Finance and Economy Decree No. 536, Dec. 29, 2006> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Applicability to Payment of Security Deposits by Guarantee Insurance Certificates, etc.) The amended provision of Article 55 (1) 3 (b) (2) shall apply to persons who pay contract security deposits after these Rules take effect, and the amended provision of Article 55 (1) 3 (c) (2) shall apply to persons who pay defect repair security deposits after these Rules take effect. ③ (Applicability to Adjustment of Contract Amount Due to Price Fluctuations) The amended provisions of Article 74, Paragraph 8 shall apply to adjustments made after the enforcement of this Decree. ④ (Transitional measures regarding the eligibility of dishonest contractors to participate in bidding) Notwithstanding the amended provisions of Item 7, Subparagraph C of Annex 2, the previous provisions shall apply to the restriction on eligibility to participate in bidding for violations that occurred before the enforcement of this rule. ⑤ (Transitional measures regarding contract conclusion, etc.) For bids, determination of successful bidders, and contract conclusions that are conducted after the enforcement of this rule in cases where a bid notice was issued before the enforcement of this rule, and for contracts concluded after the enforcement of this rule in cases where a bid was awarded before the enforcement of this rule, the previous regulations shall apply. ADDENDA <Ministry of Finance and Economy Decree No. 578, Oct. 10, 2007> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Restrict Bidding Eligibility of Unfair Business Operators) The amended provisions of Annex 2 shall apply starting from the first occurrence of a reason for restriction after the enforcement of this rule. Article 3 (Transitional Measures Concerning Contract Conclusion, etc.) Bids, determination of successful bidders, and contract conclusion conducted after the enforcement of this Rule following bid notices issued before the enforcement of this Rule, and contracts concluded after the enforcement of this Rule following a successful bid in bids conducted before the enforcement of this Rule, shall be governed by the previous regulations. ADDENDA <Ministry of Strategy and Finance Decree No. 58, Mar. 5, 2009> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability of the method of calculating prices at the time of price fluctuation in cases of natural disasters or sharp rise in raw material prices, etc.) The amended provisions of the proviso to Article 74, Paragraph 7 shall apply to contract amount adjustments made after the enforcement of this Rule. Article 3 (Transitional Measures Concerning Contract Conclusion, etc.) Bids, determination of successful bidders, and contract conclusion conducted after the enforcement of this Rule following bid notices issued before the enforcement of this Rule, and contracts concluded after the enforcement of this Rule following a successful bid in bids conducted before the enforcement of this Rule, shall be governed by the former regulations. ADDENDA <Ministry of Strategy and Finance Decree No. 95, Aug. 31, 2009> Article 1 (Enforcement Date) This rule shall enter into force on September 1, 2009. Article 2 (Application) This Rule shall apply starting from the first occurrence of a ground for restriction after the enforcement of this Rule. ADDENDA <Ministry of Strategy and Finance Decree No. 161, July 21, 2010> Article 1 (Enforcement Date) This Rule shall enter into force three months after the date of its promulgation. However, the amended provisions of Article 81-2 shall enter into force on the date of its promulgation, and the amended provisions of Articles 64 and 66 and Subparagraph 8(b) of Annex 2 shall enter into force on January 1, 2011. Article 2 (Applicability to Restrict Bidding Eligibility of Unfair Business Operators) The amended provisions of Subparagraph 7, Item (c) of Annex 2 shall apply from the first occurrence of a reason for restriction on bidding eligibility after the enforcement of this rule. Article 3 (Transitional Measures Concerning the Invalidation of Bids for Companies Not Participating in Site Explanation) Notwithstanding the amended provisions of Article 