Form 20 — 시설물의 안전 및 유지관리에 관한 특별법 시행규칙
282381 · 2026-01-02
■ Enforcement Rules of the Special Act on Safety and Maintenance of Facilities [Attachment Form No. 20] <Amended July 16, 2024>
(Page 1 of 4)
Record of Performance of Safety Inspection, etc. and Performance Evaluation Services
────────────────────────────────────────────────
1. General status
────────┬───────┬───┬─────────┬──────┬──────────
① Company Name │ │Representative│ │② Registration Field │
────────┼───────┴───┼─────┬───┴──────┴──────────
③ Service Name │ │Service Period │ . . . ? . . .
────────┼───────┬───┼────┬┴─┬──┬───────┬────────
Managing Entity Name │ │Representative│ │Phone│ │Classification │Public·Private
────────┼───────┴┬──┴────┼──┴──┼───────┼────────
④ Total Contract Completion Amount │ 1000 Won │⑤ Joint Contracting │ │⑥ Contract Method │
(Design Amount) │ (1,000 won) │(Ratio, Method) │ │ │
━━━━━━━━┷━━━━━━━━┷━━━━━━━┷━━━━━┷━━━━━━━┷━━━━━━━━
2. Status of Participating Companies
────────┬───┬───────────┬────┬──────┬───────────
Company Name │Representative│Address │Registration Field│Subcontracting Share (%) │contract amount
────────┼───┼───────────┼────┼──────┼───────────
Representative │ │ │ │ │(1,000 won)
────────┼───┼───────────┼────┼──────┼───────────
Co-(1) │ │ │ │ │(1,000 won)
────────┼───┼───────────┼────┼──────┼───────────
Co-(2) │ │ │ │ │(1,000 won)
━━━━━━━━┷━━━┷━━━━━━━━━━━┷━━━━┷━━━━━━┷━━━━━━━━━━━
3. Status of Facilities
────────┬───────┬────┬────────┬───────┬─────────
⑦ Facility Name │⑧ Facility Classification │⑨ Type │⑩ Facility Class │⑪ Completion Date │⑫ Previous Safety Grade
├───────┴────┼────────┴───────┴─────────
│⑬ Location of Facilities │⑭ Type and Dimensions of Facilities
────────┼───────┬────┼────────┬───────┬─────────
│ │ │ │ │
├───────┴────┼────────┴───────┴─────────
│ │
━━━━━━━━┷━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━
4. Inspection & Diagnosis Performance
────────────────┬─────┬────────┬────────────────
⑮ Type of Safety Inspection, etc. │ │Field of Performance │
────────────────┼─────┴────────┼────────────────
Inspection and Diagnosis Completion Amount │(1,000 won) │? Safety Rating
(Design Amount for Inspection and Diagnosis) │(1,000 won) │
────────────────┼──────────────┴────────────────
? Major defects, etc. │
────────────────┼───────────────────────────────
Main Results of Safety Inspections and Diagnoses │
────────────────┼───────────────────────────────
Major Repair and Reinforcement Plan │
─────────┬──────┼──────┬────────┬───────────────
Seismic Performance Evaluation │Eligibility │Whether the Fee Was Reflected│Whether Previously Evaluated │Whether Reinforcement Was Recommended
├──────┼──────┼────────┼───────────────
│ │ │ │
├──────┴──────┴────────┴───────────────
│Key Evaluation Results
━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
5. Performance Evaluation Records
────────────────┬───────────────┬───────────────
Completion Amount for Performance Evaluation │(1,000 won) │Field of Performance
(Design Amount for Performance Evaluation) │(1,000 won) ├───────────────
│ │
───────┬────────┼──────┬────────┼───────────────
Classification │Overall Performance │Safety Performance │Durability Performance │Serviceability Performance
───────┼────────┼──────┼────────┼───────────────
grade │ │ │ │
───────┼────────┼──────┼────────┼───────────────
Main Evaluation │ │ │ │
Results │ │ │ │
───────┴────────┴──────┴────────┴───────────────
※ If there are two or more facilities subject to inspection, diagnosis, or performance evaluation, prepare and attach a separate sheet
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]
(Page 2 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
───────────────────────────────────────────────────────────
6. Status of Principal and Participating Engineers
─────┬────┬────┬──────────────┬─────┬──────┬───────────────
Classification │Name │Date of Birth│ Task Participation Period │ │ Job │Affiliation
│ │ │ │Job Field │(Participation) Field │
│ │ │ │Grade │ │
─────┼────┼────┼──────────────┼─────┼──────┼───────────────
Principal │ │ │ . . . ? . . │ │ │
─────┼────┼────┼──────────────┼─────┼──────┼───────────────
Participating │ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┼────┼──────────────┼─────┼──────┼───────────────
│ │ │ . . . ? . . │ │ │
├────┴────┴──────────────┴─────┴──────┴───────────────
│※ Prepare and attach a separate sheet if necessary
─────┴─────────────────────────────────────────────────────
7. Technical Deliberation (Consultation)
──────────┬────────────────────────────────────────────────
Technical Review (Advisory) │
Whether Conducted │
─────┬────┴────────────────────────────────────────────────
AttachedMaterials│1. A report on the results of safety inspections, etc. under Article 13(7) and Article 17(1) of the Special Act on the Safety and Maintenance of Facilities,
│or a report on performance evaluation results under Article 40(3) of the same Act
│2. Technical Service Contract and Tax Invoice
│3. Technical Review (Consultation) Supporting Documents (Submit only if applicable)
─────┴─────────────────────────────────────────────────────
Under Article 36(1) of the Special Act on the Safety and Maintenance of Facilities and Article 29
(1) of its Enforcement Rule, I hereby submit the above performance records of safety inspections, etc. and performance evaluations.
