Form 11 — 수도법 시행규칙
287599 · 2026-06-26
■ Enforcement Rules of the Water Supply Act [Attachment Form No. 11] <Amended July 17, 2024>
(front)
( Year Month)Report on Water Purification Standard Operation Results
1. Overview of Water Treatment Plant and Filtration/Disinfection Processes
──────────┬───────────────────────────────────────────
Water Treatment Plant Name │
──────────┼───────────────────────────────────────────
Up value │
──────────┼───────────────────────────────────────────
Contact Person Name (Phone Number)│
──────────┼─┬─────────────┬───────────────────────────
Facility Capacity (㎥/day) │ │Monthly Average Production (㎥/day) │
──────────┼─┴─────────────┴───────────────────────────
Filtering Process │FilteringMethod
├───────────────────────────────────────────
│MeasurementPoint/Method
──────────┼───────────────────────────────────────────
Disinfection Process │Disinfection Method (Types of Disinfectants)
├───────────────────────────────────────────
│DisinfectionPoint
├───────────────────────────────────────────
│MeasurementPoint/Method
──────────┴───────────────────────────────────────────
2. Turbidity and Inert Ratio
───────────┬──────────────────────────────────────────
Item │Water Quality Test Results
├─────────────┬────────────────────────────
│Average (MAX~MIN) │ExceedingStandard
───────────┼─────────────┼────────────────────────────
1. Turbidity │ ( ) │/
───────────┼─────────────┼────────────────────────────
2. Residual disinfectant concentration │ ( ) │/
───────────┼─────────────┼────────────────────────────
3. CT calculated value │ ( )│/
───────────┼─────────────┼────────────────────────────
4. Inactivation ratio │ ( )│/
━━━━━━━━━━━┷━━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬────────────────────────────────────────────────
WritingMethod│1. For the average, enter the arithmetic mean of the monthly analysis results of the specimens, and enter the maximum and minimum values in parentheses.
│2. For exceeding standards, enter "Number of cases exceeding standards / Total number of inspections" for each item.
─────┴────────────────────────────────────────────────
(Back)
3. Details of Standard Violations and Results of Actions
──────┬────┬────┬───────────────────────────────────────
Water Treatment Plant Name │day Time │Violation Details│Cause of Excess and Actions Taken
──────┼────┼────┼───────────────────────────────────────
│ │ │
──────┼────┴────┴───────────────────────────────────────
WritingMethod │1. In the violation details section, record violations such as turbidity standard violations and insufficient inactivation ratios along with the date of the excess.
│2. In the section on Causes of Excess and Actions Taken, details of measures taken for cause analysis, improvement of facilities and operational management, required budget,
│Enter specific details such as whether or not it was promoted to local residents.
━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210㎜×297㎜[White Paper 80g/㎡]