Form 16 — 액화석유가스의 안전관리 및 사업법 시행규칙
282369 · 2026-01-02
■ Enforcement Rules of the Act on Safety Management and Business of Liquefied Petroleum Gas [Form No. 16] <Amended Dec. 16, 2021>
Technical Review Application
Application Form for Technical Review
※ The dark colored field is not to be filled out by the applicant.(The dark colored field is not applicable for an applicant) (Front)
────────┬──────────┬─────────────────────────────────────────────────────────────
Receipt Number │Date of Receipt │Processing Period Refer to back
Receipt No. │Receipt Date │Process Term Refer to the back page
────────┴──────────┴─────────────────────────────────────────────────────────────
※Your Business Registration No. and email address are used for the issuance of electronic tax invoices in accordance with the Value Added Tax Act.(Your Business Registration No. and
E-mail is used for issuing E-Tax Bill.)
──────┬──────────────────────────────────────────────────────────────────────────
Applicant │ Trade Name:
Applicant │ (Company Name)
├────────────────────┬─────────────────────────────────────────────────────
│ Representative: │ Date of Birth:
│ (Name of CEO) │ (Date of Birth)
├────────────────────┼─────────────────────────────────────────────────────
│ Office Location: │ Telephone Number:
│ (Office Address) │ (Phone No.)
├────────────────────┴─────────────────────────────────────────────────────
│ Business Registration Number:
│ (Business Registration No.)
├──────────────────────────────────────────────────────────────────────────
│ Email Address:
│ (E-Mail)
├──────────────────────────────────────────────────────────────────────────
│ Business Office Location:
│ (Business Address)
──────┴──────────────────────────────────────────────────────────────────────────
※ Please refer to the back for the type of business and scope of application.
(Refer to back. Fill in business type and scope including type of gas appliances in case of manufacture registration of forei
gn gas appliances.)
─────────────┬───────────────────────────────────────────────────────────────────
Types of Business and Scope of Target│
Business Type and Scope │
─────────────┴───────────────────────────────────────────────────────────────────
Article 6, Paragraph 1, Subparagraph 4 and Article 34-2, Paragraph 4 of the Act on Safety Management and Business of Liquefied Petroleum Gas, and Article 4, Paragraph 1, Subparagraph 4 of the Enforcement Decree of the same Act
Pursuant to Article 6, Paragraph 1, Subparagraph 2 and Article 15, Paragraph 1, Article 49-3, Paragraph 6, Article 51, Paragraph 3, Subparagraph 1, and Article 70, Paragraph 3 of the Enforcement Rules of the same Act
I hereby apply as above for a technical review.
I hereby apply to undergo the technical review in accordance with the Article 6(1)4 and Article 34-2(4) of the
Safety Control and Business of Liquefied Petroleum Gas Act and the Article 4(1)4 and Article 6(1)2 of the Enfo
rcement Decree of the same Act and the Article 15(1), Article 49-3(6), Article 51(3)1 and Article 70(3) of the
Enforcement Rule of the same Act.
Year month day
(year) (Month) (Date)
Applicant (Signature or Seal) (Signature)
President of Korea Gas Safety Corporation Your
to: President & CEO Korea
Gas Safety Corporation
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
──────┬───────────────────────────────────────────────────────────────┬──────────
Attached Documents │ 1. In the case of an application for technical review pursuant to Article 15 of the Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas (The technical review in accordance │
Required │with the Article 15 of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas Act) │Fee
Document │ a. Installation plan for the facility (in cases where permit or registration matters are to be changed, or where change work is to be carried out pursuant to Article 51, Paragraph 2, Subparagraph 2, the change │(Handling Fee)
│refers only to the section) 1 copy [1 copy of facility installation plan (only the changed plan of the corresponding section in │
│case of alteration)] │「High-pressure gas safety
│ b. Drawings and descriptions regarding facility standards and technical standards (in cases where permit or registration matters are to be changed and change work pursuant to Article 51, Paragraph 2, Subparagraph 2 │Enforcement Decree of the Management Act」
│(if applying to amend the approval, only the changed parts are required) one copy [one drawing and one document explaining the facility and technical standards │pursuant to Article 22
│ards (only the changed document of the corresponding section in case of alteration)] │Fee
│ c. For a gas appliance manufacturer or a registered foreign gas appliance manufacturer, a manufacturing process flow diagram (where approval or registration details are being changed, │According to the
│refers only to the changed part) 1 part [1 process drawing for manufacturer (including foreigner) of gas appliances (only │Article 22 of the
│the changed document of the corresponding section in case of alteration)] │Enforcement De
│ 2. In the case of an application for technical review pursuant to Article 49-3, Paragraph 6 of the Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas (The technical review in acc │cree of the High
│ordance with the Article 49-3 of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas │Pressure Gas Sa
│Act) │fety Control Act
│ a. Facility installation plan (in the case of facility change, only the changed part applies)[1 copy of facility installation plan (only the changed │
│plan of the corresponding section in case of alteration)] │
│ B. Manual on facility standards and technical standards (in the case of facility changes, only the changed part applies) [1 manual on facility standards and │
│technical standards(only the changed document of the corresponding section in case of alteration)] │
│ It is a drawing (in the case of piping, it must be prepared in accordance with Article 3, Item 2, Subparagraph (a) of Annex 4-2), and in the case of facility changes, only the changed part is applicable │
│)[1 drawing on facility standards and technical standards (only the changed document of the corresponding section │
│in case of alteration)] │
│ 3. In the case of an application for technical review pursuant to Article 70, Paragraph 3 of the Enforcement Rule of the Act on Safety Management and Business of Liquefied Petroleum Gas (The technical review in acco │
│rdance with the Article 70(3) of the Enforcement Rule of the Safety Control and Business of Liquefied Petroleum Gas │
│Act) │
│ A. Facility Installation Plan (1 copy of facility installation plan) │
│ b. Drawings and descriptions regarding facility standards and technical standards (in case of intended changes, only the changed parts) 1 copy (1 drawing and 1 │
│manual on facility standards and technical standards) │
──────┴───────────────────────────────────────────────────────────────┴──────────
210mm×297mm[White Paper 80g/㎡(Recycled)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
※ In the 'Type of Business and Scope' section at the front, fill in all applicable items from the following, and regarding the gas appliance manufacturing business or the foreign gas appliance manufacturing registration
, please fill out the form including the type of gas appliance.