44, subparagraph 6-2, regarding the invalidation of bids for construction projects with an estimated price of 10 billion won or more for which site explanations are conducted pursuant to the main text of Article 14-2, paragraphs 1 and 2 of the Enforcement Decree at the time of the enforcement of this Rule, the former provisions shall apply. Article 4 (Transitional Measures Concerning Non-performance of Guarantee by Joint Guarantors) In the event that a person who was a joint guarantor for a construction contract concluded before the enforcement of this Rule fails to comply with a request to perform the guarantee (including the performance of the obligation to repair defects), the previous regulations shall apply regarding the restriction on eligibility to participate in bidding, notwithstanding the amended provisions of Item 8, Subparagraph (b) of Annex 2. ADDENDA <Ministry of Strategy and Finance Decree No. 284, May 18, 2012> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 25, Paragraphs 3 and 4 and Article 33, Paragraph 2 shall enter into force on July 1, 2012. Article 2 (Applicability to Restricted Competitive Bidding Based on Location of Principal Business Office) The amended provisions of Article 25, Paragraphs 3 and 4 shall apply from the first bid announcement made on or after July 1, 2012. Article 3 (Applicability to Restrictions on Submission of Quotation for Private Contracts Based on Location of Principal Business Office) The amended provisions of Article 33, Paragraph 2 shall apply from the first private contract concluded on or after July 1, 2012. ADDENDA <Ministry of Strategy and Finance Decree No. 342, Mar. 23, 2013> (Enforcement Rule for the Organizational Structure of the Ministry of Strategy and Finance and Its Affiliated Agencies) Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Articles 2 and 3 omitted Article 4 (Amendment of Other Rules) ① through ③ Omitted ④ Part of the Enforcement Rules of the Act on Contracts to Which the State is a Party is amended as follows. In the main text and proviso of Article 78, Paragraph 1 (excluding the numbered items), Paragraph 3 of the same article, the main text of Article 79, Paragraph 1 (excluding the numbered items), Paragraph 2, and Article 81, “Minister of Land, Transport and Maritime Affairs” shall be changed to “Minister of Land, Infrastructure and Transport.” ⑤ through ⑮ omitted ADDENDA <Ministry of Strategy and Finance Decree No. 352, June 19, 2013> Article 1 (Enforcement Date) This rule shall enter into force on June 19, 2013. Article 2 (Applicability to Items on Good Faith in Contract Performance) The amended provisions of Article 23 shall apply to contracts for which bid notices are issued after the enforcement of this Rule. Article 3 (Applicability to Defect Repair Guarantee Deposit Rates) The amended provisions of Article 72, Paragraph 2, Subparagraph 1 and Annex 1 shall apply to contracts for which a bid notice is issued after the enforcement of this rule. Article 4 (Applicability to Restrictions on the Eligibility of Unfair Business Operators to Participate in Bidding) The amended provisions of Article 77-2, Annex 2, subparagraph 3 (c), and Annexes 3 and 4 shall apply to cases in which grounds for restricting eligibility to participate in bidding arise after these Rules take effect. ADDENDA <Ministry of Strategy and Finance Decree No. 355, June 28, 2013> (Enforcement Rule of the Value Added Tax Act) Article 1 (Enforcement Date) This rule shall enter into force on July 1, 2013. Articles 2 through 9 omitted Article 10 (Amendment of Other Laws) ① Omitted ② The Enforcement Rules of the Act on Contracts to Which the State is a Party are partially amended as follows: In Article 10, subparagraph 1, “pursuant to the provisions of Article 5 of the Value Added Tax Act” shall be changed to “pursuant to Article 8 of the Value Added Tax Act”. In Article 11, Paragraph 3, “Article 12, Paragraph 1 of the Value Added Tax Act” shall be changed to “Article 26, Paragraph 1 of the Value Added Tax Act”. In Article 14, Paragraph 1, “Article 5 of the Value Added Tax Act” shall be changed to “Article 8 of the Value Added Tax Act”. ③ through ⑨ omitted Article 11 Omitted ADDENDA <Ministry of Strategy and Finance Decree