건설기술 진흥법 시행규칙
286885 · 2026-06-11
Ministry of Land, Infrastructure and Transport (Construction Safety Division - Construction Material Quality Management), 044-201-3580, 3579
Ministry of Land, Infrastructure and Transport (Technology Policy Division - Career Management, Education), 044-201-3555
Ministry of Land, Infrastructure and Transport (Technical Standards Division - Design System), 044-201-3567
Ministry of Land, Infrastructure and Transport (Construction Safety Division - Penalty Points, Inspections), 044-201-3586, 4593
Ministry of Land, Infrastructure and Transport (Technology Policy Division - Others), 044-201-3554
Ministry of Land, Infrastructure and Transport (Construction Safety Division - Construction Project Management, Safety Management Level Assessment), 044-201-3582, 4592
Ministry of Land, Infrastructure and Transport (Technology Policy Division - New Construction Technologies), 044-201-3558
Ministry of Land, Infrastructure and Transport (Technology Policy Division - Environmental Management Costs), 044-201-3558
Ministry of Land, Infrastructure and Transport (Construction Safety Division - Construction Accidents), 044-201-3562, 3563
Ministry of Land, Infrastructure and Transport (Construction Safety Division - Construction Safety), 044-201-3575, 3574
Chapter 1 General Provisions
Article 1 (Purpose) The purpose of this rule is to prescribe matters delegated by the Construction Technology Promotion Act and the Enforcement Decree of the same Act, and matters necessary for the implementation thereof.
Article 2 (Criteria for Deliberation on Bidding Methods for Large-Scale Construction Projects) The Minister of Land, Infrastructure and Transport shall prescribe matters concerning criteria for the deliberation of bidding methods pursuant to Article 6, Subparagraph 8 of the Enforcement Decree of the Construction Technology Promotion Act (hereinafter referred to as the “Decree”), and shall publish such criteria after deliberation by the Central Construction Technology Deliberation Committee (hereinafter referred to as the “Central Deliberation Committee”) pursuant to Article 5 of the Construction Technology Promotion Act (hereinafter referred to as the “Act”). <Amended May 26, 2020>
Article 3 (Construction Works Not Subject to Deliberation by the Local Construction Technology Deliberation Committee) In the proviso to the part other than each item of Article 17, Paragraph 2, Subparagraph 1 of the Enforcement Decree, the term “construction works prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the construction works set forth in each of the following subparagraphs. <Amended June 11, 2026>
1. Construction project for which construction project management for design services has been performed pursuant to Article 39, Paragraph 3 of the Act
2. Repair, restoration, and maintenance work on designated cultural properties and provisionally designated cultural properties pursuant to Article 2, Paragraph 2 and Article 32 of the Cultural Heritage Protection Act
3. Construction work carried out during a war, armed conflict, or other equivalent national emergency
4. Construction work for the urgent recovery from a disaster
4-2. Construction work carried out in accordance with the disaster recovery plan under Article 46, Paragraph 2 of the Natural Disaster Countermeasures Act
5. Construction work carried out in accordance with standard design documents pursuant to Article 23, Paragraph 4 of the Building Act
6. Construction work related to national security
7. Dredging work
Article 4 (Verification and Evaluation of Construction Works for which Technical Advice was Provided) ① The Minister of Land, Infrastructure and Transport may verify and evaluate the execution of construction works for which the Technical Advisory Committee was consulted pursuant to Article 6 of the Act (hereinafter referred to as the “Technical Advisory Committee”).
② The Minister of Land, Infrastructure and Transport may notify the contracting authority of the results of the verification and evaluation under Paragraph 1 and request necessary measures.
Chapter 2 Support for Research and Development of Construction Technology, etc.
Article 5 (Institutions Subject to Agreements for Construction Technology Research and Development Projects, etc.) In Subparagraph 9 of Article 23, Paragraph 1 of the Enforcement Decree, the term “institutions, associations, academic societies, etc. prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the institutions, associations, academic societies, or unions listed in each of the following subparagraphs. <Amended July 1, 2015; December 19, 2022>
1. Among public enterprises and quasi-governmental institutions pursuant to Article 5 of the Act on the Operation of Public Institutions (hereinafter referred to as “public enterprises and quasi-governmental institutions”), institutions subject to the guidance and supervision of the Minister of Land, Infrastructure and Transport
2. The Association established pursuant to Article 69, Paragraph 1 of the Act, the Association pursuant to Article 50 of the Framework Act on the Construction Industry, the Overseas Construction Association pursuant to Article 23 of the Overseas Construction Promotion Act, and the Korean Institute of Architects pursuant to Article 31 of the Architects Act
3. Mutual aid associations established pursuant to Article 74, Paragraph 1 of the Act, mutual aid associations pursuant to Article 54 of the Framework Act on the Construction Industry, and the Korea Housing & Urban Guarantee Corporation pursuant to Article 16 of the Housing & Urban Fund Act
4. An association or academic society that is a corporation in the field of construction technology established under the Civil Act or other laws, and which meets all of the requirements of each of the following subparagraphs.
a. Always maintain at least five dedicated research personnel who hold a bachelor's degree or higher in a natural science field and have at least three years of research experience (including research experience prior to obtaining the degree) (at least two of whom must hold a doctoral degree or a Professional Engineer qualification).
b. Must be equipped with an independent research facility
Article 6 (Persons Recommended for Investment in Construction Technology Development) In Article 26, Paragraph 1 of the Enforcement Decree, the phrase “persons with a track record of construction work or construction engineering exceeding an amount prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to any of the following persons: <Amended Sep. 17, 2021>
1. A person registered in the construction industry for general construction projects pursuant to Annex 1 of the Enforcement Decree of the Framework Act on the Construction Industry who has a construction track record of 60 billion KRW or more in the relevant field over the past two years.
2. A person who has registered as a construction engineering business pursuant to Article 26 of the Act and has a track record of construction engineering worth 20 billion KRW or more over the past two years.
Article 7 (Application for Designation of New Technology) The application for designation of new technology pursuant to Article 31 of the Enforcement Decree is as in Form No. 1 of the Attached Form.
Article 8 (Examination Agency for New Technology, etc.) ① The examination period for new technology pursuant to Article 14, Paragraph 1 of the Act (hereinafter referred to as “new technology”) shall not include the periods set forth in each of the following subparagraphs.
1. Time required for the applicant to supplement the documents
2. Period for soliciting opinions pursuant to Article 32, Paragraph 2 of the Enforcement Decree
3. Notice period pursuant to Article 32, Paragraph 3 of the Enforcement Decree
② In Article 32, Paragraph 2 of the Enforcement Decree, “institutions prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to relevant administrative agencies, public enterprises and quasi-governmental institutions, and the institutions or organizations listed in each subparagraph of Article 23, Paragraph 1 of the Enforcement Decree.
Article 9 (Certificate of Designation of New Technology) ① The certificate of designation of new technology pursuant to the part other than each subparagraph of Article 33, Paragraph 1 of the Enforcement Decree shall be in the form of Annex 2.
② Any person who wishes to obtain a new technology designation certificate reissuance in accordance with any of the following subparagraphs shall submit an application for reissuance of a new technology designation certificate in the form of Annex 3 to the Minister of Land, Infrastructure and Transport.
1. In the case where the New Technology Designation Certificate is lost or damaged to the point of being unusable
2. If the information regarding the technology developer has changed
Article 10 (Submission of Performance Report on New Technology Utilization) ① The performance report on new technology utilization pursuant to Article 34, Paragraph 6 of the Enforcement Decree shall be prepared in accordance with Form No. 4 of the Attached Form.
② Persons who have utilized the new technology other than those who have been designated as new technology may, if necessary, prepare a report on the utilization of the new technology in accordance with Form No. 4 of the attached document and submit it to the Minister of Land, Infrastructure and Transport.
③ When submitting performance results regarding the utilization of new technologies pursuant to Paragraphs 1 and 2, documents classified according to each of the following subparagraphs must be attached. <Amended July 1, 2019>
1. In the case of construction work: The following documents
a. Certificate of New Technology Utilization Performance (Form No. 5) issued by the contracting authority or the contractor (only applicable in the case of subcontracted work)
b. Tax invoices or summary table of tax invoices by customer
c. Contract for work or subcontract (applicable only to construction work contracted or subcontracted by a party other than the contracting authority)
2. Cases other than construction projects: Documents proving the utilization of new technology, such as tax invoices or confirmations of payment of technology usage fees.
Article 11 (Application for Extension of Protection Period for New Technology) The application for extension of the protection period for new technology pursuant to Article 35, Paragraph 3 of the Enforcement Decree shall be in accordance with Form No. 6 of the Attached Form.
Article 12 (Implementation of Test Construction, etc.) ① The contracting authority that has carried out test construction pursuant to Article 14, Paragraph 4 of the Act and the specialized agency for new technology evaluation pursuant to the first part of Article 32, Paragraph 1 of the Enforcement Decree shall jointly analyze and evaluate the results of the test construction and submit the results to the Minister of Land, Infrastructure and Transport.
② When the contracting authority notifies the Minister of Land, Infrastructure and Transport of the reason for not conducting test construction pursuant to Article 36, Paragraph 1 of the Enforcement Decree, it shall include a comprehensive comparison and analysis table of new technology and existing construction methods.
Article 12-2 (Application for Issuance of Certificate of New Technology Use Agreement, etc.) ① The documents to be submitted by a person who intends to apply for the issuance of a certificate regarding a new technology agreement pursuant to the latter part of Article 14-2, Paragraph 1 of the Act and Article 36-2, Paragraph 2 of the Enforcement Decree shall be as classified in each of the following subparagraphs.
1. Application for Issuance of Certificate of New Technology Use Agreement pursuant to the latter part of Article 14-2, Paragraph 1 of the Act : Form No. 1-2
2. New Technology Usage Agreement pursuant to Article 36-2, Paragraph 2, Subparagraph 1 of the Enforcement Decree: Form No. 1-3
3. Certificate of Technology Transfer under New Technology Use Agreement pursuant to Article 36-2, Paragraph 2, Subparagraph 4 of the Enforcement Decree: Form No. 1-4
4. Consent Form for the Utilization of Intellectual Property Rights Related to the New Technology Use Agreement Pursuant to Article 36-2, Paragraph 2, Subparagraph 5 of the Enforcement Decree: Form No. 1-5
② The certificate regarding the agreement for the use of new technology pursuant to Article 14-2, Paragraph 2 is in the form of Annex 1-6.
[This Article Newly Inserted July 1, 2019]
Article 13 (International Exchange and Cooperation) The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 17, subparagraph 5 of the Act refers to the following matters:
1. Holding regular cooperation meetings with foreign government agencies
2. Demand Survey for Construction Technology Development Required for Overseas Expansion
Article 14 (Provision of Construction Technology Information) ① The method and procedure for sending construction technology-related data pursuant to Article 18, Paragraph 3 of the Act shall be as follows:
1. The materials specified in each subparagraph of Article 40 of the Enforcement Decree shall be sent in the form of electronic files or printed materials.
2. A person sending construction technology-related data shall submit a deposit form for construction technology data in the format of Annex 7.
3. The construction technology-related data in subparagraph 1 and the deposit form for construction technology data in subparagraph 2 may be sent through the construction technology information system pursuant to Article 18, Paragraph 1 of the Act.
② An institution entrusted with the task of establishing and operating a construction technology information system pursuant to Article 18, Paragraph 1 of the Act pursuant to Article 117, Paragraph 1 of the Enforcement Decree shall provide data and information regarding construction technology to users in the following ways, and may receive a fee from users within the scope of actual costs.
1. List, index, and search and viewing of contents regarding materials on registered construction technology
2. Publication of bibliographies on construction technology information
3. Reproduction and distribution of materials regarding registered construction technology
Article 15 (Consultative Body Related to the Integrated Information System for Supporting Construction Works) The Minister of Land, Infrastructure and Transport may form and operate a consultative body with companies, institutions, or organizations related to construction for the efficient establishment of the Integrated Information System for Supporting Construction Works (hereinafter referred to as the “Integrated Information System for Supporting Construction Works”) pursuant to Article 19, Paragraph 1 of the Act.
Chapter 3 Fostering of Construction Professionals, etc. <Amended Feb. 25, 2019>
Article 16 (Designation Certificate for Educational Institutions) The Designation Certificate for an education and training institution for construction engineers designated pursuant to Article 43, Paragraph 2 of the Enforcement Decree (hereinafter referred to as the “Educational Institution”) issued pursuant to Paragraph 4 of the same Article shall be in the form of Annex 8. <Amended Feb. 25, 2019>
Article 17 (Conduct of Entrusted Education and Training by Educational Institutions) ① If an educational institution intends to conduct education and training for construction engineers, it shall formulate an education and training plan and submit it to the Minister of Land, Infrastructure and Transport. <Amended Feb. 25, 2019>
② The Minister of Land, Infrastructure and Transport or an educational institution shall issue a Certificate of Completion of Education in the form of Annex 9 to a construction engineer who has received education or training, and record and verify the details of education completion on the Certificate of Construction Technology Career pursuant to Article 21, Paragraph 2 of the Act. <Amended Feb. 25, 2019>
③ When the Minister of Land, Infrastructure and Transport or an educational institution has conducted education or training for construction engineers, they shall record the status of such education or training in Form No. 10 of the Annex and attach one copy of the electronic record medium containing the relevant data, and send it to the entrusted agency for the career management of construction engineers (referring to an agency entrusted with the duties concerning the career management of construction engineers pursuant to Article 117, Paragraph 1, Subparagraphs 4 and 5 of the Enforcement Decree; hereinafter the same applies) within 14 days after the completion of the relevant education course. <Amended Feb. 25, 2019>
④ Educational institutions shall submit the details of training fees received from construction engineers to the Minister of Land, Infrastructure and Transport. <Amended Feb. 25, 2019>
⑤ Detailed matters necessary for the delegation of education and training, such as the establishment of branch offices of educational institutions, the implementation of on-site training, and the operation of educational institutions, shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Newly added Sep. 17, 2021>
Article 17-2 (Renewal of Education and Training Agency) ① An educational institution that intends to renew the education and training agency in accordance with Article 20-3, Paragraph 3 of the Act shall apply to the Minister of Land, Infrastructure and Transport by attaching the documents of each of the following subparagraphs to the application for renewal of the educational institution agency in the form of Annex 10-2, no later than six months before the expiration of the validity period.
1. Educational Institution Designation Certificate
2. Documents regarding the current status of education and training facilities
3. Documents proving the employment of faculty and staff
4. Documents regarding education and training plans and operational performance
5. Documents regarding the results of the examination or evaluation conducted by the Minister of Land, Infrastructure and Transport on the relevant educational institution during the validity period
② The Minister of Land, Infrastructure and Transport who receives an application for renewal pursuant to Paragraph 1 shall review the matters in each of the following subparagraphs and decide whether to renew.
1. Whether the educational institution meets the agency requirements
2. Level of possession and utilization of education and training facilities and personnel
3. Development and Operation System and Performance of Education and Training
4. Adequacy and Satisfaction of Education and Training Services
5. Results of the examination or evaluation pursuant to Paragraph 1, Subparagraph 5
③ The Minister of Land, Infrastructure and Transport may designate and announce educational institutions for which the renewal of education and training agency services has been decided pursuant to Paragraph 2, by education and training subjects and specialized fields.
