Form 6 — 건축법 시행규칙
283727 · 2026-02-27
■Enforcement Rules of the Building Act [Attachment Form No. 6] <Amended July 31, 2025> You can also apply at Seumteo (www.eais.go.kr).
Notification Form for Construction, Major Repair, and Change of Use (Change)
? Dark or( ) is not written by the reporting person, and [ Mark the appropriate box in . (Page 1 of 7)
────────────────────────┬──────────┬────────────────────────
ReportNumber(Year-AgencyCode-BusinessClass-ReportSerialNumber) │Receipt Date │ProcessingDate
│ │
────────────────────────┴──────────┴────────────────────────
──────┬─────────────────────────────────────────────────────
BuildingClassification │[ ] New Construction [ ] Extension [ ] Reconstruction [ ] Rebuilding [ ] Relocation [ ] Major Repair
│
│[ ] Change of Reported Details [ [ ] Change of Use
──────┴─────────────────────────────────────────────────────
──────┬───────────────────┬─────────────────────────────────
①Building Owner │Name(Corporate Name) │Date of Birth (Business or Corporate Registration Number)
├───────────────────┴─────────────────────────────────
│Address
│(Phone Number: )
├─────┬───────────────────────────────────────────────
│Email │Under Article 14 of the Administrative Procedures Act, I consent to service by electronic means of documents such as advance notice of the imposition of charges.
│Consent to Electronic Service │I agree to delivery.
│ ├───────────────────────────────────────────────
│ │[ ] Agree [ ] Disagree
│ ├───────────────────────────────────────────────
│ │Building Owner (Signature or seal)
│ ├───────────────────────────────────────────────
│ │Email Address @
──────┴─────┴───────────────────────────────────────────────
──────┬──────────────────┬────────┬─────────────────────────
②Designer │Name(Corporate Name) (Signature or seal) │QualificationNumber │Association Member Number
├──────────────────┼────────┴─────────────────────────
│Office Name │Report Number
├──────────────────┴──────────────────────────────────
│Office Address
│(Phone Number: )
──────┴─────────────────────────────────────────────────────
──────┬─────────────────────────────────────────────────────
③Site Conditions│Site Location
├───────────────────┬─────────────────────────────────
│Lot Number │Related Lot Numbers
├───────────────────┼─────────────────────────────────
│Land Category │Zoning
│ │ /
├───────────────────┼─────────────────────────────────
│Zoning District / │Usage Zone /
──────┴───────────────────┴─────────────────────────────────
────────────────────────────────────────────────────────────
※ For major repairs, complete only Part IV (Outline of Major Repairs) unless the main structural system changes,
in which case enter the changed main structural system in the building-by-building and floor-by-floor summaries.
※ Enter a summary of all buildings regardless of the work category.
────────────────────────────────────────────────────────────
────────────────────────────────────────────────────────────
I. Overall Summary
─────────────────────┬──────────────────────────────────────
Site Area ㎡ │Building Area ㎡
─────────────────────┼──────────────────────────────────────
Building Coverage Ratio % │Total Gross Floor Area ㎡
─────────────────────┼──────────────────────────────────────
Total Gross Floor Area (For Floor Area Ratio Calculation) ㎡ │Floor Area Ratio %
──────────────┬──────┴─────────┬────────────────────────────
④BuildingName │Number of main buildings Buildings │Ancillary Buildings Buildings ㎡
──────────────┼────────────────┼────────────────────────────
⑤Main Use │Number of Households/Units Households │Total Number of Parking Spaces Vehicles
│ 호 │
│ Furniture │
──────────────┴────────────────┴────────────────────────────
Average exclusive area per household/family/unit when housing is included ㎡
────────────────────────────────────────────────────────────
■Enforcement Rules of the Building Act [Attachment Form No. 6] (Page 2 of 7)
─────────┬──────────────┬──────────────────────────────────────
⑥Sewage Treatment Facility │format │Capacity Quote
─────────┼────┬─────────┴──────────────────────────────────────
Water Supply Equipment (Reservoir)│Category │Quantity and Total Capacity