No. 360, Sep. 17, 2013> (Enforcement Rule of the Act on the Use and Promotion of Electronic Procurement) Article 1 (Enforcement Date) This rule shall enter into force on September 23, 2013. Article 2 (Amendment of Other Laws) ① Omitted ② The Enforcement Rules of the Act on Contracts to Which the State is a Party are partially amended as follows: In Article 15, Paragraph 2, Subparagraph 2, Item (e), “information processing device designated and notified by the Minister of Strategy and Finance (hereinafter referred to as “designated information processing device”)” shall be changed to “National Integrated Electronic Procurement System (hereinafter referred to as “electronic procurement system”)”; in the first and second parts of Paragraph 5 of the same article and in the part other than the subparagraphs of Paragraph 7 of the same article, “designated information processing device” shall be changed to “electronic procurement system”; and in Paragraph 8 of the same article, “designated information processing device” shall be changed to “electronic procurement system”, and “to the designated information processing device” shall be changed to “to the electronic procurement system”. In Article 23-2, Paragraph 4; the part other than the subparagraphs of Article 33, Paragraph 1; Subparagraph 3 of the same Paragraph; Subparagraph 7-2 of Article 44; the proviso of Article 45; and the proviso of Article 48, Paragraph 1, the term “designated information processing device” shall be changed to “electronic procurement system”. In Article 77, Paragraph 3, “designated information processing device” shall be changed to “electronic procurement system,” and in Paragraph 4 of the same article, “designated information processing device” shall be changed to “electronic procurement system.” In Article 81, “designated information processing device” shall be changed to “electronic procurement system”. ③ and ④ omitted ADDENDA <Ministry of Strategy and Finance Decree No. 443, Nov. 4, 2014> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 4 shall enter into force on January 1, 2015, and the amended provisions of Article 5, Paragraph 2 shall enter into force on March 1, 2015. Article 2 (Applicability to Defect Liability Period and Liquidated Damages Rate) The amended provisions of Article 70, Paragraph 1 and Article 75, Paragraph 1, Subparagraph 2 shall apply from the time a contract is concluded after the enforcement of this Rule. Article 3 (Applicability to Subjects and Standards for Imposing Surcharges) The amended provisions of Annex 4 shall also apply to violations committed prior to January 1, 2015. ADDENDA <Ministry of Strategy and Finance Decree No. 444, Nov. 19, 2014> (Enforcement Rule for the Organizational Structure of the Ministry of Strategy and Finance and Its Affiliated Agencies) Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Amendment of Other Rules) ① The Enforcement Rules of the Act on Contracts to Which the State is a Party are partially amended as follows: In Article 85, Paragraph 1, “Ministry of Security and Public Administration” shall be changed to “Ministry of Government Administration and Home Affairs.” Omit ② through ⑨ ADDENDA <Ministry of Strategy and Finance Decree No. 487, June 30, 2015> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the General Administrative Expense Ratio in Determining the Estimated Price by Cost Calculation) The amended provisions of Article 8, Paragraph 1 shall apply from the time a bid notice is issued or a private contract is concluded after the enforcement of this rule. Article 3 (Applicability of Restriction Criteria for Restricted Competitive Bidding) The amended provisions of Article 25, Paragraph 3 shall apply from the time a bid notice is issued after the enforcement of this Rule. ADDENDA <Ministry of Strategy and Finance Decree No. 533, Feb. 1, 2016> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Invalidation of Bids) The amended provisions of Article 44 shall apply to contracts for which bid notices are issued after the enforcement of this Rule. Article 3 (Transitional provisions regarding the disclosure of contract information) Notwithstanding the amended provisions of Article 82, for construction projects for which