[This Article Newly Inserted Dec. 14, 2020]
Article 17-3 (Scope of Entrustment of Education and Training Duties, etc.) ① The duties that the Minister of Land, Infrastructure and Transport may entrust pursuant to Article 20-6, Paragraph 1 of the Act are as follows:
1. Receipt of application for agency by educational institution pursuant to Article 20-2, Paragraph 2 of the Act and verification of application details
2. Receipt of application for renewal of education and training agency services pursuant to Article 20-3, Paragraph 3 of the Act and verification of application details
3. Request for submission of materials to confirm whether they fall under the grounds for violation of each subparagraph of Article 20-4, Paragraph 1 of the Act, and verification of the contents thereof
4. Matters concerning the management of education and training pursuant to Article 20-5 of the Act
5. Matters concerning the public call for proposals for educational institutions pursuant to Article 43, Paragraph 2 of the Enforcement Decree
② An institution entrusted with education and training duties pursuant to Article 20-6, Paragraph 1 of the Act and Article 43-3 of the Enforcement Decree (hereinafter referred to as the “education management institution”) shall report the results of the entrusted duties to the Minister of Land, Infrastructure and Transport by the end of the following month, based on the last day of each half-year.
[This Article Newly Inserted Dec. 14, 2020]
Article 17-4 (Funding Support for Educational Management Institutions) ① If an educational management institution intends to receive funding for expenses necessary for entrusted work, it shall submit to the Minister of Land, Infrastructure and Transport a plan for the implementation of the entrusted work and the basis for calculating the necessary expenses.
② The Minister of Land, Infrastructure and Transport may review the materials submitted pursuant to Paragraph 1 and provide support for the costs necessary for the entrusted work. In this case, the supported amount shall not be used for any purpose other than the performance of the entrusted work.
[This Article Newly Inserted Dec. 14, 2020]
Article 18 (Reporting by Construction Engineers) ① A person who intends to report as a construction engineer pursuant to the first part of Article 21, Paragraph 1 of the Act shall submit the Construction Engineer Career Report Form (Form No. 11) to the entrusted institution for the management of construction engineer careers, attaching the documents specified in each of the following subparagraphs (including electronic documents). However, in cases where only the fact of resignation from a workplace is reported, the document under subparagraph 1 may be omitted, and the documents under subparagraphs 2 through 6 shall be attached only by the applicable person. <Amended Feb. 25, 2019>
1. Certificate of Experience in Form No. 12 or Certificate of Overseas Experience in Form No. 13 [limited to those confirmed by the client, the administrative agency that granted permission, authorization, approval, etc. for the construction work (hereinafter referred to as the “Licensing Agency”), or the employer (representative)]
2. Deleted <2018. 10. 12.>
3. Graduation Certificate
4. Documents proving education and training matters (excluding documents regarding education and training sent pursuant to Article 17, Paragraph 3)
5. Copy of the certificate of award conferred by the contracting authority in connection with construction work
6. Documents proving workplace or work experience
7. One passport-sized photograph (excluding cases where a passport-sized photograph is attached and printed to the Construction Engineer Career Report)
② A person who intends to report a change of construction engineer pursuant to the latter part of Article 21, Paragraph 1 of the Act shall submit the Report on Change of Construction Engineer Career in Annex 14, attached with the documents specified in Paragraph 1, Subparagraphs 1 and 6, to the entrusted institution for the management of construction engineer careers. <Amended Feb. 25, 2019>
③ The construction technology career certificate pursuant to Article 21, Paragraph 2 of the Act (hereinafter referred to as the “construction technology career certificate”) is as in Form No. 15 of the Attached Form.
④ In accordance with Article 21, Paragraph 2 of the Act, if a construction engineer intends to obtain the issuance, renewal, or reissuance of a Certificate of Construction Engineer Career, they must submit an Application for Issuance (New, Mobile, Renewal, or Reissuance) of a Certificate of Construction Engineer Career (Form No. 16) to the entrusted agency for the management of construction engineer careers, attaching one passport-sized photograph. If a construction engineer requests issuance in a mobile form using a mobile communication device, the entrusted agency may issue a mobile Certificate of Construction Engineer Career in accordance with Form No. 15. <Amended Feb. 25, 2019; Dec. 30, 2022>
⑤ The entrusted institution for the management of construction engineer careers shall record and manage the fact that a construction technology career certificate has been issued in the Construction Technology Career Certificate Issuance Register in accordance with Form No. 17. <Amended Feb. 25, 2019>
⑥ Verification of the workplace, qualifications, educational background, and experience, etc. (hereinafter referred to as “workplace and experience, etc.”) of a construction engineer pursuant to Article 21, Paragraphs 2 and 4 of the Act shall be in accordance with the Certificate of Career of a Construction Engineer in Form No. 18 (or Form No. 18-2 in the case of issuance in English) and the Certificate of Possession of a Construction Engineer in Form No. 19. <Amended Feb. 25, 2019; Jul. 10, 2024>
⑦ The entrusted institution for the career management of construction engineers may receive a fee within the scope of actual expenses from the applicant (excluding cases where the applicant is the head of an administrative agency pursuant to Article 21, Paragraph 4 of the Act) for the career management of construction engineers pursuant to Paragraphs 1 through 4 and Paragraph 6. <Amended Feb. 25, 2019>
⑧ The entrusted institution for the management of construction engineer careers shall, as prescribed by the Notification of the Minister of Land, Infrastructure and Transport, exchange the contents and status of reports or reports of change under Paragraphs 1 and 2 with the status of issuance of construction engineer career certificates. <Amended Feb. 25, 2019>
⑨ Upon receiving a report or a report of change pursuant to Paragraphs 1 and 2, the entrusted institution for the career management of construction engineers shall verify the contents of said report with the relevant authorities. <Amended Feb. 25, 2019>
[Title amended Feb. 25, 2019]
Article 18-2 (Verification of Experience of Construction Engineers) ① When a client, licensing authority, or employer (representative) employing a construction engineer receives and processes a request for the issuance of a certificate of experience or a certificate of overseas experience pursuant to Article 18, Paragraph 1, Item 1, they shall record it in the Construction Engineer Experience Verification Receipt (Processing) Register in the form of Annex 19-2.
② The client, licensing authority, or the employer (representative) employing a construction engineer may utilize a system for electronically processing and managing certificate issuance and career data to enhance the convenience of applying for career verification of a construction engineer, the efficiency of certificate issuance, and the accuracy of career data management.
③ Detailed matters concerning the career verification procedures of the career verification authority required for the issuance of career verification certificates and overseas career verification certificates pursuant to Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport.
[This Article Newly Inserted April 4, 2019]
Article 19 (Correction Instructions, etc. to Construction Engineers) When there is a risk that a construction project may become substandard due to a construction engineer failing to perform their duties faithfully, the contracting authority shall issue a correction instruction or a warning pursuant to Article 24, Paragraph 2 of the Act; provided that if the engineer fails to comply with the correction instruction, the contracting authority shall issue a correction instruction again, and if the engineer fails to comply thereafter, the contracting authority shall issue a correction instruction again and then submit the results to the Minister of Land, Infrastructure and Transport. <Amended Feb. 25, 2019>
[Title amended Feb. 25, 2019]
Article 20 (Suspension of Duties, etc. of Construction Engineers) ① The standards for the suspension of duties of construction engineers pursuant to Article 24, Paragraph 5 of the Act are as set forth in Attached Table 1. <Amended Feb. 25, 2019>
② In cases where the Head of a Regional Land and Transport Office has issued an administrative disposition against a construction engineer pursuant to Article 24, Paragraph 1 of the Act or Article 16 of the National Technical Qualifications Act, he/she shall notify the entrusted agency for the career management of construction engineers and the construction business operator, housing construction registration business operator (referring to a person registered as a housing construction business operator pursuant to Article 4 of the Housing Act; hereinafter the same applies), or construction engineering business operator to which the relevant construction engineer belongs of the details of such disposition, and shall make a public announcement of the fact. <Amended Aug. 12, 2016; Feb. 25, 2019; Mar. 18, 2020; Sep. 17, 2021>
③ When an entrusted institution for the management of construction engineer careers issues a Certificate of Construction Technology Career or a Certificate of Construction Engineer Career pursuant to Article 18, Paragraph 6, it shall record the details of the disposition notified pursuant to Paragraph 2 on the said Certificate of Construction Technology Career or Certificate of Construction Engineer Career during the period notified by the Minister of Land, Infrastructure and Transport. <Amended Feb. 25, 2019>
④ A construction business operator, housing construction registration business operator, or construction engineering business operator who has been notified of the fact of suspension of business of an affiliated construction engineer pursuant to Paragraph 2 shall notify the contracting authority that commissioned the relevant construction work or construction engineering, etc. of the details thereof within 10 days from the date of receiving the notification. <Amended Feb. 25, 2019; Mar. 18, 2020; Sep. 17, 2021>
[Title amended Feb. 25, 2019]
Chapter 4 Construction Engineering, etc. <Amended Sep. 17, 2021>
Article 21 (Application for Registration of Construction Engineering Business) ① A person who intends to register a construction engineering business pursuant to Article 26, Paragraph 1 of the Act (in the case of a corporation, the representative; hereinafter referred to as the “Applicant”) shall submit the application for registration (change of registration) of a construction engineering business in the form of Annex No. 20 (including an application in the form of an electronic document) with the following documents (including electronic documents) attached to it to the entrusted agency for registration, etc. duties (referring to an agency entrusted with the duties of receiving, verifying, and managing the registration, change of registration, report of suspension or closure of business, and report of business transfer or merger of a construction engineering business operator pursuant to Article 117, Paragraph 3 of the Enforcement Decree; hereinafter the same applies). <Amended Oct. 12, 2018; Feb. 25, 2019; Mar. 18, 2020; Aug. 27, 2021; Sep. 17, 2021>
1. Deleted <2018. 10. 12.>
2. Certificate of Possession of Construction Engineers (Form No. 19) proving the employment of technical personnel in accordance with registration requirements
3. Documents proving possession of an office or testing laboratory (only if required for registration)
4. Documents classified according to the following items proving possession of capital in accordance with the registration requirements (only applicable if required for registration requirements)
a. Corporation: Balance Sheet and Income Statement
b. Individual: Statement of Business Assets and Supporting Documents
5. A copy of the Certificate of Registration as an Engineering Business Operator under the Engineering Industry Promotion Act or a copy of the Certificate of Registration for the Establishment of a Professional Engineer Office under the Professional Engineers Act in the field of construction technology (only if required for registration requirements)
6. Documents proving possession of equipment in accordance with registration requirements (only applicable if required for registration requirements)
7. In the case where the applicant is a foreigner, a document issued by the government of the relevant country, a notary public (only those qualified as notaries public under the law), or other competent authority proving that the applicant does not fall under the grounds for disqualification under Article 27 of the Act, and confirmed by a Korean consul stationed in that country. However, in the case of a country that has concluded the “Convention Abolishing the Requirement of Legalization for Foreign Public Documents,” an Apostille may substitute for consular confirmation.
8. Documents proving investment by a foreigner or foreign corporation (applicable only when a foreigner or foreign corporation invests 50% or more of the capital)
② The documents referred to in each subparagraph of Paragraph 1 (excluding Subparagraph 5) must have been issued or prepared within one month prior to the application for registration of construction engineering business. <Amended Sep. 17, 2021>
[Title amended Sep. 17, 2021]
Article 22 (Issuance of Construction Engineering Business Registration Certificate, etc.) ① If the agency entrusted with the duties of registration, etc. recognizes that an application for registration of a construction engineering business conforms to the registration standards, it shall notify the Mayor of a Special City, Metropolitan City, or Special Self-Governing City, or the Governor of a Province or Special Self-Governing Province (hereinafter referred to as the “Mayor/Provincial Governor”) of such fact without delay, and record it in the Construction Engineering Business Operator Register in the form of Annex 21 and send it to the Mayor/Provincial Governor. <Amended Mar. 18, 2020; Sep. 17, 2021>
② The Mayor or Provincial Governor who has received the notification and transmission pursuant to Paragraph 1 shall issue a Construction Engineering Business Registration Certificate in the form of Annex 22 to the applicant pursuant to Article 26, Paragraph 2 of the Act (including issuance by electronic document). <Amended Sep. 17, 2021>
③ If a Mayor or Provincial Governor has issued a construction engineering business registration certificate pursuant to Paragraph 2, they shall notify the entrusted agency for registration, etc. of such fact without delay. <Amended Sep. 17, 2021>
④ The Register of Construction Engineering Business Operators under Paragraph 1 shall be prepared and managed in a manner that enables electronic processing, unless there are special circumstances making electronic processing impossible. <Amended Mar. 18, 2020; Sep. 17, 2021>
⑤ The entrusted agency for registration and other duties shall notify the mayor or provincial governor of the results of the registration work processing by the 7th of the following month, based on the last day of each month.
⑥ If a construction engineering business operator intends to have their Construction Engineering Business Registration Certificate reissued because it has been lost or damaged beyond repair, they must submit an Application for Reissuance of Construction Engineering Business Registration Certificate (Form No. 23) to the entrusted agency responsible for registration and related duties. In this case, if the certificate is to be reissued due to damage, the relevant certificate must be attached. <Amended Mar. 18, 2020; Sep. 17, 2021>
[Title amended Sep. 17, 2021]
Article 23 (Reporting of Change of Registration and Suspension or Closure of Construction Engineering Business) ① The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 26, Paragraph 3 of the Act refers to the matters in each of the following subparagraphs. <Newly added Sep. 17, 2021>
1. Trade name or corporate name
2. Office or examination room
3. Representative
4. Specialization or Subfield
5. Technical personnel
6. Equipment
② In Article 26, Paragraph 3 of the Act, the term “period prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to three months from the date on which the cause for change occurred. <Amended Sep. 17, 2021>
③ Any person who intends to register a change pursuant to Article 26, Paragraph 3 of the Act shall submit the Application for Registration (Change Registration) of Construction Engineering Business in the Form No. 20 attached hereto, along with the documents specified in each of the following subparagraphs, to the entrusted agency for registration, etc. <Amended Oct. 12, 2018; Sep. 17, 2021>
1. Construction engineering business registration certificate pursuant to Article 26, Paragraph 2 of the Act
2. Documents related to changes in registered matters among the documents listed in each subparagraph of Article 21, Paragraph 1
④ In the event that a construction engineering business operator intends to report a suspension or closure of business pursuant to the first part of Article 26, Paragraph 4 of the Act, the operator shall submit a Report on Suspension (Closure) of Construction Engineering Business (Form No. 24) to the entrusted agency for registration, etc., within one month from the date of such suspension or closure, attaching documents proving the suspension or closure. <Amended Mar. 18, 2020; Sep. 17, 2021>
[Title amended Sep. 17, 2021]
Article 24 (Reporting of Transfer of Construction Engineering Business, etc.) ① If a construction engineering business operator intends to report a transfer of business pursuant to Article 29, Paragraph 1, Subparagraph 1 of the Act, they shall, within 30 days from the date of the transfer of business, submit a Report on Transfer and Acquisition of Construction Engineering Business in the Form of Annex 25, attached with the documents specified in each of the following subparagraphs, to the entrusted agency for registration, etc., jointly with the transferee. <Amended Oct. 12, 2018; Mar. 18, 2020; Sep. 17, 2021>
1. Copy of the Assignment Agreement
2. Documents under each subparagraph of Article 21, Paragraph 1 concerning the assignee
3. In the case of ongoing construction engineering, documents proving the contracting authority's consent to the transfer or assignment of the relevant services
② In the event that a construction engineering business operator intends to report a merger between corporations (including a split merger) pursuant to Article 29, Paragraph 1, Subparagraph 2 of the Act, the representative thereof and the representative of the corporation surviving after the merger or the corporation established pursuant to the merger shall, within 30 days from the date of the merger, jointly submit the Report on Corporate Merger in the Construction Engineering Business (Form No. 26) to the entrusted agency for registration, etc. of the City or Province having jurisdiction over the surviving corporation or the corporation established pursuant to the merger, attaching the documents specified in each of the following subparagraphs. <Amended Oct. 12, 2018; Mar. 18, 2020; Sep. 17, 2021>
1. Copy of Merger Agreement
2. Merger Notice
3. A copy of the resolution of the General Meeting or the Founding General Meeting that resolved matters concerning the merger
4. Documents under each subparagraph of Article 21, Paragraph 1 concerning the surviving corporation after the merger or the corporation established pursuant to the merger
5. If construction engineering is in progress, documents proving the consent of the contracting authority
③ When the entrusted institution for registration, etc. receives a report pursuant to Paragraphs 1 and 2, it shall verify whether the assignee, the surviving corporation after the merger, or the corporation established pursuant to the merger (hereinafter referred to as “assignee, etc.”) meets the registration standards, and if they do not meet the registration standards, it may request supplementation.
