고압가스 안전관리법 시행규칙

286887 · 2027-07-01

Ministry of Trade, Industry and Resources (Resource Safety Team), 044-203-5181 Ministry of Trade, Industry and Resources (Energy Safety Division – Hydrogen), 044-203-3985 Article 1 (Purpose) The purpose of this rule is to prescribe matters delegated by the High-Pressure Gas Safety Management Act and the Enforcement Decree of the same Act , and matters necessary for the implementation thereof. [Wholly Amended July 16, 2008] Article 2 (Definitions) ① The meanings of terms used in this Rule are as follows. <Amended Nov. 20, 2009; Mar. 23, 2013; Aug. 24, 2017; Feb. 26, 2021; Jan. 21, 2022; Jun. 2, 2022; Nov. 14, 2024; Oct. 1, 2025> 1. “Flammable gas” means acrylonitrile, acrylaldehyde, acetaldehyde, acetylene, ammonia, hydrogen, hydrogen sulfide, hydrogen cyanide, carbon monoxide, carbon disulfide, methane, methyl chloride, methyl bromide, ethane, ethyl chloride, vinyl chloride, ethylene, ethylene oxide, propane, cyclopropane, propylene, propylene oxide, butane, butadiene, butylene, methyl ether, monomethylamine, dimethylamine, trimethylamine, ethylamine, benzene, ethylbenzene, and other gases that burn in air, wherein the lower limit of the explosion limit (referring to the limit of gas concentration in air that can cause combustion when mixed with air; hereinafter the same) is 10 percent or less, and the difference between the upper and lower limits of the explosion limit is 20 percent or more. 2. “Toxic gas” means acrylonitrile, acrylaldehyde, sulfur dioxide, ammonia, carbon monoxide, carbon disulfide, fluorine, chlorine, methyl bromide, methyl chloride, chloroprene, ethylene oxide, hydrogen cyanide, hydrogen sulfide, monomethylamine, dimethylamine, trimethylamine, benzene, phosgene, hydrogen iodide, hydrogen bromide, hydrogen chloride, hydrogen fluoride, mustard gas, arsine, monosilane, disilane, diborane, hydrogen selenide, phosphine, monogermane, and other gases that are toxic to the human body when present in the air in amounts exceeding a certain level, and whose permissible concentration (referring to the concentration of a gas at which at least half of the rats die within 14 days if a group of mature rats are continuously exposed to the gas in the atmosphere for 1 hour; hereinafter the same applies) is 5,000 parts per million or less. 3. “Liquefied gas” means a substance that is in a liquid state by means of pressurization, cooling, etc., and has a boiling point at atmospheric pressure of 40 degrees Celsius or lower or a normal operating temperature or lower. 4. “Compressed gas” refers to gas that is compressed under a constant pressure. 5. “Storage facility” refers to a facility for filling and storing high-pressure gas, including storage tanks and filling container storage facilities. 6. “Storage capacity” refers to the amount of high-pressure gas that can be stored in a storage facility, calculated in accordance with Table 1 . 7. “Storage tank” means a tank fixedly installed above or below ground for filling and storing high-pressure gas. 8. “Cryogenic storage tank” means a storage tank designed to store liquefied gas at minus 50 degrees Celsius or lower, with insulation or refrigeration to prevent the gas temperature inside the tank from exceeding its normal operating temperature. 9. “Low-temperature storage tank” means a tank for storing liquefied gas, equipped with insulation or refrigeration so that the gas temperature inside the tank does not exceed its normal operating temperature, excluding cryogenic storage tanks and low-temperature storage tanks for flammable gas. 10. “Low-temperature storage tank for flammable gas” means a storage tank for keeping flammable gas whose boiling point at atmospheric pressure is 0 degrees Celsius or lower, either as a liquid at 0 degrees Celsius or lower or in a liquid state at which the operating pressure of the gas phase is 0.1 megapascal or lower, with insulation or refrigeration to prevent the gas temperature inside the tank from exceeding its normal operating temperature. 11. “Tank fixed to a vehicle” means a tank fixedly installed on a vehicle for the transport and handling of high-pressure gas. 12. “Cryogenic container” means a container for filling with liquefied gas at minus 50 degrees Celsius or lower, equipped with insulation or refrigeration so that the gas temperature inside the container does not exceed its normal operating temperature. 13. “Low-temperature container” means a container for filling with liquefied gas, equipped with insulation or refrigeration so that the gas temperature inside the container does not exceed its normal operating temperature, excluding cryogenic containers. 14. “Filled container” refers to a container in which at least half of the filling mass or filling pressure of high-pressure gas is filled. 15. “Residual gas container” refers to a container in which less than half of the filling mass or filling pressure of high-pressure gas is filled. 16. “Gas facility” means a facility through which gas (referring to high-pressure gas being manufactured, stored, or used, gas in a state other than high-pressure gas being in a manufacturing process, gas that is a raw material for the manufacture of such high-pressure gas, and hydrogen in a state other than high-pressure gas) passes among facilities for the manufacture, storage, or use of high-pressure gas (including piping attached to the manufacturing, storage, or use facilities, but excluding piping located outside the business premises). 17. “High-pressure gas facilities” refers to the facilities among gas facilities that fall under each of the following subparagraphs. a. Equipment through which high-pressure gas passes b. Equipment connected to the equipment under subparagraph a, through which hydrogen in a state other than high-pressure gas passes. However, equipment installed in a hydrogen fuel usage facility pursuant to subparagraph 9 of Article 2 of the Act on Promotion of Hydrogen Economy and Hydrogen Safety Management shall be excluded. 18. “Processing facility” means, among facilities capable of processing gas by compression, liquefaction or other methods, equipment necessary for manufacturing high-pressure gas (including filling), and pumps, compressors and vaporizers attached to storage tanks. 19. “Pressure reducing equipment” refers to equipment that lowers the pressure of high-pressure gas. 20. “Processing capacity” means the amount of gas that can be processed per day by compression, liquefaction, or other methods using a processing facility or a depressurization facility (based on a temperature of 0 degrees Celsius and a gauge pressure of 0 Pascals. The same applies hereinafter). 21. “Non-combustible material” means non-combustible material pursuant to Article 2, Item 10 of the Enforcement Decree of the Building Act . 22. “Protective wall” means a wall made of reinforced concrete with a height of 2 meters or more and a thickness of 12 centimeters or more, or a wall having a strength of the same level or higher. 23. “Protection facility” means a Class 1 protection facility and a Class 2 protection facility as specified in Annex 2 . 24. “Welded container” means a container manufactured by separately forming and welding a shell plate and end plates (referring to plates attached to both ends of the cylindrical shell; hereinafter the same applies). 25. “Seamless container” means a container manufactured without seams by forming the shell plate and end plates as a single unit. 26. “Joined or soldered container” means a disposable container with an internal capacity of 1 liter or less, manufactured by separately forming a shell plate and end plates and then joining them by seam welding or another method, or soldering them together. 27. “Filling equipment” means equipment for filling high-pressure gas into a container or a tank fixed to a vehicle, and includes a filling machine and a pump and compressor attached to a storage tank. 28. “Special high-pressure gas” means compressed monosilane, compressed diborane, liquefied arsine, phosphine, hydrogen selenide, germane, disilane, and other high-pressure gases used for special purposes recognized by the Minister of Trade, Industry and Resources, such as cleaning semiconductors. 29. “Hydrogen fuel charging facility” refers to a facility for charging hydrogen into means of transportation, such as vehicles and ships that use hydrogen as fuel (hereinafter referred to as “means of transportation”). 30. “Compressed gas facility” refers to a pressure vessel used in a hydrogen fuel charging facility for storing compressed gas from a processing facility. ② In Article 3, Subparagraph 1 of the High-Pressure Gas Safety Management Act (hereinafter referred to as the “Act”) , the term “certain amount prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the storage capacity set forth in each of the following subparagraphs. <Amended Nov. 20, 2009; Mar. 23, 2013; Oct. 1, 2025> 1. Liquefied gas: 5 tons. However, in the case of liquefied gas that is toxic, it means 1 ton (100 kilograms in the case of toxic gas with an allowable concentration of 200 parts per million or less). 2. Compressed gas: 500 cubic meters. However, in the case of toxic compressed gas, it refers to 100 cubic meters (10 cubic meters in the case of toxic gas with an allowable concentration of 200 parts per million or less). ③ In Article 3, Subparagraph 4 of the Act , “refrigeration capacity prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to a refrigeration capacity of 3 tons calculated in accordance with the refrigeration capacity calculation standards set forth in Annex 3. <Amended Mar. 23, 2013; Oct. 1, 2025> ④ In Article 3, Subparagraph 4-2 of the Act , “matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to safety equipment falling under any of the following subparagraphs, and the specific scope of such safety equipment shall be determined and announced by the Minister of Trade, Industry and Resources . <Newly added Oct. 31, 2019; Oct. 1, 2025> 1. Toxic gas detector 2. Toxic gas scrubber 3. Valve ⑤ In Article 3, Subparagraph 5 of the Act , the term “high-pressure gas-related facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the facilities set forth in each of the following subparagraphs. <Amended Oct. 13, 2010; Mar. 23, 2013; Jan. 26, 2017; May 21, 2019; Oct. 31, 2019; Oct. 1, 2025; Jun. 11, 2026> 1. Safety valve, emergency shut-off device, flashback arrestor 2. Vaporizer 3. Pressure vessel 4. Automatic gas injector for automobiles 5. Valve for toxic gas piping 6. Compressors, condensers, evaporators, or pressure vessels constituting refrigeration equipment ( excluding integrated refrigeration units specified in Subparagraph 4, Item B of Annex 11 ) (hereinafter referred to as “specific refrigeration equipment”) 7. Cylinder cabinet for high-pressure gas 8. Slow-charging compressed natural gas (CNG) refueling facilities for automobiles (referring to refueling facilities with a processing capacity of less than 18.5 cubic meters per hour) 9. Residual gas recovery device for liquefied petroleum gas containers 10. Tank fixed to the vehicle 11. Extreme Ultraviolet (EUV) Lithography Equipment for Semiconductor Manufacturing 12. Liquid Carbon Dioxide Scrubber System [Wholly Amended July 16, 2008] Article 3 (Scope of Specific Manufacturing Permit for High-Pressure Gas) The scope of the specific manufacturing permit for high-pressure gas pursuant to Article 3, Paragraph 1, Subparagraph 1 of the Enforcement Decree of the High-Pressure Gas Safety Management Act (hereinafter referred to as the “Decree”) is as follows: <Amended Mar. 23, 2013; Jan. 26, 2017; Oct. 1, 2025> 1. A facility that manufactures high-pressure gas at a petroleum refining facility or ancillary facility of a petroleum refiner, with a storage capacity of 100 tons or more 2. A facility that manufactures high-pressure gas at a petrochemical industrial facility (including petrochemical-related facilities) or ancillary facilities of a petrochemical industrial operator (including a business operator related to the petrochemical industry), having a storage capacity of 100 tons or more or a processing capacity of 10,000 cubic meters or more. 3. Those that manufacture high-pressure gas at a steel industry facility or ancillary facility of a steel manufacturer, with a processing capacity of 100,000 cubic meters or more 4. A facility that manufactures high-pressure gas at a fertilizer manufacturing facility or ancillary facility of a fertilizer producer, having a storage capacity of 100 tons or more or a processing capacity of 100,000 cubic meters or more. 5. Other facilities designated by the Minister of Trade, Industry and Resources that manufacture high-pressure gas, wherein the storage or processing capacity is equal to or greater than the scale determined by the Minister of Trade, Industry and Resources. [Wholly Amended July 16, 2008] Article 3-2 Deleted <October 13, 2010> Article 4 (Matters Requiring Permission for Change, Notification of Change, Registration of Change, etc.) ① Matters requiring permission for change or notification of change pursuant to the latter part of Article 4, Paragraph 1, Article 4, Paragraph 2, or the latter part of Paragraph 5 of the Act are as follows. Provided, however, that experimental and research facilities are excluded. < Amended Nov. 20 , 2009 ; Oct. 13, 2010; Nov. 25, 2011; Jul. 1, 2016; Feb. 21, 2019; May 21, 2019; Jan. 21, 2022; Jun. 2, 2022> 1. Change of business office location 2. Change of the type of high-pressure gas manufactured, stored, or sold (including cases where the storage capacity changes due to a change in the type of high-pressure gas; hereinafter the same applies in this subparagraph). However, cases falling under any of the following subparagraphs shall be excluded. a. Cases where the type of stored high-pressure gas is changed, and the Korea Gas Safety Corporation (hereinafter referred to as the “Korea Gas Safety Corporation”) pursuant to Article 28 of the Act recognizes that there is no risk of harm B. When changing the type of high-pressure gas in a bonded area subject to the Customs Act 2-2. Change in pressure of high-pressure gas manufactured, stored, or sold 3. Replacement of storage facilities, change of location or capacity of storage facilities. However, this shall not apply to cases where high-pressure gas cylinder cabinets are replaced, installed, or removed without increasing storage capacity. 4. Change of location or capacity of treatment facilities 4-2. Deleted <2010. 10. 13.> 5. Deleted <2011. 11. 25.> 6. Deleted <2011. 11. 25.> 7. Replacement installation or relocation of compressors, condensers, evaporators, and receivers (refrigerant storage units) in refrigeration systems using flammable or toxic gases as refrigerants 8. Replacement installation of compressed gas equipment involving a change of location or an increase in quantity or capacity 9. Change of Company Name 10. Change of representative (applicable only to corporations excluding the State, local governments, and public institutions pursuant to Article 4, Paragraph 1 of the Act on the Operation of Public Institutions. The same applies hereinafter) ② The matters requiring registration of change regarding containers, refrigeration equipment, or specific facilities (hereinafter referred to as “containers, etc.”) pursuant to the latter part of Article 5, Paragraph 1 and the latter part of Article 5-2, Paragraph 1 of the Act are as follows: <Amended Oct. 13, 2010> 1. Change of business office location 2. Change in the type of container, etc. 3. Change in manufacturing process of containers, etc. 3-2. Change in manufacturing specifications of foreign containers, etc. pursuant to Article 5-2 of the Act (referring to containers, etc. intended for export from a foreign country to Korea; hereinafter the same applies) 4. Change of Company Name 5. Change of Representative ③ Matters requiring change registration pursuant to the latter part of Article 5-3, Paragraph 1 of the Act are as follows: 1. Change of Representative 2. Change of company name 3. Change of business office location 4. Change in the type of imported high-pressure gas 5. Replacement installation of storage facilities, change of location or capacity of storage facilities ④ Matters requiring change registration pursuant to the latter part of Article 5-4, Paragraph 1 of the Act are as follows: 1. Change of Representative 2. Change of company name 3. Replacement of high-pressure gas transport vehicles 4. Change in the quantity of high-pressure gas transport vehicles ⑤ Among the matters requiring a change permit, change notification, or change registration pursuant to Paragraphs 1 through 4, a change in trade name, a change in representative, and a change in the quantity of high-pressure gas transport vehicles under Paragraph 4, Subparagraph 4 (limited to a reduction in the number of vehicles) shall be reported to the licensing authority, reporting authority, or registration authority using the relevant form pursuant to Article 5, Paragraph 1, within 30 days from the date of the change. <Newly added Nov. 20, 2009; Feb. 21, 2019> [Wholly Amended July 16, 2008] Article 5 (Application for Permission, etc.) ① Applications for permission or permission for modification pursuant to Article 4 of the Act , and notifications or notifications for modification, and applications for registration or registration for modification pursuant to Article 5 and Articles 5-2 through 5-4 of the Act shall each be in accordance with the forms set forth in the following subparagraphs. <Amended Oct. 13, 2010; Feb. 21, 2019> 1. Application for permission regarding the manufacture of high-pressure gas, installation of high-pressure gas storage facilities, and sale of high-pressure gas pursuant to the first part of Article 4 , Paragraph 1 and the first part of Paragraph 5 of the Act : Attached Form No. 1 2. Application for a permit to change the manufacture of high-pressure gas, installation of high-pressure gas storage facilities, and sale of high-pressure gas pursuant to the latter part of Article 4 , Paragraph 1 and the latter part of Paragraph 5 of the Act: Attached Form No. 1 3. Notification of high-pressure gas manufacturing and notification of change thereto pursuant to Article 4, Paragraph 2 of the Act : Form No. 3 4. Application for manufacturing registration of containers, etc. pursuant to the first part of Article 5 , Paragraph 1 of the Act and the first part of Article 5-2, Paragraph 1 of the Act : Attached Form No. 4 5. Application for change registration regarding the manufacture of containers, etc. pursuant to the latter part of Article 5, Paragraph 1 and the latter part of Article 5-2 , Paragraph 1 of the Act : Attached Form No. 5 6. Application for registration of a high-pressure gas importer pursuant to the first part of Article 5-3 , Paragraph 1 of the Act and application for registration of a high-pressure gas carrier pursuant to the first part of Article 5-4, Paragraph 1 of the Act : Attached Form No. 5-2 7. Application for change of registration of a high-pressure gas importer pursuant to the latter part of Article 5-3, Paragraph 1 of the Act and application for change of registration of a high-pressure gas carrier pursuant to the latter part of Article 5-4, Paragraph 1 of the Act : Attached Form No. 5-2 ② The application for permission or registration and the application for permission or registration change pursuant to Paragraph 1 (including applications in the form of electronic documents; hereinafter the same applies) shall be accompanied by the documents specified in each of the following subparagraphs (including electronic documents; hereinafter the same applies). However, in the case of applying for permission change or registration change, only the documents relating to the changed portion shall be attached. <Amended Aug. 13, 2014; Sep. 17, 2015; Jul. 1, 2016; Feb. 21, 2019> 1. Business Plan 2. In the case of a corporation, the articles of incorporation. However, they may not be attached in any of the following cases: a. Where the articles of incorporation have been submitted to the Mayor of a Special City, Metropolitan City, Special Self-Governing City, Governor of a Province, or Governor of a Special Self-Governing Province (hereinafter referred to as “Mayor/Governor”) or the Mayor, County Head, or District Head (referring to the head of a self-governing district; hereinafter the same applies) in accordance with other laws and regulations, and this can be verified. B. In the case of an application for a storage facility installation permit pursuant to Article 4, Paragraph 5 of the Act c. In the case of registration or change of registration pursuant to Article 5-2, Paragraph 1 of the Act 3. Technical review report by the Korea Gas Safety Agency. However, it may not be attached in any of the following cases: a. Where a person who has obtained a high-pressure gas sales permit pursuant to Article 4, Paragraph 5 of the Act registers as a high-pressure gas importer pursuant to Article 5-3, Paragraph 1 of the Act , or where a person who has registered as a high-pressure gas importer applies for a high-pressure gas sales permit. B. Cases where registration as a high-pressure gas carrier of a vehicle is applied for pursuant to Article 5-4, Paragraph 1, Subparagraphs 4 and 5 of the Enforcement Decree C. When removing high-pressure gas facilities 4. Factory inspection report from the Korea Gas Safety Agency ( to be attached only when registering the manufacture or changing the registration of foreign containers, etc. pursuant to Article 5-2, Paragraph 1 of the Act ) ③ The Minister of Trade, Industry and Resources or the Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, a County Head, or a District Head (hereinafter referred to as “Mayor, County Head, or District Head”) who has received an application pursuant to Paragraph 2 shall verify the Certificate of Corporate Registration (applicable only to corporations) and the Certificate of Vehicle Registration (applicable only to cases under Paragraph 2, Subparagraph 3, Item (b)) through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. However, if the applicant does not consent to the verification of the Certificate of Vehicle Registration, a copy thereof shall be required to be attached. <Amended Nov. 20, 2009; May 31, 2010; Oct. 13, 2010; Mar. 23, 2013; Aug. 13, 2014; Sep. 17, 2015; Oct. 1, 2025> ④ Deleted <2012. 10. 5.> ⑤ Documents proving the details of the change must be attached to the application for permission to change or the application for registration to change under Paragraph 1, Subparagraphs 2 and 7. <Amended Oct. 5, 2012> ⑥ The notification of high-pressure gas manufacturing under Paragraph 1, Subparagraph 3 shall be accompanied by an outline of the business plan, and the notification of change shall be accompanied by a document stating the parts changed in the outline of the business plan and documents proving the contents thereof. <Amended Oct. 5, 2012> ⑦ The application for registration of change regarding the manufacture of containers, etc. under Paragraph 1, Subparagraph 5 shall be accompanied by the documents specified in each of the following subparagraphs. <Newly added Oct. 5, 2012> 1. Documents proving the changes 2. Container manufacturing registration certificate, refrigeration unit manufacturing registration certificate, or specific equipment manufacturing registration certificate [Wholly Amended July 16, 2008] Article 6 (Permits, Notification Certificates, etc.) ① Permits, etc. issued by the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head shall each be in accordance with the forms set forth in the following subparagraphs. <Amended Mar. 23, 2013; Feb. 21, 2019; Oct. 1, 2025> 1. In cases where a permit for the manufacture of high-pressure gas, installation of a high-pressure gas storage facility, or business for the sale of high-pressure gas has been granted pursuant to Article 4 , Paragraphs 1 and 5 of the Act : Permit in the form of Annex 6 2. In cases where a report on the manufacture of high-pressure gas has been received pursuant to Article 4, Paragraph 2 of the Act : Report Certificate in Form No. 7 3. In cases where manufacturing registration or re-registration of containers, etc. has been obtained pursuant to Article 5 , Paragraph 1 of the Act and Article 5-2 , Paragraph 1 or 2 of the Act : Registration Certificate in Form No. 7-2 4. In cases where registration of a high-pressure gas importer has been completed pursuant to the first part of Article 5-3, Paragraph 1 of the Act and registration of a high-pressure gas carrier has been completed pursuant to the first part of Article 5-4, Paragraph 1 of the Act : Registration Certificate in Form No. 7-3 ② In cases where the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head grants a permit for a change of a permitted or reported matter or receives a report for a change pursuant to the latter part of Article 4, Paragraph 1, the latter part of Article 4, Paragraph 2, or the latter part of Paragraph 5 of the Act, or where a registration for a change is made pursuant to the latter part of Article 5 , Paragraph 1 , the latter part of Article 5-2, Paragraph 1 , the latter part of Article 5-3, Paragraph 1 , and the latter part of Article 5-4, Paragraph 1 of the Act , they shall record the details of the permit, report, or registration for a change on the back of the permit, report, or registration certificate issued pursuant to Paragraph 1 and issue it to the applicant or the notifier. <Amended Mar. 23, 2013; Feb. 21, 2019; Oct. 1, 2025> ③ In the event that a permit, certificate of notification, or certificate of registration issued pursuant to Paragraphs 1 and 2 is lost or damaged beyond repair and is to be reissued, an application for reissuance in accordance with the classifications in each of the following subparagraphs must be submitted to the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head. In this case, if the reissuance is due to damage beyond repair, the relevant permit, certificate of notification, or certificate of registration must be attached. <Newly added Jan. 26, 2017; Oct. 1, 2025> 1. Application for reissuance of permit pursuant to Paragraph 1, Subparagraph 1 and Paragraph 2: Form No. 1-2 2. Application for reissuance of report certificate pursuant to Paragraph 1, Subparagraph 2 and Paragraph 2: Form No. 3-2 3. Application for reissuance of registration certificate pursuant to Paragraph 1, Subparagraph 3 and Paragraph 2: Form No. 5-3 4. Application for reissuance of registration certificate pursuant to Paragraph 1, Subparagraph 4 and Paragraph 2: Form No. 5-4 [Wholly Amended July 16, 2008] Article 7 (Application for Technical Review, etc.) ① Any person who wishes to receive a technical review pursuant to Article 5, Paragraph 2, Subparagraph 3 shall submit an application for technical review in the form of Annex 8 to the Korea Gas Safety Corporation, attaching the documents listed in each of the following subparagraphs. 