Form 43 — 어선법 시행규칙
282099 · 2025-12-26
Enforcement Rules of the Fishing Vessel Act [Attachment Form No. 43] <Amended Sep. 3, 2020>
Application for Construction (Separate Construction) Inspection
※ [ Mark the appropriate box in []. (front)
─────────────┬─────────────────┬───────────────────────────────────
Receipt Number │Date of Receipt │Processing Period Construction period + 25 days
│ │ (25 days for separate construction inspection)
─────────────┴─────────────────┴───────────────────────────────────
─────┬─────────────────┬───────────────────────────────────────────
Builder │Name (Corporate Name) │Date of Birth
│ │(Corporate Registration Number)
├─────────────────┴───────────────────────────────────────────
│week small
│
│(Phone Number )
─────┴─────────────────────────────────────────────────────────────
─────┬─────────────────┬───────────────────────────────────────────
Owner │Name(Corporate Name) │Date of Birth
│ │(Corporate Registration Number)
├─────────────────┴───────────────────────────────────────────
│week small
│
│(Phone Number )
─────┴─────────────────────────────────────────────────────────────
─────┬─────────────────┬───────────────────────────────────────────
Fishing vessel under construction│Construction Number │Ship Loading Port
My Station├─────────────────┼───────────────────────────────────────────
│Types of Fishing Vessels [ ] Power [ ]Non-powered│line Hull material [ ] Steel [ ] Wood
│ │ [ ]Reinforced Plastic (FRP)
│ │ [ ]Other line qualities( )
├─────────────────┼───────────────────────────────────────────
│Types of fisheries │Gross Tonnage TON
├─────────────────┼───────────────────────────────────────────
│Length of the ship meter │ImplementingAgency Organization horsepower to
├─────────────────┼───────────────────────────────────────────
│(Scheduled) Date of Commencement Year month day │(Scheduled) Completion Date Year month day
─────┴─────────────────┴───────────────────────────────────────────
─────┬─────────────────────────────────────────────────────────────
RequestDetails│Date of Examination Request Year month day
├─────────────────────────────────────────────────────────────
│Examination Location
├─────────────────────────────────────────────────────────────
│Re GO
─────┴─────────────────────────────────────────────────────────────
I hereby apply for construction (separate construction) inspection of the above fishing vessel pursuant to Articles 50(1) and 53(1) of the Enforcement Rules of the Fishing Vessel Act.
Applying.
Year month day
Applicant (Signature or seal)
Chairman of the Korea Maritime Transportation Safety Authority Your
한 Country Sun Grade Time CHANG
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬────────────────────────────────────────────┬───────────────
Attached Documents │1. Documents to be submitted for construction inspection │Fee
│ a. Approved drawings related to construction inspection (not required when applying to the agency that approved them) │ of agency inspection agency
│ b. Preliminary inspection certificate, verification certificate, construction/manufacturing certificate, or maintenance certificate │ Subject to fee standards
│ │
│2. Documents to be submitted for separate construction inspection │
│ Approved drawings related to separate construction inspection (not required when applying to the agency that approved them) │
──────┴────────────────────────────────────────────┴───────────────
210mm×297mm[White Paper 80g/㎡]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
────────────────────────────────────────────────────────────────────
Fishing vessels subject to construction inspection
Fishing vessels other than the following:
- Non-motorized fishing vessel
Fishing vessels used for licensed fisheries, permitted fisheries, or reported fisheries pursuant to Article 6, Article 9, or Article 11 of the Inland Fisheries Act
- Wooden vessel less than 24 meters in length
- Fishing vessels built at foreign shipyards that undergo a construction inspection equivalent to that conducted by a foreign government or an accredited domestic or foreign ship inspection agency notified by the Minister of Oceans and Fisheries
is an inspected fishing vessel
Fishing vessels subject to separate construction inspection
All fishing vessels imported from abroad
All fishing vessels that have not undergone construction inspection
Equipment subject to construction inspection
Hull, machinery, drainage facilities, steering, mooring and anchoring facilities, and electrical installations
○ Load Line (Only applicable fishing vessels are subject to inspection)
□ Other Notes
Construction inspection shall begin when the fishing vessel's construction commences.
Among the documents submitted with a construction inspection application, drawings other than basic design drawings, preliminary inspection certificates, verification certificates, construction/manufacturing certificates, and maintenance certificates
may be submitted before construction of the relevant fishing vessel facilities begins.
Parts that passed construction inspection are exempt from the initial periodic inspection.
────────────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
────────────────────────────────────────────────────────────────────
┌──────┐ ┌──────────┐ ┌──────────┐ ┌──────────────┐
│Fill out application form │?│Receipt 수 │?│Fishing Vessel Inspection │? │Issuance of Construction (Separate Construction) Inspection Certificate │
│ │ │ │ │ │Pass│ │
└──────┘ └──────────┘ └──────────┘ └──────────────┘
Applicant Korea Maritime Transportation Safety Authority Korea Maritime Transportation Safety Authority Korea Maritime Transportation Safety Authority
/Classification Society /Classification Society /Classification Society
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━