[Title amended Sep. 17, 2021]
Article 25 (Succession of Construction Engineering Performance Records) ① When an institution entrusted with registration, etc. duties receives a report of business transfer, etc. pursuant to Article 24, Paragraphs 1 and 2, it shall notify the institution entrusted with construction engineering performance management of the details thereof within 7 days (referring to the institution entrusted with duties concerning construction engineering performance management pursuant to Article 117, Paragraph 1, Subparagraph 7 of the Enforcement Decree; hereinafter the same applies). <Amended Sep. 17, 2021>
② When the entrusted institution for the management of construction engineering performance records receives notification of the reported details pursuant to Paragraph 1, it shall manage the construction engineering performance records of the transferor or the corporation dissolved due to a merger by aggregating them with the construction engineering performance records of the transferee, etc., based on the date of submission of the report on business transfer, etc., pursuant to Article 24, Paragraphs 1 and 2. <Amended Sep. 17, 2021>
[Title amended Sep. 17, 2021]
Article 26 (Verification of Registration Requirements, etc.) ① When an institution entrusted with registration, etc. duties receives an application for registration or change of registration of a construction engineering business pursuant to Article 21, Paragraph 1 or Article 23, Paragraph 3, it shall verify the matters set forth in each of the following subparagraphs. However,in the case of an application for registration or change of registration in the quality inspection field pursuant to Article 44, Paragraph 1, Subparagraph 3 of the Enforcement Decree, the institution may have an evaluation agency pursuant to Article 61 of the Act verify the matters set forth in each of the following subparagraphs. <Amended Sep. 17, 2021>
1. Status of securing and using the applicant's office or examination room
2. Current Status of Technical Personnel
3. Equipment Holdings
4. Capital Status and Asset Management Status
5. Whether the grounds for disqualification under Article 27 of the Act apply
6. Other matters necessary for verifying registration requirements
② The entrusted institution for registration and other business matters may receive a fee from the applicant within the scope of actual expenses for the business matters of registration, issuance and reissuance of registration certificates, change of registration, report of suspension or closure of business, and report of business transfer or merger pursuant to Articles 21 through 24.
Article 27 (Notification and Disclosure of Construction Engineering Performance, etc.) ① The notifications and confirmations pursuant to Article 45, Paragraphs 2, 3, 5, and 8 of the Enforcement Decree shall each be in accordance with the forms set forth in the following subparagraphs. <Amended Feb. 25, 2019; Mar. 18, 2020; May 26, 2020; Sep. 17, 2021>
1. Contract status, such as the type of construction engineering, construction costs, and contract amount: Notification of Contract Conclusion, Contract Change, and Completion for Construction Engineering in Form No. 27. In this case, when a construction engineering business operator requests a report on performance from an administrative agency that has granted permission, authorization, or approval, etc. for construction work pursuant to Article 45, Paragraph 3, Subparagraph 2 of the Enforcement Decree (hereinafter referred to as the “licensing agency”), or directly notifies the Minister of Land, Infrastructure and Transport of the performance regarding the service under Article 45, Paragraph 1, Subparagraph 3 pursuant to Article 45, Paragraph 5, the business operator must attach a contract for construction project management services.
2. Status of Participating Construction Engineers (Change): Notification of Status of Participating Construction Engineering Engineers (Change) (Form No. 28)
3. Status of Deployment and Withdrawal of Construction Engineers Performing Construction Project Management (hereinafter referred to as “Construction Project Management Engineers”): Notification of Deployment and Withdrawal Status of Construction Project Engineers (Form No. 29)
4. Status of Construction Engineering Business Operators Subject to Restrictions on Bidding Eligibility as Unfair Contractors Pursuant to Article 27 of the Act on Contracts to Which the State is a Party and Article 31 of the Act on Contracts to Which Local Governments are a Party : Notification of Status of Construction Engineering Business Operators Restricted on Bidding Eligibility (Form No. 30)
5. Verification of Construction Engineering Performance: Construction Engineering Performance Confirmation Form (Attachment No. 31)
② When the head of a contracting authority or licensing agency notifies a construction project management engineer of withdrawal pursuant to Article 45, Paragraph 2, Subparagraph 3 of the Enforcement Decree due to any of the reasons falling under any of the following subparagraphs, they shall notify that the withdrawal has been made as the construction project management contract has been completed. <Amended Oct. 12, 2018; Feb. 25, 2019; May 26, 2020>
1. In the case of being assigned to the relevant construction site for 3 years or more
2. In the case of retirement
3. In the case of enlistment, immigration, or death
4. Cases where medical treatment is required for 3 months or more due to illness or injury
5. In cases where the commencement of construction is delayed or construction is suspended for more than 3 months
5-2. In cases where deployment is delayed by three months or more compared to the deployment plan submitted to the Contracting Authority pursuant to Article 35, Paragraph 4 (hereinafter referred to as the “Deployment Plan”) due to reasons attributable to the Contracting Authority
5-3. Cases where withdrawal occurs due to adjustment of the client's deployment plan
6. When the head of the contracting authority or licensing agency deems it necessary
③ When issuing a confirmation certificate pursuant to Article 45, Paragraph 8 of the Enforcement Decree, the entrusted institution for construction engineering performance management may receive a fee from the applicant (excluding cases where the contracting authority is the applicant) within the scope of actual expenses. <Amended May 26, 2020; September 17, 2021>
[Title amended Sep. 17, 2021]
Article 28 (Selection of Construction Engineering Business Operators, etc.) ① When a contracting authority (excluding persons falling under subparagraphs 2 through 7 of Article 3 of the Enforcement Decree, provided that it includes cases where a specialized safety diagnosis agency conducting safety inspections or detailed safety diagnoses is selected pursuant to Articles 11 and 12 of the Special Act on Safety and Maintenance of Facilities; hereinafter the same applies in this Article, Article 29, and Article 30) orders construction engineering pursuant to Article 52, Paragraph 1 of the Enforcement Decree, it shall select persons to participate in the bidding by evaluating them according to the business performance capability evaluation criteria classified in each of the following subparagraphs. <Amended Jan. 18, 2018; Mar. 18, 2020; Sep. 17, 2021; Jun. 18, 2025>
1. In the case of a basic plan, basic design, detailed design, or construction project management (excluding construction engineering evaluated pursuant to Paragraph 2) where the estimated price is equal to or greater than the amount under Article 51, Paragraph 1 of the Enforcement Decree, a person who receives a score equal to or greater than a certain score determined by the contracting authority based on the evaluation results classified according to each of the following subparagraphs shall be selected.
a. Basic plan, basic design, or detailed design: Evaluation in accordance with Item 1 of Annex 2 (in the case of construction engineering falling under the proviso of Article 52, Paragraph 1 of the Enforcement Decree, evaluation shall be conducted after the price bidding is completed)
b. Construction Project Management: Evaluation in accordance with Item 1 of Attached Table 3
2. In the case of a precision safety inspection or precision safety diagnosis pursuant to Articles 11 and 12 of the Special Act on the Safety and Maintenance of Facilities where the estimated price is 100 million won or more, a person who has received a score equal to or higher than a certain score determined by the contracting authority based on the evaluation criteria established by the contracting authority, taking into consideration the evaluation criteria in Item 1 of Annex 4, shall be selected.
② Notwithstanding Paragraph 1, the contracting authority may select bidders for construction engineering falling under any of the subparagraphs of Subparagraph 1 by requiring the submission of a technical personnel evaluation report or a technical proposal in accordance with the classifications in each subparagraph of Subparagraph 2, and evaluating them in accordance with the technical evaluation criteria specified for each type of construction engineering. <Amended Feb. 25, 2019; Sep. 17, 2021; Jun. 18, 2025>
1. Construction Engineering Subject to Evaluation
a. Construction engineering requiring the special experience and technical capabilities of engineers to ensure public safety and preserve history and culture
b. Construction engineering requiring special consideration due to limited domestic track record, complex construction types, location, ground conditions, and adjacent facilities
c. Construction engineering requiring special evaluation to promote technological development, such as new technologies, new construction methods, and eco-friendly construction techniques
2. Technology Evaluation Criteria and Methods
a. Basic plans or basic designs with an estimated price of 1 billion KRW or more but less than 3 billion KRW, and detailed designs with an estimated price of 1.5 billion KRW or more but less than 4 billion KRW: After selecting a person who has received a score equal to or higher than a certain threshold determined by the contracting authority based on the evaluation results pursuant to Item 1 of Annex 2, evaluate the technical personnel evaluation report pursuant to Item 2 of the same Annex.
b. Basic plans or basic designs with an estimated price of 3 billion KRW or more, and detailed designs with an estimated price of 4 billion KRW or more: After selecting a bidder who has received a score of at least a certain threshold determined by the contracting authority based on the evaluation results pursuant to Item 1 of Annex 2, the technical proposals shall be evaluated in accordance with Item 3 of the same Annex.
c. Construction project management with an estimated price of 2 billion KRW or more: After selecting a person who has received a score of at least a certain amount determined by the contracting authority based on the evaluation results pursuant to Item 1 of Annex 3, evaluate the technical proposal in accordance with Item 2 of the same Annex. However, for construction project management implemented during the construction phase including supervision duties pursuant to Article 2, Item 5 of the Act (hereinafter referred to as “construction project management during the construction phase”), after selecting a person who has received at least a certain score determined by the contracting authority based on the evaluation results pursuant to Item 1 of Annex 3, evaluate the technical personnel evaluation report in accordance with Item 3 of the same Annex.
d. Precision inspection or precision safety diagnosis with an estimated price of 200 million KRW or more: Select a person who has received a score of at least a certain level determined by the contracting authority based on the evaluation results pursuant to Item 1 of Annex 4, and then evaluate the technical personnel evaluation report pursuant to Item 2 of the same Annex.
③ The Minister of Land, Infrastructure and Transport may prescribe standard forms for documents, etc. to be submitted by a contracting authority when it intends to evaluate the business performance capabilities of a construction engineering business operator pursuant to Article 52, Paragraph 1 of the Enforcement Decree, and make such forms available for use by the contracting authority, etc. <Amended Mar. 18, 2020; Sep. 17, 2021>
④ In Article 52, Paragraph 7 of the Enforcement Decree, “method prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the evaluation of business performance capability pursuant to Paragraph 2.
[Title amended Sep. 17, 2021]
Article 29 (Selection of Designer by Design Competition) In cases where the contracting authority selects a designer by means of a design competition pursuant to Article 52, Paragraph 2 of the Enforcement Decree, it may evaluate the submitted works either directly or by commissioning a specialized agency in accordance with evaluation criteria separately determined in consideration of the guidelines and standards in each of the following subparagraphs.
1. Guidelines for the Operation of Design Competitions Notified by the Minister of Land, Infrastructure and Transport
2. Evaluation criteria for technical proposals under Item 3 of Attached Table 2
Article 30 (Selection of Service Providers Based on Separation of Technology and Price) In cases where a contracting authority intends to select qualified bidders eligible to participate in a bid separated by technology and price pursuant to Article 52, Paragraph 3 of the Enforcement Decree, it may evaluate bidders by requiring them to submit a technical personnel evaluation report or a technical proposal in accordance with the classifications in each item of Subparagraph 2 of Article 28, Paragraph 2. <Amended Feb. 25, 2019>
[Title amended Mar. 18, 2020]
Article 31 (Approval of Subcontracting in Construction Engineering, etc.) ① A person who intends to obtain approval for subcontracting pursuant to Article 35, Paragraph 4 of the Act shall submit to the contracting authority an application for approval of a subcontracting contract in the form of Annex 32, attaching the documents of each of the following subparagraphs.
1. Subcontracted Schedule
2. Service details specifying the scope and amount of services, etc.
② Upon receiving an application pursuant to Paragraph 1, the contracting authority shall review the appropriateness of the subcontracting agreement in accordance with the Construction Engineering Subcontracting Management Guidelines notified by the Minister of Land, Infrastructure and Transport, and notify the applicant of the approval or disapproval within 7 days. However, if there are unavoidable reasons, such as requiring a substantial amount of time to determine the appropriateness of the subcontracting agreement, the notification period may be extended only once. In the event that the notification period is extended, the contracting authority shall notify the applicant without delay by specifying the reason for the extension and an expected notification deadline within 7 days. <Amended Sep. 17, 2021>
③ If necessary for the approval of a subcontract applied for under Paragraph 1, the contracting authority may request information or opinions necessary to determine the appropriateness of the subcontract from a specialized institution capable of determining the appropriateness of construction engineering subcontracts, as notified by the Minister of Land, Infrastructure and Transport. <Amended Sep. 17, 2021>
[Title amended Sep. 17, 2021]
Article 31-2 (Reduction of Construction Engineering Fees) The phrase “cases where there are unavoidable reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as natural disasters” in the latter part of Article 37, Paragraph 1 of the Act refers to any of the following cases:
1. Cases where the relevant construction engineering cannot be carried out normally due to the occurrence of a disaster as defined in Article 3, Subparagraph 1 of the Framework Act on Disaster and Safety Management
2. Cases where the contract amount has been adjusted pursuant to Article 19 of the Act on Contracts to Which the State is a Party or Article 22 of the Act on Contracts to Which Local Governments are a Party
3. Other cases where it is deemed significantly unreasonable not to adjust the construction engineering fee due to a design change or a change in the contract terms, as stipulated in the contract between the parties (excluding the case under subparagraph 2)
[This Article Newly Inserted Sep. 17, 2021]
Article 32 (Construction Works Excluded from Application of Construction Project Management Regulations, such as Acting of Supervisory Authority) In Article 55, Paragraph 2, Subparagraph 4 of the Enforcement Decree, the term “construction works prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the construction works listed in each of the following subparagraphs. <Amended Aug. 27, 2021>
1. Paving overlay work
2. Dredging work
3. Erosion control works or construction of roads classified as agricultural production infrastructure under the Rearrangement of Agricultural and Fishing Villages Act
4. Simple earthworks such as excavation and leveling
5. Simple river construction that does not involve the construction of structures, etc.
6. Simple construction work, such as the construction of warehouses, livestock sheds, etc.
7. Construction work that does not involve structures, for which the contracting authority deems that there is no need to perform construction project management including the delegation of supervisory authority pursuant to Article 39, Paragraph 2 of the Act (hereinafter referred to as “construction project management including delegation of supervisory authority”).
Article 33 (Integrated Implementation of Construction Project Management, Including Delegation of Supervisory Authority) ① Construction projects for which integrated implementation of construction project management, including delegation of supervisory authority, may be carried out pursuant to Article 55, Paragraph 3 of the Enforcement Decree shall be limited to construction projects where the straight-line distance between construction sites is within 20 km.