1. Installation plan for the facility (in the case of intending to change permitted or registered matters, this refers only to the changed part) 2. Drawings and descriptions regarding facility standards and technical standards (in the case of changing permitted or registered matters, this refers only to the changed parts) ② Any person who wishes to undergo a factory inspection pursuant to Article 5, Paragraph 2, Subparagraph 4 shall submit to the Korea Gas Safety Corporation an application for factory inspection of foreign containers, etc., in the form of Annex 8-2, attaching the documents specified in each subparagraph of Paragraph 1. [Wholly Amended July 16, 2008] Article 8 (Facility and Technical Standards, etc. for Manufacturing, etc. of High-Pressure Gas) ① The facility and technical standards for the manufacturing, storage, and sale of high-pressure gas pursuant to Article 4, Paragraph 6 of the Act ; the facility and technical standards for the import business of high-pressure gas pursuant to Article 5-3, Paragraph 2 of the Act; and the facility and technical standards for high-pressure gas transport vehicles pursuant to Article 5-4, Paragraph 2 of the Act shall be as follows: <Amended Oct. 13, 2010; Feb. 21, 2019; Nov. 14, 2024> 1. Facility and technical standards for manufacturing high-pressure gas (specific manufacturing, general manufacturing, or filling containers and tanks fixed to vehicles): Annex 4 2. Facility and Technical Standards for Hydrogen Fuel Charging: Appendix 5 3. Facility and Technical Standards for High-Pressure Gas Refrigeration Manufacturing: Appendix 7 4. Facility and Technical Standards for High-Pressure Gas Storage: Appendix 8 5. Facility and Technical Standards for High-Pressure Gas Sales and Import Businesses: Appendix 9 6. Facility and Technical Standards for High-Pressure Gas Transport Vehicles: Appendix 9-2 ② In Article 5-3, Paragraph 2, Subparagraph 2 of the Enforcement Decree, “facility standards and technical standards prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to Annex 9. <Amended Mar. 23, 2013; Oct. 1, 2025> ③ In Article 5-4, Paragraph 2, Subparagraph 2 of the Enforcement Decree, “standards prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the facility standards set forth in Subparagraph 1 of Annex 9-2 . <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 8-2 (Subjects of Manufacturing Registration for Containers, etc.) In Article 5, Paragraph 1, Subparagraph 3 of the Enforcement Decree, the term “high-pressure gas-related facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the facilities under Article 2 , Paragraph 5 , Subparagraphs 1 through 9 , 11, and 12. <Amended Oct. 31, 2019; Oct. 1, 2025; Jun. 11, 2026> [This Article Newly Inserted Jan. 26, 2017] Article 9 (Facility Standards and Technical Standards for Manufacturing of Containers, etc.) The facility standards and technical standards required for the manufacture of containers, etc. pursuant to Article 5 , Paragraph 2 and Article 5-2, Paragraph 3 of the Act are as follows: 1. Facility and Technical Standards for Container Manufacturing: Appendix 10 2. Facility and Technical Standards for the Manufacture of Container Accessories: Appendix 10-2 3. Facility and Technical Standards for Refrigeration Equipment Manufacturing: Appendix 11 4. Facility and Technical Standards for the Manufacture of Specific Equipment: Appendix 12 [Wholly Amended July 16, 2008] Article 9-2 (Exemption from Manufacturing Registration of Foreign Containers, etc.) ① In the proviso to Article 5-2, Paragraph 1 of the Enforcement Decree, the term “containers, etc.” prescribed by the Ordinance of the Ministry of Trade, Industry and Resources refers to the containers, etc. listed in each of the following subparagraphs. <Amended Nov. 20, 2009; Oct. 13, 2010; Mar. 23, 2013; Feb. 25, 2016; Aug. 24, 2017; Nov. 14, 2024; Oct. 1, 2025> 1. Containers, etc. imported for testing or research and development purposes (only applicable where the said containers, etc. are directly tested or research and development is conducted) 2. Containers, etc. that have undergone inspection abroad and are imported for use by foreign institutions in Korea 3. Containers, etc. imported attached to industrial machinery and equipment, etc. 4. Containers, etc. imported as samples by the manufacturer or importer of containers, etc. 5. Containers, etc. that are imported for the purpose of importing high-pressure gas and are returned after the high-pressure gas inside the container has been depleted, and which have been inspected by a foreign inspection agency recognized by the Minister of Trade, Industry and Resources in accordance with the inspection standards of Annex 10 , Annex 10-2 , and Annex 12. 6. Containers not manufactured domestically that are filled with special high-pressure gas 7. Containers for aerosols 8. Containers, etc. imported for the purpose of export 8-2. Specific refrigeration equipment (excluding those attached to specific high-pressure gas manufacturing facilities, general high-pressure gas manufacturing and storage facilities, liquefied petroleum gas filling and storage facilities under the "Safety Management and Business of Liquefied Petroleum Gas Act," and gas supply facilities under the "City Gas Business Act" ) and safety valves and valves for toxic gas piping imported attached to such specific equipment and refrigeration units. 9. Specific equipment not manufactured domestically for installation and use in hydrogen fuel charging facilities 10. Other containers, etc. that the Minister of Trade, Industry and Resources recognizes and notifies as difficult to register for manufacture of foreign containers, etc. ② In Article 5-2, Paragraph 2 of the Act , the term “period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” means three years. <Amended Mar. 23, 2013; Oct. 1, 2025> ③ In Article 5-2, Paragraph 2, Subparagraph 1 of the Enforcement Decree , the term “standards prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the standards set forth in each subparagraph of Article 9. However, if the foreign manufacturing facility standards and manufacturing technical standards correspond to the facility standards and technical standards prescribed in Annex 10 , Annex 10-2 , and Annex 12 (applicable only to pressure vessels, storage tanks, and tanks fixed to vehicles), it shall refer to such standards. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 10 (Repair Standards and Scope of Repair for Containers, etc.) The repair standards and scope of repair for containers, etc. pursuant to Article 5, Paragraph 3 of the Act are as set forth in Table 13 . [Wholly Amended Aug. 13, 2014] Article 10-2 (Scope of Registration for High-Pressure Gas Importers) In Article 5-3, Paragraph 1 of the Enforcement Decree, the term “high-pressure gas prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to high-pressure gas falling under any of the following subparagraphs. <Amended Oct. 1, 2025> 1. Toxic gas 2. High-pressure gas pursuant to Annex 26 [Wholly Amended July 29, 2015] Article 10-3 (Scope of Registration for High-Pressure Gas Carriers, etc.) In Subparagraph 6 of Article 5-4, Paragraph 1 of the Enforcement Decree, the term “tank container prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to tank containers for ammonia, helium, liquefied natural gas, nitrogen, carbon dioxide, and liquefied petroleum gas in accordance with the standards of the International Organization for Standardization (ISO). <Amended Mar. 23, 2013; Jan. 26, 2017; Oct. 1, 2025> [This Article Newly Inserted July 16, 2008] Article 11 (Report on Commencement of Business, etc.) Pursuant to Article 7 of the Act , any person who intends to commence business operations or use of a storage facility, or to suspend, abolish, or resume such use for one month or longer, shall submit a report on commencement, suspension, abolition, or resumption in the form of Annex No. 9 to the licensing authority, reporting authority, or registration authority. In this case, a person who intends to abolish the use of a business or storage facility shall attach documents proving the disposal of the relevant high-pressure gas. <Amended Feb. 21, 2019> [Wholly Amended July 16, 2008] Article 12 (Reporting Succession to the Status of a Business Operator, etc.) ① Any person who succeeds to the status of a person who has obtained a permit or filed a report under Article 4 of the Act, or who has registered under Article 5, 5-3 or 5-4 of the Act (hereinafter referred to as a “business operator, etc.”), shall submit a notification of succession to status in Attached Form No. 10, together with the applicable documents listed in the following subparagraphs, to the licensing, reporting or registration authority within 30 days after the date of succession. 1. Permit, notification certificate, or registration certificate pursuant to Article 6 2. Documents proving succession to status, such as evidence of heirship, a copy of a business transfer agreement, or a copy of a merger agreement ② The Mayor, County Governor, or District Head who receives the report under Paragraph 1 shall verify the certificate of corporate registration (applicable only to corporations) of the person who has succeeded to the status through the joint use of administrative information pursuant to Article 36 , Paragraph 1 of the Electronic Government Act. <Amended Nov. 20, 2009; May 31, 2010; Oct. 13, 2010> [Wholly Amended July 16, 2008] Article 13 Deleted <July 1, 1999> Article 14 Deleted <July 1, 1999> Article 15 Deleted <July 1, 1999> Article 15-2 (Petrochemical Industry Operators, etc.) ① The term “petrochemical industry operator” in subparagraph 2 of Article 9 of the Enforcement Decree refers to any of the following persons. However, petroleum refiners under subparagraph 7 of Article 2 of the Petroleum and Petroleum Substitute Fuels Business Act shall be excluded. 1. An industrial operator that manufactures low-grade hydrocarbons or aromatic hydrocarbons by chemically treating petroleum, natural gas, or refinery waste gas 2. Industrialists who manufacture raw materials for petrochemical products, such as synthetic resins, synthetic rubber, synthetic detergents, and plasticizers, using low-grade hydrocarbons, aromatic hydrocarbons, petroleum, natural gas, or waste gas from oil refineries as primary raw materials. ② In subparagraph 2 of Article 9 of the Enforcement Decree, “person conducting support business” refers to a person who conducts a business supplying electricity, steam, water, maintenance services, etc. to a petrochemical industrial company or an incidental business common to the petrochemical industry. [Wholly Amended July 16, 2008] Article 15-3 (Standards for Administrative Dispositions) The standards for administrative dispositions pursuant to Article 9 , Paragraph 2 and Article 35-2, Paragraph 2 of the Act are as set forth in Table 13-2 . [Wholly Amended July 16, 2008] Article 16 (Duties of Suppliers, etc.) ① A high-pressure gas manufacturer or high-pressure gas seller (hereinafter referred to as the “Supplier”) shall, in accordance with Article 10, Paragraph 1 of the Act, prepare and distribute guidance materials for the prevention of hazards, such as methods of use and handling of gas, to the consumers (excluding those who have obtained a permit under Article 4 of the Act or those subject to reporting of use under Article 20 , Paragraph 1 of the Act ) at least once a year, and prepare a record of such implementation and preserve it for two years. ② Any person who intends to report the suspension of supply of high-pressure gas pursuant to Article 10, Paragraph 3 of the Act shall submit the supplier's report on the suspension of supply in Form No. 13 (including a report in electronic form) to the mayor, county governor, or district head. ③ The qualifications and number of inspectors, inspection equipment, inspection standards, and other necessary matters required for the implementation of safety inspections pursuant to Article 10 , Paragraph 5 of the Act are as set forth in Table 14 . [Wholly Amended July 16, 2008] Article 17 (Guidelines for Drafting Safety Management Regulations, etc.) Guidelines for drafting safety management regulations pursuant to Article 11 of the Act and other necessary matters are as set forth in Attached Table 15 . [Wholly Amended July 16, 2008] Article 18 (Examination of Safety Management Regulations) ① Any person who wishes to hear the opinion of the Korea Gas Safety Corporation regarding safety management regulations pursuant to Article 11, Paragraph 1 of the Act shall submit to the Korea Gas Safety Corporation an application for examination of safety management regulations in the form of Annex 14 , with the safety management regulations attached. ② Upon receiving an application for review of safety management regulations under Paragraph 1, the Korea Gas Safety Corporation shall send a written review opinion to the applicant within 10 days ( 20 days for applications from persons subject to comprehensive safety management under Article 11 , Paragraph 2 of the Act). However, if supplementation of the content is required, the period may be extended. ③ The examination standards for safety management regulations and other matters necessary for the examination shall be determined and announced by the Minister of Trade, Industry and Resources . <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 19 (Records of Implementation of Safety Management Regulations) Records of the implementation of safety management regulations pursuant to Article 11, Paragraph 5 of the Act (in the case where such data is entered into a computer auxiliary storage device, it refers to the entered data) shall be preserved for 5 years. [Wholly Amended July 16, 2008] Article 20 (Verification and Evaluation of Compliance with Safety Management Regulations) ① The verification and evaluation of compliance with safety management regulations pursuant to Article 11, Paragraph 6 of the Act shall be conducted in accordance with the classifications in each of the following subparagraphs. <Amended Jan. 7, 2022; Oct. 1, 2025> 1. Initial Verification and Evaluation: Within 30 days before or after the date marking six months from the date of filing the business commencement report pursuant to Article 7 of the Act . 2. Periodic verification and evaluation: A period determined in each of the following subparagraphs based on the date of the initial verification and evaluation pursuant to Subparagraph 1. However, in the case of facilities falling under any of the subparagraphs of Article 9 of the Enforcement Decree, the period shall be determined by the Minister of Trade, Industry and Resources within a range of five years, taking into consideration the results of the verification and evaluation pursuant to Article 11, Paragraph 6 of the Act . a. Business operators, etc. subject to inspection under Item 1, Subparagraph b of Annex 19 : When conducting periodic inspections pursuant to Article 16-2 of the Act every five years B. Business operators, etc. other than those under Item A: Within 30 days before or after the date every 5 years have elapsed from the date of the initial confirmation and evaluation under Item 1. ② When conducting periodic inspections and ad hoc inspections pursuant to Article 16-2 of the Act , or when conducting inspections pursuant to Article 17, Paragraph 1 of the Act , compliance with safety management regulations may be verified. ③ External relevant experts may be involved when conducting the verification and evaluation pursuant to Paragraph 1. ④ The standards and frequency for verifying and evaluating compliance with safety management regulations and other necessary matters may be determined and announced by the Minister of Trade, Industry and Resources . <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 21 Deleted <July 1, 1999> Article 22 Deleted <July 1, 1999> Article 23 (Safety Inspection Standards for Containers, etc.) ① A high-pressure gas manufacturer shall conduct safety inspections of containers in accordance with the standards set forth in Annex 18 pursuant to Article 13, Paragraph 2 of the Act . ② When a high-pressure gas manufacturer discovers a non-conforming container as a result of the inspection under Paragraph 1, the manufacturer shall safely maintain and manage the container, such as by repairing or maintaining it in accordance with the inspection standards. ③ High-pressure gas manufacturers and high-pressure gas sellers shall safely maintain and manage containers in accordance with the standards set forth in Annex 18 pursuant to Article 13, Paragraph 4 of the Act . ④ Where a high-pressure gas manufacturer or seller fills a container with flammable or toxic gas, or sells flammable or toxic gas filled in a container, they shall prepare records of such filling and sales in accordance with Article 13, Paragraph 5 of the Act (including cases where records are entered into a computer auxiliary storage device). However, this shall not apply in cases where high-pressure gas is filled into a container fixedly installed on a means of transportation. <Newly added Aug. 13, 2014; Nov. 14, 2024> 1. Deleted <2024. 11. 14.> 2. Deleted <2024. 11. 14.> ⑤ The forms for charging and sales records pursuant to the main text of Paragraph 4 shall be in accordance with the classifications in each of the following subparagraphs. <Newly added Aug. 13, 2014; Nov. 14, 2024> 1. High-pressure gas filling record: Attached Form No. 15 2. High-pressure gas sales records: Attached Form No. 16 ⑥ High-pressure gas manufacturers and high-pressure gas sellers shall preserve records of high-pressure gas filling and sales pursuant to the main text of Paragraph 4 (in cases where such data has been entered into a computer auxiliary storage device, the entered data) for five years. <Newly added Aug. 13, 2014; Nov. 14, 2024> [Wholly Amended July 16, 2008] Article 24 (Facilities Subject to Safety Assessment) In the first part of Article 13-2, Paragraph 1 of the Act , the term “facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to facilities falling under any of the subparagraphs of Article 9 of the Enforcement Decree and equipment related thereto. <Amended May 31, 2010; March 23, 2013; October 1, 2025> [Wholly Amended July 16, 2008] Article 24-2 (Provision of Safety Improvement Plan) In Article 13-2, Paragraph 4 of the Act , the term “matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the emergency response plan pursuant to Article 10, Paragraph 1, Subparagraph 4 of the Enforcement Decree. <Amended Oct. 1, 2025> [This Article Newly Inserted July 29, 2015] Article 25 (Application for Review of Safety Improvement Plan, etc.) ① Any person who wishes to hear the opinion of the Korea Gas Safety Corporation regarding a safety improvement plan pursuant to the latter part of Article 13-2, Paragraph 1 of the Act shall submit to the Korea Gas Safety Corporation an application for review of a safety improvement plan in the form of Annex 17 , attaching three copies of the safety improvement plan and related materials. ② Upon receiving an application under paragraph (1), the Korea Gas Safety Corporation shall review the safety improvement plan within the period publicly notified by the Minister of Trade, Industry and Resources (not exceeding 30 days), and send two copies of its written opinion to the relevant business operator. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 26 Deleted <July 1, 1999> Article 27 (Appointment, etc. of Safety Managers) ① The report on the appointment, dismissal, or resignation of a safety manager pursuant to Article 15, Paragraph 3 of the Act shall be in accordance with Form No. 19 of the Attached Form . In this case, the Mayor, County Governor, or District Head who receives the report shall verify whether the person holds a national technical qualification certificate through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act or whether the person has completed training through the Local Government Gas Safety Support System of the Korea Gas Safety Corporation; if the person reporting does not consent to the verification, a copy thereof shall be required to be attached. <Amended Jan. 26, 2017; Jun. 11, 2026> ② The report referred to in Paragraph 1 shall be accompanied by the documents specified in each of the following subparagraphs. However, the document referred to in Subparagraph 2 shall be attached only if necessary to prove that a safety manager has been appointed and possesses the qualifications of a safety manager as set forth in Annex 3 of the Enforcement Decree. <Newly added Jan. 26, 2017> 1. Copy of National Technical Qualification Certificate or Copy of Certificate of Completion for Safety Manager Training Conducted by the Korea Gas Safety Corporation 2. Documents proving work experience ③ Notwithstanding Paragraphs 1 and 2, where a report on the use of specific high-pressure gas has been filed pursuant to Article 20, Paragraph 1 of the Act , and the contents of such report include matters concerning the appointment of a safety manager, a separate notification of the appointment of a safety manager need not be filed. <Newly added Jan. 26, 2017> ④ In Note 12 of Annex 3 of the Enforcement Decree, “matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to manufacturing facilities for ball valves and globe valves pursuant to Item 6 of Annex 3 of the Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas . <Newly added Jul. 29, 2015; Jan. 26, 2017; Oct. 1, 2025> [Wholly Amended Jul. 16, 2008] [Title Amended Jul. 29, 2015] Article 28 (Intermediate Inspection and Completion Inspection) ① An application for an intermediate inspection pursuant to Article 16, Paragraph 1 of the Act shall be in accordance with Form No. 20 of the Attached Form, and an application for a final inspection pursuant to Article 16, Paragraph 3 of the Act shall be in accordance with Form No. 21 of the Attached Form. ② The processes subject to intermediate inspection pursuant to Article 16, Paragraph 1 of the Act are as follows: 1. A process in which the installation of gas facilities or piping is completed and a leak test or pressure test can be performed. 