Year month day
Confirmed by the Managing Entity: (Signature or seal)
Representative of Specialized Safety Diagnosis/Inspection Agency: (Signature or seal)
To the Korea Authority of Land and Infrastructure Safety
210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]
(Page 3 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
1. In the Company Name field ①, enter the corporate name of the specialized safety diagnosis or safety inspection agency that conducted the safety inspections, etc. or performance evaluations;
omit this field where the services were performed in-house.
2. In the Registration Field ②, select one of Roads and Tunnels, Hydraulic Facilities, Ports, Architecture or Comprehensive for a specialized safety diagnosis agency,
or one of Civil Engineering or Architecture for a specialized safety inspection agency.
3. In the "Service Name" field of ③, write the name of the service (contract).
4. In the Completion Amount field ④, enter the total amount paid for completed services in thousands of won; enter the amount ordered in the Design Amount field.
5. In the Joint Contracting field ⑤, enter 'Equity Share (%)' for joint performance or 'Allocated Share' for divided performance,
and in the Facility Name field ⑦, enter only the facilities allocated under that arrangement.
6. In the Contract Method field ⑥, indicate Open Competitive Bidding, Restricted Competitive Bidding, Negotiated Contract or Other.
7. In the Facility Name field ⑦, enter the facility name exactly as shown in the facility management register. If no such register
exists, enter the facility's proper name.
8. In the "Facility Classification" column of ⑧, select and write one of the following facilities.
Bridges · Tunnels · Ports · Dams · Buildings · Rivers · Water Supply and Sewerage · Retaining Walls · Cut Slopes · Utility Tunnels
9. In the "Type" column of ⑨, select and write one of the following facilities.
Road bridges · Road tunnels · Underpasses · Covered structures · High-speed railway bridges · High-speed railway tunnels · Urban railway bridges · Urban railway overpasses · Urban railway
Tunnel · General Railway Bridge · General Railway Tunnel · Pedestrian Overpass · Lock Facilities · Mooring Facilities · Breakwater · Wave Breaker · Revetment · Multipurpose Dam · Power Generation Dam · Flood Control
Dams · Water Supply Dams · Local Water Supply Dams · Multi-unit Housing (Apartments/Townhouses/Dormitories) · Buildings Other than Multi-unit Housing · Cultural and Assembly Facilities ·
Religious facilities · Sales facilities · Transportation facilities · Medical facilities · Facilities for the elderly and children · Training facilities · Sports facilities · Accommodation facilities · Tourist and recreational facilities · Passenger car terminals
Tunnels · High-speed rail station facilities · Urban rail station facilities · General rail station · Metropolitan rail station facilities · Airport terminals · Port passenger terminals · Auditoriums · Entertainment facilities · Public
Industrial facilities · Underground shopping arcades · Estuary dams · Seawalls · Sluice gates and culverts · Embankments and ancillary facilities · Multi-functional weirs · Drainage pump stations · Regional water supply · Industrial
Water supply · Local water supply · Public sewage treatment facilities · Retaining walls · Cut slopes · Utility tunnels · Others
10. In the Facility Class field ⑩, enter '1' for a Class 1 facility under Annex 1 to the Enforcement Decree of the Special Act on the Safety and Maintenance of Facilities,
'2' for a Class 2 facility under that Annex, '3' for a Class 3 facility under Annex 1-2 to the same Decree,
or 'Other' for any other facility.
11. In the Completion Date field ⑪, enter the date of completion (or approval for use) of the facility in YYYY-MM-DD format.
12. In the Previous Safety Grade field ⑫, enter the grade determined by a safety inspection, etc. carried out before the relevant service.
13. In the Facility Location field ⑬, enter the facility's complete address, including its lot number.
14. In the "Type and Dimensions of Facility" column of ⑭, write the following information regarding the relevant facility.
