Annex 1 — 민간인 통제선 이북지역의 산지관리에 관한 특별법 시행령

283125 · 2026-02-01

■ Enforcement Decree of the Special Act on Mountain Management in Areas North of the Civilian Control Line [Attached Table 1] <Amended July 2, 2019> Detailed Standards for Ecological Mountain Land Conversion (Related to Article 10) 1. Minimize the volume of cut and fill, as well as the area of ​​land alteration, to maintain the topography of the mountainous terrain. a. The volume of cut, fill, and soil movement resulting from mountain land conversion is necessary for the achievement of the relevant project It will be the minimum amount a. Considering the nature of the project, the surrounding landscape, and the layout of the facilities to be installed, to convert shall include the minimum area of ​​mountainous land It is the cut and fill slopes subject to restoration resulting from the alteration of the land use of mountainous areas (hereinafter referred to as "slopes"). ) is Shall not exceed 50% of the area of ​​mountain land conversion a. The vertical height of the slope resulting from mountain land conversion shall be 12m or less in the project plan DoYoung E. Terraced mountain land conversion (along the slopes of the mountain to maintain the existing topography as much as possible) In the case of constructing stairs and converting mountain land) the project site created on the stairs The width [excluding the width of small steps] must each be at least 12m. f. In accordance with the standards for mountain restoration and ecological restoration pursuant to Article 23 of the Act, mountain restoration and ecological restoration are Develop to be capable 2. Measures to prevent pollution and disasters such as landslides and soil erosion so that mountain soil is preserved thing to train a. Materials used in construction do not impede human health or the growth of animals and plants, so It must not cause soil contamination b. The slope of the embankment (referring to the ratio of the horizontal distance to the height of the embankment) is the embankment's To prevent collapse, the following standards according to soil type (in the case of terraced mountain land conversion It shall satisfy the condition that the ratio is 1:1.4 or less regardless of soil type. However, as a result of conducting a geological survey... Recognized as safe or safe by installing disaster prevention facilities such as retaining walls, piles, and anchors This is not the case if it is recognized as such. 1) In the case of hard rock: 1:0.5 or less 2) In the case of weathered rock: 1:0.8 or less 3) In the case of soil: 1:1.0 or less 4) In the case of gravel and soil layers of embankment land: 1:1.0 or less . When installing a structure on a slope, it must be a structure safe against earth pressure . In cases where there is a risk of sediment runoff, check dams to prevent sediment runoff downstream, Install sedimentation ponds, retention ponds, etc. E. In cases where there is a concern that disasters, etc. may occur due to the slope, the following protective measures Reflect START in the business plan 1) Installation of drainage facilities of sufficient size 2) Installation of facilities to prevent flying sand or rockfalls f. It shall not be a region falling under any of the following. However, the installation of disaster prevention facilities ... This is not the case when authorization is granted as a START matter. Pursuant to Article 41, Paragraph 1 of the Framework Act on Disaster and Safety Management, the Mayor, County Governor, or District Head [referring to] a risk Area designated as zone 2) The above Areas determined to have a high probability of landslides based on risk factors 3) Area where landslides occurred 3. Secure ecological corridors of trees, herbaceous plants, etc., to protect vegetation in mountainous areas a. The preservation rate of the forest in its original state shall be 60% or more, and in cases where it is unavoidable due to access roads and topographical conditions Except for the area specified in the START, a forest belt of at least 30m in width must be installed along the boundary of the application site for exclusive use. To retain B. The forest ecosystem will not be isolated, such as by being cut off from surrounding forests due to land conversion. Install facilities while maintaining the existing topography and vegetation as much as possible. . The mountain area to be exclusively used is the elevation of the mountaintop (標高: mountain based on the lower part of the mountain slope It shall be located at less than 70% of the height of the government (hereinafter the same applies). E. The average slope of the mountain area to be exclusively used shall be 25 degrees or less. 4. Scale, density, layout, and design, such as height and width, of facilities to maintain the mountain landscape Adjust the colors appropriately a. Reducing landscape damage by conducting view analysis and mountain landscape impact simulations Establish countermeasures B. The colors of the building shall be in harmony with the colors of the surrounding forest, and the colors of the surrounding forest and make it lower than the saturation of the analysis result The length of the building