├────┼───────────────┬────────────────────────────────
│Ground │open │㎥
├────┼───────────────┼────────────────────────────────
│Underground │open │㎥
─────┬───┼────┼───────────┬───┴────┬───────────────────────────
Parking │Classification │Indoor │Outdoor │Nearby │Exemption
├───┼─┬──┼────────┬──┼──┬─────┼───────────────────────────
│Self-Parking│Vehicles│㎡ │Vehicles │㎡ │ Vehicles │㎡ │Vehicles
├───┼─┼──┼────────┼──┼──┼─────┤
│Mechanical│Vehicles│㎡ │Vehicles │㎡ │ Vehicles │㎡ │
├───┼─┼──┼────────┼──┼──┼─────┤
│EVEL│Vehicles│㎡ │Vehicles │㎡ │ to │㎡ │
─────┴───┴┬┴──┴────────┼──┴──┴────┬┴───────────────────────────
Public Notice Area │Landscaping Area │Building Setback Area │Building line setback distance
㎡ │㎡ │㎡ │m
──────────┴────────────┼──────────┴────────────────────────────
[ ] Buildings for which a construction agreement has been concluded [ │[ ] Buildings for which a combined construction agreement has been concluded [
───────────────────────┼───────────────────────────────────────
[ ] Buildings constructed in a special architectural zone [ │[ ] Buildings constructed in special street zones [
──────┬─────┬──────────┼───┬────────┬──────────────────────────
Notice │NoticeNumber │DateOfNotification │Notice Name│NoticeNumber │Announcement Date
──────┼─────┼──────────┼───┼────────┼──────────────────────────
│ │ │ │ │
──────┴─────┴──────────┼───┴────────┴──────────────────────────
Special provisions applied pursuant to Article 73 of the Building Act │Special provisions applied pursuant to Article 77-3, Paragraph 2 of the "Building Act"
───────────────────────┼───────────────────────────────────────
│
───────────────────────┴───────────────────────────────────────
─────┬─────────────────────────────────────────────────────────
BatchProcessing│[ ] Notification of Construction of Temporary Building for Construction Use [ [ ] Notification of Construction of Structures [ [ ] Development Permit
Items │
│[ Designation of Urban/County Planning Facility Project Implementer and Approval of Implementation Plan [ ] Mountain Land Conversion Permit/Notification,
│ Notification of Permit for Temporary Use of Mountain Land
│
│[ ] Farmland Conversion Permit, Notification, and Consultation [ [ ] Permit for Establishment of Private Road [ ] Road Occupancy Permit
│
│[ [] Permit for Non-Agency Road Construction and Permit for Road Connection [ ] River Occupancy Permit
│
│[ ] Notification of Installation of Private Sewage Treatment Facility [ [ ] Drainage Facility Installation Report [ [ ] Water Supply Application
│
│[ ] Approval/Notification of Construction Plan for Private Electrical Facilities [ [ ] Permit/Notification for Installation of Water Pollutant Discharge Facilities [
│
│[ ] Permit/Notification for Installation of Air Pollutant Emission Facilities [ [ ] Permit/Notification for Installation of Noise and Vibration Emission Facilities [
│
│[ ] Permit/Notification for Installation of Livestock Manure Discharge Facilities [ [ ] Park Area Activity Permit
│
│[ ] City Park Occupancy Permit [ [ ] Reporting of Facilities Subject to Specific Soil Contamination Management [
│
│[ ] Permit for Activities in Fisheries Resource Protection Area [ [ ] Grassland Conversion Permit/Notification
│
│※ Note: Matters deemed to have received permission or filed a report under other laws pursuant to Articles 14, 16, and 19 of the "Building Act"
│ √ Displays.
─────┴─────────────────────────────────────────────────────────
───────────────────────────────────────────────────────────────
Pursuant to Article 14, Article 16 Paragraph 1, and Article 19 of the Building Act and Articles 12 and 12-2 of the Enforcement Rules of the same Act, as above
I am submitting the Notification of Construction, Major Repair, and Change of Use (Change).
Year / Month / Day
BuildingOwner (Signature or seal)
Mayor of a Special Self-Governing City · Governor of a Special Self-Governing Province · Mayor · County Head · District Head Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
■Enforcement Rules of the Building Act [Attachment Form No. 6] (Page 3 of 7)
Ⅱ. Overview by Dong
※ If there is an extension, only the increased portion is entered.
