Annex 26 — 선박에서의 오염방지에 관한 규칙
287033 · 2026-07-01
■ Rules on the Prevention of Pollution from Ships [Appendix 26] <Amended June 30, 2021>
Safety Standards for Vapor Emission Control Devices (Related to Article 37, Paragraph 3)
1. Definition
a. “Maximum allowable transfer rate” refers to cargo on an oil tanker
or refers to the maximum volume ratio for which ballast water can be loaded, and the hourly volume is
unit.
or. “Maximum vapor processing rate” refers to the terminal’s
Refers to the maximum capacity that a volatile organic compound treatment facility can transfer.
. A “Tanker Vapor Connection” refers to a fixed
The point connecting to the vapor collection hose or arm of the vapor collection device
refers to.
. “Terminal Vapor Connection” refers to a fixed
The point connecting to the vapor collection hose or arm of the START type collection device
says.
E. “Vapor Balancing” refers to the oil supplied due to the inflow of cargo
Through a vapor collection device into the tank of the facility discharging cargo from the ship's cargo hold
.
B. A “Vapor Collection System” refers to the release from a tanker’s cargo hold.
Collect the collected vapor and transfer it to the vapor processing unit.
It refers to pipes and hoses, etc. used to start.
Company. “Vapor Destruction Unit” refers to a means equivalent to an incinerator
It refers to a vapor treatment device that destroys cargo vapors.
A. “Vapor Dispersion Unit” refers to loading cargo or ballast
Through a vent device not located on the tanker while injecting or discharging water
It refers to a vapor treatment device that releases cargo vapors into the atmosphere.
J. “Vapor Emission Control System” refers to a system on an oil tanker
It refers to pipes and hoses, etc. used to control oil vapors collected from the start, and oil vapors
Includes a collection device and a vapor treatment device.
Vehicle. “Vapor Processing Unit” refers to oil collected from oil tankers
Refers to a component of a vapor control device that recovers, destroys, and disperses vapor.
K. “Vapor Recovery Unit” refers to absorption, adsorption, adhesion, and filtering technologies
or equivalent technology for recovering cargo vapors by a non-destructive method
refers to a processing device.
T. A “liquid knockout vessel” refers to separating liquid from vapor
.
Part. “Volatile organic compounds (hereinafter referred to as VOCs)”
It combines with nitrogen oxides (NOx) in the atmosphere to form a photochemical oxidant equivalent to ozone.
...and generates toxic substances that cause diseases in plants and the human body on Earth.
means that.
2. Exclusions
This standard shall not apply in any of the following cases.
a. In the case of being equipped with a volatile organic compound re-liquefaction facility
b. In the event of unexpected serious damage to the system
. In cases where temporary opening, etc. is required for regular inspection
3. Requirements for Replacement Facilities
Any person who intends to design or install a vapor emission control device differently from this standard shall provide alternative design and installation
must be submitted to the Head of the Regional Maritime Affairs and Fisheries Office for approval. In this case,
The evaluation report must include the following items.
a. Description of the overall system diagram
B. Identification of potential for fire and explosion
. Technical basis for ensuring the safety of a vessel or terminal
d. Technical basis indicating that the alternative design satisfies safety performance standards
E. Other materials that can be recognized as design-equivalent
4. System Overview
A. General Requirements
Not releasing volatile organic compounds generated on ships into the atmosphere and on land
, a manifold and a control device are required, and such equipment is cargo-related
, the vapor pipe device and the oxygen concentration measurement and monitoring device (the inert gas generator
(Applicable only to vessels equipped with), pressure monitoring devices, etc. must be installed. (See Figure 1)
B. Connection of the vessel's vapor pipe
1) A manually operable isolation valve shall be installed at the oil tanker vapor connection.
The operating location of this valve must be easily identifiable visually.
2) To prevent incorrect connection of the end of the vapor collection pipe or vapor collection hose
To do so, it must be marked in a way that allows for easy distinction.
3) Incorrectly connecting the vapor manifold to the terminal-side liquid loading line
To prevent connection, the vapor connection flange of each vessel is the vessel's
Regardless of the period, applying the International Council of Oil Companies and Maritime Funds (OCIMF) manifold standards
.