② In cases where a responsible construction engineer for the relevant construction project management pursuant to Article 40, Paragraph 5 of the Act (hereinafter referred to as “responsible construction project management engineer”) is assigned for construction project management, such as the delegation of supervisory authority implemented in an integrated manner pursuant to Article 55, Paragraph 3 of the Enforcement Decree, in accordance with the classifications in each subparagraph of Article 35, Paragraph 1, the total construction cost of each project shall be based on the sum of the total construction costs (referring to an amount including the cost of government-supplied materials, but excluding compensation costs for the acquisition or use of land, etc.; hereinafter the same applies). <Amended Feb. 25, 2019>
③ In the case of construction projects executed through integrated construction project management, such as by acting supervisory authority, where the total construction cost of a single project is 30 billion KRW or more, one additional Special-Grade Engineer must be assigned to the relevant construction project management, in addition to the Special-Grade Engineer serving as the Chief Construction Project Management Engineer. <Amended Feb. 25, 2019>
Article 34 (Contents of Duties in Construction Project Management, etc.) ① The term “matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 59, Paragraph 3, Subparagraph 13 of the Enforcement Decree refers to the duties set forth in each of the following subparagraphs performed by construction project management engineers (hereinafter referred to as “technical support engineers”) who support construction project management engineers stationed at a construction site (hereinafter referred to as “resident engineers”). <Amended Feb. 25, 2019; Mar. 18, 2020>
1. Analysis of site survey results requested by the Chief Construction Project Management Engineer and technical review of major structures
2. Review for Project Cost Reduction
3. Review of construction detail drawings requested by the responsible construction project management engineer
4. Progress and Final Inspection
5. Administrative support duties
6. Review of design documents
7. Technical Review of Significant Design Changes
8. Evaluation of on-site construction status and technical guidance
② If a resident technician leaves the site for one day or more due to unavoidable circumstances, they must record this in the work log and obtain confirmation from the contracting authority. <Amended Feb. 25, 2019>
③ A construction engineering business operator performing construction project management (hereinafter referred to as the “Construction Project Management Service Provider”) shall designate a responsible person among the technical support engineers to oversee the work performed by the technical support engineers. <Amended Feb. 25, 2019; Mar. 18, 2020; Sep. 17, 2021>
Article 34-2 (Standards for Establishing Construction Project Management Plans in the Construction Phase) ① A construction project management plan in the construction phase pursuant to Article 39-2, Paragraph 1 of the Act (hereinafter referred to as the “construction project management plan” in this Article) shall include the following matters:
1. Basic details of the construction project, such as project name, implementing agency name, major details, and total construction cost
2. Project management method in accordance with the standards prescribed and notified by the Minister of Land, Infrastructure and Transport
3. Plan for the placement of construction project management engineers or construction supervisors in accordance with the standards prescribed and notified by the Minister of Land, Infrastructure and Transport
4. Matters according to the classification of each of the following items
a. In the case of a contracting authority that has established a Technical Advisory Committee: Whether the matter is subject to deliberation by the Technical Advisory Committee pursuant to Article 39-2, Paragraph 3 of the Act and the results of the deliberation (applicable only if the matter is subject to deliberation by the Technical Advisory Committee)
b. In the case of a contracting authority that does not have a Technical Advisory Committee: Whether the matter is subject to deliberation by the Local Deliberation Committee pursuant to Article 59-2, Paragraph 6 of the Enforcement Decree and the results of the deliberation (applicable only if the matter is subject to deliberation by the Local Deliberation Committee)
5. Scope of work for construction supervisors or construction project management engineers
6. Other matters deemed necessary by the contracting authority
② Where a construction engineering business operator performs construction project management pursuant to Article 39 of the Act, in addition to the matters set forth in each subparagraph of Paragraph 1, the matters set forth in each subparagraph of the following subparagraphs shall be included in the construction project management plan. <Amended Mar. 18, 2020; Sep. 17, 2021>
1. Details of construction project management fees calculated in accordance with the standards prescribed and notified by the Minister of Land, Infrastructure and Transport
2. Scheduled bidding period for construction project management services
3. Among the evaluation plans for the performance of construction engineering business tasks pursuant to Article 50, Paragraph 1 of the Act, the evaluation plan targeting construction project management service business pursuant to Article 82, Paragraph 1, Subparagraph 2 of the Enforcement Decree.
③ When a contracting authority submits a construction project management plan for the construction phase to the Minister of Land, Infrastructure and Transport pursuant to Article 39-2, Paragraph 4 of the Act, it shall follow the Submission Form for Establishment or Amendment of the Construction Project Management Plan for the Construction Phase (Form No. 32-2). < Newly added Sep. 17, 2021>
[This Article Newly Inserted July 1, 2019]
Article 35 (Standards for Placement of Construction Project Management Engineers, etc.) ① When assigning a responsible construction project management engineer pursuant to Article 60, Paragraph 1 of the Enforcement Decree, the experience and placement standards required for the relevant construction field shall be as classified in each of the following subparagraphs. <Amended Feb. 25, 2019>
1. Construction projects with a total cost of 50 billion KRW or more: Special-Grade Engineers with at least one year of experience in construction project management during the construction phase for construction projects with a total cost of 30 billion KRW or more
2. Construction projects with a total cost of 30 billion KRW or more but less than 50 billion KRW: Special Grade Engineers with at least one year of experience in construction project management during the construction phase for construction projects with a total cost of 20 billion KRW or more
3. Construction projects with a total cost of 10 billion KRW or more but less than 30 billion KRW: Senior engineers with at least one year of experience in construction project management during the construction phase for projects with a total cost of 10 billion KRW or more.
② In accordance with Article 60, Paragraph 2 of the Enforcement Decree, a construction project management service provider shall assign construction project management engineers during the construction phase by classifying them into resident engineers and technical support engineers, taking into consideration the scale and type of work of the relevant construction project; the contracting authority may adjust this in consideration of the actual site conditions. <Amended Feb. 25, 2019; Mar. 18, 2020>
③ In principle, construction project management engineers shall be evenly distributed according to grade; however, the contracting authority may adjust this in accordance with the specific characteristics of the relevant construction project. <Amended Feb. 25, 2019>
④ A construction project management service provider shall formulate a deployment plan in accordance with the deployment standards under Paragraphs 2 and 3 and submit it to the contracting authority. The same shall apply when intending to change the submitted deployment plan. <Amended Mar. 18, 2020>
⑤ If the service evaluation score pursuant to the proviso to Article 83, Paragraph 1 of the Enforcement Decree is equal to or lower than the score determined and notified by the Minister of Land, Infrastructure and Transport, the contracting authority may request the construction project management service provider to replace the relevant construction project management engineer pursuant to Article 60, Paragraph 4 of the Enforcement Decree. <Amended Feb. 25, 2019; Mar. 18, 2020>
⑥ A construction project management service provider shall assign construction project management engineers in accordance with the assignment plan submitted to the contracting authority pursuant to Paragraph 4. However, if a construction project management engineer is to be assigned differently from the assignment plan, prior approval must be obtained from the contracting authority, and a construction project management engineer must be assigned whose grade, experience, performance, and scores for education and training, etc., pursuant to Annex 3, are at the same level as or higher than those of the construction project management engineer specified in the assignment plan. <Amended Feb. 25, 2019; Mar. 18, 2020>
⑦ A construction project management service provider shall not undergo a selection evaluation pursuant to Articles 28 and 30 or assign a construction project management engineer, who has been withdrawn with the approval of the contracting authority due to an illness or injury requiring medical treatment for three months or more, to another construction project management service within three months from the date of withdrawal. However, this shall not apply if the construction project management service to which the said construction project management engineer was assigned has been completed. <Amended Feb. 25, 2019; Mar. 18, 2020>
⑧ If a construction project management service provider intends to assign a construction project management engineer, it shall submit a Certificate of Experience for Construction Engineers in accordance with Form No. 18 to the contracting authority. <Amended Feb. 25, 2019; Mar. 18, 2020>
⑨ Detailed matters necessary for the placement standards, methods, etc. of construction project management engineers shall be determined and notified by the Minister of Land, Infrastructure and Transport. <Amended Feb. 25, 2019>
[Title amended Feb. 25, 2019]
Article 36 (Preparation and Submission of Construction Project Management Reports) ① The contents to be included and the method of submission of reports prepared and submitted by a construction engineering business operator who has performed construction project management duties pursuant to Article 39, Paragraph 4 of the Act shall be as classified in each of the following subparagraphs. <Amended July 4, 2016; Feb. 25, 2019; Mar. 18, 2020; Aug. 27, 2021; Sep. 17, 2021>
1. Result Report on Construction Project Management during the Design Phase: Submit to the Contracting Authority within 14 days from the expiration date of the Construction Project Management services during the design phase, including the contents of each of the following items:
a. Overview of the Task
b. Details of work performance, such as technical consultation on design and suitability review
c. Details of Work Performance for Design Economic Feasibility Review
d. Other matters specified in the contract that the contracting authority deems necessary
2. Interim Report on Construction Project Management during the Construction Phase: Prepared monthly and submitted to the Contracting Authority by the 7th of the following month, including the contents of each of the following items.
a. Current Status of Construction
b. Work Log of Construction Project Management Engineer
c. Status of Quality Testing and Inspection
d. Status of concrete pouring and steel frame installation work by structure (including worker roster)
e. Details of Inspection Request and Result Notification
f. Details of Material Supplier Approval Request and Result Notification
g. Details of inspection, receipt, and issuance of major materials
h. Status of Construction Design Changes
i. Phased Construction Status of Major Structures
j. Current Status of Crack Management in Concrete Structures
k. Construction Accident Report
l. Other matters specified in the contract that the contracting authority deems necessary
3. Final Report on Construction Project Management during the Construction Phase: Submit to the Contracting Authority within 14 days from the expiration date of the construction project management services during the construction phase, including the contents of each of the following items:
a. Overview of Construction Works and Construction Project Management Services
b. Summary of Technology Review Performance by Field
c. Project Implementation Details and Performance
d. Summary of Inspection Results
e. Cases of Excellent and Failed Construction
f. Summary of Quality Testing and Inspection Performance
g. Summary of Major Material Management Performance
h. Comprehensive Safety Management Performance
i. Comprehensive analysis
j. Other matters stipulated in the contract that the contracting authority deems necessary
② If necessary for the efficient preparation and computerization of construction project management reports pursuant to Paragraph 1, the Minister of Land, Infrastructure and Transport may develop a computer program for preparing construction project management reports and have it utilized.
③ Detailed matters concerning the contents to be included in the construction project management report pursuant to Paragraph 1 and the method of submission shall be determined and announced by the Minister of Land, Infrastructure and Transport.
Chapter 5 Management of Construction Works
Article 36-2 (Procedures for Establishing Construction Standards, etc.) ① In cases where a person specified in each subparagraph of Article 65, Paragraph 1 of the Enforcement Decree intends to enact, amend, or abolish standards concerning each subparagraph of Article 44, Paragraph 1 of the Act (hereinafter referred to as “construction standards”), they may consult with the National Construction Standards Center pursuant to Article 44-2, Paragraph 2 of the Act (hereinafter referred to as the “construction standards center”) regarding the matters of each ofthe following subparagraphs.
1. Plan for the enactment, amendment, or abolition of construction standards
2. Structure of Construction Standards
3. Whether there is overlap or conflict with other construction standards
② The Minister of Land, Infrastructure and Transport may determine and announce the construction standard organization system, etc. necessary for the establishment and management of construction standards.
[This Article Newly Inserted Jan. 29, 2015]
Article 37 (Dissemination of Construction Standards, etc.) ① In the latter part of Article 65, Paragraph 3 of the Enforcement Decree, “changes to minor matters prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to changes in each of the following subparagraphs. <Amended Jan. 29, 2015>
1. Changes to correct typographical errors or omissions, or to reflect changes in agency names, etc., to the extent that they do not affect the content of the construction standards
2. Change of construction standards to the same content due to changes in other construction standards
② In cases where the Minister of Land, Infrastructure and Transport intends to distribute books, etc. concerning construction standards for a fee pursuant to Article 65, Paragraph 5 of the Enforcement Decree, he/she shall select institutions and organizations for such distribution in accordance with the standards set forth in each of the following subparagraphs. <Amended Jan. 29, 2015>
1. If there is a request for paid distribution of the same construction standard from two or more persons falling under each subparagraph of Article 65, Paragraph 1 of the Enforcement Decree, the person who enacted or amended the construction standard, or the construction technology-related organization and research institution that participated in it, shall be selected as the paid distribution agency and organization in priority.
2. In the case of Item 1, if there are no construction technology-related organizations or research institutions that have enacted or amended the relevant construction standards or participated in such efforts, paid dissemination institutions and organizations shall be selected in order of application priority.
3. When selecting institutions and organizations for paid distribution pursuant to subparagraphs 1 and 2, two or more institutions or organizations may be selected if deemed necessary.
[Title amended Jan. 29, 2015]
Article 38 (Support for Expenses for the Revision of Construction Standards) ① person who wishes to receive support for expenses necessary for the revision of construction standards pursuant to Article 65, Paragraph 8 of the Enforcement Decree shall submit to the Minister of Land, Infrastructure and Transport an application for the disbursement of state subsidies in the form of Annex 33, attached with a plan for the revision of construction standards. <Amended Jan. 29, 2015>
② If the Minister of Land, Infrastructure and Transport intends to provide financial support to an applicant pursuant to Paragraph 1, he/ she must undergo consultation with an institution designated and notified by the Minister of Land, Infrastructure and Transport and deliberation by the Central Deliberation Committee.
[Title amended Jan. 29, 2015]
Article 38-2 (Operation of Construction Standards Center, etc.) ① In cases where the operation of the Construction Standards Center is entrusted to the Korea Institute of Construction Technology pursuant to Article 44-2, Paragraph 4 of the Act and Article 65-2, Paragraph 4 of the Enforcement Decree, the head of the Korea Institute of Construction Technology (hereinafter referred to as the “President of the Korea Institute of Construction Technology”) may establish a Construction Standards Committee within the Construction Standards Center to review professional matters concerning construction standards.
② Matters necessary for the composition and operation, etc. of the Construction Standards Committee pursuant to Paragraph 1 shall be determined by the President of the Korea Institute of Construction Technology and reported to the Minister of Land, Infrastructure and Transport.
[This Article Newly Inserted Jan. 29, 2015]
Article 39 (Reporting of Feasibility Study Data, etc.) ① The term “data prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as demand forecast data” in Article 47, Paragraph 2 of the Act refers to the data in each of the following subparagraphs.
1. Basic data for demand forecasting, such as plans related to construction projects and socioeconomic indicators
2. Results of on-site surveys and current status data regarding traffic volume, facilities, etc.
3. Data on demand analysis and forecasting, including methods and forecasting results
4. Materials on the presentation and review of alternatives, etc.
② The Minister of Land, Infrastructure and Transport may separately determine the details of the data pursuant to each subparagraph of Paragraph 1.
③ The contracting authority shall input the data referred to in Paragraph 1, reported by the construction engineering business operator, into the Integrated Information System for Construction Project Support within 60 days after the completion of the feasibility study service. <Amended Mar. 18, 2020; Sep. 17, 2021>
Article 40 (Preparation of Design Documents) ① The contracting authority or a construction engineering business operator performing design work shall prepare design documents (referring to design drawings, design specifications, construction specifications, supplementary drawings requested by the contracting authority as particularly necessary, and other related documents; hereinafter the same applies) in accordance with the standards set forth in each of the following subparagraphs. <Amended Jan. 29, 2015; Mar. 7, 2016; Feb. 25, 2019; Mar. 18, 2020; Sep. 17, 2021>
1. Design documents must be prepared in detail, without any omissions, so that field engineers can easily understand them and carry out safe and accurate construction.