─────────────────────┬──────────┬─────────────────────
Overview of Existing Buildings by Floor │Category │Overview of Reported Buildings by Floor
─────────────────────┼──────────┼─────────────────────
[ ] Main Building [ ] Ancillary Buildings │Main/Accessory Classification │[ ] Main Building [ ] Ancillary Buildings
─────────────────────┼──────────┼─────────────────────
│⑦ Dong Name and Number │
─────────────────────┼──────────┼─────────────────────
│Main Purpose │
─────────────────────┼──────────┼─────────────────────
호 │※ ⑧Lake │호
──────────┬──────────┼──────────┼──────────┬──────────
Furniture │Generation │※ ⑨ Number of Households/Households │Furniture │Generation
──────────┴──────────┼──────────┼──────────┴──────────
[ ] Reinforced concrete structure [ ] Steel frame [ ] Other│Main Structure │[ ] Reinforced concrete structure [ ] Steel frame [ ] Other
─────────────────────┼──────────┼─────────────────────
│⑩Detailed Structure │
─────────────────────┼──────────┼─────────────────────
│Roof │
─────────────────────┼──────────┼─────────────────────
│⑪Roofing Finishing Materials │
─────────────────────┼──────────┼─────────────────────
│※ Building Area (㎡) │
─────────────────────┼──────────┼─────────────────────
│※ Gross Floor Area (㎡) │
─────────────────────┼──────────┼─────────────────────
│※ For Floor Area Ratio Calculation │
│Gross Floor Area (㎡) │
──────────┬──────────┼──────────┼─────────┬───────────
Underground: floor│Ground: floor │Number of floors │Underground: floor│Ground: floor
──────────┴──────────┼──────────┼─────────┴───────────
│Height(m) │
─────────────────────┼──────────┼─────────────────────
│Passenger Elevator │
─────────────────────┼──────────┼─────────────────────
│Emergency Elevator │
─────────────────────┼──────────┼─────────────────────
Beam/Sunshade Length: m │Special Structure Building │Beam/Sunshade Length: m
BetweenColumns: m │(「Enforcement Decree of the Building Act」 │BetweenColumns: m
Between load-bearing walls: m │Article 2, Subparagraph 18) │Between load-bearing walls: m
─────────────────────┼──────────┼─────────────────────
│※⑫Special Structure │
│ Building Type │
─────────────────────┴──────────┴─────────────────────
Ⅲ. Floor Overview
──────────────────────────────────────────────────────
? Dong Name and Number (Write exactly the same as ⑦)
─────────────────────┬──────────┬─────────────────────
Floor-by-floor overview of existing buildings │ Category │Overview of Reported Building by Floor
────┬──────┬─────────┼───┬──────┼──┬────────┬─────────
⑬Structure│⑭Use │⑮Area(㎡) │floor classification│BuildingClassification │Structure│Use │Area(㎡)
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┼──────┼─────────┼───┼──────┼──┼────────┼─────────
│ │ │ │ │ │ │
────┴──────┴─────────┴───┴──────┴──┴────────┴─────────
■Enforcement Rules of the Building Act [Attachment Form No. 6] (Page 4 of 7)
Ⅳ. Overview of Major Repairs
Please mark √ next to the item you intend to repair and indicate whether it involves expansion, dismantling, repair, or alteration.