is 20m or less based on the diagonal of the rectangle, and the building is orthogonal. In the case of placement, it shall be 35m or less d. The height of the building shall not exceed 16m. However, observation towers shall be exempt. E. Using natural materials such as wood, earth, and stone, and roof shapes, fences, etc. that harmonize with the surrounding area Design with START B. Create a wooded area around buildings, and greenery on the fronts of structures, such as retaining walls facing roads. Ensure the continuity of green spaces by installing zones or planting street trees. d. In the case of installing a building on a slope, the skyline of mountainous or hilly terrain and trees and strange rock formations While preserving distinctive landscape elements such as stones to the maximum extent, and minimizing damage to green spaces due to terraced mountain land conversion Things to digest 5. Minimize changes in water quality and quantity caused by mountain land conversion a. Except in cases where the drainage volume is small and there is no risk of soil runoff or collapse, rivers or Drainage facilities must be installed so that drainage occurs through other drainage facilities, etc., and water quality due to drainage This will not be contaminated a. The mountainous land intended for conversion is a water source protection zone or a water intake facility (undesignated as a water source protection zone refers to the case. The same applies hereinafter) upstream flow distance from (流下距離: center of the water body (Distance measured along the line in the direction of water flow) 10 km outside from the boundary between the two banks of the river Located more than 500m away, it does not affect the quantity and quality of water sources, water intake facilities, etc. thing . If mountain land conversion significantly affects the increase in flow rate in downstream areas during floods or soil There will be no concern about leakage . The rainwater non-permeability shall be 30% or less of the exclusive use area, and rainwater shall be allowed to infiltrate and be retained at a low rate to the maximum extent. Introduce a decentralized rainwater management system to reduce and utilize water runoff. (Applicable only to cases of 300,000㎡ or more) 6. Use eco-friendly materials and methods to minimize carbon emissions and energy consumption a. Cooling and heating using forest biomass such as wood pellets, and solar and geothermal energy Minimize fossil fuel consumption, such as by installing heat supply facilities. b. Use eco-friendly materials such as fire-resistant wood, soil, and stone when constructing buildings. . Consider the building layout and design to maximize natural light. d. Minimize the discharge of household and industrial waste during the construction and utilization of buildings, and Maximize the reuse and recycling of waste per E. For paving of facilities such as inner ring roads and parking lots, materials and construction methods with high rainwater permeability Use Remarks 1. The method for determining the mountain peak and the lower part of the mountain slope pursuant to Subparagraph 3(d) of the part excluding the remarks is as follows: Follows the START item. a. "Mountain peak" refers to the highest peak of the slope to which the mountainous land incorporated into the project area belongs. However, in the case of a composite slope, the highest within 1 km of the project area boundary refers to the point. b. "Lower part of the mountain slope" refers to the forest map of the slope to which the mountain land incorporated into the project area belongs. It refers to the highest point of the forest boundary. . "Imgyeongji" refers to the mountain marked on the 1:25,000 scale forest map produced by the National Institute of Forest Science It refers to the boundary between the land and other land. However, land falling under any of the following and The boundary of does not regard this as an illegal boundary. 1) Land formed in a linear shape, such as roads and railways 2) Land other than mountainous land, such as farmland and grassland, with an area of ​​less than 30,000㎡ (hereinafter referred to as "farmland, grassland, etc." ) . In the case of regions without a clinical map or regions where the local clinical map does not match, the origin (mountain land conversion permit or mountain land conversion Upon receiving a report, land or ditches and roads continuously connected to which other land or ditches are being used for other purposes The highest point of (excluding farmland, grasslands, etc.) is considered the lower part of the mountain slope. 2. Part other than the remarks, necessary for applying the standards under subparagraphs 1 through 6 Details shall be determined and announced by the Administrator of the Korea Forest Service. 3. Due to the topographical conditions of the mountainous area for which an implementation plan is to be approved by designating an ecological mountain land conversion zone or In cases where it is deemed unreasonable to apply the above standards in the course of project execution, the Mountain Area Management Committee The standard may be relaxed following deliberation by the meeting.