Annex 29 — 선박에서의 오염방지에 관한 규칙

287033 · 2026-07-01

■ Rules on the Prevention of Pollution from Ships [Appendix 29] <Amended Dec. 23, 2021> Standards for Preparation of Inspection, etc. of Marine Pollution Prevention Facilities, etc. (Related to Article 47, Paragraph 1) 1. Vapor Emission Control Device a. Design Evaluation B. Inspection of the following parts 1) Blower, compressor or pump and prime mover thereof 2) Detonation Arrester and Flame Arrester 3) Process container corresponding to any of the following (A) Process vessel with a shell thickness of 16 mm or more (b) Process vessels with a design pressure of 1 MPa or higher (c) Process vessel with a design temperature exceeding 150℃ (D) A container with a volume of 0.5 m³ containing substances with a vapor pressure of 0.2 MPa or higher at 38°C Process container with more than 20 years of experience 4) Incinerator 5) Explosion-proof equipment (from an institution recognized by the Minister of Oceans and Fisheries or an internationally accredited testing laboratory Approved devices may be exempt) Other parts designated and notified as important equipment by the Minister of Oceans and Fisheries . Performance test 1) Performance inspection regarding emission limits 2) Leakage inspection of each pipe device and pressure vessel 3) Efficacy testing of safety and protective devices, etc. 2. Oil Pollution Prevention Equipment ┏━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃Test Type │검사 등 준비기준 ┃ ┠─────┼─────────────────────────────────┨ ┃PeriodicInspection │a. Oil filtration device ┃ ┃ │ 1) Open to inspect the interior and vent the contents and hazardous gases ┃ ┃ │thing to release ┃ ┃ │ 2) The location of pipes, valves, and cocks (hereinafter referred to as "pipes, etc.") can be checked ┃ ┃ │Make sure there is ┃ ┃ │ 3) Remove the pump's operating parts and open the valve box ┃ ┃ │ 4) Prepare for a pressure test (limited to cases undergoing inspection for the first time ┃ ┃ │). However, this is omitted for products that have undergone inspection. ┃ ┃ │ 5) Prepare for the operation test ┃ ┃ │ 6) Open the attached critical valves and cocks ┃ ┃ │b. Oily residue storage device or bilge water storage device ┃ ┃ │ 1) Open the manhole of the oily sludge tank or bilge water tank and the contents ┃ ┃ │and discharge hazardous gases ┃ ┃ │ 2) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 3) Prepare for the operation test ┃ ┃ │. Bilge water concentration alarm device or bilge water oil discharge monitoring and control device ┃ ┃ │ 1) Open the sample tube of the oil concentration meter ┃ ┃ │ 2) Prepare for the operation test ┃ ┃ │ 3) Exchange regarding alarm devices issued by the manufacturer or a person authorized by the manufacturer ┃ ┃ │Prepare a formal report ┃ ┃ │. Ballast water discharge pipe device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Prepare for the operation test ┃ ┃ │Oil discharge monitoring and control device or oil concentration monitoring device ┃ ┃ │ 1) Open the sample tube of the oil concentration meter and the detector of the flow meter ┃ ┃ │ 2) Prepare for the operation test ┃ ┃ │Bar. Mixing tank device ┃ ┃ │ 1) Open the tank manhole and discharge the contents and hazardous gases ┃ ┃ │ 2) Install safety platforms in appropriate locations inside ┃ ┃ │ 3) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ ┃ ┃ │ 4) Prepare for the operation test of the water-flow boundary detector ┃ ┃ │Company. Separated Ballast Water Tank ┃ ┃ │ 1) Open the manhole of the separation ballast tank and discharge the contents and hazardous gases ┃ ┃ │things to do ┃ ┃ │ 2) Install safety platforms in appropriate locations inside ┃ ┃ │ 3) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 4) Prepare for a pressure test (limited to the first inspection) ┃ ┃ │ 5) Prepare for the operation test ┃ ┃ │A. Cargo Changwon Oil Washing Facility ┃ ┃ │ 1) Prepare to verify the location of pipes, etc. ┃ ┃ │ 2) Remove the pump's operating parts and open the valve box ┃ ┃ │ 3) Prepare for pressure tests and operational tests ┃ ┃ │ 4) Open the attached critical valve ┃ ┃ │. Cargo Hold ┃ ┃ │ 1) Open the cargo tank manhole and discharge the contents and hazardous gases. ┃ ┃ │ 2) Install safety platforms in appropriate locations inside ┃ ┃ │ 3) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 4) Prepare for a pressure test (limited to the first inspection) ┃ ┠─────┼─────────────────────────────────┨ ┃Type 1 Intermediate │a. The oil filtration device shall be prepared in accordance with items 1), 3), 5), and 6) of subparagraph a of the periodic inspection. ┃ ┃Test │Things to do ┃ ┃ │B. Oily residue storage devices and bilge water storage devices are subject to periodic inspection subparagraph B 1) and ┃ ┃ │3) ┃ ┃ │. The bilge water concentration alarm device or the bilge water oil discharge monitoring and control device is ┃ ┃ │Make preparations in accordance with items 1), 2), and 3) of the preliminary inspection. ┃ ┃ │D. The ballast water discharge pipe system shall be prepared in accordance with Item D 2) of the periodic inspection. ┃ ┃ │E. Oil discharge monitoring and control devices or oil concentration monitoring devices are subject to periodic inspection E Item 1) ┃ ┃ │Make preparations according to and 2). ┃ ┃ │f. The mixing tank device shall be prepared in accordance with items 1), 2), and 4) of item f of the periodic inspection. ┃ ┃ │It ┃ ┃ │d. Separated ballast water tanks shall be prepared in accordance with items 1), 2), and 5) of the periodic inspection ┃ ┃ │th ┃ ┃ │A. Prepare the cargo tank oil washing facility for the operational test. ┃ ┃ │J. The cargo hold shall be prepared in accordance with items 1) and 2) of the periodic inspection. ┃ ┠─────┼─────────────────────────────────┨ ┃Type 2 Intermediate │Operational test for oil pollution prevention equipment under items (a) through (h) of the periodic inspection and ┃ ┃Test │Make preparations in accordance with Item 3) of the periodic inspection. ┃ ┠─────┼─────────────────────────────────┨ ┃TemporaryTest │Prepare the matters related to the relevant examination among the preparations for the regular inspection. ┃ ┃and │ ┃ ┃Temporary Voyage │ ┃ ┃Test │ ┃ ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 3. Hazardous Liquid Substance Contamination Prevention Equipment ┏━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃Test Types │검사 등 준비기준 ┃ ┠─────┼────────────────────────────────┨ ┃PeriodicInspection │A. Discharge pipe device for hazardous liquid substances and ballast water ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Prepare for the operation test ┃ ┃ │B. Pre-cleaning device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Remove the pump's operating parts and open the valve box ┃ ┃ │ 3) Open the attached critical valve ┃ ┃ │ 4) Prepare for pressure tests and operational tests ┃ ┃ │. Submerged discharge device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Remove the pump's operating parts and open the valve box ┃ ┃ │ 3) Prepare for the operation test ┃ ┃ │. Ventilation cleaning device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Prepare for the operation test ┃ ┃ │E. Stripping device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Remove the pump's operating parts and open the valve box ┃ ┃ │ 3) Open the attached critical valve ┃ ┃ │ 4) Prepare for pressure tests and operational tests ┃ ┃ │B. Dilution Water Injection Device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Remove the pump's operating parts and open the valve box ┃ ┃ │ 3) Prepare for the operation test ┃ ┃ │Company. Cargo heating device ┃ ┃ │ 1) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 2) Prepare for a pressure test (limited to the first inspection)┃ ┃ │Ah. Dedicated ballast water tank ┃ ┃ │ 1) Open the manhole cover of the dedicated ballast water tank and the contents and hazardous gases ┃ ┃ │will emit ┃ ┃ │ 2) Prepare a safety platform in a suitable location inside ┃ ┃ │ 3) Prepare to verify the location of pipes, etc. ┃ ┃ │ ┃ ┃ │ 4) Prepare for a pressure test (limited to the first inspection)┃ ┃ │ 5) Prepare for the operation test ┃ ┃ │. Cargo Hold ┃ ┃ │ 1) Open the cargo tank manhole and discharge the contents and hazardous gases ┃ ┃ │ 2) Install safety platforms in appropriate locations inside ┃ ┃ │ 3) Ensure that the location of pipes, etc. can be verified ┃ ┃ │ 4) Prepare for a pressure test (limited to the first inspection)┃ ┠─────┼────────────────────────────────┨ ┃Type 1 Intermediate │a. Discharge pipe systems for hazardous liquid substances and ballast water are subject to periodic inspection item a, subparagraph 2). ┃ ┃Check │Make preparations accordingly ┃ ┃ │B. The pre-cleaning device shall be prepared in accordance with Item B 1) of the periodic inspection ┃ ┃ │. The submerged discharge device shall be prepared in accordance