2. The design documents shall specify the details of the seismic design in accordance with the seismic design standards for each facility established by the head of the relevant central administrative agency pursuant to Article 14 of the Earthquake Disaster Countermeasures Act.
3. The construction specifications (referring to the construction standards included in the contract documents for the construction work) shall be prepared based on the standard specifications and specialized specifications (referring to the standard specifications and specialized specifications pursuant to Article 65, Paragraphs 6 and 7 of the Enforcement Decree); provided that, considering the specificity of the work, regional conditions, and construction methods, they shall describe matters that cannot be specifically indicated in the basic design and detailed design drawings, as well as construction methods for carrying out the work, performance and specifications of materials and construction methods, quality control such as quality testing and inspection, safety management, and environmental management.
4. When designing structures such as bridges, specify the design method in detail.
5. In accordance with Article 34, Paragraph 3 of the Enforcement Decree, the design report shall include the results of a comprehensive comparative analysis of constructability, economic feasibility, safety, maintainability, and environmental impact regarding new technologies and existing construction methods, and a review of whether they can be applied to the relevant construction project.
② The Minister of Land, Infrastructure and Transport shall establish general standards for the preparation of design documents for facilities and make them available for use by contracting authorities or construction engineering firms; and if necessary, contracting authorities may establish and implement their own standards for the preparation of design documents for each construction sector. <Amended Mar. 18, 2020; Sep. 17, 2021>
Article 41 (Review of Design Documents, etc.) ① The matters to be reviewed by a construction project management service provider, a construction business operator, or a housing construction registration business operator regarding design documents pursuant to Article 48, Paragraph 2 of the Act are as follows: <Amended Mar. 18, 2020; Sep. 17, 2021>
1. Whether the contents of the design documents match the site conditions
2. Whether construction can be carried out according to the design documents
3. Other matters related to construction
② In the latter part of Article 48, Paragraph 3 of the Act, “unavoidable reasons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as the cause of the relevant measure lying with the construction engineering business operator” refers to the reasons set forth in each of the following subparagraphs. <Newly added Sep. 17, 2021>
1. Cases where correction or supplementation of design documents is necessary due to reasons attributable to the construction engineering business operator
2. In cases where the contracting authority requests additional corrections, supplements, etc., within the scope of work defined in the contract with the construction engineering business operator
[Title amended Sep. 17, 2021]
Article 42 (Preparation of Detailed Construction Drawings, etc.) ① The contracting authority shall specify in the construction specifications the types of work subject to which construction business operators and housing construction registration business operators must have their construction status reviewed and verified pursuant to Article 48, Paragraph 4, Subparagraph 1 of the Act. <Amended Mar. 18, 2020>
② The contracting authority shall specify in the construction specifications the list of detailed construction drawings that construction business operators and registered housing construction business operators must prepare for each stage of construction work pursuant to Article 48, Paragraph 4, Subparagraph 2 of the Act, and may separately establish standards for the preparation of detailed construction drawings for reference by construction business operators, registered housing construction business operators, or construction project management service providers, etc. <Amended Mar. 18, 2020>
Article 43 (Recording of Work Performance by Engineers Participating in the Preparation of Design Documents) In cases where a construction engineering business operator records the work performance of a construction engineer who participated in the preparation of design documents in the said design documents pursuant to Article 48, Paragraph 5 of the Act, the business operator shall record the name and period of participation of the said construction engineer together, and shall require the said construction engineer to confirm this and sign or affix their seal. <Amended Feb. 25, 2019; Mar. 18, 2020; Sep. 17, 2021>
[Title amended Aug. 27, 2021]
Article 44 (Construction Engineering and Construction Evaluation) ① The term “construction work prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in the proviso to Article 82, Paragraph 2 of the Enforcement Decree refers to the works listed in each subparagraph of Article 32.
② When the contracting authority conducts an evaluation of the construction work pursuant to Article 50, Paragraph 2 of the Act for jointly contracted construction work (hereinafter referred to as “construction evaluation”), the construction evaluation shall be conducted in accordance with the classifications in each of the following subparagraphs.
1. In the case of a joint execution method: Conduct a construction evaluation for the representative of the joint venture.
2. In the case of a shared execution method: Conduct a construction evaluation for each company responsible for the construction work.
③ The contracting authority may reflect the results of construction site inspections pursuant to Article 54 of the Act in the evaluation of the performance of construction engineering work pursuant to Article 50, Paragraph 1 of the Act (hereinafter referred to as “service evaluation”) and the construction evaluation. <Amended Sep. 17, 2021>
④ The criteria for evaluation of service projects under each subparagraph of Article 82, Paragraph 1 of the Enforcement Decree shall be in accordance with the design service evaluation form in Annex 34 and the construction project management service evaluation form in Annex 35, such as delegation of supervisory authority.
⑤ The contracting authority shall record and manage the results of service evaluation and construction evaluation in accordance with the evaluation summary table in accordance with Form No. 36.
⑥ If the contracting authority has conducted a service evaluation and a construction evaluation, it shall notify the Minister of Land, Infrastructure and Transport of the results within 15 days of the completion of the evaluation. <Amended Mar. 7, 2016>
⑦ In addition to the matters specified in paragraphs 1 through 6, detailed matters concerning service evaluation and construction evaluation shall be determined and announced by the Minister of Land, Infrastructure and Transport.
[Title amended Sep. 17, 2021]
Article 45 (Detailed Selection Criteria for Excellent Construction Engineering Business Operators, etc.) Excellent construction engineering business operators, excellent construction business operators, or excellent construction engineers pursuant to Article 51, Paragraph 1 of the Act shall be selected by detailed fields determined and notified by the Minister of Land, Infrastructure and Transport in accordance with the classifications in each of the following subparagraphs.
1. Excellent construction engineering business operator: Among the subjects of the comprehensive evaluation pursuant to Article 50, Paragraph 4 of the Act (hereinafter referred to as “comprehensive evaluation” in this Article), those with a comprehensive evaluation score of 90 points or higher shall be selected in order of highest score, provided that the number of selected business operators shall not exceed 20 percent of the subjects of the comprehensive evaluation.
2. Excellent Construction Business Operators: Among the subjects of the comprehensive evaluation, those who meet all of the criteria in each of the following subparagraphs shall be selected in order of highest comprehensive evaluation scores, provided that the number of selected operators is not exceeding 20 percent of the subjects of the comprehensive evaluation.
a. The overall evaluation score must be 90 points or higher.
b. If there is a track record of receiving a construction evaluation pursuant to Article 50, Paragraph 2 of the Act within the last three years, the score for each must be 80 points or higher.
c. Must have continuously maintained registration for the relevant construction industry for the past 5 years
d. There must not be any record of cancellation of registration for the relevant construction business sector pursuant to Article 83 of the Framework Act on the Construction Industry.
3. Excellent Construction Engineer: A person with a comprehensive evaluation score of 90 points or higher who satisfies the detailed selection criteria prescribed and notified by the Minister of Land, Infrastructure and Transport.
[Wholly revised June 2, 2025]
Article 46 (Disclosure of Post-Evaluation Results) The contracting authority shall enter the post-evaluation report under Article 52(1) of the Act into the Integrated Information System for Supporting Construction Works, as prescribed and publicly notified by the Minister of Land, Infrastructure and Transport, and shall disclose the post-evaluation results through its website or other means.
Article 47 (Management of Results of Measurements of Substandard Construction, etc.) Where the Minister of Land, Infrastructure and Transport, a contracting authority, or the head of a licensing or permitting agency measures the degree of substandard performance of construction works, etc., under Article 53(1) of the Act (including cases where no penalty points are imposed), the authority shall manage the measurement results and, by the 15th day of the month following the end of each half-year, transmit the penalty-point summary tables in Attached Forms Nos. 37 and 38 to the institution entrusted with comprehensive management of penalty points under Article 117(1) of the Enforcement Decree.
Article 48 (Inspection of Construction Sites, etc.) ① The head of a regional land management office, the mayor of a special autonomous city, the governor of a special autonomous province, the mayor, county head, or district head (referring to the head of an autonomous district; hereinafter the same applies), or the contracting authority shall notify the construction project management service provider at the relevant construction site or the construction engineer assigned to the construction site pursuant to Article 40, Paragraph 1 of the Framework Act on the Construction Industry of the matters specified in each of the following subparagraphs at least three days prior to inspecting the construction site, etc., pursuant to Article 54, Paragraph 1 of the Act. However, such notification may be omitted in cases where specific complaints have been raised regarding the occurrence or risk of a safety accident or substandard construction work, and urgent measures are required, or where it is deemed that the purpose of the inspection cannot be achieved due to the destruction of evidence, etc., if prior notification is provided. <Amended Mar. 7, 2016; July 4, 2016; Feb. 25, 2019; Mar. 18, 2020>
1. Basis and Purpose of Inspection
2. Inspection Date and Time
3. Inspector's personal details (affiliation, position, and name)
4. Inspection Details
② A person inspecting a construction site, etc., pursuant to Article 54, Paragraph 1 of the Act (hereinafter referred to as the “inspector”) shall show the inspection officer identification card in accordance with Form No. 39 of the Attached Form to interested parties. <Amended Mar. 7, 2016>
③ An inspector who has inspected a construction site, etc., shall record the date and time of the inspection and the details of the inspection, etc., in the inspection visit log in accordance with Form No. 40. <Amended Mar. 7, 2016>
④ The client of the construction project, the construction project management service provider, and construction engineers stationed at the site shall present relevant materials, such as design documents and test results, to the inspector to ensure the smooth execution of the site inspection; and if the inspector requests materials necessary for the inspection, they shall comply unless there is a special reason not to. <Amended Mar. 7, 2016; Feb. 25, 2019; Mar. 18, 2020>
⑤ The head of a regional land management office, the mayor of a special self-governing city, the governor of a special self-governing province, the mayor, county head, or district head, or the contracting authority may involve relevant experts in the field, in addition to their affiliated public officials or staff, in inspections if necessary for the efficient inspection of construction sites, etc. <Amended Mar. 7, 2016>
⑥ In Article 88, Paragraph 3, Subparagraph 3 of the Enforcement Decree, “signboard prescribed by the Ministry of Land, Infrastructure and Transport” refers to a signboard for a construction site with defects in accordance with Form No. 41 of the Appendix.
⑦ The Minister of Land, Infrastructure and Transport may prescribe and announce detailed procedures and methods for on-site inspections of construction projects in order to enhance their effectiveness and ensure objectivity. <Newly added Mar. 7, 2016>
Article 49 (Construction Works Not Required to Establish Quality Management Plans, etc.) In the main text of Article 89, Paragraph 3 of the Enforcement Decree, “construction works prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the works listed in each of the following subparagraphs.
1. Landscaping and planting work
2. Deleted <July 4, 2016>
3. Demolition work
Article 50 (Implementation of Quality Testing and Inspection) ① Any person who performs or acts on behalf of others in quality testing and inspection (hereinafter referred to as “quality inspection”) pursuant to Article 55, Paragraph 2 or Article 60, Paragraph 1 of the Act shall record the results of the quality inspection in the quality inspection ledger in Form No. 42 of the Appendix, provided that unless there is a special reason why electronic processing is impossible, it shall be prepared and managed in a manner that enables electronic processing.
② Quality inspections that are appropriate to be performed at the construction site must be performed at the construction site, and when performing quality tests for test items that have a significant impact on the safety of the structure, the client must verify them.
③ Deleted <December 14, 2020>
④ The standards for facilities and the placement of construction engineers for quality control of construction work pursuant to Article 91, Paragraph 3 of the Enforcement Decree are as set forth in Attached Table 5. <Amended Feb. 25, 2019>
⑤ A construction business operator or a housing construction registration business operator may consolidate quality control for construction projects with similar work types and adjacent construction sites upon obtaining approval from the contracting authority or the head of the licensing agency. <Amended Mar. 18, 2020>
⑥ Verification of whether a construction business operator or a housing construction registration business operator is properly performing quality control duties pursuant to Article 92, Paragraph 2 of the Enforcement Decree shall be in accordance with the standards and guidelines for verifying appropriateness notified by the Minister of Land, Infrastructure and Transport pursuant to Article 52, Paragraph 2. <Amended Mar. 18, 2020>
Article 51 (Summary Table of Quality Inspection Results) The summary table of quality inspection results pursuant to Article 93, Paragraph 1 of the Enforcement Decree shall be in the form of Annex 43.
Article 52 (Verification of Adequacy of Quality Control) ① The verification of the adequacy of quality control pursuant to Article 55, Paragraph 4 of the Act shall be conducted at least once a year, provided that it is carried out no later than two months prior to the completion of the relevant construction project. <Amended July 10, 2024>
② The standards and guidelines for verifying appropriateness under Paragraph 1 shall be determined and announced by the Minister of Land, Infrastructure and Transport.
Article 53 (Standards for Calculation and Use of Quality Control Costs) ① The standards for the calculation and use of costs necessary for quality control of construction work pursuant to Article 56, Paragraph 1 of the Act (hereinafter referred to as “quality control costs”) are as set forth in Table 6. However, if the entity conducting the quality inspection is a national or public testing institution pursuant to each subparagraph of Article 97, Paragraph 1 of the Enforcement Decree and the said institution has separately established standards for inspection costs, those standards shall be followed.
② A construction business operator or a housing construction registration business operator shall use the quality control costs calculated pursuant to Paragraph 1 solely for the relevant purposes, and the client or the construction project management service provider may provide guidance and supervision regarding the use of quality control costs. <Amended Mar. 18, 2020>
③ A construction business operator or a housing construction registration business operator shall bear the costs if they have quality inspections, etc. performed by an agent pursuant to Article 60, Paragraph 1 of the Act. <Amended Mar. 18, 2020>
Article 54 (Factory Certification, etc.) ① Any person who intends to obtain factory certification pursuant to Article 96, Paragraph 2 of the Enforcement Decree shall submit to the Minister of Land, Infrastructure and Transport an application for factory certification in the form of Annex 44, attaching the documents listed in each of the following subparagraphs.
1. Documents recording the current status of factory technical personnel
2. Documents recording the factory size and equipment status
3. Other documents notified by the Minister of Land, Infrastructure and Transport as necessary for factory certification
② The factory certification certificate pursuant to Article 96, Paragraph 6 of the Enforcement Decree is as in Form No. 45 of the Attached Form.
③ When the Minister of Land, Infrastructure and Transport grants factory certification, he/she shall record it in the Factory Certification Issuance Register in Form No. 46 of the Appendix and prepare and manage the Factory Certification Register in Form No. 47 of the Appendix.
④ In the first part of Article 58, Paragraph 4 of the Act, the term “relevant administrative agencies and persons prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport, such as persons operating steel structure factories” refers to the persons listed in each of the following subparagraphs. <Newly added July 4, 2016>
1. Relevant administrative agencies
2. Operator of a steel structure factory
Article 55 (Public Notice of Cancellation of Factory Certification) In the event that the Minister of Land, Infrastructure and Transport cancels a factory certification pursuant to Article 59, Paragraph 1 of the Act, he/she shall notify the person manufacturing the steel structure of such fact in writing without delay and publish it in the Official Gazette.
Article 56 (Request for Delegation of Quality Inspection, etc.) ① When a client, a construction business operator, or a housing construction registration business operator intends to request the delegation of quality inspection of a construction project pursuant to Article 60, Paragraph 1 of the Act, they shall enter the matters set forth in each of the following subparagraphs into the Comprehensive Information Network for Safety Management of Construction Projects pursuant to Article 62, Paragraph 15 of the Act (hereinafter referred to as the “Information Network”). <Amended Mar. 18, 2020; Sep. 17, 2021; Jul. 10, 2024>
1. Matters concerning the outsourcing of quality inspections, such as inspection categories, standards, and purposes
2. The name (or designation in the case of a corporation) and signature of the requester of the quality inspection, the sample collector pursuant to Paragraph 2, and the client or the construction engineering business operator performing construction project management.
