Form 32 — 물환경보전법 시행규칙

287423 · 2026-06-22

Enforcement Rule of the Water Environment Preservation Act [Attached Form No. 32-4] <Newly Inserted Jan. 24, 2025> Drainage Facility Installation [ ] Approved ApplicationForm [ ] Change Approval ※ Do not fill in the shaded cells. Mark the applicable boxes with a check mark. ]. ─────────────────┬────────────────────┬──────────────── Receipt Number │Date of Receipt │Processing Period 5 days ─────────────────┴────────────────────┴──────────────── ──────┬─────────────────────┬────────────────────────── Applicant │Business Name │Business Registration Number ├─────────────────────┴────────────────────────── │Representative ├──────────────────────────────────────────────── │Address │(Phone Number: ) ──────┴──────────────────────────────────────────────── ──────┬──────┬───────────────────────────────────────── Apply │Of wastewater │ Factory Wastewater [ ], Industrial Wastewater Other than Factory Wastewater [ ], other wastewater[ ] Contents │Type │ ├──────┼─────┬─────────────────┬─────┬─────────── │Drainage pipe scale │Average pipe diameter │ mm │Length │m ├──────┼─────┴─────────────────┴─────┴─────────── │Drain pipe location │City·County·District RoadName Building Number(Legal Dong) ├──────┼───────────────────────────────────────── │Drain pipe outside │ Manhole[ ], Screen[ ], meter[ ], others( ) │Drainage Facility Installation│ ├──────┼──────┬────────────────┬─────┬─────────── │Drainage System Material│Drain pipe │PVC[ ], PE[ ], GRP[ ], │Water Collection Basin │PVC[ ], PE[ ], │ │ │PC[ ], cast iron pipe[ ], other [ ] │ │PC[ ], other [ ] ├──────┼──────┴────┬───────────┴──┬──┴─────────── │(Scheduled) Date of Commencement│Year month day │(Scheduled) Completion Date │Year month day ├──────┼───────────┼──────────────┼────────────── │Construction Implementation Method│ │Contractor │ │ │ │(Construction Industry and Registration Number) │ ├──────┼───────────┴──────────────┴────────────── │First │ Year month day │(Scheduled) Date of Use│ ──────┴──────┴───────────────────────────────────────── ──────┬──────────────────────────────────────────────── Change │ Details │ (Complete only when applying for change approval │ application │ only │ written) │ ──────┴──────────────────────────────────────────────── ─────────────────────────────────────────────────────── Article 51, Paragraph 5 of the Water Environment Preservation Act, Article 71-2, Paragraph 4 of the Enforcement Decree of the same Act, and Article 72 of the Enforcement Rules of the same Act Install drainage facilities as above in accordance with Paragraphs 6 and 7 of the Article [ ] Approved . [ ] Change Approval Year month day Applicant (Signature or seal) To the Executor ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ──────┬────┬─────────────────────────────────┬───────── Attached Documents │Approved │ 1. Drainage Facility Construction Plan Description (Includes drainage facility floor plan and longitudinal/transverse drawings)│Fee │Application │ 2. Wastewater Collection and Drainage Plan │No │IF │ │ ├────┼─────────────────────────────────┤ │ChangeApproval│ 1. Approval Certificate pursuant to Article 72, Paragraph 8 of the Enforcement Rule of the Water Environment Preservation Act │ │Application │ 2. Documents substantiating the changes │ │case │ │ ──────┴────┴─────────────────────────────────┴───────── ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━ ProcessingProcedure ─────────────────────────────────────────────────────── ┌──────┐ ┌───┐ ┌────┐ ┌────────────┐ ┌─────────┐ │Fill out application form │? │Accept │? │Review │? │Finish Re │?│Issuance of (Change) Approval Certificate │ └──────┘ └───┘ └────┘ └────────────┘ └─────────┘ Applicant Project Operator Project Operator Project Operator Project Operator ─────────────────────────────────────────────────────── 210 mm x 297 mm [white paper (80 g/m2) or medium-weight paper (80 g/m2)]