Form 16 — 농어촌도로 정비법 시행규칙

235315 · 2021-09-07

[Attachment Form No. 16] <Revised Aug. 4, 2014> (front) ┏━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━━━━━━━━━━┓ ┃Application for Road Occupancy Permit │Processing Period ┃ ┃ ├─────────────┨ ┃ │Refer to back ┃ ┠───┬───────┬──────┬────┬┴─────────────┨ ┃Applicant│Name │ │Date of Birth│ ┃ ┃ ├───────┼──────┴────┴──────────────┨ ┃ │Address │ ┃ ┠───┴───────┼──────────────────────────┨ ┃Types of Roads │ ┃ ┠───────────┼──────────────────────────┨ ┃Route name │ ┃ ┠───────────┼──────────────────────────┨ ┃Type of Occupancy │ ┃ ┠───────────┼──────────────────────────┨ ┃Purpose of Occupancy │ ┃ ┠───────────┼──────────────────────────┨ ┃Place of Occupancy │ ┃ ┠───────────┼──────────────────────────┨ ┃Period of Occupancy │ ┃ ┠───────────┼──────────────────────────┨ ┃Structure of Works (Facilities) │ ┃ ┠───────────┼──────────────────────────┨ ┃Method of carrying out construction │ ┃ ┠───────────┼──────────────────────────┨ ┃Timing of construction │ ┃ ┠───────────┼──────────────────────────┨ ┃Road restoration method │ ┃ ┠───────────┼──────────────────────────┨ ┃Measures to Prevent Soil and Dust │ ┃ ┃from Spreading During Road Excavation │ ┃ ┠───────────┴──────────────────────────┨ ┃ Pursuant to the provisions of Article 18, Paragraph 1 of the Rural Road Maintenance Act and Article 11, Paragraph 1 of the Enforcement Decree of the same Act ┃ ┃I hereby apply as above. ┃ ┃ ┃ ┃Year month day ┃ ┃ ┃ ┃Applicant (Signature or seal) ┃ ┃ ┃ ┃ To the Mayor/County Governor of ○○ ┃ ┠──────────────────────────────────┬───┨ ┃ Required Documents: 1 copy of the design plan (mark the area to be occupied on a plan at a scale of 1:1,200, including │Fee┃ ┃its location and the distances to the left and right of the road centerline). ├───┨ ┃ │No ┃ ┗━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━━┛ 21305-01621Min 210mm × 297mm 98.11.26 Approved (Newspaper paper 54g/㎡(Recyclable)) This application will be processed as follows. (Back) ┏━━━━━━━━━━━━┯━━━━━━━━━━━━━━━━━━━┓ ┃Applicant │Processing Period ┃ ┃ ├───────────────────┨ ┃ │City/County ┃ ┠────────────┼───────────────────┨ ┃ │ ┃ ┃┌────────┐ │ ┌──┐ ┃ ┃│Apply │ │ ▶│Reception│ ┃ ┃│ ├──┼───── │ │ ┃ ┃└────────┤ │ └─┬┘ ┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──┐ ┃ ┃ │ │Field Survey│ ┃ ┃ │ └─┬┘ ┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──┐ ┃ ┃ │ │Review│ ┃ ┃ │ └─┬┘ ┃ ┃ │ │(Consult with relevant departments if necessary)┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──┐ ┃ ┃ │ │Approval│ ┃ ┃ │ └─┬┘ ┃ ┃ │ │ ┃ ┃ │ ┃ ┃ │ ▼ ┃ ┃ │ ┌──┐ ┃ ┃ │ │Entry in Permit Register│ ┃ ┃ │ └─┬┘ ┃ ┃ │ │ ┃ ┃ │ ┃ ┃┌────────┐ │ ▼ ┃ ┃│Issuance │◀ │ ┌──┐ ┃ ┃│ │ ─┼──────┤Preparation of Permit│ ┃ ┃│ │ │ └──┘ ┃ ┃└────────┘ │ ┃ ┃ │ ┃ ┃ │ ┃ ┗━━━━━━━━━━━━┷━━━━━━━━━━━━━━━━━━━┛ ※ Processing Period ┏━━━━━━━━┯━━━━━━━┯━━━┯━━━━━━━━━━━┓ ┃Occupation Classification │Receiving and Processing Authority │Period │Remarks ┃ ┠────────┼───────┼───┼───────────┨ ┃Occupancy of Road Site │City/County (Construction Division)│5 days │ ┃ ┠────────┼───────┼───┼───────────┨ ┃Temporary occupancy of a road │Myeon │2days │ ┃ ┠────────┼───────┼───┼───────────┨ ┃Advertising Tower and Arch │City/County (Construction Division)│5 days │ ┃ ┠────────┼───────┼───┼───────────┨ ┃Installation of Structures │City/County (Construction Division)│5 days │ ┃ ┠────────┼───────┼───┼───────────┨ ┃RoadExcavation │City/County (Construction Division)│5 days │ ┃ ┗━━━━━━━━┷━━━━━━━┷━━━┷━━━━━━━━━━━┛