───────────┬───┬──────────────────────
old minute │Format │Scale
───────────┼───┼──────────────────────
Bridge │( ) │Length ( )m, maximum span length ( )m, number of lanes ( )
│ │
Covered Structure │( ) │Length ( ) m, width ( ) m, length ( )m,
│ │
tunnel │( ) │Length ( )m, number of lanes ( )
│ │
Underpass │( ) │Length ( ) m, number of lanes ( )
│ │
Lock Gate Facility │( ) │Maximum passing vessel tonnage( ) tons
│ │
Breakwater, Wave-Reducing Structure and Revetment│( ) │Length ( )m, height( )m
│ │
Mooring Facility │( ) │Maximum moored vessel size( ) tons
│ │
dam │( ) │Reservoir Capacity( )10 million㎥
│ │
Buildings │( ) │Underground( ) floor, ground level ( )Floor, Gross Floor Area( )㎡
│ │
Underground Shopping Arcade │( ) │Underground( )Floor, Gross Floor Area( )㎡
│ │
Estuary Barrage │( ) │Length ( )m, height( )m
│ │
Sluice Gate or Water Passage │( ) │Horizontal( ) m, height ( ) m, number of gates ( )
│ │
Embankment │( ) │Length ( )m, height( )m
│ │
Multipurpose Weir │( ) │Length ( )m, height( )m
│ │
Drainage Pump Station │( ) │Total Pump Capacity( )㎥/min
│ │
Water Supply │( ) │Supply Capacity( ) 10,000 m³/day
│ │
Public Sewage Treatment Facility │( ) │Maximum Treatment Capacity ( )㎥/day
│ │
Retaining Wall │( ) │Maximum Height ( ) m, length ( )m
│ │
Cut Slope │( ) │Maximum Vertical Height ( ) m, continuous horizontal length ( )m
│ │
Utility Tunnel │( ) │Length ( ) m, number of cells ( ) cells, width ( )m
───────────┴───┴──────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
(Page 4 of 4)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
15. In the Type of Inspection, etc. field ⑮, enter 'Regular' for regular safety inspections, 'Emergency' for emergency safety inspections,
'Detailed' for detailed safety inspections, 'Diagnosis' for detailed safety diagnoses, or 'Other' for other cases.
16. In the Field of Performance field, (1) enter the registered field in which the specialized safety diagnosis agency carried out
safety inspections, etc. and performance evaluation of the facility. For regular or detailed safety inspections, also select the appropriate field
with reference to Annex 9 to the Enforcement Decree of the Special Act on the Safety and Maintenance of Facilities from bridges and tunnels,
hydraulic facilities, ports or architecture.
(2) For retaining walls and cut slopes, select one of bridges and tunnels, hydraulic facilities or ports.
17. In the Inspection and Diagnosis Completion Amount field, enter the total completed inspection and diagnosis service amount for each facility in thousands of won; in the
Inspection and Diagnosis Design Amount field, enter the amount ordered.
18. In the Safety Grade field, indicate the safety grade (A, B, C, D or
E) determined from the safety inspection or detailed safety diagnosis.
19. In the Major Defects, etc. field, enter the types of major defects, the affected components and their locations, and the proposed repairs or reinforcement
for those components.
20. In the Seismic Performance Evaluation field, enter the evaluated parts or components, evaluation result (adequate or inadequate seismic performance),
components with inadequate seismic performance and measures to secure the required performance.
21. In the Performance Evaluation Completion Amount field, enter the total value of completed performance evaluation services for each facility in thousands of won, and in the
Performance Evaluation Design Amount field, enter the amount ordered.
22. In the Classification field, distinguish between principal engineers and participating engineers according to their roles.
23. In the Task Participation Period field, accurately enter the dates of assignment to and release from the work.
24. In the Job Field Grade field, enter the engineer's technical grade under Annex 1 to the Enforcement Decree of the Construction Technology Promotion Act
at the time of participation in the service.
25. In the Job (Participation) Field section, enter the job field under Annex 6 or 8. For the actual field of participation in parentheses,
select one of bridges and tunnels, hydraulic facilities, ports or architecture for a specialized safety diagnosis agency,
or civil engineering or architecture for a specialized safety inspection agency. This information is used to calculate relevant experience.
ex) Civil Engineering (Bridges and Tunnels), Civil Engineering (Hydraulic Facilities), Safety Management (Architecture), Safety Management (Hydraulic Facilities), … …
In the "Affiliation" field of 26., write the name of the company to which the technician belongs.
27. In the Technical Deliberation (Consultation) field, indicate whether deliberation or consultation was conducted by the Construction Technology Deliberation Committee under Article 5
or the Technical Advisory Committee under Article 6 of the Construction Technology Promotion Act and submit supporting materials.
Supporting documents must be submitted.
28. Engineers affiliated with the managing entity or a relevant administrative agency who wish to maintain separate records of regular, detailed or emergency safety inspections
shall submit them using this form.
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━