Form 9 — 소하천정비법 시행규칙

261219 · 2024-03-19

■ Enforcement Rules of the Small Stream Improvement Act [Attachment Form No. 9] <Amended Sep. 8, 2016> (front) Small Stream Status Register (○○ Stream) Small stream number: ───────────────────────────────────────────────────────────────── ○ Current Status of Small Streams ───────┬──────────────┬───┬────────────────┬────┬──────────────── Water System Name│ │Designation date│ Year month day │NoticeNumber│ ───────┼──────────────┴───┴────────────────┴────┴──────────────── section │Starting point: Ending point: ───────┼────┬────────┬─┬──────────────────┬────────────────────── Total Length │m │Watershed Area │㎢│Beneficiary Zone │Farmland: ha, Building: buildings ───────┼────┴────────┴─┴──────────────────┴─────────────────────┐ Small stream facilities │ total locations (by type: ) │ ───────┼────────────────────────────────────────────────────────┤ Water Quality (BOD) │ Grade, ppm[Location: Biological Oxygen Demand (BOD) at a point 50–100 m upstream from the end of the stream] │ ───────┼───┬─────────────────────────────┬───┬──────────────────┘ Ecosystem │fishes│Total species (major fish species: ) │기 other│ ───────┴───┴─────────────────────────────┴───┴─────────────────── ○ Current Status of Planned Small Stream Sites ────────┬─────┬────────────┬──────────────────┬────────────────── Date of Designation │Notice Number │Lot Number │Total length (m) │Remarks marks ────────┼─────┼────────────┼──────────────────┼────────────────── │ │ │ │ ────────┼─────┼────────────┼──────────────────┼────────────────── │ │ │ │ ────────┼─────┼────────────┼──────────────────┼────────────────── │ │ │ │ ────────┼─────┼────────────┼──────────────────┼────────────────── │ │ │ │ ────────┴─────┴────────────┴──────────────────┴────────────────── ───────────────────────────────────────────────────────────────── 210mm×297mm[White Paper 80g/㎡(Recycled)] (rear) ──────────────────────────────────────────────────────────────── ──────────────────────────────────────────────────────────────── ○ Goal for Maintenance of Small Streams, etc. ──────────┬─────┬───────┬──────┬──────────────┬───────────────── Total Length │m │Plan river width │ m ~ m│Riverbed │ │ │ │ │slope │ ──────────┼─────┼───────┼──────┼──────────────┼───────┬───────── Height │ m ~ m│Crest Width│ m ~ m│Inclination of the slope │Inside the embankment: 1/ │Outside of embankment: 1/ │ │ │ │기 │ │ ──────────┼─────┼───────┴──────┴──────────────┴───────┴───────── Total Length of Revetment │m │Natural Embankment: m Gabion: m Stone Construction: m revetment block: m Other parts: m ──────────┼─────┼─────────────────────────────────────────────── Small river facilities │ │By Type: ──────────┼─────┼───────┬──────┬──────────────┬───────────────── Planned Flood Level │EL m│Planned Flood Discharge │㎥/sec │Water quality (BOD) │ grade, ppm ──────────┼─────┼───────┴──────┴──────────────┼─────┬─────────── Ecosystem │fishes │Total species (major fish species: ) │기 Other │ ──────────┴─────┴─────────────────────────────┴─────┴─────────── ○ Small Stream Maintenance Plan (Unit: km, thousand won) ───────┬───────┬─────────┬─────────┬───────────────┬──────────── Classi fication │Overall Plan │Through 1994 │1995 ~ 1999 │2000 ~ 2011 │2012 Onward ───────┼───┬───┼───┬─────┼───┬─────┼───────────┬───┼───┬──────── Total │Project Volume│Project Cost│Project Volume│Project Cost │Project Volume│Project Cost │Project Volume │Project Cost│Project Volume│Project Cost ───────┼───┼───┼───┼─────┼───┼─────┼───────────┼───┼───┼──────── Embankment Construction │ │ │ │ │ │ │ │ │ │ ───────┼───┼───┼───┼─────┼───┼─────┼───────────┼───┼───┼──────── Revetment │ │ │ │ │ │ │ │ │ │ ───────┼───┼───┼───┼─────┼───┼─────┼───────────┼───┼───┼──────── Other Small Stream│ │ │ │ │ │ │ │ │ │ Facilities │ │ │ │ │ │ │ │ │ │ ───────┴───┴───┴───┴─────┴───┴─────┴───────────┴───┴───┴──────── ──────────────────────────────────────────────────────────────── 210mm×297mm[White Paper 80g/㎡(Recycled)]