4) The vapor collection hose must be suitable for use and electrically continuous
, and must have extra holes according to the industry standards applicable to the flange.
5) The 1m end of the vapor pipe connection port must be painted red/yellow/red, and
The red band is 100 mm, the yellow band is 800 mm, and in black text 50 mm in size, “Payment
(VAPOUR)” must be present, and the upper part of the vapor pipe connection flange
, and the stud is
It shall be attached between the holes of the upper middle bolts of the flange. However, for domestic navigation
In the case of vessels engaged solely in the trade, English notation may be omitted.
5. Design Requirements for Volatile Organic Compound Treatment Facilities
A. General Requirements
1) General Requirements
a) The processing capacity is 50% of the capacity of a single system with the maximum capacity according to this table.
into two groups.
b) The design and installation of vapor discharge control devices shall address the risk of overflow and over/under pressure of oil tankers
risk of injury and ignition risk, and the above
Equipped with appropriate alarm and automatic control systems to prevent dangerous situations from occurring
In addition, it must be equipped with operating procedures to minimize operator error.
must.
) At the terminal, tanker cargo oil that may occur across the entire transfer capacity
It must be designed to allow for the continuous and safe operation of the steam generation rate.
d) Possibility of accommodating two or more mutually reacting volatile organic compounds
If is present, an independent pipe fitting must be provided.
e) Detonation arresters, flame arresters, or flame screens are marine and fisheries
Standards determined and notified by the Minister or standards established by the International Maritime Organization
Must be combined.
f) In cases where inert gas is used to avoid explosions, the International Maritime Organization
It must comply with the established standards.
The vapor manifold system must have electrical continuity, and grounding must be installed where necessary.
.
a) A pipe device transporting oil vapor capable of generating a polymer is a heating device and
must be equipped with facilities that can easily remove it.
2) Design Standard
a) The design pressure is the maximum operating pressure of the fluid in the pipe, and shall not be less than the following pressures
No, it doesn't work.
(1) A pipe device having a pressure drawing valve or an overpressure protection device in place of it
, a pressure equivalent to the regulating pressure of the relevant outlet valve or overpressure relief device
(2) In the compressor discharge side pipe, the discharge side valve is completely closed at rated rotation
Discharge pressure when crushed
(3) On the low-pressure side of a pipe equipped with a pressure reducing valve, a discharge valve is not attached
In the case of START, a pressure equivalent to the design pressure on the high-pressure side
b) The design temperature shall be the maximum operating temperature of the fluid inside the pipe. However, temperatures lower than room temperature
In the case of the pipe device of the START diagram, it shall be the minimum operating temperature of the fluid inside the pipe.
3) Design requirements
a) Pressure gauges, flow meters, and other important indicators used in the system are [on-site]
and remotely.
b) The alarm device shall use a visible and audible alarm, and the alarm sound shall be similar to that of a device
Each must have a different sound or form so as not to be confused with .
) The surface temperature shall not exceed 177℃, and a surface temperature exceeding 177℃
The surface must be insulated.
B. Design Requirements for Pipe Systems
1) General
a) The pipes and pipe fittings of the vapor emission control system shall be made of steel or equivalent approved materials
.
b) Pipes and pipe fittings used in vapor collection devices shall have a maximum allowable pressure of 15K
or higher.
2) Restrictions on the Use of Carbon Steel Pipes and Low-Alloy Steel
a) RST 338 and RST 342 have a design temperature of 450℃, and RST 349 has a design temperature of 425℃
.
b) RST 412 has a design temperature of 500℃, and RST 422, RST 423 and RST 424 are
Cannot be used in tubes exceeding 550℃.
) Carbon steel pipes for piping (KSD 3507, SPP) have a design pressure of 1 MPa or less and a design temperature
It can only be used in tube devices where the START is 230℃ or lower.
3) Calculated minimum thickness of the pipe
a) The calculated minimum thickness (t) of a straight pipe subjected to internal pressure follows the following formula.
: Strength Thickness
: Corrosion Pre-thickness
: Minus Manufacturing Tolerance(%)
b) When bending a tube, the calculated minimum thickness (tb) of the tube before processing is
Follows the following formula.
