Form 11 — 에너지이용 합리화법 시행규칙

287433 · 2026-06-22

■ Enforcement Rules of the Energy Use Rationalization Act [Attachment Form No. 11] <Amended Dec. 1, 2017> Also at E-Civil Service (www.kemco.or.kr) You can apply. Equipment Subject to Inspection [ ] Welding Inspection Inspection Application [ ] Structural Inspection ※ [ ] Mark the applicable box with a check mark. ──────────┬──────────────────────────┬─────────────────── Receipt Number │Date of Receipt │Processing Period 20 days ──────────┴──────────────────────────┴─────────────────── ─────┬───────────────────────┬─────────────────────────── Applicant │Representative Name │Business Registration Number ├───────────────────────┴─────────────────────────── │Trade Name or Designation ├─────────────────────────────────────────────────── │Business Office Location (Telephone Number) ─────┴─────────────────────────────────────────────────── ─────┬──────────────────────┬──────────────────────────── Application Details│Name of Equipment Subject to Inspection │Format ├──────────────────────┼──────────────────────────── │Capacity │Maximum Operating Pressure MPa │ │ (kg/㎠) ├──────────────────────┼──────────────────────────── │Requested Inspection Date │Raw Material Inspection Report Number ├──────────────────────┼──────────────────────────── │Initial Application Date │Inspection Certificate Number ─────┴──────────────────────┴──────────────────────────── Pursuant to Articles 39 (1) and 39-2 (1) of the Energy Use Rationalization Act and Articles 31-14 through 31-16 of its Enforcement Rule, I hereby apply for inspection of the equipment subject to inspection ([ ] welding, [ ] structural). Year month day Applicant (Signature or seal) 기 Tube CHANG To ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ─────┬─────────────────────────────────────────┬───────── Attached Documents│ 1. Welding Inspection │Fee: 「Energy │ a. One copy of a drawing showing the weld locations │Use Rationalization Act │ B. Two copies of design drawings of the equipment subject to inspection │Enforcement Rule, Article 34 │ c. One copy of the strength calculation document for the equipment subject to inspection │(3) and (4) │ 2. Structural Inspection: 1 copy of the Welding Inspection Certificate. However, for equipment not subject to welding inspection, 2 copies of the design drawings must be attached. │the fee prescribed under those provisions. │and for equipment exempted from welding inspection, the documents listed in each item of Item 1 must be attached. │ │※ The specifications of the equipment subject to inspection are the same as the specifications of equipment that has already passed welding inspection or structural inspection │ │, the documents under Item 1 or 2 for 3 years from the date of passing the welding inspection or structural inspection │ │May not be attached. │ ─────┴─────────────────────────────────────────┴───────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Processing Procedure ───────────────────────────────────────────────────────── ┌──────┐ ┌──────┐ ┌──────┐ ┌──────┐ ┌──────┐ ┌───────┐ │Complete application │?│Receipt │?│Document Review │?│On-site Inspection │?│Approval │? │Preparation of Inspection Certificate │ │ │ │ │ │ │ │ │ │ │ │AND Issuance │ └──────┘ └──────┘ └──────┘ └──────┘ └──────┘ └───────┘ Applicant Accredited Inspection Agency Accredited Inspection Agency Accredited Inspection Agency Accredited Inspection Agency ───────────────────────────────────────────────────────── 210mm×297mm[White Paper 80g/㎡]