Annex 1 — 방사성폐기물 관리법 시행령
282891 · 2026-01-27
■ Enforcement Decree of the Radioactive Waste Management Act [Attached Table 1] <Amended Jan. 27, 2026>
Criteria for Calculating Management Costs (Related to Article 5, Paragraph 1)
┏━━━━━━┯━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━┓
┃Type │Calculation Unit│Calculation Formula ┃
┠──────┼────┼──────────────────────────┨
┃Low- and Intermediate Level Defense│Drum │(Present value of future project costs - Low- and intermediate-level radioactive waste ┃
┃Sasung Waste │(1 drum =│Management Account Balance) × 1/Present Value of Future Inflows ┃
┃ │200L)│ ┃
┠──────┼────┼──────────────────────────┨
┃Radioisotope│liter │ Processing Costs + Disposal Costs ┃
┃Small Waste │ │ ┃
┗━━━━━━┷━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━┛
Remarks
1. "Present value of future project costs" refers to the point in time determined and notified by the Minister of Climate, Energy and Environment (this
(hereinafter referred to as the " 기준시시") and on an annual basis thereafter, regarding the low- and intermediate-level radioactive waste management project
Convert each expected cost to its present value at the base time (at the real discount rate
It refers to the total amount calculated by discounting for the relevant period.
2. "Balance of the Intermediate and Low-Level Radioactive Waste Management Account" refers to the radioactive waste management account balance at the reference point
As the balance of the low- and intermediate-level radioactive waste management account, from the radioactive waste generator
From the management costs collected so far and the revenue resulting from the operation of the Radioactive Waste Management Fund, already
refers to the amount excluding incurred business expenses.
3. "Present value of future inflows" refers to low- and intermediate-level radioactive waste management facilities after the reference point
are based on
Convert each to the present value of the point (calculated by discounting by the real discount rate for the corresponding period)
It refers to the total inflow volume aggregated. In this case, the total inflow volume up to the time of termination of disposal facility operation
The quantity is limited to 800,000 drums.
4. "Processing costs" refers to the radioactive waste management operator taking over radioisotope waste
Refers to the costs incurred in processing, such as repackaging and volume reduction, to make it suitable for disposal.
.
5. "Disposal costs" refers to the costs incurred by a radioactive waste management operator in repackaging radioisotope waste,
of the volume of radioactive isotope waste remaining after treatment such as volume reduction
· Refers to the management costs of low-level radioactive waste.
6. The Minister of Climate, Energy and Environment [regarding] the present value of future project costs, and the management of low- and intermediate-level radioactive waste
The re-account balance, the present value of future inflows, the real discount rate, and administrative costs must be disclosed.