② In cases where a construction business operator or a housing construction registration business operator intends to request the delegation of quality inspection of a construction project pursuant to Article 60, Paragraph 1 of the Act, they shall obtain prior confirmation regarding the details of such request from the client of the relevant construction project or the construction engineering business operator performing construction project management; and when samples have been collected for the purpose of requesting the delegation of quality inspection, they shall obtain a seal or confirmation from the client of the relevant construction project or the construction engineering business operator performing construction project management. <Amended Oct. 12, 2018; Mar. 18, 2020; Sep. 17, 2021; Jul. 10, 2024>
③ Deleted <July 10, 2024>
④ The client may observe and verify the quality inspection process of materials recognized as important among the materials used in the construction work.
⑤ A construction engineering business operator shall input the contents and data of each of the following subparagraphs into the information network in accordance with Article 60, Paragraph 3 of the Act. <Amended July 10, 2024>
1. Contents stated in the quality inspection report, such as the type, method, and result of the quality inspection, and the name (or designation in the case of a corporation) and signature of the construction engineering business operator performing the quality inspection on their behalf.
2. Evidentiary materials, such as photographs, confirming whether a quality inspection was conducted
⑥ Deleted <2018. 10. 12.>
⑦ Construction business operators and housing construction registration business operators shall not use quality inspection reports viewed through an information network for any purpose other than the intended purpose. <Amended Oct. 12, 2018; Mar. 18, 2020; Jul. 10, 2024>
⑧ The submission of the previous year's quality inspection agency performance results pursuant to Article 97, Paragraph 2, Subparagraph 4 of the Enforcement Decree shall be in accordance with the Quality Inspection Agency Performance Notification Form No. 50.
Article 57 (Evaluation Agency for Quality Inspection Agency) ① In the event that the Minister of Land, Infrastructure and Transport designates or revokes an evaluation agency (hereinafter referred to as the “Evaluation Agency”) for the investigation and evaluation of a construction engineering business operator performing quality inspection on behalf of others pursuant to Article 61, Paragraph 1 of the Act, the Minister shall publish such designation in the Official Gazette. <Amended Mar. 18, 2020; Sep. 17, 2021>
② The Minister of Land, Infrastructure and Transport may establish operational guidelines necessary for the performance of duties by evaluation agencies, and evaluation agencies shall perform their duties in accordance with such operational guidelines.
③ The results of the investigation into the operational status of evaluation agencies pursuant to the latter part of Article 61, Paragraph 3 of the Act shall be published within two months from the date the investigation is completed by posting on the internet homepage of the Ministry of Land, Infrastructure and Transport or by publishing in the Official Gazette. <Newly added July 4, 2016>
Article 58 (Standards for Establishing Safety Management Plans) The standards for establishing a safety management plan pursuant to Article 62, Paragraph 1 of the Act (hereinafter referred to as the “safety management plan”) are as set forth in Table 7.
Article 59 (Periodic Safety Inspection and Detailed Safety Inspection) ① The matters to be inspected in the periodic safety inspection pursuant to Article 100, Paragraph 1, Subparagraph 1 of the Enforcement Decree are as follows: <Amended Dec. 14, 2020>
1. Safety of temporary facilities and temporary construction methods for the safe construction of the project object
2. Appropriateness of the quality, construction status, etc. of the construction object
3. Adequacy of safety measures around the construction site, such as the stability of adjacent buildings or structures
4. Work procedures, such as installation (including tower crane lifting) and dismantling, for construction machinery falling under each item of Article 98, Paragraph 1, Subparagraph 5 of the Enforcement Decree, and the appropriateness of safety measures to prevent overturning, collapse, etc. of construction machinery during work
② In the detailed safety inspection pursuant to Article 100, Paragraph 1, Subparagraph 2 of the Enforcement Decree, the structural safety and causes of physical and functional defects of the facility shall be investigated, measured, and evaluated, and methods for repair, reinforcement, etc. shall be presented.
③ In the latter part of Article 100, Paragraph 6 of the Enforcement Decree, the term “qualification requirements prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the qualification requirements for inspection chiefs or inspectors under Item 2, Subparagraph (b) 1) or 2) of Annex 9 of the Enforcement Rules of the Construction Machinery Management Act. <Newly added Dec. 14, 2020>
④ Detailed matters concerning periodic safety inspections and precise safety inspections pursuant to Paragraphs 1 and 2 shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Amended Dec. 14, 2020>
Article 59-2 (Standards for Establishing Small-Scale Safety Management Plans) The standards for establishing a small-scale safety management plan (hereinafter referred to as “small-scale safety management plan”) pursuant to Article 62-2, Paragraph 1 of the Act are as set forth in Table 7-2.
[This Article Newly Inserted Dec. 14, 2020]
Article 59-3 (Recovery and Restriction of Subsidies and Support) ① The phrase “cases prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” in Article 62-3, Paragraph 3, Subparagraph 3 of the Act refers to cases where a death occurs due to gross negligence in the management of the relevant facilities and equipment within three years of receiving subsidies or support.
② The period during which subsidies and support may be restricted pursuant to Article 62-3, Paragraph 4 of the Act shall be as classified in each of the following subparagraphs.
1. In the case of Article 62-3, Paragraph 3, Subparagraph 1 or 2 of the Act : 3 years
2. In the case of Article 62-3, Paragraph 3, Subparagraph 3 of the Act : 1 year
3. In the case of a violation of the same matter within 2 years after a violation of Article 62-3, Paragraph 3, Subparagraph 3 of the Act : 2 years
[This Article Newly Inserted Sep. 17, 2021]
Article 60 (Safety Management Costs) ① The costs necessary for the safety management of construction work pursuant to Article 63, Paragraph 1 of the Act (hereinafter referred to as “safety management costs”) shall include the costs set forth in each of the following subparagraphs. <Amended Mar. 7, 2016; Mar. 18, 2020; Dec. 14, 2020>
1. Costs for preparing and reviewing the safety management plan or costs for preparing the small-scale safety management plan
2. Safety inspection costs pursuant to Article 100, Paragraph 1, Subparagraphs 1 and 3 of the Enforcement Decree
3. Cost of measures to prevent damage to surrounding buildings, etc. caused by construction work such as blasting and excavation
4. Cost of traffic safety management measures around the construction site
5. Installation and operation costs of safety monitoring devices, such as measuring equipment and closed-circuit television
6. Costs required for verifying the structural safety of temporary structures pursuant to Article 62, Paragraph 11 of the Act
7. Costs for establishing and operating a safety management system at a construction site using wireless equipment and wireless communication pursuant to Article 2, Paragraph 1, Subparagraphs 5 and 5-2 of the Radio Waves Act
② When the client of a construction project includes safety management costs in the construction cost pursuant to Article 63, Paragraph 1 of the Act, they shall comply with the standards set forth in each of the following subparagraphs. <Amended Mar. 7, 2016; July 4, 2016; Mar. 18, 2020>
1. Costs under Paragraph 1, Subparagraph 1: Calculated by applying the engineering project fee standards pursuant to Article 31 of the Engineering Industry Promotion Act, taking into consideration the subject of preparation and the complexity of the construction work, etc.
2. Costs under Paragraph 1, Subparagraph 2: Calculated by applying the detailed calculation standards for safety inspection fees pursuant to Article 100, Paragraph 8 of the Enforcement Decree
3. Costs under Paragraph 1, Subparagraph 3: Calculate costs necessary for prior reinforcement, repair, temporary relocation, etc., to minimize damage to buildings, etc., surrounding the construction site that may inevitably occur due to construction work.
4. Costs under Paragraph 1, Subparagraph 4: Costs for the installation of facilities for traffic safety and flow during construction and costs for the deployment of signalmen shall be calculated by applying design standards and labor cost standards in relevant fields such as civil engineering and architecture.
5. Costs under Paragraph 1, Subparagraph 5: Calculate the costs necessary for the installation and operation of safety monitoring devices, such as measuring equipment and closed-circuit television, in accordance with the process-specific safety inspection plan under Article 99, Paragraph 1, Subparagraph 2 of the Enforcement Decree.
6. Costs under Paragraph 1, Subparagraph 6: Calculate the costs required for verification by relevant experts pursuant to Article 62, Paragraph 11 of the Act to ensure the structural safety of temporary structures.
7. Costs under Paragraph 1, Subparagraph 7: Calculate costs necessary for the purchase, lease, maintenance, etc., of wireless equipment used for the establishment and operation of a safety management system at a construction site, and costs necessary for the establishment and use, etc., of wireless communication.
③ The client of a construction project shall calculate safety management costs increased in accordance with the standards set forth in each subparagraph of Paragraph 2 for any additional safety management costs incurred due to any of the reasons falling under any of the following subparagraphs. However, this shall be limited to cases caused by the client's request or reasons attributable to the client. <Newly added July 4, 2016>
1. Extension of construction period
2. Addition of construction work details due to design changes, etc.
3. Changes to the safety management plan, such as the additional scheduling of safety inspections
4. Other reasons deemed by the Client to require an increase in safety management costs
④ A construction business operator or a housing construction registration business operator shall use safety management expenses solely for the intended purpose and shall settle them based on the performance of safety management activities verified by the client or the construction project management service provider. <Amended July 4, 2016; March 18, 2020>
⑤ Detailed matters concerning the calculation and use of safety management expenses shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Amended July 4, 2016>
Article 61 (Calculation of Environmental Management Costs, etc.) ① The costs necessary for environmental management of construction work pursuant to Article 66, Paragraph 3 of the Act (hereinafter referred to as “environmental management costs”) shall be calculated by adding the costs of each of the following subparagraphs.
1. Costs required for the installation and operation of environmental pollution prevention facilities at construction sites
2. Costs required for the treatment and recycling of waste generated at construction sites
② A construction business operator or a housing construction registration business operator shall submit a plan for the use of expenses pursuant to Paragraph 1 to the client prior to the initial installation of environmental pollution prevention facilities pursuant to Subparagraph 1 of the same Paragraph, and shall settle indirect construction costs among the expenses verified by the client or the construction project management service provider based on actual usage. <Amended June 18, 2018; March 18, 2020>
③ The detailed calculation standards for costs pursuant to each subparagraph of Paragraph 1 are as set forth in Attached Table 8.
④ In addition to the matters prescribed in Paragraphs 1 through 3, detailed matters necessary for the calculation standards and management of environmental management costs shall be determined and announced by the Minister of Land, Infrastructure and Transport. <Amended June 18, 2018>
Article 62 (Joint Investigation of Major Construction Site Accidents) ① Deleted <Mar. 7, 2016>
② The Minister of Land, Infrastructure and Transport, the contracting authority, and the heads of licensing and permitting agencies may request the Minister of Employment and Labor to conduct a joint investigation involving persons falling under each subparagraph of Article 106, Paragraph 2 of the Enforcement Decree, in cases where the Minister of Employment and Labor conducts an investigation into the cause of a serious accident pursuant to Article 26, Paragraph 4 of the Industrial Safety and Health Act (hereinafter referred to as the “investigation into the cause of a serious accident”) regarding an accident pursuant to Article 105, Paragraph 3 of the Enforcement Decree (hereinafter referred to as a “serious construction site accident”). <Amended Mar. 7, 2016>
③ In the case of conducting a joint investigation pursuant to Paragraph 2, an accident investigation pursuant to Article 67 of the Act shall not be conducted.
④ Deleted <March 7, 2016>
⑤ Deleted <March 7, 2016>
⑥ Deleted <March 7, 2016>
[Title amended Mar. 7, 2016]
Chapter 6 Supplementary Provisions
Article 63 (Fees) The criteria for calculating fees payable by any person falling under subparagraphs 2 through 4 of Article 79 of the Act are as set forth in Attached Table 9.
Article 63-2 (Joint Use of Administrative Information) When an entrusted agency for the career management of construction engineers or an entrusted agency for registration, etc., receives a report or application falling under any of the following subparagraphs, it shall verify the documents classified according to each of the following subparagraphs through the joint use of administrative information pursuant to Article 36, Paragraph 1 of the Electronic Government Act. However, if the reporter or applicant does not consent to the verification, they shall be required to attach the relevant documents (in the case of Subparagraph 1, Item (a), a copy of the national technical qualification certificate may be substituted). <Amended Feb. 25, 2019; Sep. 17, 2021; Dec. 30, 2022>
1. Report or change report of a construction engineer pursuant to Article 18, Paragraphs 1 and 2: The documents listed in each of the following subparagraphs (only applicable if necessary for the processing of the report or change report)
a. Confirmation of National Technical Qualification Acquisition
b. Certificate of Health Insurance Eligibility or Proof of National Pension Subscriber
c. Proof of facts regarding entry and exit pursuant to the main clause of Article 88, Paragraph 1 of the Immigration Control Act
2. Application for registration or notification of change of registration for construction engineering business pursuant to Article 21, Paragraph 1 and Article 23, Paragraph 3 : The documents in each of the following subparagraphs
a. Business Registration Certificate (applicable to individuals only)
b. Certificate of Alien Registration pursuant to Article 88, Paragraph 2 of the Immigration Control Act (applicable only if the representative, executive, or affiliated construction engineer is a foreigner residing in Korea)
c. Certificate of Corporate Registration
[This Article Newly Inserted Oct. 12, 2018]
Article 64 (Review of Regulations) The Minister of Land, Infrastructure and Transport shall review the validity of the standards for facilities and the placement of construction engineers for quality control of construction work pursuant to Article 50, Paragraph 4 and Annex 5 every three years starting from January 1, 2024 (meaning until the day before the same date as the reference date of every third year) and take measures such as improving them.
[This Article Newly Inserted Dec. 30, 2022]
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 94, May 22, 2014>
Article 1 (Enforcement Date) This rule shall enter into force on May 23, 2014.
Article 2 (Applicability to the Selection of Construction Project Management Service Providers) The amended provisions of Article 28, Paragraph 1, Subparagraph 1, Item (b), Article 28, Paragraph 2, Subparagraph 2, Item (c), and Annex 3 shall apply to construction project management services for which a bid notice is issued after the enforcement of this rule.
Article 3 (Applicability to Integrated Implementation of Construction Project Management, Including Delegation of Supervisory Authority) The amended provisions of Article 33, Paragraph 1 shall apply to construction project management services, including delegation of supervisory authority, for which bid notices are issued after the enforcement of this Rule.
Article 4 (Applicability to the Preparation and Submission of Construction Project Management Reports) The amended provisions of Article 36 shall apply to construction project management services for which bid notices are issued after the enforcement of this Rule.
Article 5 (Applicability to Input of Demand Forecast Data, etc. into the Integrated Information System for Construction Support) The amended provisions of Article 39, Paragraph 3 shall apply to feasibility study services completed after the enforcement of this Rule.
Article 6 (Transitional Measures Concerning the Registration of Construction Technology Service Providers) ① In the part other than the subparagraphs of Article 11, Paragraph 2 of the Addenda to the Enforcement Decree, the term “application form and attached documents prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the application form and attached documents classified according to the following subparagraphs.
1. Service providers for design, etc. pursuant to Article 20-2 of the former Act (hereinafter referred to as “Service Providers for Design, etc.”): Application for Registration (Change of Registration) of Construction Technology Service Business in Form No. 20 of the Appendix and documents corresponding to the provisions of Article 21, Paragraph 1, Subparagraphs 2 through 4.