: As for the pre-thickness for bending (mm), it shall comply with the provisions of (d).
, and : Subject to the preceding subsection.
d) The strength thickness (t0) of the pipe follows the following formula.
: Design pressure (MPa)
: Outer diameter of the tube (mm)
: As allowable stress (), it shall comply with the provisions of e).
: As for joint efficiency, it shall be as follows.
(1) Seamless pipe: 1.00
(2) Electric resistance welded tube: 0.85 (provided, that which is recognized as equivalent to a seamless tube
, set it to 1.00.)
(3) Other welded pipes and butt welded pipes shall be determined as determined at the time.
d) The pre-thickness (b) for bending must be greater than or equal to that calculated according to the following formula. After processing
The minimum thickness of the bent portion of the tube is smaller than the calculated minimum thickness (t) of the straight tube.
should not.
: Outer diameter of the tube (mm)
: Radius of curvature of the centerline (mm). Provided, .
: As for strength thickness (mm), it shall comply with the provisions of subparagraph (c).
e) The allowable stress of carbon steel pipes or alloy steel pipes is, in principle, the minimum of the following values
.
: Standard minimum yield strength or 0.2% yield strength at design temperature (
: Minimum tensile strength at room temperature (
: Average breaking strength after 100,000 hours at design temperature()
. Amount of volatile organic compounds generated
1) Calculation of Generation Amount
a) The calculation of the predicted generation amount of vapors shall be expressed as a function of time, and the following matters
must be included.
(1) Flow rate of generated gas
(2) Temperature of generated gas
(3) Properties and state of the generated gas, i.e., C1, C2, C3, iC4, nC4, iC5, nC5, C6,
C7 etc
(4) Mixing ratio of VOC, methane, inert gas etc.
b) The generated gas is produced in the tank, passes through a pipe device, and is guided to the treatment facility.
with prediction of the amount generated in the tank according to the movement of fluid in the well
Temperature prediction of each part must be possible, and in particular, the loading and unloading conditions of the vessel must be high
must be calculated and adjusted with consideration.
) The amount of volatile organic compounds generated during the loading and unloading of a vessel (of organic compounds
) Calculate using the following formula.
: Total annual volatile organic compound emissions (kg/year)
0.1203: Constant (kg-mole×K/㎪×103ℓ)
S: Saturation Factor (Dimensionless, 1.0 for splash dropping and 0.2 for liquid level dropping)
P: Vapor pressure of cargo at temperature T (kPa)
M: Molecular weight of vapor (kg/kg-mole)
Q: Cargo Volume (1000ℓ/year)
T: Temperature (K)
d) Loading conditions, properties, condition and temperature of the cargo oil, loading rate, shape of the vessel, etc. occur
rate, the incidence rate according to all possible calculations
It must be predicted, and the basis for such calculations must be submitted at the time of application for inspection.
d. Calculation of pressure loss in vapor-related pipe systems
1) Pressure loss is the density of the Cargo Vapor-Air Mixture
Calculate through START (Density) calculation.
2) Pressure Loss Calculation Formula
a) The formula for calculating pressure loss is as follows.
: Pressure Drop
: Friction Loss Coefficient
: Length of Pipe
: Inner Diameter of Pipe
: Loss Coefficient of Pipe Fittings
: Density, )
: Mean Velocity
b) In equation a), the friction loss coefficient (f) is as follows.
: Friction loss coefficient
: Reynolds number
: Tube surface roughness
: Inner diameter of the tube
: Kinematic Viscosity of Fluid
c) In equation a), the pipe device loss factor is as shown in the table below.
┏━━━━━┯━━┳━━━━━━━━━┯━━┓
┃Classification │ ┃Classification │ ┃
┠─────┼──╂─────────┼──┨
┃90° bend │0.32┃Diffuser │0.58┃
┠─────┼──╂─────────┼──┨
┃Tee │1.40┃Reducer │0.35┃
┠─────┼──╂─────────┼──┨
┃Tee │0.38┃Butterfly Valve │0.9 ┃
┃ │ ┃(Butterfly valve) │ ┃
┠─────┼──╂─────────┼──┨
┃Tee │0.33┃FlameArrester │3.0 ┃
┃ │ ┃(Frame arrester) │ ┃
┗━━━━━┷━━┻━━━━━━━━━┷━━┛
d) In equation b), if the friction loss coefficient (f) is difficult to calculate, use 0.02
can be used.
