Annex 6 — 지하안전관리에 관한 특별법 시행령
283007 · 2026-02-01
■ Enforcement Decree of the Special Act on Underground Safety Management [Appendix 6] <Amended Jan. 25, 2022>
Evaluation Items and Methods for Small-Scale Underground Safety Assessment (Related to Article 25, Paragraph 1)
┌───────────┬──────────────────────────┐
│EvaluationItems │EvaluationMethod │
├───────────┼──────────────────────────┤
│1. Ground and Geological Conditions │A. Information Analysis through the Underground Information Integration System │
│ │B. Drilling Survey │
│ │. Pitcher test │
├───────────┼──────────────────────────┤
│2. │a. Groundwater Survey via Observation Network │
│Influence │B. Analysis of Groundwater Flow in the Target Area │
├───────────┼──────────────────────────┤
│3. Ground Stability │A. Analysis of Ground Stability Due to Excavation Work │
│ │B. Analysis of the Safety of Surrounding Facilities │
└───────────┴──────────────────────────┘
Remarks
1. "Drilling investigation" refers to the investigation of samples by drilling the ground using drilling machinery or equipment, etc.
means that.
2. "Permeability test" refers to measuring the amount of water that infiltrates within a certain time at a constant difference in water level
It refers to testing by starting.
3. "Ground stability analysis" refers to engineering using analysis programs, etc. pursuant to Subparagraph 3 of Annex 8
It refers to analyzing the possibility of settlement of the relevant ground, etc., through analytical analysis.