2. A specialized supervision company under Article 28, Paragraph 1 of the former Act (hereinafter referred to as “Specialized Supervision Company”): Application for Registration (Change Registration) of Construction Technology Service Business in Form No. 20 of the Attached Form and documents corresponding to the provisions of Article 21, Paragraph 1, Subparagraphs 2 through 4
3. A specialized quality inspection agency pursuant to Article 25, Paragraph 2 of the former Act (hereinafter referred to as the “Specialized Quality Inspection Agency”): Application for Registration (Change of Registration) of Construction Technology Service Business in Form No. 20
② In accordance with the latter part of Article 13, Paragraph 1 of the Addenda to the Act and Article 11, Paragraph 2 of the Addenda to the Enforcement Decree, the mayor or provincial governor who has received a report shall issue a construction technology service business registration certificate in the form of Annex 22 in accordance with Article 13, Paragraph 2 of the Addenda to the Act if the design and other service provider, supervision specialist company, or quality inspection specialist agency meets the requirements under the amended provisions of Annex 5 of the Enforcement Decree.
③ In the part other than the subparagraphs of Article 11, Paragraph 3 of the Addenda to Presidential Decree No. 25358, the term “application form prescribed by the Ordinance of the Ministry of Land, Infrastructure and Transport” refers to the application form for registration (change of registration) of construction technology service business in Annex 20. <Newly added May 25, 2016>
Article 7 (Amendment of Other Laws) ① The Enforcement Rules of the Framework Act on Construction Industry are partially amended as follows.
In Article 25-3, subparagraphs 1 and 6, “the Enforcement Decree of the Construction Technology Management Act” shall be changed to “the Enforcement Decree of the Construction Technology Promotion Act”.
In Article 25-4, Paragraph 1, Subparagraph 7, “registration of a specialized supervision company under the Construction Technology Management Act” shall be changed to “registration of a construction technology service business under the Construction Technology Promotion Act.”
In Article 25-6, subparagraph 1, item (a), “Article 18 of the Construction Technology Management Act” shall be changed to “Article 14 of the Construction Technology Promotion Act”.
In Annex 1, Item 1, Subparagraph (1)(b), “Construction Technology Management Act” shall be changed to “Construction Technology Promotion Act”, and in the first part of Subparagraph (1) of the same item, “a person who has been designated as a new technology pursuant to Article 18 of the Construction Technology Management Act, a person designated as an excellent construction business operator pursuant to Article 36 of the same Act” shall be changed to “a person who has been designated as a new technology pursuant to Article 14 of the Construction Technology Promotion Act, a person designated as an excellent construction business operator pursuant to Article 51 of the same Act”, and in Subparagraph (4), “defective points pursuant to Article 21-4 of the Construction Technology Management Act” shall be changed to “defective points pursuant to Article 53 of the Construction Technology Promotion Act”.
In Appendix 2, Item 1, Subparagraph (1)(b), “Construction Technology Management Act” shall be changed to “Construction Technology Promotion Act”, and in the first part of Subparagraph (1) of the same item, “a person who has been designated as a new technology pursuant to Article 18 of the Construction Technology Management Act, a person designated as an excellent construction business operator pursuant to Article 36 of the same Act” shall be changed to “a person who has been designated as a new technology pursuant to Article 14 of the Construction Technology Promotion Act, a person designated as an excellent construction business operator pursuant to Article 51 of the same Act”.
② The Rules on Structural Standards, etc. for Buildings are partially amended as follows.
In Article 3, Paragraph 4, “pursuant to the provisions of Article 5 of the Construction Technology Management Act” shall be changed to “pursuant to Article 5 of the Construction Technology Promotion Act”.
③ The Rules on Standards for Evacuation and Fire Protection Structures of Buildings are partially amended as follows:
In Article 6, subparagraph 1, “pursuant to the provisions of Article 34, paragraph 1, subparagraph 2 of the Construction Technology Management Act” shall be changed to “pursuant to Article 44, paragraph 1, subparagraph 2 of the Construction Technology Promotion Act”.
④ Part of the Enforcement Rule of the Aggregate Extraction Act is amended as follows.
In Article 14-7, Paragraph 1, “as a quality inspection specialized agency pursuant to Article 25 of the Construction Technology Management Act” shall be changed to “as a construction technology service provider pursuant to Article 26 of the Construction Technology Promotion Act.”
⑤ The Rules on Quality Certification and Management of Recycled Aggregates are partially amended as follows.
Article 8, Paragraph 3, Subparagraph 2 shall be as follows.
2. Construction technology service providers performing quality inspections on behalf of others pursuant to Article 60, Paragraph 1 of the Construction Technology Promotion Act
⑥ Part of the Enforcement Rules of the Special Act on Safety Management of Facilities is amended as follows.
In Article 4, Paragraph 1, Subparagraph 1, “Article 25, Paragraph 1 of the Enforcement Decree of the Construction Technology Management Act” shall be changed to “Article 43, Paragraph 2 of the Enforcement Decree of the Construction Technology Promotion Act”.
In the proviso to Article 9, “Item 1 of Annex 1 of the Enforcement Decree of the Construction Technology Management Act” shall be changed to “Item 4 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act”.
⑦ Part of the Enforcement Rules of the Housing Act is amended as follows.
In Article 6, Paragraph 1, Subparagraph 3, Item (a), “pursuant to the provisions of Article 6-2, Paragraph 2 of the Construction Technology Management Act” shall be changed to “pursuant to Article 21, Paragraph 2 of the Construction Technology Promotion Act”.
In the main text of Article 13, Paragraph 2, Subparagraph 1, Item (a), replace “Chief Supervisor or Supervisor pursuant to Annex 7 of the Enforcement Decree of the Construction Technology Management Act” with “Special Grade Technician or Senior Technician performing construction project management duties pursuant to Subparagraph 2 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act”; in the proviso of the same subparagraph, replace “Basic education pursuant to Subparagraph 2, Item (a) of Annex 3 of the Enforcement Decree of the Construction Technology Management Act, which corresponds to the qualification standards for Chief Supervisor or Supervisor in Annex 7 of the Enforcement Decree of the Construction Technology Management Act” with “Basic education pursuant to Subparagraph 2, Item (b) of Annex 3 of the Enforcement Decree of the Construction Technology Promotion Act, which corresponds to the grade of Special Grade Technician or Senior Technician performing construction project management duties pursuant to Subparagraph 2 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act”; and in Item (b) of the same subparagraph, replace “Chief Supervisor pursuant to Annex 7 of the Enforcement Decree of the Construction Technology Management Act” with “Special Grade Technician performing construction project management duties pursuant to Subparagraph 2 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act”; and in the main text of Subparagraph 2 of the same paragraph, “supervisors pursuant to Annex 7 of the Enforcement Decree of the Construction Technology Management Act” shall be replaced with “construction technologists performing construction project management duties pursuant to Subparagraph 2 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act”, and in the proviso of the same subparagraph, “basic education corresponding to the qualification standards for supervisors pursuant to Annex 7 of the Enforcement Decree of the Construction Technology Management Act and subparagraph 2(a) of Annex 3 of the Enforcement Decree of the Construction Technology Management Act” shall be replaced with “basic education corresponding to the grade of construction technologists performing construction project management duties pursuant to Subparagraph 2 of Annex 1 of the Enforcement Decree of the Construction Technology Promotion Act and subparagraph 2(b) of Annex 3 of the Enforcement Decree of the Construction Technology Promotion Act”.
⑧ Part of the Enforcement Rules of the Railway Safety Act is amended as follows.
In Article 92, Paragraph 1, Subparagraph 3, “construction engineer career certificate pursuant to the Construction Technology Management Act” shall be changed to “construction technology career certificate pursuant to the Construction Technology Promotion Act.”
⑨ The Rules on the Operation of Standard Design Documents, etc. are partially amended as follows.
In Article 2, Paragraph 3, Subparagraph 2, “Special Construction Technology Deliberation Committee pursuant to the proviso of Article 5, Paragraph 1 of the Construction Technology Management Act” shall be replaced with “Special Construction Technology Deliberation Committee pursuant to Article 5, Paragraph 2 of the Construction Technology Promotion Act,” and in Subparagraph 3 of the same paragraph, “Design Advisory Committee pursuant to Article 21 of the Enforcement Decree of the Construction Technology Management Act” shall be replaced with “Technology Advisory Committee pursuant to Article 6 of the Construction Technology Promotion Act.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 178, Jan. 29, 2015>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 213, July 1, 2015> (Enforcement Rule of the Housing and Urban Development Fund Act)
Article 1 (Enforcement Date) This rule shall enter into force on July 1, 2015.
Article 2 (Amendment of Other Laws) ① The Enforcement Rules of the Construction Technology Promotion Act are partially amended as follows.
In Article 5, subparagraph 3, “Korea Housing Guarantee Corporation pursuant to Article 76 of the Housing Act” shall be changed to “Housing and Urban Guarantee Corporation pursuant to Article 16 of the Housing and Urban Fund Act”.
② through ⑪ omitted
Article 3 Omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 295, Mar. 7, 2016>
Article 1 (Enforcement Date) This rule shall enter into force on May 19, 2016.
Article 2 (Applicability to Safety Management Costs and Safety Management Plans) The amended provisions of Article 60, Paragraph 1, Subparagraphs 5 and 6, Paragraph 2, Subparagraphs 5 and 6, and Annex 7 shall apply to construction projects for which a bid notice is issued (or, in cases where the contracting authority is not a contracting agency, the permission, authorization, approval, etc. of the construction work) after the enforcement of this rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 312, May 25, 2016>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 333, July 4, 2016>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation. However, the amended provision of Article 49, subparagraph 2 shall enter into force on July 1, 2017.
Article 2 (Applicability to the Preparation and Submission of Construction Project Management Reports) The amended provisions of Article 36, Paragraph 1, Subparagraph 2, Item (d) shall apply to construction projects for which bid notices are issued after the enforcement of this Rule.
Article 3 (Applicability to the Establishment of Quality Management Plans) The amended provisions of Article 49, Subparagraph 2 shall apply to construction projects for which a bid notice is issued (or, in cases where the contracting authority is not a contracting agency, the permission, authorization, approval, etc. for construction work) after the effective date pursuant to the proviso of Article 1 of the Addenda.
Article 4 (Applicability to Safety Management Costs) The amended provisions of Article 60, Paragraphs 2 and 3 shall apply to construction projects for which a bid notice is issued after the enforcement of this Rule (or, in cases where the contracting authority is not a contracting agency, the permission, authorization, approval, etc. of the construction work).
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 353, Aug. 12, 2016> (Enforcement Rule of the Housing Act)
Article 1 (Enforcement Date) This Rule shall enter into force on August 12, 2016. <Proviso Omitted>
Article 2 omitted
Article 3 (Amendment of Other Laws) ① Omitted
② The Enforcement Rules of the Construction Technology Promotion Act are partially amended as follows.
In Article 20, Paragraph 2, “Article 9 of the Housing Act” shall be changed to “Article 4 of the Housing Act”.
③ through ⑰ omitted
Article 5 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 483, Jan. 18, 2018> (Enforcement Rule of the Special Act on Safety and Maintenance of Facilities)
Article 1 (Enforcement Date) This rule shall enter into force on January 18, 2018.
Articles 2 through 5 omitted
Article 6 (Amendment of Other Laws) ① The Enforcement Rules of the Construction Technology Promotion Act are partially amended as follows:
In the part other than the subparagraphs of Article 28, Paragraph 1, “Articles 6 and 7 of the Special Act on Safety Management of Facilities” shall be changed to “Articles 11 and 12 of the Special Act on Safety and Maintenance of Facilities,” and in Subparagraph 2 of the same paragraph, “detailed inspection or detailed safety diagnosis pursuant to Articles 6 and 7 of the Special Act on Safety Management of Facilities” shall be changed to “detailed safety inspection or detailed safety diagnosis pursuant to Articles 11 and 12 of the Special Act on Safety and Maintenance of Facilities.”
In Form No. 12 of the attached document, “「Special Act on Safety Management of Facilities」” shall be changed to “「Special Act on Safety and Maintenance of Facilities」”.
② through ⑧ omitted
Article 7 omitted
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 521, June 18, 2018>
Article 1 (Enforcement Date) This rule shall enter into force on January 1, 2019.
Article 2 (Applicability to Calculation, etc. of Environmental Management Costs) The amended provisions of Article 61, Paragraphs 2 and 4 and Annex 8 shall apply to construction projects ordered after the enforcement of this rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 547, Oct. 12, 2018>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Reporting, etc. by Construction Technicians) The amended provisions of Articles 18, 21, 23, and 63-2, Forms No. 11 through 14, and Form No. 20 shall apply from the time of reporting or reporting a change of report by a construction technician, or applying for registration or reporting a change of registration for a construction technology service business, following the enforcement of this Rule.
Article 3 (Applicability to Reporting Transfer of Business, etc. by Construction Technology Service Providers) The amended provisions of Article 24 shall apply from the time a construction technology service provider transfers its business or reports a merger between corporate construction technology service providers after the enforcement of this rule.
Article 4 (Applicability to Notification of Withdrawal of Construction Project Management Engineers) The amended provisions of Article 27 shall apply from the time a notification of withdrawal of a construction project management engineer is made pursuant to Article 45, Paragraph 1, Subparagraph 3 of the Enforcement Decree after the enforcement of this Rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 596, Feb. 25, 2019>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) ① The Enforcement Rules of the Framework Act on Construction Industry are partially amended as follows:
In Article 25-3, subparagraph 1, “senior technicians and special-grade technicians” shall be changed to “senior technical personnel and special-grade technical personnel.”
② The Enforcement Rules of the Building Act are partially amended as follows.
In Article 43-2, Paragraph 4, Subparagraph 2, Item (b), “special-grade technicians in the architectural structure field among construction technicians” shall be changed to “special-grade technicians in the architectural structure field among construction engineers”; in Subparagraph 4, Item (b) of the same paragraph, “special-grade technicians in the architectural mechanical equipment field among construction technicians” shall be changed to “special-grade technicians in the architectural mechanical equipment field among construction engineers”; and in Subparagraph 5, Item (b) of the same paragraph, “special-grade technicians in the soil and geology field among construction technicians” shall be changed to “special-grade technicians in the soil and geology field among construction engineers”.
③ The Enforcement Rules of the Act on the Establishment and Management of Spatial Information, etc. are partially amended as follows.
In the fee column of item 3 of Annex 12, replace “intermediate technician” with “intermediate technical professional”.
In Annex 13, item 2(a)(1), replace “senior technician” with “senior technical professional”; In Annex 13, item 2(a)(2)(a), review personnel (persons) column, replace “senior technician” with “senior technical professional”; In Annex 13, item 2(a)(2)(a), review personnel (persons) column, replace “intermediate technician” with “intermediate technical professional”; In Annex 13, item 2(a)(2)(a), review personnel (persons) column, replace “junior technician” with “junior technical professional”; In Annex 13, item 2(a)(2)(b), review personnel (persons) column, replace “senior technician” with “senior technical professional”; In Annex 13, item 2(a)(2)(b), review personnel (persons) column, replace “intermediate technician” with “intermediate technical professional”; In Annex 13, item 2(a)(2)(b), review personnel (persons) column, replace “junior technician” with “junior technical professional”; In Annex 13, item 2(b), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(c), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(e)(1), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(e)(2), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(e)(3), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(f)(1), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(f)(2), review personnel (persons) column, replace “senior technician” with “senior technical professional”; In Annex 13, item 2(f)(2), review personnel (persons) column, replace “intermediate technician” with “intermediate technical professional”; In Annex 13, item 2(f)(2), review personnel (persons) column, replace “junior technician” with “junior technical professional”; In Annex 13, item 2(g), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(h), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(i), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(j), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(k), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(l), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”; In Annex 13, item 2(m), replace “number of review personnel (senior technician)” with “number of review personnel (senior technical professional)”.