bid notices were issued by the head of each central government agency or the contracting officer prior to January 1, 2016, the previous provisions shall apply. Article 4 (Transitional Measures Concerning Restrictions on Eligibility for Bidding) Notwithstanding the amended provisions of Annex 2 and Annex 4, administrative dispositions for violations committed prior to the enforcement of this rule shall be governed by the former provisions. ADDENDA <Ministry of Strategy and Finance Decree No. 573, Sep. 23, 2016> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 15, Paragraph 2, Subparagraph 1 (e), Subparagraph 2 (f), and Subparagraph 3 (e) shall enter into force on January 1, 2017. Article 2 (Applicability to Registration of Eligibility for Bidding) The amended provisions of Article 15, Paragraph 2, Subparagraphs 1(e), 2(f), and 3(e), as well as Forms 3, 5, 6, and 13, shall apply from the date of effective date pursuant to the proviso of Article 1 of the Addenda. Article 3 (Applicability to Invalidation of Bids) The amended provisions of Article 44, Paragraph 2 shall apply from the time a bid notice is issued after the enforcement of this Rule. ADDENDA <Ministry of Strategy and Finance Decree No. 644, Dec. 28, 2017> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to Liquidated Damages Rates) The amended provisions of Article 75 shall apply from the time a bid notice (excluding cases where a re-announcement or re-bid notice is made) or a private contract is concluded after the enforcement of this rule. ADDENDA <Ministry of Economy and Finance Decree No. 699, Dec. 4, 2018> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 9 shall enter into force three months after the date of promulgation. Article 2 (Applicability to the Subjects of Restricted Competitive Bidding) The amended provisions of Article 24, Paragraph 2, Subparagraph 1, Item (b) shall apply from the time a bid notice is issued after the enforcement of this Rule. Article 3 (Applicability of Restriction Criteria for Restricted Competitive Bidding) The amended provisions of Article 25, Paragraph 5 shall apply from the time a bid notice is issued after the enforcement of this Rule. Article 4 (Transitional Measures Concerning Restrictions on Eligibility for Bidding) Notwithstanding the amended provisions of Annex 2, Annex 3, and Annex 4, administrative dispositions for violations committed prior to the enforcement of this rule shall be governed by the former provisions. ADDENDA <Ministry of Economy and Finance Decree No. 751, Sep. 17, 2019> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 25, Paragraphs 2 and 3, Article 41-2, and Article 44, Paragraph 1 shall enter into force three months after the date of its promulgation. Article 2 (Applicability of Restriction Criteria for Restricted Competitive Bidding) The amended provisions of Article 25, Paragraph 3 shall apply from the date of enforcement pursuant to the proviso of Article 1 of the Addenda. Article 3 (Transitional Measures Concerning Restriction Standards, etc. for Restricted Competitive Bidding) In cases where a bid notice is issued prior to the effective date pursuant to the proviso of Article 1 of the Addenda, the former provisions shall apply notwithstanding the amended provisions of Article 25, Paragraph 2, Subparagraph 2 and Article 44, Paragraph 1, Subparagraph 7-3. Article 4 (Transitional Measures Concerning Restrictions on Eligibility for Bidding) Notwithstanding the amended provisions of Annex 2, Annex 3, and Annex 4, administrative dispositions for violations committed prior to the enforcement of this rule shall be governed by the former provisions. ADDENDA <Ministry of Economy and Finance Decree No. 859, July 6, 2021> Article 1 (Enforcement Date) This rule shall enter into force on July 6, 2021. Article 2 (Applicability to Subjects and Criteria for Imposing Surcharges) The amended provisions of Notes No. 4 and No. 5 of Annex 3 and Notes No. 4 and No. 5 of Annex 4 shall also apply to cases where the head of each central government agency requests deliberation on the imposition of a surcharge in lieu of a restriction on bidding eligibility for violations committed before the enforcement of this rule after the enforcement of this