2. Process immediately before burying the storage tank underground 3. In the case of installing pipelines underground, the process immediately prior to burying the portion designated by the Korea Gas Safety Agency 4. Process for conducting non-destructive testing on parts designated by the Korea Gas Safety Agency 5. Foundation installation process for protective walls or storage tanks 6. Foundation Installation Process for Equipment Subject to Seismic Design ③ Modification works on facilities subject to a completion inspection pursuant to Article 16, Paragraph 3 of the Act are as follows: <Newly added Nov. 25, 2011; Jul. 1, 2016; May 21, 2019; Jun. 2, 2022> 1. Change construction work subject to change permit, change notification, or change registration pursuant to Article 4 2. Among the modification works excluded from the scope of modification permits, modification notifications, and modification registrations under Article 4, any of the following works a. Change in pipe inner diameter (referring only to cases where processing capacity changes) B. Change of piping installation location (refers only to cases where the total length of the piping at the part to be changed is 300 meters or more) C. Replacement, installation (only applicable where there is no increase in storage capacity), or removal of high-pressure gas cylinder cabinets D. Replacement installation of compressed gas equipment with no increase or a decrease in quantity or capacity ④ The inspection standards for each facility subject to inspection for intermediate inspection or completion inspection pursuant to Article 16, Paragraphs 1 and 3 of the Act are as follows: <Amended Oct. 13, 2010; Nov. 25, 2011; Nov. 14, 2024> 1. Standards for intermediate or completion inspection of high-pressure gas manufacturing facilities (referring to specific manufacturing, general manufacturing, container, and vehicle-mounted tank filling facilities): Appendix 4 2. Standards for Intermediate or Completion Inspection of Hydrogen Fuel Charging Facilities: Appendix 5 3. Standards for Intermediate or Completion Inspection of High-Pressure Gas Refrigeration Manufacturing Facilities: Appendix 7 4. Standards for Intermediate or Completion Inspection of High-Pressure Gas Storage Facilities: Appendix 8 5. Standards for Intermediate or Completion Inspection of High-Pressure Gas Sales Facilities and High-Pressure Gas Import Facilities: Appendix 9 6. Standards for Completion Inspection of Container Manufacturing Facilities: Attached Table 10 7. Standards for Completion Inspection of Container Accessories Manufacturing Facilities: Attached Table 10-2 8. Standards for Completion Inspection of Refrigeration Equipment Manufacturing Facilities: Appendix 11 9. Standards for Completion Inspection of Manufacturing Facilities for Specific Equipment: Appendix 12 ⑤ A certificate of completion inspection in the form of Annex 22 shall be issued to a person who has passed the completion inspection pursuant to Article 16 , Paragraph 3 of the Act . [Wholly Amended July 16, 2008] Article 28-2 (Construction Supervision) ① Any person who intends to receive supervision pursuant to Article 16, Paragraph 2 of the Act shall submit an application for construction supervision in the form of Annex 21-2 to the Korea Gas Safety Corporation, attaching a construction schedule. ② The standards and supervision methods for the Korea Gas Safety Corporation when supervising installation or modification work of high-pressure gas pipelines pursuant to Article 16, Paragraph 2 of the Act are as follows: <Amended May 31, 2010> 1. The Korea Gas Safety Corporation shall appoint a person qualified as an inspector pursuant to Article 61 and station him/her at the construction site. 2. Supervisors of the Korea Gas Safety Corporation shall verify the following matters: a. Whether the contractor is a person registered for the construction business (referring to a business category performing specialized construction work) pursuant to Article 9 of the Framework Act on the Construction Industry, and whether the construction manager is a construction technician pursuant to Article 40 of the Framework Act on the Construction Industry B. Whether the construction details comply with the supervision standards in Attached Table 4 ③ If the installation or modification work of a high-pressure gas pipeline complies with the supervision standards under Paragraph 2, the Korea Gas Safety Corporation shall issue a construction supervision certificate in the form of Annex 22-2 to the applicant for supervision. [Wholly Amended July 16, 2008] Article 28-3 (Preparation and Preservation of Construction Records, etc.) Pursuant to Article 16, Paragraph 5 of the Act , a high-pressure gas manufacturer shall prepare construction records corresponding to each of the following subparagraphs and preserve them for five years, and shall prepare completed drawings and preserve them permanently. 1. Non-destructive testing reports, drawings, and films 2. Report on measurements of electrical potential at cathodic protection facilities 3. Photos regarding construction work at locations requiring special management, such as obstacles and bedrock [Wholly Amended July 16, 2008] Article 29 (Temporary Use) The term “minor matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in Article 16 , Paragraph 4, Subparagraph 1 of the Act is as set forth in Attached Table 20. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 30 (Periodic Inspection) ① An application for a periodic inspection pursuant to Article 16-2, Paragraph 1 of the Act shall be made in accordance with Form No. 21 of the Attached Form . ② The inspection cycles for each subject of periodic inspection pursuant to Article 16-2, Paragraph 1 of the Act shall be as set forth in Attached Table 19. However, if the Mayor, County Governor, or District Head recognizes that it is inappropriate to conduct the periodic inspection at the relevant time due to natural disasters, calamities, or other unavoidable circumstances, the periodic inspection may be received at a time separately determined through consultation with the persons listed in each of the following subparagraphs. <Amended Jan. 7, 2022> 1. Periodic inspection pursuant to Article 16-2, Paragraph 1 of the Act (excluding the periodic inspection under Subparagraph 2): Korea Gas Safety Corporation, which has been entrusted with periodic inspections pursuant to Article 25, Paragraph 1, Subparagraph 3 of the Enforcement Decree 2. Periodic inspection of refrigeration manufacturing facilities for heating and cooling in buildings using gases other than flammable or toxic gases as refrigerants, among the periodic inspections under Article 16-2, Paragraph 1 of the Act : Person entrusted with the periodic inspection duties pursuant to Article 25, Paragraph 2 of the Enforcement Decree ③ The inspection standards for each facility subject to periodic inspection under Article 16-2 , Paragraph 1 of the Act are as follows: <Amended Oct. 13, 2010; Nov. 14, 2024> 1. Periodic Inspection Standards for High-Pressure Gas Manufacturing Facilities (referring to specific manufacturing, general manufacturing, container, and vehicle-mounted tank filling facilities): Appendix 4 2. Periodic Inspection Standards for Hydrogen Fuel Charging Facilities: Appendix 5 3. Periodic Inspection Standards for High-Pressure Gas Refrigeration Manufacturing Facilities: Appendix 7 4. Periodic Inspection Standards for High-Pressure Gas Storage Facilities: Appendix 8 5. Periodic Inspection Standards for High-Pressure Gas Sales Facilities and High-Pressure Gas Import Facilities: Appendix 9 ④ In cases where there are two or more facilities subject to periodic inspection within the same business office and the timing for periodic inspection is different for each, the periodic inspection of another facility may be conducted together during the periodic inspection period of one of the facilities subject to periodic inspection in the same year. ⑤ A Certificate of Periodic Inspection in the form of Annex 22 shall be issued to a person who has passed the periodic inspection pursuant to Article 16-2, Paragraph 1 of the Act . <Amended Mar. 13, 2018> [Wholly Amended July 16, 2008] Article 31 (Ad Hoc Inspection) ① Ad hoc inspections pursuant to Article 16-2 of the Act shall be conducted when the licensing authority or the reporting authority deems it necessary for the prevention of accidents caused by gas or for other gas safety. ② When the licensing authority or the reporting authority intends to conduct an unscheduled inspection, it shall notify the person subject to inspection in advance. However, this shall not apply if the purpose of the inspection cannot be achieved by notification or if notification cannot be given due to other urgent reasons. ③ The inspection standards for unscheduled inspections are as follows: <Amended Oct. 13, 2010; Nov. 14, 2024> 1. Standards for Ad Hoc Inspections of High-Pressure Gas Manufacturing Facilities (referring to specific manufacturing, general manufacturing, or facilities for filling containers and tanks fixed to vehicles): Appendix 4 2. Standards for Ad Hoc Inspections of Hydrogen Fuel Charging Facilities: Appendix 5 3. Standards for Ad Hoc Inspections of High-Pressure Gas Refrigeration Manufacturing Facilities: Appendix 7 4. Standards for Ad Hoc Inspections of High-Pressure Gas Storage Facilities: Appendix 8 5. Standards for Ad Hoc Inspections of High-Pressure Gas Sales Facilities and High-Pressure Gas Import Facilities: Appendix 9 [Wholly Amended July 16, 2008] Article 32 (Exemption from Periodic Inspection) Any person who wishes to receive an exemption from all or part of a periodic inspection pursuant to Article 14 , Paragraph 1 of the Enforcement Decree shall submit an application for exemption from periodic inspection in the form of Annex 23 to the licensing authority or the reporting authority, attaching a review opinion from the Korea Gas Safety Corporation regarding each of the following subparagraphs. <Amended Oct. 13, 2010> 1. Implementation Status of Safety Management Regulations Over the Past Two Years 2. Records of periodic and ad hoc inspections over the past two years 3. Other capabilities for autonomous safety management [Wholly Amended July 16, 2008] Article 33 (Subjects of Detailed Safety Inspection) In Article 16-3, Paragraph 1 of the Act , the term “aging facilities corresponding to the types and scales prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to facilities for which 15 years have elapsed since the date on which a certificate of completion inspection was first received pursuant to Article 28 , Paragraph 5, and which fall under any of the following subparagraphs. <Amended May 31, 2010; March 23, 2013; July 29, 2015; October 1, 2025> 1. A high-pressure gas specific manufacturing facility pursuant to Article 3 , Subparagraphs 1 , 2, 4, or 5, in which a special reaction facility pursuant to Subparagraph 1, Item (a), 6)(h) of Annex 4 is installed. 2. Refrigeration manufacturing facilities that meet all of the requirements of the following items ( excluding facilities where a person falling under any of the items of Article 3, Paragraph 1, Subparagraph 4 of the Enforcement Decree manufactures refrigeration in accordance with the contents of the permit) a. The refrigeration capacity calculated according to the refrigeration capacity calculation standards under Attached Table 3 shall be 500 tons or more. B. It must use toxic gas as a refrigerant. [Wholly Amended July 16, 2008] Article 34 (Period of Implementation of Precision Safety Inspections, etc.) ① In Article 16-3, Paragraph 1 of the Act , the term “period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to four years. <Amended Mar. 23, 2013; Oct. 1, 2025> ② The detailed safety inspection pursuant to Article 16-3, Paragraph 1 of the Act (hereinafter referred to as “detailed safety inspection”) shall be received within the periods specified in each of the following subparagraphs. <Amended July 29, 2015> 1. The year in which 15 years have elapsed since the date the Certificate of Completion Inspection was first received pursuant to Article 28, Paragraph 5 2. The periodic maintenance period of the year in which the period specified in each of the following items has elapsed from the date of the most recent periodic inspection. However, if there is no periodic maintenance period in the relevant year, it shall be the period between the periodic maintenance period of the previous year and the periodic maintenance period of the following year. a. Specific high-pressure gas manufacturing facilities pursuant to Article 33 , Subparagraph 1 : 2 years B. Refrigeration manufacturing facilities pursuant to Article 33 , Subparagraph 2 : 4 years [Wholly Amended July 16, 2008] Article 35 (Procedures for Detailed Safety Inspection, etc.) ① Any person who intends to undergo a detailed safety inspection pursuant to Article 16-3, Paragraph 2 of the Act shall submit an application for a detailed safety inspection in the form of Annex 24 to a detailed safety inspection agency for each unit facility no later than 60 days prior to the date on which the inspection is to be received. <Amended Nov. 20, 2009> ② A precision safety inspection agency shall submit the results to the Minister of Trade, Industry and Resources and the person who underwent the precision safety inspection within 30 days from the date of completion of the precision safety inspection. <Amended Mar. 23, 2013; Oct. 1, 2025> ③ The standards for precise safety inspections are as set forth in Annex 4 and Annex 7. <Amended Jul. 29, 2015> [Wholly Amended July 16, 2008] Article 36 (Application for Inspection of Containers, etc.) ① Any person who intends to undergo an inspection or re-inspection pursuant to Article 17 , Paragraph 1 or 2 of the Act shall submit an application form, as classified in each of the following subparagraphs, to the Korea Gas Safety Corporation or an inspection agency pursuant to Article 35 of the Act (hereinafter referred to as the “inspection agency”). 1. Application for Inspection or Re-inspection of Containers: Form No. 25 2. Application for Inspection of Refrigeration Unit: Form No. 26 3. Application for Inspection or Re-inspection of Specific Facilities: Attached Form No. 27 ② A person who intends to import a container shall submit an application pursuant to Paragraph 1, Item 1 before importing the container in order to obtain confirmation from the head of the customs office pursuant to Article 226 of the Customs Act . ③ When the Korea Gas Safety Corporation or an inspection agency receives an application for re-inspection of a container among the applications under Paragraph 1, Item 1, it shall re-inspect the container and issue a container re-inspection report in the form of Annex 28-3 to the applicant. [Wholly Amended Jan. 26, 2017] Article 37 (Omission of Entire Inspection of Containers, etc.) ① Deleted <2009. 11. 20.> ② Any person intending to import containers, etc. for which the entire inspection is omitted pursuant to Article 17, Paragraph 7 of the Act may obtain such confirmation by submitting an Application for Confirmation of Inspection Omission ( Form No. 28 ) to the inspection authority for containers, etc. ( referring to the person conducting the inspection of containers, etc. pursuant to Article 25, Paragraph 1, Subparagraph 4 or Paragraph 2, Subparagraph 2 of the Enforcement Decree; hereinafter the same applies). However, any person intending to import containers under Article 15 , Paragraph 1, Subparagraph 8 of the Enforcement Decree shall submit an Application for Confirmation of Inspection Omission prior to importing the containers in order to obtain confirmation from the head of the customs office pursuant to Article 226 of the Customs Act . <Amended Nov. 20, 2009; Jan. 7, 2022> ③ The application form under Paragraph 2 shall be accompanied by materials proving that the container, etc. is exempt from inspection. <Amended Nov. 20, 2009> ④ In Article 15, Paragraph 1, Subparagraph 10 of the Enforcement Decree, “minor repairs prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the repairs set forth in each of the following subparagraphs. <Amended Nov. 25, 2011; Mar. 23, 2013; Oct. 1, 2025> 1. Repairs performed by the container manufacturer in each of the following items a. Replacement of container parts B. Replacement of insulation in low-temperature containers 2. Repairs performed by a specific equipment manufacturer in each of the following subparagraphs a. Replacement of parts for specific equipment fittings. Provided, however, that parts for safety valves refer only to those designated and notified by the Minister of Trade, Industry and Resources . B. Replacement of insulation in low-temperature storage tanks 3. Repairs performed by the refrigeration manufacturer in each of the following items A. Replacement of refrigeration unit parts B. Replacement of insulation for the refrigeration unit 4. Repairs performed by the high-pressure gas manufacturer in each of the following subparagraphs a. Replacement of container valve parts B. Replacement of parts of specific equipment (referring only to the replacement of safety valve parts recognized by the Korea Gas Safety Corporation as having a low risk) C. Replacement of chiller parts D. Replacement of insulation (excluding replacement of insulation for cryogenic containers and cryogenic storage tanks) E. Welding repair of specific equipment (referring only to specific high-pressure gas manufacturers who have submitted a safety improvement plan and are recognized by the Korea Gas Safety Corporation as having the capability to perform welding) 5. Repairs performed by the inspection agency in each of the following items a. Replacement of parts for specific equipment (excluding replacement of safety valve parts) B. Replacement of insulation (excluding replacement of insulation for cryogenic containers and cryogenic storage tanks) C. Screw-type sealing measure for the liquid outlet of a liquefied petroleum gas container for using liquefied petroleum gas in a liquid state D. Replacement of container parts 6. Replacement of parts for valves for liquefied petroleum gas containers performed by a liquefied petroleum gas filling business operator (referring only to cases where there is no risk of gas leakage when replacing such parts, such as handle replacement) 7. Repair of container accessories attached to liquefied petroleum gas containers of vehicles performed by an automobile management business operator [Wholly Amended July 16, 2008] Article 37-2 Deleted <July 16, 2008> Article 38 (Partial Omission of Inspection of Containers, etc.) ① In Article 15, Paragraph 2, Subparagraph 1 of the Enforcement Decree, the term “containers, etc.” prescribed by the Ordinance of the Ministry of Trade, Industry and Resources refers to containers , etc. annually notified by the Minister of Trade, Industry and Resources, taking into consideration the results of inspections of containers, etc. collected pursuant to Article 18, Paragraph 2 of the Act over the past three years, and the results of periodic examinations and market surveillance, etc., pursuant to Articles 19 and 20 of the Industrial Standardization Act . <Amended Mar. 23, 2013; Oct. 1, 2025> ② For containers, etc. pursuant to Article 15, Paragraph 2, Subparagraph 1 of the Enforcement Decree, production stage inspection pursuant to Subparagraph 3, Item (b) of Annex 10 , Subparagraph 3, Item (b) of Annex 10-2 , Subparagraph 3, Item (b) of Annex 11, and Subparagraph 3, Item (b) of Annex 12 may be omitted. In this case, the person who manufactured or imported the containers, etc. shall notify the inspection authority of the containers, etc. of the fact that they have received certification pursuant to Article 15 of the Industrial Standardization Act . ③ Where the form, etc. of a container, etc., as stipulated in Article 15, Paragraph 2, Subparagraph 1 of the Enforcement Decree is changed and a product examination is conducted pursuant to Article 14 of the Enforcement Rule of the Industrial Standardization Act , the design stage inspection required under Subparagraph 3(b) of Annex 10 , Subparagraph 3(b) of Annex 10-2 , Subparagraph 3(b) of Annex 11, and Subparagraph 3(b) of Annex 12 may be omitted. In this case, the person who manufactured or imported the container, etc., shall submit the product examination report to the inspection authority for the container, etc. ④ Cases in which part of the inspection may be omitted pursuant to Article 15, Paragraph 2, Subparagraph 2 of the Enforcement Decree are as follows: <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Cases where a person who has registered the manufacture of foreign containers, etc. manufactures the containers, etc. 2. If there is a risk that conducting the inspection may degrade the performance of the container, etc. 3. If there is a risk of damage to containers, etc. as a result of conducting the inspection 4. Cases where it is proven that an inspection has been received from a foreign inspection agency recognized by the Minister of Trade, Industry and Resources in accordance with the inspection standards of Annex 10 , Annex 10-2 , Annex 11 , and Annex 12 [Wholly Amended Nov. 20, 2009] Article 39 (Re-inspection of Containers, etc.) The re-inspection period for containers, etc. that are subject to re-inspection pursuant to Article 17, Paragraph 2 of the Act is as set forth in Table 22 . [Wholly Amended July 16, 2008] Article 39-2 (Exemption from Re-inspection of Pressure Vessels) ① Any person who wishes to be exempted in whole or in part from the re-inspection of pressure vessels pursuant to Article 15-2, Paragraph 1, Subparagraph 1 of the Enforcement Decree shall submit an application in the form of Annex 28-2 , attached with a review opinion from the Korea Gas Safety Corporation regarding each of the following subparagraphs,to the Mayor, County Governor, or District Head within 30 days prior to the expiration of the re-inspection period under Article 39. <Amended May 31, 2010> 1. Status of compliance with safety management regulations pursuant to Article 11, Paragraph 1 of the Act over the past two years 2. Recent records of periodic and unscheduled inspections under Article 16-2 of the Act 3. The adequacy of the inspection personnel, equipment, and regulations of the party intending to conduct self-inspections of pressure vessels, and the track record of recent self-inspections. ② Any person who wishes to be exempted in whole or in part from the re-inspection of a pressure vessel pursuant to Article 15-2, Paragraph 1, Subparagraph 2 of the Enforcement Decree shall submit an application in the form of Annex 28-2, along with a review opinion from the Korea Gas Safety Corporation regarding each of the following subparagraphs, to the mayor, county governor, or district head within 30 days prior to the expiration of the re-inspection period pursuant to Article 39 . 1. Whether accidents under the Industrial Accident Compensation Insurance Act caused by high-pressure gas-related facilities have occurred over the past two years 2. Whether insurance has been purchased that meets the requirements of each item of Article 15-2, Paragraph 1, Subparagraph 2 of the Enforcement Decree 3. Inspection facilities, inspection technology, and recent inspection performance of specialized agencies inspecting pressure vessels ③ The Minister of Trade, Industry and Resources may prescribe and announce matters necessary for the exemption from re-inspection of pressure vessels in addition to Paragraphs 1 and 2. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 40 (Method of Destruction of Rejected Containers and Specific Equipment, etc.) ① The method of destroying rejected containers and specific equipment pursuant to Article 17, Paragraph 3 of the Act is as set forth in Table 23 . ② When repairing specific equipment pursuant to the proviso of Article 17, Paragraph 3 of the Act , it must be made to comply with the technical and inspection standards for the manufacture of specific equipment set forth in Table 12 . [Wholly Amended July 16, 2008] Article 41 (Marking and Engraving of Containers, etc.) ① The marking methods for containers, etc. manufactured or imported pursuant to Article 11-2 of the Act are as set forth in Table 24 . ② The method of engraving or marking on approved containers, etc. pursuant to Article 17, Paragraph 4 of the Act is as set forth in Attached Table 25 . ③ For containers, etc. for which the entire inspection is omitted pursuant to the proviso to Article 17, Paragraph 1 of the Act and Article 15, Paragraph 1 of the Enforcement Decree, a self-inspection mark must be affixed as determined by the mayor, county head, or district head. [Wholly Amended July 16, 2008] Article 42 (Certificate of Conformity for Containers, etc.) ① Containers, etc. for which a certificate of conformity must be issued pursuant to Article 17, Paragraph 6 of the Act are as follows: 1. Refrigeration unit 2. Storage tanks, pressure vessels, tanks fixed to vehicles, and vaporization devices among specific facilities ② The certificate of conformity for containers, etc. under Paragraph 1 shall be in accordance with the classifications in each of the following subparagraphs. 1. Certificate of Conformity for Refrigeration Equipment: Attached Form No. 29 2. Certificate of Conformity for Storage Tanks and Pressure Vessels: Form No. 30 3. Certificate of Conformity for Tanks Fixed to Vehicles: Form No. 31 4. Certificate of Conformity for Vaporizer: Form No. 32 [Wholly Amended July 16, 2008] Article 43 (Inspection Standards for Containers, etc.) ① Inspections and re-inspections of containers, etc. pursuant to Article 17 , Paragraphs 1 and 2 of the Act shall be conducted to determine whether they comply with the standards of each of the following subparagraphs. 