In the wage column of Annex 16, replace “senior technician” with “senior technical professional” in each instance.
In the sections on the method of preparation and fees of Form No. 9, “intermediate technician” shall be changed to “intermediate technical personnel” respectively.
④ Part of the Enforcement Rules for the Organization of the Ministry of Land, Infrastructure and Transport and its affiliated agencies is amended as follows.
In Article 9, Paragraph 7, Subparagraphs 7 through 11, “construction technician” shall be changed to “construction engineer” in each instance.
In Article 18, Paragraph 4, Subparagraph 6, “construction technician” shall be changed to “construction engineer.”
⑤ The Enforcement Rules of the Special Act on Safety and Maintenance of Facilities are partially amended as follows.
In Article 24, Paragraph 1, Subparagraph 3, “construction technician” shall be changed to “construction engineer.”
In item 3 of the “Documents Submitted by Applicant (Representative)” section on the front of Attached Form No. 10, replace “construction technician” with “construction engineer”.
⑥ Part of the Enforcement Rules of the Housing Act is amended as follows.
In Article 4, Paragraph 1, Subparagraph 2, Item (a), “construction technician” shall be replaced with “construction technical personnel,” and in Paragraph 7 of the same article, “number of technicians” shall be replaced with “number of technical personnel.”
In the main text of Article 18, Paragraph 1, Subparagraph 1, Item (a) excluding 1), 2), and 3), “special-grade technician or senior technician” shall be changed to “special-grade technical personnel or senior technical personnel”; in Subparagraph 2), “construction technician” shall be changed to “construction technical personnel” and “special-grade technician or senior technician” shall be changed to “special-grade technical personnel or senior technical personnel”; in Subparagraph (b) of the same subparagraph, “special-grade technician” shall be changed to “special-grade technical personnel”; and in the main text of Subparagraph 2 of the same paragraph excluding each item and Subparagraph (b) of the same subparagraph, “construction technician” shall be changed to “construction technical personnel” respectively.
On the front of Attached Form No. 1, replace “technician (a technician employed by the asset management company in the case of an entrusted-management real estate investment company)” with “technical professional (a technical professional employed by the asset management company in the case of an entrusted-management real estate investment company)”; and in item 2(a) of the attached-documents section on the same page, replace “construction technician” with “construction engineer” in each instance.
In the section on the status of technical personnel holdings in Form No. 7, “Architectural field technician (excluding Professional Engineer in the architectural field)” shall be changed to “Architectural field technical personnel (excluding Professional Engineer in the architectural field)”, “Civil engineering field technician” to “Civil engineering field technical personnel”, “Mechanical field technician” to “Mechanical field technical personnel”, “Electrical field technician” to “Electrical field technical personnel”, and “Safety management technician” to “Safety management field technical personnel”.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 617, Apr. 4, 2019>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 632, July 1, 2019>
This rule shall take effect on July 1, 2019.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 709, Mar. 18, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Safety Management Costs and Safety Management Plans) The amended provisions of Article 60, Paragraphs 1 and 2 and Annex 7 shall apply to construction projects for which a bid notice is issued after the enforcement of this rule (in cases where the contracting authority is not a contracting agency, this refers to an application for permission, authorization, approval, etc. for construction work).
Article 3 (Applicability to Standards for the Placement of Construction Engineers for Quality Control of Construction Works) The amended provisions of Annex 5 shall apply to construction works for which a bid notice is issued after the enforcement of this rule (in cases where the contracting authority is not a contracting agency, this refers to an application for permission, authorization, approval, etc. for construction work).
Article 4 (Applicability to Standards for Calculation and Use of Quality Control Costs) The amended provisions of Annex 6 shall apply to construction projects for which a bid notice is issued after the enforcement of this rule (in cases where the contracting authority is not a contracting agency, this refers to an application for permission, authorization, approval, etc. for construction work).
Article 5 (Amendment of Other Laws) ① The Enforcement Rules of the Aggregate Extraction Act are partially amended as follows:
In Article 14-7(1), replace “construction technology service provider” with “construction technology service business operator”.
② The Rules on Quality Certification and Management of Recycled Aggregates are partially amended as follows.
In Article 8(3)2, replace “construction technology service provider” with “construction technology service business operator”.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 726, May 26, 2020>
This rule will take effect on May 27, 2020.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 758, Sep. 9, 2020> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 9 Ministerial Decrees to Reflect the Name Change of Korea Rail Network Authority)
This rule shall take effect on September 10, 2020.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 792, Dec. 14, 2020>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to Periodic Safety Inspections) The amended provisions of Article 59, Paragraphs 1 and 3 shall apply to construction projects for which a bid notice is issued after the enforcement of this Rule (or, in cases where the contracting authority is not a contracting agency, the permission, authorization, approval, etc. of the construction work).
Article 3 (Applicability to Matters Included in Safety Management Costs) The amended provisions of Article 60, Paragraph 1 shall apply to construction projects for which a bid notice is issued after the enforcement of this Rule (or, in cases where the contracting authority is not a contracting agency, the permission, authorization, approval, etc. of the construction work).
Article 4 (Applicability to Safety Management Plans) The amended provisions of Annex 7 shall apply to construction projects for which a bid notice is issued after the enforcement of this rule (in cases where the contracting authority is not a contracting agency, this refers to the permission, authorization, approval, etc. of the construction work).
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 882, Aug. 27, 2021> (Partial Amendment to 80 Ministry of Land, Infrastructure and Transport Decrees for the Reorganization of Difficult Legal Terms)
This rule shall take effect from the date of its promulgation. <Proviso omitted>
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 887, Sep. 17, 2021>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Amendment of Other Laws) ① The Enforcement Rules of the Framework Act on Construction Industry are partially amended as follows:
In Article 25-4, Paragraph 1, Subparagraph 7, “construction technology service business” shall be changed to “construction engineering business.”
② The Enforcement Rules of the Aggregate Extraction Act are partially amended as follows.
In Article 14-7, Paragraph 1, “construction technology service provider” shall be changed to “construction engineering business operator.”
③ The Enforcement Rules for the Organization of the Ministry of Land, Infrastructure and Transport and its affiliated agencies are partially amended as follows.
In Article 9, Paragraph 10, Subparagraph 21, “construction technology service business” shall be changed to “construction engineering business.”
In Article 21, Paragraph 4, Subparagraph 3, “construction technology services” shall be changed to “construction engineering.”
④ The Rules on Quality Certification and Management of Recycled Aggregates are partially amended as follows.
In Article 8, Paragraph 3, Subparagraph 2, “construction technology service provider” shall be changed to “construction engineering business operator.”
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1168, Dec. 19, 2022> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Three Acts for the Expansion of the Scope of Recognition of Practical Experience Required for Qualification Acquisition, etc.)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1175, Dec. 30, 2022>
Article 1 (Enforcement Date) This Decree shall enter into force on the date of its promulgation. However, the amended provisions of Annex 5 shall enter into force one year after the date of its promulgation.
Article 2 (Transitional Measures concerning Facilities and Placement Standards for Construction Engineers for Quality Control of Construction Works) Notwithstanding the amended provisions of Annex 5, the former provisions shall apply to the placement standards for construction engineers for construction projects for which a bid notice (or an application for permission, authorization, approval, etc. for construction work in cases where the contracting authority is not a contracting agency) was issued prior to the effective date pursuant to the proviso of Article 1 of the Addenda.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1325, Apr. 23, 2024>
This rule shall enter into force on August 1, 2024. However, Form No. 1, Form No. 6, and Form No. 11 shall enter into force on April 23, 2024.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1362, July 10, 2024>
Article 1 (Enforcement Date) This Rule shall enter into force on July 10, 2024. However, the amended provisions of Form No. 18-2 shall enter into force on August 1, 2024.
Article 2 (Applicability to Entry in the Quality Inspection Register) The amended provisions of Form No. 42 shall apply from the time a construction business operator or a housing construction registration business operator conducts a quality inspection after the enforcement of this Rule, or when the client of a construction project, a construction business operator, or a housing construction registration business operator requests the delegation of a quality inspection.
Article 3 (Transitional Measures Concerning Request for Delegation of Quality Inspection, etc.) In cases where a client of a construction project, a construction business operator, or a housing construction registration business operator requested the delegation of quality inspection prior to the enforcement of this Rule, notwithstanding the amended provisions of Article 56, Paragraph 3, the former Article 56, Paragraph 3 and Form No. 49 shall apply.
Article 4 (Transitional Measures Concerning Facility Standards for Quality Control of Construction Works) Notwithstanding the amended provisions of Annex 5, facility standards for quality control of construction works for which a bid notice (or an application for permission, authorization, approval, etc. for construction works in cases where the contracting authority is not a contracting agency) was issued prior to the enforcement of this rule shall be governed by the previous provisions.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1369, July 30, 2024> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of Three Acts, Including the Enforcement Rule of the Construction Machinery Management Act, for the Alleviation of Administrative Burdens on Citizens and Resolution of Inconveniences)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1489, June 2, 2025>
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1502, June 18, 2025>
Article 1 (Enforcement Date) This Rule shall enter into force on the date of its promulgation.
Article 2 (Applicability to the Selection of Construction Engineering Business Operators, etc.) The amended provisions of Article 28, Paragraph 2, Subparagraph 2, Items (a) and (b) and Annex 2 shall apply to construction engineering for which a bid notice is issued after the enforcement of this rule.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1531, Oct. 31, 2025> (Ministry of Land, Infrastructure and Transport Decree on the Partial Amendment of 16 Laws to Reflect Government Organizational Reorganization)
This rule shall take effect from the date of its promulgation.
ADDENDA <Ministry of Land, Infrastructure and Transport Decree No. 1597, June 11, 2026>
This rule shall take effect from the date of its promulgation.
[Attached Table 1] Criteria for Suspension of Duties for Construction Engineers (Related to Article 20, Paragraph 1)
[Appendix 2] Evaluation Criteria for Project Performance Capability of Basic Plan, Basic Design, and Detailed Design (Related to Article 28)
[Appendix 3] Evaluation Criteria for Business Performance Capability in Construction Project Management (Related to Article 28)
[Appendix 4] Evaluation Criteria for Business Performance Capability of Precision Inspections and Precision Safety Diagnoses (Related to Article 28)
[Appendix 5] Standards for Facilities and Placement of Construction Engineers for Quality Control of Construction Works (Related to Article 50, Paragraph 4)
[Appendix 6] Standards for Calculation and Use of Quality Control Costs (Related to Article 53, Paragraph 1)
[Appendix 7] Standards for Establishing Safety Management Plans (Related to Article 58)
[Appendix 7-2] Standards for Establishing Small-Scale Safety Management Plans (Related to Article 59-2)
[Attached Table 8] Detailed Calculation Standards for Environmental Management Costs (Related to Article 61, Paragraph 3)
[Appendix 9] Calculation Standards for Fees (Related to Article 63)
[Attachment Form No. 1] Application for New Technology Designation
[Attachment Form No. 1-2] Application for Issuance of New Technology Use Agreement Certificate
[Attachment Form No. 1-3] New Technology Usage Agreement
[Attachment Form No. 1-4] Confirmation of Technology Transfer for New Technology Usage Agreement
[Attachment Form No. 1-5] Consent Form for the Utilization of Intellectual Property Rights Related to New Technology Usage Agreement
[Attachment Form No. 1-6] Certificate of New Technology Use Agreement
[Attachment Form No. 2] Certificate of Designation for New Technology
[Attachment Form No. 3] Application for Reissuance of New Technology Designation Certificate
[Attachment Form No. 4] New Technology Utilization Performance
[Attachment Form No. 5] Certificate of New Technology Utilization Performance
[Attachment Form No. 6] Application for Extension of New Technology Protection Period
[Attachment Form No. 7] Deposit of Construction Technical Data
[Attachment Form No. 8] Designation of Educational Institution
[Attachment Form No. 9] Certificate of Completion of Training
[Attachment Form No. 10] Notification of Education and Training Status
[Attachment Form No. 10-2] Application for Renewal through Agency of Educational Institution
[Attachment Form No. 11] Construction Engineer Career Report
[Attachment Form No. 12] Certificate of Work Experience
[Attachment Form No. 13] Certificate of Overseas Work Experience
[Attachment Form No. 14] Report of Change in Construction Engineer Career
[Attachment Form No. 15] Construction Technology Experience Certificate
[Attachment Form No. 16] Application for Issuance of Construction Technology Career Certificate (New, Mobile, Renewal, Reissuance)
[Attachment Form No. 17] Register of Construction Technology Experience Certificates
[Attachment Form No. 18] Certificate of Experience for Construction Engineers
[Form No. 18-2] Certificate of Career Experience of Construction Engineer
[Attachment Form No. 19] Certificate of Employment of Construction Engineers
[Form No. 19-2] Receipt (Processing) Register for Verification of Construction Engineer Career
[Attachment Form No. 20] Application for Construction Engineering Business (Registration, Change of Registration)
[Attachment Form No. 21] Construction Engineering Business Operator Registration
[Attachment Form No. 22] Construction Engineering Business Registration Certificate
[Attachment Form No. 23] Application for Reissuance of Construction Engineering Business Registration Certificate
[Attachment Form No. 24] Construction Engineering Business (Suspension, Closure) Report
[Attachment Form No. 25] Report on Transfer and Acquisition of Construction Engineering Business
[Attachment Form No. 26] Report on Corporate Merger of Construction Engineering Business
[Attachment Form No. 27] Notification of Construction Engineering (Contract Conclusion, Contract Modification, Completion)
[Attachment Form No. 28] Notification of Status (Change) of Participating Engineers in Construction Engineering
[Attachment Form No. 29] Notification of Deployment and Withdrawal Status of Construction Project Management Engineers and Supervisors
[Attachment Form No. 30] Notification of Status of Construction Engineering Business Operators with Restricted Bidding Eligibility
[Attachment Form No. 31] Construction Engineering Performance Confirmation
[Attachment Form No. 32] Application for Approval of Subcontract Agreement
[Form No. 32-2] Submission of Construction Project Management Plan (Establishment, Amendment) for the Construction Phase
[Attachment Form No. 33] Application for Government Subsidy
[Attachment Form No. 34] Design Service Evaluation Sheet (Basic Design Service, Detailed Design Service Process, Detailed Design Service Results)
[Attachment Form No. 35] Evaluation Results Table for Construction Project Management Services, Including Acting Supervisory Authority
[Attachment Form No. 36] Summary Table of Design Service Evaluation, Summary Table of Construction Project Management Service Evaluation (e.g., Delegation of Supervisory Authority), Summary Table of Construction Evaluation
[Attachment Form No. 37] Notification of Summary Table of Penalty Points (Construction Business Operators, Registered Housing Construction Business Operators, Construction Engineering Business Operators, Architectural Firm Establishers)
[Attachment Form No. 38] Notification of Summary of Penalty Points (Construction Engineers, Architects)
[Attachment Form No. 39] Inspection Personnel ID Card
[Attachment Form No. 40] Inspection Visit Log
[Attachment Form No. 41] Signage for Defective Construction Sites
[Attachment Form No. 42] Quality Inspection Register
[Attachment Form No. 43] Summary Table of Quality Inspection Results
[Attachment Form No. 44] Factory Certification Application
[Attachment Form No. 45] Factory Certificate
[Attachment Form No. 46] Factory Certificate Issuance Register
[Attachment Form No. 47] Factory Certification Register
[Attachment Form No. 50] Notification of Quality Inspection Agency Performance