with Item D1) of the periodic inspection. ┃ ┃ │. Prepare the ventilation cleaning device for the operation test. ┃ ┃ │E. The stripping device shall comply with the preparation and operation tests pursuant to Item E1) of the periodic inspection. ┃ ┃ │will do the rain ┃ ┃ │B. Prepare the dilution water injection device for the operation test ┃ ┃ │d. Cargo heating devices shall be prepared in accordance with Item 1) of the periodic inspection ┃ ┃ │A. The dedicated ballast water tank shall be prepared in accordance with Items A1) and 3) of the periodic inspection. ┃ ┃ │J. The cargo hold shall be prepared in accordance with items 1) and 2) of the periodic inspection. ┃ ┠─────┼────────────────────────────────┨ ┃Type 2 Intermediate │a. The pre-cleaning device shall be designed to allow verification of the location of piping, etc. ┃ ┃Check │B. The stripping device shall be designed to allow verification of the location of piping, etc. ┃ ┃ │. Prepare the dilution water injection device for the operational test ┃ ┃ │d. The cargo heating device shall be designed so that the location of piping, etc. can be verified ┃ ┃ │E. The dedicated ballast water tank shall be prepared in accordance with Items H1) and 3) of the periodic inspection. ┃ ┠─────┼────────────────────────────────┨ ┃TemporaryTest │Prepare the matters related to the relevant examination among the preparations for the regular inspection. ┃ ┃and │ ┃ ┃Temporary Voyage │ ┃ ┃Test │ ┃ ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 4. Sewage Pollution Prevention Equipment ┏━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃Test Type │검사 등 준비기준 ┃ ┠─────┼─────────────────────────────────┨ ┃PeriodicInspection │A. Sewage Treatment Device ┃ ┃ │ 1) Open the manholes of each tank and remove the contents ┃ ┃ │ 2) Disassemble the main operating parts of the auxiliary pump and open the valve ┃ ┃ │ 3) Prepare for the operation test ┃ ┃ │B. Manure grinding and disinfection device ┃ ┃ │ ┃ ┃ │ 1) Internal inspection is possible through the status inspection window of the circulating water tank and auxiliary tank ┃ ┃ │Things to prepare to be able to START ┃ ┃ │ 2) Delete <2021. 12. 23.> ┃ ┃ │ 3) Prepare to check the condition of the filter and grinding device ┃ ┃ │ 4) Prepare for a pressure test after assembly (as in the case of the first inspection ┃ ┃ │determine) ┃ ┃ │ 5) Prepare for the operation test ┃ ┃ │ 6) Prepare to inspect the treatment agent ┃ ┃ │. Manure storage device ┃ ┃ │ 1) Open the storage tank manhole and remove the contents ┃ ┃ │ 2) Prepare for the operation test ┃ ┠─────┼─────────────────────────────────┨ ┃Type 1 Intermediate │a. The manure treatment device shall make preparations in accordance with items 1) through 3) of subparagraph a) of the periodic inspection ┃ ┃Check │th ┃ ┃ │B. The manure grinding and disinfection device shall be in accordance with items 1) through 3) and 5) of subparagraph B of the periodic inspection ┃ ┃ │Prepare ┃ ┃ │. The manure storage device shall be prepared in accordance with Item D of the periodic inspection ┃ ┠─────┼─────────────────────────────────┨ ┃Type 2 Intermediate │a. The manure storage device shall be prepared for an operational test. ┃ ┃Test │B. Prepare the manure grinding and disinfection device for an operational test ┃ ┃ │. Prepare the manure treatment device for the operation test ┃ ┠─────┼─────────────────────────────────┨ ┃TemporaryTest │Prepare the matters related to the relevant examination among the preparations for the regular inspection. ┃ ┃and │ ┃ ┃Temporary Voyage │ ┃ ┃Check │ ┃ ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛ 5. Air Pollution Control Equipment ┏━━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┓ ┃Test Type │검사 등 준비기준 ┃ ┠─────┼────────────────────────────────┨ ┃PeriodicInspection │a. Ozone-depleting substances (excluding vessels with a gross tonnage of less than 400 tons) ┃ ┃ │ 1) Prepare a leak test for fire extinguishing systems containing Halon ┃ ┃ │ 2) ┃ ┃ │Prepare for the leak test of the START device ┃ ┃ │B. Nitrogen oxide emission control equipment for diesel engines ┃ ┃ │ 1) For each diesel engine, Engine Air Pollution Prevention Certificate, regarding nitrogen oxide emissions ┃ ┃ │Keep a record book and an institutional variable record book. In this case, the institutional variable record ┃ ┃ │In the START section, if there is replacement or adjustment of components, it is recorded