1. Inspection and Re-inspection of Containers: Whether they comply with the inspection standards for container manufacturing specified in Attached Table 10 2. Inspection and re-inspection of container accessories: Whether they comply with the inspection standards for the manufacture of container accessories specified in Annex 10-2 3. Inspection of the refrigeration unit: Whether it complies with the inspection standards for refrigeration unit manufacturing specified in Annex 11 4. Inspection and Re-inspection of Specific Equipment: Whether it complies with the inspection standards for the manufacture of specific equipment as specified in Attached Table 12 ② For containers imported filled with high-pressure gas, an external inspection shall be conducted, and after all the high-pressure gas has been used, an inspection pursuant to Paragraph 1 shall be carried out without delay. [Wholly Amended July 16, 2008] Article 44 (Collection and Inspection of Containers in Circulation, etc.) ① The subjects of collection and inspection pursuant to Article 18, Paragraph 2 of the Act shall be containers and container accessories. ② Inspections of containers collected pursuant to Paragraph 1 shall be conducted to determine whether they comply with the inspection standards for container manufacturing in Table 10 , and inspections of container accessories shall be conducted to determine whether they comply with the inspection standards for container accessory manufacturing in Table 10-2 . [Wholly Amended July 16, 2008] Article 44-2 (Order for Recall, Exchange, Refund, and Public Announcement of Defective Containers) ① An order for recall, exchange, and refund (hereinafter referred to as “recall, etc.”) pursuant to Article 18 , Paragraphs 2 and 3 of the Act shall include the matters of each of the following subparagraphs. <Amended Aug. 24, 2017> 1. Product Name and Product Number 2. Date of manufacture or import 3. Name of manufacturer or importer 4. Reasons for recall, etc. 5. Time, place, and method of retrieval, etc. ② Any person who has received an order pursuant to Paragraph 1 shall, without delay, suspend or cease the distribution and sale of containers subject to recall, etc., and shall formulate a plan regarding the recall, etc., and submit it to the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> ③ A person who has received an order pursuant to Paragraph 1 shall report the results of the recall, etc. to the Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> ④ A person who has received an order for public announcement pursuant to Article 18, Paragraphs 2 and 3 of the Act shall, without delay, publish an advertisement regarding the recall, etc., containing the matters of each of the following subparagraphs in at least two major national daily newspapers. <Amended Aug. 24, 2017> 1. Title containing content regarding the collection of containers, etc. 2. Product Name and Product Number 3. Date of manufacture or import of containers subject to recall, etc. 4. Reasons for recall, etc. 5. Methods of recovery, etc. 6. Name of the manufacturer or importer carrying out the recall, etc. 7. Other matters necessary for recovery, etc. ⑤ The Minister of Trade, Industry and Resources or the Mayor, County Governor, or District Head may prescribe and announce detailed matters concerning recall, etc. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 45 (Types of High-Pressure Gases Subject to Quality Maintenance) In Article 15-3 of the Enforcement Decree , “types of high-pressure gas prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the high-pressure gases listed in Annex 26. <Amended Oct. 1, 2025> [This Article Newly Inserted July 29, 2015] Article 45-2 (Method of Quality Inspection, etc.) ① Any person who intends to undergo a quality inspection pursuant to Article 18-3, Paragraph 1 of the Act shall submit an application in the form of Annex 32-2 to the Korea Gas Safety Corporation. ② The methods and procedures for quality inspection pursuant to Article 18-3 , Paragraphs 1 and 2 of the Act are as set forth in Table 27 . [This Article Newly Inserted July 29, 2015] Article 45-3 (Publication of High-Pressure Gas Violating Quality Standards) ① The Minister of Trade, Industry and Resources may post the matters set forth in each of the following subparagraphs on the internet homepage of the Korea Gas Safety Corporation pursuant to Article 18-3, Paragraph 3 of the Act. In this case, the matters may be posted on the internet homepage of the local government where the business operator's workplace is located, or published using the Official Gazette, newspapers pursuant to the Act on the Promotion of Newspapers, etc. , or broadcasts pursuant to the Broadcasting Act . <Amended Oct. 1, 2025> 1. A title indicating that it is a public announcement of a legal violation 2. Types of businesses permitted under Article 4 of the Act or types of businesses registered under Article 5-3 of the Act 3. Trade name, address, and name of representative of the violating business operator (including the supplier of the violating high-pressure gas). 4. Details of the violation 5. Details of administrative dispositions for violations ( Details of administrative dispositions in Annex 13-2 and Annex 2 of the Enforcement Decree) 6. Date of administrative disposition (date the administrative disposition became final) 7. Period of administrative disposition (referring to the period of business suspension or business restriction; in the case of an penalty surcharge, it refers to the period corresponding to the penalty surcharge imposed in accordance with the administrative disposition standards in Annex 13-2 and the penalty surcharge calculation standards in Annex 2 of the Enforcement Decree) ② The publication pursuant to Paragraph 1 shall be made within 10 days from the date of the relevant administrative disposition. In this case, when publication is made by posting on an internet homepage, the period specified in each of the following subparagraphs shall be the publication period. 1. In the case of a business suspension or business restriction order: A period equal to or greater than the business suspension period or the business restriction period. 2. In the case of a disposition imposing an penalty surcharge: A period of business suspension or business restriction equivalent to or greater than the period specified in Annex 2 of the Enforcement Decree corresponding to the relevant violation. ③ Before making a public announcement pursuant to Article 18-3, Paragraph 3 of the Act , the Minister of Trade, Industry and Resources shall notify the person subject to public announcement of the fact that he or she is subject to public announcement and provide an opportunity to submit explanatory materials or present their opinion. <Amended Oct. 1, 2025> ④ If the relevant administrative disposition under Paragraph 1, Subparagraph 5 is revoked, the Minister of Trade, Industry and Resources shall publish the fact of such revocation in the same manner as the said publication for a period equal to or longer than the period of publication. <Amended Oct. 1, 2025> [This Article Newly Inserted July 29, 2015] Article 46 (Reporting of Use of Specific High-Pressure Gas, etc.) ① Persons required to report the use of specific high-pressure gas pursuant to Article 20, Paragraph 1 of the Act are as follows: <Amended Aug. 24, 2017; Jan. 7, 2022> 1. Persons intending to use specific high-pressure gas who have liquefied-gas storage facilities with a storage capacity of at least 500 kilograms 2. Persons intending to use specific high-pressure gas who have compressed-gas storage facilities with a storage capacity of at least 50 cubic meters 3. Persons who intend to receive and use specific high-pressure gas (excluding natural gas) through pipelines 4. Persons who intend to use compressed monosilane, compressed diborane, liquid arsine, phosphine, hydrogen selenide, germane, disilane, arsenic pentafluoride, phosphorus pentafluoride, phosphorus trifluoride, nitrogen trifluoride, boron trifluoride, sulfur tetrafluoride, silicon tetrafluoride, liquid chlorine, or liquid ammonia. However, this excludes cases where the gas is used for testing (only when the relevant high-pressure gas itself is directly tested), and cases where liquid ammonia is used to ferment rice straw or similar materials for animal feed in an area designated by the mayor, county head, or district head. 5. Persons who intend to receive and use specific high-pressure gas for automobile fuel 6. Deleted <2010. 10. 13.> ② Any person who intends to report the use of specific high-pressure gas pursuant to Article 20, Paragraph 1 of the Act shall submit the report on the use of specific high-pressure gas in the form of Annex 33 to the mayor, county governor, or district head at least seven days before the commencement of use. ③ The mayor, county governor, or district head who receives a report pursuant to Paragraph 2 shall issue a certificate of report on the use of specific high-pressure gas in the form of Annex 34 to the reporting person and notify the Korea Gas Safety Corporation of the reported matters, and the government agency that has received registration pursuant to the Automobile Management Act shall notify the Korea Gas Safety Corporation of the registered matters. [Wholly Amended July 16, 2008] Article 47 (Facility Standards and Technical Standards for Facilities Using Specific High-Pressure Gases) The facility standards and technical standards for facilities using specific high-pressure gases pursuant to Article 20, Paragraph 3 of the Act are as set forth in Table 8 . [Wholly Amended July 16, 2008] Article 48 (Inspection of Facilities Reported for Use of Specific High-Pressure Gas) ① A person who intends to undergo a completion inspection (attached with a drawing indicating the location of the facility) or a periodic inspection of a facility for the use of specific high-pressure gas pursuant to Article 20 , Paragraph 4 of the Act shall submit an application for completion inspection or a periodic inspection in the form of Annex 35 to the Korea Gas Safety Corporation. However, in the case of a vehicle using specific high-pressure gas as fuel that is subject to reporting of use pursuant to Article 46 , Paragraph 1, Subparagraph 5, the manufacturer thereof may submit an application for completion inspection to the Korea Gas Safety Corporation on behalf of the person who reported the use of specific high-pressure gas, and shall notify the person who reported the use of specific high-pressure gas of such fact and the inspection results. <Amended Oct. 13, 2010> ② A person who has reported the use of specific high-pressure gas shall undergo a periodic inspection within 15 days before or after the date marking every one-year period from the date of issuance of the Certificate of Completion Inspection pursuant to Article 20, Paragraph 4 of the Act. However, in the cases of each of the following subparagraphs, the periodic inspection may be received at the time prescribed in each subparagraph. <Amended Jan. 7, 2022; Jun. 11, 2026> 1. In the case of a person falling under Article 20, Paragraph 1, Subparagraph 1 of the Act : The timing of the periodic inspection pursuant to Article 16-2 of the Act 2. Cases where the Mayor, County Governor, or District Head recognizes that it is inappropriate to conduct the periodic inspection at the relevant time due to natural disasters, calamities, or other unavoidable circumstances: A time separately determined in consultation with the person entrusted with the periodic inspection duties pursuant to Article 25, Paragraph 2 of the Enforcement Decree. 3. Cases where the President of the Korea Gas Safety Corporation deems it necessary: ​​A time separately determined for each Eup, Myeon, and Dong ③ In cases where there are two or more facilities subject to periodic inspection within the same business establishment and the timing of periodic inspections differs, other facilities may undergo periodic inspections together with one facility among those subject to periodic inspection in the same year. ④ If a person who has reported the use of specific high-pressure gas for automobile fuel has received a periodic inspection or a structural modification inspection in accordance with the Automobile Management Act, it shall be deemed that they have received the periodic inspection pursuant to Article 20, Paragraph 4 of the Act . ⑤ The standards for completion inspection and periodic inspection are as set forth in Attached Table 8 . ⑥ A certificate of completion inspection or a certificate of periodic inspection in the form of Annex 36 shall be issued to those who have passed the completion inspection or periodic inspection. [Wholly Amended July 16, 2008] Article 49 (Import Declaration of High-Pressure Gas) ① Any person who intends to declare the import of high-pressure gas pursuant to Article 21 of the Act shall submit a high-pressure gas import declaration form in Annex 37 to the Korea Gas Safety Corporation, attaching documents stating the type and quantity of high-pressure gas to be imported. ② When the Korea Gas Safety Corporation receives a high-pressure gas import declaration form pursuant to Paragraph 1, it shall verify the contents thereof and issue a receipt for the high-pressure gas import declaration in the form of Annex 37-2 to the declarant. ③ The phrase “cases prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” pursuant to the proviso of Article 21 of the Act means any of the following: <Amended Mar. 23, 2013; Oct. 1, 2025> 1. High-pressure gas filled in containers with a capacity of less than 300 milliliters (excluding toxic gases) 2. High-pressure gas subject to reporting by petroleum importers pursuant to Article 45, Paragraph 1 of the Enforcement Rule of the Petroleum and Petroleum Substitute Fuels Business Act 3. High-pressure gas subject to import levies under Article 18 of the Petroleum and Petroleum Substitute Fuels Business Act 4. High-pressure gas subject to import permit under Article 11, Paragraph 1 of the Act on the Regulation of Manufacture, etc. of Specific Substances for the Protection of the Ozone Layer [Wholly Amended July 16, 2008] Article 50 (Standards for Transport, etc. of High-Pressure Gas) The standards for transfer, assignment, transport, or carrying (hereinafter referred to as “transport, etc.”) pursuant to Article 22, Paragraph 1 of the Act are as set forth in Attached Table 30. <Amended Aug. 24, 2017> [Wholly Amended July 16, 2008] Article 50-2 (Procedure for Enactment or Amendment of Detailed Standards) ① Any person who intends to apply for the enactment or amendment of detailed standards pursuant to Article 22-2, Paragraph 1 of the Act shall submit the documents listed in each of the following subparagraphs to the Gas Technical Standards Committee pursuant to Article 33-2 of the Act (hereinafter referred to as the “Standards Committee”). 1. Proposed enactment or amendment of detailed standards 2. Reasons for the necessity of enactment or amendment and supporting materials ② When the Standards Committee receives an application pursuant to Paragraph 1, it shall review within 15 days whether to submit the matter to a meeting of the Standards Committee, and if it decides to submit it to a meeting, it shall submit the matter to the meeting; if it decides not to submit it to a meeting, it shall notify the applicant of the reason. ③ If the Standards Committee decides to submit a matter to a meeting pursuant to Paragraph 2, it shall notify the general public of the name, number (only in the case of amendment), main contents, reasons, and period for submitting opinions of the detailed standard using the internet homepage, etc. ④ An applicant who has received notice that a matter will not be submitted to a meeting pursuant to Paragraph 2 may file an objection within 10 days from the date of receiving the notice of the reason. ⑤ Except for the matters prescribed in Paragraphs 1 through 4, detailed matters necessary for the enactment or amendment of detailed standards shall be determined by the Standards Committee. <Amended Aug. 24, 2017> [This Article Newly Inserted Oct. 13, 2010] Article 51 (Safety Education) ① The scope of persons subject to safety education, the education period, the education curriculum, and other matters necessary for education pursuant to Article 23, Paragraph 1 of the Act are as set forth in Table 31 . ② Any person who wishes to receive education pursuant to Paragraph 1 shall submit the application for safety education in the form of Annex 38 to the Korea Gas Safety Corporation. [Wholly Amended July 16, 2008] Article 52 (Verification of High-Pressure Gas Pipeline Burial Status, etc.) ① When an excavation contractor requests verification from the Information Support Center pursuant to Article 23-2 of the Act (hereinafter referred to as the “Information Support Center”) regarding whether a high-pressure gas pipeline is buried pursuant to Article 23-3, Paragraph 1 of the Act , the contractor shall notify the Information Support Center of an excavation plan that includes the following items: 1. Company name of the excavation client 2. Company name of the excavation contractor and personal details of the person in charge of the work 3. Type, location, and scheduled date of excavation work ② In cases where a person intending to notify an excavation plan pursuant to Paragraph 1 has obtained a permit for the occupation of a road pursuant to Article 61 of the Road Act , and the permitting authority has provided information regarding the excavation plan to the Information Support Center, the excavation contractor shall be deemed to have notified the excavation plan. ③ Upon receiving notification of an excavation plan pursuant to Paragraph 1 or 2, the Information Support Center shall issue a receipt number to the excavation contractor. In this case, this may be substituted by assigning the receipt number to an information and communications network so that the excavation contractor can verify it through the information and communications network. ④ When the Information Support Center receives notification of an excavation plan from an excavation contractor pursuant to Article 23-3, Paragraph 2 of the Act , it shall immediately notify the business operator holding the pipeline outside the business premises pursuant to Article 23-3, Paragraph 2 of the Act (hereinafter referred to as the “business operator holding the pipeline outside the business premises”) of the contents of such notification through an information and communication network. ⑤ When a business operator possessing pipelines outside the business premises receives notification of the contents of an excavation plan from the Information Support Center pursuant to Article 23-3, Paragraph 3 of the Act , the operator shall verify whether there are buried pipelines within 24 hours from that time and notify the Information Support Center of the results. In this case, Saturdays and public holidays pursuant to Article 2 of the Regulations on Public Holidays for Government Offices shall not be included in the notification time. ⑥ The Information Support Center shall notify the excavation contractor of the confirmation of the buried high-pressure gas pipeline received pursuant to Paragraph 5 without delay. ⑦ The excavation plan notified under paragraph (1) shall be valid for 15 days. If the location of the excavation site and the location of the buried high-pressure gas pipeline have not been marked under Article 52-2 by the date 15 days after the date of notifying the Information Support Center of the excavation plan or the scheduled date of the excavation work, the excavation contractor shall notify the Information Support Center of the excavation plan again. [This Article Newly Inserted July 29, 2015] Article 52-2 (Measures to be taken by excavation contractors and business operators holding pipelines outside the business premises) The matters to be taken by excavation contractors and business operators holding pipelines outside the business premises pursuant to Article 23-3, Paragraph 4 of the Act are as set forth in Item 1 of Annex 31-2 . [This Article Newly Inserted July 29, 2015] Article 52-3 (Commencement of Excavation Work) Pursuant to Article 23-3, Paragraph 5 of the Act , the Information Support Center shall notify the excavator that they may commence excavation work within the time corresponding to any of the following subparagraphs. 1. 24 hours from the time of receiving notification that there are no buried pipes pursuant to Article 52, Paragraph 5 2. 1 hour from the time of receiving notification of the marking of the high-pressure gas pipeline burial location pursuant to Article 52-2 [This Article Newly Inserted July 29, 2015] Article 52-4 (Preparation of Consultation on Excavation Work) ① The term “excavation work prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in Article 23-4, Paragraph 1 of the Act refers to excavation work falling under any of the following subparagraphs. <Amended Oct. 1, 2025> 1. Excavation work where the length of the high-pressure gas pipeline buried within the planned excavation area is 100 meters or more 2. Excavation work in which high-pressure gas pipelines are expected to be exposed for 10 meters or more ② Any person who intends to carry out excavation work pursuant to each subparagraph of Paragraph 1 shall, before commencing excavation work pursuant to Article 23-4 Paragraph 1 of the Act , consult with the business operator holding the pipeline outside the business office, and then, pursuant to Article 23-4 Paragraph 2 of the Act , prepare an excavation work consultation form in accordance with Form No. 38-2 of the Attached Form . [This Article Newly Inserted July 29, 2015] Article 52-5 (Emergency Excavation Work, etc.) Notwithstanding the provisions of Article 52 , Paragraphs 3 , 5 , and 6 and Articles 52-2 through 52-4, if an excavation contractor intends to carry out excavation work falling under any of the following subparagraphs, he/she may consult with the business operator holding the pipeline outside the business premises regarding the buried status of the high-pressure gas pipeline at the excavation site and commence excavation work in the presence of the business operator holding the pipeline outside the business premises. 1. Excavation work for emergency restoration due to natural disasters or sudden accidents 2. Excavation work for water supply with a length of 10 meters or less and a width of 3 meters or less [This Article Newly Inserted July 29, 2015] Article 52-6 (Standards for Preventing Damage to High-Pressure Gas Pipelines) In Article 23-5 of the Act , the term “standards for preventing damage to high-pressure gas pipelines prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to Subparagraph 2 of Annex 31-2 . <Amended Oct. 1, 2025> [This Article Newly Inserted July 29, 2015] Article 52-7 (Safety Measures, etc. for High-Pressure Gas Pipelines) ① The term “safety measures prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in Article 23-6, Paragraph 1 of the Act refers to the matters in each of the following subparagraphs. <Amended Oct. 1, 2025> 1. Designation and Operation of Safety Managers for Each Excavation Site 2. Provision of drawings indicating pipe burial locations, etc. to the excavation contractor 3. Guidance and consultation on systems for the protection of high-pressure gas pipelines, including verification of buried pipeline status and consultation on excavation work. 4. Other matters specified in Annex 31-2 ② In Article 23-6, Paragraph 2 of the Act , “other matters prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the matters in each of the following subparagraphs. <Amended Oct. 1, 2025> 1. Burial location of piping and ancillary facilities 2. Pressure, nominal diameter, and material of high-pressure gas piping, and type of gas 3. Contractor and Date of Construction 4. Other matters deemed necessary by the Minister of Trade, Industry and Resources [This Article Newly Inserted July 29, 2015] Article 53 (Insurance Subscription, etc.) ① In Subparagraph 3 of Article 18, Paragraph 2 of the Enforcement Decree, the term “person prescribed by the Ordinance of the Ministry of Trade, Industry and Resources among persons who have reported the use of specific high-pressure gases” refers to a person subject to reporting falling under any of the provisions of Subparagraphs 1 through 4 of Article 46 , Paragraph 1. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> ② The insurance amount pursuant to Article 18, Paragraph 3 of the Enforcement Decree shall be the amount corresponding to the standards of each of the following subparagraphs. However, the insurance amount to be paid shall not exceed the actual loss, except in the case of the proviso to subparagraph 1. <Amended Nov. 14, 2024> 1. In the case of death, 150 million won per person. However, if the actual loss is less than 20 million won, it shall be 20 million won. 2. In the case of injury, the amount specified in Item 1 of Attached Table 33 per person for each injury grade 3. In the case of an injury, if a physical disability (hereinafter referred to as “permanent disability”) occurs as a result of the injury after the completion of treatment, the amount determined per person in the insurance amount by grade of permanent disability under Item 2 of Attached Table 33. 