Form 8 — 시설물의 안전 및 유지관리에 관한 특별법 시행규칙

282381 · 2026-01-02

■ Enforcement Rules of the Special Act on Safety and Maintenance of Facilities [Form No. 8-2] <Newly Inserted Feb. 21, 2020> Files may also be attached to submissions through the Small-Scale Vulnerable Facilities Information System (www.sfms.or.kr) and submitted through that system. Repair and Reinforcement Plan for Small-Scale Vulnerable Facilities ┌─────┬─────┬──────┬──────┬─────────────────────┬────────┬──────────────────┐ │ⓐ Facility Name │ⓑ Parts Requiring Repair or│ⓒ Damage Status │ⓓ Action Method │ActionCompleted │ⓔ Financing Methods│Remarks │ │ │Parts Requiring Reinforcement │ │ │Scheduled date │ │ │ ├─────┼─────┼──────┼──────┼─────────────────────┼────────┼──────────────────┤ │ │ │ │ │ │ │ │ └─────┴─────┴──────┴──────┴─────────────────────┴────────┴──────────────────┘ ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Instructions for Writing ───────────────────────────────────────────────────────────────────────────── 1. In column ⓐ, enter the name of the facility on the report. 2. In column ⓑ, specifically describe the floor number, room name, and location of parts such as floors, beams, and columns for the areas requiring repair and reinforcement recorded in the report. 3. In section ⓒ, the damage status in the report shall be specifically described as cracks, leakage, peeling, spalling, subsidence, deformation, etc. 4. In column ⓓ, specifically describe the method of action, such as repair/reinforcement methods, reconstruction, or demolition. 5. In column ⓔ, specifically state the method of financing costs for measures such as repair and reinforcement, including self-financing and local government support. ───────────────────────────────────────────────────────────────────────────── 297mm×210mm[White Paper(80g/㎡)]