and maintained. ┃ ┃ │should. ┃ ┃ │ 2) In the case where the onboard engine variable inspection method is adopted, one ┃ ┃ │Open the cylinder or prepare spare parts. However, those engaged in domestic voyages ┃ ┃ │As a vessel, Article 31, Paragraph 9 of the "Enforcement Rules of the Ship Safety Act" and the "Fishing Vessel Act ┃ ┃ │Cases where preparation for open inspection is exempted pursuant to Article 56, Paragraph 6 of the Enforcement Rules ┃ ┃ │, preparation for the inspection may be waived until that deadline. ┃ ┃ │ ┃ ┃ │ 3) Prepare for nitrogen oxide emission tests when adopting the onboard simple measurement method ┃ ┃ │Things to do ┃ ┃ │ 4) If an exhaust gas purification device is installed, open the chemical storage tank ┃ ┃ │ Construction machinery inspection certificate under Annex 2 of the "Enforcement Rules of the Construction Machinery Management Act" and ┃ ┃ │Construction machinery engine exhaust pursuant to Annex 31-2 of the "Enforcement Rule of the Air Environment Preservation Act" ┃ ┃ │Keep a Certificate of Export Gas (limited to applicable vessels) on hand. ┃ ┃ │. Fuel oil ┃ ┃ │ Prepare a fuel oil supply order and a fuel oil sample. ┃ ┃ │Ra. Vapor collection control device ┃ ┃ │ 1) Prepare approved drawings of the vapor collection and control device ┃ ┃ │ 2) Pipeline device of vapor collection and control system, oxygen concentration measurement and monitoring device, pressure monitoring┃ ┃ │Prepare for the operation test of the START device ┃ ┃ │E. Onboard Incinerator ┃ ┃ │ 1) Prepare the incinerator inspection certificate and the waste record book. ┃ ┃ │ 2) Open and clean to inspect the interior ┃ ┃ │ 3) Prepare for the operation test ┃ ┃ │B. Exhaust gas purification device for sulfur oxides (limited to cases where installed) ┃ ┃ │ 1) Open the chemical storage tank ┃ ┃ │ 2) Keep the technical manual for the exhaust gas purification system for sulfur oxides on hand. ┃ ┃ │ 3) Keep a record book for the exhaust gas purification device for sulfur oxides ┃ ┠─────┼────────────────────────────────┨ ┃Type 1 Intermediate │a. Prepare for operational testing of various equipment ┃ ┃Test │B. Ozone-depleting substances (excluding vessels with a gross tonnage of less than 400 tons) ┃ ┃ │ 1) Prepare a leak test for fire extinguishing systems containing Halon ┃ ┃ │ 2) Leakage test of devices containing chlorofluorocarbons or chlorofluorohydrocarbons┃ ┃ │Prepare for START ┃ ┃ │. Nitrogen oxide emission prevention equipment for diesel engines ┃ ┃ │ 1) For each diesel engine, Engine Air Pollution Prevention Certificate, Nitrogen Oxide Emission Related┃ ┃ │Keep a logbook and an institutional variable record book. In this case, the institutional variable record book shall be kept on file. ┃ ┃ │must be recorded and maintained in the event of replacement or adjustment of components ┃ ┃ │. ┃ ┃ │ 2) In the case where the onboard engine variable inspection method is adopted, one ┃ ┃ │Open the cylinder or prepare spare parts. However, those engaged in domestic voyages ┃ ┃ │As a vessel, Article 31, Paragraph 9 of the "Enforcement Rules of the Ship Safety Act" and the "Fishing Vessel Act ┃ ┃ │Cases where preparation for open inspection is exempted pursuant to Article 56, Paragraph 6 of the Enforcement Rules ┃ ┃ │, preparation for the inspection may be waived until that deadline. ┃ ┃ │ 3) Prepare for nitrogen oxide emission tests when adopting the onboard simple measurement method ┃ ┃ │Things to do ┃ ┃ │ 4) Prepare for Item 5) of Subparagraph B of the periodic inspection ┃ ┃ │. Fuel oil ┃ ┃ │ Prepare a fuel oil supply order and fuel oil samples. ┃ ┃ │E. Exhaust gas purification device for sulfur oxides (limited to cases where installed) ┃ ┃ │ 1) Open the chemical storage tank ┃ ┃ │ 2) Keep the technical manual for the exhaust gas purification system for sulfur oxides on hand. ┃ ┃ │ 3) Keep a record book for the exhaust gas purification device for sulfur oxides ┃ ┠─────┼────────────────────────────────┨ ┃Type 2 Intermediate │a. Prepare for operational testing of various equipment. ┃ ┃Test │B. If applicable, prepare for the periodic inspection under Item B 1) and Item B 5). ┃ ┠─────┼────────────────────────────────┨ ┃TemporaryTest │Prepare the matters related to the relevant examination among the preparations for the regular inspection. ┃ ┃and │ ┃ ┃Temporary Voyage │ ┃ ┃Check │ ┃ ┗━━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━┛