─────────┬───────────────────────────────────────────
Major Repair Details │ [ ] Load-bearing wall Expansion·Dismantling·Repair·Change [ ㎡]
│
│ [ ] Pillar Expansion·Dismantling·Repair·Change [ units]
│
│ [ ] BO Expansion·Dismantling·Repair·Change [ units]
│
│ [ ] Truss Expansion·Dismantling·Repair·Change [ units]
│
│ [ ] Firewall Expansion·Dismantling·Repair·Change
│
│ [ ] Fire Compartment Expansion·Dismantling·Repair·Change
│
│ [ ] Main Staircase Expansion·Dismantling·Repair·Change
│
│ [ ] Evacuation Stairs Expansion·Dismantling·Repair·Change
│
│ [ ] Special Evacuation Stairs Expansion·Dismantling·Repair·Change
│
│ [ ] Expansion, demolition, repair, or alteration of boundary walls between units in multi-family housing [
│
│ [ ] Expansion, demolition, repair, or alteration of boundary walls between households in multi-family housing [
│
│ [ ] Exterior walls of buildings Expansion·Dismantling·Repair·Change [ ㎡]
─────────┴───────────────────────────────────────────
※ Overview of Semi-residential and Urban Living Housing
───────────────────────┬─────────────────────────────
Overview of Existing Buildings by Type │Overview of Reported Buildings by Type
────────┬──────┬───────┼───────┬──────┬──────────────
Type │Number of Rooms/Units/Households│By Room/Unit/Household │Type │Number of Rooms/Units/Households│By Room/Unit/Household
│ │Area (㎡) │ │ │Area(㎡)
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┴──────┴───────┴───────┴──────┴──────────────
※ Area by Unit (Household) in Multi-family Housing
───────────────────────┬─────────────────────────────
Overview of Existing Buildings by Type │Overview of Reported Buildings by Type
────────┬──────┬───────┼───────┬──────┬──────────────
Unit (Family) Classification │floor classification │ By Household (Household) │Unit (Family) Classification │floor classification │By Household (Household)
│ │Exclusive Area(㎡) │ │ │Exclusive Area(㎡)
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┴──────┴───────┴───────┴──────┴──────────────
※ Area by Room in Rental Dormitories
───────────────────────┬─────────────────────────────
Overview of Existing Buildings by Type │Overview of Reported Buildings by Type
───────────────┬───────┼──────────────┬──────────────
Total shared space area (㎡) │ │Total shared space area (㎡) │
───────────────┼───────┼──────────────┼──────────────
Total Area of Common Spaces (㎡) │ │Total Area of Common Spaces (㎡) │
────────┬──────┼───────┼───────┬──────┼──────────────
Room (Room) Classification │floor classification │?By Room │Room (Room) Classification │floor classification │?By Room
│ │Exclusive Area(㎡) │ │ │Exclusive Area(㎡)
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┼──────┼───────┼───────┼──────┼──────────────
│ │ │ │ │
────────┴──────┴───────┴───────┴──────┴──────────────
■Enforcement Rules of the Building Act [Attachment Form No. 6] (Page 5 of 7)
V. Drawing Overview
Creates site plans and floor plans by floor.
──────────────────────────────────────────────────────────────────
─────┬────────────────────────────────────────────────────────────
DrawingType│axis Chuck /
─────┴────────────────────────────────────────────────────────────
──────────────────────────────────────────────────────────────────
─────┬────────────────────────────────────────────────────────────
DrawingType│axis Chuck /
─────┴────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
WritingMethod
──────────────────────────────────────────────────────────────────
1. Matters to be indicated on the site plan (For extensions, it is convenient to refer to the building register)
A.Direction, Na.Scale, .Land boundary line, d. In the case of an existing building, the outer wall line of the existing building, E. Distance between the exterior wall of the building and the site boundary
2. Items to be indicated on the floor plan
a. Direction, or. Scale, . The purpose of each room
──────────────────────────────────────────────────────────────────
■Enforcement Rules of the Building Act [Attachment Form No. 6] (Page 6 of 7)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Attached Documents and Confirmation by Licensing Authority
─────────┬────────────────────────────────────────────────────────────
1.New Construction, Extension, │a. Site plans, floor plans (only those prepared by floor), elevations, and section drawings in Annex 2 of the Enforcement Rules of the Building Act. Provided, however, that each of the following
Renovation, Reconstruction, │of the following items, the documents specified for each item shall apply.
