Form 26 — 승강기 안전관리법 시행규칙

268955 · 2025-01-31

■ Enforcement Rules of the Elevator Safety Management Act [Attachment Form No. 26] Application for Postponement of Safety Inspection ※ Applicants shall not complete the shaded fields. Please read the notes before completing this form. ───────────────┬─────────────────┬──────────── Receipt Number │Date of Receipt │Processing Period 5 days ───────────────┴─────────────────┴──────────── ──────┬─────────────────────────────────────── Applicant │Building Name (Business Name) ├──────────────────────┬──────────────── │Representative Name │Representative's Date of Birth ├──────────────────────┼──────────────── │Office Location │Office Phone/Fax Number ├──────────────────────┴──────────────── │Elevator Location ──────┴─────────────────────────────────────── ──────┬────────────┬──────────┬──────┬──────── Acting Awards │Types of Elevators │Elevator Number │RegularInspectionCycle│SafetyInspection Elevator ├───────┬────┤ │ coming date │Reason for postponement number │Structure │Use │ │ │ ├───────┼────┼──────────┼──────┼──────── │ │ │ │ │ ├───────┼────┼──────────┼──────┼──────── │ │ │ │ │ ├───────┼────┼──────────┼──────┼──────── │ │ │ │ │ ├───────┼────┼──────────┼──────┼──────── │ │ │ │ │ ├───────┼────┼──────────┼──────┼──────── │ │ │ │ │ ──────┴───────┴────┴──────────┴──────┴──────── In accordance with Article 32, Paragraph 3 of the Elevator Safety Management Act and Article 57, Paragraph 2 of the Enforcement Rules of the same Act, the safety inspection as above I am requesting a postponement. Year month day Applicant (Signature or seal) [ ] President of the Korea Elevator Safety Agency, Head of Designated Inspection Agency [ Your [ Minister of the Interior and Safety ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ────────┬───────────────────────────┬───────── Attached Documents │ Documents confirming the reason for the postponement of the safety inspection │No Fee ────────┴───────────────────────────┴───────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ Important Notes ────────────────────────────────────────────── In the Safety Inspection Postponement Reason Number field, you must enter the number below corresponding to the reason for the safety inspection postponement. 1. In cases where normal operation of the elevator is impossible due to a serious defect in the building or facility where the elevator is installed 2. In the event that the managing entity suspends the operation of the elevator (excluding elevators for which installation is mandatory under other laws) 3. In the event of other unavoidable circumstances such as natural disasters ────────────────────────────────────────────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ProcessingProcedure ────────────────────────────────────────────── ┌────────┐ ┌────┐ ┌────────┐ ┌─────┐ ┌──────┐ │Fill out application form │?│Receipt │?│On-site inspection (if necessary)│?│Drafting and Approval│? │Reply │ │ │ │ │ │or Review/Confirm │ │ │ │ │ └────────┘ └────┘ └────────┘ └─────┘ └──────┘ Applicant Korea Occupational Safety and Health Agency Industrial Complex Industrial Complex ────────────────────────────────────────────── 210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]