Form 74 — 산업안전보건법 시행규칙
288431 · 2026-08-01
■ Enforcement Rules of the Occupational Safety and Health Act [Form No. 74] <Amended Sep. 27, 2023>
Application for Confirmation of Exemption from Asbestos Survey, etc.
[ ] Asbestos-free [ ] Contains more than 1 percent asbestos [
[ ] Conducted an asbestos survey in accordance with the "Asbestos Safety Management Act" [
※ Please check the instructions and notices on the back before filling out the form, and [ ]. (front)
──────────┬───────────────┬──────────────┬────────────────────────
Receipt Number │Date of Receipt │Processing Date │Processing Period 20 days
──────────┴───────────────┴──────────────┴────────────────────────
─────────┬─────────────────────────────┬──────────────────────────
Owner │Name │Telephone Number
├─────────────────────────────┴──────────────────────────
│Address
─────────┴────────────────────────────────────────────────────────
─────────┬─────────────────────────────┬──────────────────────────
Target Building │Building Name (Equipment Name) │Year of Construction (Installation)
or ├─────────────────────────────┴──────────────────────────
Facility Overview │Location(Address)
├────────────────────────────────────────────────────────
│Use
├─────────────────────────────┬──────────────────────────
│structure │Gross Floor Area
├─────────────────────────────┼──────────────────────────
│Number of buildings │Number of Households
─────────┴─────────────────────────────┴──────────────────────────
─────────┬──────────────┬────────────┬─────────────────┬──────────
Dismantle·Remove │Position │Type │Material (or Material Name) │Area (m²), Volume
Target │(Include equipment name for equipment) │ │ │(㎥) or length(m)
[ ]Buildings ├──────────────┼────────────┼─────────────────┼──────────
[ ] Equipment │ │Sprayed Material │ │
(see the instructions on the │ ├────────────┼─────────────────┼──────────
reverse side) │ │Fireproof coating material │ │
│ ├────────────┼─────────────────┼──────────
│ │Ceiling Material │ │
│ ├────────────┼─────────────────┼──────────
│ │Roofing Material │ │
│ ├────────────┼─────────────────┼──────────
│ │Wall material │ │
│ │(Wall finishing material) │ │
│ ├────────────┼─────────────────┼──────────
│ │Flooring │ │
│ ├────────────┼─────────────────┼──────────
│ │Pipe insulation │ │
│ ├────────────┼─────────────────┼──────────
│ │Insulation Material │ │
│ ├────────────┼─────────────────┼──────────
│ │Gasket │ │
│ ├────────────┼─────────────────┼──────────
│ │Other │ │
│ │(Attach separately if space is insufficient) │ │
─────────┴──────────────┴────────────┴─────────────────┴──────────
Under Article 119(2) and (3) of the Occupational Safety and Health Act, Article 91(2) of its Enforcement Decree, and Article 175(1)
and (2) of its Enforcement Rules, I apply for confirmation of exemption from asbestos survey requirements.
Year month day
Applicant (Signature or seal)
To the Head of the Regional Employment and Labor Office (Branch Office)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
210mm×297mm(Preservation Paper (Type 2) 70g/㎡)
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬─────────────────────────────────────────────────┬────
Attached Documents│ 1. If a building or facility contains no asbestos: plans and other documents establishing the absence of asbestos, including a list of building materials,│Fee
│photographs, composition analysis results and photographs of the interior and exterior. │None
│ ※ The component analysis report must be submitted as issued by the building material manufacturer. │
│ 2. In the case of a newly constructed building for which a report of commencement of construction was filed pursuant to Article 21 of the Building Act on or after July 1, 2017: Construction │
│a copy of the building register │
│ 3. If a building or facility contains more than 1% asbestos by weight: a copy of the construction contract│
│(or a construction plan in the case of an in-house project) │
│ 4. In cases where an asbestos survey was conducted in accordance with the "Asbestos Safety Management Act": Asbestos Survey Results Report │
─────┴─────────────────────────────────────────────────┴────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Instructions for Completion
────────────────────────────────────────────────────────────
in the "Target for Dismantling/Removal" column
a. Differentiate between buildings and facilities and mark [√] in the corresponding box.
B. In the "Location" column, for buildings, indicate the unit number (room) or floor number; if the buildings are different, list them separately for each location (by building, floor, and unit number).
and, in the case of equipment, you must prepare a report categorized by location and type of equipment and attach it as a separate sheet.
※ If the type and material are the same for each location (facility), they can be written together
. In the "Type" column, you must list every structural part of the building or facility to be dismantled or removed without omission.
. In the "Material" field, write the name of the material or product name, etc.
※ Example) Cement, wood, gypsum board, slate, ○○tex, etc.
E. If none of the items apply to each box, write "None".
────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Notice
────────────────────────────────────────────────────────────
1. Where a new building was reported as commencing construction on or after July 1, 2017 and the building register is attached,
submitting this application completes the procedure for confirming exemption from the asbestos survey.
2. Where asbestos survey results have already been submitted to the competent administrative authority under Article 26 of the Enforcement Rules of the Asbestos Safety Management Act,
this confirmation application need not be submitted.
3. We will conduct a telephone survey via your phone number (mobile phone) to assess satisfaction with the processing results of this application and to gather opinions necessary for improving related systems.
can do.
────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Processing Procedure
────────────────────────────────────────────────────────────
┌───┐ ┌───┐ ┌───┐ ┌───┐ ┌──┐ ┌──────┐
│Application│ ?│Receipt │ ?│Review │ ?│Approval │ ?│Enforcement│ ?│Notification │
│Write ├─ │ ├─ │ ├─ │ ├─ │ ├─ │(Document Sending) │
│ │ │ │ │ │ │ │ │ │ │ │
└───┘ └───┘ └───┘ └───┘ └──┘ └──────┘
Applicant Document Received Industrial Safety & Health Regional Employment and Labor Office Industrial Safety and Health Industrial Safety and Health
Department in Charge Department in Charge of Tasks (Branch Office) Chief Department in Charge Department in Charge
────────────────────────────────────────────────────────────
210mm×297mm(Standard paper 60g/㎡(Recycled))