rule. ADDENDA <Ministry of Economy and Finance Decree No. 867, Oct. 28, 2021> (Partial Amendment to 23 Ministry of Economy and Finance Decrees, including the Enforcement Rule of the Individual Consumption Tax Act, for the Reorganization of Difficult Legal Terms) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Economy and Finance Decree No. 1022, Nov. 2, 2023> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Economy and Finance Decree No. 1102, Jan. 2, 2025> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Economy and Finance Decree No. 261, May 1, 2025> Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the General Administrative Expense Ratio in Determining Estimated Price by Cost Calculation) The amended provisions of Article 8, Paragraph 1, Subparagraph 1 shall apply from the time a bid notice is issued or a private contract is concluded after the enforcement of this rule. ADDENDA <Ministry of Finance and Economy Decree No. 1, Jan. 2, 2026> (Enforcement Rule of the Organizational Structure of the Ministry of Finance and Economy) Article 1 (Enforcement Date) This rule shall enter into force on January 2, 2026. Articles 2 and 3 omitted Article 4 (Amendment of Other Laws) ① through ⑧ Omitted ⑨ Part of the Enforcement Rules of the Act on Contracts to Which the State is a Party is amended as follows. In Article 5, Paragraph 1, Subparagraph 2; Paragraph 2 of the same article; Article 6, Paragraph 1, Subparagraph 5; Paragraph 4 of the same article; the proviso to Article 7, Paragraph 1, Subparagraph 1; the proviso to the part other than the subparagraphs of Article 8, Paragraph 2; Paragraphs 4 and 5 of Article 9; Subparagraph 5 of Article 23-3; Subparagraph 3 of Article 33, Paragraph 1; the proviso to Article 43, Paragraph 1; Subparagraphs 6 and 11 of Article 44, Paragraph 1; the proviso to Article 50; Subparagraph 4 of Article 74, Paragraph 4; Paragraph 10 of the same article; and Article 83, Paragraph 2, “Minister of Strategy and Finance” shall be changed to “Minister of Finance and Economy”. In Article 14, Paragraph 1; the part other than the numbered clauses of Article 23-3; the part other than the numbered clauses of Article 24, Paragraph 1; the part other than the numbered clauses of Paragraph 2 of the same article; the part other than the numbered clauses of Article 33, Paragraph 1; the part other than the numbered clauses of Paragraph 3 of the same article; the part other than the numbered clauses of Article 41, Paragraph 1; the part other than the numbered clauses of Paragraph 2 of the same article; Article 75-2; the part other than the numbered clauses of Article 82; and Article 82-2, “Ordinance of the Ministry of Strategy and Finance” shall be changed to “Ordinance of the Ministry of Finance and Economy”. ⑩ through <56> omitted. [Appendix 2] Criteria for Restricting Bidding Eligibility of Unfair Contractors (Related to Article 76) [Appendix 3] Criteria for Imposing Penalty Surcharges on Unfair Business Operators Whose Liability Is Minor (Related to Article 77-2 (1) 1) [Appendix 4] Criteria for Imposing Surcharges Where Valid Competitive Bidding Is Clearly Not Established Due to Restrictions on Bidding Eligibility (Related to Article 77-2, Paragraph 1, Subparagraph 2) [Attachment Form No. 1] Certificate of Registration of Qualifications for Participation in Competitive Bidding [Attachment Form No. 2] Notice of Participation in Competitive Bidding (General, Restricted, Nominated) [Attachment Form No. 3] Application for Participation in Bid [Attachment Form No. 4] Certificate of Application for Participation in Bidding [Attachment Form No. 5] Bid Form [Attachment Form No. 6] Bid Form [Attachment Form No. 7] Standard Construction Contract [Attachment Form No. 8] Standard Contract for Goods Purchase [Attachment Form No. 9] Standard Service Contract [Attachment Form No. 10] Contract Security Deposit Payment Form [Attachment Form No. 11] Application for Substitution of Bid Security Deposit with Contract Security Deposit [Attachment Form No. 12] Defect Repair Guarantee Deposit Payment Form [Attachment Form No. 13] Consent to Establish Pledge [Attachment Form No. 14] Memorandum [Attachment Form No. 15] Confirmation of Sanctions against Unfair Business Operators