Previous and from │ 1) In the case of constructing a detached house under Item 1 of Annex 1 of the Enforcement Decree of the Building Act, with a total floor area exceeding 100 square meters: "Building Act
Repair │Among the design documents in Annex 2 of the "Enforcement Rules," the architectural plan, site plan, floor plan, elevation plan, section plan, and structural drawing (major parts in terms of structural strength
│only drawings indicating plans and sections of the relevant portions)
│ 2) In the case of construction in accordance with standard design documents pursuant to Article 23, Paragraph 4 of the Building Act: Architectural plan and site plan
│ 3) In cases where a preliminary decision has been received pursuant to Article 10 of the "Building Act": Floor plan
│a. In order to obtain a permit, etc., or to file a report pursuant to each subparagraph of Article 11, Paragraph 5 of the “Building Act,” the relevant laws and regulations require submission
│Application Form and Required Documents (Limited to cases where applicable)
│. Documents regarding the scope of the building site
│d. Documents proving the right to own or use the land to be built. However, regarding state-owned or public-owned land included in the land to be built
│The Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, or the Mayor, County Head, or District Head shall, in consultation with the managing authority of the relevant land, have the managing authority [refer to] the relevant land
│Documents confirming the sale or transfer to the building owner may substitute documents proving the right to ownership of the land, and
│In the case of changing the common areas of a multi-unit building, a resolution pursuant to Article 15, Paragraph 1 of the "Act on Ownership and Management of Multi-unit Buildings"
│It may be substituted with documents proving that it existed.
│e. In the case of construction or major renovations requiring verification of structural safety pursuant to Article 48, Paragraph 2 of the Building Act: pursuant to Annex 2 of the Enforcement Rules of the Building Act
│Structural drawings and structural calculation sheets. However, as small-scale buildings pursuant to the "Rules on Structural Standards for Buildings, etc." designated by the Minister of Land, Infrastructure and Transport
│If designed in accordance with the Small-Scale Building Structural Standards, only the structural drawings need to be submitted.
│
│※The Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, or the Mayor, County Head, or District Head who recognizes that there is a risk of disaster on the site where a building is to be constructed
│In such cases, after deliberation by the Local Architectural Committee, the remaining documents listed in Annex 2 of the Enforcement Rules of the Building Act, excluding those already submitted,
│You may be required to submit additional documents.
─────────┼────────────────────────────────────────────────────────────
2. Change of Reported Details│Design documents before and after the part to be changed
─────────┼────────────────────────────────────────────────────────────
3.Change of Use │a. Floor plan of the relevant floor after the proposed change of use
│b. Drawings indicating matters concerning fire resistance, fire prevention, evacuation, or building facilities that are changed due to the change of use
│
│※ The floor plan prior to the change of use of the floor intended for change shall be obtained through the Joint Use of Administrative Information or computerized data pursuant to Article 32, Paragraph 1 of the Building Act
│If not verified, you must submit it directly.
─────────┼────────────────────────────────────────────────────────────
4. Licensee │a. Related to Item 1 (d): Certificate of Land Registration
CheckItems │b. Floor plan prior to change of the floor for which the use is to be changed among Item 3: Building Register or computerized data pursuant to Article 32, Paragraph 1 of the Building Act
─────────┴────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Reporting Guide
─────────┬─────────────────┬────┬─────────────────────────────────────
Submission Location │Special Self-Governing City · Special Self-Governing Province · City · County · District│Processing Department│Building Notification Department
─────────┼─────────────────┼────┼─────────────────────────────────────
Fee │Refer to Annex 4 of the Enforcement Rules of the Building Act │Processing Period│5 days, 20 days (Reporting requiring consultation, etc.)
─────────┴─────────────────┴────┴─────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Basis Regulation of the "Building Act"
─────────┬────────────────────────────────────────────────────────────
Article 14 │1. Expansion, alteration, or reconstruction with a total floor area of 85 square meters or less. However, in the case of a building with three or more stories, expansion, alteration, or
Article 1 │Limited to cases where the total floor area of the part to be reconstructed is within one-tenth of the total floor area of the building.
│2. In management areas, agricultural and forestry areas, or natural environment conservation areas pursuant to the "Act on Planning and Utilization of National Land," a gross floor area of 200 square meters
│and has fewer than 3 stories. However, in a district unit planning zone and a zone pursuant to Article 11, Paragraph 1 of the Enforcement Decree of the Building Act or
│construction in any such district or area is excluded.
