Annex 11 — 선박안전법 시행규칙

288417 · 2026-07-27

■ Enforcement Rules of the Ship Safety Act [Appendix 11] <Amended Apr. 12, 2023> Preparations for Intermediate Inspection (Related to Article 30, Paragraph 1, Subparagraph 3) 1. Type 1 Intermediate Inspection A. Preparation regarding the hull Attached Table 10, Subparagraphs 1a through d, Subparagraph k (limited to the exterior of the hull), Subparagraph g and Subparagraph n Prepare for START B. Preparation regarding the institution 1) Main Engine a) Internal combustion engine (1) Remove cylinder cover (2) The amount of opening and closing of the crank arm shall be measured. However, for high-speed engines It is not so. (3) After removing the upper or lower half of the crankshaft bearing and the crank pin bearing To enable the crankshaft to rotate, and the joint between the crankshaft and the crank arm If it is difficult to inspect the START, lift the crankshaft. (4) Open the exhaust turbine supercharger and scavenger so that the interior can be inspected b) Gas turbines and steam turbines, the upper half of the turbine and compressor cabins and the upper half of the rotor bearings After removing the platen, enable the rotor to rotate 2) Drive shaft system a) remove the propeller and the propeller shaft (including the stern tube shaft, and the waterjet propulsion device , (referring to the main shaft) shall be extracted. However, for the waterjet propulsion system , after preparing to verify the following items, depending on the verification result, If the condition is deemed good, the spindle may not be removed. (1) Condition of coupling bolt (2) Condition of bow and stern bearings of the main shaft (3) Condition of contact part between impeller boss and main shaft (when attached with key and spline) (4) Impeller status (5) Main part of the main shaft pre-swing sealing device (6) Open thrust bearing state b) Remove the upper half or cover and thrust bearing of each axis bearing, and each axis Make rotatable d) Ensure that the gap between the shaft and the ground material at the aft end of the stern tube can be measured. d) Inspect the change mechanism or rotating part inside the propeller of a variable pitch propeller Disassemble to enable START, and remove one wing. e) Disassemble the reduction gear so that the teeth can be inspected. 3) Boiler a) After cleaning the interior of the boiler, flame-contacted parts, and the interior of the pressure vessel, the man Remove the covers of the START hole, cleaning hole, and inspection hole, and the attached key valve and cock. 을 분해할 것 b) Leave the boiler smoke box door open. d) Remove part of the outer part of the boiler, such as insulation, and measure the thickness of the plates and tubes Make it possible 4) Generators related to the propulsion and navigation of a vessel or beams related to the propulsion of a vessel The auxiliary engine driving the START machine shall make the preparations for 1). 5) Views and enema devices a) Open to inspect the interior of the view and remove the operating parts b) Capable of inspecting the interior of fuel oil tanks, filters, valves, cocks, and other pipe fittings . However, light oil (referring to crude oil or fuel oil that is not heavy oil) For vessels using START, preparation for opening for internal inspection may be exempted. There is. 6) Display fixtures in a suitable place 7) Prepare for efficacy testing and ceramic testing . Preparation regarding drainage facilities Make the preparations specified in Subparagraph 3 of Attached Table 10. d. Preparation of facilities for steering, mooring, and anchoring Display anchors, anchor chains or ropes and mooring ropes in a suitable place. E. Preparations regarding life-saving and fire-fighting equipment 1) Remove items that must be removed for inspection and display them in a suitable place. 2) Prepare for efficacy testing or condition inspection B. Preparation of Navigation Facilities 떼어내어 검사하여야 하는 것은 떼어내어 적당한 장소에 진열할 것 사. 위험물의 적부설비 및 하역설비에 관한 준비 효력시험의 준비를 할 것 아. 전기설비에 관한 준비 절연저항시험 및 효력시험의 준비를 할 것 자. 컨테이너설비에 관한 준비 현상검사의 준비를 할 것 차. 승강설비에 관한 준비 효력시험의 준비를 할 것 카. 거주 및 위생설비에 관한 준비 효력시험 또는 현상검사의 준비를 할 것 타. 만재흘수선 및 무선설비에 관한 준비 효력시험 또는 현상검사의 준비를 할 것 파. 냉동, 냉장 및 수산물처리가공설비에 관한 준비 효력시험 또는 현상검사의 준비를 할 것 2. 제2종 중간검사 가. 만재흘수선의 표시를 검사할 수 있도록 안전한 발판을 설치할 것 나. 수밀문ㆍ방화문 등 폐쇄장치에 대한 효력시험의 준비를 할 것 다. 기관, 배수설비, 조타설비, 구명 및 소방설비, 항해용구 및 위험물의 적부설 비는 효력시험 또는 현상검사의 준비를 할 것 라. 전기설비의 경우에는 절연저항시험 및 효력시험의 준비를 할 것 마. 선령 10년을 넘는 산적화물선의 화물창의 경우에는 별표 10의 제1호너목 1) 부터 3)까지의 준비를 할 것 바. 거주 및 위생설비에 관한 준비 현상검사의 준비를 할 것 사. 만재흘수선 및 무선설비에 관한 준비 효력시험 또는 현상검사의 준비를 할 것