Form 2 — 대기환경보전법 시행규칙
288199 · 2026-07-15
Enforcement Rules of the Air Environment Preservation Act [Form No. 2] <Amended July 16, 2019>
Air Pollutant Emission Facility [ ] Application for Installation Permit
[ ] Report
(front)
───────────────┬────────────────────┬─────────────────────────
Receipt Number │Date of Receipt │Processing Period 10 days
───────────────┴────────────────────┴─────────────────────────
────┬───────────────────────────────┬─────────────────────────
Applicant│Name of business (trade name) │Business Registration Number
├───────────────────────────────┼─────────────────────────
│Representative Name │Date of Birth
├───────────────────────────────┼─────────────────────────
│Telephone Number │Mobile Phone Number
├───────────────────────────────┴─────────────────────────
│Address
├───────────────────────────────┬─────────────────────────
│Workplace Location │Telephone Number
────┴───────────────────────────────┴─────────────────────────
────┬────────────────────────┬────────────────────────────────
Apply │ Sector │ Name of principal product
Content ├────────────────────────┼────────────────────────────────
(Report │ ScheduledInstallationDate │ Scheduled Start Date
content) ├────────────────────────┴────────────────────────────────
│Air pollutant emission facilities and prevention facilities
├────┬────┬─────────┬───┬───────┬──────┬────────┬─────────
│ProductionProcess│EmissionFacility│Volatile Organic Compounds │MTQ4e411666143fe97800042Quantity for operation │Quantity │Pollution-control facility Name │MTQ4e411666143fe97800041Quantity for operation │Quantity
│ │ │Whether there is duplication of emission facilities│ │ │ │ │
├────┼────┼─────────┼───┼───────┼──────┼────────┼─────────
│ │ │ │ │ │ │ │
├────┴────┴─────────┼───┴───────┴─────┬┴────────┴─────────
│(Scheduled) operating time of discharge facility │Air pollutant emission amount (dust,SO2,NO2) │Air pollutant emissions
├────┬────┬─────────┼──┬───────┬──┬───┼────────┬───┬──────
│ProductionProcess│EmissionFacility│Daily Operation (Scheduled) │Type│Fuel and Raw Materials │Emission│Generation│Type │Emissions│processing method
│ │ │Time (Annual Operating Days) │ │Usage │coefficient│ │ │ │Law
├────┼────┼─────────┼──┼───────┼──┼───┼────────┼───┼──────
│ │ │ │ │ │ │ │ │ │
────┴────┴────┴─────────┴──┴───────┴──┴───┴────────┴───┴──────
Pursuant to Article 23, Paragraph 1 of the Air Environment Preservation Act, and Articles 25 and 59, Paragraph 1 of the Enforcement Rules of the same Act, of emission facilities
([ ] Apply for installation permit, [ ] Report installation) .
Year month day
Applicant (Signature or seal)
Head of Basin Environmental Office, Head of Regional Environmental Office, Head of Capital Area Air Environment Office, or Mayor/Provincial Governor Your
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
─────┬─────────────────────────────────────────────┬──────────
Attached Documents│1. Predicted usage of raw materials (including fuel), production volume of products, and emissions of air pollutants, etc. │Fee: 10,000
│1 copy of specification │won
│2.1 Copy of Installation Details for Emission and Pollution Control Facilities │(Using an information and communication network
│3. General drawing of pollution control facilities Part 1 │and electronic currency
│4. One copy of the Annual Maintenance Plan for Pollution Control Facilities │· Electronic approval, etc.
│5. Documents related to exemption from pollution control facility installation (to be submitted only by those exempted) 1 copy │method
│6. Documents related to the design and construction of self-pollution control facilities (to be submitted only by the designer and contractor of self-pollution control facilities) 1 copy │When paying 9,000 won)
│7. Documents related to the installation of joint pollution control facilities (to be submitted only by those intending to install joint pollution control facilities) 1 copy │
│8. Documents related to the use of fuels other than low-sulfur fuel (submit only if you intend to use fuels other than low-sulfur fuel) 1 copy │
│9. Documents related to the application for approval of solid fuel use (to be submitted only if seeking approval for solid fuel use) 1 copy │
│10. Specification of facilities emitting volatile organic compounds and installation of emission control and prevention facilities (Volatile Organic Compounds │
│(Submit only if applicable to emission facilities) 1 copy each │
│11. Data on the Calculation of Air Pollutant Emissions (1 copy) │
│12. Documents attached to applications or notifications for installation of water-pollutant, noise, or vibration emission facilities│
│facilities; submit only when newly installing facilities subject to water quality, noise, or vibration emission regulations) │
│13. Documents attached to applications for amendment permits or amendment notifications for water-pollutant, noise, or vibration facilities │
│changes in treatment capacity or major equipment) │
─────┴─────────────────────────────────────────────┴──────────
210mm×297mm[White Paper 80g/㎡(Recycled)]
(rear)
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
How to write
──────────────────────────────────────────
1. In the representative field, for corporations, you may enter the job title instead of the name.
2. Estimates of raw-material use (including fuel), production volume, and air pollutant emissions shall state raw and auxiliary materials
maximum quantities (maximum facility capacity), product names, production quantities, and expected pollutant types and emission quantities
must be prepared for each emission facility and workplace, specifying the calculation method for each pollutant type and emission quantity.
3. The installation specifications for emission and pollution control facilities shall include the facility names, capacities, and
Quantities, etc. must be specified, and the input points of raw materials, etc., and the emission points of air pollutants must be indicated.
4. The general diagram of the pollution control facility is provided by discharge outlet so that the type, external dimensions, treatment capacity, and equipment capacity of the pollution control facility can be identified
prepared for each outlet; if prepared by a pollution control facility business, its name must be stated accurately.
5. The annual maintenance plan shall clearly itemize installation, operation, and repair costs for all pollution control facilities at the workplace, by individual
pollution control facility, with costs clearly itemized.
6. For air emission facilities that overlap with volatile organic compound emission facilities, mark "○" in column ⑩ "Duplication with Volatile Organic Compound Emission Facilities".
accordingly.
──────────────────────────────────────────
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ProcessingProcedure
──────────────────────────────────────────
┌────────┐ ┌───┐ ┌───┐ ┌──┐ ┌──┐
│Application Form (Report) │?│Accept │?│Review │?│Approval│?│Notification│
│Preparation │ │ │ │ │ │ │ │ │
└────────┘ └───┘ └───┘ └──┘ └──┘
Applicant Civil Affairs Office Basin Environmental Office, Regional Environmental Office, Capital Area Air Environment Office, or City/Province
(Department in charge of air pollutant emission facilities)
──────────────────────────────────────────