│3. Major renovations of buildings with a gross floor area of less than 200 square meters and fewer than 3 stories
│4. Major repairs falling under any of the following items
│ a. Repair of load-bearing walls with an area of 30 square meters or more, B. Repair of three or more columns
│ . Three or more repair lines, . Repair of three or more roof trusses
│ E. Floor or wall repairs for firewalls or fire compartments, B. Repair of main stairs, escape stairs, or special escape stairs
│5. Construction of any of the following buildings
│ a. Buildings with a total floor area of 100 square meters or less, b. Buildings whose height is extended within a range of 3 meters or less
│ It is a building constructed in accordance with standard design documents pursuant to Article 23, Paragraph 4 of the Building Act, whose use and scale, in relation to the surrounding environment and aesthetics
│Buildings designated by the building ordinance as having no hindrance
│ d. Industrial areas pursuant to Article 36, Paragraph 1, Subparagraph 1, Item c of the National Land Planning and Utilization Act, and districts pursuant to Article 51, Paragraph 3 of the same Act
│Construction in unit planning zones (applicable only to industrial and distribution types) and industrial complexes under the Industrial Location and Development Act
│A factory that is a building of two stories or less and has a total floor area of 500 square meters or less (in accordance with subparagraph 4, item (n) of Annex 1 of the Enforcement Decree of the Building Act
│(Includes facilities for the manufacture and processing of goods at manufacturing establishments, etc.)
│ E. In order to engage in agriculture or fisheries, in Eup or Myeon areas (the Mayor of a Special Self-Governing City, the Governor of a Special Self-Governing Province, a Mayor, or the Governor of a County [regarding] regional planning or urban
│Warehouses with a gross floor area of 200 square meters or less constructed in areas (excluding zones designated and announced as hindering military planning) and
│Livestock barns, crop cultivation facilities, seedling cultivation facilities, greenhouses for flowers and bonsai, etc. with a total floor area of 400 square meters or less
─────────┼────────────────────────────────────────────────────────────
Article 16, Paragraph 1 │If you wish to change the reported details
─────────┼────────────────────────────────────────────────────────────
Article 19, Paragraph 2 │Change of Use (Refers to a change of use to a subgroup)
─────────┴────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Notes pursuant to the "Building Act"
─────────┬────────────────────────────────────────────────────────────
Article 14 · Article 19 │ If construction is not commenced within one year from the date of the building or change of use notification, the notification becomes invalid.
─────────┼────────────────────────────────────────────────────────────
Article 80ㆍ │ In urban areas, changing the use of a building without reporting is punishable by imprisonment for up to three years or a fine of up to 500 million won, and illegal buildings
Article 108 │Enforcement fines will be imposed up to twice a year until the violations are corrected.
─────────┼────────────────────────────────────────────────────────────
Article 80ㆍ │ If a change of use is made outside of an urban area without reporting, the offender is subject to imprisonment for up to two years or a fine of up to 100 million won, and regarding illegal buildings...
Article 110 │Enforcement fines will be imposed up to twice a year until the violations are corrected.
─────────┼────────────────────────────────────────────────────────────
Article 80ㆍ │ If a building is constructed or extensively renovated without filing a report or a report of change, or if a false report is filed, a fine not exceeding 50 million won shall be imposed.
Article 111 │It will be done, and for violating buildings, enforcement fines will be imposed up to twice a year until the violations are corrected.
─────────┴────────────────────────────────────────────────────────────
■Enforcement Rules of the Building Act [Attachment Form No. 6]
(Page 7 of 7)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
──────────────────────────────────────────────────────────────────────
1. ①ㆍ②: If there are multiple applicable persons, write “○○○ and ○ others,” and submit the status of “other ○ persons.” In addition, regarding the prior notice of various levies
Indicate whether you consent to delivery via email, and if you consent, enter your email address.
2. ③: Enter the parcel number in accordance with the "Act on the Establishment and Management of Spatial Information, etc."; in the case of multiple parcels, enter the representative parcel number in the "Parcel Number" column, and "Related
Write the parcel numbers other than the representative parcel number in the “Parcel Number” field, and in accordance with Article 8 of the “Act on the Management and Reclamation of Public Waters,” the permit for occupation and use of public waters
If received, and the location does not have a lot number, write the location for which occupancy and use permission was obtained.