E. Terminal Vapor Pipe Connection
1) Requirements for terminal vapor connection to prevent vessel overpressure
a) Remotely operated cargo vapor shut-off valves shall comply with the following requirements.
(1) To be installed as close as possible to the terminal vapor connection
(2) Manual operation may be possible
(3) It must be equipped with an opening/closing indicator
(4) The emergency cutoff signal will be cut off within 30 seconds after it sounds
(5) hydraulic or pneumatic so as to be automatically shut off even if the control signal is lost
, and shall be shut off within 30 seconds even in this case
(6) Emits an alarm during operation
b) The terminal vapor connector must be identifiable to prevent erroneous operation
and the connecting flange must conform to the standards for oil tanker vapor connections
.
d) Hose used to transport oil vapors must comply with the following requirements
.
(1) The maximum allowable pressure shall be 0.5 kg/㎠ or more
(2) Withstand a burst pressure of 4 times the maximum allowable pressure
(3) - No deformation under negative pressure of 0.2 kg/㎠
d) The vapor pipe of the terminal shall be equipped with pressure measuring equipment near the terminal connection port
must be checked. In this case, the operating status of the pressure measuring equipment must be verified before loading
...and must emit an alarm that the operator can see and hear. Also,
It must be linked with the operation of the emergency shut-off valve, and regarding operations such as cargo pump stoppage
and mutual agreement between the person in charge of the vessel's cargo transfer and the terminal manager
must exist.
e) To prevent the oil tanker from becoming overpressurized due to a malfunction of the onshore processing facility, reverse
It must be equipped with facilities equivalent to flow prevention equipment or overpressure protection devices, etc.
2) Requirements for Terminal Vapor Collection Devices
a) The handling capacity shall be at least 1.25 times the maximum cargo loading rate, and the occurrence on the vessel
sufficiently consider the capacity of inert gas supply rate, gas-free, etc.
must be. In addition, the generation rate of oil vapors in the ship's cargo hold at loading
Must be at least 25%.
b) In the case of a vessel, the capacity of the device is at the set pressure of the cargo hold's overpressure protection device
It must be maintained with a 20% margin, and under no circumstances should the vessel's...
The system pressure shall not be exceeded, and negative pressure shall not occur.
) The pressure connected to the onshore vapor collection pipe reaches from the vessel to the connection point
It must be corrected by considering the pressure drop in the tube, etc.
d) The pressure measurement location of the terminal vapor pipe is the pressure of the ship's vapor pipe, connecting hose, etc.
The force drop must be sufficiently considered.
e) A pressure indicator shall be installed in the vapor collection pipe system.
b) Compressors, blowers, etc. used to transfer oil vapor from oil tankers
, monitoring and safety devices to prevent negative pressure must be installed, and
The monitoring device emits an alarm when the set pressure is reached, and the compressor or blower
The transfer rate of START must be adjusted, and the emergency stop function when the allowable limit is reached is
must exist.
B. Protection from fire or explosion
1) As long as vapor is received from an inactivated cargo tank and processed by a vapor recovery device
connections recovers vapor from a vessel
Before starting, the vapor collector pipe must be filled with inert gas, and at least one
A continuously measuring oxygen concentration meter from the terminal vapor connector
It must be installed within 6m or equivalent measures must be taken.
2) As long as oil vapor is received from an inactivated cargo tank and processed by a vapor destruction device
connectors from the terminal vapor connector
Install a detonation arrester within a total piping length of 18m or deactivate the system
must be converted.
3) Receiving oil vapor from an uninactivated cargo tank and using a vapor recovery device or
Vapor emission control unit having only one connection processed by a vapor blasting device
value for detonation within a total piping length of 18m from the terminal vapor connection
must install a stopper or take measures to keep the system out of the explosion range
.
4) Oxygen and hydrocarbon analysis when gas concentration in the vapor control device reaches permissible limit
Install a safety device capable of automatically closing the vapor shut-off valve according to the START signal.
or equivalent measures must be taken.
