■ Enforcement Rules of the Framework Act on the Construction Industry [Attached Form No. 22-6] <Amended Oct. 16, 2024>
Direct Construction Plan for Construction Work
(front)
───────┬──────────────────────────────────────────────────
Project Name │
───────┼─────┬──────┬───┬───────────┬──┬──────────────────
①Construction │ │①-1 │ │①-2 │ │Site Location
Type │ │WorkTypeGroupType│ │Type of Detailed Work │ │
│ │ │ │(Comprehensive) │ │
───────┼─────┴──────┼───┴───────────┼──┴──────────────────
Ordering Party │Company Name (Organization Name) │Classification │Representative
│ │[ ] Public Institution [ ] Private │
├────────────┴───────────────┴─────────────────────
│Address
───────┼───────────────┬──────────────────────────────────
Contractor │Trade Name │Representative
├───────────────┴──────────────────────────────────
│Sales Office Location
───────┴──────────────────────────────────────────────────
───────┬──────────────────────────────────────────────────
Contracting Method │[ ] Sole Contract
│[ ] Joint Contracting([ ] Joint Implementation Method [ ] Shared Execution Method [ ] Prime Contractor Management Method)
───────┼──────────────────────────────────────────────────
Nature of Contract │[ ] Long-term continuous construction [ ] Other Construction Work
───────┼──────┬──────┬──────┬─────────┬───────────────────
②Contract Date │. . . │③Commencement Date │. . . │④Scheduled Completion Date │. . .
───────┼──────┴──────┴──────┴─────────┴───────────────────
⑤Total Labor Costs │ Won
───────┴──────────────────────────────────────────────────
──────────────────────────────────────────────────────────
Direct Construction Plan
──────────────────────┬───────────────────────────────────
Direct Construction Work Type (Personnel to be Deployed as Skilled Workers: persons)│Subcontract (Planned) Work Type
────────────┬─────────┼──────────────┬────────────────────
⑥Detailed Work Item │Amount │⑥Detailed Work Item │Amount
────────────┼─────────┼──────────────┼────────────────────
│ │ │
────────────┼─────────┼──────────────┼────────────────────
│ │ │
────────────┼─────────┼──────────────┼────────────────────
│ │ │
────────────┼─────────┼──────────────┼────────────────────
│ │ │
────────────┼─────────┼──────────────┼────────────────────
│ │ │
────────────┼─────────┼──────────────┼────────────────────
⑦Total Direct Construction Amount │ Won│⑧Subcontract (Estimated) Total Labor Cost │ Won
(Direct Construction Labor Costs) │ │ │
────────────┴─────────┴──────────────┴────────────────────
Article 28-2, Paragraph 2 of the Framework Act on the Construction Industry, Article 30-2, Paragraph 4 of the Enforcement Decree of the same Act, and Article 25-5 of the Enforcement Rules of the same Act
(1) of the Enforcement Rules of the same Act, I hereby notify the direct construction plan for the construction work.
Year month day
Contractor (Signature or seal)
Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬────────────────────────────────────────────────────
Attached Documents│ 1. Statement of construction work quantities, unit prices and construction amounts (including labor costs) for work to be directly constructed or subcontracted
│ 2. Scheduled Work Schedule
─────┴────────────────────────────────────────────────────
210㎜×297㎜[White paper (80g/㎡) or medium paper (80g/㎡)]
(Rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
※ Notification of Direct Construction Plan (Entry) Subjects
For a sole contract, the contractor shall complete this form; for a joint contract, the representative of the joint venture shall complete it.
※ Instructions for filling out
1. ① ①-1, ①-2: Select and write from the following.
