Form 22 — 건축법 시행규칙
283727 · 2026-02-27
■ Enforcement Rules of the Building Act [Form No. 22-2] <Amended July 1, 2024> You can also apply at Seumteo (www.eais.go.kr).
Submission of Architectural Assistant Layout Status for Construction
? and [ ]. (Page 1 of 3)
───┬────────┬───────────────┬──────────────┬──────────────────────
gun │Construction Project Name │ │BuildingUse │
axis ├────────┼───────────────┴──────────────┴──────────────────────
gong │Site Location │
Company ├────────┼───────────────┬──────────────┬──────────────────────
│Building Permit Date │ │Scheduled Start Date │
Units ├────────┼───────────────┼──────────────┼──────────────────────
요 │Building Permit Number │ │ScheduledCompletionDate │
├────────┼───────────────┼──────────────┼──────────────────────
│Project Overview │(Total Construction Cost) won│Floor Number(Minimum/Maximum) │Underground Floor / Ground floor
├────────┼───────────────┼──────────────┼──────────────────────
│Total Gross Floor Area │ ㎡ │Dongsu │ Buildings
├────────┼───────────────┴──────────────┴──────────────────────
│Construction Main │(Name) (Telephone Number)
├────────┼─────────────────────────────────────────────────────
│Construction Worker │(Company Name) (Telephone Number)
├────────┼─────────────────────────────────────────────────────
│Designer │(Architect Name) (Architect License Number) (Association Member Number)
│ │(Architectural Firm Name) (Representative) (Telephone Number)
───┼────────┼─────────────────────────────────────────────────────
empty │SupervisionClassification │[ ] Resident Supervision [ ] Other than Resident Supervision [ ] Designation of Licensee [ ] Designation of Building Owner
Company ├────────┼─────────────────────────────────────────────────────
gam │Construction Supervision │[ ] Multi-use Building [ ] Special Structure Building [ ] Piloti-type buildings of 3 stories or more [
ri │Types of Construction Work │[ ] High-rise buildings [ ] Other Construction Works [
│ ├─────┬───────────────────────────────────────────────
Units │ │corresponding │[ Excavation work exceeding 10m and retaining wall construction exceeding 5m (Article 19, Paragraph 6 of the Enforcement Decree of the Building Act)
요 │ │Case Entry │[ Installation of finishing materials (Article 19, Paragraph 7 of the Enforcement Decree of the Building Act)
│ ├─────┼───────────────────────────────────────────────
│ │Structure Format │[ ] Reinforced Concrete Structure [ [ ] Steel-reinforced concrete structure
│ │ │[ ] Masonry or reinforced concrete block masonry [ ] Steel frame [ ] Other Structures
├────────┼─────┴───────────────────────────────────────────────
│Supervisor │(Architect Name) (Architect License Number) (Association Member Number)
│(Architect) │(Architectural Firm Name) (Representative) (Telephone Number)
│ ├─────┬─────────────────┬───────┬─────────────────────
│ │Contract Amount │ │ContractPeriod │
├────────┼─────┴─────────────────┴───────┴─────────────────────
│Supervisor │(Construction Engineering Business Name) (Representative)
│(Construction Engineering │(Construction Engineering Business Registration Number) (Telephone Number)
│BusinessOwner) ├─────┬─────────────────┬───────┬─────────────────────
│ │Contract amount │ │Contract Period │
───┼──┬─────┼────┬┴─────┬───────────┼───────┴──────────┬────┬─────
ship │Field│Name │Date of Birth│Company │Batch (Scheduled) Period │QualificationClass │work │Dual batch
value │ │ │ │(Business Registration Number)│(Include date) ├─────┬─────┬──────┤Form │status etc.