5) Oil vapors collected from the vessel are transferred to the terminal's storage tank through a collection device
If a vapor balance type oil vapor control system is adopted, the following requirements apply:
Must combine.
a) The total piping length from the vapor connection port of each terminal not exceeding 18m as described above
A detonation arrester must be installed on the START unit.
b) Detonation as close as possible to the vapor return line of each terminal storage tank
A START arrester must be installed.
) Terminal storage tanks must be equipped with high-liquid level alarm devices and overload control devices
.
Except for vapor extinguishing devices, a flame arrester at the outlet of each vent device
Must be installed.
Company. Vapor Compressors and Blowers
1) At the inlet and outlet of vapor compressors and blowers handling oil vapors within the explosive range,
Must be equipped with one of the following facilities.
a) Detonation Arrester
or) Flame Arrester
) Explosion suppression equipment
2) If a reciprocating or screw-type compressor is used in the vapor collection device,
In the event that any of the following sounds occur, emit a visible and audible alarm and give instructions
Must be equipped with facilities capable of START.
a) Excessive rise in discharge gas temperature of each compressor room
b) Excessive rise in coolant temperature
) Excessive vibration
d) Decrease in lubricant level
e) Decrease in lubricating oil pressure
bar) Excessive rise in bearing temperature
3) When using a liquid ring-type compressor in a vapor collection device
emits a visible and audible alarm in any of the following cases, and
Must be equipped with facilities capable of giving instructions.
a) Low oil level of liquid sealing media
b) Flow rate reduction of liquid sealing medium
d) Excessive temperature rise of liquid sealing medium
d) Decrease in lubricant level
e) Decrease in lubricating oil pressure
bar) Excessive rise in bearing temperature
4) When using a centrifugal compressor, blower, or lobe blower in a vapor collection device
A non-flammable material must be used above.
A. Liquid Knockout Container
1) When a liquid knockout vessel is installed, the following facilities must be provided.
a) Equipment for identifying liquid level inside a container
b) High Liquid Level Alarm Device
d) In the event that the emergency low liquid level is reached, the vapor shut-off valve, compressor, and blower
Z
. Vapor recovery device and vapor destruction device
1) A vapor recovery device handling oil vapors within an explosive range shall have any of the following:
.
a) Detonation Arrester
or) Flame Arrester
d) Explosion suppression equipment
2) The inlet of the steam blasting device shall be equipped with the following facilities.
a) Liquid sealing device
b) Two emergency shut-off valves installed in series on a steam pipe
3) The installation standards for steam breaker devices are as follows.
a) It shall be installed at a distance of at least 30m from a vessel berthed on land.
b) Install a detonation arrester or flame arrester in the steam pipe system
) Alarm if Detonation Arrester or Flame Arrester detects flame
and emergency stop will be possible
4) In the event of an emergency stop or fire in the steam breaker, the emergency shut-off valve operates
must be.
. Electrical and Control Equipment
1) Terminal Danger Zone
a) At terminals, hazardous areas shall comply with the relevant regulations of the International Electrotechnical Commission (IEC)
is classified into three categories as follows, and according to the risk level, according to the following table
Explosion-proof facilities must be provided.
┏━━━━┯━━━━━━━━━━━━━━━━━━━━━━━━━━┯━━━━┓
┃ │Explosion-proof Equipment │Zone ┃
┠────┼──────────────────────────┼────┨
┃Ex d │Flameproof (Explosion proof) Enclosure] │1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex e │Increased Safety[Increased Safety] │1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex ia │Intrinsically Safe │0, 1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex ib │Intrinsically Safe │1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex o │Inrush explosion-proof[Oil Immersion] │2 ┃
┠────┼──────────────────────────┼────┨
┃Ex p │Pressurized Apparatus (Purged Apparatus)]│1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex q │Sand Cubic Explosive Type[Powder Filling (Sand Filling)] │2 ┃
┠────┼──────────────────────────┼────┨
┃Ex m │Molding Explosion Proof[Encapsulation] │1, 2 ┃
┠────┼──────────────────────────┼────┨
┃Ex n or │“N” type explosion proof [Non incentive or/and normally no │2 ┃
┃Ex N │sparking │ ┃
┃ │ circuits] │ ┃
┗━━━━┷━━━━━━━━━━━━━━━━━━━━━━━━━━┷━━━━┛
(1) Zone 0
A mixture of air and a flammable substance, such as gas or oil vapor, is continuously or
A place where prolonged exposure forms an explosive atmosphere
(2) Zone 1
A mixture of air and flammable substances, such as gas or oil vapor, during normal operation
Places that are occasionally exposed and form an explosive atmosphere
(3) Zone 2
A mixture of air and flammable substances in the form of gas or oil vapors during normal operation
does not occur but forms an explosive atmosphere upon short-term exposure
Place
2) Explosion-proof electrical equipment
a) Explosion-proof electrical equipment shall be IEC 60079 series (KS C IEC 60079 series) or
Must comply with standards equivalent to or higher than this, and must also comply with the provisions of this table
.