┌──┬──────┬────────────────────────────────────────────┐
│① │①-1 │①-2 │
│Construction│Work Type Group │Type of Detailed Work │
│Type│Type │ │
├──┼──────┼────────────────────────────────────────────┤
│Civil Engineering│TransportationFacilities │General road, expressway, highway, road bridge, railway bridge, airport, conventional railway, high-speed railway, subway │
│ │ │Road Tunnel, Railway Tunnel │
│ ├──────┼────────────────────────────────────────────┤
│ │Water Resources Facility │Dam, Port, Canal, Flood Control/River, Waterway Tunnel, Irrigation Canal, Water Supply (1,000 mm or more), Water Supply (less than 1,000 mm), │
│ │ │Water purification plant, sewer │
│ ├──────┼────────────────────────────────────────────┤
│ │Other Civil Engineering Facilities│Land reclamation, farmland consolidation, residential land development, industrial land development, forest and erosion control, other tunnels, other civil engineering facilities │
├──┼──────┼────────────────────────────────────────────┤
│Architecture│Residential Facilities │Detached houses/townhouses, low-rise apartments (5 stories or less), high-rise apartments (6 to 15 stories or less), │
│ │ │High-rise apartments (16 stories or more), mixed-use buildings │
│ ├──────┼────────────────────────────────────────────┤
│ │Non-residential Facility │Commercial buildings, department stores, shopping centers, office buildings, officetels, intelligent buildings, hotels, accommodations │
│ │ │Government buildings (11 stories or less), Government buildings (12 stories or more), Schools, Hospitals, Traditional-style architecture │
│ │ │Religious buildings such as churches and temples, other cultural heritage and historic buildings, performance and assembly facilities, stadiums and sports fields │
│ │ │Exhibition facilities, warehouses, garages, terminal buildings, factory and workshop buildings, machinery and equipment facilities (excluding plants) │
│ │ │Hazardous materials storage facilities, buildings for substations and power plants, other construction facilities │
├──┴──────┼────────────────────────────────────────────┤
│Industrial & Environmental Equipment │Industrial production facilities such as steel mills and petrochemical plants, nuclear power plants, thermal power plants, combined heat and power plants │
│ │Hydroelectric power plant, Solar power plant, Wind power plant, Tidal power plant │
│ │(District Energy Supply Facility) Oil Pipeline, (District Energy Supply Facility) Oil Storage Facility, (District Energy Supply Facility) Gas Pipeline│
│ │(District Energy Supply Facility) Gas Storage Facility, Waste Incineration Plant, Sewage Treatment Plant │
│ │Wastewater Treatment Plant, Other Environmental Facility Construction, Other Plant Equipment Construction │
├─────────┼────────────────────────────────────────────┤
│Landscaping │Arboretum, Park, Other Landscaping Works │
└─────────┴────────────────────────────────────────────┘
2. ② Contract Date. ③ Commencement Date. ④ Estimated Completion Date and ⑤ Total Labor Costs: Contract Date, Commencement Date, Estimated Completion Date and Contract Amount
Enter the total amount of labor costs listed in the calculation statement. In the case of long-term continuous construction, the initial contract year for the total construction
Enter the month and day, the date of initial commencement, the scheduled date of initial completion, and the total amount of labor costs within the total construction accounting amount.
3. ⑥ Detailed Work Items: Based on the Bill of Works submitted as a supporting document, enter as follows.
Example) ㆍCivil Engineering Works: List all applicable processes such as structural work, drainage work, safety facilities, auxiliary facilities, bridge work, tunnel work, etc.
Enter 'Other' for unidentifiable parts.
ㆍConstruction Works: Joint Temporary Works, Temporary Works, Earthworks, Reinforced Concrete Works, Steel Frame Works, Masonry Works, Waterproofing Works, Plastering Works,
Tile work, masonry, metalwork, window and door work, glasswork, painting, interior finishing (interior finishing work
All applicable processes, such as roofing and gutter work, miscellaneous works, facility and exclusion works, etc., must be listed and distinguished.
For missing items, enter 'Other'.
· Other civil engineering works, industrial facility construction, landscaping works, etc., shall also be described in the same manner according to the characteristics of each project.
4. The sum of ⑦ the total direct construction amount (direct construction labor costs) and ⑧ the total subcontracted (estimated) labor costs (⑦+⑧) is ⑤ total labor costs and
to match.
────────────────────────────────────────────────────────────
210mm×297mm[White paper (80g/㎡) or medium paper (80g/㎡)]