Form 2 — 선박안전법 시행규칙

288417 · 2026-07-27

[Attachment Form No. 2] <Revised Aug. 20, 2019> (front) ┏━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃ ┃ ┃Application for Construction (Separate Construction) Inspection ┃ ┃ ┃ ┃※ Check the applicable boxes (□) and refer to the instructions on the back. ┃ ┠─┬───────┬────────────────────────────────────┨ ┃Build│①Name (Representative Name)│ ┃ ┃er├───────┼────────────────────────────────────┨ ┃ja│③Ad dress │ ┃ ┃ ├───────┼────────────────────────────────────┨ ┃ │③Trade 호│ (Phone : ) ┃ ┠─┼───────┼────────────────────────────────────┨ ┃small│④Name (Representative Name)│ ┃ ┃Owner├───────┼────────────────────────────────────┨ ┃ja│⑤Ad dress│ ┃ ┃ ├───────┼────────────────────────────────────┨ ┃ │⑥Trade 호 │ (Phone : ) ┃ ┠─┴─────┬─┴────────────┬────────┬──────────────┨ ┃⑦Construction Number │ │⑧Port of Registry port│ ┃ ┠───────┼──────────────┼────────┼──────────────┨ ┃⑨Type of Vessel │□ Powered vessel □ Sailing vessel □ Barge □ Other │⑩Hull Material│□ Steel □ Wood □ FRP □ Other ┃ ┠───────┼──────────────┼────────┼──────────────┨ ┃⑪Pur pose │ │⑫Gross Tonnage 수│ tons ┃ ┠───────┼──────────────┼────────┼──────────────┨ ┃⑬Length of Vessel │ meters │⑭Propulsion Machinery Qa Tube│ [kW] [PS] units┃ ┃ │ │ │ [kW] [PS] units┃ ┠───────┼──────────────┼────────┼──────────────┨ ┃⑮Navigation Area │ Zone │(Scheduled) Date of Commencement │ Year month day ┃ ┠───────┼──────────────┼────────┼──────────────┨ ┃(Scheduled) Completion Date │ Year month day │Requested Inspection Date │ Year month day ┃ ┠───────┼──────────────┴────────┴──────────────┨ ┃Inspection Location │ ┃ ┠───────┼──────────────────────────────────────┨ ┃Re marks │ ┃ ┠───────┴──────────────────────────────────────┨ ┃ I hereby apply for a construction (separate construction) inspection of the above vessel under Articles 10(1) and 11(1) of the Enforcement Rules of the Ship Safety Act. ┃ ┃I am applying for a drying (separate drying) inspection. ┃ ┃ ┃ ┃ Year month day ┃ ┃ ┃ ┃ Applicant (Signature or seal) ┃ ┃ ┃ ┠──────┬───────────────────────────────────────┨ ┃Required Documents │1. Documents for Construction Inspection ┃ ┃ │ a. Approved drawings for construction inspection (not required if filed with the delegated inspection agency that approved the drawings ┃ ┃ │) ┃ ┃ │ B. Certificate of Examination, Confirmation, or Certificate of Conformity/Preliminary Inspection ┃ ┃ │2. Documents for Separate Construction Inspection ┃ ┃ │ Approved drawings for separate construction inspection (not required if filed with the delegated inspection agency that approved the drawings ┃ ┃ │) ┃ ┗━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 210㎜ × 297㎜[Standard Paper 60g/㎡ (Recycled)] Instructions for Applying for Construction (Separate Construction) Inspection (rear) ┏━━━━━━┯━━━━━━━━━━━━━━━━━━┯━━━━┯━━━━━━━━━━━━━┓ ┃Submission Location │Delegated inspection agency (Korea Maritime Transportation Safety Authority, │Processing Department│Regional Offices ┃ ┃ │Classification Society) │ │ ┃ ┠──────┼──────────────────┼────┼─────────────┨ ┃수 수 Fee │According to the fee standards set by the agency inspection agency │Processing Period│Drying period + 25 days ┃ ┃ │follow │ │(25 days for separate construction inspection)┃ ┠──────┼──────────────────┴────┴─────────────┨ ┃ │ ┃ ┃Important Notes │□ Penalty Regulations ┃ ┃ │A person who fails to undergo construction inspection or obtains it by fraud or other improper means ┃ ┃ │shall be punished by imprisonment for up to one year or a fine not exceeding 10 million won ┃ ┃ │. ┃ ┃ │ ┃ ┃ │□ Vessels Subject to Construction Inspection ┃ ┃ │All vessels ┃ ┃ │ ┃ ┃ │□ Vessels Subject to Separate Construction Inspection ┃ ┃ │All vessels imported from abroad ┃ ┃ │ㅇ Vessels not inspected under the Ship Safety Act before November 4, 2007, ┃ ┃ │including all such vessels ┃ ┃ │ ┃ ┃ │□ Equipment Subject to Construction Inspection ┃ ┃ │hull, machinery, drainage facilities, steering facilities, mooring and anchoring facilities and electrical facilities ┃ ┃ │ㅇ Load Line (Only applicable vessels are subject to inspection) ┃ ┃ │ ┃ ┃ │□ Oth er ┃ ┃ │Construction inspections must be undergone from the time the vessel commences construction. ┃ ┃ │ㅇ Of the documents submitted for construction inspection, drawings other than basic design drawings and examination ┃ ┃ │certificates, confirmations, pass certificates or preliminary inspection certificates ┃ ┃ │may be submitted before work starts on the relevant ship facilities. ┃ ┃ │ㅇ The initial periodic inspection is waived for portions that passed construction inspection. ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┃ │ ┃ ┗━━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