4. In the case of property damage, the amount specified in Annex 33-2 per accident 5. In the event that the injured person dies during treatment as a result of the injury, the sum of the amounts in Subparagraphs 1 and 2 6. In cases where the injured person develops a permanent disability as a result of the injury, the sum of the amounts in subparagraphs 2 and 3. 7. In the event that death occurs as a result of the injury after the amount under Subparagraph 3 has been paid, the amount obtained by subtracting the amount paid pursuant to Subparagraph 3 from the amount under Subparagraph 1. [Wholly Amended July 16, 2008] Article 54 (Notification of Accidents, etc.) ① Notification of accidents pursuant to Article 26, Paragraph 1 of the Act shall be in accordance with Annex 34 . ② In Article 26, Paragraph 1, Subparagraph 5 of the Act , “other accidents in which gas facilities are damaged or gas is leaked, as prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to an accident in which gas leaks from a storage tank of a business operator, etc. <Amended Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 55 (Toxic Gases) In Subparagraph 13 of Article 28 , Paragraph 2 of the Act , the phrase “high-pressure gas prescribed by the Ordinance of the Ministry of Trade, Industry and Resources, which is a gas having toxicity harmful to the human body when present in the air in an amount exceeding a certain level” refers to the toxic gas referred to in Subparagraph 2 of Article 2 , Paragraph 1. <Amended Oct. 1, 2025> [This Article Newly Inserted Jan. 7, 2022] Article 56 (Gas Safety Technology Deliberation Committee) ① The Gas Safety Technology Deliberation Committee pursuant to Article 28, Paragraph 6 of the Act (hereinafter referred to as the “Deliberation Committee”) shall be composed of no more than 30 members, including one Chairperson. <Amended Oct. 13, 2010> ② The Deliberation Committee shall deliberate on the following matters. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> 1. Matters notified by the Minister of Trade, Industry and Resources pursuant to gas-related laws and regulations (excluding matters concerning detailed standards) for which the Minister of Trade, Industry and Resources requests a review 2. Matters concerning gas safety policies and systems necessary for the operation of gas-related laws and regulations 3. Matters concerning the investigation, research, and development of gas safety technology 4. Other matters concerning gas safety technology that are requested by the Minister of Trade, Industry and Resources or submitted to the meeting by the Chairperson. ③ The Chairperson shall be the President of the Korea Gas Safety Corporation, and the members shall be persons appointed by the President of the Korea Gas Safety Corporation from among those with extensive knowledge and experience in gas safety, subject to the approval of the Minister of Trade, Industry and Resources. <Amended Oct. 13, 2010; Mar. 23, 2013; Oct. 1, 2025> ④ The Chairperson shall oversee the affairs of the Deliberation Committee and represent the Deliberation Committee. <Amended Jan. 21, 2022> ⑤ In the event that the Chairperson is unable to perform their duties due to unavoidable circumstances, a person designated by the Chairperson shall act as the Chairperson. <Amended Oct. 13, 2010> ⑥ The deliberation committee shall have subcommittees for each field. ⑦ In addition to the provisions of paragraphs 1 through 6, matters necessary for the operation of the deliberation committee shall be determined by the chairperson following a resolution by the deliberation committee. [Wholly Amended July 16, 2008] Article 56-2 (Contribution of Funds) In Article 29, Paragraph 2 of the Act , the term “person prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to any person falling under any of the following subparagraphs. <Amended Mar. 23, 2013; Oct. 1, 2025> 1. Public institutions pursuant to Article 2, Paragraph 1 of the Act on the Operation of Public Institutions 2. A corporation pursuant to Article 32 of the Civil Act [Wholly Amended July 16, 2008] Article 56-3 (Secretariat) ① The Secretariat established in the Korea Gas Safety Corporation pursuant to Article 33-2, Paragraph 7 of the Act shall have one Secretary General and the necessary staff, and may have employees of the Korea Gas Safety Corporation hold concurrent positions. ② The Secretariat pursuant to Article 33-2, Paragraph 7 of the Act shall perform the duties set forth in each of the following subparagraphs. <Amended Oct. 13, 2010> 1. Preparation and study of proposals for the enactment or amendment of detailed standards under Article 22-2(1) of the Act (hereinafter referred to as “detailed standards”) 2. Review of agenda items to be submitted to the Standards Committee meeting 3. Handling of tasks related to the preparation and operation of the Standards Committee's meeting minutes 4. Consultation regarding the drafting of detailed standards enactment/amendment proposals and related supporting documents requested from the Standards Committee 5. Domestic and International Exchange and Cooperation Regarding Gas Technical Standards [This Article Newly Inserted July 16, 2008] Article 57 (Fees, etc.) ① The fees pursuant to Article 34, Paragraph 1 of the Act are as set forth in Attached Table 35 . ② The fee under Paragraph 1 shall be paid with revenue stamps of the relevant local government. However, the Governor of a City or Province, or the Mayor, County Governor, or District Head may allow payment by means of electronic money, electronic payment, etc., using an information and communications network. [Wholly Amended July 16, 2008] Article 57-2 (Payment of Levies by Credit Card, etc.) ① In Article 23-5, Paragraph 1 of the Enforcement Decree, the term “institution acting as an agent for the payment of levies prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the institutions listed in each of the following subparagraphs. <Amended Oct. 1, 2025> 1. Korea Financial Clearing Institute established with the permission of the Financial Services Commission pursuant to Article 32 of the Civil Act 2. Among institutions that perform payments using credit cards, debit cards, etc. (hereinafter referred to as “credit cards, etc.” in this Article) via information and communications networks, institutions designated and notified by the Minister of Trade, Industry and Resources in consideration of facilities, operational capabilities, capital size, etc. ② The agencies listed in each subparagraph of Paragraph 1 (hereinafter referred to as “levy payment agencies”) shall obtain approval from the Minister of Trade, Industry and Resources regarding the payment agency fees pursuant to Article 23-5, Paragraph 2 of the Enforcement Decree . In this case, the Minister of Trade, Industry and Resources shall approve the payment agency fees after comprehensively considering the operating expenses, etc., of the levy payment agencies. <Amended Oct. 1, 2025> ③ In cases where a levy is paid by credit card, etc. pursuant to Article 23-5 of the Enforcement Decree , the date of approval by the levy payment agency shall be deemed the date of payment. [This Article Newly Inserted Jan. 26, 2017] Article 58 (Designation of Inspection Agencies, etc.) ① A person who intends to receive a technical review pursuant to Article 24, Paragraph 2, Subparagraph 1, Item (e) and Subparagraph 2 , Item ( c ) of the Enforcement Decree shall submit an application for technical review in the form of Annex 39 to the Korea Gas Safety Corporation, attaching the documents specified in each of the following subparagraphs. However, the documents under Subparagraphs 2 through 4 may be submitted as a single document. <Amended Nov. 20, 2009> 1. Inspection Facility Installation Plan 2. Inspection Regulations 3. Operating Regulations of Inspection Agencies 4. Inspection Agency's Internal Safety Management Regulations 5. Specifications and performance of inspection equipment ② Applications for designation, re-designation, or change of designation of specialized inspection agencies and accredited inspection agencies pursuant to Article 35 of the Act and Article 24 , Paragraph 1 of the Enforcement Decree shall be in accordance with Form No. 40 of the Attached Form . <Amended Nov. 20, 2009> ③ The application for designation, re-designation, or change of designation pursuant to Paragraph 2 shall be accompanied by the documents specified in each of the following subparagraphs. However, an application for re-designation must be made no later than 14 days prior to the expiration of the validity period, and a change of the representative of an inspection agency pursuant to Article 58-2 , Subparagraph 4 shall be submitted to the Mayor or Provincial Governor within 30 days from the date of the change, attached to Form No. 40, which contains documents proving the details of the change. <Amended Nov. 20, 2009; Apr. 9, 2015> 1. Business Plan 2. Current Status of Inspection Personnel 3. Documents regarding the technical review pursuant to Article 24, Paragraph 2, Subparagraph 1, Item (e) of the Enforcement Decree. However, in the case of seeking re-designation pursuant to Article 35, Paragraph 3 of the Act , documents accredited as an inspection agency by an accreditation body pursuant to Article 23 of the National Standards Basic Act may be substituted. ④ The standards for assets, personnel, and inspection equipment of inspection agencies pursuant to Article 24, Paragraph 4 of the Enforcement Decree are as set forth in Table 36 . ⑤ In cases where a City or Provincial Governor designates, re-designates, or changes the designation of an inspection agency pursuant to Article 35 of the Act , they shall issue a Certificate of Designation of Inspection Agency in the form of Annex 41. <Amended Nov. 20, 2009> ⑥ If a person wishes to have a certificate of designation as an inspection agency issued pursuant to Paragraph 5 reissued because it has been lost or is damaged beyond repair, they must submit an application for reissuance in the form of Annex 40-2 to the Mayor or Provincial Governor. In this case, if the reissuance is due to the certificate being damaged beyond repair, the relevant certificate of designation as an inspection agency must be attached. <Newly added Jan. 26, 2017> ⑦ In addition to the matters prescribed in Paragraphs 1 through 6, matters necessary for the designation, etc. of inspection agencies shall be determined and announced by the Minister of Trade, Industry and Resources . <Amended Jan. 26, 2017; Oct. 1, 2025> [Wholly Amended Jul. 16, 2008] [Title Amended Nov. 20, 2009] Article 58-2 (Grounds for Change of Designation of Inspection Agency) The cases requiring a change of designation of an inspection agency pursuant to Article 35, Paragraph 2 of the Act are as follows: <Amended Nov. 20, 2009; Jan. 26, 2017> 1. Change of location of the inspection agency 2. Change in inspection scope 3. Replacement of pressure-resistant/pressurization testing equipment or painting equipment, or an increase or decrease of 10 percent or more in the capacity thereof 4. Change of Representative of Inspection Agency [Wholly Amended July 16, 2008] Article 58-3 (Notification of Inspection Equipment Failure) If a failure occurs in the hydrostatic and pneumatic pressure test equipment or painting equipment among the inspection facilities it possesses, the inspection agency shall notify the Korea Gas Safety Corporation without delay. [This Article was newly added on Jan. 26, 2017.] [Formerly Article 58-3 was moved to Article 58-4 <Jan. 26, 2017>] Article 58-4 (Validity Period of Designation of Inspection Agency) The term “validity period prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” in Article 35, Paragraph 3 of the Act shall be as follows: <Amended Oct. 1, 2025> 1. Specialized inspection agency for the re-inspection of liquefied petroleum gas containers: 3 years 2. Inspection agencies other than those in Item 1: 5 years [Wholly Amended Apr. 9, 2015] [Moved from Article 58-3 <Jan. 26, 2017>] Article 59 (Verification of Inspection Facilities) ① Any person who intends to obtain verification pursuant to Article 35, Paragraph 5 of the Act shall submit an application for verification in the form of Annex 42 to the Korea Gas Safety Corporation. <Amended Nov. 20, 2009> ② Verification pursuant to Article 35 , Paragraph 5 of the Act shall be conducted regarding compliance with the standards for designation and re-designation pursuant to Article 24, Paragraph 2 of the Enforcement Decree . <Amended Nov. 20, 2009> [Wholly Amended July 16, 2008] Article 59-2 (Entrustment of Inspection of Specific Facilities) In Article 25, Paragraph 2, Subparagraph 2 of the Enforcement Decree, the term “specific facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to specific facilities for refrigeration (excluding those attached to specific manufacturing facilities for high-pressure gas, general manufacturing facilities and storage facilities, filling and storage facilities for liquefied petroleum gas pursuant to the Act on the Safety Management of and Business in Liquefied Petroleum Gas, and gas supply facilities pursuant to the City Gas Business Act ), and safety valves and valves for toxic gas piping that are imported attached to such specific facilities and refrigeration units. <Amended Nov. 20, 2009; Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 60 (Entrustment of Re-inspection Duties for Specific Facilities) In Article 25, Paragraph 2, Subparagraph 3 of the Enforcement Decree , the term “specific facilities prescribed by the Ordinance of the Ministry of Trade, Industry and Resources” refers to the facilities listed in each of the following subparagraphs. <Amended Nov. 20, 2009; Mar. 23, 2013; Oct. 1, 2025> 1. Storage tanks and their accessories 2. Tanks fixed to vehicles and their accessories 3. Vaporizer 4. Specific equipment for refrigeration [Wholly Amended Jul. 16, 2008] [Title Amended Nov. 20, 2009] Article 61 (Inspectors, etc.) ① Various inspection duties carried out by the Korea Gas Safety Corporation under entrusted authority pursuant to Article 36 of the Act shall be performed by a person falling under any of the following subparagraphs. However, inspection duties regarding usage facilities may be performed by a person designated by the President of the Korea Gas Safety Corporation. 1. Among those qualified as a safety manager under gas-related laws and regulations, a person who has acquired a qualification under the National Technical Qualifications Act 2. Persons who have obtained a master's degree in science or engineering, or who have graduated from a department in the field of chemistry, mechanical engineering, metallurgy, or safety management at a science or engineering university. 3. Persons who have graduated from a department at a science or engineering college other than chemistry, mechanical engineering, metallurgy, or safety management, and have at least one year of experience in gas safety management. 4. Persons who have graduated from a science or engineering college with a degree in chemistry, mechanical engineering, metallurgy, or safety management and have at least one year of experience in gas safety management. 5. A graduate of a junior college or vocational high school other than those specified in Item 4 who has at least two years of experience in gas safety management after graduation. 6. A graduate of a high school other than an industrial high school who has at least 3 years of experience in gas safety management after graduation. ② Various inspection tasks carried out by an inspection agency entrusted with authority pursuant to Article 36 of the Act shall be performed by persons who meet the standards for technical personnel set forth in Annex 36 . [Wholly Amended July 16, 2008] Article 61-2 Deleted <Mar. 27, 2017> Article 62 (Special Provisions Concerning Facilities, Technical Standards, etc.) Where the Minister of Trade, Industry and Resources recognizes that any of the following subparagraphs applies, he/she may separately establish special provisions regarding facilities, technical standards, etc., or prescribe and announce matters necessary for the implementation of facilities, technical standards , etc. <Amended Jun. 12, 2012; Mar. 23, 2013; Oct. 1, 2025> 1. In the case where the technology regarding high-pressure gas has been changed 2. Cases where a person who has obtained permission under Article 4, Paragraph 1 of the Act has divided and transferred the business pursuant to Article 8, Paragraph 1 of the Act , and it is significantly difficult to comply with the standards for safety distance, distance from other facilities, and distance from the business premises boundary. 3. Other cases deemed necessary for the safety management of high-pressure gas [Wholly Amended July 16, 2008] Article 63 (Procedures for Handling Entrusted Duties, etc.) The Minister of Trade, Industry and Resources may prescribe detailed matters concerning procedures, etc. necessary for handling duties entrusted to the Korea Gas Safety Corporation or inspection agencies pursuant to Article 25, Paragraphs 1 and 2 of the Enforcement Decree, and duties carried out by precision safety inspection agencies pursuant to Article 16-3 of the Act . < Amended Nov. 20, 2009; Mar. 23, 2013; Oct. 1, 2025> [Wholly Amended July 16, 2008] Article 64 (Review of Regulations) ① The Minister of Trade, Industry and Resources shall review the validity of the matters set forth in each of the following subparagraphs every three years based on the reference dates specified in each of the following subparagraphs (meaning the period prior to the same date as the reference date of the year marking every third year) and take measures such as improvements. <Amended Dec. 31, 2014; Nov. 14, 2024; Oct. 1, 2025> 1. Facility, technical, and inspection standards for hydrogen fuel charging pursuant to Article 8 , Paragraph 1 , Subparagraph 2 ; Article 28 , Paragraph 3 , Subparagraph 2; Article 30 , Paragraph 3 , Subparagraph 2 ; Article 31, Paragraph 3 , Subparagraph 2; and Annex 5, Subparagraphs 1 and 2: January 1, 2014 2. Retention period of safety inspection records pursuant to Article 16, Paragraph 3 and Annex 14 , Item 5, Subparagraph (b): January 1, 2014 3. Re-inspection period for containers and specific equipment pursuant to Article 39 and Annex 22 : January 1, 2014 4. Insurance amounts by disability grade pursuant to Article 53, Paragraph 2 , Subparagraph 3 and Annex 33 , Subparagraph 2: January 1, 2014 ② The Minister of Trade, Industry and Resources shall review the validity of the matters set forth in each of the following subparagraphs every five years based on the reference dates specified in each of the following subparagraphs (meaning until the day before the same date as the reference date of the year marking every fifth year) and take measures such as improvements. <Newly added Dec. 31, 2014; Feb. 21, 2019; Oct. 1, 2025; Jun. 11, 2026> 1. Deleted <February 21, 2019> 2. Deleted <June 11, 2026> 3. Gas facility standards for high-pressure gas manufacturing pursuant to Article 8, Paragraph 1 , Subparagraph 1 and Annex 4 , Subparagraph 1, Item (a), Subparagraph 4) (d): January 1, 2024 4. Facility standards and technical standards for the manufacture of refrigeration equipment pursuant to Article 9, Subparagraph 3 and Annex 11 : January 1, 2024 5. Facility standards and technical standards for the manufacture of specific equipment pursuant to Article 9, Subparagraph 4 and Annex 12 : January 1, 2024 6. Deleted <February 21, 2019> 7. Scope of persons subject to safety training and training period pursuant to Article 51 , Paragraph 1 and Annex 31 , Subparagraph 4: January 1, 2024 8. Standards for assets, personnel, and inspection equipment of inspection agencies pursuant to Article 58, Paragraph 4 and Annex 36 : January 1, 2024 [Wholly Amended Feb. 4, 2014] ADDENDA <Ministry of Trade, Industry and Energy Decree No. 33, Mar. 11, 1996> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Valves for Toxic Gas Piping)  ① Any person who is manufacturing valves for toxic gas piping that are newly included in specific facilities pursuant to the amendment of Article 2, Paragraph 4, Subparagraph 5 at the time of enforcement of this Rule and who wishes to continue the manufacturing business shall obtain a permit pursuant to Article 5 of the Act within six months after the enforcement of this Rule. ② For specific equipment under the provisions of Paragraph 1, inspections shall be conducted by applying the provisions of Article 17, Paragraph 1 of the Act to those manufactured or imported after the date six months have elapsed since the enforcement of this rule. Article 3 (Transitional Measures concerning the Verification and Evaluation of Compliance with Safety Management Regulations)  ① Business operators, etc. who submitted safety management regulations to the licensing authority or registration authority in accordance with the previous regulations prior to the enforcement of this rule (excluding those subject to comprehensive safety management under Article 11, Paragraph 2 of the Act) shall amend their safety management regulations to comply with the provisions of Article 17 by December 31, 1996. ② The initial verification and evaluation of compliance with safety management regulations for business operators, etc. who submitted safety management regulations to the licensing authority or registration authority in accordance with the previous regulations at the time of the enforcement of this Rule (excluding persons subject to comprehensive safety management under Article 11, Paragraph 2 of the Act) shall be conducted according to the following classifications. 1. For those who submitted safety management regulations prior to December 31, 1984, implementation shall be carried out during the period up to June 30, 1997. 2. For those who submitted safety management regulations between January 1, 1985 and December 31, 1993, implementation shall be carried out during the period from July 1, 1997 to December 31, 1998. 3. For those who submitted safety management regulations on or after January 1, 1994, implementation shall be carried out within 30 days before or after the date five years have elapsed from the date of submission. Article 4 (Transitional Measures Concerning Facility Standards, etc.)  High-pressure gas manufacturing facilities, storage facilities, sales facilities, or specific high-pressure gas usage facilities installed by high-pressure gas manufacturers, high-pressure gas storage facility installers, high-pressure gas sellers, or specific high-pressure gas users who obtained permission or made a report under the former regulations at the time of the enforcement of this Rule, and which do not conform to the facility standards and technical standards under the provisions of this Rule, shall be made compliant with this Rule within six months from the date of enforcement of this Rule. However, regarding corrosion prevention and cathodic protection measures for valves for toxic gas piping, storage tanks, and piping installed before the enforcement of this Rule, the former regulations shall apply notwithstanding the provisions of Article 2, Paragraph 4, Annex 4, Item 3, Subparagraph (a)(3), Annex 5, Item 1, Subparagraph (c)(2) and Annex 30, Item 12, Subparagraph (b). Article 5 (Transitional Measures concerning Self-Inspection) For high-pressure gas manufacturing, storage or sales facilities that underwent completion inspection before this Rule entered into force (excluding those for which the first periodic inspection period had not yet arrived when the Rule entered into force), the self-inspection period shall be calculated by deeming the date of the most recently issued certificate of periodic inspection to be the date of issuance of the certificate of completion inspection under the latter part of Article 21(1). Article 6 (Transitional Measures Concerning the Qualifications of Safety Inspectors)  Persons who received special training for filling personnel and supply personnel under the previous regulations prior to the enforcement of this Rule shall be deemed to possess the qualifications of a safety inspector pursuant to Item 1 of Annex 14 and Item 1 of Annex 8 of the Enforcement Rule of the Act on Safety and Business Management of Liquefied Petroleum Gas. Article 7 (Transitional Measures Concerning Forms)  Forms under the former regulations in effect at the time of the enforcement of this Rule may be used together with the forms under this Rule for three months from the date of enforcement of this Rule. In this case, any provisions of the Act, Decree, or Rule cited in the forms under the former regulations shall be deemed to be cited in the forms under this Rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 75, Jan. 10, 1998> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 53, Paragraph 2, Subparagraph 1, Item 1, Subparagraph (b) of Annex 24, Note 5, and Annex 33 shall enter into force on April 1, 1998; the amended provisions of Item 2, Subparagraphs (t) and (ge) of Annex 10, Item 2, Subparagraph (b) (d) of Annex 26, and Item 1, Subparagraph (e) of Annex 30 shall enter into force on June 1, 1998; and the amended provisions of Item 2, Subparagraph (t) of Annex 4, Item 3, Subparagraph (a) of Annex 4, Item 1, Subparagraph (e) of Annex 5, and Item 1, Subparagraph (f) of Annex 7 shall enter into force on October 1, 1998. Article 2 (Transitional Measures Concerning Insured Persons)  Notwithstanding the amended provisions of Article 53, Paragraph 2, Subparagraph 1 and Annex 33, the former provisions shall apply to the insured amount of persons who have subscribed to insurance pursuant to the provisions of Article 25 of the Act at the time of the enforcement of this Rule. Article 3 (Transitional Measures Concerning Facility Standards, etc.)  