Confirm │ │ │ │ │ │Architectural Magazine │Technical Qualifications│Construction Project Management│ │Confirm
Persons │ │ │ │ │ │(Reporting Qualification)│(Qualification Subject)│Technician(Grade)│ │
├──┼─────┼────┼──────┼───────────┼─────┼─────┼──────┼────┼─────
│gun │ │ │ │~ │[ ] │[ ] │[ ] │[ ] Sangju│[ ]
│axis │ │ │ │ │( ) │( ) │( ) │[ ] Technology│
│ │ │ │ │ │ │ │ │Support │
├──┼─────┼────┼──────┼───────────┼─────┼─────┼──────┼────┼─────
│토 │ │ │ │~ │[ ] │[ ] │[ ] │[ ] Sangju│[ ]
│Thursday │ │ │ │ │( ) │( ) │( ) │[ ] Technology│
│ │ │ │ │ │ │ │ │Support │
├──┼─────┼────┼──────┼───────────┼─────┼─────┼──────┼────┼─────
│Qa │ │ │ │~ │[ ] │[ ] │[ ] │[ ] Sangju│[ ]
│Total │ │ │ │ │( ) │( ) │( ) │[ ] Technology│
│ │ │ │ │ │ │ │ │Support │
├──┼─────┼────┼──────┼───────────┼─────┼─────┼──────┼────┼─────
│An │ │ │ │~ │[ ] │[ ] │[ ] │[ ] Sangju│[ ]
│Previous │ │ │ │ │( ) │( ) │( ) │[ ] Technology│
│ │ │ │ │ │ │ │ │Support │
├──┼─────┼────┼──────┼───────────┼─────┼─────┼──────┼────┼─────
│Previous │ │ │ │~ │[ ] │[ ] │[ ] │[ ] Sangju│[ ]
│Qa │ │ │ │ │( ) │( ) │( ) │[ ] Technology│
│ │ │ │ │ │ │ │ │Support │
───┴──┴─────┴────┴──────┴───────────┴─────┴─────┴──────┴────┴─────
(Page 2 of 3)
────┬──┬──┬────┬───┬────┬────────────────────────┬──────
iron │Field│Name│Date of Birth│Withdrawal date│Batch Period│CheolsuContent │Reason for withdrawal
수 ├──┼──┼────┼───┼────┼────────────────────────┼──────
Confirm │ │ │ │ │~ │Replace [ ] │
Persons │ │ │ │ │ ├───────┬────────────────┤
│ │ │ │ │ │Complete │Process Completed [ ] , Construction Suspended [ ] │
│ │ │ │ │ │ │Retirement·Enlistment·Immigration·Death·Nursing Care [ ]│
├──┼──┼────┼───┼────┼───────┴────────────────┼──────
│ │ │ │ │ │Replace [ ] │
│ │ │ │ │ ├───────┬────────────────┤
│ │ │ │ │ │Completed │Process Completed [ ] , Construction Suspended [ ] │
│ │ │ │ │ │ │Retirement·Enlistment·Immigration·Death·Nursing Care [ ]│
├──┼──┼────┼───┼────┼───────┴────────────────┼──────
│ │ │ │ │ │Replace [ ] │
│ │ │ │ │ ├───────┬────────────────┤
│ │ │ │ │ │Completed │Process Completed [ ] , Construction Suspended [ ] │
│ │ │ │ │ │ │Retirement·Enlistment·Immigration·Death·Nursing Care [ ]│
├──┼──┼────┼───┼────┼───────┴────────────────┼──────
│ │ │ │ │ │Replace [ ] │
│ │ │ │ │ ├───────┬────────────────┤
│ │ │ │ │ │Completed │Process Completed [ ] , Construction Suspended [ ] │
│ │ │ │ │ │ │Retirement·Enlistment·Immigration·Death·Nursing Care [ ]│
├──┼──┼────┼───┼────┼───────┴────────────────┼──────
│ │ │ │ │ │Replace [ ] │
│ │ │ │ │ ├───────┬────────────────┤
│ │ │ │ │ │Completed │Process Completed [ ] , Construction Suspended [ ] │
│ │ │ │ │ │ │Retirement·Enlistment·Immigration·Death·Nursing Care [ ]│
────┼──┼──┼────┼───┼────┴───────┼────────────────┴──────
[ ] │Field│Name│Date of Birth│ChangeDate│Change (Correction) Item │Change (Correction) Details
variation ├──┼──┼────┼───┼────────────┼─────┬─────────────────
circle │ │ │ │ │Replacement [ ] , Period [ ], │Dangcho │(Content already notified)
│ │ │ │ │Qualifications [ ] , Employment Type [ ], ├─────┼─────────────────
[ ] │ │ │ │ │Affiliated Company [ ] , Others [ ] │Change(Correction)│(Content to be notified of change/correction)
Test ├──┼──┼────┼───┼────────────┼─────┼─────────────────
Test │ │ │ │ │Replace [ ] , Period [ ], │Dangcho │(Content already notified)
│ │ │ │ │Qualifications [ ] , Employment Type [ ], ├─────┼─────────────────
│ │ │ │ │Affiliated Company [ ] , Others [ ] │Change(Correction)│(Content to be notified of change/correction)
├──┼──┼────┼───┼────────────┼─────┼─────────────────
│ │ │ │ │Replace [ ] , Period [ ], │Dangcho │(Content already notified)
│ │ │ │ │Qualifications [ ] , Employment Type [ ], ├─────┼─────────────────
│ │ │ │ │Affiliated Company [ ] , Others [ ] │Change(Correction)│(Content to be notified of change/correction)
├──┼──┼────┼───┼────────────┼─────┼─────────────────
│ │ │ │ │Replace [ ] , Period [ ], │Dangcho │(Content already notified)
│ │ │ │ │Qualifications [ ] , Employment Type [ ], ├─────┼─────────────────
│ │ │ │ │Affiliated Company [ ] , Others [ ] │Change(Correction)│(Content to be notified of change/correction)
├──┼──┼────┼───┼────────────┼─────┼─────────────────
│ │ │ │ │Replace [ ] , Period [ ], │Dangcho │(Content already notified)
│ │ │ │ │Qualifications [ ] , Employment Type [ ], ├─────┼─────────────────
│ │ │ │ │Affiliated Company [ ] , Others [ ] │Change(Correction)│(Content to be notified of change/correction)
────┴──┴──┴────┴───┴────────────┴─────┴─────────────────
────────────────────────────────────────────────────────
In accordance with Article 25 of the Building Act and Article 19-2, Paragraph 2 of the Enforcement Rules of the same Act, the current status of assistant architect placement is submitted as above.