3. ④: You must write a collective name for the building (excluding single-family homes) (e.g., Twin Buildings, ○○ Apartment).
4. ⑤: In the case of mixed use, list only the primary use (do not write “mixed-use residential and commercial building,” etc.).
5. ⑥: If multiple types are used in combination, list the representative type (also list the other types), and for the capacity of the sewage treatment facility, list the representative type and the other types
Enter the combined capacity.
6. ⑦: Write the building name and number clearly so as not to overlap with other buildings (e.g., Building 101, Building A, etc.).
7.⑧ㆍ⑨ㆍㆍ: The number of separately owned business units in a multi-unit building is “number of units”, the number of residential units in a detached house is “number of households”, and the number of separately owned residential units in a multi-unit dwelling is
Write the “number of households”, and for the number of Goshiwon sections, write the “actual number”.
8. ⑩ : Write the structural type by building [Single section steel structure, steel-reinforced concrete composite structure, industrialized thin-plate steel structure (PEB), light steel structure, truss structure, other].
9. ⑪ : List roof finishing materials (RC slab, composite material, metal plate, glass, tile, etc.).
10. ⑫ : Special structure buildings pursuant to Subparagraph (c) of Article 2, Item 18 of the Enforcement Decree of the Building Act shall be written as “flat slab structure,” and special structure buildings pursuant to Subparagraph (d) of the same item shall be the following
Enter the type of special structure building according to the table. If the building falls under multiple types, list them all.
┌────────────────────────────────────────────────────────────────────┐
│Special Structure Building Type │
├────────────────────────────────────────────────────────────────────┤
│ 1.Buildings whose main structural components are industrialized thin-plate steel structures (PEB) 2.Building whose main structural component is a steel pipe three-dimensional truss (space frame) │
│ 3.Buildings with membrane structures as their main structural components 4.Buildings whose main structural components are cable structures │
│ 5.Buildings whose main structural components are floating structures 6. A building in which the load of columns or walls supporting six or more stories is transferred to slabs or beams │
│ 7.Buildings using seismic isolation and vibration damping devices in the main structural parts 8.Other │
└────────────────────────────────────────────────────────────────────┘
11. ㆍ : List the types of quasi-housing and urban-type residential housing pursuant to Articles 4 and 10 of the Enforcement Decree of the Housing Act.
12.ㆍ : Regardless of the floor overview, based on the entire site, for quasi-residential housing, the area per room/unit/household, and for urban-type residential housing, the exclusive residential area (「Enforcement of the Housing Act
Rules") shall be entered.
13. ~
Example 1) In an agricultural and forestry area, a detached house with a floor area of 50㎡ on the first basement level (detached house) constructed of reinforced concrete, and a detached house with a floor area of 50㎡ on the first floor above ground (detached
In the case of intending to construct a new house) using masonry
┌──────────────────────────┬───────────┬───────────────────────────┐
│Existing Building Floor Overview │Category │Report Floor Overview │
├───────┬─────────────┬────┼──────┬────┼───────┬─────────┬─────────┤
│Structure │Use │Area(㎡)│floor classification │BuildingClassification│Structure │Use │Area(㎡) │
├───────┼─────────────┼────┼──────┼────┼───────┼─────────┼─────────┤
│ │ │ │Z1 │New Construction │Reinforced Concrete Structure│Detached House (Detached House)│50 │
├───────┼─────────────┼────┼──────┼────┼───────┼─────────┼─────────┤
│ │ │ │ 1 │New Construction │Masonry │Single-family house(Single-family house)│50 │
└───────┴─────────────┴────┴──────┴────┴───────┴─────────┴─────────┘
Example 2) An existing 5-story building has a floor area of 300㎡ per floor, and a 3-story accommodation facility (inn) of reinforced concrete measuring 150㎡ is designated as a Class 2 Neighborhood Living Facility (General Restaurant).
