Annex 2 — 송ㆍ변전설비 주변지역의 보상 및 지원에 관한 법률 시행령

286475 · 2026-06-03

■ Enforcement Decree of the Act on Compensation and Support for Areas Surrounding Transmission and Substation Facilities [Table 2] <Amended Dec. 10, 2024> Criteria for Determining Subsidies (Related to Article 25, Paragraph 2) 1. Subsidies by Business Operator a. Subsidies per operator depend on the length per transmission line and substation capacity, etc., for each operator It shall be the sum of the transmission line support funds and substation support funds calculated based on the standard. B. Transmission line subsidies and substation subsidies shall be calculated according to the following formulas. Transmission line subsidy = Total line length by voltage as of June 30 of the previous year (cm: cir unit meter) × Transmission line subsidy unit price by voltage (KRW/cm) Substation Subsidy = Total substation capacity as of June 30 of the previous year (MVA: mega volt amp ere) × Substation Subsidy Unit Price (KRW/MVA) . The unit price of the subsidy in the calculation formula for Item B is as follows. ┌───────────────────────┬─────────┐ │Transmission Line Subsidy Unit Price │Substation Subsidy Unit Price│ ├───────┬───────┬───────┤ │ │345kV │500kV │765kV │ │ ├───────┼───────┼───────┼─────────┤ │10,784(won/cm)│23,700(won/cm)│42,660(won/cm)│141,726(KRW/MVA) │ └───────┴───────┴───────┴─────────┘ d. The total substation capacity pursuant to subparagraph 2) of item b shall be the sum of the transformer capacities of the substations eligible for support. 2. Regional Subsidies a. Regional subsidies are the total sum of subsidies per operator of the transmission and substation facility support coefficient Calculated by allocating based on the ratio of the transmission and substation facility support coefficient by basic administrative region to the total sum It shall be the fixed amount. B. The support coefficient for transmission and substation facilities pursuant to Item A shall be calculated according to the following formula. ┌────────────────────────────┐ │ │ │ Transmission and Substation Facility Support Factor = P × T × V × ( F + F ) │ │ │ └────────────────────────────┘ 1) Number of households (P): Number of households in surrounding areas by basic administrative district 2) Transmission and Substation Facility Coefficient (T): 1 for areas surrounding transmission lines, 1.5 for areas surrounding substations 3) Factor by voltage (V): 1 for 345kV, 4 for 500kV and 765kV 4) Geographic Characteristic Coefficient of Surrounding Area (F): Rural areas (Eup, Myeon) are 0.9, and urban areas (Dong) are 0.3 5) Characteristic coefficient (F) of transmission and substation facilities: Characteristic coefficient according to the following classifications a) Transmission lines: 0.3 for 2 lines or fewer, 0.4 for 3 and 4 lines, and 0.5 for 5 lines or more b) Substation: Outdoor steel structure type is 0.5, mixed type is 0.4, outdoor gas-insulated switchgear type is 0.3 . The business operator shall, out of the total amount of support project expenses, support projects under Items 2 through 5 of Attached Table 1 (hereinafter The proportion of the amount for carrying out the "Joint Support Project" (hereinafter referred to as such in this heading) is 50/100 For areas exceeding the scope, the continuous promotion and encouragement of joint support projects The remaining balance after the implementation of the support project may be used for joint support projects. In this case, the joint Detailed matters, such as criteria for amounts based on the proportion of the support project, shall be established in the support project plan. is determined by guidelines. 3. Remarks a. Subsidies per business operator and per region shall be calculated annually. b. Where a substation surrounding area and a transmission line surrounding area exist separately or overlap within a basic administrative area , the transmission and substation facility coefficient (T) and transmission and substation facility characteristic coefficient (F) in the area surrounding the substation . . In basic administrative areas, areas surrounding 765kV transmission lines, areas surrounding 500kV transmission lines, or 3 In cases where areas surrounding 45kV transmission lines are separate or overlap, the voltage coefficient (V) is further Apply voltage-specific coefficients of high voltage. . Regional support funds for a single basic administrative area are for the area surrounding transmission and substation facilities The operator with a region shall bear the cost. However, if the main transmission and substation facilities in a single basic administrative region In cases where there are multiple business operators with a variable area, the regional sub-area for the relevant basic administrative area The principal shall be borne only by the following business operator. 1) Substations and Transmission Lines: Substation Owners and Operators 2) 765kV transmission line, 500kV transmission line, 345kV transmission line: of higher voltage Transmission line owner/operator 3) 345kV Transmission Line: Business owning and operating the 345kV transmission line with the highest number of households (P) . However, if the number of households is the same, it shall be determined by consultation between the business operators. E. The point in time for determining the number of households (P) in the calculation formula for the transmission and substation facility support coefficient is the resident pursuant to Article 19, Paragraph 3 The date on which the collection of opinions is completed shall be the date. B. When calculating regional subsidies, amounts less than 1,000 won are discarded. Company. The subsidy calculation period is based on daily units. a. The total sum of regional subsidies borne by each business operator pursuant to subparagraph (d) is pursuant to subparagraph 1 If the amount is more or less than the support amount per business operator that must be borne by each business operator, that difference The amount is settled among the business operators.