High-pressure gas manufacturing facilities, storage facilities, sales facilities, import registration facilities, or specific high-pressure gas usage facilities installed by high-pressure gas manufacturers, installers of high-pressure gas storage facilities, sellers, registered importers, or specific high-pressure gas users who obtained permission, registered, or reported under the previous regulations at the time of the enforcement of this Rule, and which have become non-compliant with the facility and technical standards under this Rule, shall be made compliant with this Rule within six months from the date of enforcement of this Rule. However, among general high-pressure gas manufacturing facilities installed before the enforcement of this Rule, piping installed outside the business premises shall be deemed to comply with the standards of Item (c) of Subparagraph 1 of Annex 5. Article 4 (Transitional Measures Concerning Seismic Design)  Notwithstanding the amended provisions of Annex 4, Item 2, Subparagraph (t), Annex 4, Item 3, Subparagraph (a)(3), Annex 5, Item 1, Subparagraph (e)(2), and Annex 7, Item 1, Subparagraph (f), facilities for manufacturing, storage, sales, import registration, or specific high-pressure gas use installed at the time of enforcement of this Rule shall be deemed to comply with the standards for seismic design. Article 5 (Transitional Measures Concerning Safety Management Regulations)  Safety management regulations submitted by business operators, etc. to the licensing authority or registration authority pursuant to the previous regulations at the time of the enforcement of this Rule shall be deemed to comply with the standards of Annex 15. Article 6 (Transitional Measures Concerning the Marking of Passing Inspection)  Among containers that passed manufacturing, repair, or import inspections under the former regulations at the time of the enforcement of this Rule, the marking of soldered or bonded containers may be carried out in accordance with the former regulations for three months from the date of enforcement of this Rule, notwithstanding the amended provisions of Item 1, Subparagraph (a)(2) of Annex 25. Article 7 (Transitional Measures Concerning Vehicles Dedicated to Transporting High-Pressure Gas)  Notwithstanding the amended provisions of Item 1, Subparagraph (e) of Annex 30, regarding high-pressure gas transport vehicles of high-pressure gas manufacturers, installers of high-pressure gas storage facilities, sellers of high-pressure gas, and registered importers of high-pressure gas who obtained a permit, registered, or reported under the former regulations at the time of the enforcement of this rule, the former regulations shall apply until July 1, 1999. Article 8 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with the forms under this regulation for six months from the date of enforcement of this rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 34, Mar. 12, 1999> ① (Enforcement Date) This rule shall take effect on April 1, 1999. ② (Transitional measures concerning insured persons) Notwithstanding the amended provisions of Article 53, Paragraph 2 and Annex 33, the former provisions shall apply to the insurance amount of persons who have subscribed to insurance pursuant to the provisions of Article 25 of the Act at the time of the enforcement of this Rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 73, July 1, 1999> ① (Enforcement Date) This rule shall take effect on the date of its promulgation. ② (Transitional measures concerning safety management regulations) Any person who, prior to the enforcement of this rule, prepared and submitted safety management regulations to the licensing authority in accordance with the provisions of the former Annex 15, shall, within six months from the enforcement date of this rule, amend them to conform to the revised provisions of Annex 15 and submit them to the licensing authority together with a written opinion of the Korea Gas Safety Corporation. ③ (Transitional measures regarding forms) Forms used under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule until October 31, 1999. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 138, July 12, 2001> ① (Enforcement Date) This rule shall enter into force on the date of its promulgation. However, the amended provisions of Item 3, Subparagraph (h) of Annex 4 and Item 3, Subparagraph (b) of Annex 19 shall enter into force on January 1, 2002. ② (Transitional measures concerning cylinder cabinets for specific high-pressure gases) Any person who manufactures cylinder cabinets for specific high-pressure gases that are newly included in specific facilities pursuant to the amended provisions of Article 2, Paragraph 4, Subparagraph 7 at the time of enforcement of this rule shall register the manufacture of specific facilities pursuant to the provisions of Article 5, Paragraph 1 of the Act within six months after the enforcement of this rule. ③ (Transitional measures concerning leak testing of existing piping) Notwithstanding the amended provisions of Subparagraph H of Item 3 of Annex 4, leak testing for piping already installed at the time of enforcement of this rule shall be carried out at the times specified in each of the following subparagraphs. 1. For piping installed prior to December 31, 1983, the regular maintenance period shall be during 2002. However, if regular maintenance is not performed in the relevant year, the regular maintenance period shall be the following year. 2. For piping installed during the period from January 1, 1984 to December 31, 1988, the regular maintenance period shall be in 2003. However, if regular maintenance is not performed in the relevant year, the regular maintenance period shall be the previous year or the next year. ④ (Transitional measures concerning safety management regulations) Among manufacturers of high-pressure gas and manufacturers of containers, etc., those who intend to repair containers, etc. shall change the safety management regulations to conform to the amended regulations of Annex 15 and submit them to the licensing authority or registration authority within 6 months from the effective date of this rule. ⑤ (Transitional measures regarding forms) Forms under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule for six months from the date of enforcement of this rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 181, Sep. 26, 2002> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Subparagraph 1, Item (b) and Subparagraph 2 of Annex 6-2 shall enter into force on November 1, 2002; the amended provisions of Subparagraph 1, Item (c) of Annex 6-2 shall enter into force on April 1, 2004; and the amended provisions of Subparagraphs 1, 2, and 4 of Annex 31 shall enter into force on January 1, 2003. <Amended June 30, 2003> Article 2 (Special Provisions for Charging Mobile Charging Vehicles)  Notwithstanding the amended provisions of the main text of Item 1, Subparagraph (a) of Annex 6-2, business operators of fixed-type vehicle charging stations licensed under the previous regulations at the time of the enforcement of this Rule may charge mobile charging vehicles until June 30, 2006. <Amended June 25, 2004> Article 3 (Transitional Measures Concerning the Implementation of Detailed Safety Inspections)  Facilities that are required to undergo detailed safety inspections pursuant to the amended provisions of Article 33 and are already installed at the time of enforcement of this Rule shall undergo detailed safety inspections during the periodic maintenance periods specified in each of the following subparagraphs, notwithstanding the amended provisions of Article 34, Paragraph 2. 1. For facilities installed prior to December 31, 1975, the regular maintenance period shall be during 2003. However, if regular maintenance is not performed in the relevant year, the regular maintenance period shall be the following year. 2. For facilities installed from January 1, 1976 to December 31, 1980, the periodic maintenance period shall be during the year 2004. However, if no periodic maintenance is performed in the relevant year, the periodic maintenance period shall be the previous year or the next year. 3. For facilities installed from January 1, 1981 to December 31, 1987, the periodic maintenance period shall be during 2005. However, if no periodic maintenance is performed in the relevant year, the periodic maintenance period shall be the previous year or the next year. Article 4 (Transitional Measures Concerning Fixed Vehicle Charging Stations)  Fixed vehicle charging stations installed under the previous regulations at the time of the enforcement of this Rule shall be deemed to have been installed under the amended regulations of Annex 6-2. However, charging stations that do not comply with the amended regulations of Annex 6-2, Item 1, Subparagraph (a) [excluding (18)(a)] shall be made compliant with the amended regulations by February 28, 2003. Article 5 (Transitional measures concerning mobile charging vehicles)  Mobile charging vehicles that were inspected in accordance with the provisions of Article 43 prior to the enforcement of this rule shall be deemed to comply with the amended provisions of Item 1, item 1(c)(3) of Annex 6-2. Article 6 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of the enforcement of this Rule may be used together with the forms under this Rule until February 28, 2003. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 206, June 30, 2003> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 224, Mar. 8, 2004> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 230, Apr. 20, 2004> (Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through  11 omitted Article 12 (Amendment of Other Laws)  ① The Enforcement Rules of the High-Pressure Gas Safety Management Act shall be amended as follows: In Article 10, Paragraph 1, Subparagraph 3 and Article 59-2, “Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Act on Safety Management and Business of Liquefied Petroleum Gas”. In the proviso to subparagraph (t) of Item 3 of Annex 30, “Enforcement Rules of the Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas”. In Notes No. 5 and No. 6 of Table No. 4 of Annex 31, “Enforcement Rules of the Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas”. In the inspection classification column of Table No. 2 of Annex 36, “Liquefied Petroleum Gas Safety and Business Management Act” shall be changed to “Liquefied Petroleum Gas Safety Management and Business Act”. In the declarant section of Form No. 19, “Act on Safety and Business Management of Liquefied Petroleum Gas” shall be changed to “Act on Safety Management and Business of Liquefied Petroleum Gas”. ② to ⑥ omitted Article 13  Omitted ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 238, June 25, 2004> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 254, Feb. 2, 2005> (Partial Amendment to the Enforcement Rules of the Act on Measurement, etc. for the Processing of Electronic Civil Petitions) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 281, June 4, 2005> (Enforcement Rule of the Petroleum and Petroleum Substitute Fuels Business Act) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through  5 omitted Article 6 (Amendment of Other Laws)  ① The Enforcement Rules of the High-Pressure Gas Safety Management Act are partially amended as follows: In the proviso of the part other than each subparagraph of Article 15-2, Paragraph 1, “Article 2, Subparagraph 8 of the Petroleum Business Act” shall be changed to “Article 2, Subparagraph 7 of the Petroleum and Petroleum Substitute Fuels Business Act”. ② and ③ omitted Article 7  omitted ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 322, Feb. 6, 2006> Article 1 (Enforcement Date)  This rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 2, Paragraph 4, Subparagraphs 8 and 9; Article 20, Paragraph 4; Article 46, Paragraph 1, Subparagraph 6; Article 53, Paragraph 2, Subparagraph 1; Annex 12, Subparagraph 1, Items f and g; Annex 12, Subparagraph 2, Item d (3); Annex 28, Subparagraph 3; and Annex 29, Subparagraph 21 shall enter into force on April 27, 2006, and the amended provisions of Annex 10, Subparagraph 2, Items g and m; and Annex 26, Subparagraph 2, Item c shall enter into force on November 27, 2006. Article 2 (Transitional Measures Concerning Manufacturers of Specific Facilities) Any person who  is manufacturing a slow-charging compressed natural gas (CNG) filling facility for automobiles or a container residual gas recovery device for liquefied petroleum gas that was newly added to the specific facilities pursuant to the amended provisions of Article 2, Paragraph 4, Subparagraph 8 or 9 at the time of enforcement of this Rule shall register pursuant to Article 5 of the Act by April 27, 2007, and, after receiving a completion inspection pursuant to Article 16, Paragraph 3 of the Act, report the commencement of business pursuant to Article 7 of the Act. Article 3 (Transitional Measures Concerning Reporting of Use of Specific High-Pressure Gas)  ① Any person who is required to make a new report on the use of specific high-pressure gas pursuant to the amended provisions of Article 46, Paragraph 1, Subparagraph 4 at the time of enforcement of this Rule shall make a report pursuant to the provisions of Article 20, Paragraph 1 of the Act by November 27, 2006, and undergo a completion inspection pursuant to the provisions of Article 20, Paragraph 4 of the Act. ② Any person who is required to make a new report on the use of specific high-pressure gas pursuant to the amended provisions of Article 46, Paragraph 1, Subparagraph 6 at the time of enforcement of this rule shall make a report pursuant to the provisions of Article 20, Paragraph 1 of the Act by November 27, 2006, and undergo a completion inspection pursuant to the provisions of Article 20, Paragraph 4 of the Act. Article 4 (Transitional Measures Concerning Insured Persons)  Notwithstanding the amended provisions of Article 53, Paragraph 2, Subparagraph 1, the former provisions shall apply to the insured amount of persons who have subscribed to insurance pursuant to the provisions of Article 25 of the Act at the time of the enforcement of this Rule. Article 5 (Transitional Measures Concerning Manufacturers and Storage Operators of High-Pressure Gas) Manufacturers or storage operators of high-pressure gas who,  at the time of the enforcement of this Rule, do not meet the standards pursuant to the amended provisions of Annex 4 Item 5, Annex 5 Item 1 Subparagraph (ha), Annex 6-2 Item 1 Subparagraph (a)(1)(a),(b),(d), Subparagraph (2)(4), Subparagraph (5)(b), Subparagraph (7), Subparagraph (8), Subparagraph (9)(a), Subparagraph (10), Subparagraph (12)(a)·(e), Subparagraph (14)(a), Subparagraph (15)(ta)·(pa), Subparagraph (17)(d)·(e), Subparagraph (19)(c)·(d), Subparagraph (24)(e), Subparagraph (26) through (30), Item 2 Subparagraph (j) of the same Table, Annex 7 Item 1 Subparagraph (g), Annex 8 Item 1 Subparagraph (c), and Item 2 of the same Table, must meet the amended standards within six months after the enforcement of this Rule. However, for safety valves installed before the enforcement of this rule, the previous regulations shall apply notwithstanding the amended regulations of Annex 5 Item 1, Subparagraph (a) (3), Annex 5 Item 2, Subparagraph (k) (4), Annex 7 Item 2, Subparagraph (b), Annex 8 Item 1, Subparagraph (c), and Annex 8 Item 2. Article 6 (Transitional measures concerning fixed vehicle charging stations)  Fixed vehicle charging stations installed under the previous regulations at the time of enforcement of this rule shall be deemed to meet the standards under the revised regulations of Item 1, Subparagraph (a) of Annex 6-2 (30). Article 7 (Transitional Measures Concerning High-Pressure Gas Sales Business Operators and High-Pressure Gas Sales Outlets)  ① Any high-pressure gas sales business operator who, at the time of the enforcement of this Rule, fails to meet the standards under the amended provisions of Item 1, Subparagraph (f) of Annex 9 shall meet the standards under the said amended provisions within six months after the enforcement of this Rule. However, regarding safety valves installed prior to the enforcement of this Rule, the former provisions shall apply notwithstanding the amended provisions of Item 1, Subparagraph (g) and Item 2, Subparagraph (d) of Annex 9. ② High-pressure gas sales outlets established under the previous regulations at the time of enforcement of this rule shall be deemed to meet the standards under the revised regulations of item 1(a)(4) of Annex 9, Subparagraphs (d) through (f). Article 8 (Transitional Measures Concerning Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule for three months from the date of enforcement of this rule. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 366, Oct. 2, 2006> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 369, Oct. 4, 2006> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for the Joint Use of Administrative Information and Document Reduction) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 393, Apr. 3, 2007> This rule shall take effect on April 4, 2007. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 415, Sep. 6, 2007> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 423, Sep. 21, 2007> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for the Joint Use of Administrative Information and Document Reduction) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 1, Mar. 3, 2008> (Enforcement Rule of the Organizational Structure of the Ministry of Knowledge Economy and Its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Articles 2 through 4  omitted Article 5 (Amendment of Other Laws)  ① Omitted ② The Enforcement Rules of the High Pressure Gas Safety Management Act are partially amended as follows. Article 2, Paragraph 1, Subparagraphs 22 and 28; Article 2, Paragraph 4, Subparagraph 6; Article 3, Subparagraph 5; Article 6, Paragraphs 1 and 2; Article 9-2, Paragraph 1, Subparagraph 8 and Paragraph 3; Article 18, Paragraph 3; Article 20, Paragraphs 1 and 4; Article 28, Paragraph 4; Article 30, Paragraph 5; Article 35, Paragraph 2; Article 37, Paragraph 4, Subparagraph 2; Article 37-2, Paragraph 3; Article 38, Subparagraph 4; Article 39-2, Paragraph 3; Article 43, Paragraph 3; Article 48, Paragraph 6; Article 56, Paragraph 2, Subparagraphs 1 and 5 and Paragraph 3; Article 62; Article 63; Annex 4, Subparagraph 2, Item (e) (2) and Item (t); Annex 4, Subparagraph 3, Item (a) (1), (3), (4) and Item (c) (2)(d)① and (5)(b), remarks in the table and sub-item (2), Appendix 5 No. 1 sub-items (b)(1), (e)(2), (f), (i)(3), (p), (k)(2)(4) and (k)(3), Appendix 6 No. 1 sub-item (a)(2)(a), (6), (15), sub-item (b)(2)(a), and sub-item (c) and Appendix 2 No. 2 sub-items (j)(2) and (seo)(3), Appendix 6-2 No. 1 sub-item (a)(1)(b), (4), (9)(b), (10), (12)(c), (20), (21), (22), sub-item (c)(1)(b), (14)(b) and Appendix 2 No. 2 sub-item (s), Appendix 6-3 No. 1 sub-item (b)(1) and Appendix 2 No. 2 sub-item (m), Appendix 7 No. 1 sub-item (c)(8), (9), (10), and sub-item (f) and Appendix 9 Item 1 (f); Annex 9-2 Item 1 (d) and Item 2 (j); Annex 10 Item 2 (g), (r), (m), (f), and (s); Annex 12 Item 2 (d) (1), (2), and (3); Annex 14 Item 3; Annex 19 Item 1 (b), Item 3 (a) (4), and (b) (d); Annex 21 Note column of Table 1 and Item 2; Annex 22 Table 1 and Items 2 and 5 in the Note column and Item 2 (h) of the same table; Annex 26 Item 1 (a), (b) (4) (d), (6), and (7) and Item 2 (a) (6), (c), (d), and (e) of the same table and Item 3 (d), (j), and (f); Annex 27 Items 1 and 2; Annex 28 Item 1 (e) (3), (g), and (h) In addition, in Nos. 2, 3, 4, and 5 of the same table, No. 21 of Annex 29, Item 1 (e) and Item 3 (c) of Annex 30, No. 4 of Annex 31, and No. 3 of Annex 36, “Minister of Commerce, Industry and Energy” shall be changed to “Minister of Knowledge Economy”. In Article 2, Paragraphs 2, 3, and 4; Article 3-2; Article 8, Paragraphs 2 and 3; Article 9-2, Paragraphs 1, 2, and 3; Article 10-2; Article 29; Article 33; Article 34; Article 37, Paragraph 4; Article 37-2, Paragraph 1; Article 53, Paragraph 1; Article 54, Paragraph 2; Article 56-2; Article 59-2; and Article 60, “Ordinance of the Ministry of Commerce, Industry and Energy” shall be replaced with “Ordinance of the Ministry of Knowledge Economy.” ③ through <64> omitted ADDENDA <Ministry of Commerce, Industry and Energy Decree No. 9, Apr. 17, 2008> (Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Articles 2 through 6  omitted Article 7 (Amendment of Other Laws)  Part of the Enforcement Rules of the High Pressure Gas Safety Management Act is amended as follows: In Article 10, Paragraph 2, “pursuant to the provisions of Article 54, Paragraph 1 and Annex 19, Item 4, Subparagraph (3) or (4) of the Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas” shall be changed to “pursuant to Article 51, Paragraph 1 and Annex 22, Item 4, Subparagraph (3) or 4) of the Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas”. Article 8  Omitted ADDENDA <Ministry of Knowledge Economy Decree No. 16, July 1, 2008> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 18, July 16, 2008> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 2, Paragraph 4, Subparagraph 6; Article 8, Paragraph 1; Article 9; Article 9-2, Paragraph 3; Article 28, Paragraphs 3 and 4; Article 28-2, Paragraph 2, Subparagraph 2 (b); Article 30, Paragraphs 2, 3 and 5; Article 31, Paragraph 3; Article 33, Subparagraph 1; Article 35, Paragraph 3; Article 38, Subparagraph 4; Article 40, Paragraph 2; Article 43, Paragraphs 1 and 3; Article 44; Article 47; Article 48, Paragraph 5; Annex 4; Annex 5; Annex 7; Annex 9; Annex 9-2; Annex 10; Annex 10-2; Annex 11; Annex 12; Annex 13, Subparagraph 2; Annex 19; and Annex 30 shall enter into force on January 1, 2009. Article 2 (Transitional Measures Concerning Standards for Administrative Dispositions)  Administrative dispositions for violations under Article 15-3 prior to the enforcement of this Rule shall be governed by the former provisions. Article 3 (Transitional Measures Concerning Facility Standards)  Facilities for high-pressure gas manufacturing (specific manufacturing, general manufacturing, filling of containers and tanks fixed to vehicles), facilities for high-pressure gas vehicle filling (including filling of mobile compressed natural gas filling vehicles), facilities for high-pressure gas refrigeration manufacturing, facilities for high-pressure gas storage and use, facilities of high-pressure gas sales and importers, facilities of high-pressure gas transport vehicles, facilities for container manufacturing, facilities for container accessory manufacturing, facilities for refrigeration equipment manufacturing, and facilities for specific equipment manufacturing that were installed in accordance with the previous facility standards shall be deemed to have been installed in accordance with the amended provisions of Annex 4, Annex 5, Annex 7, Annex 8, Annex 9, Annex 9-2, Annex 10, Annex 10-2, Annex 11, and Annex 12. Article 4 (Transitional Measures for Persons Subject to Education)  Drivers of vehicles using high-pressure gas and operators of high-pressure gas vehicle charging facilities who are newly required to receive special education pursuant to the amended provisions of Annex 31 must receive the relevant education by June 30, 2009. Article 5 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Knowledge Economy Decree No. 49, Dec. 31, 2008> Article 1 (Enforcement Date)  This Rule shall enter into force on January 1, 2009. However, the amended provisions of Annex 25 shall enter into force on July 1, 2009. Article 2 (Transitional measures concerning engraving or marking on compliant containers, etc.)  