Form 11 — 온천법 시행규칙
279391 · 2025-10-31
[Attachment Form No. 11] <Revised Sep. 7, 2021>
Hot Spring Management Register ( )Hot Spring
(Front)
────────┬────────────────────────────────────────────
Hot Spring Location │
────────┴────────────────────────────────────────────
────────┬───────────────────┬────────────────────────
HotSpring │Areas used since before the enactment of the Hot Springs Act │Areas newly designated after the enactment of the Hot Spring Act
DiscoveryStatus ├───────────────────┼───────┬──────┬─────────
│Initial Period of Use (Year/Decade) │Date of Discovery Report │Date of Acceptance of Report│Discoverer's Personal Information
├───────────────────┼───────┼──────┼─────────
│ │ │ │
────────┴───────────────────┴───────┴──────┴─────────
────────┬───────────────────┬──┬────┬──────┬─────────
Hot Spring Well │Location │Land Category│Area │Owner Address │Owner's Name
discovered ├───────────────────┼──┼────┼──────┼─────────
Land │ │ │ │ │
────────┴───────────────────┴──┴────┴──────┴─────────
────────┬──────────┬─────────┬───────────────────────
Hot Spring │DesignatedDate │Designated Area │Hot Spring Specialist Inspection
Protected District ├──────────┼─────────┼───────────┬───────────
or │ │ │Testing Agency Name │TestPeriod
Hot Spring Well │ │ ├───────────┼───────────
of protected areas │ │ │ │
Designate ├──────────┼─────────┼───────────┼───────────
│Daily optimal pumping volume │Appropriate Development Area │Number of Excavated Wells │Discharge Temperature
├──────────┼─────────┼───────────┼───────────
│ │ │ │
────────┴──────────┴─────────┴───────────┴───────────
────────┬─────┬──────────────────────────────┬───────
Establishment of Development Plan │DateEstablished │Development Plan Area │Remarks
and ├─────┼─────┬────┬────┬────┬────┬────┼───────
Development Progress │ │Total │Hot Spring Use│CommercialFacility│Public Facilities│GreeneryFacilities│Other Facilities│
│ │ │Facility │ │ │ │ │
│ ├─────┼────┼────┼────┼────┼────┤
│ │㎥ │ │ │ │ │ │
├─────┼─────┴────┼────┴────┼────┴────┼───────
│Development Entity │Total Project Cost │Project Period │Profit after development │Facility Plan
├─────┼──────────┼─────────┼─────────┼───────
│ │ │ │ │
├─────┼──────────┴─────────┴─────────┼───────
│Development Method │Administrative Action Details (Date of Action) │Development Progress
│(Developed Area)│ │Situation
├─────┼──────┬─────┬─────┬─────┬─────┼───────
│ │Land Use │Urban Planning Change│Designated as a tourist attraction│Environmental Impact Assessment│Other Development │
│ │Plan Change │ │ │ │Plan Approval │
│ ├──────┼─────┼─────┼─────┼─────┤
│ │ │ │ │ │ │
────────┴─────┴──────┴─────┴─────┴─────┴─────┴───────
────────┬─────┬──────┬─────┬─────┬─────┬─────┬───────
Hot Spring Status │Hot Spring Well │Number of Hot Spring Wells │Number of Wells Authorized for Use│Number of Unauthorized Wells│Depth │From Ground Surface│Stable Water Level in Well
│ │ │ │(Number of Closed Wells) │(High~Low)│WaterLevel │(High~Low)
│ │ │ │ │ │(High~Low)│
│ ├──────┼─────┼─────┼─────┼─────┼───────
│ │ │ │ │ │ │
├─────┼──────┼─────┼─────┼─────┼─────┼───────
│temperature and │Temperature │Appropriate Daily │Quantity Eligible for Authorization│Authorized Quantity of Use│Water Characteristics │Drinkability
│Quantity │(High~Low) │Pumping Volume │(ton/day) │(ton/day) │(Main Ingredients)│
│ │ │(ton/day) │ │ │ │
│ ├──────┼─────┼─────┼─────┼─────┼───────
│ │ │ │ │ │ │
├─────┼──────┴─────┴─────┴─────┴─────┴───────
│Efficacy │
────────┴─────┴──────────────────────────────────────
────────┬───────────────┬─────┬──────────────────────
Usage Status │Users │Daily Maximum │Facility
│ │Capacity │
├────┬────┬─────┼─────┼───┬──┬────┬───┬──────
│Daily Maximum │Daily Average │Annual Visitors│ │Total │Hotel│Inn │Hot Spring Bathhouse│Other
├────┼────┼─────┤ ├───┼──┼────┼───┼──────
│ │ │ │ │ │ │ │ │
────────┴────┴────┴─────┴─────┴───┴──┴────┴───┴──────
────────┬─────────┬───────────┬──────────────────────
HotSpringResources │Hot Spring Resource Survey Results │Water quality inspection and │Status of Hydrological Observation Facility Installation
Maintenance Management │ │Component Inspection Results │
├─────────┼───────────┼──────────────────────
│ㆍSurvey Period │· Inspection Cycle │· Water level measuring tube (heat-resistant and pressure-resistant tube with inner diameter of 30 mm or more)
│ㆍSurvey Agency │ㆍInspection Agency │or water level measuring device
│·Survey Results │·Test Result │·Flow meter
│ │ │·Thermometer
────────┴─────────┴───────────┴──────────────────────
────────┬────────────────────────────────────────────
HotSpringResources │
Maintenance Management │
ActionStatus │
────────┴────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×594㎜[Preservation Paper (Type 2) 70g/㎡ (Recyclable)]