In the case of changing the use and intending to add an 80㎡ accommodation facility (inn) on the 6th floor
┌──────────────────────────┬───────────┬───────────────────────────┐
│Existing Building Floor Overview │Category │Report Floor Overview │
├───────┬─────────────┬────┼──────┬────┼───────┬──────────┬────────┤
│Structure │Use │Area(㎡)│floor classification │BuildingClassification│Structure │Use │Area(㎡) │
├───────┼─────────────┼────┼──────┼────┼───────┼──────────┼────────┤
│Reinforced Concrete Structure│Accommodation (Inn) │150 │3 │Change of Use│Reinforced Concrete Structure│Type 2 Neighborhood Living Facility (General Restaurant)│150 │
├───────┼─────────────┼────┼──────┼────┼───────┼──────────┼────────┤
│ │ │ │6 │Expansion │Reinforced Concrete Structure│Type 2 Neighborhood Living Facility (Office)│80 │
└───────┴─────────────┴────┴──────┴────┴───────┴──────────┴────────┘
Example 3) Major renovation of 100㎡ of a reinforced concrete Class II neighborhood living facility (office) on the first floor of an existing two-story building with a total floor area of 200㎡
┌──────────────────────────┬───────────┬───────────────────────────┐
│Overview of Existing Buildings by Floor │Category │Report Floor Overview │
├───────┬─────────────┬────┼──────┬────┼───────┬──────────┬────────┤
│Structure │Use │Area(㎡)│floor classification │BuildingClassification│Structure │Use │Area(㎡) │
├───────┼─────────────┼────┼──────┼────┼───────┼──────────┼────────┤
│Reinforced Concrete Structure│Type 2 Neighborhood Living Facility (Office) │100 │1 │Main Repair │Reinforced Concrete Structure│Type 2 Neighborhood Living Facility (Office)│100 │
└───────┴─────────────┴────┴──────┴────┴───────┴──────────┴────────┘
Example 4) Expanding 2 units of quasi-residential (officetel) with a per-unit area of 25㎡, or constructing 6 units of urban-type residential housing (studio type) with an exclusive area of 30㎡ in a managed area
(including a change of use)
※ Overview of Semi-residential and Urban Living Housing
┌─────────────────────────────────┬────────────────────────────────┐
│Overview of Existing Buildings by Type │Overview of Reported Buildings by Type │
├────────┬────────────┬───────────┼─────────────┬──────┬───────────┤
│Type │Number of Rooms/Units/Households │Area by Room/Unit/Household (㎡) │Type │Number of Rooms/Units/Households│Area by Room/Unit/Household (㎡) │
├────────┼────────────┼───────────┼─────────────┼──────┼───────────┤
│Semi-residential (Officetel)│10 │25 │Semi-residential (Officetel) │2 │25 │
├────────┼────────────┼───────────┼─────────────┼──────┼───────────┤
│ │ │ │Urban-type Living Housing (Studio Apartment)│6 │30 │
└────────┴────────────┴───────────┴─────────────┴──────┴───────────┘
14. ㆍ : In accordance with Article 2, Subparagraph 1 of the Enforcement Rules of the Housing Act, enter the exclusive residential area for each unit (household) of a multi-family dwelling.
15. ㆍ : Living rooms, kitchens, shared bathrooms, etc., used jointly by multiple residents excluding private spaces within a rental-type dormitory, for movement
Write the area excluding corridors, stairs, elevators, and parking lots, etc.
16. ?ㆍ? : Within the rental-type dormitory, excluding the sum of the exclusive area per unit (room) and the total area of shared spaces, corridors, stairs, elevators, and parking lots for movement
etc.
17. ?ㆍ? : In accordance with Article 2, Subparagraph 2 of the Enforcement Rules of the Housing Act, write the exclusive residential area for each unit (room) of the rental-type dormitory (multi-unit housing).
──────────────────────────────────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
──────────────────────────────────────────────────────────────────────
┌────┐ ┌───┐ ┌──────┐ ┌───┐ ┌───────┐ ┌───────┐
│Report │→│Receipt │ → │Review (Consultation)│ → │Conclusion Re │ → │Preparation of Report Certificate │ → │Issuance of Report Certificate │
│Write │ │ │ │ │ │ │ │ │ │ │
└────┘ └───┘ └──────┘ └───┘ └───────┘ └───────┘
Reporter(Building Owner) Special Self-Governing City/Special Self-Governing Province, City/County/District (Building Notification Department) Reporter(Building Owner)
──────────────────────────────────────────────────────────────────────