Engraving or marking on compliant containers, etc. pursuant to the former Annex 25 may be used together with engraving or marking on compliant containers, etc. pursuant to the amended provisions of Annex 25 until June 30, 2011. ADDENDA <Ministry of Knowledge Economy Decree No. 93, Sep. 10, 2009> (Partial Amendment to the Enforcement Rules of the Act on Promotion of Industrial Agglomeration and Factory Establishment, etc. for the Application of the Sunset Clause on Regulations) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 101, Nov. 20, 2009> Article 1 (Enforcement Date)  This Rule shall enter into force on November 22, 2009. However, the amended provisions of No. 1 and No. 6 of the remarks column of Item 1, Subparagraph (b) 1) of Annex 24 shall enter into force on July 1, 2010. Article 2 (Special provisions regarding design stage inspection)  Containers, etc. that have been certified pursuant to Article 15 of the Industrial Standardization Act at the time of the enforcement of this Rule and do not fall under Article 38, Paragraph 3, must undergo the relevant design stage inspection by June 30, 2010. Article 3 (Special Provisions Concerning Professional Training)  Notwithstanding the amended provisions of Subparagraph 4, Item (a) of Annex 31, persons who, at the time of the enforcement of this Rule, have received regular training or professional training once upon new employment in accordance with the previous regulations shall receive professional training in accordance with the classifications in each of the following subparagraphs. 1. Persons who received regular or specialized training before December 31, 2003: From January 1, 2010 to December 31, 2010 2. Persons who received professional training between January 1, 2004, and December 31, 2006: From January 1, 2011, to December 31, 2011 3. Persons who received professional training between January 1, 2007, and December 31, 2009: From January 1, 2012, to December 31, 2012 Article 4 (Special provisions regarding special training for maintenance personnel of high-pressure gas vehicles)  Maintenance personnel of high-pressure gas vehicles who are required to receive special training pursuant to the amended provisions of Subparagraph 4, Item (b) of Annex 31 must receive the relevant training by June 31, 2010. Article 5 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for six months from the date of enforcement of this Rule. ADDENDA <Ministry of Knowledge Economy Decree No. 129, May 31, 2010> Article 1 (Enforcement Date)  This rule shall enter into force on May 31, 2010. Article 2 (Applicability to Re-inspection of Welded Vessels for Liquefied Petroleum Gas)  The amended provisions of Item 1 of Annex 22 shall apply to welded vessels for liquefied petroleum gas for which the re-inspection period under the previous provisions has not expired at the time of the enforcement of this Rule, starting with the vessels that undergo the first re-inspection after the enforcement of this Rule. However, for welded vessels for liquefied petroleum gas that are 20 years old since manufacture, the provisions shall apply after they have undergone re-inspection under the previous provisions. Article 3 (Special Provisions on the Disposal of Welded Containers for Liquefied Petroleum Gas)  Welded containers for liquefied petroleum gas that were already manufactured at the time of the enforcement of this Rule (only those with a capacity of 45L or more and less than 125L) and fall under any of the following subparagraphs may be used without disposal until the period specified in each of the following subparagraphs, notwithstanding the amended provisions of Note 7 of Subparagraph 1 of Annex 22. 1. Containers at least 28 years old: By May 31, 2011 2. Containers at least 27 years old: By May 31, 2012 3. Containers at least 26 years old: By May 31, 2013 ADDENDA <Ministry of Knowledge Economy Decree No. 374, June 30, 2010> (Enforcement Rule of the Noise and Vibration Control Act) Article 1 (Enforcement Date)  This Rule shall enter into force on July 1, 2010. <Proviso Omitted> Articles 2 and 3  omitted Article 4 (Amendment of Other Acts)  ① through ③ Omitted ④ Part of the Enforcement Rules of the High Pressure Gas Safety Management Act is amended as follows. In Appendix 8, Item 4, Subparagraph (a) 2), “Noise and Vibration Regulation Act” shall be changed to “Noise and Vibration Management Act”. ⑤ through ㉑ omitted Article 5  omitted ADDENDA <Ministry of Knowledge Economy Decree No. 151, Oct. 13, 2010> Article 1 (Enforcement Date)  This Rule shall enter into force on October 13, 2010. However, the amended provisions of Annex 5 and Annex 10, Subparagraph 3, Item (b) 1) shall enter into force on July 1, 2011. Article 2 (Transitional Measures Concerning Facility Standards for High-Pressure Gas Manufacturing)  High-pressure gas specific manufacturing facilities installed by high-pressure gas manufacturers who received a permit under the previous regulations at the time of the enforcement of this rule and which have become non-compliant with the amended regulations of Item 1, Subparagraph (a), Subparagraph (4)(d) of Annex 4 shall be made compliant with the amended regulations by April 13, 2011. Article 3 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule until April 13, 2011. ADDENDA <Ministry of Knowledge Economy Decree No. 169, Jan. 28, 2011> (Enforcement Rule of the Engineering Industry Promotion Act) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Article 2  omitted Article 3 (Amendment of Other Laws)  ① The Enforcement Rules of the High Pressure Gas Safety Management Act are partially amended as follows: In the inspection equipment column for the re-inspection of specific facilities (excluding pressure vessels) under Item 1 of Annex 36, “engineering activity entity reported to the Ministry of Science and Technology pursuant to the Engineering Technology Promotion Act” shall be changed to “engineering business operator reported pursuant to the Engineering Industry Promotion Act.” ② through ④ omitted Article 4  omitted ADDENDA <Ministry of Knowledge Economy Decree No. 185, Apr. 4, 2011> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 24 shall enter into force on January 1, 2012. Article 2 (Transitional measures concerning the marking of liquefied petroleum gas containers)  Liquefied petroleum gas containers in accordance with the former Annex 24 may be used together with liquefied petroleum gas containers marked in accordance with the amended provisions of Annex 24 until the first re-inspection period that arrives in accordance with Article 39 and Annex 22 after the enforcement of this rule. ADDENDA <Ministry of Knowledge Economy Decree No. 207, Oct. 19, 2011> (Partial Amendment to the Enforcement Rules of the Special Act on the Designation and Operation of Free Economic Zones, etc., for the Comprehensive Revision of Legal Basis for the Processing of Personal Information, Including Resident Registration Numbers) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning the Revision of Forms)  Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used. ADDENDA <Ministry of Knowledge Economy Decree No. 213, Nov. 25, 2011> Article 1 (Enforcement Date)  This Rule shall enter into force on November 25, 2011. However, the amended provisions of Item 1 of Annex 22 shall enter into force on May 25, 2012. Article 2 (Transitional Measures Concerning Manufacturers of Automatic Gas Injectors for Compressed Natural Gas Vehicles)  Any person who is manufacturing automatic gas injectors for compressed natural gas vehicles in accordance with the previous regulations at the time of enforcement of this rule shall undergo a design stage inspection in accordance with the amended regulations of Subparagraph 3, Item (b) 3) of Annex 12 by May 25, 2012. Article 3 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with forms under the revised regulations until May 25, 2012. ADDENDA <Ministry of Knowledge Economy Decree No. 254, June 12, 2012> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Knowledge Economy Decree No. 271, Oct. 5, 2012> (Partial Amendment to the Enforcement Rules of the Act on Weights and Measures, etc. for the Improvement of Legal Forms) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning the Revision of Forms)  Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that the parts revised pursuant to this Rule are modified and used. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 1, Mar. 23, 2013> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Energy and its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. <Proviso Omitted> Articles 2 through 6  omitted Article 7 (Amendment of Other Laws)  ① and ② Omitted ③ The Enforcement Rules of the High Pressure Gas Safety Management Act are partially amended as follows. In Article 2, Paragraph 1, Subparagraph 28; Article 3, Subparagraph 5; Article 5, Paragraph 3; Article 6, Paragraph 1 (excluding the subparagraphs) and Paragraph 2 of the same article; Article 9-2, Paragraph 1, Subparagraphs 5 and 9; Article 18, Paragraph 3; Article 20, Paragraphs 1 and 4; Article 25, Paragraph 2; Article 35, Paragraph 2; the proviso to Article 37, Paragraph 4, Subparagraph 2(a); Article 38, Paragraph 1; Article 38, Paragraph 4, Subparagraph 4; Article 39-2, Paragraph 3; Article 44-2, Paragraphs 2, 3, and 5; Article 56, Paragraph 2, Subparagraphs 1 and 4; Article 56, Paragraph 3; Article 58, Paragraph 6; Article 62 (excluding the subparagraphs); Article 63; and Article 64, Paragraphs 2 through 4, the term “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In the part other than the subparagraphs of Article 2, Paragraph 2; Paragraph 3 of the same article; the part other than the subparagraphs of Paragraph 4 of the same article; Paragraphs 2 and 3 of Article 8; the part other than the subparagraphs of Article 9-2, Paragraph 1; Paragraphs 2 and 3 of the same article; Article 10-2; Article 10-3; Article 24; Article 29; the part other than the subparagraphs of Article 33; Article 34, Paragraph 1; the part other than the subparagraphs of Article 37, Paragraph 4; Article 38, Paragraph 1; the part other than the subparagraphs of Article 49, Paragraph 3; Article 53, Paragraph 1; Article 54, Paragraph 2; the part other than the subparagraphs of Article 56-2; Article 58-3; Article 59-2; and the part other than the subparagraphs of Article 60, the term “Ordinance of the Ministry of Knowledge Economy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Energy”. In the inspection-items column for periodic inspections under Annex 4, item 1(c)(1)(c), and the notes under item 1(e)(1) of the same Annex, replace “Minister of Knowledge Economy” with “Minister of Trade, Industry and Energy” in each instance. In Item 3 of Annex 5, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In the proviso to Item 7)b) of Subparagraph 1a of Annex 9, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraphs 1(d) and 2(d) of Annex 9-2, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraphs (a) through (c) of subparagraph 4 of Annex 10, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraphs (a) through (c) of subparagraph 4 of Annex 10-2, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Annex 11, Item 4 (a), Item 4 (b) 5), and Item 4 (c), “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraphs (a), (b), and (d) of subparagraph 4 of Annex 12, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Item 3 of Annex 15, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In subparagraph (d) of Item 1 of Annex 19, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Annex 22, Item 1, the column for the elapsed years after the new inspection of composite material containers for liquefied petroleum gas, the column for the remarks in the same item, Item 2(h)(4) and Item 2, Subparagraph (k) of the same table, the term “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Item 3 of Annex 36, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Form No. 4, Form No. 5, the front of Form No. 7-2, Form No. 14, Form No. 17, Form No. 20, Form No. 21, Form No. 21-2, Form No. 24, the front of Form No. 25, Form No. 26, the back of Form No. 27, Form No. 35, Form No. 38, and Form No. 42, “Minister of Knowledge Economy” shall be changed to “Minister of Trade, Industry and Energy”. In Forms No. 4 and No. 5, “Ministry of Knowledge Economy” shall be changed to “Ministry of Trade, Industry and Energy”. ④ through <63> omitted ADDENDA <Ministry of Trade, Industry and Energy Decree No. 30, Oct. 23, 2013> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Special Provisions Concerning the Disposal of Welded Containers for Liquefied Petroleum Gas)  ① Notwithstanding the amended provisions of Note 7 of Table 1 of Annex 22, welded containers for liquefied petroleum gas falling under any of the following subparagraphs may be used without disposal until the date specified in each of the following subparagraphs. 1. Welded vessels for liquefied petroleum gas manufactured from October 1, 1987, to December 31, 1987: April 30, 2015 2. Welded vessels for liquefied petroleum gas manufactured from January 1, 1988, to June 30, 1988: April 30, 2016 3. Welded vessels for liquefied petroleum gas manufactured from July 1, 1988, to December 31, 1988: April 30, 2017 ② Welded vessels for liquefied petroleum gas under each subparagraph of Paragraph 1 may be used only if they have passed the re-inspection pursuant to the main text of Article 17, Paragraph 2 of the Act before 26 years have elapsed since their manufacture. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 48, Feb. 4, 2014> (Partial Amendment to the Enforcement Rules of the Act on Measurement, etc. for the Provision of Review Periods Pursuant to the Amendment of the Framework Act on Administrative Regulations) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 80, Aug. 13, 2014> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. Amended provisions of Annex 4, Subparagraphs 2 and 3; Annex 8, Subparagraph 1, Item (a) 1); and Annex 31, Subparagraph 4, Item (a): January 1, 2015 2. The amended provisions of Annex 9-2, items 1(a) and 2(a), and Annex 30, item 1 (excluding the amendment of item 1(b)(5) of Annex 30): January 22, 2015 Article 2 (Applicability to Standards, etc. for High-Pressure Gas Manufacturing and Storage Facilities)  ① The amended provisions of Item 2, Subparagraph (a) 1) of Annex 4, Item 3, Subparagraph (a) of the same table, and Item 1, Subparagraph (a) 1)c) of Annex 8 shall apply to high-pressure gas manufacturing and storage facilities that obtain permission for or report the installation of high-pressure gas manufacturing or storage facilities after the effective date pursuant to Article 1, Subparagraph 1 of the Addenda. ② The amended provisions of Item 2, Subparagraph (a) 1) of Annex 4, Item 3, Subparagraph (a) of the same table, and Item 1, Subparagraph (a) 1)c) of Annex 8 shall also apply to high-pressure gas manufacturing and storage facilities for which permission for the installation of high-pressure gas manufacturing or storage was obtained or reported prior to the effective date pursuant to Article 1, Subparagraph 1 of the Addenda, in cases where replacement or modification is made after the said effective date (only applicable in cases where processing capacity or storage capacity has increased). Article 3 (Special Provisions Concerning Vehicles Transporting High-Pressure Gas)  Vehicles that transported high-pressure gas in containers prior to the effective date pursuant to Subparagraph 2 of Article 1 of the Addenda shall be deemed vehicles compliant with the amended provisions of Subparagraph 1(a) and Subparagraph 2(a) of Annex 9-2 and Subparagraph 1 of Annex 30 [excluding the amended provisions of Subparagraph 5) of Subparagraph 1(b) of Annex 30]. However, they must meet the requirements pursuant to the amended provisions of Subparagraph 1(a) and Subparagraph 2(a) of Annex 9-2 and Subparagraph 1 of Annex 30 [excluding the amended provisions of Subparagraph 5) of Subparagraph 1(b) of Annex 30] by April 22, 2015. Article 4 (Special provisions regarding technical standards for container accessories)  If a valve attached to a liquefied petroleum gas container imported or produced prior to the effective date pursuant to the main text of the part other than each subparagraph of Article 1 of the Addenda does not comply with the amended provisions of subparagraph 2, item c of Annex 10-2, it must be made to comply with the amended provisions of subparagraph 2, item c of Annex 10-2 within 30 days from the effective date. Article 5 (Transitional Measures Concerning Specialized Education)  If a person subject to education under the amended provisions of Subparagraph (a) 5) or 6) of Item 4 of Annex 31 has received specialized education in accordance with the previous provisions, such person shall be deemed to have received specialized education in accordance with the amended provisions of Subparagraph (a) 5) or 6) of Item 4 of Annex 31. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 106, Dec. 31, 2014> (Partial Amendment to the Enforcement Rules of the High Pressure Gas Safety Management Act, etc. for Regulatory Reform, Including Setting Regulatory Review Periods) This rule shall take effect on January 1, 2015. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 119, Apr. 9, 2015> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Applicability to the Validity Period of Designation of Specialized Inspection Agencies for Re-inspection of Liquefied Petroleum Gas Containers)  The amended provisions of Article 58-3, Subparagraph 1 shall apply to specialized inspection agencies designated or re-designated after the enforcement of this Rule. Article 3 (Applicability to the Re-inspection Cycle of Pressure Vessels)  The amended provisions of Subparagraph 2 of Annex 22 shall apply from the time the conformity is recognized in accordance with the method prescribed and notified by the Minister of Trade, Industry and Energy after the enforcement of this Rule. Article 4 (Transitional Measures Concerning Design Stage Inspection)  In the case of liquefied petroleum gas containers that received a new inspection in accordance with the previous regulations prior to the enforcement of this rule (limited to containers with a capacity of 30L or more and less than 125L), notwithstanding the amended provisions of Subparagraph 3, Item 1)a)⑤ of Annex 10, a design stage inspection must be received in accordance with the classifications in each of the following subparagraphs. 1. Vessels that underwent design phase inspection on or after January 1, 2009: Until April 30, 2018 2. Containers other than those in Item 1: By April 30, 2017 Article 5 (Transitional Measures Concerning Changes to Administrative Disposition Standards)  Notwithstanding the amended provisions of Subparagraphs (d) and (e) of Item 13-2 of the attached Table, administrative dispositions for violations committed prior to the enforcement of this Rule shall be governed by the former provisions. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 148, July 29, 2015> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. Amended provision of Item 1, Subparagraph (e) of Attached Table 4: January 1, 2016 2. Amended provisions of Article 10-2, subparagraph 2; Article 45; Article 45-2; Article 45-3; Annex 13-2, subparagraph 2; Annex 26; Annex 27; and Forms No. 32-2 through No. 32-4: January 29, 2016 Article 2 (Applicability to Special and Selective Fields of Precision Safety Inspection for Specific High-Pressure Gas Manufacturing Facilities)  The amended provisions of Item 1, Subparagraph (e) 1) of Annex 4 shall apply to unit facilities that submit a precision safety inspection application for the first time after the enforcement of this rule. Article 3 (Special Provisions Concerning Precision Safety Inspections of Refrigeration Manufacturing Facilities)  Notwithstanding the amended provisions of Article 34, Paragraph 2, refrigeration manufacturing facilities subject to precision safety inspections under the following subparagraphs shall undergo precision safety inspections during the periodic maintenance period specified in each of the following subparagraphs. However, if there is no periodic maintenance period in the relevant period, the inspection shall be conducted during the periodic maintenance period of the relevant year, the preceding year, or the following year. 1. Facilities installed prior to December 31, 1989: The period from July 1, 2016 to June 30, 2017 2. Facilities installed from January 1, 1990, to December 31, 1995: Period from July 1, 2017, to June 30, 2018 3. Facilities installed from January 1, 1996 to December 31, 2002: Period from July 1, 2018 to June 30, 2019 Article 4 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with the revised forms under this rule until August 31, 2015. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 157, Sep. 17, 2015> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 185, Feb. 25, 2016> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Forms)  Forms pursuant to the previous regulations at the time of the enforcement of this Rule may be used together with the revised forms pursuant to this Rule for six months following the enforcement of this Rule. In this case, the part where the Resident Registration Number has been revised to the Date of Birth in accordance with the revised provisions of this Rule shall be modified and used. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 194, July 1, 2016> This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 237, Jan. 26, 2017> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 36, Paragraphs 2 and 3 shall enter into force on March 30, 2017, and the amended provisions of Article 10-3 shall enter into force on June 30, 2017. Article 2 (Applicability regarding the timing of submission of the application for inspection of containers)  The amended provisions of Article 36, Paragraph 2 shall apply to cases where containers are to be imported on or after March 30, 2017. Article 3 (Transitional Measures Concerning Administrative Dispositions)  Notwithstanding the amended provisions of item 1(a) through (c) of Annex 13-2, violations committed prior to the enforcement of this Rule shall be governed by the former provisions. Article 4 (Transitional Measures Concerning Marking of Tanks Fixed to Vehicles)  Any person who marked a tank fixed to a vehicle in accordance with the previous regulations prior to the enforcement of this rule shall mark the tank fixed to the vehicle in accordance with the amended regulations of Subparagraph 4, Item (b) of Annex 24 by March 30, 2017. Article 5 (Transitional Measures Regarding Amendment of Forms)  Forms under the previous regulations at the time of enforcement of this rule may be used together with the forms under this rule for three months after enforcement of this rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 250, Mar. 27, 2017> This rule shall take effect on March 30, 2017. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 268, Aug. 24, 2017> This rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 31 shall enter into force on September 1, 2017. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 289, Mar. 13, 2018> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures Concerning Facility Standards for High-Pressure Gas Vehicle Charging)  Hydrogen vehicle charging facilities installed after obtaining a high-pressure gas manufacturing permit prior to the enforcement of this Rule shall be deemed to comply with the placement standards pursuant to the amended provisions of item 1(a)(1)(a) of Annex 5. Article 3 (Transitional Measures Concerning the Marking of Liquefied Petroleum Gas Containers)  ① Liquefied petroleum gas containers manufactured or imported prior to the enforcement of this Rule (including liquefied petroleum gas containers marked in accordance with Paragraph 2) shall be deemed to comply with the marking requirements under the amended provisions of item 1(a)(4) and (8) and item 1(b)(1) of Annex 24. ② Notwithstanding the amended provisions of Item 1, Subparagraph (a) 4) and 8) and item 1(b)(1) of Annex 24, a person who manufactures or imports liquefied petroleum gas containers may mark them in accordance with the previous provisions for six months from the effective date of this rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 327, Feb. 21, 2019> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Transitional Measures concerning Forms)  Forms under the previous regulations at the time of enforcement of this Rule may be used together with the forms under this Rule for three months after enforcement of this Rule. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 334, May 21, 2019> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Subparagraph 2 of Annex 13-2 shall enter into force on June 12, 2019. Article 2 (Applicability to the handling of inspection results of high-pressure gas filled in automobile containers)  The amended provisions of Subparagraph 3, Item (a) 2) of Annex 27 shall also apply to high-pressure gas filled in automobile containers that were already sold or delivered prior to the enforcement of this rule. Article 3 (Transitional Measures Concerning Manufacturers, etc. of Specific Facilities)  ① Any person who, at the time of enforcement of this Rule, has manufactured a cylinder cabinet for high-pressure gas that is newly included in specific facilities pursuant to the amended provisions of Article 2, Paragraph 4, Subparagraph 7, shall, within six months from the date of enforcement of this Rule, register pursuant to Article 5 of the Act, undergo a completion inspection pursuant to Article 16, Paragraph 3 of the Act, and then file a report of commencement of business pursuant to Article 7 of the Act. ② Any person who, at the time of the enforcement of this Rule, has manufactured, repaired, or imported a high-pressure gas cylinder cabinet newly included in specific facilities pursuant to the amended provisions of Article 2, Paragraph 4, Subparagraph 7 (including foreign manufacturers of containers, etc.) shall be deemed to have affixed the marking pursuant to Article 11-2 of the Act and to have received the inspection pursuant to Article 17, Paragraph 1. Article 4 (Transitional Measures Concerning High-Pressure Gas Vehicle Filling Stations)  High-pressure gas vehicle filling stations installed in accordance with the previous regulations at the time of the enforcement of this Rule shall be deemed to meet the standards pursuant to the amended regulations of Item 1, Subparagraph (a), 1)c) of Annex 5. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 353, Oct. 31, 2019> Article 1 (Enforcement Date)  This rule shall enter into force on November 1, 2019. Article 2 (Transitional Measures concerning Facility Standards for High-Pressure Gas Vehicle Charging)  Notwithstanding the amended provisions of Item 1, Subparagraph (a) 10) of Annex 5, facility standards for high-pressure gas vehicle charging that were technically reviewed by the Korea Gas Safety Corporation prior to the enforcement of this Rule shall be governed by the previous provisions. Article 3 (Transitional Measures Concerning Forms)  Forms in accordance with the previous regulations at the time of the enforcement of this Rule shall continue to be used, provided that parts amended pursuant to this Rule are modified and used. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 411, Feb. 26, 2021> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. Amended provisions of Article 2, Paragraph 1, Subparagraph 16, Subparagraph 17, Item (a) and the main text of Item (b), Annex 5, Subparagraph 1, Item (b) 5), and Annex 9-2, Subparagraph 1, Item (c): Six months after the date of promulgation 2. Amended provision of the proviso to Article 2, Paragraph 1, Subparagraph 17, Item (b): February 5, 2022 Article 2 (Transitional Measures Concerning Gas Facilities and High-Pressure Gas Facilities)  Facilities through which hydrogen passes in a state other than high-pressure gas, which are newly included in gas facilities and high-pressure gas facilities pursuant to the amended provisions of Article 2, Paragraph 1, Subparagraphs 16 and 17, and which were permitted or reported under the previous regulations at the time of the enforcement of this Rule, shall be deemed to comply with the facility standards and technical standards under this Rule. Article 3 (Transitional Measures Concerning High-Pressure Gas Transport Vehicles)  Transport vehicles carrying two or more connected seamless containers fixed to a vehicle registered under the previous regulations at the time of the enforcement of this Rule shall be deemed to comply with the facility standards and technical standards pursuant to the amended regulations of Item 1, Subparagraph (c) of Annex 9-2. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 446, Jan. 7, 2022> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. Amended provisions of the proviso to Article 37, Paragraph 2 and Form No. 28: June 8, 2022 2. Amended provisions of Annex 4, Item 1, Subparagraph (a) 7), Annex 4, Item 2, Subparagraph (a) 3), and Annex 10, Item 2, Subparagraph (t): January 1, 2023 Article 2 (Applicability to facility standards for high-pressure gas manufacturing, etc.)  The amended provisions of item 1(a)(7)(b)(5) and item 1(a)(7)(c) of Annex 4 shall apply to facilities that obtain a permit for high-pressure gas manufacturing (including a permit for change due to a change in the location of storage facilities or an increase in storage capacity) or make a report (including a report for change due to a change in the location of storage facilities or an increase in storage capacity) after the effective date pursuant to Subparagraph 2 of Article 1 of the Addenda. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 448, Jan. 21, 2022> (Partial Amendment to 36 Ministry of Trade, Industry and Energy Decrees, including the Enforcement Rule of the High-Pressure Gas Safety Management Act) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 454, Mar. 30, 2022> (Ministry of Trade, Industry and Energy Decree on the Partial Amendment of Seven Acts for the Improvement of Forms to Enhance Public Convenience) This rule shall take effect from the date of its promulgation. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 469, June 2, 2022> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of each of the following subparagraphs shall enter into force on the date specified in each subparagraph. 1. Amended provisions of Article 4, Paragraph 1; Article 28, Paragraph 3, Subparagraph 2, Item (d); Annex 5, Subparagraph 1, Item (a), 1)b) and 10)d); Subparagraph 2, Item (a), 4) through 8) and Subparagraph (c), 1)a) of the same Table: Six months after the date of promulgation 2. Amended provision of Annex 5, item 1(a)10)(e): January 1, 2024 3. Amended provisions of Annex 31: One year after the date of promulgation Article 2 (Applicability to Facility Standards for High-Pressure Gas Vehicle Charging Facilities)  ① The amended provisions of Item 1, Subparagraph (a) of Table 5, Subparagraph 10)d) shall apply even if a technical review is applied for to the Korea Gas Safety Corporation prior to the effective date pursuant to Article 1, Subparagraph 1 of the Addenda and the technical review is in progress at the time of the effective date pursuant to Article 1, Subparagraph 1 of the Addenda. ② The amended provisions of item 1(a)(10)(e) of Annex 5 shall apply to high-pressure gas vehicle charging facilities licensed after the effective date pursuant to Article 1, Subparagraph 2 of the Addenda. ③ The amended provisions of Item 1, Subparagraph (a) 1) b) and Item 2, Subparagraph (a) 4) of Annex 5 shall apply from the time a request for technical review is made to the Korea Gas Safety Corporation after the effective date pursuant to Article 1, Subparagraph 1 of the Addenda. Article 3 (Transitional Measures concerning Facility Standards for High-Pressure Gas Manufacturing, Storage, and Sales Facilities, etc.)  Notwithstanding the amended provisions of Annex 4 Item 1 Subparagraph (a) 10)b) and (c), Annex 5 Item 1 Subparagraph (a) 10)a) and (c), Annex 8 Item 1 Subparagraph (a) 10)a) and (c), Annex 8, item 2(a)(8)(b) and (c), and Annex 9 Item 2 Subparagraph (a) 9)b) and (c), hydrogen products installed in high-pressure gas manufacturing, storage, and sales facilities or specific high-pressure gas usage facilities that were permitted or reported in accordance with the previous regulations at the time of the enforcement of this rule shall be governed by the previous regulations. Article 4 (Transitional Measures Concerning Specialized Education)  Persons who received specialized education pursuant to Item 4, Subparagraph (a) 1) of the former Annex 31 prior to the enforcement of this Rule shall be deemed to have received specialized education pursuant to the amended provisions of Item 4, Subparagraph (a) 7) of Annex 31. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 574, Sep. 11, 2024> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. Article 2 (Special Provisions on Professional Training for Technical Personnel of Inspection Agencies)  Notwithstanding the amended provisions of Subparagraph 4, Item (a) of Annex 31, technical personnel of an inspection agency for whom three years have elapsed since receiving professional training for new employment in accordance with the previous regulations at the time of the enforcement of this Rule shall receive the first training among the professional training conducted every three years by June 30, 2025. ADDENDA <Ministry of Trade, Industry and Energy Decree No. 582, Nov. 14, 2024> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Article 2, Article 8, Article 9-2, Article 23, Article 28, Article 30, Article 31, Article 53 Paragraph 2 Subparagraph 1, Annex 5, Annex 10, Annex 14, Annex 24, Annex 31, Annex 33, Form No. 20, and Form No. 21 shall enter into force six months after the date of promulgation. Article 2 (Transitional Measures concerning Facility Standards, etc. for Hydrogen Fuel Charging Facilities)  Notwithstanding the amended provisions of Annex 5, facility standards, etc. for hydrogen fuel charging facilities for which a technical review was applied for in accordance with the former provisions prior to the enforcement of this Rule and for which the technical review is in progress or has been reviewed by the Korea Gas Safety Corporation at the time of enforcement of this Rule shall be governed by the former provisions. However, if the facility standards, etc. of the relevant charging facility cease to comply with the amended provisions of Annex 5, they must be made compliant with the amended provisions of Annex 5 within two years after the enforcement of this Rule. Article 3 (Transitional Measures Concerning Insurance Amount)  Notwithstanding the amended provisions of Article 53, Paragraph 2, Subparagraph 1 and Annex 33, the insurance amount of a person who took out insurance pursuant to Article 25 of the Act prior to the enforcement of this Rule shall be governed by the former provisions until the expiration of the insurance period. ADDENDA <Ministry of Trade, Industry and Resources Decree No. 1, Oct. 1, 2025> (Enforcement Rule of the Organizational Structure of the Ministry of Trade, Industry and Resources and its Affiliated Agencies) Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, among the Ministerial Ordinances amended pursuant to Article 5 of the Addenda, the parts amending Ministerial Ordinances that were promulgated prior to the enforcement of this Rule but whose effective date has not yet arrived shall enter into force on the effective date of said Ministerial Ordinance. Articles 2 through 4  omitted Article 5 (Amendment of Other Laws)  ① and ② Omitted ③ The Enforcement Rules of the High Pressure Gas Safety Management Act are partially amended as follows. Article 2, Paragraph 1, Subparagraph 28; the part other than the subparagraphs of Paragraph 4 of the same article; Article 3, Subparagraph 5; the main text of Article 5, Paragraph 3; the part other than the subparagraphs of Paragraph 1 of Article 6; Paragraph 2 of the same article; the first part other than the subparagraphs of Paragraph 3 of the same article; Article 9-2, Paragraph 1, Subparagraph 5; Subparagraph 10 of the same paragraph; Article 18, Paragraph 3; the proviso to the part other than the items of Subparagraph 2 of Paragraph 1 of Article 20; Paragraph 4 of the same article; Article 25, Paragraph 2; Article 35, Paragraph 2; the proviso to Article 37, Paragraph 4, Subparagraph 2(a); Article 38, Paragraph 1; Article 38, Paragraph 4, Subparagraph 4; Article 39-2, Paragraph 3; Article 44-2, Paragraphs 2, 3, and 5; the first part other than the subparagraphs of Paragraph 1 of Article 45-3; Paragraphs 3 and 4 of the same article; Article 52-7, Paragraph 2, Subparagraph 4; Article 56, Paragraph 2, Subparagraphs 1 and 4; Paragraph 3 of the same article; Article 57-2, Paragraph 1, Subparagraph 2; the first and second parts of Paragraph 2 of the same article; Article 58, Paragraph 7; the part other than the numbered subparagraphs of Article 62; Article 63; the part other than the numbered subparagraphs of Article 64, Paragraph 1; and the part other than the numbered subparagraphs of Paragraph 2 of the same article, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Trade, Industry and Resources”. Article 2, Paragraph 2 (excluding the numbered clauses), Paragraph 3 of the same article, Paragraph 4 (excluding the numbered clauses), Paragraph 5 (excluding the numbered clauses), Article 8, Paragraphs 2 and 3, Article 8-2, Article 9-2, Paragraph 1 (excluding the numbered clauses), Paragraph 2 of the same article, main text of Paragraph 3 of the same article, Article 10-2 (excluding the numbered clauses), Article 10-3, Article 24, Article 24-2, Article 27, Paragraph 4, Article 29, Article 33 (excluding the numbered clauses), Article 34, Paragraph 1, Article 37, Paragraph 4 (excluding the numbered clauses), Article 38, Paragraph 1, Article 45, Article 49, Paragraph 3 (excluding the numbered clauses), Article 52-4, Paragraph 1 (excluding the numbered clauses), Article 52-6, Article 52-7, Paragraph 1 (excluding the numbered clauses), Paragraph 2 (excluding the numbered clauses), Article 53, Paragraph 1; Article 54, Paragraph 2; Article 55; the part other than the numbered clauses of Article 56-2; the part other than the numbered clauses of Article 57-2, Paragraph 1; the part other than the numbered clauses of Article 58-4; Article 59-2; and the part other than the numbered clauses of Article 60, “Ordinance of the Ministry of Trade, Industry and Energy” shall be changed to “Ordinance of the Ministry of Trade, Industry and Resources”. In Forms No. 4, No. 5, and No. 42, “Minister of Trade, Industry and Energy” shall be changed to “Minister of Trade, Industry and Resources”. In the processing procedure section of Form No. 4 and Form No. 5, “Ministry of Trade, Industry and Energy” shall be changed to “Ministry of Trade, Industry and Resources”. ④ through <54> omitted ADDENDA <Ministry of Trade, Industry and Resources Decree No. 15, June 11, 2026> Article 1 (Enforcement Date)  This Rule shall enter into force on the date of its promulgation. However, the amended provisions of Annex 31 shall enter into force on July 1, 2027. Article 2 (Transitional Measures concerning Facility Standards, etc.)  For extreme ultraviolet lithography equipment for semiconductor manufacturing that has been licensed or reported pursuant to Article 4 of the Act in accordance with the former regulations at the time of the enforcement of this Rule, the former regulations shall apply notwithstanding the amended provisions of Article 2, Paragraph 5, Item 11 and Annex 12. [Attached Table 1] Standards for Calculating Storage Capacity (Related to Article 2, Paragraph 1, Subparagraph 6) [Appendix 2] Protection Facilities (Related to Article 2, Paragraph 1, Item 23) [Appendix 3] Standards for Calculating Refrigeration Capacity (Related to Article 2, Paragraph 3) [Appendix 4] Standards for Facilities, Technology, Inspection, Supervision, and Detailed Safety Inspection of High-Pressure Gas Manufacturing (Specific Manufacturing, General Manufacturing, or Filling of Containers and Tanks Fixed to Vehicles) (Related to Article 8, Paragraph 1, Subparagraph 1; Article 28, Paragraph 4, Subparagraph 1; Article 28-2, Paragraph 2, Subparagraph 2(b); Article 30, Paragraph 3, Subparagraph 1; Article 31, Paragraph 3, Subparagraph 1; Article 33, Subparagraph 1; and Article 35, Paragraph 3) [Appendix 5] Facility, Technology, and Inspection Standards for Hydrogen Fuel Charging (Related to Article 8, Paragraph 1, Subparagraph 2; Article 28, Paragraph 4, Subparagraph 2; Article 30, Paragraph 3, Subparagraph 2; and Article 31, Paragraph 3, Subparagraph 2) [Appendix 7] Standards for Facilities, Technology, Inspection, and Detailed Safety Inspection of High-Pressure Gas Refrigeration Manufacturing (Related to Article 8, Paragraph 1, Subparagraph 3; Article 28, Paragraph 4, Subparagraph 3; Article 30, Paragraph 3, Subparagraph 3; Article 33, Subparagraph 2; and Article 35, Paragraph 3) [Appendix 8] Facility, Technical, and Inspection Standards for Storage and Use of High-Pressure Gas (Related to Article 8, Paragraph 1, Subparagraph 4; Article 28, Paragraph 4, Subparagraph 4; Article 30, Paragraph 3, Subparagraph 4; Article 31, Paragraph 3, Subparagraph 4; Article 47; and Article 48, Paragraph 5) [Appendix 9] Facility, Technical, and Inspection Standards for High-Pressure Gas Sales and Import Businesses (Related to Article 8, Paragraph 1, Subparagraph 5; Article 8, Paragraph 2; Article 28, Paragraph 4, Subparagraph 5; Article 30, Paragraph 3, Subparagraph 5; and Article 31, Paragraph 3, Subparagraph 5) [Attached Table 9-2] Facility and Technical Standards for High-Pressure Gas Transport Vehicles (Related to Article 8, Paragraph 1, Subparagraph 6 and Article 8, Paragraph 3) [Appendix 10] Facility, Technology, and Inspection Standards for Container Manufacturing and Re-inspection Standards for Containers (Related to Article 9, Item 1; Article 9-2, Paragraph 3; Article 28, Paragraph 4, Item 6; Article 43, Paragraph 1, Item 1; and Article 44, Paragraph 2) [Appendix 10-2] Facility, Technology, and Inspection Standards for the Manufacture of Container Accessories and Re-inspection Standards for Container Accessories (Related to Article 9, Subparagraph 2; Article 9-2, Paragraph 3, Proviso; Article 28, Paragraph 4, Subparagraph 7; Article 38, Paragraph 4, Subparagraph 4; Article 43, Paragraph 1, Subparagraph 2; and Article 44, Paragraph 2) [Appendix 11] Facility, Technology, and Inspection Standards for Refrigeration Equipment Manufacturing (Related to Article 2, Paragraph 5, Subparagraph 6; Article 9, Subparagraph 3; Article 28, Paragraph 4, Subparagraph 8; and Article 43, Paragraph 1, Subparagraph 3) [Appendix 12] Facility, Technology, and Inspection Standards for the Manufacture of Specific Equipment and Re-inspection Standards for Specific Equipment (Related to Article 9, Item 4; Article 9-2, Paragraph 3, Proviso; Article 28, Paragraph 4, Item 9; Article 40, Paragraph 2; and Article 43, Paragraph 1, Item 4) [Appendix 13] Repair Standards and Scope of Repair for Containers, etc. (Related to Article 10) [Attached Table 13-2] Standards for Administrative Dispositions (Related to Article 15-3) [Appendix 14] Supplier Safety Inspection Standards, etc. (Related to Article 16, Paragraph 3) [Appendix 15] Guidelines for Drafting Safety Management Regulations (Related to Article 17) [Appendix 18] Safety Inspection and Maintenance Standards for Containers (Related to Article 23, Paragraphs 1 and 3) [Appendix 19] Inspection Cycles by Subject of Periodic Inspection (Related to Article 30, Paragraph 2) [Attached Table 20] Minor Matters by Facility (Related to Article 29) [Appendix 22] Re-inspection Period for Containers and Specific Equipment (Related to Article 39) [Appendix 23] Method of Destruction of Rejected Containers and Specific Equipment (Related to Article 40, Paragraph 1) [Appendix 24] Marking of Containers, etc. (Related to Article 41, Paragraph 1) [Appendix 25] Engraving or Marking on Accepted Containers, etc. (Related to Article 41, Paragraph 2) [Appendix 26] Types of High-Pressure Gases Subject to Quality Maintenance (Related to Article 45) [Appendix 27] Methods and Procedures for Quality Inspection (Related to Article 45-2, Paragraph 2) [Attached Table 30] Standards for High-Pressure Gas Transport, etc. (Related to Article 50) [Attached Table 31] Method of Conducting Safety Education (Related to Article 51, Paragraph 1) [Appendix 31] Method of Conducting Safety Education (Related to Article 51, Paragraph 1)   [Effective Date: July 1, 2027] [Appendix 31-2] Safety Measures and Damage Prevention Standards for High-Pressure Gas Pipelines (Related to Articles 52-2, 52-6, and 52-7, Paragraph 1, Subparagraph 4) [Appendix 33] Insurance Amount (Related to Article 53) [Attached Table 33-2] Insurance Amount for Property Damage (Related to Article 53, Paragraph 2, Subparagraph 4) [Appendix 34] Method of Notification of Accidents, etc. (Related to Article 54, Paragraph 1) [Appendix 35] Fees for Permits, etc. (Related to Article 57, Paragraph 1) [Appendix 36] Technical personnel, inspection equipment, and assets, etc. of inspection agencies (related to Article 58, Paragraph 4 and Article 61, Paragraph 2) [Attachment Form No. 1] Application for High-Pressure Gas [Manufacturing, Storage Installation, Sales (Permit, Amendment Permit)], List of Facilities Subject to Bulk Reporting Due to Change of Business Name/Representative [Attachment Form No. 1-2] Application for Reissuance of High-Pressure Gas (Manufacturing, Storage Installation, Sales) Permit [Attached Form No. 3] Notification of High-Pressure Gas Manufacturing (Initial or Amended); List of Facilities Subject to Collective Notification upon Change of Trade Name or Representative [Attachment Form No. 3-2] Application for Reissuance of High-Pressure Gas Manufacturing Report Certificate [Attachment Form No. 4] Application for Manufacturing Registration (Containers, Refrigeration Units, Specific Equipment) [Attachment Form No. 5] Application for Change of Manufacturing Registration (Containers, Refrigeration Units, Specific Equipment) [Attachment Form No. 5-2] Application for High-Pressure Gas [Importer, Carrier (Registration, Change Registration)] [Form No. 5-3] Application for Reissuance of Manufacturing Registration Certificate (Containers, Refrigeration Units, Specific Equipment) [Attachment Form No. 5-4] Application for Reissuance of High-Pressure Gas (Importer, Carrier) Registration Certificate [Attachment Form No. 6] Permit [Attachment Form No. 7] Certificate of Reporting High-Pressure Gas Manufacturing [Form No. 7-2] Certificate of Registration for the Manufacture of Containers (Refrigeration Units and Specific Equipment) [Attachment Form No. 7-3] Certificate of Registration for High-Pressure Gas Importers (High-Pressure Gas Carriers) [Attachment Form No. 8] Application for Technical Review [Form No. 8-2] Application for Factory Inspection of Foreign Containers, etc. [Attachment Form No. 9] [Notification of Commencement, Suspension, Closure, or Resumption of (Business, Storage Use)] [Attachment Form No. 10] Report on Succession of Status [Attachment Form No. 13] Supplier's Notification of Suspension of Supply [Attachment Form No. 14] Application for Review of Safety Management Regulations [Attachment Form No. 15] High-pressure gas filling log [Attachment Form No. 16] High-pressure gas sales ledger [Attachment Form No. 17] Application for Review of Safety Improvement Plan [Attachment Form No. 19] Safety Manager (Appointment, Dismissal, Retirement) Report [Attachment Form No. 20] Application for Intermediate Inspection [Form No. 21] Application for (Completion, Periodic) Inspection [Form No. 21-2] Application for Construction Supervision [Attachment Form No. 22] (Completion, Periodic) Inspection Certificate [Form No. 22-2] Construction Supervision Certificate [Attachment Form No. 23] Application for Exemption from Periodic Inspection (All or Partial) [Attachment Form No. 24] Application for Detailed Safety Inspection [Attached Form No. 25] Application for Initial Inspection or Re-inspection of a Container [Attachment Form No. 26] Application for Refrigeration Unit Inspection [Attached Form No. 27] Application for Initial Inspection or Re-inspection of Specific Equipment [Attachment Form No. 28] Application for Confirmation of Exemption from Inspection of Containers, etc. [Form No. 28-2] Application for Exemption from Re-inspection (All or Partial) of Specific Facilities [Form No. 28-3] Container Re-inspection Report [Attachment Form No. 29] Refrigeration Unit Inspection Certificate [Form No. 30] Certificate of Passing Inspection for Storage Tanks (Pressure Vessels) [Attachment Form No. 31] Certificate of Passing Inspection for Tanks Fixed to Vehicles [Form No. 32] Certificate of Passing Vaporizer Inspection [Form No. 32-2] Application for High-Pressure Gas Quality Inspection [Form No. 32-3] Quality Inspection Record Book [Form No. 32-4] Quality Inspection Performance Report [Attachment Form No. 33] Notification of Use of Specific High-Pressure Gas [Attachment Form No. 34] Certificate of Reporting the Use of Specific High-Pressure Gas [Attachment Form No. 35] Application for Specific High-Pressure Gas Usage Facilities (Completion Inspection, Periodic Inspection) [Form No. 36] Certificate of (Completion, Periodic) Inspection [Attachment Form No. 37] High-Pressure Gas Import Declaration [Form No. 37-2] Receipt for High-Pressure Gas Import Declaration [Attachment Form No. 38] Safety Training Application Form [Attachment Form No. 38-2] Excavation Work Consultation Form [Attached Form No. 39] Application for Technical Review of an Inspection Agency [Attached Form No. 40] Application for Designation, Re-designation or Amendment of Designation as an Inspection Agency [Form No. 40-2] Application for Reissuance of (Specialized, Accredited) Inspection Agency Designation Certificate [Attachment Form No. 41] Designation Certificate for (Specialized, Accredited) Inspection Agency [Attachment Form No. 42] Application for Confirmation of Inspection Facility