Year month day
Construction Supervisor (Signature or Seal)
( )Field Architectural Magazine (Signature or Seal)
( )Field Architectural Magazine (Signature or seal)
( )Field Architectural Magazine (Signature or seal)
( )Field Architectural Magazine (Signature or Seal)
To the Mayor of a Special City, Metropolitan City, Special Self-Governing City, or Governor of a Special Self-Governing Province, and to the Mayor, County Head, or District Head
────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Attached Documents
───────────┬────────────────────────────────────────
「Enforcement Rules of the Building Act」 │ 1. Scheduled Construction Schedule (referring to the one confirmed by the client) and Layout Plan for Architectural Assistants by Field
Article 19-2, Paragraph 2 │ 2. Documents proving the career, qualifications, and affiliation of the architectural assistant
───────────┴────────────────────────────────────────
────────────────────────────────────────────────────────
(Page 3 of 3)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Instructions for Filling Out
───────────────────────────────────────────────────────────────────────────────
1. For the 'Construction Work Overview,' refer to the details provided at the time of the building permit or commencement of construction report.
2. 'Total construction cost' refers to the construction subject to electrical, fire safety, or telecommunications supervision in cases where a supervisory contractor is separately designated in accordance with relevant laws and regulations regarding electrical, fire safety, or telecommunications.
Excluding expenses, enter the construction costs for processes requiring supervision in accordance with the "Building Act." Additionally, in accordance with relevant laws, [documents/regulations] regarding electrical, telecommunications, and fire safety supervisors
If a separate placement report has been filed, the corresponding supervisor shall not be listed as an Assistant Architect on this form.
3. When entering "periods" or "dates" on this form, you must include the "date".
4. For 'Supervision Classification', in the case of multi-use buildings pursuant to Article 19, Paragraph 2 of the Enforcement Decree of the Building Act and construction work falling under Paragraph 5, mark √ on "Resident Supervision", and
For other construction works, mark √ in “Other than on-site supervision,” and mark √ to distinguish whether the supervision is designated by the licensing authority or the building owner.
5. 'Supervisor' shall record the information of the architect serving as the construction supervisor, and pursuant to Article 19, Paragraph 1, Subparagraph 2 of the Enforcement Decree of the Building Act, as the construction supervisor of a multi-use building, Construction EN
If an engineering contractor is designated, enter the information of the relevant construction engineering contractor.
6. In 'Deployment Confirmation', record the status of all assistant architects by field assigned to each process throughout the entire construction period according to the assistant architect deployment plan. 'Architects by Field
The term 'Bo' refers to a person who has obtained a national technical qualification in the relevant field, such as architecture, civil engineering, or machinery, or a person qualified to perform construction technology project management, and who is in the relevant field
Refers to a person with at least two years of experience in construction, design, supervision, etc.
7. For 'Affiliated Company', write the name of the company (including business registration number) to which the architectural assistant by field is actually affiliated. Architectural assistants in the architecture field who are stationed on-site throughout the entire period are construction supervisors
They must be affiliated with the construction supervisor, or a professional engineer's office pursuant to Article 6 of the Professional Engineers Act or Article 23 of the Architects Act.
Must be a person affiliated with a construction engineering business operator, etc., pursuant to each subparagraph of Paragraph 9.