Fill in the blanks of the business type and scope mentioned preceding page with the following relevent information, and in case of
manufacture business of gas appliance or manufacture registration of foreign gas appliance, including kinds of gas appliance.
────────┬───────────────────────┬─────────────────────────┬────────────
business's │Types of Business │Target Range │Processing Period
Types and Targets │(Business type) │(Scope) │(Process term)
Range ├───────────────────────┼─────────────────────────┼────────────
(Business │ Liquefied Petroleum Gas Filling Business (LP Gas filling business)│ Cylinder filling business │7 days
Type and │ │ Vehicle-mounted container filling business │(7 days)
Scope) │ │(Vehicle Cylinder filling business) │
│ │ Small Container Filling Business │
│ │(Small Cylinder filling business) │
│ │ Gas Heating Container Filling Business │
│ │(Gas Heater Cylinder filling business) │
│ │ Vehicle fixed tank filling business │
│ │(Tanks Fixed on Vehicle filling business) │
│ │ Business for filling storage tanks via pipelines │
│ │(Storage Tank through piping filling business) │
├───────────────────────┼─────────────────────────┼────────────
│ Gas Appliance Manufacturing Business │- │7 days
│(Gas appliance production business) │ │(7 days)
├───────────────────────┼─────────────────────────┼────────────
│ Foreign Gas Appliance Manufacturing Registration │- │15 days
│(Foreign gas appliance manufacture Registration)│ │(15 days)
├───────────────────────┼─────────────────────────┼────────────
│ Liquefied Petroleum Gas Collective Supply Business │Piping Network Supply Business │Manufacturer: 10th
│(LP Gas Collective Supply business) │(Pipe Network Supply business) │Pressure Regulator·Piping: 5 days
│ │ │(Manufactory: 10days
│ │ │Governer station and
│ │ │pipes: 5days
│ ├─────────────────────────┼────────────
│ │General Group Supply Business │7 days
│ │(General Collective Supply business) │(7 days)
├───────────────────────┼─────────────────────────┼────────────
│ Liquefied Petroleum Gas Sales Business │ Sales business of liquefied petroleum gas filled in containers │7days
│(LP Gas Sales business) │(LP Gas that is filled in Cylinder sales business)│(7 days)
│ │ Business of selling liquefied petroleum gas filled in containers and to automobiles │
│ │ Sales business of liquefied petroleum gas filled in fixed tanks │
│ │(LP Gas that is filled in Cylinder Tanks Fixed on │
│ │Vehicle sales business) │
├───────────────────────┼─────────────────────────┼────────────
│ Installation of Liquefied Petroleum Gas Filling Business Office │- │7 days
│(Places LP Gas filling business premises) │ │(7 days)
├───────────────────────┼─────────────────────────┼────────────
│ Installation of Liquefied Petroleum Gas Storage Facilities (Places storing LP Gas)│- │7days
│ │ │(7 days)
├───────────────────────┼─────────────────────────┼────────────
│ Specified LP Gas use │- │7 days
│ │ │(7 days)
────────┴───────────────────────┴─────────────────────────┴────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Handling Process
───────────────────────────────────────────────────────────────────────
This application form will proceed as follows.
────────────┬──────────────────────────────────────────────────────────
Applicant │Processing Agency
Applicant │Institution
├──────────────────────────────────────────────────────────
│Korea Gas Safety Corporation
│Korea Gas Safety Corporation
────────────┼──────────────────────────────────────────────────────────
│
┌───────┐ │ ┌───────────────────────┐
│New Blue │ │ ▶│Accept │
│Application ├──┼───────────────────── │Receipt │
│ │ │ │ │
└───────┘ │ └┬──────────────────────┘
│ │
│
│ ▼
│ ┌───────────────────────┐
│ │Review │
│ │Review │
│ └┬──────────────────────┘
│ │
│
│ ▼
│ ┌───────────────────────┐
│ │Determination of suitability │
│ │Acceptance Decision │
│ └┬──────────────────────┘
│ │
│
│ ▼
┌───────┐ │ ┌───────────────────────┐
│Release │◀ │ │Draft ㆍ Approval │
│Issue │ ─┼──────────────────────┤Draft ㆍ Approval │
│ │ │ │ │
└───────┘ │ └───────────────────────┘
│
────────────┴──────────────────────────────────────────────────────────
210mm×297mm[White Paper 80g/㎡(Recycled)]
───────────────────────────────────────────────────────────────────────