Annex 3 — 석면안전관리법 시행령

281603 · 2026-01-02

■ Enforcement Decree of the Asbestos Safety Management Act [Appendix 3] <Amended Oct. 1, 2025> Standards and Methods for Slate Treatment, etc. (Related to Article 37, Paragraph 2, Subparagraph 2) 1. Standards for Measures for Dismantling and Removal of Slate a. Work must be performed wet using water or a wetting agent. b. Dismantled slate must not be dropped or thrown directly onto the ground. . During the process of dismantling and removing slate, debris or residue is not generated Every effort must be made to ensure that unavoidably generated debris, residue, etc. is packaged in bags made of polyethylene or other similar materials (where there is a risk of scattering , seal in a sturdy container after taking measures such as humidity control, or high-density water-resistant material ) must be done. d. A changing room for everyday clothes and work clothes Sanitary facilities, including changing rooms, must be installed. Sanitary facilities shall prevent asbestos dust, etc. High performance capable of capturing more than 99.97 percent of particles 0.3㎛ or larger to remove It must be possible to clean it using a vacuum cleaner equipped with a filter. E. In relation to the installation of sanitary facilities under Subparagraph D, when dismantling or removing slate at the factory By installing shower facilities or making shower facilities in an adjacent location available for use, must. B. Dismantled and removed waste slate shall be packaging material designated and notified by the Minister of Climate, Energy and Environment It must be packaged using the specified quality and packaging method, and waste slate must be loaded or unloaded from the transport vehicle Care must be taken to ensure that the sack does not tear during START. 2. Specific Standards and Methods for the Collection, Transportation, Storage, and Disposal of Waste Slate a. In the case of collection and transportation Waste slate generated from factories is designated pursuant to Article 2, Subparagraph 4 of the "Waste Management Act" Waste must be collected and transported using transport vehicles of waste collection and transport operators. However, excluding factories Waste slate generated from buildings falls under any of the following waste collection and transportation It can be collected and transported by a transport vehicle of a business operator. a) discharge facilities pursuant to Article 2, Subparagraph 3 of the Waste Management Act or Article 2 of the Enforcement Decree of the same Act Waste discharged from the operation of facilities pursuant to the provisions of Nos. 1 through 5 (this (hereinafter referred to as "Waste from Business Establishment Emission Facilities") b) Waste from workplace emission facilities discharged from the relevant workplace specified in a) above and projects pursuant to Article 2, Subparagraphs 7 and 9 of the Enforcement Decree of the Waste Management Act Waste discharged from the site [hereinafter referred to as "waste from business equipment (non-)discharge facilities"] 2) Waste collection and transport business operator for workplace discharge facilities or business equipment discharge facilities In the case of collecting and transporting waste slate in accordance with 1) above, the load of the collection and transport vehicle On both sides of the box, in white with dimensions of at least 100 centimeters in width and 50 centimeters in height A vehicle that must indicate it is a waste slate transport vehicle in red letters on a background or attach a label . 3) To prevent packaging from being damaged or scattered during the process of collecting and transporting waste slate, etc. must record. 4) Waste slate must not be mixed with other waste during transportation. or. In the case of storage 1) Waste slate must not be mixed with other waste during the storage process. 2) Care must be taken to ensure that the packaging is not damaged during the storage process of waste slate, etc. 3) Necessary measures to prevent dust or debris from being generated from stored waste slate must be set and stored. 4) Dispose of waste slate generated after slate dismantling and removal at a location other than the waste slate generation site In the case of intending to store slate on land owned by the dismantling and removal company or at other locations shall store it after receiving approval for the storage quantity, storage period, etc. from the head of the competent administrative agency can do. 5) In the case of storing waste slate in accordance with 4), if the storage standards from 1) to 4) are met Must be stored together. . In the case of processing, Waste slate generated from factories is treated as designated waste under the "Waste Management Act" every It must be disposed of in a managed landfill facility. However, waste generated from buildings other than factories Waste slate is household waste or general industrial waste pursuant to the "Waste Management Act". It can be landfilled in a landfill facility. Waste slate is landfilled in a packaged state so that asbestos dust does not become airborne during the landfill process. You must water sufficiently to ensure proper watering and frequently backfill the soil, and equipment , etc., must be performed after backfilling. In this case, compaction and compression During the work process, waste slate debris, etc., must not be exposed to the surface of the backfill layer. ni doen. 3) Debris, residues, etc. generated during the dismantling and removal of slates are solidified It must be processed using the START method. 4) Floor vinyl sheets, dust masks, work clothes, etc. used in the dismantling and removal of slates By treating by solidification or burying in a designated hazardous waste landfill in a packaged state, must. In the case of landfilling waste slate, designate a specific area within the landfill facility and landfill and a sign indicating the landfill area must be installed as follows. ┏━━━━━━━━━━┓ ┃Waste Slate Landfill Area ┃ ┠──────┬───┨ ┃Landfill Capacity (㎥)│ ┃ ┠──────┼───┨ ┃Landfill Area (㎡)│ ┃ ┠──────┼───┨ ┃LandfillLocation │ ┃ ┠──────┼───┨ ┃매립기간 │ ┃ ┠──────┼───┨ ┃관리기관 │ ┃ ┃(전화번호) │ ┃ ┗━━━━━━┷━━━┛ 비고 1. 표지판은 사람이 쉽게 볼 수 있는 위치에 설치 2. 표지의 규격: 가로 80센티미터 이상×세로 80센티미터 이상 3. Cover color: Black lines and black text on a yellow background The installer and operator of a landfill facility [regarding] the degree of asbestos dispersion during the landfilling of waste slate must be measured. The degree of asbestos dispersion, measurement points, methods, frequency, etc., and the Matters concerning processing, storage, etc. shall be determined and notified by the Minister of Climate, Energy and Environment.