'Qualification Classification' refers to Assistant Architect under the Architects Act, technical qualifications in the relevant field under the National Technical Qualifications Act, and Construction Business Officer under the Construction Technology Promotion Act.
Select one of the technical personnel, and write the details by qualification category as follows.
a. Assistant Architect "Reporting Qualifications": In the case of Article 2, Subparagraph 2, Item (a) of the Architects Act, 'person undergoing practical training'; in the case of Item (b) of the same subparagraph, 'person with technical qualifications'; and in the case of Item (c) of the same subparagraph
, write 'Academic Experience Holder'.
B. Technical Qualifications "Qualification Category": Enter the national technical qualification category pursuant to the "National Technical Qualifications Act".
. Construction Project Management Engineer "Grade": Enter the grade of the relevant job field in accordance with the "Construction Technology Promotion Act".
9. For 'Employment Type', mark √ for 'Resident'; however, in the case of multi-use buildings, distinguish between Resident Supervisors and Technical Support Supervisors and mark √ accordingly.
10. For 'Withdrawal Details', if an assistant architect withdraws without working until the completion of the planned construction process according to the site plan, mark √ on "Replacement", and upon completion of the planned construction process...
In cases of withdrawal due to retirement, enlistment, immigration, death, medical treatment lasting 3 months or more, or suspension of construction lasting 3 months or more, mark √ in the applicable section under "Completed".
━━━━━━━━ 11. 'Change and Correction' refers to cases where there are changes, such as the replacement of an architectural assistant, regarding the previously notified contents among each item of the placement or withdrawal verification matters, the notified contents
Important Notes
────────
Write this when notifying corrections to errors or changes, etc. during START.
1, The submission period for the architectural newsletter layout status is as follows.
a. In the case of assigning an architectural assistant for the first time, within 7 days from the scheduled start date of construction
b. In the case of construction projects that are not subject to on-site supervision but include 'excavation work of 10m or more, retaining wall construction of 5m or more, or finishing material installation work'
, within 7 days from the date the architectural assistant in the relevant field was assigned to the construction site
. In the event that the placement of the architectural newsletter is changed, within 7 days from the date of change
d. In the case where an architectural assistant has withdrawn, within 7 days from the date of withdrawal
2. The placement standards for architectural assistants are as follows.
a. Pursuant to Article 19, Paragraph 5 of the Enforcement Decree of the Building Act, an architect serving as a construction supervisor must not be assigned as a field-specific assistant architect.
a. In accordance with Article 19, Paragraph 8 of the Enforcement Decree of the Building Act, supervision duties must be performed by an assistant architect who is not currently performing supervision duties for other construction sites or processes.
. In the case of construction work for multi-use buildings, the "Construction Engineer
Calculate the number of personnel required to perform construction phase tasks in the architectural field among the deployment standards for construction project management engineers pursuant to the "Standards on Ring Remuneration, etc."
Assistant architects are assigned by field (electrical, fire safety, and telecommunications fields are assigned separately in accordance with relevant laws), and the responsibility pursuant to Article 60, Paragraph 1 of the Enforcement Decree of the Construction Technology Promotion Act
List the construction project management engineer separately.
d. In the case of construction work other than for multi-use buildings, assistant architects by field are assigned as follows in accordance with Article 19, Paragraphs 5 through 7 of the Enforcement Decree of the Building Act.
.
1) Construction projects subject to on-site supervision: In the architectural field, at least one assistant architect shall be assigned for the entire construction period from commencement of construction until final approval of occupancy, and civil engineering, mechanical, and electrical
At least one assistant architect shall be assigned to the field of [specific role] (excluding cases where separately assigned in accordance with relevant laws) during the relevant construction period.
2) Construction work other than that subject to on-site supervision (construction work falling under the following cases that do not fall under each subparagraph of Article 19, Paragraph 5 of the Enforcement Decree of the Building Act)
a) In the case of construction work involving excavation of 10m or more or retaining wall construction of 5m or more, an assistant architect in the architectural or civil engineering field must be employed during the relevant construction period
Deploying 1 or more people.
b) Installation of finishing materials [Factories, warehouse facilities, hazardous materials storage and processing facilities (including facilities used for self-heating and self-generation, etc.), use of automobile-related facilities
In cases where insulation materials other than non-combustible, semi-non-combustible, or flame-retardant materials are used in buildings used as roads, and the said insulation materials are exposed to the outside air
In the case of construction work involving [the company], at least one assistant architect in the architecture or safety field shall be assigned during the construction period for installing the relevant finishing materials.
───────────────────────────────────────────────────────────────────────────────