b) The constituent materials of the explosion-proof structure shall, with respect to the environmental conditions of the installation site and explosive gases
Must have sufficient electrical, mechanical, thermal and chemical resistance
.
The container and external parts of portable devices have a low risk of spark generation due to friction.
is a sturdy cover made of non-metal with a material or carrying strap attached
should be.
d) Insulating compounds and sealing compounds used in critical parts of explosion-proof structures during use
It must not cause harmful expansion, shrinkage, softening, or cracking, etc. during START.
and the compound filled in the exposed filling part must be flame-retardant.
e) Light transmission of lighting fixtures having pressure-resistant explosion-proof structure, safety-enhanced explosion-proof structure and pressure-resistant explosion-proof structure
In principle, sturdy metal guards shall be installed on the observation windows of the body and other devices.
Must install.
b) For explosion-proof electrical equipment, the type of explosion-proof structure and the type of target gas shall be clearly indicated
It must be specified, and the type and wattage of the suitable bulb must be indicated on the lighting fixture.
, and the standard ambient temperature for explosion-proof electrical equipment shall be 50℃.
3) Control and Safety Equipment
a) The power supply circuits of systems related to control and safety are power circuits and lighting circuits and
Must be separated.
b) Control systems, alarm systems, and safety systems shall, as far as possible, prevent one failure from other
It must be ensured that it does not escalate into a failure, and the scope of impeding the function
It must be designed according to the fail-safe principle to minimize it.
d) In principle, when control is performed hydraulically or pneumatically, one system
It must be designed so as not to cause abnormalities to the system even if the system is damaged.
d) Among control and safety devices, due to a power outage or system defect on the vessel or terminal
Equipment or devices capable of causing significant impact that are capable of operating in an emergency
must be equipped with a circuit or facility.
K. Work Procedure
1) Cargo Transfer Operation
a) Transfer operations must be discussed between the vessel's personnel and the terminal manager before commencement.
...and information exchange must take place even during the transfer operation.
b) Intrinsically safe two-way radio telephone for communication between the vessel and the terminal 2
A set must be provided.
d) The cargo transfer rate shall be discussed in advance with the vessel, taking into consideration the terminal's vapor transfer capacity, etc.
It must be adjusted according to the transfer rate based on .
d) The maximum allowable transfer rate shall not be greater than the maximum vapor transfer rate.
2) Before receiving volatile organic compounds from a vessel, verify and record the following
must.
a) Effectiveness tests of all alarm devices and cutoff devices shall be performed.
b) Shut-off and operation of all relevant valves on the vessel and terminal sides related to the vapor supply system
The operating status must be checked.
3) The following matters shall be verified and recorded in accordance with prescribed procedures.
a) Important analyzers used within the system must be calibrated according to established procedures
...and in accordance with calibration by a nationally recognized calibration and inspection agency or approved span gas
It must be corrected according to the method and the record must be maintained.
b) The person in charge shall periodically verify the contents of the records regarding the vapor emission control device
must be due to.
4) Work Procedure
a) On the terminal, work procedures and practical guidelines written in a language understandable to the operator
and reference drawings must be kept on file, and the work procedure manuals must include
Includes provisions regarding responsibility in emergency situations and emergency measures, etc.
must.
b) Matters related to emergency measures shall be diagrammed so that users can easily understand them
It must be provided and posted in a conspicuous place at each worker's work location.
must.